HomeMy WebLinkAbout06-11-2015 B1 PadillaCOUNCIL MEETING: Cob l o) -zo1 S
ITEM NO.: B N
• �
TO: City Council
FROM: Wayne Padilla, Finance & I.T. Director JDFC- 1VF1-
DATE: June 11, 2015 JUN 11 2015
VIA: Katie Lichtig, City Manager Cl .cr.cy 0,
-F RI/
SUBJECT: Response to Council initiatives from the June 9t' budget hearing
In response to the Council's direction last night regarding new items to be considered as part of the
Preliminary 2015 -17 Financial Plan and 2015 -16 budget, staff reviewed options for funding the items
that were discussed. These changes included the following:
The balance needed for the removal of the Jack House elevator: $ 22,000*
Octagon Barn contribution: $206,000*
Ranger positions — Two 30 hr. /wk employees (1.5 FTE) $ 75,000
Ranger Vehicle $ 35,000* (1)
$338,000
In order to fund these costs without affecting existing program costs, staff is proposing the following
cost offsets which will not have an adverse effect on the operating or capital programs:
Replace Local Revenue Measure funding of Laguna Lake ADA Trail with
Parkland Fees: ($250,000)
Reduce Local Revenue Measure funding for Storm Drain CIP planning costs: ($ 13,000)
Adjust salary projections: ($ 25,000) **
Adjust funding for employee leave payouts: ($50,000)
Net Amount remaining: $ 0.00
Finance and IT Director Wayne Padilla will make a brief presentation at the start of Thursday's budget
hearing to review this information and answer questions you may have. Please find attached a revised
Local Revenue Measure Spending Summary Worksheet based on these proposed changes.
*These items are proposed to be funded from Local Revenue Measure monies.
(1) Staff identified a vehicle that would meet the needs of the Ranger staff with a lower cost than was
discussed during the budget hearing. This saves approximately $15,000 from the original total.
* *Staff re- evaluated certain staffing projections based on hire dates and other variables and it is
reasonable to lower the projections by the amount shown.
The following uses of local sales tax revenue are consistent with Council goals and objectives, the spending priorities of voter -
approved Local Revenue Measure G, and the recommendations of the Citizens' Revenue Enhancement Oversight Commission
(REOC).
Item
Open Space Preservation
Laguna Lake Dredging and Sediment Management
Tt 14
Open Space Acquisition
Open Space Maintenance
Ranger Program Pickup Truck (,1 in 15 -16)
Natural Resources (Open Space Wildfire Fuel
Reduction)
Ranger Services (Ranger Staffing; FTE = 2)
Subtotal
Bicycle and Pedestrian Improvements
Bicycle Facility Improvements
Bicycle Transportation Plan Implementation
Bike Bridge at Phillips Lane
Bob Jones Trail Octagon Barn Connection
Downtown Renewal
Pedestrian and Bicycle Pathway Maintenance
Replacement of Lighted Crosswalk on Higuera Street
Safe Route to School Improvements- Pacheco and Bishop
Peak
Sidewalk and Tree Replacements
Sidewalk Ramp Construction
Traffic, Bicycle & Pedestrian Marking Replacement
Transportation Planning and Engineering (Engineers,
Bike Coordinator; FTE = 1.6)
Subtotal
Traffic Congestion Relief / Safety Improvements
Monterey & Osos Traffic Signal Safety Upgrade
Neighborhood Traffic Improvements
Parking Structures Assessment and Rehabilitation Study
Signals and Lighting Maintenance Lift Truck
South & Parker Traffic Safety Project: Median
Traffic Operation Improvement Projects
Traffic Safety Improvement Projects
Transportation Radar Trailer
Signal and Light Maintenance (Technician; FTE = 1)
Subtotal
Operating
Programs
CIP
General Fund
2015 -16
2016 -17
2015 -16
2016 -17
2 -yr Total
450,000
450,000
250,000-
250,000
250,000
500,000
285,000
104,000
285,000
570,000
139,000
139,000
5,000
5,000
10,000
121,590
129,530
251,120
100,000
100,000
200,000
400,000
400,000
250,000
250,000
50,000
50,000
6,000
6,000
100,000
60,000
160,000
43,500
43,500
45,000
45,000
100,000
100,000
200,000
45,000
45,000
20,000
20,000
173,799
175,948
349,747
1,769,247
225,000
225,000
20,000
20,000
40,000
8,333
8,333
91,000
91,000
30,000
30,000
30,000
30,000
25,000
25,000
50,000
15,000
15,000
96,866
98,127
194,993
684,326
Item
Public Safety
911 Phone System
Computer -Aided Dispatch
Fire Electronic Patient Care Reporting System
Fire Emergency Response Forklift
Fire Emergency Response SUV
Fire Emergency Response Van with Ambulance Package
Fire Prevention SUV (2 in 15 -16)
Fire Station 2 Exterior Driveway Ramp Replacement
Fire Station 2 Restroom and Dorms Privacy
Modifications
Police Administration Sedan
Police CAD hardware
Police Investigations Sedans (2 in 15 -16)
Police Patrol Sedans (2 in 15 -16, 3 in 16 -17)
Police Patrol SUV
Police Support Services Pickup
Police Traffic Safety Motorcycles (2, 1)
Policy Facility Site Assessment
Patrol Services (Officers, Sergeant; FTE = 4)
Subtotal
Neighborhood Street Paving
Capital Engineering Pickup Truck
Street Reconstruction & Resurfacing
Streets Maintenance Asphalt Grinder & Trailer Mount
Streets Maintenance Backhoe
Streets Maintenance Trucks
CIP Project Engineering (Inspector; FTE = 1)
Streets and Sidewalk Maintenance (Maintenance
Worker; FTE = 1)
Subtotal
Code Enforcement
Mission Plaza Railing Upgrade
Building and Safety (Code Enforcement Officer,
Neighborhood Services Specialists; FTE = 3)
Subtotal
Operating Programs
CIP
General Fund
2015 -16
2016 -17
2015 -16
2016 -17
2 -yr Total
245,000
245,000
25,000
25,000
53,800
25,700
79,500
50,000
50,000
99,400
99,400
180,000
180,000
91,000
91,000
10,000
10,000
160,000
160,000
38,500
38,500
250,000
250,000
66,600
66,600
83,500
129,700
213,200
53,000
53,000
31,400
31,400
63,400
34,200
97,600
45,000
45,000
764,741
786,655
1,551,396
3,286,596
31,500
31,500
1,566,817
1,630,700
3,197,517
89,100
89,100
128,000
128,000
69,000
69,000
109,234
116,258
225,492
80,597
85,003
165,600
3,906,209
247,185 256,639
30,000 30,000 60,000
503,824
563,824
LOCAL REVENUE MEASURE ' 1
Operating Programs CIP General Fund
Item 2015 -16 2016 -17 2015 -16 2016 -17 2 -yr Total
Flood Protection
Broad Street Bank Reinforcement
40,000
Flood Control Pickup Truck
28,500
Marsh Street Bridge Replacement
734,000
;< 00
Storm Drain System Replacement
,,` 00
574,300
Toro Street Bank Stabilization
50,000
Creek and Flood Protection (Collection Operators,
Stormwater Management Plan; FTE = 6)
577,878
583,794
Subtotal
Parks and Recreation /Senior Programs and Facilities
Golf Course Pickup Truck
28,500
Olympic Pool Replastering
290,000
Park Major Maintenance & Repairs
86,000
220,000
Restroom Replacement and Remodeling
400,000
80,000
Octagon Barn Contribution
206,000
Jack House Elevator Removal
22.000
Parks and Landscape Maintenance (Maintenance
Worker; FTE = 1)
77,658
78,657
Subtotal
Total
2,254,548
2,315,611 6,635,350
5,113,100
Local Sales Tax Revenues
Amount
2015 -16 Revenue
7,133,054
2015 -16 Anticipated Interest
2016 -17 Revenue
7,432,546
2016 -17 Anticipated Interest
50,000
2014 -15 Projected Fund Balance
2,197,000
Total
16,862,600
2015 -17 Program Allocations
16,756,109
Undesignated Measure G funds
106,491
40,000
28,500
734,000
1,122, 800
50,000
1,161,672
3,136, 972
28,500
290,000
306,000
480,000
206,000
22,000
156,315
1,488,815
16,756,109