FROM: Jay D. Walter, Director of Public Works 9D
Prepared By: Manny Guzman, Engineer II
SUBJECT: MEASURE Y PROJECT CURB RAMPS AREA 5, SPECIFICATION .
NUMBER 91050
RECOMMENDATIONS
1. Approve plans and specifications for the Curb Ramps Area 5 Project, Specification No. 91050.
2. Authorize staff to advertise for bids and authorize the City Manager to award the contract if the
lowest responsible bid is within the Engineer's Estimate of$161,000.
DISCUSSION
In coordination with the City's pavement management plan (PMP), ramp construction has been
designed for Pavement Area 5. Curb ramps included in this project are shown to be installed
prior to paving and microsurfacing programs which will start in the summer of 2012.
A total of 32 existing street corners in Area 5 will be retrofitted with new curb ramps or
detectable warning material (truncated domes) to meet current Americans with Disabilities Act
(ADA) standards. 25 existing curb ramps will be removed and replaced partially or entirely at
corners, to provide accessibility and meet ADA requirements. Seven other curb ramps will just
have the truncated domes installed, where existing ramps meet ADA requirements with the
exception of the lack of truncated domes.
The attachment shows the locations throughout Area 5 where work will be completed as part of
this project.
CONCURRENCES
This project is exempt from environmental review since it is a maintenance and replacement
project and a Notice of Exemption has been filed through the Community Development
Department.
FISCAL IMPACT
This project is included in the 2009-11 Financial Plan, pages 3-208 to 3-210. The master account
for Sidewalk Accessibility Improvements (99868) currently has a balance of$184,300. A budget
amendment request will be processed to transfer the appropriate project funding from the master
account at the time of contract award. This project is funded 100%by Measure Y funds.
C14-1
0 0
Curb Ramps Area 5, Specification No. 91050 Page 2
Engineer's Estimate: $1617000
Contingencies: $227500
Printing and Misc: $500
Total Project Estimate $1849000
Sidewalk Accessibility Impr Master Account
(99868) Current Balance. 5184,300
ATTACHMENT
Vicinity Map
AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE
Area 5 Curb Ramps Plans and Specifications
T:\Council Agenda Reports\Public Works CAR\2011\CIP\91050 Area 5 Curb Ramps\91050 CAR ADVERTISE.doc
C14-2
ATTACHMENT
� P
co <
2 Fl
c! MA BO
cgllfp2 aQOQ1 2�„�A ��9 0"�i0�o P�Op N � y MITA
��R P SRO c�' DR.
PJ�O+Q1. 0 o P`pSOpO 9 ¢ � o�z
AI DR, o
SEP Ao CUA
A NgIRE CT. n-� C YA A �
i
MAR
oy R� a o aR sanl (�
2 P 5 q0o r
Az
C'j 0 C a
PyJ PRADO
0
� a
av BONET]
RANADzQ�+4`� w
A v=i
0
4-Y
y0 /N DOOR MEISSNER
( Oq /gCNO(/q 0 HIND
qa(y DR
l0 CgyTf U� F0 �
+P M R fRRy Q R O J�
O+Pa
ul `E,OPOJ�'
\ G� RFFkSm/MfO� TANK ARM
9
CROSS
� S
U R r
O �
2 50R U
C-C(o�.
c�0 z 14 +s SUBURBAN
N
h w
CT
MIRAD R $
z
0
a
W
Jco BUCKLEY
z
0
ti
z
w
a
N
w
LEGEND
® CURB RAMP TO BE IMPROVED CURB RAMPS AREA SPECIFICATION NO. 91050
'J O
council memomnoum
July 19, 2011 METING AGENDA
TO: City Council DATE `� �� ITEM #
FROM: Jay D. Walter, Public Works Director @
VIA: Katie Lichtig, City Manager
SUBJECT: Red File Item C-14
Council Member Ashbaugh asked staff to provide a response to an email from Brett Cross on
Item C-14, the project to construct ADA access ramps at several corners throughout the City.
Council Member Ahsbaugh asked specifically:
1. Please ID in the City's financial plan where the curb ramp project is found, and how the source
of funding for it is tied to Measure Y (perhaps display the page or pages where this relationship
is made.)
A. This project was included in the 2009-11 Financial Plan CIP, and was specifically identified
as a Measure Y project. See attached excerpt from the 2009-11 plan, page 1-12.
2. How does this proposed set of curb ramps relate to the larger schedule and plan for installing
curb ramps throughout the city? I would be interested in knowing, for example, when the City
would be installing more curb ramps in the Foothill area, where there is a considerable need
along Cerro Romualdo, Patricia Drive, and other streets and intersections around Pacheco and
Bishops Peak/Teach Schools.
A. The City has an ongoing plan to retrofit curbs throughout the City. We are obligated to make
these improvements whenever we pave or alter the street, and many projects have used General
Funds or CDBG funds to make the improvements. We coordinate these improvements to stay
ahead of the City's paving program, which makes improvements in a rotating neighborhood
approach. We will next have the opportunity to consider ramps in the Foothill neighborhood in
the summer of 2013. The 2011-13 Financial Plan lists this project on page 3-146 of Appendix B.
G:\Staff-Reports-Agendas-Minutes\ CCMemos\201I\ADA Ramps.doc
W
0 FaCrrYMGR
�CR IRGR RM HIEFRNEY IF.JUORIG ECHIEFS&RECDIRNE DIRTIMES IRITYNE915CIL
MGR
o CLERK
f
INTRODUCTION
Use of Measure Y Revenues
The uses of Measure Y revenues for 2009-11 in funding operating programs and capital improvement plan(CIP)
projects are aligned with top Council goals and objectives,and closely match projected revenues.
Operating Programs CD' Two-Year
2009-10 2010-11 2009-10 2010-11 Budget Total
Infrastructure Maintenance
Meadow Park Roof Replacement 5,000 40,000 45,000
Andrews Creek Bypass 330,000 330,000
Storm Drain Replacements 260,000 260,000 520,000
Minor Storm Drain Facilities 25,000 25,000 50,000
Higuera Culvert Repair 150,000 150,000
Sidewalk Repair 20,000 20,000 40,000
*Sidewalk ADA Access Improvements 135,000 100,000 235,000
Warden Bridge Resurfacing 45,000 45,000
Street Reconstruction&Resurfacing 2,050,000 1,900,000 3,950,000
Street Light Painting 50,000 50,000 100,000
Urban Forest Management Plan 25,000 25,000 50,000
Street Fleet Replacements:Paver and Roller 365,800 365,800
Other Infrastructure Maintenance Projects 97,500 97,500
Total Infrastructure Maintenance 3,228,300 2,750,000 5,978,300
Traffic Congestion Relief
Bicycle Safety 15,000 15,000 30,000
Traffic Safety Report Implementation 25,000 25,000 50,000
Neighborhood Traffic Management 20,000 20,000 40,000
Sidewalk Repair 20,000 20,000 40,000
Street Light Replacements-Broad Street 60,000 60,000
Total Traffic Congestion Relief 15,000 15,000 115,000 65,000 110,000
Preservation of Essential Services
Public Safety
Police Protection:Traffic Safety&Patrol 476,500 483,300 959,800
Fire Prevention&Training 400,900 424,800 825,700
Fire Engine/Truck Replacement:Debt Service 97,000 97,000
Maintenance Services
Streets,Sidewalks and Traffic Signal Operations 179,100 184,600 40,000 66,500 470,200
Creek&Flood Protection 434,600 461,200 895,800
Parks 164,700 169,300 29,400 48,700 412,100
Project Management&Inspection 242,100 249,500 491,600
Neighborhood Code Enforcement
Enhanced Building&Zoning Code Enforcement 122,100 125,700 247,800
"SNAP"Enhancement 18,100 18,100 36,200
Total Preservation of Essential Services 2,038,100 2,116,500 69,400 212,200 4,436,200
Open Space Preservation 322,500 311,500
Downtown Maintenance&Beautification
Sidewalk Repairs 5,000 5,000 20,000 20,000 50,000
Mission Style Sidewalks 100,000 100,000 200,000
Sidewalk Scrubbing 20,000 20,000 40,000
Pedestrian Lighting 70,000 70,000
Comprehensive Signing Program 25,000 50,000 75,000
Total Downtown Maintenance& Beautification 25,000 25,000 145,000 240,000 435.000
TOTAL $2,078,100 $2,156500 $3,890,200 $3,267,200 1 $11,392,000
Projected Measure Y Revenues
2009-10 5,572,800
2010-11 5,778,Ioo
Total $11,350,900
1-12
J �
RED FILE
From: Brett Cross[SMTP:BRETTCROSS@YAHOO.COM] MEETING AGENDA
Sent: Thursday, July 14, 20112:30:21 PM
To: Council, Slocity DATEY, < !I ITEM #
Subject: Item C14 Measure Y Project Curb Ramps
Auto forwarded by a Rule
Can someone direct me to the text of the staff report that indicates that this project is a
Measure Y priority project. I see discussion about ADA compliance but nothing in the
report regarding Measure Y priorities other than the funding is coming 100% from
Measure Y which is hard to understand because I thought that Measure Y funds were not
separate from the General Fund. I thought the ramping projects were being funded out of
CDBG funds.
Honestly I'm a bit tired of the BS regarding Measure Y funding and projects. What is
required and what needs to be provided the public is the INDEPENDENT AUDIT of
Measure Y funding and expenditures that were required as part of the ballot measure. It's
too bad no one has the money to take the City to court to force what is required. I can
probably tell you what an independent Audit would say and that is more than 1/2 the
money was spent on salary and benefit increases: A large portion going to police and the
rest to management.
Brett Cross
hard CM.-
91
O COUNCIL c CDD DIR
o CrrY MGR c FIT DIR
o ASST CM o FIRE CHIEF
o ATrORNEY o PW DOR
G CLERIUGRIG a POLICE�
o PIE � Dt
0 71UBUNE o UTH.DIR
o NE TDM o HR DIR
o.SIAMYNEWS c COUNCIL
o CRY MGR
o CLERK