COUNCIL AGENDA REPORT �NUM
FROM:
David F. Romero y'' William T. Hetland Prepared by: Gary Henderson 4041
Public Works Director Utilities Director Civil Engineer
SUBJECT
Submittal of Plans and Specifications for "Water Main Reconstruction
Project: Higuera Street - Johnson to California; City Plan No. N-21P."
RECOMMENDATION:
Approve Plans and Specifications, Authorize Staff to Advertise for Bids and
Authorize CAO to Award Contract.
BACKGROUND:
This project is required to improve water distribution in the downtown area as
identified in the Draft Water Management Plan. The existing 4-inch waterline
will be replaced with a 8-inch waterline which sill improve distribution and
fire flows in the area. The project is listed in the Capital Improvement Plan
on page E-5.
This project has been given an EIR clearance by the Planning Departmant.
Status: Categorical Exemption.
SIGNIFICANT IMPACT:
Base Bid: $86,975
Contingencies 8,600
Total: $95,575
This project is included in the Capital Replacement Plan of the 1987/1989
Financial Plan (page E-5).
CONSEQUENCE OF NOT TAKING ACTION:
The substandard condition will remain and costs may be higher at a later date.
ACTION RECOMMENDED:
Approve plans and specifications, authorize staff to advertise for bids and
authorize CAO to award the contract.
(Plans and specs available in Council Office for inspection)
I�����►�Ni►dlllllllllpu ���ID City of san tins oBi spo
ONGs COUNCIL AGENDA REPORT
Page Two.
APPROVED:
ity,A_ linistrative Of icer
City At;15i-rector
e
Finance
City eineer
Project Manager
gwh8/n2lp-sr