HomeMy WebLinkAbout05/03/2011, C13 - INFORMATION TECHNOLOGY 2011-16 STRATEGIC PLAN council MR6.°� 5-3-11
j acjcnoa REpoRt
CI TY OF SAN LUIS OBISPO
FROM: Mary Bradley, Interim Director of Finance & Information Technology
Steve Schmidt, Information Technology Manager
SUBJECT: INFORMATION TECHNOLOGY 2011-16 STRATEGIC PLAN
RECOMMENDATION
Award a contract to NexLevel Information Technology, Inc. for consultant services for a five-
year IT Strategic Plan and authorize the City Manager to execute the contract totaling $34,780.
DISCUSSION
Background
In 2000, the City contracted with the Gartner Group for a five-year IT strategic plan. After
providing a full assessment of the City's current use of technology, Gartner identified many new
initiatives that would improve customer service, productivity and public access to information.
In addition, the plan prioritized and phased initiatives and provided the City with equipment
acquisition and support costs.
The Gartner plan also included the recommendation that service level agreements be established
with all departments to assure that both parties clearly understood service expectations. The plan
also addressed current and future staffing requirements as well as recommending a centralized IT
division.
IT staff have recently completed the majority of the 2001-05 strategic plan's recommendations
and initiatives. With the rapid changes in technology and the need to utilize technology to
enhance staff productivity, it is imperative that the City again prepare a five-year IT strategic plan
to help guide future technology projects and goals.
PROJECT SCOPE
The IT Strategic Plan will utilize consultant services to identify a high-level vision and goals for
the Information Technology Division. The scope will define the "new normal"and the role of IT
over the next five years. The plan will also identify future technology challenges and possible
resolutions. The purpose of the plan is not to add funding to IT or to justify additional staffing
needs, but rather to suggest ways to better utilize existing recourses to improve the division's
return on investment.
The plan will also address citywide application administration management guidelines as well as
propose an equipment replacement strategy for the future. NexLevel has assured staff that they
will be in a position to start on this important project by the first or second week in May.
C13-4
Information Technology Five-year Strategic Plan Page 2
The Gartner strategic plan was much more in-depth and expensive than the current proposal with
NexLevel. In order to balance the City's fiscal situation with the need for an updated strategic
plan, staff will work collaboratively with the NexLevel consultants to provide much of the
existing network information, which will keep costs down. The budget for this project is
$35,000. The scope of the plan is to give Information Technology staff a high-level roadmap for
the future, rather then an in-depth report like the Gartner report, which drilled down to a more
detailed project schedule level.
Selection Process
The City received eight proposals from credible information technology consultant firms for this
project. Of the eight proposals, three finalists were selected by the review team based on the
firm's ability to meet most, if not all of the following criteria:
1. Understanding of the work required by the City.
2. Quality, clarity and responsiveness of the proposal.
3. Demonstrated competence and professional qualifications necessary for successfully
performing the work required by the City.
4. Recent experience in successfully performing similar services.
5. Proposed approach in completing the work and ability to implement the replacement in a
timely manner.
6. References.
7. Background and related experience of the specific individuals to be assigned to this project.
8. Proposed compensation.
As reflected above, the contract awards are not based solely on price, but on a combination of
factors such as user preference, program functionality, vendor availability and required
information technology resources.
Cost Estimates
Vendors provided cost estimates based on their understanding of the City's needs. As
summarized below, these cost estimates ranged from $33,664 to $44,000.
Pro oser Cost
CIO Solutions $33,664
RNR Consulting 33,954
Pacific Technologies 34,685
NexLevel Information Technology 34,780
eGov Consulting 34,871
ThirdWave Corporation 35,000
Mission Consulting 35,000
Soos Creek Consulting 44,000
C13-2
Information Technology Five-year Strategic Plan Page 3
Review Committee Recommendation
The review committee was comprised of staff from Administration and Finance & IT. The
committee compared the vendors' years of experience, program functionality and method of
approach. Based on the above factors, the committee unanimously selected NexLevel
Information Technology.
CONCURRENCES
The IT Steering.Committee concurs with this recommendation.
FISCAL IMPACT
General Fund carryover funds will be used to finance this project. The current balance in the
carryover account is $599,600.
ALTERNATIVES
1. Select a different vendor. This is not recommended,because the committee made the
selection based on extensive research and background checks of all vendors. Additionally, the
committee was unanimous in its selection of NexLevel
2. Defer the project. Given the fast changing information technology world, the City cannot
afford to wait several years to address the Information Technologies direction.
ATTACHMENTS
1. IT Strategic Plan RFQ
2. IT Strategic Project Plan
AVAILABLE FOR REVIEW IN THE COUNCIL READING FILE
Nexlevel Proposal
T:\Council Agenda ReponsTinance&rr CAR\IT201 I\rr strategic Plan
C13-3
city of
san lugs OBISPO
990 Palm Street ■ San Luis Obispo, CA 93401
Request for Qualifications
INFORMATION TECHNOLOGY 2011-16 STRATEGIC PLAN
The City of San Luis Obispo is inviting consultants to submit their qualifications to provide the
City with a comprehensive five-year Information Technology Strategic Plan.
All qualifications must be received by 3:00 p.m. on Wednesday, March 23, addressed to Finance& IT
Department, 990 Palm Street, San Luis Obispo, CA 92301. Qualifications received after that date and
time will not be considered.
Applications submitted in response to this request for qualifications (RFQ) will be reviewed by a
team consisting of City representatives. The team will review all complete, eligible qualification
submittals received by the deadline. Upon evaluating the qualifications provided in the
applications, the team will identify top vendors to be invited for finalist interviews.
The RFQ package and additional information may be obtained free on the City's Web site at
www.slocity.org/finance/bids.asp or by contacting Steve Schmidt at sschmidtna,slocity.org.
® The City of San Luis Obispo is committed to Including disabled persons in all of our services,programs and activities.
Telecommunications Device for the Deaf(805)781-7410.
C13-4
AttachMffilt®
Request for Qualifications
TABLE_OF CONTENTS
A. Description of Work 2
Purpose 2
Background 2
Project Scope 2
Objectives and Deliverables 3
B. Qualifications Submittal 4
Qualifications Content 4
Qualification Submittal 4
Submittal Length and Copies 4
Qualification Review and Award Schedule 4
C. Existing Technology Environment 5
Existing Infrastructure Overview 5
Existing City Applications 5
D. Submittal Forms 9
Qualifications Submittal Form 10
References 11
C13-5
- 1 -
Attachments
Section A
DESCRIPTION OF WORK
PURPOSE
The City is interested in consultant services to work with City staff to develop a comprehensive
five-year strategic plan for the City's Information Technology (IT) Division-that-will provide
high-level targets and goals for both Geographic Information Systems and Network Services,
improve system reliability and move the responsibility for all City software applications from the
departments to Information Technology.
BACKGROUND
In 2000, the City contracted with the Gartner Group for a five-year IT strategic plan. After
providing a full assessment of the City's current use of technology, Gartner identified many new
initiatives that would improve customer service, productivity and public access to information.
In addition, the plan prioritized and phased initiatives and provided the City with equipment
acquisition and support costs.
The Gartner plan also included the recommendation that service level agreements be established
with all departments to assure that both parties clearly understood service expectations. The plan
also addressed current and future staffing requirements as well as recommending a centralized IT
division.
IT staff have recently completed the 2001-05 strategic plan's recommendations and initiatives.
With the rapid changes in technology and the need to utilize technology to enhance staff
productivity, it is imperative that the City again prepare a five-year IT strategic plan to help guide
future technology projects and goals.
PROJECT SCOPE
The IT Strategic Plan will utilize consultant services to identify a high-level vision and goals for
the Information Technology Division. The scope will define the "new normal" and the role of IT
over the next five years. The plan will identify future technology challenges and possible
resolutions. The scope of work will be based on responding to the following challenges:
■ Recognize the City's current and long term fiscal challenges
■ IT is challenged to redefine itself and become more efficient and cost effective
■ Assess where IT is today and institute change where needed
■ Stop thinking"outside the box"and actually step outside the box to better view reality
Examine other methods of providing services as applicable to the business needs of the City
The consultant scope of work will employ the following strategies to address these challenges:
■ Make IT an essential business enabler for reducing City costs and improving service
delivery
-z-
C13-6
- - ' Attachments
■ Focus on value, services, benefits and solutions
■ Reduce backend technology costs and technician involvement
■ Consider cloud technology and shared services
■ Maintain organizational core values
■ Follow industry based standards
OBJECTIVES AND DELIVERABLES
The objective of the request for qualifications (RFQ) is to identify consultants capable of
delivering a strategic plan with the following components:
• Provide the City with examples of experience working with similar governmental
agencies to develop IT strategic plans.
• Provide the City with project milestones.
■ Assess the City's current IT environment,
• Interview department representatives identify immediate and future departmental needs.
■ Prepare a draft plan to the Information Technology Steering Committee (ITSC) with
monthly status updates throughout the duration of the project.
■ Present the completed strategic plan to the ITSC for review and upgrades.
• Finalize Strategic Plan
C13-7
-3-
Attachment
Section B
QUALIFICATIONS
1• Qualifications Content. Your qualification submittal must include the following
information:
Submittal Forms -" - -
a. Qualifications summary form
b. References from at least three firms for whom you have provided similar services.
Note: For ease of electronic preparation, vendor may prepare their own submittal forms
as long as they contain the same information in a similar format.
Qualification Summary
C. Experience of your firm in providing strategic plans to other agencies.
d. Availability of your firm to begin working on the project beginning on March
23,2011 and completing by June 30,2011.
e. Any other information that would assist us in evaluating your qualifications.
2. Qualifications Submittal. Please send a completed qualifications package consisting
of no more than 25 pages, including forms, to Finance& IT Department, 990 Palm Street,
San Luis Obispo, CA 93401. The deadline for submittals is Wednesday, February 16,
2011. Each qualifications package must be submitted in the format described in the RFQ
specifications and accompanied by any other required submittals or supplemental
materials.
3. Submittal Length and Copies. Please provide the City with five copies. Proposals
should not exceed 25 pages, including attachments and supplemental materials. The
proposal should be prepared simply and economically, providing a straightforward,
concise presentation of the information requested.
4• Qualifications Review and Award Schedule. The following is an outline of the
anticipated schedule for qualification review and contract award:
• RFQ release
• Contract for Consultant Services March 3,2011
• Present Draft Strategic Plan Copy to the ITSC Match 28, 2011
Completed Strategic Plan May 23, 2011
June 30, 2011
C13-8
-4-
Attachment
Section C
EXISTING TECHNOLOGY
, s •
INFRASTRUCTURE OVERVIEW
The City's current IT infrastructure is comprised of the following components:
• Users—450
• Workstations—400
• Office applications - Outlook, Office 2003, Windows XP
• Publication software -Adobe Acrobat
• Database software - SQL Server 2005, 2008
• Network operating system - Windows Server 2008
• Storage network—NetApp/Compellent
• Network infrastructure - Extreme Networks
EXISTING APPLICATIONS
The following City applications are listed by the department that currently utilizes the
application.
Software Title Department(s) .,.
RareFind 3 Government Admin
CWHR Admin
Cerberus Admin
Liberty Meeting Recorder Admin
FTP Synchronizer Admin
Munimetrix ImageFlow lite Admin
primoPDF All
Adobe Acrobat Reader All
Adobe Acrobat Pro All
Adobe PhotoShop Elements All
Adobe Premier Elements All
Quicktime All
Canon All
WebEx All
GoToAssist All
TightVNC All
VFP8 All
Cyberlink PowerDVD All
ESET All
Google Earth All
Google Chrome All
Google Picasa All
HP Printer Software All
Microsoft Frontpage All
C13-9
-5-
Attachment �
Microsoft Office Excel All
Microsoft Office Outlook All
Microsoft Office PowerPoint All
Microsoft Office Word All
Microsoft Windows XP All
Microsoft Internet Explorer All
Mozilla FireFox All
- MXLogic - -All
Add2Exchange All
Java All
Registry Mechanic All
PowerVideo Maker All
Blackberry Software All
Roxio All
SpyBot All
ShoreTel Call Manager All
Pentamation All
W estLaw Attorney
Adobe Contribute Community Development(CDD)
FastTrack CDD
Contex CDD
Google SketchUp CDD
Nero CDD, Finance& IT(FIT)
FireStudio Fire
Emergency Services Simulator 6 Fire
FUR Fire
DVR Studio Fire
Knightlite Software Fire
ZOLL Data Fire
Sybase Fire and Police
Kodak EasyShare Fire, Parks & Rec(P&R)
Telestaff Fire, Police
ArcGIS Server FIT
CuteFTP FIT
HP Array Configuration FIT
HP Server Software FIT
Kiwi Syslog FIT
Informix FIT
UltraCompare FIT
7-zip FIT
TreeSize FIT
Kaseya FIT
LogMeln FIT
Malwarebytes FIT
Microsoft Exchange FIT
Microsoft SQL FIT
Microsoft Visual FoxPro FIT
Microsoft Visual Studio FIT
Microsoft Office Visio FIT
Microsoft Virtual PC FIT
Microsoft Server 2003 FIT
NetApp System Manager FIT
13-10
-6-
Attachment
Beyond Compare FIT
Wireshark FIT
Vmware FIT
Image Onsite FIT
Adobe Encore FIT, CDD
Adobe Flash FIT, CDD
Adobe_S_ound_booth FIT, CDD
HdL FIT, CDD, Admin
FIT, CDD, P&R, Utilities, Public Works
Adobe Photoshop (PW)
Adobe Premier Pro FIT, CDD, Utilities
Adobe Illustrator FIT, CDD, Utilities, P&R
Adobe After Effects FIT, CDD, Utilties
Motorola FIT, Fire
Adobe InDesign FIT, HR, CDD, PW, P&R
Microsoft Windows 7 FIT, Police
Juniper Network Network Connect FIT, Police, Fire, Utilities
VZ Access Manager FIT, Police, Fire, Utilities, PW
Adobe Dreamweaver FIT, PW
Adobe Fireworks FIT, PW
Ipswitch FIT, PW
Microsoft Office OneNote FIT, PW
Microsoft Office Project FIT, PW
Adobe Flex Builder FIT, PW, CDD
ArcGIS Desktop FIT, PW, CDD
Adobe Pagemaker P&R
ArcSoft P&R
Fore! Reservations P&R
Avery P&R, CDD, PW
Microsoft Office Publisher P&R, CDD, Utilities
SignlT Parking
Avtec Scount Police
Axis Camera Software Police
Cellebrite Mobile Police
ClearCube Sentral Police
CMS Police
Laserfiche Police
CopWare Folio Police
Critical Reach Police
XPS Annotator Police
Uploadit Police
ELO Police
Fujitsu Scanner Software Police
Hirsch Police
Insight CMS Police
Out'n About Police
Milestone Police
O'neil Printer Software Police
SkyTrack Police
Pantech Police
Forensic Software Police
TaserCam Police
13-11
-7-
1 Attachment.1
Synergy Police
Veritas Cluster Manager Police
VieVU Police
VoicePrint Police
SpeedShift Police
TS CAD Police
Spillman Summit Police, Fire
Spillman-Mobile Police, Fire
Microsoft Office Access Police, Fire, P&R
Panasonic Software Police, Fire, Utilities
Cartegraph PW
Weatherlink PW
GFI PW
QuicNet PW
Microsoft Project Server PW
PaperPort PW
Primavera PW
Dymo PW
SquareRigger PW
Transoft PW
UPS Shipping Assistant PW
PAVER PW
Xerox Software PW
Transcad PW
Intersection Magic PW
Rain Master PW
Arbor Pro PW
Calendar Creator PW, CDD, Admin
AutoCAD PW, FIT
Crystal Reports PW, FIT, Utilities
Hanson Utilities
Hydrologice Engineering Center Utilities
MP32 Utilities
OPS32 Utilities
Pinnacle Systems Utilities
GoSync Utilities
DataStream - MP2 Utilities
GE Fanuc-FIX32 Utilities
GE Fanuc-iFIX Utilities
Corel Draw . Utiltities
13-12
s
Attan0 B 9 C ent.L
Section D
SUBMITTAL FORMS
Along with other information about your qualifications to provide the City with integrated applications,
conversion experience and availability of your firm to begin installing replacement applications by
April 2010 and completion by August 2010, the following three forms should be included.withyouur
submittal:
1. Qualifications summary
2. Applications checklists
3. References from at least three firms for whom you have provided similar services.
For ease of electronic preparation, vendor may prepare their own submittal forms as long as
they contain the same information in a similar format.
13-13
-9-
Aftachment
QUALIFICATIONS SUBMITTAL FORM
Organization-wide Software Application Solutions
The authorized representative identified below declares that she or he:
1. Has carefully examined the Request for Qualifications
2. Is thoroughly familiar with its contents.
3. Is authorized to represent the proposing firm.
Firm Name and Address
Contact Name
Phone Email
Authorized Representative
Name
Title Date
- io- C13-14
y �q 1
Afta8I®tllltl a pqfb dl .
REFERENCES
Number of years engaged in providing the services included within the scope of the specifications under
the present business name or by the principal assigned to this engagement: years.
-Describe fully the last three contracts performed by your firm or the principal assigned to this
engagement that demonstrates your ability to provide the services included with the scope of the
specifications. Attach additional pages if required. The City reserves the right to contact each of the
references listed for additional information regarding your firm's qualifications.
Reference No. 1
Customer Name
Contact Individual
Telephone&FAX number
Street Address
City, State,Zip.Code
Description of services provided
including contract amount,when
provided and project outcome
Reference No. 2
Customer Name
Contact Individual
Telephone&FAX number
Street Address
City, State,Zip Code
Description of services provided
including contract amount,when
provided and project outcome
Reference No.3
Customer Name
Contact Individual
Telephone&FAX number
Street Address
City, State,Zip Code
Description of services provided
including contract amount,when
provided and project outcome
13-15
- 11 -
Attachment=
Pro'ect Plan
INFORMATION TECHNOLOGYPLAN
February 23, 2011
PURPOSE
Establish a comprehensive five-year strategic plan for the City's Information Technology Division that
will provide organizational overview and goals for both GIS and Network Services, improve system
reliability and ensure that all City software applications are managed for maximum effectiveness.
OBJECTIVES AND DELIVERABLES
The objective of the project is to identify a consultant capable of delivering a strategic plan with the
following components:
■ Provide the City with examples of experience working with similar governmental agencies to
develop IT strategic plans.
■ Provide the City with project milestones.
■ Assess the City's current IT environment,
■ Interview department representatives identify immediate and future departmental needs.
■ Prepare a draft plan to the Information Technology Steering Committee (ITSC) with monthly
status updates throughout the duration of the project.
By June 23, 2011
■ Present the completed strategic plan to the IT Steering Committee for review and upgrades.
■ Finalize Strategic Plan
BACKGROUND
In 2000, the City contracted with the Gartner Group to create a five-year IT strategic plan. After
providing a full assessment of the City's current use of technology, Gartner identified many new
initiatives that would improve customer service, productivity and public access to information. In
addition, the plan prioritized and phased initiatives and provided the City with equipment acquisition and
support costs.
The Gartner plan also included the recommendation that service level agreements (SLA's) be established
with all departments to assure that both parties clearly understood service expectations. The plan also
addressed current and future staffing requirements as well as recommending a centralized IT division.
The 2001-05 strategic plan's recommendations and initiatives have over-time become obsolete. With the
rapid changes in technology and the need to constantly enhance services to increase staff productivity, it
is imperative that the City again prepare a five-year IT strategic plan to help guide future technology
projects and goals.
PROJECT STRATEGY AND SCOPE
Project Strategy
C13-16
A t chment_ a
IT Strategic Plan - Project Plan Page 2
The IT Strategic Plan will utilize consultant services to identify a high-level vision and goals for the
Information Technology Division. The scope will define the"new normal" and the role of IT over the
next five years. The Plan will identify future technology challenges and possible resolutions. The scope
of work will be based on responding to the following challenges:
• Recognize the City's current and long term fiscal challenges
• IT is challenged to redefine itself and become more efficient and cost effective
• Assess where IT is today and institute change where needed
■ Stop thinking`outside the box" and actually step outside the box to better view reality
■ Examine other methods of providing services as applicable to the business needs of the City
The consultant scope of work will employ the following strategies to address these challenges:
■ Make IT an essential business enabler for reducing City costs and improving service delivery
■ Focus on value, services, benefits and solutions
■ Reduce backend technology costs and technician involvement
• Consider cloud technology and shared services
• Maintain organizational core values
■ Follow Industry based standards
Project Scope and Consultant Deliverables
1. Current City Data Network, Equipment and Software Application Assessment IT staff will
conduct an inventory of all City IT network equipment to provide to the selected consultant. This
inventory will also detail the City's extensive software applications, fiber network infrastructure,
network schema, current operating systems, wired and wireless facilities and GIS technology.
2. Review Existing Service Level Agreements. IT currently has SLA's with several departments in
the City. These agreements will be reviewed and updated because of this project..
3. Conduct department interviews. Work with the selected consultant to schedule and conduct
interviews with City department representatives to identify current needs, future needs and their
expectations of the IT division.
4. Preliminary Draft Copy. Present the draft copy of the strategic plan to the ITSC for their review
and updates.
5. Council Agenda Report Present the five-year strategic plan to Council in report form,which will
detail the long-term targets and goals identified.
KEY PROJECT ASSUMPTIONS
• The City will continue to face fiscal hardships
■ IT as it was in the past can not fiscally continue the same into the future
■ IT will work toward improving the delivery of services as well as maintaining backend equipment
Standards achieved by IT must include flexibility, responsiveness, teamwork, and communication
• Continue to strengthen relationships with other City departments
C13-17
Attachment
- IT Strategic Plan - Project Plan Page 3
PROJECT CONSTRAINTS AND LIMITATIONS
1. Limited funding for consultant ($35,000) and resultant need to utilize internal staff for required
research
2. Changing the paradigm of the IT staff
3. Resistance to change strategic direction
PROJECT ORGANIZATION AND TEAM
Sponsor: Director of Finance & Information Technology
Oversight: IT Steering Committee
Project Manager: IT Manager
Team: Cross departmental team
STAKEHOLDERS
Stakeholders include all City employees that benefit from the services performed and information
provided by IT services and software applications.
PROJECT TASKS AND SCHEDULE
Task Who When
Project Planning
1. Complete Project Plan IT Manager 2/28/2011
2. Contract for Consultant Services IT Manager 3/30/2011
3. Present Draft Copy to the ITSC IT Manager 5/23/2011
4. Completed Strategic Plan IT Manager 6/30/2011
PROJECT RESOURCES
Project Funding
Consultant Funding 35,000
Total $35,000
C13-18