Loading...
HomeMy WebLinkAbout01/02/1990, C-10 - ESTABLISHMENT OF REGULAR SENIOR PLANNER POSITION (OPEN SPACE) MEETING DATE: 1111,10118pp lfcity of San tuts OBISpo 1-2-90 COUNCIL AGENDA REPORT n1'"NUMBER: FROM: Ken Hampian, Assistant City Administrative Officer SUBJECT: Establishment of Regular Senior Planner Position (Open Space) CAO RECOMMENDATION: Authorize the immediate establishment of a regular Senior Planner position in the Community Development Department for the purpose. of completing and implementing Open Space, Conservation and Parks and Recreation Elements of the General Plan. DISCUSSION Background In September 1988, the City entered into a two-year contract for the employment of a "Long Range Planner" to work primarily on the development of Open Space, Conservation and Parks and Recreation Elements of the General Plan (Mr. Randy Rossi) . As part of the adoption of the 1989-91 Financial Plan, the Council approved the establishment of a regular Senior Planner position (full-time, permanent) , to be authorized in FY 1990-91. The concept was that the contract "Long Range Planner" position would prepare the Open Space, Conservation and Parks and Recreation Elements; the regular Senior Planner position would subsequently be established to implement primarily the open space and park land acquisition portions of the elements. Circumstances have changed to a point where staff is now recommending the immediate authorization of this regular position. First, the unanticipated vacancy of the Community Development Director position resulted in the appointment of the Long Range Planner to the position of Interim Community Development Director. Although significant progress has been made on the Open Space, Conservation and Parks and Recreation Elements, the substantial change in Mr. Rossi 's job responsibilities nevertheless slowed progress. Second, Mr. Rossi has advised staff that due to personal responsibilities he will not complete the full two-year term of his contract. Instead, it is expected that Mr. Rossi will separate from City service in late Spring, 1990. Therefore, the City faces two alternatives with respect to filling the "Long Range Planner" position: (1) initiate a recruitment to . +�����i>li►i(Vlllllllllli ����11 city of San LUIS o61Spo COUNCIL AGENDA REPORT i hire another contract planner to complete the remaining term of the existing contract (approximately four months from the estimated time of Mr. Rossi's departure) and recruit for the regular Senior Planner following adoption of next year's budget; or (2) establish the regular Senior Planner position immediately and initiate a recruitment to fill this position on a long term basis. Evaluation of Alternatives 1. Continuance of Contract Position. Recruiting to fill the term of the contract would retain the sequence of events relative to establishing the regular position outlined in the current Financial Plan, which is to support a contract position through September 1990, and fill a regular position shortly thereafter. The logic of this sequence was that the City would have a better understanding as to the specific staffing required to implement the Open Space/Parks Acquisition Program after the updated General Plan is adopted by the City Council. This is the primary potential benefit to be derived from retaining the existing contract position. In addition, recruiting to fill the position on a contract basis might also be faster (since the more formal recruitment and testing processes required to fill a regular position would not be necessary) . Quickly filling the position would be advantageous in terms of accelerating a work effort which has f already experienced some delay. However, in order to find a qualified person, it will still take 6-8 weeks before someone is actually working in the position. At best, it is not likely that the position could be filled on a contract basis until late February or early March, 1990. At worst, it may take significantly longer to fill the contract position, given the possible difficulty in finding qualified candidates who would be willing to accept the uncertainty of a contract position with only four months remaining in its, term. 2. Establishing the Regular Position Now. If the management of an Open Space/Park. Land Acquisition program is to be an on- going City activity over the next several years (and all indications are that it will be) , then accelerating the time frame for establishing the regular senior Planner position will not be premature. At a minimum, staff believes that it is safe to assume that a Senior Planner position will be necessary to properly manage the program. Furthermore, this approach offers several significant advantages: First, city or sat I LUIS OBispo GRAZO COUNCIL AGENDA REPORT this approach will assure greater continuity in terms of managing the open space/park land acquisition program. should the City pursue filling the position on a contract basis, then. it is possible that a different person would actually be hired to serve in the regular position when established in FY 1990-91. Second, recruiting for a regular Senior Planner is much more likely to result in attracting qualified candidates than an attempt to fill a temporary position for four months. Third, by establishing the regular position now, the City will avoid the cost of recruiting twice; once for the contract planner and a second time for the regular Senior Planner. If the regular position is approved by Council on January 2nd, then it is expected that the person hired will start work by mid to late April, 1990. 3. Hire A Consultant. In addition to the alternatives outlined above, the City could contract with a consultant to'assist in the completion of the Open Space/Conservation and Parks and Recreation Elements of the General Plan. For reasons related to continuity, and the need for direct and "hands on" City involvement in this critical General Plan element, this alternative is not recommended. A substantial responsibility of the incumbent in this position is to build relationships in the community in order to effectively communicate the goals of an open space program. Such relationships will also be essential in properly implementing the program. This can best be done by a regular city staff person, as opposed to an outside consultant. Consistency with Human Resource Management Policy Authorization of a regular Senior Planner position is consistent with the City Council 's Human Resource Management Policy (page B- 11 of the 1989-91 Financial Plan) . Consistency was determined when the position was approved by Council for inclusion in the Recommended FY 1990-91 Budget. This action only accelerates by six months the timeframe for formally establishing and filling this position. FISCAL IMPACT The recommended action will have no additional fiscal impact during the current fiscal year. This is because funds have already been appropriated to support a contract position through the end of the fiscal year. In addition, adequate salary savings have been realized in the Community Development Department as a result of position vacancies. Therefore, no additional appropriations are °11��►►►i��i{IIIIIIIP►'�°'�1IIIU city of San tu:,, OBISpo is COUNCIL AGENDA REPORT necessary at this time. The appropriation of funds for next fiscal year will take place as a part of the adoption of the 1990-91 Budget. The estimated 1990-9.1 cost of the position, including salary and benefits, is approximately $46,000. Adoption of the staff recommendation will increase the number of regular positions in the Community Development Department from 22. 6 to 23 .6. CONCURRENCES The Community Development, Finance and Personnel Departments have reviewed this report and concur with the recommended action. ATTACHMENTS Portions of the 1989-91 Financial Plan and Approved 1989-90 budget KH1/CDstfrpt.wp I COMMUNITY DEVL_JPMENT PROGRAM: Current/Advanced Planning & Enforcement OPERATION: Planning DEPARTMENT: Community Development FUND: General Fund 1987-88 1988-89 1989-90 1990-91 PROGRAM COSTS ACTUAL BUDGETED REQUESTED PROPOSED Staffing $ 579,200 $ 681,900 $ 744,000 $ 766,700 Contract Services 35,100 186,700 230,400 53,300 Other Operating Expenditures 38,600 45,800 59,300 54,000 Minor Capital 10.900 13.900 9.000 _ 4.000 TOTAL $ 6639800 $ 928,300 $ 1,042,700 $ 878,000 PROGRAM DESCRIPTION The Current/Advanced Planning and Enforcement Program maintains the General Plan, manages long and intermediate-range planning projects, and works with the Architectural Review Commission, Cultural Heritage Committee, and Planning Commission. This program also reviews and processes development permit applications, ensures that projects comply with city development and use regulations, investigates complaints about violations, and carries out abatement procedures. STAFFING SUMMARY Regular Positions Director 0.7 0.7 0.7 0.7 Principal Planner 1.0 1.0 1.0 1.0 Senior Planner 1.0 1.0 1.0 2.0 Cti Associate Assistant Planner 5.8 5.8 5.8 5.8 Administrative Assistant 1.0 1.0 1.0 1.0 Drafting Technician 1.0 1.0 1.0 1.0 Executive Secretary 1.0 1.0 1.0 1.0 Secretary 1.0 1.0 1.0 1.0 Office Assistant 0.5 0.$ p_8 TOTAL 13.0 11.3 13.3 14.3 Temporary Positions Full-Time Equivalents 4.4 5.2 5.5 4.2 SIGNIFICANT EXPENDITURE AND STAFFING CHANGES 1. 1989-90: General Plan Land Use Element: Extend the services of a contract planner ($44,800); temporary staffing to conduct research related to office conversion policies ($5,000); and consultant services to prepare EIR and technical documents ($100,000), downtown concept physical plan ($30,000), and strategies for a Greek Row ($30,000). 2. 198940: Circulation Element: Consultant services to identify Neighborhood Traffic Management areas ($4,000). NOTE: $170,000 for design and construction is included in the Capital Improvement Plan (Transportation projects - page E-8). 3. 1989-91: Open Space/Conservation and Parks & Recreation Elements: Provide for contract planner services and related program support through September .1990 ($102,800). 4. 1989-90: Noise Element: Participate in County technical studies program ($15,000 as City's portion based on population). 5. 1990-91: Open Space: Implement an open space/park land acquisition and management program contingent upon approval of policies resulting from General Plan revisions ($63,100). 6. : 1990-91: Hire a contract enforcement officer to implement anticipated residential rental regulations and private property maintenance ordinance ($40,000). �y D-71 BUDGET SUPPLEMENT' SUMMARY OF REGULAR POSITIONS BY DEPARTMENT (continued) 1987-88 1988-89 1989-90 1990-91 ACTUAL BUDGETED REQUESTED PROPOSED COMMUNITY DEVELOPMENT Administration Community Development Director 1.0 1.0 1.0 1.0 Administrative Assistant 1.0 1.0 1.0 1.0 Executive Secretary 1.0 1.0 1.0 1.0 Secretary 2.0 2.0 2.0 2.0 Office Assistant 0.5 0.8 1.8 1.8 Planning Principal Planner 1.0 1.0 1.0 1.0 Senior Planner 1.0 1.0 2.0 Associate/Assistant Planner 5.8 5.8 5.8 5.8 Drafting Technician 1.0 1.0 1.0 1.0 Building & Safety Building Official 1.0 1.0 1.0 1.0 Plan Check Engineer 1.0 1.0 1.0 1.0 Building Permit Coordinator 1.0 1.0 1.0 1.0 Building Inspector 3.0 3.0 3.0 3.0 Grading Plan Checker/Inspector 1Q 1.0 I Q 1_0 Total Community Development 21.3 21.6 22.6 23.6 UTILITIES Administration and Engineering Utilities Director 1.0 1.0 1.0 1.0 Utilities Engineer 1.0 1.0 1.0 1.0 Administrative Analyst 0.0 0.0 1.0 1.0 Secretary 1.0 1.0 1.0 1.0 Water Services Water Division Manager 0.0 1.0 1.0 1.0 Treatment Plant Supervisor 1.0 1.0 1.0 1.0 Supply/Distribution Supervisor 1.0 2.0 2.0 2.0 Chief Treatment Plant Operator 1.0 0.0 0.0 0.0 Water Conservation Coordinator 0.0 1.0 1.0 1.0 Crew Leader 1.0 0.0 0.0 0.0 Treatment Plant Operator 5.0 5.0 5.0 5.0 Laboratory Technician 1.0 1.0 1.0 1.0 Instrumentation Technician 0.0 0.0 1.0 1.0 Water Supply Operator 3.0 3.0 2.0 2.0 Heavy Equipment Operator 1.0 1.0 1.0 1.0 Utility Worker 4.0 4.0 4.0 4.0 Customer Service Representative 3.0 3.0 3.0 3.0 Wastewater Services Wastewater Division Manager 0.0 1.0 1.0 1.0 Treatment Plant Supervisor 1.0 1.0 1.0 1.0 Utility Maintenance Supervisor 1.0 1.0 1.0 1.0 Chief Treatment Plant Operator 1.0 0.0 0.0 0.0 Industrial Waste Inspector 1.0 1.0 1.0 1.0 • Treatment Plant Operator 5.0 5.0 6.0 6.0 Laboratory Technician 1.0 1.0 1.0 1.0 Utility Worker 4.0 4.0 4.0 4.0 Maintenance Worker 110 1_0 1.0 1_0 Total Utilities 39.0 40.0 42.0 42.0 H-15 �'��