Loading...
HomeMy WebLinkAbout09/20/2011, C 3 - SEWERLINE REPLACEMENT 2009-10, SPECIFICATION NO. 90916 1 council M1�rcnng Dare09/20/2011 j AQenaa IZCPORt C I TY OF SAN LU IS O B 1 S P 0 FROM: Jay D. Walter, Director of Public Works BL Prepared By: Matt Horn, Supervising Civil Engineer SUBJECT: SEWERLINE REPLACEMENT 2009-10, SPECIFICATION NO. 90916 RECOMMENDATIONS 1. Approve the plans and specifications for the "Sewerline Replacements 2009-2010" project, Specification No. 90916. 2. Authorize staff to advertise for bids and authorize the City Manager to award the contract if the lowest responsible bid is within the Engineer's Estimate of$1,120,000. DISCUSSION Background Replacement of sewage collection pipes is part of an ongoing program to replace aging and deteriorating infrastructure. This program has several objectives: 1) Ensure reliable removal of waste; 2) Reduce the need for emergency repairs; 3) Reduce the need for preventive maintenance; and 4) Ensure uninterrupted sewage flow without health hazard or effluent leakage. This project will accomplish these objectives for part of the City's wastewater collection system. The scope of this project includes replacing sewerlines in portions of Pismo, Beach, Islay and Chorro Streets. The existing sewerlines require a large amount of maintenance and have the need for more capacity. Portions of the existing sewer system will be upsized from 6" and 8" diameter pipes to 8", 10" and 12" diameter pipes increasing the systems capacity.. Experience and Reference Requirements This project will require the contractor to replace these sewerlines using a trenchless process. The two specified methods of installation are pipe bursting and pipe reaming. Using a trenchless process will allow for a higher quality seamless pipe to be installed at a lower cost due to the lower pipe installation cost as compared to conventional trenching. While the trenchless installation process for sewerline replacement is advantageous in this situation, it requires a contractor with specific experience and expertise to complete this work. A contractor with limited trenchless pipe installation experience could damage the sewer system, cause sewage spills, and increase public inconvenience during the installation process. For these reasons, staff is planning to request the contractors to submit references documenting their experience. To comply with a recent legal decision, staff will be using a responsibility review to determine that experience requirements have been met. Public Works staff will be working with the City Attorney's office to ensure proper protocols are used. Staff is requesting C3-1 Sewerline Replacement 2009-10, Specification No. 90916 Page 2 the Director of Public Works be authorized to complete responsibility/ qualification hearings in order to determine if the lowest responsive bid was submitted by a responsible contractor capable of completing this specialized work. The hearings will allow any contractor initially determined by the project manager to not have the necessary experience to provide information to the Director as to why their experience is adequate. CONCURRENCE The Community Development Department has given this project a categorical exemption from environmental review. FISCAL IMPACT This sewerline replacement project is originally identified in the 2009-11 Financial Plan and carried over to the 2011-13 Financial Plan, Appendix B, on page 3-92, which identifies a $1,300,000 budget estimate for this project. Sufficient funding to support this sewerline replacement project is available in the Wastewater Collection System Improvements Master account, which has a current balance of$2,487,356. Staff recommends transferring funding from the Master Account to the project account at time of contract award, based on construction bid amounts. Master Account funding is sufficicnt to fund this as well as other projects. , Estimated Project Costs Construction(Engineer's Estimate): $1,120,000 Construction Contingencies: $112,000 Total for Construction: $1,232,000 1 Materials Testing: $10'000 __ .... Miscellaneous (incl printing) - — —' $500 �.__ _.. Total for other costs: $10,500 Total Cost of Project $172429500 1 Master Collect S st Account 90239 $2,487,356 Available Funding: ATTACHMENT Vicinity Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Plans and Special Provisions \\chstore4\Team\Counci1 Agenda Reports\Public Works CAR\2011\CIP\90916 Sewerline Replacement\90916 CAR-AdverUse.doc C3-2 ATTACHMENT O rw;oO � �o o0O � O PROJECT 3 O O LOCATION z e 0 AZ 0 so Q.SD O 09 O � o � o O o O i O C1 o00 o HIGH oo 000DUo _C.D ® BRANCH U U UNOHO V,n J 3 � G C.7 O N ON BRIDGE 0 CORRIDA C1 SCALE IN FEES _ OODBRIDGE W CD o M MRCHELL "WREN C ?q 0 _ OR. SII , City of oaispo VICINITY MAP san Public Works Department 2009-10 SEWERLINE 919 Palm street, San Luis Obispo, CA 93402 REPLACEMENT PROJECT C3-3