city or san lues osispo MaZa
COUNCIL AGENDA REPORT ITE ume ER
FROM: David F. Romero / Lane Wilson" . Prepared by: David P. Pierce
Public Works Dir. Parks & Bu 1 Ings Mgr. Projects Mgr.
SUBJECT:
Submittal of plans and specifications for "Santa Rosa Park
Irrigation Replacement City Plan No. M-05Y
CAO RECOMMENDATION:
Approve plans and specifications and authorize staff to advertise
for bids, find that the project is not of sensitive or
exceptional community interest, and authorize the City
Administrative Officer to award contracts within the estimated
cost.
BACKGROUND:
Santa Rosa Park is approximately 40 years old. The existing
irrigation system has deteriorated and wastes water. This project
will install A modern system that has been designed to take advantage
of current technology in irrigation and water conservation.
Construction of this project will reduce water consumption and will
reduce repair time and costs which are very high due to the age of
the system.
The Utilities Department has conferred with the private geologist
working for the City to develop ne:: well water sources and the
Recreation Director who helped develop Santa Rosa Park. They have
determined that very poor potential cor a productive well exists at
Santa Rosa Park due to the extremely shallow rock conditions that are
present in the park.
This project will help meet the stated City parks program goal which
is to maintain safe, useful and attractive parks and landscape areas.
This project conforms with the City's adopted five year water
conservation program in the following areas :
1 . Water Waste Program - It replaces a faulty system thus
eliminating water waste
2. Landscape Water Audit Program - The irrigation system is designed
to conform with the state landscape water management program
based on evapotranspiration rate. Efficient use of irrigation
water will be achieved by proper distribution and elimination of
leaks.
The project scope increased during design. Inspection of the pipes
showed that they were in worse condition than had been anticipated.
All piping is to be replaced back to the street service. The water
meter had to be relocated to conform to the County requirements for
backflow prevention. (f ?—/
City of San tins OBISp0
MaZa COUNCIL AGENDA REPORT
City Plan No. M-05Y'
Page 2
Purchasing Procedure
Purchasing Control Procedure 403-3 - Projects costing more than
$5,000 applies to this project.
Coordination
The Community Development Department has determined that this project
has a categorical exemption from further environmental evaluation.
Fiscal Impact
Engineer's estimate: $ 133,000
Contingencies: $ 13,000
TOTAL $ 146,000
Funds Available'
The FY 1988-89 Capital Reinvestment Program Budget (page E-9) as
ammended in June 1988 identified $94,000 for the construction of this
project.
Recommendation
Approve plans and specifications -and authorize staff to advertise for
bids, find that tb.,- project is not of sensitive or exceptional
community interest, and authorize -the City Administrative Officer to
award contracts within the estimated cost.
APPROVED:
ity A strat a Officer City orney
1
Finance Director
Plans & Specs are Available in the
Council Office for Review.
Public Works Director
W
Project Manager
g/sr-irragd �r Q