Loading...
HomeMy WebLinkAbout01/17/1989, C-6 - AMENDMENT NO 1 TO AGREEMENT FOR ENGINEERING SERVICES FOR IMPLEMENTATION OF WASTEWATER MANAGEMENT PL MEETING DATE city Of San LUIS OB1Spo Jan. COUNCIL AGENDA REPORT FROM: William T. Hetland, Utilities Director SUBJECT: Amendment No 1 to Agreement for Engineering Services for Implementation of Wastewater Management Plan CAO RECOMMENDATION Adopt Resolution approving Amendment No 1 to Engineering Services for Implementation of Wastewater Management Plan BACKGROUND The City of San Luis Obispo entered into an agreement with the firm of Brown and Caldwell Consulting Engineers to provide engineering services for the implementation of the Wastewater Management Plan. Those services primarily involved the predesign of the wastewater collection system relief sewers to help resolve the City's infiltration and inflow problem and treatment plant modifications to meet the City's waste discharge requirements. The work in both of these areas is underway. The predesign work on the collection system is completed and the City staff is now doing �- the detailed design work. The treatment plant modifications are 40+% complete and moving ahead on schedule. Both projects are scheduled to be bid this spring. Construction of the first phase of the collection system- work is estimated to be six to eight months. Construction of the treatment plant modifications is estimated to be 24 months. The consultant will provide a detailed briefing on the status of these projects to the Council in March. Since the begining of the design of these projects, some additional items came up that required additional work by the consultants and therefore a scope change to the consultants contract is necessary. The additional tasks are summarized below: 1. Supplemental report to the Wastewater Management Plan - The supplemental report was needed to update the City's Wastewater Management Plan based on the actions of the Regional Board and the City Council since the original Wastewater Mangement Plan was adopted. A copy of the Supplemental report has been distributed to the Council and the Regional Board. 2 . Design improvements to the sludge drying beds - Improvements to the sludge beds were included in last years budget. It was decided to combine them with the plant modifications for ease of construction and economy of scale. lillm ►InigJ1iil1U city of S& . LUIS 0131SPO COUNCIL AGENDA REPORT Amendment to Agreement for Engineering Services Page 2 3. Design improvements to existing plant utility systems - During design it was determined that the existing service air, instrument air, reclaimed water, and non-potable water systems needed to be upgraded to meet the needs of the new plant. 4. Design a new primary sludge pumping station - The primary sludge pumping facilities are inadequate and needed to be upgraded. 5. Assist City in handling lead in the sludge - The City is experiencing high levels of lead in the sludge and requesting assistance from the consultant in dealing with the Regional Board and the State Health Department in handling thi-- problem. 6. Develop a work plan for a pilot study - The Council's approval of the full compliance option at its October 11, 1988, meeting included the development of a pilot program at the treatment plant to determine operating parameters and design criteria. This task will develop the work plan to implement the pilot program. FISCAL IMPACT The initial agreement for engineering services is for $1, 047, 035. The total cost of these additional tasks is $137 , 310. Sufficient funds are available in the Sewer Fund to cover these costs. RECOMMENDATION Staff recommends Council adopt the attached resolution approving Amendment No 1 to Engineering services for Implementation of Wastewater Management Plan. Attachments: Resolution Transmittal Memo Amendment #1 & Attachment I I bcengamd/n RESOLUTION 90. (1989 Series) A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN LUIS OBISPO APPROVING AMENDMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES BETWEEN THE CITY OF SAN LUIS OBISPO" AND .BROWN AND CALDWELL FOR IMPLEMENTATION OF WASTEWATER MANAGEMENT PLAN WHEREAS, the City has adopted a Wastewater Management. Plan; and WHEREAS, the Wastewater Management Plan identifies a specific program for the implementation of the Wastewater Management Plan; and WHEREAS, the City has retained the consulting firm of Brown and Caldwell to provide assistance; and WHEREAS, since initiating of the design of these projects, additional items came up that require additional work by the consultants and therefore a scope change; and WHEREAS, the total cost of these additional tasks is $137,810 and ! sufficient funds are available in the Sewer Fund to cover these costs; NOW, THEREFORE, BE IT RESOLVED that the Mayor is authorized to approve Amendment No. l to the Agreement for Engineering Services for .Implementation of Wastewater Management Plan, and authorize the consultant to proceed with these tasks for a total cost of $137,810. On motion of seconded by and on the following roll call vote: AYES: NOES: ABSENT: the foregoing Resolution was passed and adopted this day of 1989. i i Resolution No. (1989 Series) MAYOR RON DUNIN ATTEST: CITY CLERK PAMELA VOGES APPROVED: City A inistr 've Officer City to ney J FigWe director Ti Utilities Director bcengand/n c y e BROWN AND D CALDWE_ LL CONSULTING ENGINEERS December 13 , 1988 Mr. William T. Hetland Utilities Director City of San Luis Obispo 955 Morro Street San Luis Obispo, California 93401 12-3797-01/2 Subject: Agreement for Engineering Services Amendment No. 1 Implementation of Wastewater Management Plan Dear Mr. Hetland: As requested , we are enclosing Amendment No. 1 to our Engineering Services Agreement; this amendment covers the following addition tasks which .have been. added to our scope: 1. a supplemental report to the wastewater management plan; 2. design improvements to the existing sludge drying beds; 3 . C.-:sign improvements to existing plant utility systems ; � I 4 . designing a new primary sludge pumping station; 5. assisting the City in getting a "non-hazardous determination for the sludge; and 6 . developing a work plan for the pilot study. As you are aware, Tae have already begun work on many of the activities listed above; the work on other activities which have not started yet needs to proceed very quickly. We are enclosing two copies of the Amendment for your approval . Please furnish us caith one executed copy of the Amendment and a written authorization to proceed in accordance with our Agreement. Please call us if you have any questions . Ver truly yours , B AND ALDWELL P tvaiz Anwar Vice President PA:AL14M: fa Enclosure N/AG'-000026 150 SOUTH ARROYO PARKWAY POST OFFICE BOX 7103 PASADENA.CALIFORNIA 91109.7203•(818)577-1020•FAX:(818)795-6016 AMENDMENT 1 TO AGREEMENT FOR ENGINEERING SERVICES BETWEEN 'CITY OF SAN LUIS OBISPO AND BROWN AND CALDWELL FOR IMPLEMENTATION OF WASTEWATER MANAGE14ENT PLAN THIS AMENDMENT NO. 1 to the Engineering Services Agreement dated February 23 , 1988 , between City of San Luis Obispo, hereinafter referred to as "Owner" ; and Brown and Caldwell , a California corporation, hereinafter referred to as "Engineer, " is made and entered into this day of December, 1988 . WITNESSETH: WHEREAS, on February 23 , 1988, Owner and Engineer entered into an agreement for engineering services; and WHEREAS , in Article IIB of said Agreement, Owner and Engineer agreed that certain of the work contemplated to be performed by Engineer could not be sufficiently defined at the time of execution of the Agreement; and WHEREAS , during the detailed engineering design o,f the improve- ments, it became apparent that additional facilities were required for a functional facility; and WHEREAS , Owner has requested changes in the scope of work; NOW THEREFORE, Owner and Engineer agree to amend the Agreement as follows: I. SCOPE OF PLANNED ENGINEERING SERVICES The scope of work as described in Exhibit B of the original Agreement is amended to provide the following additional engineering services J 1. Prepare a supplement to the Wastewater Management Plan (WMP) summarizing all the developments since the adoption of the WMP by the City. The supplement will address the steps taken by the City to meet discharge Page 1 of 3 N/AGR:000026-1 requirements including : adoption of: the WMP, provisions for stream enhancement and water reclamation facilities , and adoption of the full compliance option for the treatment and disposal of the wastewater 2. Provide design improvements to the existing earthen sludge drying beds. The beds will be designed to facilitate sludge spreading and sludge cake collection. 3. Design improvements to the existing plant utility system. The design will include the following utilities a. . Plant-wide service air system b. Plant-wide instrument air system c. Plant-wide reclaimed water ( 3w) system d. Plant-wide non-potable (2W) water system 4. Design new .primary sludge pumps and make changes in piping to use existing primary sludge pumps for pumping primary scum. The new primary sludge pumps will be located in the existing - abandoned chlorine contact pond. The design will also include modifications to the existing chlorine contact pond. 5. Assist the City in determining the lead source in the waste sludge and advise regarding disposal of the stockpiled sludge. This task will include : a. Preparation of a letter report summarizing the lead investigation to date and activities planned to identify and control the lead source. b. Preparation of an application to the Department of Health Services (DHS) for a "non-hazardous" determination for the sludge. This task will include consultation with DHS , meetings with City staff and DHS officials, and coordinating laboratory work needed for getting the waste classification. Laboratory work is not included in this task. c. Assist the City in disposing the stockpiled sludge. This will include consultationwith the Regional Water Quality Control Board (RWQCB) the City staff, and landfill Owner/Operators. Page 2 of 3 N/AGR:000026-1 6 . Development of a:. .workplan for the pilot study. The O work plan will include : objective of the pilot study; description of the treatment systems; sequencing experimental design, preliminary sizing of the equipment; preparation of cost estimates; and preparation of the final workplan. II SCHEDULE Engineer was authorized to proceed with the modified scope of work effective on The modified scope of work shall be completed by July 1, 1989 . III. COMPENSATION Compensation for the services provided under Article I of this Amendment shall be calculated on the same basis as in the original Agreement. The labor hours and cost estimates for completing the work defined in this Amendment are shown in Attachment A. The cost ceiling for the work done under this Amendment is $ 122 ,750 which increases the total cost ceiling under the. Agreement to $ 1 ,055 ,.285. The fixed professional fee for the work done under this Amendment is $ 15 ,060 which increases the total fixed professional fee to $ 129 ,560 . n All other terms and conditions of the Agreement dated Febrdary 23, \ _ 1988 remain un raged. ' BROWN AND CAL LL OWNER Signature Signature _. Printed Name Pervaiz Anwar . Printed name Title Vice President Title Date 11I16L Date Page 3 of 3 (� N/AGR:000026-1 ATTACHMENT A Cost ceiling , Task No. Task Description Labor dollars 1 Prepare supplement to the Wastewater Management Plan 230 16 ,000 2 Design improvements to the the existing sludge drying beds 64 4 ,450 3 Design Improvements to the existing plant utility system a. Service air 171 11 ,600 b. Instrument air 171 11,600 c. Reclaimed water 263 171,900 d. Non-potable water 164 11 ,200 4 Design a new primary sludge pumping station 230 15,000 5 Assist the City in getting "non-hazardous" determina- tion for ,the sludge 196 13 ,000 6 Develop a workplan for the pilot study 344 22,000 Total cost ceiling 122,750 Fixed professional fee 15 ,060 Attachment A Page 1 of 1 December 12, 1988 N/AGR:000026A