Loading...
HomeMy WebLinkAbout03/20/1990, C-7 - UTILITY TRENCH REPAIR, CITY PLAN NO. P-45A III^I��III��IIIIIIII U � - MEETING DATE: C� II �ill�ll or San Luis OBISr10 March 20, 1990 u COUNCIL AGENDA REPORT ITEM NUMBER: FROM: David F. Romero Dennis Coxrepared by: Geor/Bradley Public Works Dir . Streets Mgz�treets Projects Coordinator SUBJECT: Utility Trench Repair, City Plan No. P-45A CAO RECOMMENDATION: Adopt a Resolution approving Plans and Specifications for the 1990 Utility Trench Repair Project, City Plan No. P-45A; Authorize Staff to advertise for bids; Authorize the CAO to award a contract within the Engineer' s Estimate. BACKGROUND: During the last year and a half , the Streets Division has been unable to make permanent repairs to the Water Distribution utility trenches. These trenches had been excavated to make repairs to water lines and patched by Water Distribution with a temporary pavement which needs to be replaced with permanent pavement . The street pavement repair is the final step in making a pipeline repair. A contract approach to making permanent trench repairs was discussed and approved by the Council during budget discussions. Purchasing__Procedures The provisions of Purchasing Control Manual Section PC-403-3 apply to this contract . Fiscal Impact Engineer' s estimate $31 , 000 Contingencies @ 5% 1 , 550 TOTAL PROJECT COST $32 , 550 Funds Available The funds for this project will come from the Water Fund Operating Budget , Water Distribution Program Miscellaneous Capital Maintenance (050-5063-063-800) . Attachments : Engineer 's Estimate Resolution Plans & Specifications (available in Council Office) ENGINEER'S ESTIMATE Item Unit of Estimated Item Price* Total* No. Item Measure Quantity ( in Fictures) ( in. .Ficures) 1 Repave utility Sq. ft . 3,394 $8.23 $27 ,932 . 62 trench with asphalt concrete 2 Repave utility Sq. ft . 206 $9 .05 $ 1 ,656 . 15 with asphalt concrete and Portland cement concrete 3 Repave utility Sq. ft . 70 $9.05 $ 633 .50 trench with Portland cement concrete 4 Reset water valve Each 25 $30.00 $ 750.00 wells ESTIMATED BID TOTAL $ 30,972. 27 RESOLUTION NO. ( 1990 SERIES) A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN 'LUIS OBISPO APPROVING PROJECT FOR UTILITY TRENCH REPAIR WHEREAS, repair of the street pavement is the final step in making a pipeline repair; and, WHEREAS, funds for said repair are available in the Water Fund Operating Budget., and WHEREAS, the City has prepared Plans and Specifications for the 1990 Utility Trench Repair Project, City Plan No. P-45A; NOW THEREFORE BE IT RESOLVED by the Council of the City of San Luis Obispo as follows: SECTION 1 . Plans and Specifications are approved for 1990 I Utility Trench Repair Project, City Plan No. P-45A. SECTION 2 . Staff is authorized to advertise for bids. SECTION 3. The City Administrative Officer is authorized to award a contract if the low bid is less than the Engineer's Estimate. SECTION 4 . The City Clerk shall furnish a copy of this , , resolution to the Director of the Public Works, Finance Department and Utilities Department. Resolution No. ( 1990) Page Two On motion of seconded by and of the following roll call vote: AYES: NOES: ABSENT: The foregoing Resolution was passed and adopted this day of 1990. MAYOR RON DUNIN ATTEST: CITY CLERK PAM VOGES a s s a e e s s APPROVED: City A i tr a Officer A to eY Fi ce Director Public Works Director Project Manager Utilities Director p45a.wp/bradley/street92