HomeMy WebLinkAbout07/20/2010, C5 - SEWERLINE REPLACEMENTS 2010-11, SPECIFICATION NO. 90787 council. M tmg 'July 20,2010
j acEnaa REpoRt 6.N..b,
CITY OF SAN LUIS OBISPO
FROM: Jay D. Walter, Director of Public Works JOW
Prepared By' Jennifer Lawrence, Engineering Technician III
SUBJECT: SEWERLINE REPLACEMENTS 2010-11, SPECIFICATION NO. 90787
RECOMMENDATIONS
1. Approve the plans and specifications for the "Sewerline Replacements 2010-2011" project,
Specification No. 90787.
2. Authorize staff to advertise for bids and authorize the City Manager to award the contract if
the lowest responsible bid is within the Engineer's Estimate of$533,190.
DISCUSSION
Replacement of wastewater collection pipes is part of an ongoing program to replace aging,
deteriorating, or otherwise troublesome sewer iinfrastructure. This program has several objectives.
Among them are:
1) Replace aging,deteriorated, deficient,or otherwise troublesome sewer infrastructure
2) Reduce or eliminate periodic maintenance requirements and emergency repairs
3) Reduce infiltration and inflow of storm,water
4) Ensure uninterrupted sewage flow without health hazard or effluent leakage
This project will accomplish these objectives for part of the City wastewater collection system.
The scope of this project includes replacing sewerlines at sections of Pacific, Pismo, Santa Rosa
and Toro Streets. The existing sewerlines in Pacific, Pismo and Santa Rosa Streets are failing due
to age. They also require high levels of maintenance and are at capacity. These lines will be
replaced and upsized to 10" diameter pipe to better accommodate existing service requirements.
The existing 6" sewerline in Toro Street also requires frequent maintenance, but will be replaced
with a new 6"pipe as service requirements for that line are not projected to increase.
CONCURRENCE
The Community Development Department has given this project a categorical exemption from
environmental review.
W -
Sewerline Replacements 2010-11 (90787) Page 2
FISCAL IMPACT
Sewer Fund
The replacement locations are identified in the 2009-11 Financial Plan, Appendix B, page 3-113.
The section of Osos Street from Pacific to Marsh identified for construction is included in the
downtown project currently under construction. These sewerline replacements will be funded
from the Wastewater Collection System Improvements Master account. Currently, there is
$2,213,700 in the Master Account which is sufficient funding to support the project costs. Staff
recommends transferring funding from the Master Account to the project account at time of
contract award, based on construction bid amounts.
Construction Management and Inspection Services
The Sewerline Replacements 2010-11 project budget does not include funding for construction
management services. Based on the expected workload for current City inspection staff during
the summer months and the suitability of this project for contracted construction management,
staff is recommending adding funds from the Wastewater Collections System Improvements
Master account in the amount of $52,000 to fund construction management and inspection
services for this project.
The construction scheduled for this summer and fall is the product of the 2007-09 and 2009-11
Financial Plans which funded an aggressive Capital Improvement Program. As the work from
these Capital Improvement Projects are completed, the need for contract construction
management should be reduced. As workloads return to prior levels, construction management
will be largely manageable by regular staffing resources.
SEWERLINE REPLACEMENTS 2010-11 (9078�)
Estimated Project Costs
Construction(Engineer's Estimate): $533,190.00
Construction Contingencies: $80,000.00
1Totalfor Construction: $613,190.00
Contract Inspection:. $52,000.00
Materials Testing; $10,000.00
Miscellaneous (incl printing) $500.00
Total for other costs: $62,500.00
Total Cost o Project $6759690.00
Master Collect Syst Account (90239)
Available Funding: $2,213,718.21
cS-�
\` J
Sewerline Replacements 2010-11 (90787) Page 3
ATTACHMENT
Vicinity Map
AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE
Plans and Special Provisions
T:\Council Agenda Reports\Public Works CAR\2010\aP\90787 Sewerline Replacements 2010-11\90787 CAR adv.doc
C6
ATTACHMENT
OE
o m zt
z
LnV
O 4,
s�
F v� (O
/o �Fgcyoo NA BDNiTq
vn
0_ o A I D DR.
m o
\ _ HI)
col
S
\ m � ADR.
a A 'DR. a
/ " tz=' LUpljAJI —
IA-SAN
pRq�O _
z NP\,A A
PRADO
0
��' ��
v BDNETTI
/ 4� `� J
v�ZF GRANADA v�
R — �J
MApRCH qC /NF 019 �Q�MEISSNER
M R R qp�OR 0 Z HIND
CANT£R 0� OR ,`Z
MD �RRY a �O J
0
cy�RF S�FD TANK FARM
ss9 777=TANK
CROSS
�S
H PARR A
0
PROJECT SCOPE
Higuera Street: Prado - Margarita N
Margarita Avenue: South Higuera - Estelita
city Of HIGUERA- MARGARITA RECYCLED WATERLINE
SPECIFICATION NO.90915
San lui S OBI SPO LOCATION MAP CS
counat memoRAnbum
July 19, 2010 REG iVED
TO: City Council JUL i 9 2Q10
FROM: Jay D. Walter, Public Works Director SLO CI [Y CLERK
VIA: Katie Lichtig, City Manager
SUBJECT: RED FILE- Sewerline Replacements- Item C-5
The staff report that was included in the Agenda packet for this item had a vicinity map that
referred to Recycled Water Line improvements Item C-7. Attached please find the correct
vicinity map for Item C-5. If you have questions, please contact Public Works Director Jay
Walter.
Attachment
Vicinity Map— Sewerline Replacements 2010-2011
T:\Council Agenda ReportsTublic Works CAR\2010\CIP\90787 Sewerline Replacements 2010-11\Red File 7-20-10.doc
RED FILE
- 6VIWING AGENDA
DA lb rrEM #
hRt L.
COUNCIL I CDD DIR
CA&C3-1 FIN DIR
Ami®RCI FIRE CH'
ATTORNEY PW D:
CLERK/ORIG POucF
❑ DEPT HEADS RE% I:'
JZ IJTI:
r c
14 nGNI TtMC5 aCuNui_
a CM
13 CLW-V-
ATTACHMENT 1
o PHILLIPS
o EACH
`9
Q
KENDR
��III�IIIIIIII����������IIIIII�IDI�IIIIII�III�II� Clty of VICINITY MAP
San WIS OBISpo SEWERLINE REPLACEMENTS 2010-2011
SPEC. N0. 90787