HomeMy WebLinkAbout11/21/1989, 4 - AMENDMENT NO. 3 WWMP, PROJECT REPORT SUPPLEMENT PREPARATION FOR WASTEWATER FACILITIES IMPROVEMENTS. MEETING DATE:
City Of San IDIS OBISPO movembior 21 . 19R9
COUNCIL AGENDA REPORT MM NUMBER:
FROM: William T. Hetland ��� Prepared by: John E. Moss
Utilities Director Wastewater Division Manage
SUBJECT:
Amendment No. 3 WWMP, Project Report Supplement Preparation
for Wastewater Facilities Improvements.
CAO RECOMMENDATION:
Council Adopt resolution approving Amendment No. 3 to
Engineering Services for implementation of the wastewater
Management Plan - preparation of a Project Report Supplement
for Wastewater Facilities Improvements.
BACKGROUND:
Summary:
The City is seeking funding assistance from the State Water
Resources Control Board, Division of Loans and Grants, for
the required Wastewater Facilities Improvements project _ in
the form of low interest State Revolving Fund loans. This
loan money is conditional upon State water Resources Control
Board approval of the project. In order to obtain approval
C� of the loan the State is requiring the submittal of a
Project Report Supplement that "in sufficient detail"
describes the project and insures compliance. with all
applicable State and Federal regulations. Staff recommends
retaining Brown & Caldwell to prepare the project request
supplement.
Discussion:
The City's wastewater treatment facilities have been unable
to consistently meet the discharge requirements imposed by
the Regional Water Quality Control Board. In addition to
this, the wastewater collection system experiences high flow
rates and overflows during winter storm periods.
On October 28, 1986, the city retained Brown and Caldwell
Engineers to prepare the Wastewater Management Plan (WWMP) .
The purpose of the plan was to identify needed improvements
to the City's wastewater treatment and. collection facilities
to meet all discharge requirements and- treat expected future
flows to the year 2015. Upon completion of the WWMP staff
has worked closely with Brown and Caldwell in review,
selection, and design of needed improvements.
RECEIVED
NOV 1 4 1989
/o:SOA �— l
CITY CLERK
SAN LUIS 0915r10.CA
11111111111114111 city of san «is oBispo
COUNCIL AGENDA REPORT
Project Report Supplement
Meeting of November 21, 1989
Page 2
In May of 1989 the City submitted documentation to the
State, Division of Loans and Grants, seeking low interest
loan assistance for the needed facilities improvements.
These loan monies are capitalized in part by federal funds
authorized under the Federal Clean Water Act. The interest
rate is approximately 4% and the City is seeking a total
loan amount of approximately $30 million. The other
remaining funding option would be through a municipal bond
program at an interest rate of approximately 8.5%. An
increase in sewer rates will be required to pay back either
option with a substantially greater increase required to pay
off the municipal bond option.
The State has subsequently responded to the application for
loan funding and has identified needed documentation on the
project for compliance with State and Federal requirements.
The State has requested the City prepare a single Project
Report Supplement that "in sufficient detail" accurately
describes the project and addresses the various key elements
as required by State and Federal guidelines.
Staff has also been negotiating with the State Regional
Water Quality Control Board, the final terms of a consent
decree. The consent decree in essence provides protection
for both the City and the State for the duration of the
improvements project. The City is afforded protection from
significant fines from the State for those violations of the
discharge requirements which the City is attempting to
address in the improvement project. The State is afforded
protection in the sense that the consent decree provides the
City with a legally binding schedule for making the needed
improvements and meeting discharge requirements. The
schedule in the consent decree is closely linked with the
time line for obtaining State Revolving Fund Loan approval.
This makes timely and complete preparation of the Project
Report Supplement essential in order to avoid funding delays
which may result in noncompliance with the schedule provided
in the consent decree. It is for this reason as well as the
detailed nature of the document that staff recommends
entering into agreement with Brown and Caldwell for
preparation of the Project Report Supplement.
I•
m � ii�►I�Ill�pa�ui���l city of san tuts OBlspo -
i COUNCIL AGENDA REPORT
Project Report Supplement
Meeting of November 21, 1989
Page 3
ALTERNATIVES:
Option 1. Adopt resolution authorizing Brown and Caldwell to
prepare the Project Report Supplement. This would
result in timely and complete preparation of the
document and would greatly assist the City in obtaining
State loan funding.
Option 2. Direct staff to prepare the Project Report Supplement.
This would reduce overall contract expenditures,
Project Report Supplement however , this would also
require a significant amount of staff time.
Timely and complete preparation of this document
is esential for obtaining funding approval without
significant delays. The detailed information
required could be more adequately be addressed by
the consultant.
Option 3. Direct staff to fund the project through municipal
bonds. This would not require document preparation for
meeting State loan application requirements. The
projected interest rate for municipal bond funding is
approximately 8. 5% versus 4% for the State loan. Over
the long term this option would drastically increase
the cost of the project to the City and would result in
a significantly higher rate increase to the users.
Option 4. Take no action. Delays in obtaining funding will
result in delaying project completion and compliance
with State discharge requirements. This may also
result in not meeting critical time schedule dates as
detailed in the consent decree which would result in
stipulated penalties from the State.
FISCAL IMPACT:
Brown and Caldwell proposes to prepare the Project Report
Supplement at a cost to the City of $40, 000. Long term
fiscal impact would be a significant savings to the City in
the form of lower interest rate financing being secured from
the State, as well as avoidance of stipulated penalties from
the State for noncompliance with critical dates established
in the consent decree. Money is available in the sewer fund
to cover these expenditures.
�-3
►►�n��r,NI�II�III�pI�DI city of san gats oBispo
WWGW COUNCIL AGENOA REPORT
Meeting of November 21, 1989
Page 4
RECOMMENDATION:
Adopt resolution approving Amendment No. 3 to the WWMP :for
preparation of the Project Report Supplement for Wastewater
Facilities Improvements by Brown and. Caldwell Engineers.
ATTACHMENT : Resolution
carpr/moss
I
. i
RESOLUTION NO. (1989 Series)
A RESOLUTION OF THE COUNCIL OF THE CITY OF
SAN LUIS OBISPO APPROVING AMENDMENT NO. 3 TO THE
WASTEWATER MANAGEMENT PLAN
WHEREAS, the City has adopted a Wastewater Management Plan;
WHEREAS, the. City has applied for a State low-interest loan
for funding of the facilities improvements projects, for
implementation of the Wastewater Management Plan;
WHEREAS, the State requires preparation of a 'Project Report
Supplement for a facilities plan and loan approval for all
projects applying for State funds.
NOW THEREFORE, BE IT RESOLVED that the City Council approve
Amendment No. 3 to the Wastewater Management Plan for Engineering
Services of Brown and Caldwell Engineers for preparation of a
Project Report Supplement.
On motion of , seconded by
and on the following roll call vote:
AYES:
NOES:
ABSENT:
The foregoing Resolution was passed and adopted this day
of , 1989.
MAYOR RON DUNIN
ATTEST:
CITY CLERK PAM VOLES
Resolution No. (1989 Series)
Page Two
APPROVED:
City dministrative Officer
City At ey
Finance Director
W �-�0--
Utilities Director
resno3/moss
MEETING AGENDA
DATE a/ Py ITEM #
*Denotes action by Lead Person
Rssiwnd by*
u AMENDMENT NO. 3 P oAO
C
ao
TO City Atty.
AGREEMENT FOR ENGINEERING SERVICES .�g
BETWEEN CITY OF SAN LUIS OBISPO
AND BROWN AND CALDWELL FOR
IMPLEMENTATION OF WASTEWATER MANAGEMENT PLA`.
THIS AMENDMENT NO. 3 to the Engineering Services Agreement dated
February 23 , 1988 , between City of San Luis Obispo , hereinafter
referred to as "Owner" , and Brown and Caldwell , a California
corporation, hereinafter referred to as "Engineer, " is made and
entered into this day of November 1989 .
WITNESSETH:
WHEREAS , on February 23 , 1988 , Owner and Engineer entered into an
agreement for engineering services; and
WHEREAS, in Article IIB of said Agreement , Owner and Engineer
agreed that certain of the work contemplated to be performed by
Engineer could not be sufficiently defined at the time of execution
of the Agreement; and
WHEREAS , during the detailed engineering design of the improve-
ments , it became apparent that additional facilities were required
to comply with the receiving water requirements ; and
WHEREAS , Owner has requested Engineer to prepare a Project Report
in accordance with the State Water Resources Control Board (SWRCBJ
policy for implementing the State Revolving Fund (SRF) for
construction of wastewater treatment facilities.
WHEREAS , Owner has requested changes in the scope of work;
NOW THEREFORE, Owner and Engineer agree to amend the Agreement as
follows:
I . SCOPE OF PLANNED ENGINEERING SERVICES
The scope of planned engineering services as described in Exhibit B
of the original Agreement is amended to provide the following
additional engineering services :
RECEIVE®
C' NOV 1 51989 Page 1 of 2
N/AGR:SLO-A3
CITY CLERK
SAN LUIS OBM,CA
C1 . Prepare a Project Report in accordance with the
requirements outlined on Pages 6 through 8 of the SWRCB
"Policy for Implementing the SRF for Construction of
Wastewater Treatment Facilities , August .18 , 1988" .
2 . Submit five copies of the draft Project Report to the
City and SWRCB for their review and comments .
Incorporate review comments and submit ten copies of
the final Project Report to the City.
IV. SCHEDULE
Engineer was authorized to proceed with the modified scope of work
effective on November 13 , 1989. The modified scope of work shall
be completed by January 31 , 1990 .
IV. COMPENSATION
.Compensation for the services provided under Article I of this
Amendment shall be calculated on the same basis as in the original
Agreement . The cost ceiling for the work done under this
Amendment is $35 ,500 which increases the total cost ceiling under
the Agreement to $1 ;271 ;525. The fixed professional fee for the
work done under this Amendment is $4 ,500 which increases the total,
fixed professional fee to $153 ,820 .
All other terms and conditions of the Agreement dated February 23 ,
1988 remain unchanged.
BROWN AND CALL ELL OWNER.
i
Signature Signature
Printed Name Pe_rvaiz Anwar Printed name
Title Vice President Title
Date ( Date
Page 2 of 2
N/AGR:SLO-A3
.TING AGENDA .
DATE 11-2141 ITEM #
C
�i►Ild III I II III III ,������Illl�l�ll II II II I��
ClNor
SAn WIS OBISPO
�
955 Morro Street • San Luis Obispo, CA 93401
'ehoies action by Lead Person
November 20, 1989 F by
jb/�Gbquncll
2iy Atty.
c7-
MEMORANDUM /LE
�f/ETL4��
TO: City Council
VIA: John Dunn, City Administrative Officer
FROM: William T. Hetland, Utilities Director /+hd-
SUBJECT: Cost Estimate-Amendment No. -3
Enclosed for your review is the cost estimate amendment No. 3
(tel justification. The additional 40, 000 dollars requested has been
identified on page two.
If you have any questions or comments please do not hesitate to
contact me.
RECEIVED
Enclosures
NOV 2 1 1989
CITY CLERK
SAN LUIS OBISPO,CA
BROWN AND CALDWELL --
CONSULTING ENGINEERS
November 16, 1989
Mr. William Hetland
Utilites Director
City of San Luis Obispo
Post Office Box 8100
San Luis Obispo, California 93404-8100 12-3797-01/1
Subject: Cost Estimate - Amendment No. 3
Dear Mr. Hetland:
Attached for your information is a breakdown of the $40, 000 budget
identified in Amendment No. 3 to our Agreement for engineering
services for implementation of Wastewater Management Plan. This
amendment authorizes professional engineering services to prepare
C , the Project Report required by the State Water Resources Control
Board (SWRCB) to support the City ' s State Revolving Fund
application.
The breakdown is our best estimate at this time: As discussed, we
will try to complete the project below budget. It would also be a
good idea to see if the SWRCB would consider relaxing some of their
rigid requirements for this document. We will discuss this aspect
with Mr. Eric Torguson and try to find ways to reduce the estimated
level of effort.
Please call us if you should have further questions regarding cur
fee estimate.
Ve truly urs,
B� N AND DWELL
P rvaiz Anwar
Vice President
PA:MS
C' Enclosure
cc: Azee Malik, Brown and Caldweli
150 SOUTH ARROYO PARKWAY POST OFFICE 8M 7= PASADENA.CALIFORNIA 91109-7203•(818)577-1020•FAX:(818)795.6816
i
E :SLOPR 15-Nov-89
SAN LUIS OBISPO PROJECT REPORT COST ESTIMATE
MANHOURS
TASK DESCRIPTION PROFESSIONAL TECHNICAL
01 REVIEW EXISTING DOCUMENTS 40
02 EDIT EXISTING DOCUMENTS FOR 48
INCLUSION • IN PROJECT REPORT
03 DEVELOP NEW SECTIONS OF
PROJECT REPORT (NOT PREVIOUSLY
COVERED)
Sludge Disposal 24
Reduce Use or Recover 12
Energy
Evaluation of Revenue 12
Producing Facilities
Open Space Evaluation 12
Eligible Capacity 20
Description of BPWTT 12
Costs , Including User Costs 20
04 UPDATE I/I WORK 32
05 PROJECT DESCRIPTION (NOT
PREVIOUSLY COVERED)
Energy Requirements 20
0 & M , Requirements 20
Public Participation Summary 12
06 PREPARE DRAFT PROJECT REPORT 24 40 60
07 PREPARE FINAL PROJECT REPORT 40 10 20
TOTAL, MANHOURS 348 50 80
COST SUMMARY
Total Labor wi/ markup 35 , 005
Other Direct Costs 4 , 500
Profit 500
Project Total Cost $40 , 005