Loading...
HomeMy WebLinkAbout08/21/1990, C-11 - TROLLEY DEMONSTRATION PROJECT/LEASE EXTENSION �Iml ��lllll� iI city p MEETING DATE: P°"u►�n�i► o san iuis OBISPO 8/21/90 1COUNCIL AGENDA REPORT NUMEIER;/�_IL e FROM: Ken Hampian, Assistant City Administrative Officer Prepared by: Harry Watson, Transit Man #1 SUBJECT: Trolley Demonstration Project/"Lease Extension CAO RECOMMENDATION: 1. Approve the extension of the downtown trolley demonstration program for a period of two months, from the current expiration date of October 22, 1990 to December 22, 1990. 2. Receive status and performance information concerning various aspects of the Demonstration Program. DISCUSSION: Background The development and initiation of a pilot downtown trolley demonstration has proven to be a very successful part of the 1989- 91 Council Work Program. The demonstration program is currently operating on a trial basis through the peak tourist season. The effective dates of the City's trolley lease are June 22, 1990 through October 228 1990. Contractually, any extension of this lease must be exercised by the CAO by September 1, 1990. With October 22, 1990 being the current expiration date, if Council elects to extend for a two month period, the extension would take the demonstration through the non-tourist fall period and include the Christmas shopping season. The new expiration date will be i December 22, 1990. In terms of trolley operation, any extension to our existing demonstration program can be accomplished under the authority of the amendment to our service provider contract, Laidlaw Transportation, Inc. Extension of Trolley Contract Given the success of the demonstration so far through the summer months, staff feels there is merit in continuing the demonstration through the fall season to ascertain the level of public support during the non-tourist season and up to Christmas. This would also allow staff to determine how the trolley will interact with the Marsh Street Parking Structure. Information supporting the success of the program thus far, and other performance information, is outlined below. Program Status/Performance Report Performance Evaluation Report: As an attachment to this report please find a Performance and Ridership Report which includes ridership numbers, operating costs per passenger, operating cost per vehicle service hour, passengers per vehicle service hour and city of san lui s osi spo COUNCIL AGENDA REPORT Page Two finally passengers per vehicle service mile. Ridership in excess of 18,000 for a single month has exceeded our most optimistic preliminary expectations for the program. Survey Results: Although the onboard survey has not been completed at the time of this reportfs preparation, some preliminary trends are interesting. For example, even though the survey is being conducted at the height of the tourist season, a clear majority of our riders are local residents. Also, for those indicating a willingness to pay a fare, $.25 is the most commonly chosen amount. The full results of the current survey will be presented in a November Performance Report, as discussed later. Also in the November report will be the results of a smaller parking related .survey that staff plans to conduct in October. Hours: The program start-up hours of 9:30 a.m. to 5:30 p.m. Monday through Friday, Thursday evening hours until 9:30 p.m. , Saturday hours from 10:00 a.m. until 5:30 p.m. and Sunday hours from 12:00 to 5:00 p.m. have proven to be the right hours for the routes that we are currently serving. The first two loops in the morning and the last two loops in the evening Monday through Saturday are at approximately 30% of capacity while a large percentage of the rest of the day is at or exceeding capacity. Route: The route as initially installed also seems to meet with a high level of acceptance by both residents of our community and tourists visiting our town. That route is bordered by Osos to the north, Nipomo to the south, Palm to the west and Marsh to the east with Higuera receiving double serve per loop. During the a.m. a headway is consistently being maintained while the p.m. and evening service is averaging a 15-minute headway which is the outside parameter of acceptability. Headways on Higuera Street are approximately 6 - 8 minutes. Fare: As spelled out in the Council Work Program there has been no fare charged on the Old SLO Trolley to date. This policy has been received with a very high level of enthusiasm as one might imagine by those who use the trolley. At the time of writing this Council Agenda Report, staff is involved in an on-board survey which includes a question dealing with any future fares that might be charged for the trolley use. Survey results will be provided at a later time, though preliinary results show that among those willing to pay a fare, $.25 is the preferred amount. Marketing: By the August 21 Council meeting, the marketing effort for the Trolley Demonstration Program will be complete. . The marketing effort has included print media in the County Telegram Tribune, in the Mustang Daily, in the New Times newspaper, in -al- � ►�►8NI�11�A city of san tuis ogispo COUNCIL AGENDA REPORT Council Agenda Report Page Three television ads that were run on RSBY TV, on table top advertisements that were placed in each motel room up and down Monterey Street, as well as in the lobbies of each of the motels. There were also numerous interviews given to radio stations and television stations as part of their news format. Future of the Trolley Program The main purpose of the November Performance Report will be a comprehensive program evaluation, a discussion about the long-term future of the trolley program, and a request for Council direction. It may be necessary for Council to make a decision at that time, to increase the possibility that a long-term program can be in place by next summer (the development of specifications, bidding, etc. will require several months) . The trolley program will be reviewed by the Mass Transportation Committee prior to the November meeting. As pointed out in all former Council Agenda Reports, if Council approves a permanent trolley service, there will be a break in service between the demonstration that is in operation now and the initiation of any permanent trolley program. This would be caused by the acquisition time needed to acquire trolleys that would fill the long-term needs of the City, that meet our specifications and that are handicapped accessible. FISCAL IMPACT: Through the budget process Council originally set aside $90,000 of General. Fund monies for the trolley demonstration. -The start-up and operating expenses have been held to a minimum through the first month and one-half of operation. To date the expenditures have been $39,263.00. The current balance in the program account is $50,737.00. Expenditures yet to be incurred in the original four month program are approximately $22,000.00 leaving an approximate balance at the end of the original demonstration of $28,737. A two month extension may cost up to $21,500.00 (depending on how many trolleys we end up leasing) , so there are sufficient funds in the original appropriation to cover a two month extension. Staff may attempt to negotiate the return of one trolley during the final two months of the demonstration. CONCLUSION: The Trolley Demonstration Project to date has been a success due in large part to the support that staff has received from the- City Council, Mass Transportation Committee and various departments within the City. Many residents of San Luis Obispo and the r city of san lues oBispo COUNCIL AGENOA REPORT Council Agenda Report Page Four adjoining County along with the tourists that have been visiting our City, have expressed the opinion that the trolley is a very visible asset to our community. Both verbally and in writing, several persons have expressed their thanks to the City Council. ATTACffiCWS: 1. Performance Evaluation Report HW\demonrpt .►.L{ O TROLLEY PIDEPSHIP - JULY TOTAL = 18, 967 5000 - 4000 u 3000 a CE 2000 1000 0 7/2-8 7/9-15 7/16-22 7/23-29 7/30 d 31 WEEKS Operating Costs for the Trolley Demonstration are based on our contract per mile rate of $1.85. The trolley ran 1792 seivice miles in July. Our lease. cost is $6000.00 per month. Gross Cost: $1.85 x 1792 miles = $3,31520 + $6,000.00 Lease = $9,31520 Cost per passenger: 18,967 + $9,31520 = $.49 Cost per hour. $9,31520 + 224 hours = $41.59 Passengers per hour: 18,967 + 224 hours = 85 Passengers per mile: 18,967 + 1792 = 11 U t."R7E1 NG A -NDA,-.17 iL e'-P-� rC ITEIN� # Li RECEIVED DOWNTOWN SAN LUIS OBISPO BUSINESS IMPROVEMENT ASSOCIATION SAN Mllc!rOltP0.CA August 21, 1990 Mayor Ron Dunin and City Council Members City of San Luis Obispo 1 7 7' P.O. Box 8100 San Luis Obispo, CA 93403-8100 Dear Mayor Dunin and council Members: There is a new era beginning in San Luis Obispo. It is heralded by the clanging of the trolley bell downtown and O the spectacular response from the public and downtown business people. This phenomenon of interest, which has attracted widespread support from just about every segment of the community, is unheard of in recent history and shows just what can be done with a little imagination and effort. The Business Improvement Association would like to insure the success of this program by urging the Council to do two things. First, extend the current program through January 22, 1991 for both vehicles operating both of them on Thursdays and Saturdays; plus, if possible, amend the current route to cover some of the existing downtown not currently included as long as headway timing is not sacrificed. Second, if ridership and interest are maintained to October 1, 1990, the City purchase at least two Molley Trolley vehicles. If ordered at that time, the first trolley should arrive 100 days later or just prior to the expiration date of the current lease extension. It is important that if this program is viable there should not be an interruption of the current service and every effort should be made to expedite this program for its intrinsic value to the downtown and the community as a whole. P.O. Box 1402, Son Luis Obispo, CA 93406 (805) 541 -0286 we look forward to the perpetuation of the Olde SLO Trolley clanging bell announcing our progressive new era. Sincerely, i Tom Donat President