HomeMy WebLinkAbout03-19-2013 b3 lovr interchange update & amendment to design contractcounci l j'1!!agenba RepolRt C I T Y O F S A N L U I S O B I S P O FROM : Daryl Grigsby, Director of Public Work s Prepared By : Timothy Scott Bochum, Deputy Director of Public Work s SUBJECT :LOS OSOS VALLEY ROAD/US 101 INTERCHANGE PROJECT UPDATE AN D CONTRACT SERVICES AMENDMEN T RECOMMENDATION S 1.Approved the transfer of $166,896 .37 from the Project's Study ($2,402 .58), Environmenta l Review ($58,293 .79) and Land Acquisition ($106,200) phases to the Project's Design phase . 2.Approve a contract amendment with Dokken Engineering (Encumbrance No . 40908) in th e amount of $212,890 to perform additional consultant services for the Los Osos Valley Road/ 101 interchange project, Specification No . 99821 . DISCUSSION Backgroun d • The Los Osos Valley Road (LOVR) Interchange with US Highway 101 has long been a vital link i n the region's transportation infrastructure . It is a critical connection to the San Luis Obispo regiona l airport, major retail centers on LOVR and serves as a major corridor for the communities of Morr o Bay and Los Osos to the north . The interchange, which was first built in the 1960's, was modifie d in 1987 to connect across San Luis Obispo Creek to South Higuera Street . Since that time, traffi c volumes have increased to the point that the interchange suffers congestion during certain pea k hours . Staff has been working for several years to get project approvals for an upgrade to th e interchange to improve operations . These specific improvements will improve safety, increas e capacity in and around the interchange, and will meet a minimum twenty years of traffic growt h believed to occur in this area of the City . The project includes widening Los Osos Valley Road to four lanes between the recently constructe d Calle Joaquin intersection and South Higuera Street . To accomplish this, a new two-lane bridg e structure will be constructed south of and adjacent to the existing overcrossing . The existing bridg e will carry the westbound traffic and the new bridge will carry eastbound traffic . An adjacent bridg e crossing San Luis Obispo Creek will be widened to accommodate the four travel lanes . The projec t will also reconstruct the interchange on and off-ramps and install pedestrian and bicycle facilities . The proposed 6-foot wide sidewalks and 6 .5-foot wide bike lanes dramatically improve circulatio n through the site which currently lack bike lanes and a continuous sidewalk from one side of th e freeway to the other . Finally, the project will not preclude the development of the Bob Jones City- to-Sea bikeway that will pass through the site . • Project Status The project timeline (see Attachment 1) identifies key milestones in the project development an d the steps that remain to complete the project . Council was last updated on this project on October 4 , 'Meeting Date 03/19/1 3 Item Number 2011 . Since that update an environmental lawsuit regarding this project was filed and settled, th e Architectural Review Commission reviewed and approved the project design (see Attachment 2 ) over a period of three meetings, and the temporary and permanent easements needed prior t o construction are being pursued . The project is on track to begin construction in the Fall of 201 4 when Statewide Transportation Improvement Program (STIP) funding becomes available fo r construction for the project . Unfortunately last year the City was unsuccessful in its request t o accelerate the STIP funding . Construction is estimated to take two years . • Budget Updat e The FY 2011-13 Financial Plan (Appendix B, Pages 3-133-135) identifies $15,400,000 fo r construction and $2,400,000 for construction management in 2014-15 . With the development of th e 95% plans the consultant and City staff has developed more detailed cost estimates that excee d these figures . Specifically, staff now estimates construction at $17,300,000 and constructio n management at $4,250,000 . The construction estimate has increased for a variety of reason s including : •the required change from spread footings to pile supported retaining walls ; •compliance with new Caltrans design criteria that have changed during this period ; •the inclusion of architectural bridge treatments requested by the Architectural Revie w Commission ; and •more specific estimates generated from the more detailed construction drawings from whic h to prepare the estimates . The construction management estimate has also increased . After conferring with other agencies , including the County's experience with the Willow Interchange, staff believes a full time residen t engineer is necessary for this project . The engineer would act as project manager and be hired later • •this year before construction begins in order to have an active role in the development of th e construction contracts and plans . They would also gain significant knowledge of the project prior t o construction . Additionally, the resident engineer would remain on the job several months afte r construction has been completed to close out the project and oversee record drawings . It i s important to note that staff is not seeking budget amendments with this requested Council action . This is an update which will be further clarified during the upcoming of the FY 2013-15 Financia l Plan process . Staff continues to work with Caltrans, the design engineers and internally to refin e project costs and wherever possible locate offsetting project cost savings . Contract Amendment Reques t On May 6, 2008 Council approved a contract with Dokken Engineering in the amount o f $2,408,000 to prepare construction plans, specifications, and estimates (PS&E) and right of wa y services for the interchange project (Encumbrance No . 40908). The design of the project wa s initially anticipated to take approximately two years . However, several factors extended tha t timeframe. These include change in design standards by Caltrans, longer than anticipate d environmental review, additional studies required as part of the Caltrans permitting process and th e environmental clearance legal challenge . Due to the additional time required during this period an d the various items not included as part of the initial scope (described below), the design firm i s requesting, and staff is supporting, increases to the design budget as detailed below . 1 .Changed Requirements .In April 2012, Caltrans upgraded their design standards from 200 6 •to 2010 and required all projects advertising for construction after 2012 to adhere to thes e new standards . These design changes impacted the Los Osos Valley Road Interchang e project . The extended environmental process and the deferral of STIP funding for th e project delayed construction to 2014 . The consultant is required to include the Caltrans ' new standards, including the update of foundation reports and redesign of retaining walls . Additionally, in 2012, Caltrans issued a directive for local agencies to prepare a Construction Quality Management Plan and a Source Inspection Quality Management Plan for local agency projects on State right of way . Lastly, the Army Corps of Engineer s developed new permitting requirements in 2008 that require additional efforts on the part o f the consultant . These were not part of the initial scope and require the following additiona l costs to the project . Revise Foundation Reports $14,890 Revise Retaining Wall Designs $22,300 Quality Management and Source Inspections Plans $14,980 Army Corps Permit Compliance $ 7,000 $59,170 2 .Design Changes .During the geotechnical field work in 2008, evidence of a previousl y unknown on-site fault was discovered and very soft clay soils were identified . As a result,a new Fault Rupture Study was required and additional potholing needed . This new information resulted in the retaining wall foundations being changed from spread footings t o pile supported walls . This change required the walls to be custom designed rather tha n •based on Caltrans standard plans . Additionally, the Architectural Review Commissio n conditioned the project to include architectural treatments . To facilitate this, changes to the bridge design are needed to accept the weight of th e architectural features . Finally, the original project scope planned to improve the drainag e capacity of Prefumo Creek under US-101 . Staff projected that this could be done for a modest cost by installing two new culverts under the highway . This feature was included i n the Hydraulic Study approved by Caltrans . The culverts triggered additional hydrauli c analysis and requirements driving the overall cost to $2 million . Given the limited project funding, the culverts were removed from the project and the Hydraulic Study, Project Repor t and environmental document were revised accordingly . Fault Rupture Study $22,71 0 Additional Potholing $12,81 5 Change to Pile Supported Retaining Walls $21,96 0 Revise Bridge Design for Weight of Architectural Features $11,840 Hydraulic Analysis for Fish Passage $27,42 0 Revised Hydraulic Study $10,58 0 Revised Project Report $ 5,06 0 Revised Environmental Document $20,15 0 $132,53 5 3.Dated information .The project was first surveyed at project commencement . Since tha t time, Caltrans modified the highway ramps and shoulders as part of a rehabilitation project . Because the existing conditions have changed, Caltrans has required a new survey . Additionally, wetland delineation was performed in 2007 . In 2008, the Army Corps o f Engineers issued new rules that require the delineation to be updated to the new criteria . New Survey $12,63 0 Updated Jurisdictional Delineation $ 6,995 $19,625 4.Off-Site Mitigation .The design contract anticipated the City would pay into a mitigatio n bank for required project mitigations . With the City's acquisition of Johnson Ranch, th e opportunity has arisen to plan and implement the mitigation locally under City control . Thi s new task develops a mitigation planting plan for Johnson Ranch in lieu of payin g approximately $200,000 into a mitigation bank that the City would not have control over fo r its use . Off-Site Mitigation Plan $16,56 0 The total cost of contract amendments is $227,890 . A $15,000 credit for geotechnical drillin g permits that are no longer needed for the project will be credited against this total . Following thi s credit, the total additional charges require a $212,890 augmentation to the design contract for th e project . Staff further recommends that additional funding be added to this amount to support 20 % contingency funding . FISCAL IMPAC T Funding for the LOVR/101 Interchange project was approved as part of the 2011-13 Financial Pla n and included $1,200,000 for land acquisition . Recent land appraisals for the needed right-of-wa y and construction easements have indicated that the $1,200,000 budgeted is in excess necessary for • • • land acquisition . Now that appraisals have been completed for the easements needed for th e project, staff believes that the budget exceeds what is needed and recommends moving funds o f $106,200 from the land acquisition budget to the design budget to cover the additional desig n services required for Dokken Engineering . After all transfers recommended in this report ar e complete there will still be approximately $51,019 money left in the contingency line item for th e PS&E design stage of the project . This amount is being maintained to address any final unforesee n issues from here to caltrans permit issuance . Any finding remaining in this line item when the PS&E is completed will be used to fund construction for the project . Additionally, both the Study and Environmental Review phases have been completed under budget . Staff recommends transferring remaining funds for these two phases (totaling $60,696 .37)into the design phase to help support additional design services for Dokken . There are sufficient program funds to support this transfer request . Fiscal Impact Summary Costs By Type Phase Current Proposed Chang e Land Acq - LOVR/HWY 101 INTERCHANG E Study - LOVR/HWY 101 INTERCHANG E Design - LOVR/HWY 101 INTERCHANG E Env Review - LOVR/HWY 101 INTERCHANGE 95 0 95 1 95 2 957 1,200,00 0 2,40 3 51,01 9 58,294 1,093,800 - 217,91 6 - (106,200) (2,403 ) 166,89 7 (58,294) Total 1,311,716 1,311,716 0 Staff further recommends Council approve a contract amendment with Dokken Engineering in th e amount of $212,890 for additional design work which includes preparing construction plans , specifications, and estimates (PS&E) and right-of-way services for the LOVRI101 interchang e project . (Encumbrance No .40908). ALTERNATIVE Deny Funding Transfer.City Council could choose to deny this funding transfer request . Staff does not recommend this alternative . The LOVR/101 Interchange project needs to move forwar d and the required work necessary to be completed prior to project approval by Caltrans . Alternativ e funding for these purposes could come from the General Fund Reserve or other lower priorit y projects however staff does not recommend this alternative since there is sufficient funding in th e project's other phases to support the cost of the additional design items and complete land acquisitions . ATTACHMENT S 1.Project Timeline and Schedul e 2.ARC Approved Project Design T:\Council Agenda Reports\2013\2013-03-19\LOVR interchange (Grigsby-Bochum)\CAR LOVR IC Project Update .docx • • Attachment 1 LOVR Interchange Project Milestones and Proposed Timeline to Construction • 2002 February 200 4 June 200 8 January 200 8 October 200 8 March 2010 June 201 1 August 201 1 October 201 1 October 201 1 April 201 2 August 201 2 February 201 3 March 2013 Begin Project Study Report developmen t Project Study Report identifies 5 alternatives for evaluatio n Project Study Report Recommends Alternative #3 Council report- Funding strategy Council report- Draft Project Report and environmental documen t 30% design submitted to Caltrans for commen t 60% design submitted to Caltrans for commen t Project Report and Final Environmental Document Signe d Council report- Project update and final Project Report an d environmental document . Prefumo Creek culvert removed from project . Environmental lawsuit file d Environmental lawsuit settle d ARC approves project aesthetics, lighting and landscapin g Project easement acquisitions pursue d Council report- Project update and contract amendmen t April 201 3 September 201 3 June 2014 July 201 4 September 201 4 October 201 4 Winter 2016 Submit 95%design to Caltrans for commen t Submit 100% design to Caltrans for commen t California Transportation Commission allocates fundin g City invites bids for constructio n Construction contract award Construction begin s Construction completion • • Attachment 2 Los Osos Valley Road Overcrossin g w/ Architectural Treatment Page intentionally left 0 blank . •