HomeMy WebLinkAbout07/20/2010, C8 - CITY HALL ROOF REPAIRS, SPECIFICATION NO. 90778 council ti6,Dluly 20,20 10 j acjcnaa wpoRt 6.Num6u CITY OF SAN LUIS OBISPO FROM: Jay D. Walter, Director of Public Work r Prepared By Michael J. McGuire, Engin e//��t� r III SUBJECT: CITY HALL ROOF REPAIRS, SPECIFICATION No. 90778 RECOMMENDATIONS 1. Award a contract to Tecta America Sacramento Inc. for the "City Hall Roof Repairs, Specification No. 90778"and authorize the City Manager to execute the agreement. 2. Approve a transfer of$15,000 from the project construction management account to the project construction account. 3. Approve a transfer of $5,000 from the General Fund CIP Reserves account to the project construction account. 4. Authorize the Director of Public Works to record the Notice of Completion within five days of completion of the project. DISCUSSION Background Over the past several years, there have been numerous water leaks in City Hall that have caused damage to various wall and ceiling areas. After the San Simeon earthquake in December 2003, the water leaks became more pronounced and frequent. A Roof Leak Analysis Report was prepared that revealed the current roofing system is inadequate to provide correct protection for the building and discovered some problems with the roofing components, which resulted in the advanced deterioration of the roof and subsequent water intrusion into the City Hall building. Staff determined from this report that the roof would require complete replacement. On June 1, 2010, the City Council authorized inviting bids for the "City Hall Roof Repairs, Specification No. 90778". Bids were opened on July 1, 2010 and five bids were received. Only one bid was lower than the Engineer's Estimate of $250,000, with Wicks Roofing of San Luis Obispo being the lowest bidder at$178,169. On July 7, 2010, Wicks Roofing notified the City that they were withdrawing their bid due to clerical errors in their bid price. The next apparent lowest bidder was Tecta America Sacramento Inc. at $299,500, exceeding the Engineer's Estimate. Staff is satisfied with this bid as it is within 5% of the three middle bidders and reflects recent materials cost increases. Also, Tecta America is one of the largest commercial roofing contractors in the United States. Bidder Bid Price Engineer's Estimate $250,000 Wicks Roofing 178,169 Tecta America Sacramento Inc. 299,500 F. Rodgers Specialty Contractor 309,718 C��1 Cool Roofing Systems,Inc. 313,116 l.0 Best Contracting Services, Inc. 389,000 C C City Hall Roof Repairs-Spec No.90778 Page 2 FISCAL IMPACT The 2007-09 Financial Plan, Appendix B, pages 3-528 to 3-532, originally identified $360,000 for construction and $20,000 for construction management for this repair project. When this project was starting the design phase in 2009, the funds in the construction management account were transferred into the design account to fully fund design consultant fees. At the time of advertising this project, $50,000 was transferred from the construction account back into the construction management account as it was determined that inspection for the project could not be done by in-house staff due to a large and demanding construction schedule this summer. Since that transfer of funds, Public Works has received a proposal from one of the City's construction management consultants identifying the cost of this construction management work at $35,000 and the therefore the remaining $15,000 is available to be transferred back into the construction account. To fully fund the project construction, $5,000 is needed from the General Fund CIP Reserves account. Currently, there is $482,013 in the General Fund CIP Reserves account but with the June 15, 2010 Council adopted budget, $442,100 of this funding has been identified to help balance the General Fund budget gap, leaving $39,913 to support this request of$5,000. Project Budget $ 360,000 Construction: $ 299,500 Construction Contingencies: 30,000 Total for Construction: $329,500 j Printing/Advertising. $__500 Construction Mgmt& Inspection: 35,000 Total for other costs: $ 35,500 Total Cost of Project 5365,000 ALTERNATIVE Deny approval for award. The City Council could choose to deny the approval for award. Staff does not recommend this alternative. Should the approval for award be denied or deferred, roof repairs for City Hall will be delayed and subject to additional water leakage into the building during the rainy season, resulting in water damage to the building's contents, lost work productivity of the staff and continued use of maintenance staff for repair and cleanup. ATTACHMENTS 1. Council Agenda Report, authorizing advertising. 2. Contract Agreement, Tecta America Sacramento Inc. 77 T:\Coundl Agenda Reports\Public Works CAR\2010\CIP\90778 City Hall Roof Repairs\90778 CAR Award.doc Attachment 1 council MTiND1une 1,20 10 j ac;Enc*)A aEpoat CITY O F SAN LUIS O B I S P O FROM: Jay D. Walter, Director of Public Works 9D'W Prepared By: Michael J. McGuire, Engineer III SUBJECT: CITY HALL ROOF REPAIRS, SPECIFICATION No. 90778 RECOMMENDATIONS 1. Approve plans and specifications for "City Hall Roof Repairs, Specification No. 90778". 2. Authorize staff to advertise for bids. 3. Authorize the City Manager to award a construction contract if the lowest responsible bid is less than the Engineer's Estimate of$250,000. 4. Approve a transfer of$50,000 from the project construction account to the project construction management account. DISCUSSION Background Over the past several years, there have been numerous water leaks in City Hall that have caused damage to various wall and ceiling areas. After the San Simeon earthquake in December 2003, the water leaks became more pronounced and frequent. To assist in determining the best approach to address the problems, staff hired a roofing consultant, Architectural Roof Design Group (ARDG),to investigate and report their findings. The Roof Leak Analysis Report, prepared by ARDG, revealed that the current roofing system is inadequate to provide correct protection for the building and discovered some problems with the roofing components, which resulted in the advanced deterioration of the roof and subsequent water intrusion into the City Hall building.. Staff determined from this report that the roof would require complete replacement. ARDG was retained as design consultant for roof repairs to City Hall and have prepared plans and specifications that include the removal of the existing clay tile roofing, placement of new membranes and coatings for proper sealing of the roof deck and mechanical equipment and a more secure hold-down for the clay tiles. CONCURRENCES This project has been determined to be Categorically Exempt under the California Environmental Quality Act(CEQA)by the Community Development Department. FISCAL IMPACT The 2007-09 Financial Plan, Appendix B, pages 3-528 to 3-532, originally identified $360,000 for construction and $20,000 for construction management for this repair project. Currently, there is only $360,000 available in the construction account. When this project was starting the CF-3 Attachment 1 City Hall Roof Repairs—Spec No.90778 Page 2 design phase with ARDG in 2009, the funds in the construction management account were transferred into the design account to fully fund design consultant fees. As part of departmental budget reduction measures, it was intended that inspection for the project would be done by in- house staff. It is anticipated there will be a large and demanding workload for the Public Works Inspection Division this summer, such that consultant construction management services will be needed to provide sufficient construction inspection for this project. Staff is recommending that $50,000 be transferred from the construction account into the construction management account to fully fund construction management and inspection services. Due to the ongoing favorable bid climate, staff believes that the remaining funding of$310,000 in the construction phase will be adequate to fund the construction contract. City Hall Roof Repairs BUdget Construction Budget $ 360,000 t Construction: $ 250,000 Construction Contingencies 25,000 Total for Construction: — $275,000 Printing_._._._._....-- — $ 1,000..1 Construction Mgmt& Inspection: 50,000 Total for other costs: $ 51,000 i 3 Total Cost of Project $326,000 ALTERNATIVE Deny approval for advertising. The City Council could choose to deny the approval for advertising. Staff does not recommend this alternative. Should the approval to advertise be denied or deferred, roof repairs for City Hall will be delayed and subject to additional water leakage into the building during the rainy season, resulting in water damage to the building's contents, lost work productivity of the staff and continued use of maintenance staff for repair and cleanup. AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Plans & Specifications. T:\Council Agenda Reports\Public Works CAR\2010\CiP\90778 City Hall Roof Repairs\90778 CAR Adver[ise.doc CF - Attachment 2 CITY OF SAN LUIS OBISPO CALIFORNIA AGREEMENT THIS AGREEMENT, made on this day of 2010, by and between the City of San Luis Obispo, a municipal corporation and charter city, San Luis Obispo County, California, hereinafter called the Owner, and Tecta America Sacramento Inc., hereinafter called the Contractor. WITNESSETH: That the Owner and the Contractor for the consideration stated herein agree as follows: ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be performed, shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required to complete all the work of construction of City Hall Roof Repairs,Specification No. 90778 in strict accordance with the plans and specifications therefore, including any and all Addenda, adopted by the Owner, in strict compliance with the Contract Documents hereinafter enumerated. It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed and completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives. ARTICLE H, CONTRACT PRICE: The owner shall pay the Contractor as full consideration for the faithful performance of this Contract, subject to any additions or deductions as provided in the Contract Documents,the contract prices as follows: Item Total (in figures) Roofing replacement and repairs of the existing City $299,500.00 Hall building per the Contract Documents. CONTRACT TOTAL $299,500.00 Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the documents made a part of this Contract: CR �� - Attachment 2 Should any dispute arise respecting the true value of any work omitted, or of any extra work which the Contractor may be required to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, said dispute shall be decided by the Owner and its decision shall be final,and conclusive. ARTICLE III, COMPONENT PARTS OF THIS CONTRACT: The full, complete and exclusive contract between the parties hereto shall consist of the following identified documents (the "Contract Documents") all of which are as fully a part thereof as if herein set out in full, if not attached, as if hereto attached: Notice to Bidders, Instructions to Bidders, Information Available to Bidders, Proposal Form, Listing of Subcontractors, Non-Collusion Declaration, Bidder's Bond, this Agreement, Escrow Agreement for Security Deposits in Lieu of Retention, Performance Bond, Payment Bond, Insurance Requirements, Guarantee of Work, Release, General Conditions, Specifications, Standard Specifications, Engineering Standards drawings, any addenda, and any change orders, field orders or directives issued pursuant to and in accordance with this Agreement. ARTICLE IV, CONFLICTS: It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE V, BINDING AGREEMENT; ASSIGNMENT: Contractor, by execution of this Agreement and the other Contract Documents, understands them, and agrees to be bound by their terms and conditions. The Contract Documents shall inure to the benefit of and shall be binding upon the Contractor and the Owner and their respective successors and assigns. ARTICLE VI, SEVERABILITY: If any provision of the Contract Documents shall be held invalid or unenforceable by a court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision hereof. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date first above written. CITY OF SAN LUIS OBISPO, A Municipal Corporation Katie Lichtig, City Manager APPROVED AS TO FORM: CONTRACTOR J. Christine Dietrick Michael McClain, President City Attorney Tecta America Sacramento Inc. LO