HomeMy WebLinkAbout07/18/1989, 2 - 1989-90 ANNUAL WATER OPERATIONAL PLAN Uy �, O� San �U,� OU,��O MEETWG DATE: Warms Jul 18 1989 COUNCIL AGENDA REPORTR ECMveff- E'' ' MSM FROM: JUL1 4P9 William T. Hetland Allen Short Utilities Director Water Division Manager SAN 99MV00F,*lead F on SUBJECT: Respond by: 1989-90 Annual Water Operational Plan M QD001 f�:pto CAO RECOMMENDATION: Any. Receive and file report. Provide direction to staff as necessary. t T. Summary The City is finishing up its third dry year with minimal rainfall and reservoir inflows. It is also continuing to develop additional water resources, and a brief status report on each of the projects is provided. The water conservation program has been very effective, which has resulted in a reduction in water use of 35% to 40% since its inception. Public relations aspects and additional incentive programs are being pursued. The Annual Water Operational Plan each year projects reservoir storage to make sure that the City is able to adequately meet its water commitments. This year the curve has been adjusted to use last year's historical Inflow data and to include groundwater development. The curve shows that the City does not have to go to 50% mandatory water conservation, and that even at 20% conservation there is adequate water to sustain us beyond the end of the six year dry cycle. I. Introduction In 1985 the City Council adopted the Annual Water Operational Plan Policy Statement. This established a procedure to monitor the City's water supply situation and implement certain programs at specific action levels as City reservoir levels diminished. The Annual Water Operational Plan looks at the current reservoir storage situation, projects future storage based on a worse case scenario, and then evaluates supply and demand management options. The end result is a reservoir storage curve showing the estimated reservoir levels during the City's worst case historical dry cycle of six years. 11. Existing Water Supply Status As of July 1, 1989 the Salinas Reservoir had 4742.3 acre feet of water in storage. This represents 20.4% of the reservoir capacity. The Whale Rock Reservoir has 22,383.8 acre feet of water in storage•which represents 55.1% of the reservoir's capacity. The City's share of its storage at Whale Rock is 50.6% or 11330.7 acre feet. Together the two reservoirs provide the City with a total storage amount of 16,073.0 acre feet of water, which is 35.2% of the City's total storage capacity. Exhibit A and B show the change in lake elevation at each of the reservoirs over the past four years. This correlates directly to storage capacity. During the last year the City has been developing groundwater wells to supplement the City's surface water supplies. We currently have two domestic wells operational. They are producing approximately 43 acre feet per month. Exhibit C shows the monthly production for the wells since they have been operational. One irrigation well at Laguna Lake Golf Course is operational and has produced 8.5 acre feet of water. This represents about 50% of the golf course's total irrigation needs. In addition, a construction well at the City's Corporation Yard has produced 4.6 acre feet of water. �� city of San-Luis osispo COUNCIL AGENDA REPORT Page 2 Ill. Water Supply Development Projects The City is looking at the development of both long-term and short-term water supply projects. The following is a brief status report of those projects currently under development. Salinas Reservoir Expansion The feasibility study for this project is approximately 85% complete. The geotechnical, siemic and dam stability portions have been completed. This analysis shows that an earthquake fault located within one mile of the dam is now considered active. Prior studies had felt that this fault was not active. This results in higher ground accelerations at the dam site which means larger forces on the dam during an earthquake. The consultant feels that these higher forces are not significant but that additional testing of the dam concrete strength is necessary to verify this conclusion. The State Division of Dam Safety and the Army Corps of Engineers have concurred informally with this recommendation. Analysis on the probable maximium flood (PMF) that the dam may experience has also shown the value to be higher than previoulsy determined. This is because of changes in how the PFM is now calculated. This will most likely require some additional downstream protection of the dam foundation. The consultant is reviewing this further and at this time does not see this as a major obstacle to the feasibility of the project. The environmental analysis and yield studies will be underway next week. A draft report will be completed in September.. Coastal Streams Diversion Project This past winter the inadequate rainfall did not produce enough runoff for the biologist to do a complete fisheries analysis. That portion will have to be completed next year if and when adequate rainfall is received. The institutional arrangements are currently being performed. Staff from the Whale Rock Commission and City of Morro Bay will be reviewing that information shortly before a preliminary document is developed for distribution some time in October. State Water Project The State Department of Water Resources is currently doing the environmental analysis and predesign on the coastal branch of the State Water Project. The draft Environmental Impact Report is scheduled to be completed in November. It will be distributed and public hearings will be held over the next year, with completion of the final document scheduled for November of 1990. San Bernardo Dam Project I The City of Morro Bay has informally requested the City to participate in their proposed San Bernardo Dam Project. Staff has met with the Morro Bay staff and their consultant to discuss the feasibility of this project. Additional information was requested of the consultant before the City staff felt that a firm recommendation could be made. The Morro Bay staff will provide the additional information and a formal request for participation it city of San LUIS OBISpo COUNCIL AGENDA REPORT Page 3 Desalinization The City was approached by a firm that was proposing to develop a desalinization plant in Morro Bay. The project would furnish water to both the City of San Luis Obispo and Morro Bay at a cost in the neighborhood of $1500 to $1800 per acre feet. Staff met a couple of times with these people to review this concept. The firm was to finalize some of their numbers and return them to the City with a formal proposal. To date they have not been returned, but they have submitted a separate proposal to the City of Morro Bay. Groundwater Wells The groundwater development program first involved the identification of potential well sites for development. Once the well sites are identified they are then drilled, cased, gravel packed, air lifted and pump tested for volume. Additionally, the well is sampled to determine water quality and compliance with the State of California Health Service's maximum contaminant levels. If the water quality analysis meets or exceeds the State of California maximum contaminant levels, the well pump is properly sized and installed. A summary of what the groundwater program has accomplished to date is listed below. Number of wells drilled 10 Number of sites augured 10 Number of wells sampled 14 Number of wells operational 4 Exhibit D shows the location of the different well development sites throughout the City. The four wells that are operational and their yields are listed below. GPM AFY Pacific Beach # 1 Domestic use 165 266 Fire Station # 4 Domestic use 80 134 Golf Course Irrigation use 80 134 Corp Yard Construction use 150 242 Three additional wells will be on line by the end of September. They are: GPM AFY Dalidio Domestic use 500 807 Auto Parkway Domestic use 700 1129 Police Range Domestic use 80 134 By the end of September 2470 Acre feet per year of well water will be operational. I �z-3 �'1Q1�1WI upm1�p1I1I C 1 C R C 4 0 �V �I�11 city O f Van Luis OVI spo u COUNCIL AGENDA REPORT Page 4 Water quality tests have shown that eight wells do not meet State Water Quality Regulations. Those wells are: Laguna Lake Golf Course Auto Parkway Dalidio McBrides (Border Patrol) Madonna Well #1 Fire Station #1 Mission Street Tot.Lot Corporation Yard Those wells which are not in compliance with the State of California Water Quality Regulations will require some form of treatment prior to domestic consumption. Water quality analyses have revealed the following constiuents in violation of the State Regulations: Iron and manganese. Arsenic Nitrates PCE TCE It is estimated that treatment costs to remove the constituents listed above will range from $100,000 to $250,000 depending on the well capacity and the amount of the contaminant. In addition to the hardware requirements, manpower and ongoing chemical testing requirements will also increase to ensure system reliability. It is anticipated that the City will have on-line approximately 3350 acre feet by the end of October, 1989. This represents approximately 43 percent of the water demand which has historically been supplied by the existing surface water reservoirs. IV. Water Conservation Since the implementation of the mandatory water conservation program in April, the City's water consumption has been reduced by approximately 35% to 40%. Exhibit E shows the weekly reduction in water use over the same time frame in 1987, the base year for our program. This is a very pleasant response since the City's initial goal was only a 20% overall reduction in water use. Attachment 1 is a summary by Bill Statler, City Finance Director, of the first billing cycle which includes the mandatory water conservation regulations. This provides a good insight on which customers are conserving and which customers are paying penalties. Hotline The Water Conservation Program which was approved by the City Council on April 5, 1989, is fully functional and operational. The first phase of the program was to hire, train and properly equip those individuals whose responsibility it would be to respond to public comments, questions and concerns. These individuals have been identified as "hotline" personnel. C11y Of San LUIS OBISpO COUNCIL AGENDA REPORT Page 5 Their primary function is to answer all questions and provide information concerning the water conservation and adjustment allocation programs. In addition, they must be well versed in all aspects of the conservation program, billing cycles, industry terminology and the allocation procedure and process. From May 6, 1989 to date, the Hotline personnel have answered 8216 calls, and have sent out 1917 allocation adjustment form requests and have received 1038. The largest number of phone calls occurred after the target allocation letter had been sent out to each customer. The single largest number of phone calls occurred on May 18, 1989: a total number of 551 calls were logged that day. Drought Patrol The second phase of the program is the enforcement of the Water Conservation Ordinance. This phase of the program over the past three years has been accomplished through the use of a drought patrol. The drought patrol is actually in the field patroling the community. The drought patrol's primary purpose is to educate customers to the importance of water conservation and enforce the City's Water Conservation Ordinance and Municipal Codes. The drought patrol was officially on the road Wednesday, May 24, 1989. As of this writing they have handed out approximately 60 warnings to those who are in violation of the Water Conservation Ordinance and Municipal Codes. There have been no formal citations or fines levied as a result of visible water waste. Public Relations and Public Information Plan. To implement an effective Water Conservation Program requires the public to be thoroughly informed. Staff has been in the process of developing communication strategies and a long term approach to addressing and informing the public. During the initial stages of the program the Water Conservation Staff produced a pamphlet on the mandatory water conservation program, "Every Drop Counts". The pamphlet was mass distributed to approximately 28,000 mail boxes, business and Post. Office boxes within the City. In addition, prior to each informational release, press releases are generated and distributed to both T.V. and radio media. These include: o The "Every Drop Counts" pamphlet. o Introduction to the drought patrol. o Water Allocation notices. o Program success. I ' 1 CMY Of SM LUIS OBISPO COUNCIL AGENDA REPORT Page 6 Staff has also been available and involved in presentations to community and business groups. Staff has also written articles for various newsletters, Chamber of Commerce, BIA, and the City's employee newsletter. The Staff has established an informational booth at farmer's market on a bimonthly basis to pass out information, answer questions and explain the goals and objectives of the Water Conservation Program. Staff has been actively involved in the writing and production of public service announcements which are approximately 30 seconds in length and which were distributed to all of the County radio stations. Additionally, staff has developed a positive proacitive " paid advertising campaign. This includes the following: o Radio advertising -- Water Conservation jungle "cool water". o Print advertising -- Ads have been developed and placed in the Cal Poly Mustang Daily and soon will appear in the Telegram Tribune. o Development of television commercials and storyboard. Actual production date has been delayed and the project held in reserve, pending water conservation trends. o A list of conservation materials and books for the reference section of the library. o Conservation tips room tents for hotel and motel use. Finally, staff is in the process of developing a program to recognizing those individuals or business who demonstrate significant water savings. To recognize those individuals residents, staff has designed and ordered a special T shirt in titled "Drought Busters". In addition, staff is investigating the use of the telegram tribune, certificates, and council recognition. Staff is also investigation and developing concepts for the development of plaque and certificates to recognize those in the business community. Development and implementation of a public relations and Informational Plan is an ongoing process which is constantly being reviewed, modified and improved to ensure that target audiences are met and program goals and objectives are properly conveyed. V. Projected Water Supply Situation The basis for projecting the City's water supply situation is the development of the reservoir storage curve. The curve is developed by starting with the current amount of water in storage at the two reservoirs. The future levels are projected taking into account the consumption, conservation, reservoir inflow, evaporation and the use of alternate water supplies like wells. Four wells representing approximately 400 acre feet per year are currently on line. It is estimated that over the summer additional wells will become operational as they are completed and the treatment units installed. Exhibit F shows the projected groundwater amount and the months it will be operational. By the end of October there will be operational 3340 acre feet per year of well water. These amounts are reflected in the reservoir storage curve. Additional well water could be developed if necessary. I v�-5P _ :=±t _ ^z;•rpt?tyz::x-rrexc�+,nc:+:,wcv¢ AEtrNM�Sa4c g� Clay O� Sd11 LUIS OBISPO WiNS_ -COUNCIL AGENDA REPORT Page 7 Consumption and conservation for the curve was estimated using two assumptions. The first was a 20% reduction is normal consumption with no allowance for growth. The 20% is the City's current goal for its mandatory water conservation program. The second curve is based on a 40% reduction in water consumption with no allowance for growth. The 40% reflects the actual reduction in consumption that the City has experienced since the mandatory water conservation program was adopted in April. Reservoir inflow values are based on the historical 1988-89 amounts. This is a more conservation approach since these values are less than the previously used average inflow for the worst case six year dry cycle. Evaporation losses were caluculated based on the historical evaporation data. All this data was then inputted on a Lotus spreadsheet for each month for five years and then plotted. Exhibit G shows the resulting reservoir storage curve for City. There are a number of key points on the reservoir storage curve that need to be highlighted. The first is that under the 20% conservation assumption there is adequate water in the reservoirs, plus groundwater, to last the City until the beginning of 1994 before the Reservoir reaches the minimuim pools. This is well beyond the projected end of the six year dry cycle that the City uses for water planning purposes. At a conservation level of 40%, the level the City is currently maintaining, the reservoirs still have over 9000 acre feet of storage left by early 1994. These curves demonstrate that with groundwater and the current reservoir storage the City can meet its water commitments beyond the end of the City's worst case six year dry cycle. It further shows that as long as the conservation level is maintain in the 20% to 40% level there is no need to establish more restrictive levels of mandatory water conservation. VI. Recommendation Staff recommends that Council receive and file this report. I wthannwtr/ n r- -- Exhibit-.A . , 9 i € a mm j OD co i i e CD c QS aD • i i i I i ; ; I i T mCO UJm LLCO OD L 1 i i i ' i i i I I t jt CD ao LU OD i i i i i i e - ' woo CDco1 m m t i I co W i clf ; i � f � li ! j III � I Ili i m I j „ I l I I I ao oa aloe - i Ia °D-oD Z j E i i i s - m `moop Im1XIo } co ao T i , ; 1 Q 5 v!J � t I j I j i I � � I -4 { � W J W OWOWOWOWO�OO�OOWOtUO TOOC�C�a�a0l.1�mOWW �t �c�C� � O O M N N N N N N N N N N N N N N Q P P T P P P P P P P P P P P P P P Z J C - � • u i • + ! ! 1 t W z 1 1 1 1 1 I ! 1 t 1 1 Q t if Ym � ! 1 ' a A. a � a i '• i t i i ; j i V //�� co LLz co L , co Ih CDi i i i i i i i �j LU U i i ii i�i ® mti m Go ' ! LU m N i 1 + O � I !W�� ; �W�,LLILLi OD a_ to luui i i i a ic;CCI O z Utdi0i o idi 1 Q W I 1 �=; = a m all, i o ) ' 0aJ OL" 1 4 i I 1�1 �LOa W MiCO CO) mmgrmgw iNI>-(r' Owo T-0 1 1 ! I 1 U !3, O cr N N N N N W A P P 0 0 W J Q 2 P Exhibit C LOC uJI 196 i e i i f � 93V ' O cc CO O wm ' ` ! w a E zm U® o � It E � LL � m Lu N U- 1 LU co P O 0 o C7 N tO I i 9 ^X •� L I c � _ _ o city o�- San Luis oBispo ® ; LA1llUlL L. G1 �W li L/ W N W > ' ... . . .. ... ... 1 1 � ir- OD m �1 4D /( iJs .. ... ........... Ny W W V fi 1 � W u Z � W W � N � V uj r W W N 4W m a F- UA C` W i i i i i i t t t LU w i N � > 1 d !J J ; ' N U 0 nO (OD t � d co ' I jUl cr cc N L N y D Q o0 1 ® w 1 A CO) Wco C3 U ! N Z W 1 Wcc ((�� t 1 W 1 (L L ' D � W W NLL O � O :•I:•:: .•J.•fl •:V:tt '::1\1'If:V:\:V:V1J:':'iif:'.:}.i:Yil:':V ' 1 W O 14 O IQ O 10 O W 9 N N 0 ch a a- W' Gla O � U � 4 aC y W N 136 O a vi a w 3 ol O O OO O O O O O W O IOA O O O W 4X"D.L L b V 1 1 1 1 1 1 1 1 1 V/ i OIL 1 1 1 I f i a o eN� MW Q �U aCCco Q LL LU * N 0kin L � O . ZFCC m 1 ; O ; ® b Z m ' LL, W ? < W U LL C� U Q cl G g ' co O 0 0 Illt N Q 0 0 v N co N P P P P P r � 9 Attachment $1 r July 10, 1989 i TO: Distribution FROM: William C. Statler, Director of Financcwill� SUBJECT: WATER USE Attached for your use and information are the summary results of the first billing since the adoption of the Mandatory-Water Conservation Program (April 5, 1989) that includes target allocations and any related surcharges. The following is a summary of key statistics: • 3,996 accounts are included with this billing, representing approximately 32% of all the City's customers. These accounts are primarily located in the Foothill, Cal Poly, and Laguna Lake areas. Consumption periods range from April 10 to June 5 through April 24 to June 22. • For these customers, an overall reduction of 18% would have met conservation goals for this period; actual water usage declined by 39%. • Residential customers accounted for 80% of the decrease. a 549 customers tentatively have incurred surcharges of 100% to 200% as summarized below. However, it is anticipated that many of these customers will be eligible for adiustments based on factors used in granting adjustments to other customers. Total With Surcharges Surcharge Accounts 100% Level 200% Level Revenues Residential Single Family Detached 3,161 137 260 S 34,858 Other 577 27 48 13,278 Other Customers 258 23 54 26.514 Total 3.996 187 362 $74,650 If you have any questions concerning the attached summaries, or require additional information, please do not hesitate to contact me. Distribution: John Dunn Bill Hctland Allen Short Tina Metsger Bernie Ries Dixon Flynn WATER/7-10WUSE r C W m V' a CD It O N N N W CD 0 0 0 0 0 0 0 O Vr totO0 'T .- O V , O CO 1� co 't U) }L (aa n Rt O CD 11 co r. n o m ro J N r` N V M N N 69 Q W D a F r- o $ornov oo MOOMp It) M WV W (DN Cl) N N (D N C) r` A A a) r. O CO O CD fl rZ O N _ r, .- CO N Cl) N T -e O C.) N N (D N N N 01 C7 U L N O 0 et N CD N h r' LO 01 Q O O N O F— J J a _ Z� o 9! o o a o 6R o e v o 0 0 o a o 0 0 0 0 W M O N O W N N CO (D N O N CO (D N O _ Q (n CD In C7 O O rl (D (D N V N C) Cl) C) 01 V N O V O U Q CD N N C7 01 O1 N m 7 r` 01 O O O4 6 V C7 O1 W W It O V N V) N 1 0 N N 1 to tA 01 V t` V' CO V Cl) o Z z n N w CO cq 0 0 0 co O N N O O O O O O O N (n < In O N fr C'7 a ([) O O W (n � CD N O O [7 a) CO (n O1 O O n n co O CO r. N O N O1 N CD -1 Co n N O co C.) Co (O c0 CO V' N n 0) Cl) O .- (A O n 't C7 Co C.) N Co n Cl) P, , 0co t` O O O O N Z O U Z o 0 0 Co 0 (0 0 W 0 m O o 0 0 0 0 0 o 0 o O N N v (n 0 CD O O Q O Q m O (D N N V N - O CC-) W N _ H O O O �_ O LO 1 CO V N N N O O [O Co O O N" (O aO N CO 1O O 1� N O / 1 I� M (C1 N (M 7 CO .4rf 0 O (A V (D CO N \ / co fn (L)� N � Z n O U Lf) _ r N O V M N . N O M ^ — W N v (D Cl) (D O Q) O Co Cl) N Na) I N I z cl co C6 O O r a U (n U } w Q Q Q c D n U) O w ` O CL a) = a O W } c cy m cb a. f- a. C7 m o a Y E a`> N ami (� J o D cz< a N � w '_' E a) c W O ' a Y m m c E z -� J U in m Q (a z m > a m > O m J U 1 1 Y ti E O Q U m i > > m o U a) m Q `� `�-� h o CT) 0 o. m m a a y (a a Q) 'o U CO m a0i x c y o °� v a) L (� (r) >1 C7 m a E O UJ z 0 'm a c`rs o .0 a) �% E ca c c d 5 r t M ("a 'a 0 -� z a) a) O a O O O O O a) m o (u L U U O a) ap � O QX0 < cc � UErJ .JJLL0U) (nU (nLL o n 0 0 o 0 o 0 0 o 0 0 u1 0 0 0 0 0 0 0 f.- J Q cn WQ O O ^ N O U N c7 V t0O O W O O 01 O 001 C � Q Q o u r qr co 'it n I O O Of n v O1) 0 ^(o to O 00 0 O co a 0 N J �p N A N v C* N f^D Q N 49 Z W J a H 0 y � � -T N N O N 0) O) N to fA O O O O �- O O UM Ln U a LL 0 co co �C N < O O co co V co 0 N 0 0 0 O co O O a) C.) t• < Cl) 7 @ T (D c') to tD co W i O N m N O c7 N n Q Z 19 W Q W = a. U O N 7 O N O O O IM N O 0 0 0 O O N N N c') O co H o V CVa N U- 0 0 N f, O O O O N N a) O O 0) to 0 0 0 0 0 0 0 fl. tD O O co N 'r co 7 O to tD m 0) 0) N tD m V f� U; C .1 tD 1.9W Q to co CC Z a r� UJi U L6 CO CO � o m o 0 0 o a to 0 0 0 0 0 0 m c o U o U cj o O W J cr- Z) Z CcLLJ CL v, W S U) 0 o w cc 0 Ir = a w V >- c c c m m ~ m a 7 Y CL CD 'aE O d U) N C O Z (n N Y O D O C W O c a Q Y m 0 °) CO c� E E c Z 0 coU cq � is to caZ � > a m E > U) U m �u LL o c tU?,ca a s y n a o 0 0 z c Q (D m x c m y of tvn c_ o o C7 _Z _ J W Q N H a ca O :6 m m E iD 7 C C CU 7 L L 0 O m D Z Q Q O Q Q m _ Mom J J J LL O W W O O LL U W O N 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 N O O y 0 O O N0 V U) (D0000000 � 0 C J E U a 0 •- r N C7 a CD CD r� CO m CO O O Oa. , D Q Q U U