Loading...
HomeMy WebLinkAbout06-16-2015 C7 Refurbishment of 879 MorroCity of San Luis Obispo, Council Agenda Report, Meeting Date, Item Number FROM: Carrie Mattingly, Director of Utilities Prepared By: Brigitte Elke, Business Manager SUBJECT: UTILITIES DEPARTMENT REFURBISHMENT AT 879 MORRO STREET RECOMMENDATION Approve a new Capital Improvement project for “Utilities Department Refurbishment” Specification No. 91362. DISCUSSION On April 6, 2015, the City Manager approved use of $12,000 in 2013-14 carryover funding for design services to reconfigure and refurbish the interior of the Utilities Department 879 Morro Street building including accessibility upgrades. The building was bought in 1998 and, after extensive remodel, was occupied in 2000. After 15 years, the building is showing wear and tear and ADA accessibility needs addressing. Additional workspaces to accommodate employees require a reconfiguration that will improve the workflow and accessibility of individual workstations and common areas. The overall scope considers to: 1. Improve workflow, workplace ergonomics (including lighting), ADA compliance and accessibility. 2. Replace the current office furniture to address aged work stations. These stations were already in used condition when installed 15 years ago and constructed with materials that absorb dust and odors. In addition to lack of functionality, there have been demonstrated health and allergen reactions and the units are unable to be adequately cleaned. 3. Reconfiguration of the work areas to create additional workspaces for employees, support increased collaboration and modern work styles. 4. Replace worn out flooring. In 2005, the building was flooded by a sewer backup and while appropriate clean-up was done, the refurbishment would address any issue potentially lingering. 5. Create informal meeting space upstairs to increase availability of the 879 Morro conference room (a space used by all City departments) and to support private conversations or a quiet zone in an open-office configuration. 6. Reconfigure the counter space and entrance area to comply with ADA requirements and improve accessibility to the conference room and customer service areas. The proposed project involves removal of one wall and partition, workstation (cubicle) reconfigurations, furniture purchases, fixture installations, re-flooring and painting. June 16, 2015 C7 C7 - 1 Utilities Department 879 Morro Street Refurbishment Page 2 Project Plan and Timing The project is proposed to begin in October 2015. The work will be phased to minimize disruption. Some staff may be temporarily relocated during construction. Staff will evaluate the possibility for work phases to be accomplished on weekends to further avoid disruption. FISCAL IMPACT The estimated project cost is $175,000. Both the Sewer and Water Fund have 2013-14 carryover funding available. The 879 Morro Street building houses field operations, administrative and engineering programs that provide services related to both water and sewer functions. Therefore, costs will be shared between Sewer and Water. Currently, the Water Fund has $75,330 in carryover funding available; the Sewer Fund has $101,222 available in support of this project. Available Project Budget $ 175,000 Design $12,000 Construction Estimate incl. Permits including painting & flooring $ 60,000 Construction Contingencies $ 10,000 Total for Construction $ 70,000 Furniture & Equipment $90,000 Lighting $ 8,000 Printing & Advertising $ 1,000 Total Ancillary Items $ 99,000 Total Project Budget: $169,000 Authorized Budget to Date: $12,000 Estimated Total Remaining Budget $6,000 ALTERNATIVE Deny the project. The Council could choose to deny or defer the project. This is not recommended since efficiencies from the project – public accessibility to staff, workspace flow, additional workspace needed, and health related upgrades – are necessary to continue effective and efficient customer service and work program execution. ATTACHMENT 1. Concept Plans T:\Council Agenda Reports\2015\2015-06-16\Refurbishment of Utilities Dept. at 879 Morro and RFP's (Mattingly-Hix) C7 - 2 REVISIONS: SHEET DRAWN BY: SCALE: DATE: 1540 Marsh St. #110 San Luis Obispo CA. 93403 ph 805-781-3550 sustainable commercial & residential interior design CI T Y O F S L O O F F I C E S LAYOUT WITH WALL DEMO DEMO WALL DEMO WALL 3' - 6 " DEMO CABINET REMOVE WALL HUNG SINK DEMO RECEPTION DESK REMOVE 2X4 FLOUR. AT CONFERENCE RM CONF/LIBRARY OFFICEOFFICEOFFICE REMOVE 2x4 FLOUR. DE M O P L A N S PE R M I T R E Q U I R E D 1/8" = 1'-0" MAY 4 2015 1ST FLOOR2ND FLOOR Attachment 1 C7 - 3 REVISIONS: SHEET DRAWN BY: SCALE: DATE: 1540 Marsh St. #110 San Luis Obispo CA. 93403 ph 805-781-3550 sustainable commercial & residential interior design CI T Y O F S L O O F F I C E S CONFERENCE ROOM RECEPTION LOBBY WORK STATIONS COPY/ SUPPLIES OFFICE 10'-8" 15'-2"6'-0" 6' - 0 " LAYOUT WITH WALL DEMO MOVEABLE STOOLS PARTITION SHELVING UNIT 1'-0" NEW GLASS WALL (E) COL. COUNTER HEIGHT W/ ELEC. 4'x12' (E) TABLE (N) LAMINATE CABINETRY & COUNTERS (N) LAMINATE DESK (N) VINYL FLOORING (N) "WATER" & PIPE RECEPTION FEATURE W/ CHROMA TOP CONF/LIBRARY OFFICEOFFICEOFFICE 33 ' - 8 " 8' - 6 " 12'-4" 7' - 8 " 12 ' - 4 1 / 2 " 10'-7"12'-7"10'-6" 11 ' - 2 " 8'-5"x7'-0" MAX WINDOW SILL +74 1/2" TYP. 30"x30" MAX CHAIRS W/ TABLETS 36" D NO PARTITION PARTITION LARGE SHARED MONITOR HIGH/LOW DESK HIGH/LOW DESK MOVEABLE WHITE BOARDSNEW GLASS WALLS OPAQUE PARTITION (N) RECLAIMED WOOD & PIPE LIBRARY SHELVING UNIT (N) CARPET FLOORING PR O P O S E D FL O O R P L A N S PE R M I T R E Q U I R E D 1/8" = 1'-0" MAY 4 2015 C7 - 4 REVISIONS: SHEET DRAWN BY: SCALE: DATE: 1540 Marsh St. #110 San Luis Obispo CA. 93403 ph 805-781-3550 sustainable commercial & residential interior design CI T Y O F S L O O F F I C E S CONFERENCE ROOM RECEPTION LOBBY WORK STATIONS COPY/ SUPPLIES OFFICE LAYOUT WITH WALL DEMO NEW TBAR CEILING REPLACE W/ NEW 2X4 FIXTURE, TYP. NEW PENDANT TYP. REPLACE ALL TBAR W/ NEW CEILING PANELS, TYP. CONF/LIBRARY OFFICEOFFICEOFFICE NEW "WATER" MULTI-PORT PENDANT FEATURE REPLACE W/ NEW 96 STRIP; TYP. REPLACE W/ NEW 2X4 FIXTURE; TYP. NEW PENDANT PR O P O S E D R E F L E C T E D CE I L I N G P L A N S PE R M I T R E Q U I R E D 1/8" = 1'-0" MAY 4 2015 C7 - 5 THIS PAGE IS INTENTIONALLY LEFT BLANK C7 - 6