Loading...
HomeMy WebLinkAbout07/00/1989, 1-A - BUDGET SUPPLEMENT - INFILTRATION AND INFLOW REVIEW AND ALTERNATIVES _ MEETWG DATE: a .y Of San LUIS OBISPO July 24, 1989 COUNCIL AGENDA REPORT 'TEKA NUMBER: FROM William T. Hetland, Utilities Director SUBJECT: Budget Supplement - Infiltration and Inflow Review and Alternatives RECOMMENDATION: Staff recomends that the Council support the alternative approach to correction of the infiltration and inflow problem through a combination of treatment plant expansion, relief sewer construction and infiltration and inflow source correction. PURPOSE During the City Council's budget review, concerns were expressed that an increased effort was needed in correcting infiltration and inflow (I/I) problems in the collection system. This report will provide some background on I/I and an alternative approach to increased level of correction of the I/I sources. SUMMARY The City's wastewater collection system have significant deficiencies which have resulted in major problems to the City. The system does not meet the current Regional Water Quality Control Board standards nor does it meet the high ideals of this environmentally sensitive community. The City has done extensive study and analysis through the City's Wastewater Management Plan over the last few years. This has resulted in development of a program of treatment plant improvements and relief sewer construction to address the City's immediate wastewater problems. Long term approaches to infiltration and inflow plus capacity for growth are also included. This program is expensive and will take a number of years to accomplish but it is the most realistic alternative for the City to meet our current standards and correct the I/I problem. BACKGROUND The City's wastewater collection system consists of 150 miles of sewers ranging from 6 to 30 inches in diameter and 8 lift stations. The City has experienced problems with high flows due to infiltration and inflow. Most of the infiltration and inflow is the result of old clay pipe with cement mortar joints that have failed and deteriorating service laterals composed of bitumimous fiber pipe (Orangeburg). As part of the Wastewater Management Plan a detailed computer program of the collection system was developed to better analyze the hydraulics of the system and determine needed improvements. In addition, winter flow monitoring of the fourteen basins within the collection system was done to measure the level of infiltration and inflow. These measurements showed four to five of the basins were peak I/1 areas. =� I CI O� San LWS OBISPO page 2 Infiltration and Inflow Alternates TRADITIONAL INFILTRATION AND INFLOW CORRECTION METHODS Traditionally, infiltration and inflow is handled in two ways. The source of the I/I, the collection system and laterals can be rehabilitated to eliminate the I/I or the treatment plant capacity can be increased to treat the I/I. A cost benefit analysis to determine which I/I correction option is the most cost effective can be performed. Extensive studies required for the construction grants program showed that handling the I/I at the treatment plant was usually the most cost effective option. The City's flow monitoring work shows four or five basins with high I/I that may lend themselves to rehabilitation. Other basins showed I/I but at lower levels. The difficulty with rehabilitation work is the high cost and the uncertainty as to the level of success that can be achieved. This is because it is difficult to clearly identify the exact location of the I/I source and to make corrective repairs. Monitoring work required to identify specific sources of I/1 is also very expensive. There is also a tendency that as one section of pipe is repaired it simply moves the groundwater to the next section where it finds new areas to infiltrate the sewer. A key source of I/I is private sewer laterals, especially those involving bituminous fiber pipe (Orangeburg). Bituminous fiber pipe was used in San Luis Obispo between 1940 to 1964. The subdivisions developed during that timeframe show some correlation to the basins where high I/I exists, but not completely. It is estimated there are 4000 service - laterals in the subdivision identified as having bituminous fiber pipe. If the average cost for replacement of the laterals averaged $2500 per lateral, the total cost of a replacement program would be $10,000,000. These costs do not include any rehabilitation work for the collection system which are another source of I/I. It has been estimated that an additional $4,000,000 to $6,000,000 would be needed for the rehabilitation of the collection system in the four basins with the highest I/I. This approach of lateral replacement and collection system rehabilitation would then total over $16,000,000 for only a partial solution and little assurances that I/I problems would be resolved. PREVIOUS COUNCIL DIRECTION On July 5, 1988, Council provided direction to staff to approach the I/I problem in a multifaceted manner. The general. philosophy was to handle the I/I at the treatment plant (including relief sewers) in the short term, but also address the source of the I/I (collection system and sewer laterals) over the long term. By following this approach the City would be in compliance with the Regional Board and by reducing the sources of I/I would provide an additional safety factor or insurance policy from future violations of the City's waste discharge requirements. The program included the following specific items: 1. Develop a relief sewer program and increase the treatment plant capacity to handle _i the I/I problem. The treatment plant design has been completed at a cost of over $1.0 million. The first phase of relief sewers are being designed by the City staff and are 75% completed. It is anticipated to bid this work this summer and fall. 1-4.4 � city Of san�LUIS OBIspo Mi;% COUNCIL AGENDA REPORT page 3 Infiltration and Inflow Alternates 2. Have staff develop an ordinance requiring the inspection and testing of sewer laterals at time of saleof property. Inspection and testing of the laterals at the time of any building permit issuance, issuance of special use permit for changing residential to commerical residential, sidewalk reconstruction and street resurfacing are also being considered. A draft ordinance has been prepared and the agenda report completed. This will be placed on the Council agenda very shortly. 3. Direct staff to develop a lateral replacement and loan financing program. Alternative programs, cost estimates and funding options are currently being investigated. With the competion of the budget, the Finance and Utilities Director will work together to develop program options to present to Council in a few months. CONSENT DECREE IMPACT The City is currently negotiating a consent decree with the Regional Board which has a major impact on the City's Wastewater Management Program. The decree is basically a time schedule which the City agrees to follow in order to comply with our established waste discharge requirements. Interim discharge requirements are also in the decree. The decree includes stipulated penalties the City would pay if it does not meet the time schedule or violates other provisions of the decree. All the negotiations to date have been based on the City handling I/I at the treatment plant and installing the necessary relief sewers. To change that strategy significantly at this date may be very difficult, if not close to impossible. If the City were to change its program we would not be able to meet the standards and time schedule of the consent decree and could face the prospect of losing to fines and penalties monies which could be better used to correct deficiencies of the existing system. CURRENT I/I ACTIVITIES There are currently budgeted capital improvement projects and operations expenditures which directly and indirectly help to correct I/I problems. There are two capital projects that will address I/I. The first is the relief sewer project itself. As part of that project it is estimated that over 1000 laterals will be tested and repaired if necessary. In addition, our annual sewer main replacement program replaces those sewers which are undersized or damaged and therefore a potential source of 1/1. Also it will include the testing and repair of laterals associated with those projects. The City is proposing to spend about $200,000 per year on these projects. On the operations side of the budget nearly 20% ($50,000) of the collection system operating budget is spent each year on I/I elimination tasks. These include manhole repair, sewerline repair, and sewer lateral wye installation and repair. In addition I/I detection involving smoke testing and televising of sewer lines is done. Also approximately 5% ($3,000) of the Pretreatment Program operating budget is spent on the detection and elimination of inflow sources as industrial waste inspections are performed. ��u��i�u��IIIII���Ini► J► City of San ling OBISpo niis COUNCIL AGENDA REPORT page 4 Infiltration and Inflow Alternates 1989-93 CAPITAL IMPROVEMENT PROGRAM ALTERNATIVE The proposed 1989-93 Capital Improvement Program includes the two major projects which relate to I/I; the expansion of the wastewater treatment plant and the relief sewers. It is proposed that the relief sewers project be modified to better address the issue of 1/1 source correction. The first year project is the largest section of relief sewers which will extend from the treatment plant north to above our major problem area at Chorro and the freeway for a cost of $5.20 million. Over the next three years it was then proposed to construct the balance of the relief sewers at a total cost of $3.77 million. An alternative to this approach would be to construct the initial section of the relief sewers to above Chorro and the freeway as initially prposed. Thi's section is currently estimated at $5.20 million but may be less depending where the project is terminated. This project would resolve our immediate problem of surcharging the system and popping manhole covers in this area during peak storms. The balance of the relief sewer budget, $3.77 to $4.50 million, could be used to follow a three part program. The first part would be to analyze the upstream I/I and determine the feasibility of rehabilitation work on the system and laterals. An extensive lateral repair/replacement program could be implemented with the City providing the money up front and then require the homeowner to repay the money over a set period of time. The third part of the program would be to build additional relief sewers as may be needed with the proceeds of the repayment funds. This alternative will require some additional study to determine its feasibility and cost. This study may include additional computer modeling, flow monitoring, and collection system and lateral inspection and testing. There may also be a slight increase in the risk of spilling sewage following this approach. The program has the advantage of solving the short term problem while correcting I/I over the long term. It also allows the double use of money in correcting the 1/1 problem. i .wthii/n A4�� _TING_ AGENDA D47E " -? ITEM #Al �illllllll IIIIIIIII ���IIIIIIII�IIIIIIIII I II city, of sAn IuIS OBISPO down I ONIM 990 Palm Street/Post Office Box 8100 • San Luis Obispo, CA 93403-8100 1"* '=:uenp:es acion by Lead Person July 24, 1989 Respond by: 0Counca rr7'CAO MEMORANDUM (j4m,Atty. [[ �lerk•orig. To: City Council 7.1% �r � From: JohnDu BILE Subject: Newsp er i erest - Inflow and Infiltration For your information, Bill Hetland will be meeting with Winston Caine to talk about "I and I" and related sewer issues. JD:mp RECEIVED JUL 2 4 1989 /L:QTA CITY CLERK SAN LUIS OBISPO,CA