HomeMy WebLinkAbout05/03/2011, C 9 - GRAND AVENUE/HIGHWAY 101 TRAFFIC SIGNAL INSTALLATION, SPECIFICATION NO. 90876 council "May 3,2011 j agenba wpoM c CITY OF SAN LUIS O B I S P O FROM: Jay D. Walter, Director of Public Works 9VW Prepared By: Matt Crisp, Engineer II -Traffic Division SUBJECT: GRAND AVENUE/HIGHWAY 101 TRAFFIC SIGNAL INSTALLATION, SPECIFICATION NO. 90876 RECOMMENDATIONS 1. Approve the plans and specifications for the "Grand Avenue/HWY 101 Traffic Signal" Project, Specification No. 90876. 2. Authorize staff to advertise for bids and authorize the City Manager to award the contract if the lowest responsible bid is within the Engineer's Estimate of$225,000. DISCUSSION In 2007, the California Department of Transportation (Caltrans) approached City staff requesting assistance in signalizing the intersection of Grand Avenue and Highway 101. This intersection is primarily under State jurisdiction. Caltrans first found this intersection met the criteria justifying signalization in May 1993; however, Caltrans postponed signalization of this intersection to allow for further review. In March 2007, Caltrans once again found that this intersection met the criteria justifying signalization and began working with the City to initiate the project. In April 2007, as part of a joint effort with the Caltrans, City staff applied for Federal Highway Safety Improvement Program (HSIP) grant funding and the grant was awarded to the City in 2008. The City Council approved this project with the Council Agenda Report on July 15, 2008 and as part of the 2008 Annual Traffic Safety Report. Project design work began in May 2009 and construction documents are now complete. Staff is ready to begin advertising for construction bids. The design process for this particular project took longer than typical for signalization projects due to constraints with the Federal grant funding, staff priority reassignments such as Laguna Village Shopping Center and Prado Road - Measure H, and an extended review period by Caltrans. CONCURRENCES This is a joint project between the City and Caltrans. Caltrans has completed the traffic signal warrant analysis justifying signalization, of which the City concurs. City staff has agreed to assist Caltrans in the design and implementation of the project because signalization of this intersection is identified as a priority safety measure in the City Annual Traffic Safety Program. C9-1 ( 1 - Grand AvenuelHWY 101 Traffic Signal (90876) Page 2 FISCAL IMPACT The total budget for the Grand Ave/Hwy 101 project is $407,000. This project is 100% grant funded through HSIP grant funds ($370,000) and Caltrans State Highway Operation and Protection Program (SHOPP) funds (37,000). Currently, there is $373,011 remaining in the project account. There is sufficient funding to support this request. Although this traffic signal will be constructed by the City, Caltrans will assume all operational and maintenance responsibilities once it is completed. !Engineer's Estimate ? $ 225,000 IlConstruction Contingencies $ 30,000 j Total for Construction _,__. $ 255,000 a � i Printing& Misc __. 3 $._ 3,000 Construction Management i $ 40,000 f Project Sub-total $ 43,000 I i TOTAL PROJECT COSTS _ $ 2989000 j lFundsAvailable _ i $ A� 373,OII j ATTACHMENTS 1. City Manager Report authorizing design award, January 26, 2009 2. Council Agenda Report appropriating grant funds, July 15, 2008 AVAILABLE FOR REVIEW IN THE COUNCIL READING FILE Plans and Special Provisions ,y s•S...e{ h MIi. i� 'h'a x 3... a.,�q w^�a :c�. t�i�rw+��,,✓�{�e °} p4Y'-"Q sµ.., ..thy ,,.��'c�5 Y';:z'8 T:\Coundl Agenda Reports\Public Works CAR\2011\Transportation\Grand-HWY 101 signal\90876 CAR.doc C9-2 Attachment 1 city of San Luis OBISpo CITY MANAGER RE-PORT s • s Final CAO Approval A rover Name Date Approved City Administration Shelly Stanwyck February 25, 2009 Reviewer Routing List Reviewer Name_ Date Reviewed City Attorney Jonathan Lowell February 10, 2009 City Engineer Barbara Lvnch February 3,2009 Finance& Information Technology Bill Statler 24-09 January 26, 2009 FROM: Jay D. Walter,Public Works Director IPLV PREPARED BY: Matt Crisp, Contract Engineer II—Traffic SUBJECT: Grand Avenue& Hwy 101 Traffic Signal, Specification No. 90876 RECOMMENDATIONS 1. Execute an agreement with PBS&J in an amount not to exceed $22,750 for the design of the traffic signal installation at Grand Avenue and Hwy 101 North Bound off ramp. 2. Approve the transfer of $40,000 from the project construction account to the project construction management account. DISCUSSION In a joint effort with the California Department of Transportation(Caltrans), City staff applied for Federal Highway Safety Improvement Program (HSIP)grant fiinding on April 6,2007 in effort to signalize the Grand Avenue/Hwy 101 intersection. The grant was awarded in 2008 and the City was just recently authorized to begin design. The intersection has long been a concern for Caltrans, in particular with vehicle queues extending onto mainline 101 during peak periods. The signal first met warrants in May of 1993, at which time Caltrans decided to postpone the signalization until a later date. The intersection again met wan-ants in March 2007 at which time Caltrans approached the City to assist in signalizing the intersection. This project is 100%grant funded. The City will be only dedicating staff resources through construction. Once construction is completed Caltrans will assume operation and maintenance responsibilities for the signal.Per the City's purchasing policy, a Request-for-Proposals(RFP)was advertised on December 9,2008 and ten proposals were received on January 8,2009. A committee of three Public Works Department staff members independently reviewed and scored each proposal based on the following criteria; understanding of the work to be done,experience with similar kinds of work,quality of staff for work to be done, capability in developing innovative C9-3 Attacnment Grand Avenue/Hw101 NB Signalization, Specifcation No. 90876 - 2 - y or advanced techniques, familiarity with state and federal procedures, financial responsibility, and demonstrated technical ability. The rankings are based upon a total of 100 points possible. The following is a summary of the committee rankings: Consultant Avera2e Score PBS&J 90.7 Hatch Mott MacDonald 87.7 Rick Engineering 86 Quad Knopf 84.7 Penfield Smith 83.7 Wood Rodgers 74.3 Tetra Tech 74 Fehr and Peers 73 MNS Engineers 73 Cannon 64.7 FISCAL IMPACT Funding for this project is provided through a Federal Highway Safety Improvement Program (HSIP) grant in the amount of$370,000. In addition to the grant funding, the required 10% local match of$37,000 will be provided by Caltrans. City Council approved the project and funding at its July 15,2008 meeting. Currently $30,000 is allocated for design and $340,000 for the construction phase of the project. Staff is recommending approval of the contract agreement to PBS&J for the design of the traffic signal installation at Grand Avenue and Highway 101 North Bound off-ramp. There is sufficient funding in the design phase to support this request. Following approval of the contract agreement, there will be a balance of$7,250 remaining in the project's design account. Typically, 10% of construction costs are allocated towards construction management services. However, in anticipation of unforeseen circumstances impeding construction inspections and management services and working with outside agencies, staff requests using anticipated construction savings in the amount of$40,000,or approximately 15%of the total construction costs, to support construction management services. Staff will transfer funding by budget amendment request following this approval. At this time, there is $340,000 available in the project's construction account to provide for this request. After the transfer of funds, there will be a balance of$300,000 in the project's construction account. C9-4 riLLCL LILLl011L Grand Avenue/Hwy 101 NB Signalization, Specification No. 90876 - 3 - Project 3 -Project Budget 2008-09 t Iy Design Services $ 30,000 Construction $ 300,000 Construction Mgmt $ 40,000 Total Project Budget $ 3709000 Design Award (22,750) Remaining Project Budget 3479250 ALTERNATIVES 1. Deny or defer the project The City Manager may choose to deny or defer the project. However this project is 100% grant funded with no financial obligation to the City other than miscellaneous reimbursable costs and staff resources. Denial or deferral of the project with result in forfeiture of the grant funding. In addition, should this project not proceed, the opportunity for high impact collisions to occur along this location will continue. Pedestrians, bicyclists and disabled individuals will continue to have difficulty accessing the area and crossing these roadways. ATTACHMENTS 1. Agreement 2. PBS&J Proposal 3. Budget Amendment Request T:\City Managcr RcportsTublic Works\2009\Transportation\90876-Grand Hwy 101 Signal\90876 Award Dcsign.doc C9-5 Attachment 2 I council 7/15,2008 j acEnaa RepoRt �N CITY OF SAN LUI S O B I S P O FROM: Jay D. Walter, Director of Public Works Prepared By: Jake Hudson, Engineer III - Traffic SUBJECT: TRANSPORTATION GRANT FUNDING CAO RECOMMENDATION 1. Appropriate $120,000 in approved State Highway Account (SHA) grant funding for design and construction of the Bob Jones Bike Path Bridge Connections project budget(90670). 2. Appropriate $370,000 in approved Highway Safety Improvement Program (HSIP) grant funding for design and construction of a traffic signal at the intersection of Grand and US 101 North Bound off-ramp. 3. Appropriate $255,150 in approved Safe Routes to School (SR2S) grant funding for pedestrian improvements at Hawthorne Elementary, Sinsheimer Elementary, and San Luis Obispo High School, and program $25,515 from the Capital Improvement Project Reserve Account for the required 10% local match. 4. Appropriate $1,642,000 in approved SHA grant funding for eligible traffic signal and congestion related improvements as identified in the following report. REPORT IN BRIEF During difficult fiscal times it= is important to take advantage of outside funding sources. Over the past couple of years Transportation staff has been successful in applying for and receiving approximately 2.4 million dollars in grant funding for specific functions and projects such as traffic signal improvements & school zone pedestrian improvements. These grants included three different funding sources; SHA (State Highway Account), HSE? (Hazard Safety Improvement Program), and SR2S (Safe Routes to School). From these three funding sources eight separate projects are eligible for funding-, Bob Jones Bike Trail — Connections, General Traffic Signal System Improvements, Foothill & California Traffic Signal Reconstruction, Foothill & California Railroad Preemption improvements, Traffic Operations Report Implementation, Hwy 227 Relinquishment signal conversions and upgrades, Grand & Hwy 101 North Bound Traffic Signal Installation, pedestrian improvements at Sinsheimer Elementary, Hawthorne Elementary, and San Luis High Schools. Although these grants have been awarded over the past couple of years SLOGOG has just recently released them for spending. These grants come at an excellent time, when staff would have otherwise been requesting this new funding from the general fund during the next Financial Plan, additional funds will now be available for other new projects� . C9-6 Attachment 2 Transportation Grant Funding Page 2 DISCUSSION Each year various grants become available for transportation purposes. City policy requires that the Council review grant submittals that are sought by the City for these purposes. The Safe Routes to School (SR2S) grant application was approved by Council in April 2003. Unfortunately, funding was not approved at that time. Staff resubmitted SR2S grant applications and received notice of award in November 2007. The Hazard Safety Improvement Program (HSIP) and State Highways Account (SHA) grant applications were not provided to Council prior to the grant application. The HSIP grant was a joint grant application process, with Caltrans taking the lead and providing local match funding. The San Luis Obispo Council of Governments (SLOCOG) provided a very limited application timeline for the SHA grant program. In part by lack of staffing and an expedited application schedule delegated by SLOCOG, the SHA grant application was not provided for Council review prior to submittal. During this difficult fiscal time, staff feels it is essential that the City take advantage of any outside funding source to assist in delivering capital improvements. State takeaways and continued decreases in key General Fund revenues have made obtaining grant program funding increasingly more competitive. The Transportation Planning and Engineering staff has actively sought out grant revenues that will assist the City in achieving its goals and objectives, as well as play a key role in the City's overall financial health. The City has been successful in obtaining several State grants for various transportation improvement projects as noted above. It is important to note that each of these grants have been awarded for specific projects and functions related to transportation and safety improvements. Other than what is specified in this report there are currently no other Capital Improvement Projects (CIP) or operating programs which are eligible for these grant funds. Only one of the three approved State grants will require a 10% local match amount in order to access the funds. The City has been very successful in competing for and receiving various grants but due to the timing of grant submittals and various staffing issues experienced by the Public Works department, the programming of the grants into the City's budget was delayed. Notification of grant awards have been previously provided to Council via Council notes or as part of the San Luis Obispo Council of Governments (SLOCOG) Council representation updates. These approved grants are comprised of three different funding sources, State Highway Account (SHA), Hazard Safety Improvement Program (HSIP), and Safe Routes to School (SR2S). From the SHA funding source, the City has been awarded four grants; City Wide Signal Improvements, Various Signal Operation Improvements, Signal Improvements at California & Foothill, & The Bob Jones Bike Path. From the HSIP funding source, the City has been awarded a grant for Signalization of Grand & Hwy 101 North Bound off-ramp. From the SR2S funding source, the City has been awarded a grant for various pedestrian improvements at Hawthorne & Sinsheimer Elementary and San Luis High School. C9-7 Attachment 2 Transportation Grant Funding Page 3 The following table indicates the incoming grant funding and the corresponding projects which qualify for the funding. Attachment 1 to this report contains a detailed description of the various grants and corresponding projects needing to be programmed in the City budget. GRANT - PROJ. GRANT FUNDING SOURCE AMOUNT ELIGIBLE PROJECTS ESTIMATE STATE HIGHWAY ACCOUNT(SHA) SHA ELIGIBLE PROJECTS TO BE PROGRAMMED NOW Bob Jones Bike Path(90670) $110,000 Bob.Jone Bike Trail Connection(90670)-Grant Augmentation $110.000 City Wide Signal Improvements $400,000 General Traffic Signal System Improvements $517,000 Signal Operations $1,115.000 Foothill Traffic Signal Reconstruction-Rail Road Safety Trail $150.000 Signal Improvements California/Foothill $117,000 Foothill Traffic Signal Rail Road Preemption-Rail Road Safety Trail $500,000 Traffic Operations Report Implementation $165,000 Hwy 227 Relinquishment-Signal Conversions& Upgrades $200,000 SHA GRANT FUNDING TOTAL $1.762,000 JIDENTIFIED ELIGIBLE PROJECTS TOTAL 51.762,000 HAZARD SAFETY IMPROVEMENT PROGRAM (HSIP) HSIP ELIGIBLE PROJECTSTO BE PROGRAMMED NOW i Grand&Hwy 101 North Bound Si nalization $370,000 Grand& Hwy 101 North Bound Signalization $370,000 SAFE ROUTES TO SCHOOL(SR2S) SR2S ELIGIBLE PROJECTS TO BE PROGRAMMED NOW Hawthorne,Sinsheimer.&San Luis High $255,150 Hawthorne,Sinshcimer,&San Luis High Pcd $255,Ii0 Ped Improvements lImprovements FISCAL IMPACT Bob Jones Bike Trail (90670)—Bridee Connections (SHA) The Bob Jones Bike Trail — Bridge Connections CIP is identified in the FY 2007-09 Financial Plan, Appendix B pages 3-270 through 3-273, where $50,000 was appropriated for design and $170,000 for construction in 2007-08 fiscal year. Project carryover funds in the amount of $500,000 were combined with the 2007-08 FY funds, making the total project budget—(4 $720,000. Currently the project has a remaining account balance of$219,559. After receiving $120,000 in grant funding the project balance will be $339,559. This project is currently in progress and staff has identified that the construction phase is underfunded and supplemental funding will be needed to help support construction services. The additional grant funding will be used help supplement rising construction costs and contingencies associated with the project. C9-8 Attachment 2 'I Transportation Grant Funding _ Page 4 2007/09 FINANCIAL SHA GRANT NEW PROJECT PLAN AUGMENTATION BALANCE DESIGN $50,000 $0 550,000 CONSTRUCTION $170,000 $120,000 $790,000 Transfer to CONSTRUCTION $500,000 TOTAL PROJECT BUDGET $720,000 $840,000 DESIGN EXPEND. (S48.400) $0 ($4N,400) CONSTRUCTION EXPEND. (S45-1.041) $0 ($4521041) FUNDS AVAILABLE $219,559 $120,000 $339,559 General Traffic Signal System Improvements (SHA) In an attempt to simplify grant funding programs, SLOCOG has combined several grants with the same eligibility requirements into one large signal operation improvements grant. The Traffic Signal Improvements 97-99 (Specification No. 99813) was combined with several other grants recently released. Staff proposes to create a new project titled General Traffic Signal System Improvements and transfer the remaining funds from the existing project account to the new project account budget. The Traffic Signal Improvements 97-99 (99813) was identified in the 1997-99 Financial Plan, pages 104 and 105. A total of$650,000 was approved for eligible signal improvements from 1997 to 2001. Taking into account all expenditures and carryover balances to date, there is a remaining balance of $158,081. After the new project receives its appropriated budget of $527,000 and the remaining funds from the Traffic Signal Improvements 97-99 are transferred, the new project balance will be $685,081. Projects are expected to start immediately after receiving funding and will continue until all funds are exhausted. 1997/99 FINANCIAL ADDITIONAL SHA NEW PROJECT PLAN GRANT FUNDING BUDGET ALLOCATION $650,000 $527,000 $1,177,000 EXPENDITURES ($491,919) $0 ($491,919) FUNDS AVAILABLE $158,081 $527,000 $685,081 Foothill/California Traffic Simal Reconstruction—RR Safety Trail Improvements (SHA) This project was recommended as one of three smaller traffic signal reconstructions and included in the 2007-09 Financial Plan, Appendix B, Pages 3-241 through 3-243. Funding for the Traffic Signal Reconstruction Project is identified in an"out year-", tentatively earmarked for funding in 2009-10 FY because it was dependent upon completion of another project. The Foothill/California Traffic Signal Reconstruction will be completed as a key connection between Rail Road Safety Trail phase 4 and phase 4a. Staff proposes to remove this project C9-9 Attachment 2 Transportation Grant Funding Page 5 from the overall 2007-09 Traffic Signal Reconstructions CIP. Staff recommends to - program+ni-ng funding for the Foothill/California project. Staff will return to Council with a reduced CIP request for the remaining two signal reconstructions as part of the next Financial Plan. The total project is currently estimated at$250,000. Staff anticipates the project commencing within the next six months and project completion within the 2008-09 fiscal year. NEW PROJECT BUDGET (SHA GRANT) ENGINEERS ESTIMATE $190,000 CONTINGENCIES 528,500 PRINTING&PERMITS $3,000 CONSTRUCTION MANAGEMENT $28,500 TOTAL PROJECT COSTS $250,000 FUNDS AVAILABLE $250,000 Foothill/California Traffic Signal RR Preemption—RR Safety Trail Improvements (SHA) As part of the Rail Road Safety Trail Signal Reconstruction design, staff identified the need for Rail Road Preemption. This project is not currently identified in any Financial Plan. The Foothill/California Traffic Signal RR Preemption will be required in order to complete a key connection between Rail Road Safety Trail phases 4 &4a. Staff proposes to program the Foothill/California Traffic Signal RR Preemption project at this time so that work maybe initiated immediately NEW PROJECT BUDGET (SHA GRANT) ENGINEERS ESTIMATE $430,000 CONTINGENCIES $64,500 PRINTING&PERMITS $5.500 TOTAL PROJECT COSTS $500,000 FUNDS AVAILABLE $500,000 Traffic Signal Installation at Grand&Hwy 101 North Bound (HSIP) As part of the City of San Luis Obispo's 2006 Annual Traffic Safety Report, the intersection of Grand Avenue and the Highway 101 North Bound off-ramp was identified as the highest collision ranked intersection in the City of its class. Of those collisions, 90% 4-�were deemed correctable. As such, staff proposes to use the Hazard Safety Improvement Program funding for these improvements. It is anticipated that this project will commence immediately after receiving funding. C9-10 I Attachment 2 Transportation Grant Funding Page 6 The traffic signal installation at Grand and Hwy 101 North Bound off-ramp and the associated HSIP grant funding is not currently identified in any Financial Plan. The total project cost is estimated at $370,000. In addition to the grant funding there is a required 10% local match. The California State Department of Transportation (DOT) has agreed to fund the required local match of$37,000. Therefore, no financial commitments from the City, other than miscellaneous reimbursable costs and staff resources are necessary. NEW PROJECT BUDGET (HSIP GRANT) ENGINEERS ESTIMATE $267,000 DESIGN $20,000 CONTINGENCIES $40,050 PRINTING&PERMITS $2,900 CONSTRUCTION MANAGEMENT $40,050 TOTAL PROJECT COSTS $370,000 10%Local Match(DOT) $37,000 FUNDS AVAILABLE $407,000 Hawthorne, Sinsheimer, & San_Luis Hieh School Pedestrian Improvements (SR2S) Pedestrian improvements at these three schools and the associated grant funding are not currently identified in any Financial Plan. A 10% local match of approximately $26,000 is required to receive this grant funding. Staff recommends the transfer of$26,000 from the CIP Reserve account to fund the local match- and will prepare a Budget Amendment Request when the project specification number has been identified. The CIP Reserve account currently has a balance of $554,000. -After this transfer, the CIP Reserves will have a balance of $528,000. There is sufficient funding in the CIP Reserves account to support the p*e}ee�s= rajecfs local match. The total project cost is estimated at$255,150. This project is expected to start immediately after receiving funding and will continue until all funds are expended. NEW PROJECT BUDGET (SR2S GRANT) ENGINEERS ESTIMATE $180,000 DESIGN $20,000 CONTINGENCIES $27,000 PRINTING&PERMITS $1,150 CONSTRUCTION MANAGEMENT $27,000 TOTAL PROJECT COST $255;150 10%Local Match(Transfer from CIP Reserve) $26,000 FUNDS AVAII -BLE $281,150 C9-11 Attachment 2 J Transportation Grant Funding Page 7 CONCURRENCES Safe Routes to School: The San Luis Unified School District including representative faculty and parents at each of the schools identified in the grant hasye reviewed the proposed projects and contributed letters of support to the grant. HSIP: The State Department of Transportation initiated and supports this grant and associated project. In addition they will be providing the local match. ALTERNATIVES Deny approval of SR2S local match finding. The Council may choose not to appropriate the Safe Routes to School (SR2S) local match of$26,000.Staff does not recommend this alternative because the award of the SR2S grant funding is contingent upon the local match. If local match funds are not appropriated, reimbursement of the SR2Sgrant funds will not occur. With no grant funding available, -the pedestrian improvements at Sinsheimer & Hawthorne Elementary and San Luis High school will not have the necessary funding to proceed. Deny appropriation of grant funding. The Council may chose not to appropriate the grant funding. Staff does not recommend this altemative. The above listed grants represent a total of $2,424,150 in funds available to the City of San Luis Obispo for eligible transportation and traffic safety projects. Without these funds, the projects will not have the necessary financial support to continue. Projects may need to be deferred until alternative funding can be identified. ATTACHMENT Description of Projects �%ch=MZApubbcwofkslstaftfeponsagendm minutes)_cw=0811mnspoWionlgmnt lune inglgmnl lunding.doc C9-12