Loading...
HomeMy WebLinkAbout07/20/2010, C9 - VARIOUS TRAFFIC SIGNAL MODIFICATIONS, SPECIFICATION NO. 91021 council Ma* July 20,2010 j acEnaa nEpmt 1�N.,b� G CITY OF SAN LUIS O B I S P O FROM: Jay D. Walter, Director of Public Workga Prepared By: Jake Hudson, Traffic Operations Manager Matt Crisp, Engineer II - Traffic SUBJECT: VARIOUS TRAFFIC SIGNAL MODIFICATIONS, SPECIFICATION NO. 91021 RECOMMENDATIONS 1. Approve plans and specifications for`Various Traffic Signal Modifications, Specification 91021''. 2. Authorize staff to advertise for bids 3. Authorize the City Manager to award a contract for Various Traffic Signal Modifications, Specification No. 91021, if the lowest responsible bid is within the Engineer's Estimate of$107,900 4. Approve the transfer of$23,732 from the Traffic Safety Report Implementation account to the project's construction account. 5. Approve the transfer of$86,668 from the Traffic Operations Implementation Account to the project's construction account. DISCUSSION As part of the City's Annual Traffic Safety & Bi-Annual Traffic Operations Report presented to City Council on September 15, 2009, the Council approved various congestion relief and traffic safety mitigation strategies. This project is the implementation of various minor measures identified in those reports. These modifications and upgrades are all strategic measures designed to improve operations and safety at each of these locations: o Chorro & Marsh and Osos & Pismo Intersections — Staff identified a collision pattern involving red light violations at these intersections. The intent of the project is to improve signal indication visibility by replacing the existing 8" vehicle head with 12" vehicle heads and adding pedestrian heads to the intersection. o Higuera Street and Broad Street - Staff identified a collision pattern involving permissive left turns and pedestrians. The intent of this project is to improve pedestrian visibility by adding pedestrian heads and replacing the existing 8" signal heads with 12" signal heads. o Calle Joaquin and Los Osos Valley Road - Staff identified a collision pattern involving eastbound rear-ends at this intersection. The intent of this project is to improve signal indication visibility for Eastbound traffic by adding a nearside signal head. o Broad & Pismo and Broad & Buchon Intersections — Staff identified an operational inefficiency at both of these intersection involving a lack of vehicle detection causing Various Traffic Signal Impr.,Specification No.91021 Page 2 unnecessary delays to Buchon & Pismo streets primarily during off-peak hours. The intent of this project is to reduce side street delay by installing video detection. FISCAL IMPACT The 2009-11 Financial Plan, Appendix B, Pages 3-162 to 3-164, identifies an annual allocation of$25,000 for implementation of the Annual Traffic Safety Report. The current balance of the Traffic Safety account is $23,732. The Traffic Safety Report Implementation is partially funded by Measure Y sales tax revenues. At its July 15, 2008 meeting, the Council appropriated an additional $1,642,000 in approved State Highway Account (SHA) grant funding for eligible traffic signal upgrades. Of the SHA grant funding, $165,000 has been allocated for implementation of the Bi-Annual Traffic Operation Report. With the inclusion of miscellaneous design services, the current balance of the Traffic Operations Report account is $158,911. Staff recommends transferring $23,732 of Traffic Safety Account funds and $86,668 Traffic Operations Report funds to the Various Traffic Signal Improvements project account. This budget transfer will provide the Various Traffic Signal Improvements with $110,400, which is sufficient to support construction of this project. Following the budget transfer there will be $0 remaining in the Traffic Safety Account and $72,243 remaining in the Traffic Operations Report account. Any remaining funds following the conclusion of the project will be returned via a Budget Amendment Request to the originating accounts. Fiscal Impact Summary Current Proposed Change Various Traff Sig Impr(910 1) - 110,400 110,400 Traffic Safety Report(90558) 19,232 - (19;232) Traffic Ops Report(90884) 158,911 67,743 (91,168) Total 178,143 1 178,143 0 The total project costs for the Various Traffic Signal Improvement account, Specification No. 91021 is are provided below. C f— � Various Traffic Signal Impr.,Specification No. 91021 Page 3 Project ENGINEER'S ESTIMATE $ 107,900 Traffic Safety Report(90558) $ 19,232 Traffic Operations Report(90884) $ 158,911 Construction $ 83,000 Total Available: $ 178,143 15%Contingencies $ 12,450 15%Construction Management $ 12,450 90558 Transfer to Project Account $ 19,232 90884 Transfer to Project Account $ 91,168 Misc.(PGE Permitting, Printing, Etc.) $ 2,500 Total Project Funding: $ 110,400 Total Project Cost: $ 110,400 Remaining Funding: $ 67,743 ALTERNATIVE Deny or Defer Construction of the Various Traffic Signa! Modifications, (91021). The City Council may choose to deny or defer the construction of traffic signal upgrades until a later date. However, staff does not recommend this alternative because without these measures these locations will continue to experience high traffic congestion levels and collisions will continue to occur. In addition, staff anticipates construction costs will continue to increase over time. If construction is deferred, construction costs will likely increase and compromise the ability to construct the various improvements. ATTACHMENT Vicinitv Map COUNCIL READING FILE Project plans and specifications are available for review in the Council reading file. t\council agenda reports\public works car\2010\transportation\91021 various traffic signal improvements\91021 car-advertise.doc � n C/— ATTACHMENT t PROJECT LOCATIONS N PROJECT LOCATIONS C"Of i SMWISOBISPO VICINITY MAP Public Works Department n C� 919 Palm Street, San Luis Obispo, CA 93402 (.