Loading...
HomeMy WebLinkAbout05/03/2011, C 3 - MICROSURFACING SUMMER 2011 MEASURE Y PROJECT, SPECIFICATION NO. 91041 & STREET RECONSTRUCTION SUMME council 5/3/2011 j aGEnaa Report CITY OF SAN LUIS OBI SPO FROM: Jay D. Walter, Director of Public Works 7D1W Prepared By: Manny Guzman, Engineer II SUBJECT: MICROSURFACING SUMMER 2011 MEASURE Y PROJECT, SPECIFICATION NO. 91041 & STREET RECONSTRUCTION SUMMER 2011 MEASURE Y PROJECT, SPECIFICATION NO. 91040. RECOMMENDATIONS 1. Approve plans and specifications for the Microsurfacing Summer 2011 Project, Specification No. 91041. 2. Approve plans and specifications for the Street Reconstruction Summer 2011 Project, Specification No. 91040. 3. Authorize staff to advertise for bids and authorize the City Manager to award the contract if the lowest responsible bid for the Microsurfacing Summer 2011 Project is within the Engineer's Estimate of$940,000. 4. Authorize staff to advertise for bids and authorize the City Manager to award the contract if the lowest responsible bid for the Street Reconstruction Summer 2011 Project is within the Engineer's Estimate of$1,245,400. DISCUSSION The City's Pavement Maintenance Plan (PMP)was adopted by the City Council on April 14, 1998. The key elements of the PMP include establishment of eight pavement maintenance areas within the City and a maintenance plan in which each of these eight areas will receive maintenance over an eight-year period. A ninth area, the downtown, is designated to receive maintenance on an annual basis. On October 6, 2009 Council gave new direction for the PMP to give a higher priority to arterial and downtown streets. Since 2006, ten projects have been completed that repaired portions of twenty- one arterial roadways (Attachment 2). In the 2011-12 fiscal year, the Street Reconstruction and Microsurfacing projects will overlay or microsurface portions of Foothill, Santa Rosa, Broad, Higuera, Osos and Tank Farm Road. Also scheduled for reconstruction under separate contracts in the 2011-12 fiscal year are Chorro between Palm and Higuera, Johnson between Islay and Lizzie, and Johnson between Pismo and Breck. Due to waterline replacement work, Santa Barbara Street is not included in this year's work plan, but is planned in 2012. All these streets are classified as arterial streets by the City's Circulation Element. In anticipation of the 2011-12 fiscal year's microsurfacing project, the City's Street Maintenance staff has performed isolated pavement repairs and crack sealing on the streets included within the scope of the specified microsurfacing project. This preparatory work is now complete and will CM Microsurfacing &Street Reconstruction Summer 2011 Projects Page 2 increase the long-term effectiveness of the microsurfacing application and reduce the construction costs. Microsurfacing is.a polymer modified cold-mix paving system that uses a quick set emulsion and can be ready to support traffic in a few hours. Microsurfacing estimated costs are about 11.5% of the cost of a 2 inch asphalt overlay, and 2.3% of the cost of complete reconstruction. Microsurfacing works by sealing the pavement and subgrade from water intrusion and providing some additional wearing surface. Regular use of microsurfacing can postpone more expensive reconstruction work for significant periods of time. The project also includes some drainage work. Three catch basins on Higuera between Bridge and Vachell Lane will be upgraded to the current City standards. Existing catch basins are top opening structures with metal grates in the bike lane which have been identified as roadway obstacles by the bicycling community. On Lawrence Drive several hundred feet of curb and gutter will be removed and replaced with a grated line drain. Trees that have since been removed lifted the curb and gutter resulting in poor street drainage. A continuous grated line drain connected to a new catch basin will help to alleviate the ponding that occurs in this area. Also included with the reconstruction project is the localized repair of curb, gutter, and sidewalk in front of 1441 Nipomo and 1129 Pacific. In both locations trees have lifted the curb and gutter resulting in poor street drainage. The driveway ramp at 1441 Nipomo will also be repaired to match the new grades of the replaced curb and gutter. Neglecting repairs of the curb and gutter and the driveway ramp will result-in water ponding and could reduce the service life of the new paving surface. Americans with Disability Act (ADA) accessible curb ramps required by law for street reconstruction work will also be upgraded as part of the street reconstruction. A total of 26 existing street comers will be retrofitted with new curb ramps or truncated domes to meet current ADA standards. This work is in addition to two other curb ramp projects schedule for construction this summer. CONCURRENCES The project qualifies for a categorical exemption from environmental review, and a notice of exemption has been filed through the Community Development Department for both the Microsurfacing Summer 2011 project and the Street Reconstruction Summer 2011 project. FISCAL IMPACT There is currently $1,068,227 in the Street Reconstruction & Resurfacing Master Account and additional construction funding of$1,450,000 (the construction portion of the $1,700,000 request for 2011-12) is proposed in the 2011-13 Financial Plan. If approved, this additional funding will bring the total funding available to $2,518,227 to support this request for$2,514,500 ($1,080,750 for 91040 & $1,433,750 for 91041). Also, there is a current available balance of $101,535 from the Bicycle Facility Improvement project that can be used to support the $22,000 portion of the 91040 project and the $440 portion C3-2 Microsurfacing &Street Reconstruction Summer 2011 Projects Page 3 of the 91041 project. This funding will be utilized to upgrade three catch basins and the revisions to the drainage inlet grates. For the 91041 projects, water and sewer utility improvement budget is currently available in the Water Distribution System Improvements Master account (current balance of$407,885) and the Collection System Improvements Master account (current balance of $190,836) to fund the proposed costs of $24,000 and $3,500, respectively. This funding supports the adjustment of water and sewer facilities to the new pavement elevations. The Street Reconstruction and Microsurfacing projects will not be awarded until after the start of the new fiscal year, 2011-12. By the time bids are received, Council will have concluded the budget process. If Council has funded the 2011-13 Street Reconstruction & Resurfacing Master Account at the time of contract award, a Budget Amendment Request will be generated to transfer funding to the appropriate project's account for construction. If this funding has not been approved, staff will recommend rejection of bids and re-advertising of a smaller project. This project is 98% funded through Measure Y, the half-cent sales tax measure approved by the City's residents. Estimated Project Cost by Funding Sources Nlicrosurfacino Sunini-er 2011 Project (91040) Street R& R Master Bicycle Account(90346) Facility Impr. Total (90572) Construction Estimate: $920,000 $20,000 $940,000 Contingencies: $92,000 $2,000 $94,000 Construction Management: $65,000 $0 $65,000 Material Testing: $3,000 $0 $3,000 Printing: $750 $0 $750 Total for Construction: $1,080,750 $22,000 $1,102,750 C3-3 Microsurfacing&Street Reconstruction Summer 2011 Projects Page 4 Estimated Project Cost by Funding Sources Street Ileconstroction Stininier 2011 Project (91041) Sewer Bicycle Water Collection Street R& R Master Facility Impr. Distribution System Total Account(90346) (90572) System Improve Improve Master(90227) Master 90239 Construction Estimate: $1,220,000 $400 $22,000 $3,000 $1,245,400 Contingencies: $124,000 $40 $2,000 $500 $126,540 Construction Management: $85,000 $0 $0 $0 $85,000 Material Testing: $4,000 $0 $0 $0 $4,000 Printing: $750 $0 $0 $0 $750 Total for Construction: $1,433,7501 $4401 $24,0001 $3,5001 $1,461,690 Total Proposed Costs for both 91040&91041 : $2,514,500 Funding Available by Fund: $2.518,227 $101,535 8407,885 $190,836 General TIF Water Sewer ATTACHMENTS 1. Location Map 2. Map of arterial roadway work AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Plans and Specifications T:\Coundl Agenda Reports\Public Works CAR\2011\CIP\91040 Street R&R Summer 2011\91041 CAR Advertise.doc. C3-4 � G Q � PHILPS = 9AP2 Qu ATTACHMENT 1 o P F moa Q _ O 1 M I 1 o O JTH I 1 Q Q 1 N LTON N p j QPO v V- S.4 � ayg`'� o � � ROMAULDO nypP �yJc^ S9 2 m P F 10 G d ILL w4 (2 � NAI � a �P"s Srn d` f xNIrER DESER JROUG 'H I RAMONA M INECKE nlcH Qp ,ix 0 3 SOUTH ® CE fP9 `➢' �h faP s � o h� ��a RRIDGE � - y � 8 �❑D � � C�� J J COfl9M OODBRIOGC O'q, SINSHEIMER PMK �g _ R � 0 �� 5 MITCHELL � � �cf <\� "� �p� V WREx 0 MOR p WH DM0 a J ORCUTT 5 ORCU - 'ULPDy ,tPf =w�A PRADO p 2l� q T V� �' BONEIP NOFNINS PP 4p , MEISSNER N G4 V Z NINA O clwt ti R Cpp•e.r TANK ARM EPM 7 TANK FARM ROSS kp PARROSA ¢'< 0' SUDURB+N FlOtO W' S � AMDRDsu pNAP COUIENflOD v9k Pte' BP oo LEGEND STREET RECONSTRUCTION& Q 2011 STREET RECONSTRUCTION MICROSURFACING SUMMER 2011 PROJECTS 2011 MICROSURFACING C3-5 ATTACHMENT 2 tb I P—w i P ,0`T 1 Com® M* `WO � `f ® o� O e y�J omn 4 9 I � NNPONf 3 PAST ARTERIAL ROADWAY WORK C3-6