Loading...
HomeMy WebLinkAbout07/18/1989, C-2 - FINAL MAP APPROVAL FOR TRACT NO. 1545, A 6-UNIT AIRSPACE RESIDENTIAL CONDOMINIUM AT 550 BUCHON STRE MEETING DATE: 1111111111111101111 city of san Luis oBispo Jul 18, 1989 Mlor" COUNCIL AGENDA REPORT 11 NUMBER: OLS FROM: David F. Romero Wayne A. Peterson Prepared by: Gerald W. Kenny , Public Works Director City Engineer Supervising Civil Enginee SUBJECT: Final Map Approval for Tract No. 1545, a 6-Unit Airspace Residential Condominium at 550 Buchan Street (Nelson and Joanne Harris, Subdividers) RECOMMENDATION: Adopt resolution approving the final map for Tract No. 1545 DISCUSSION: This tract consists of 6 residential airspace condominiums on a common lot. The subdivider has complied with the conditions of the tentative map per Resolution No. 6406 (1988 Series) as follows: 1 . The subdivider has installed the necessary subdivision improvements (except as listed below in 4 below) and has paid the required fees in conjunction with the construction of the condominium units. There is no subdivision agreement.. 2. The CC&R's have been approved and the necessary easements have been dedicated on the map. All fees and deposit: have been paid as indicated on the attached Fee and Bond List. 3. The final map has been checked and is in substantial conformance with the tentative map. 4. Conditions 11 and 12 of Resolution No. 6406 (1988 Series) required the installation of a new fire hydrant adjacent to the project's driveway and a water main extension to the satisfaction of the Fire Dept. The Fire Dept. re-onalyzed their requirements and determined that the existing hydrant at the westerly corner of Buchan and Nipomo Streets will be able to serve this development until a new hydrant is installed with a City project (listed in the proposed CRP). The subdivider paid $3000.00 to the City in lieu of installation of this fire hydrant at the direction of the Fire Dept. The money will be used to install a new hydrant at the corner of Buchan and Beach Streets which better serves the entire neighborhood. (See attached memo from Erwin Willis. ) II��ti�� ►�illllli�pn ���lt MY Of San Luis OBISPO WMIrms COUNCIL AGENDA REPORT Tract No. 1545 Meeting of July 18, 1989 Page Two ALTERNATIVES: Option 1 : Adopt resolution approving the final map for Tract 1545. Option 2: Deny approval of the final map if Council finds that conditions have not been satisfactorily met. CONSEQUENCES OF NOT TAKING RECOMMENDED ACTION: Delay in recording the final map and occupancy of the units until approval and recordation of the final map. CONCURRENCES: The Community Development Director, Fire Chief, Utilities Director and City Attorney concur with the recommendation. No department has expressed any opposition. RECOMMENDATION: Adopt resolution approving the final map for Tract No. 1545. Attachments: 1 - Draft Resolution 2 - Map 3 - Checklist 4 - Fee and Bond List 5 - Resolution No. 6406 (1988 Series) 6 - Memo from Erwin Willis N/jkt1545 jk I 4"�.2 '.2 RESOLUTION NO. ( 1989 series) i A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN LUIS OBISPO APPROVING THE FINAL MAP FOR TRACT NO. 1545 WHEREAS, the City Council made certain findings concerning Tract No. 1545 as contained in Resolution No. 6406 (1988 Series), and, WHEREAS, the Fire Department has determined that a new fire hydrant is not needed at the entrance to the project as prescribed in Condition 11 of the above-mentioned resolution, due to the existonce of an adequate fire hydrant at the intersection of Buchan and Nipomo Streets, and the Subdivider has paid $3000.00 to the City for a fire hydrant to be installed at the intersection of Buchon and Beach Streets under a future City contract which will better serve the neighborhood, and WHEREAS, the 8-inch watermain per Condition 12 of said resolution is therefore not needed to support the previous fire hydrant location, and WHEREAS, all all other conditions required for Tract No. 1545 have been met; NOW THEREFORE BE IT RESOLVED that final approval is hereby granted for Tract No. 1545. On motion of seconded by and on the following roll call vote: AYES: NOES: ABSENT: the foregoing Resolution was passed and adopted this day of 1989. MAYOR ATTEST: CITY CLERK Resolution No. (1989. Series) Page Two. APPROVED: City A ministrative Officer City Attor City Engineer Fire Chief ` i Utilities Director Community Development Director N/jkt1545 jk i � BEACH; STREET a .• � s/.3.'SD•1✓.33Qa0.ftx•/, A/.adr•5230"1✓..��'/�M. 4 /Sa00iCl lBQ4/M: IWOO.R-/,/50.4/ML . i . , .4 ' Aor3e-53.'ei..3olaQo.'.e/� r.v.31rit3r'a /sagotb Cg. . . � a o n �=..g +"r r -4 g ° o a ak Zt p pU Z •'Rw. � . . � 0.. l�w 8 rsa 1710�!/ /SQ495 iI. /SQA R�/ /SQ 493 M. a : '•1 f ••1 4: a s&7 R-/, ,4C$i a2 t7 W.dQ0 99 M NI RV rTQce,r-i/.so..s37 IAMW V /s0:as7 se. _ . .: -.tt3l�_S?'K..SSD.00',2I, .V.36•SZ�CP."JI.9S/.09.61.. . .. - .. �•. . .. N/POMO STREET �- rs• rs' _ � u' rs' l� �i��i�x����� ������1i� city off-sari-cuis os�spo -�' �` FINAL MAP APPROVAL CHECKLIST PROJECT NAME 550 Buchon DESCRIPTION 6-unit airspace residential condo MAP NUMBER Tract 1545 SPECIFIC PLAN REZONING GEN. PLAN USE PERMIT VARIANCE ARC OTHER PUBLIC IMPROVEMENT CONDITIONS It DESCRIPTION INITIAL 'DATE COMMENTS 1 GRACING Including planting 3 retaining walls 2 STORM DRAINS A DRAINAGE STRUCTURES 3 SEWERS 6 SERVICES 4 WATERLINES d SERVICES 5 FIRE HYDRANTS - W 8 CONCRETE Curbs and Gutters Sidewalks Driveways A \ 7 STREETS 3 PAVING7-1 Pavement Signing,strlping and curb painting 8 NON-CITY UTILITIES - P.G.SE — Electrical Street Ughts Cable TV Telephone Co. Gas Company 9 FEES RECEIVED(Water,Sew" N 10 PUBLIC IMPROVEMENTS payments received 11 AGREEMENT CONDITIONS have been met 12 MONUMENTATION 13 STREET TREES 14 OFFSITE WORK - 15 BONDIGUARANTEE deposited 18 PARK de"—•'^^ or in4leu fees OTHER CONDITIONS 17 BOARD OF ADJUSTMENTS 18 PLANNING COMMISSION 19 ARCHITECTURAL REVIEW_ COMMISSION 20 CITY COUNCIL 21 ABANDONMENTS 22 OTHER CCSR`s - 1 ATTACH LIST OF CONDITIONS 8 SUBDIVISION AGREEMENT COMMUNITY�+DEVELOPMENT APP L .9-81 PUBLIC Sr PPROV TRACT 1545 550 BUCHON FEE LIST Paid Fund Number Water acreage fee $732.34 (22, 615 - 6000 sq. ft. )( 1920) 6/26/89 050-0017-071-020 43,560 Park-in-lieu fee $ 7, 998.00 6/26/89 011-0010-013-020 Max = ($1333). (6 units) Fire hydrant $3, 000.00 5/3/89 050-0017-070-050 Per Condition 11 tJ I hb7/1545-fee by RESOLUTION NO. 6406 (1988 Series) A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN LUIS OBISPO GRANTING APPROVAL OF TENTATIVE TRACT NO. 1545 LOCATED AT 550 BUCHON STREET BE IT RESOLVED by the Council of the City of San Luis Obispo as follows: SECTION 1. Findings. That this council, after consideration of the tentative map of Tract 1545 and the Planning Commission's recommendations, staff recommendations and reports thereon, makes the following findings: 1. The tentative map is consistent with the General Plan. 2. The design and improvements of the proposed subdivision are consistent with the General Plan. 3. The site is physically suitable for the type of development proposed and the density allowed in the R-2 zone. 4. The design of the subdivision and the proposed improvements are not likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat. 5. The design of the subdivision or the type of improvements are not likely to cause public health problems. 6. The design of the subdivision or the type of improvements will not conflict with easements, for access through or use of property, within the proposed subdivision. 7. The Community Development Director has determined that the proposed subdivision will not have a significant effect on the environment and has granted a negative declaration. SECTION 2 Conditions That the approval of the tentative map for Tract 1545 be subject to the following conditions: 1. Each unit shall have individual utilities and all new internal utilities shall be underground. 2. Final map shall show a 6-foot public utilities easement and a 10-foot tree easement along the project's public street frontage. 3. Subdivider shall grant an easement over the common lot area, except under structures, for underground public utilities serving the site, to the approval of the City Engineer and affected utility companies. 4. Subdivider shall provide necessary easement for existing overhead utility line along -�- ----�-- --- ------- •'-- -- - - --- -^- -- - -^ .. ,.. a .. Resolution No. 6406(1988 Series) Tract 1545 Page 2 5. All on-site driveways, nonstructural parking improvements, and utilities shall be installed as subdivision improvements. 6. Subdivider shall install individual water service for each dwelling unit. Meters shall be clustered at the Buchon Street frontage to the approval of the Public Works Department. 7. Subdivider shall pay water acreage and park in-lieu fees as calculated by the City Engineer prior to recordation of final map. S. Subdivider shall install an 8400t wide curb, gutter and sidewalk per city standards to the satisfaction of the.City Engineer. 9. Subdivider shall install one new street light on Buchon Street. to the satisfaction of the City Engineer. C,' 10. Subdivider shall install one street tree per 35 ft. of property frontage to city standards to the approval of the Public Works Department. 11. Subdivider shall install a fire hydrant as required to the approval of the City Fire Department. - ~~ --� 12. Subdivider shall install a new 8-inch_water line.,in Buchon Street from the project site northerly to Nipomo Street to the satisfaction of the City Engineer. 13. Subdivider shall prepare conditions, covenants and restrictions to be approved by the City Attorney and Community Development Director prior to final map approval. CC&R's shall contain the following provisions: a. Creation of a homeowner's association to enforce the CC&R's and provide for professional, perpetual maintenance of all common area including private driveways, private utilities, drainage, guest parking, walls and fences, lighting, and landscaping in a first class condition. b. Grant to the city the right to maintain common area if the homeowner's association fails to perform, and to assess the homeowner's association for expenses incurred, and the right of the city to inspect the site at mutually agreed times to assure conditions of CC&R's and final map are being met. C. No parking except in approved, designed spaces.. Provision shall be made for two additional guest parking spaces to be installed within the project if a majority of the homeowners' association feels that future conditions warrant them. Landscaping between the street yard and the driveway for Unit 6 and in the landscaped area between Units 4 and 5, or such other area approved by the Community Development Director, shall be designed to accommodate potential future conversion. d. Grant to the city the right to tow away vehicles on a complaint basis which are /f nnrked in unauthorized maces_ I_ Resolution No. 6406 (1988 Series) Tract 1545 Page 3 C. Prohibition of storage or other uses which would conflict with the use of garages for parking purposes. f. No outdoor storage of boats, campers, motorhomes, or trailers nor long-term storage of inoperable vehicles. g. No outdoor storage by individual units except in designed storage areas. h. No change in city-required provisions of the CC&R's without prior City Council approval. L Homeowner's association shall file with the City Clerk the names and addresses of all officers of the homeowner's association within 15 days of any change in officers of the association. 14. All units shall be numbered in accordance with an addressing plan approved by the \ Community Development Department. J 15. Subdivider shall install a unit identification plan with directory at the Buchon Street entrance to the site to the approval of the Community Development Department staf f. On motion of Mayor Dunin . seconded by Councilmember Settle , and on the following roll call vote: AYES: Mayor Dunin and Councilmembers Settle and Rappa NOES: Councilmember Reiss ABSENT: Councilmember Pinard the foregoing resolution was passed and adopted this _jj.L day of March 1988. s or ATTEST: PJL-�V Ci Clerk MEMORANDUM ------To: Jerry Kenny, Engineer From: Erwin L VWi is, Fire Marshal Subject 550 Buchon - Tract 1545 Date: July 5, 1989 The condo project at 550 Buchon is nearing completion and the water line and required fire hydrant have not yet been installed At the request of the owner of this property I reevaluated the need for a fire hydrant in this area. There is currently a hydrant at the corner of Buchon and Nipomo which is approximately 400 feet from the rear building of this project. Our current standards require a hydrant within 300 feet of all residential structures. This requirement could be met by a hydrant at the comer of Beach and:Buchon. Since there is no hydrant at this comer this location would best serve the area's fire- protection needs. A hydrant in this location would provide this project and the other houses from mid- block between Nipomo and Beach to mid-block between Beach and Carmel and the houses on Beach Street. Since the existing water line is only a 4" line, to install a hydrant at this comer will require installing a new water line from Nipomo to Beach. This was the proposal that was discussed at the August 24, 1988 meeting with the owners. is my understanding that the Utility Department will budget for the replacement of the water line from Nipomo to Beach on Buchon in a future CRP budget. Sincethe original Council requirements on this project required the installation of a fire hydrant and new water line to the hydrant, we can require the developer to immediately install a new water line up to the driveway of his project and put a hydrant at that location. This will cover his project but not the houses in the area of Buchon and Beach. Eventually, the City will still have to come in and tear up the street, again, to replace the rest of the main to the corner of Beach and Buchon and install a second hydrant at that location. This does not seem like a logical or economical way to proceed. Only one hydrant is needed in the area and it would seem more prudent to only tear up the street one time instead of two. The Fire Department is willing to delay the fire hydrant requirement until the City can install the new water main-