FROM: Carrie Mattingly, Utilities Director
Prepared By: Jennifer Lawrence, Project Manager
SUBJECT: MONTEREY STREET WATERLINE REPLACEMENT
RECOMMENDATION
1. Authorize the City Manager to award a contract to Cannon in the amount of $59,840 for design
services for the “Monterey Street Waterline Replacement.”
2. Approve a Budget Amendment Request to transfer $59,840 from Water Completed Projects to
the design phase of the project.
3. Authorize staff to advertise for bids and authorize the City Manager to award the construction
contract if the lowest responsible bid is within the Engineer’s Estimate of $336,026.
DISCUSSION
In the past year the ten-inch waterline on Monterey Street between California and Pepper has
broken twice. Businesses in the area were without water and traffic was diverted around this section
of Monterey Street while crews spent several hours repairing the break.
An analysis of the risk and benefit of replacing the waterline was completed after the second break.
It is recommended, although the project is not currently on the list of scheduled waterline
replacements, that, due to age and condition of the existing pipeline, the entire section of pipe on
Monterey between California and Johnson be replaced as soon as possible.
There are two 16” water transmission line replacement projects (Phase I and Phase II) that will be
constructed in the area of this proposed project (see the 2013-15 Financial Plan, Capital
Improvement Plan, page 3-117). These projects are currently in the design stage with Phase I
scheduled for construction in April 2014. Phase II, which includes the intersection of California and
Monterey is scheduled for construction starting in July of 2014. Design and construction of this
proposed waterline replacement on Monterey would be scheduled concurrently with Phase II of the
16” water transmission line replacement to reduce costs and minimize traffic and service impacts.
CONCURRENCES
The Community Development Department has granted a Notice of Exemption for the proposed
project since minimal environmental impacts are anticipated.
FISCAL IMPACT
Staff has received a proposal for design from Cannon, one of the City’s on-call consultants
approved for engineering services (Attachment 1). Funding for the design and construction support
portion of the project is available in the Water Completed Projects Account which has a current
Meeting Date
Item Number Dec. 10, 2013
C10 - 1
Monterey Street Waterline Replacement Page 2
available balance of $130,553. The construction services portion of the project will begin in fiscal
year 2014-15. Funding will be provided during the 2014-15 budget supplement process from the
Water Fund’s working capital.
The project costs are estimated as shown below. A Budget Amendment Request will be processed
to transfer funding from the Completed Projects account to the project’s design.
Design Engineering and Construction Support
Design Services $34,540
Potholing$25,300
Total $59,840
Construction Services
Engineer's Estimate $336,026
Contingencies (15%)$50,404
Printing and Miscellaneous $5,000
Total $391,430
Total Project Cost$451,270
Monterey Street Waterline Replacement
ALTERNATIVE
Council could choose to deny funding for this project and pursue construction and design services at
a later date. This option is not recommended due to the two recent breaks in this pipe segment.
Without replacement, this section of pipeline is expected to fail and again cause traffic and water
service disruptions to the community.
ATTACHMENT
1. Engineer’s Design and Construction Budget Estimates
2. Budget Amendment Request
..\Monterey Street Waterline Replacement
C10 - 2
1050 Southwood Drive
San Luis Obispo, CA 93401
T 805.544.7407
F 805.544.3863
CannonCorp.us
November 12, 2013
Mr. Wade Horton, PE
Water Division Manager
City of San Luis Obispo
Utilities Administration and Engineering
879 Morro Street
San Luis Obispo, CA 93401
SUBJECT: PROPOSAL—MONTEREY STREET WATER MAIN REPLACEMENT
Dear Mr. Horton:
We understand the time-sensitive and critical nature of replacing an old water main in
Monterey Street between California Blvd and Johnson Ave. A recent waterline break along
this section of road resulted in significant road damage, disruption to businesses and
residences, and loss of potable water. Replacing this section of antiquated water main before
another break occurs will result in long-term savings to the City.
In preparing our proposal, we have visited the project site, discussed goals for the project with
City staff, developed a general understanding of the water service area of the water main, and
performed initial utility research along the street corridor. Based on this research we have
identified what we consider are the key elements for the success of this project.
•Water Main Alignment—it is critical to develop a realistic and constructible alignment
for the replacement main. This will require detailed utility research, field verification,
and base mapping in order to confidently choose the preferred location for the new
main.
•Constructible Design—thought needs to be devoted to developing construction and
connection details that can be easily installed in short timeframes. This will minimize
overall disruption to the community (i.e. traffic, businesses, residents and tourists.)
•Project Costs—alternative alignments and construction methods (i.e. trenchless
technology) need to be adequately evaluated in order to balance cost of construction
with community disruption.
Cannon has assembled a team of experienced design professionals with practical, local
knowledge in pipeline design, construction and detailed cost estimation. Our local staff
comes to this project with recent, relevant design experience including the City’s Johnson
Ave. water main replacement project completed in 2011.
The following proposal further identifies our understanding of the project and provides a
detailed scope of work. Considering the importance of sequencing for this project, we have
included a project schedule which shows the design phase of this work to be completed by
March 2014.
We stand ready to assist the City in replacing this critical component of infrastructure.
Attachment 1
C10 - 3
Proposal: Monterey Street Water Main Replacement
131033 2
Sincerely,
Larry P. Kraemer, PE
Director, Public Infrastructure Division
C 44813
C10 - 4
Proposal: Monterey Street Water Main Replacement
131033 1
PROJECT UNDERSTANDING
We understand the City intends to replace a critical segment of existing water main in
Monterey Street as a result of a recent break and the likelihood of another occurring in the
near future. Replacement of this aging infrastructure prior to another break will provide long-
term savings and reliability of service to the Community.
The design work necessary to replace the Monterey Street Water Main includes a topographic
survey, utility research and mapping, potholing, alignment alternatives analysis, plan and
profile layout, connection details, technical specifications, and cost estimates. Preliminary
design criteria are summarized below.
Project Criteria Notes
Diameter 10-inch
Material C900 PVC
Approximate Length 1,040 linear feet
Working Pressure To be determined during design
Surge Pressure To be determined during design
Hydrants Reconnect to existing (1-total). Evaluate additional
hydrants
Service Laterals Reconnect (preferred). Replace if polybutylene or
lead based.
In-line Valves Replace at same locations.
Installation Methods Open-cut and/or trenchless
Street Reconstruction considerations Old concrete roadway underneath. Dowel-in and
replace with concrete to minimize differential
settlement
Known Buried Obstructions Large, existing rectangular box culvert running
parallel to existing main along with City Comm.
(fiber optics)
Traffic Concerns Heavy but plenty of roadway width for one lane in
each direction
Connections Monterey/California, Monterey/Johnson,
hydrant(s), laterals
Other Ongoing Projects in the Vicinity Sewer line replacement at Monterey/California
(Filippin); water line replacement in California
(MNS); storm drain improvements at
California/Monterey (Penfield & Smith)
Budget Cost Estimate $415,000 (see attached preliminary cost estimate)
C10 - 5
Proposal: Monterey Street Water Main Replacement
131033 2
SCOPE OF WORK
Cannon’s approach to successful completion of this project consists of providing professional
services in three progressive phases: Preliminary Engineering, Construction Documents, and
Construction Engineering Support. Services will include a kickoff meeting, utility research and
mapping, potholing, design, cost estimates, construction documents, and responses to RFI’s.
Descriptions of our proposed involvement and proposed deliverables are summarized below
within each corresponding project task.
Phase 1. Preliminary Engineering
Task 1. Kick-Off Meeting
We will orchestrate and attend a Project Kick-Off Meeting with appropriate personnel from the
City. This meeting agenda will focus on project understanding, team involvement, project
constraints, and the anticipation of design development impediments. This meeting will also
include project introduction, review of background information and project scope, and an
overview of the project schedule. This meeting represents a key opportunity for
representatives from the City to steer the project and further clarify critical elements of the
scope. We anticipate that a field review meeting may also be of value and we have
incorporated a field walk with the City following the project kick-off meeting into our scope.
Task 1 Deliverables:
• Attend Project Kick-Off Meeting and Field Walk
• Prepare and distribute meeting minutes
Task 2. Utility Research & Base Mapping
We will coordinate with the utility companies and the City to obtain pertinent operations data
and record drawing information of utilities within the project areas. We will review applicable
utility documents, topographic survey, as-built drawings and other available materials provided
by the City to compile an electronic base map for use in the design plans. Potential utility
conflicts and/or relocation requirements will be identified and evaluated as needed to minimize
unexpected design modifications or construction delays.
We will initiate a USA Dig Alert Utility Search and will request that the utilities be marked in
order that the marking can be surveyed into the base drawing.
City Provided Items:
• Access to all available, pertinent record drawings in the City’s database
Task 2 Deliverables:
• Base Map in digital format
Task 3. Topographic Survey
We will prepare a topographic survey of the project corridor showing contours and spot
elevations, locations of existing structures, natural land features, roadways, paving, curb,
sidewalk, and existing utilities, drain inlets and catch basins, manholes and fire hydrants. If
required, we also provide locations of trees (greater than 4” in diameter).
An attempt will be made to correlate data that is collected in the field with the location and size
of all underground utilities gathered through our review of available record documentation.
C10 - 6
Proposal: Monterey Street Water Main Replacement
131033 3
We will utilize record data to show the record street right-of-way to identify the limits of public
property and to establish a boundary of the contractors work area.
Task 3 Deliverables:
• Topographic survey incorporated into the digital Base Map
Task 4. Potholing
Record data research of utility as-built information may fail to accurately identify both vertical
and horizontal locations of subsurface facilities. Where detailed information is required to
construct a tie-in connection or avoid crossing interferences and conflicts, potholing will be
used to verify horizontal and vertical depths. We assumed that 10 potholes will be required
for the project. The type of street pothole repair includes backfill with 2-sack slurry to below
AC grade and HMA patch at 6-inch thick. A no-fee encroachment will be issued by the City.
All traffic control will be in accordance with City requirements.
Task 4 Deliverables:
• Horizontal and vertical measurements using tape measure methods
Task 5. Preliminary Alignment
We will develop a preferred alignment alternative for the new 10-inch waterline within the
project corridor. We will prepare a preliminary plan and information that summarizes our
evaluation of the project’s constraints, which include the following:
• Proposed preliminary water main alignment via open-cut method
• Potential utility conflicts
• Utility location discrepancies
• Trenchless Alternative Evaluation (Swageline)
• Health department and other utility company horizontal and vertical clearance
requirements.
The preliminary plan and constraints information will also memorialize the design and test
pressures, as well as the specified materials for the project. A summary of the City-approved
variances and deviations from standard plans will be included in the analysis. We have
assumed the coordination and processing of Health Department approvals will be completed
by the City. One meeting with City staff is included with this task.
Task 5 Deliverables:
• Preliminary Alignment Information and Exhibit
Phase 2. Construction Documents
Task 6. 75% Construction Documents (Plans, Specifications, and Cost Estimate)
We will submit a “Review Submittal” Design Plans Package at a design and detail level
approximately equal to 75 percent of the anticipated final construction documents for your
review and comment. The Design Package will consist of five drawing sheets (24” x 36”) as
listed below, technical specifications, and a preliminary opinion of probable construction costs.
Anticipated Underground Improvement Plan Set:
• Title Sheet
• Two (2) Plan and Profile Sheets
• Two (2) Construction Details Sheets
C10 - 7
Proposal: Monterey Street Water Main Replacement
131033 4
This design package will contain the necessary plan, profile, and details to connect the new
water main with the existing mains in California and Johnson as well as service laterals and
hydrants.
Task 6 Deliverables:
• 75% Design Plans – Three (3) sets full size and One (1) PDF Format
• 75% Technical Specifications – PDF and Word Format
• 75% Cost Estimate – Excel and PDF Format
City Provided Items:
• City General Provisions – PDF and Word Format (Sample)
Task 7. 75% Design Review Meeting
We will attend one meeting with City staff to review and discuss the design submittal at the
75% completion stage.
Task 7 Deliverables:
• Attend meeting with City; provide meeting minutes
Task 8. 100% Construction Documents (Plans, Specifications, and Cost Estimate)
We will submit a “Review Submittal” Design Plans Package at a design and detail level
approximately equal to 100 percent of the anticipated final construction documents for your
review and comment. The Design Package will consist of three drawing sheets (24” x 36”) as
listed below, technical specifications, and a preliminary opinion of probable construction costs.
Anticipated Intersection Improvement Plan Set:
• Title Sheet
• Two (2) Plan and Profile Sheets
• Two (2) Construction Details Sheets
This design package will contain the necessary plan, profile, and details to connect the new
water main with the existing mains in California and Johnson as well as service laterals and
hydrants.
Task 8 Deliverables:
• 100% Design Plans – Three (3) sets full size and One (1) PDF Format
• 100% Technical Specifications – PDF and Word Format
• 100% Cost Estimate – Excel and PDF Format
City Provided Items:
• City General Provisions – PDF and Word Format (Sample)
Task 9. 100% Design Review Meeting
We will attend one meeting with City staff to review and discuss the design submittal at the
100% completion stage.
Task 9 Deliverables:
• Attend meeting with City; provide meeting minutes
C10 - 8
Proposal: Monterey Street Water Main Replacement
131033 5
Task 10. Final Construction Documents (Plans, Specifications, and Cost Estimate)
Based on City comments on the 100% submittal package, we will prepare and submit a Final
Construction Documents Bid package. This submittal package will contain complete
Construction Plans on permanent drawing medium (Mylar film) and an Opinion of Probable
Construction Costs. Bid documents will be prepared in the City’s standard format, including
contract documents and technical specifications. Electronic copies of all drawing files of the
Final Construction Documents will be submitted to the City.
Task 10 Deliverables:
• Final Design Plans – 3 sets full size (signed), 1 set Mylar, and PDF Format
• Final Technical Specifications – PDF and Word Format
• Final Cost Estimate – Excel and PDF Format
Phase 3. Construction
Task 11. Engineering Support
We will provide responses to requests for information (RFI) and requests for clarifications
during bidding and construction. We budgeted 16 hours for this effort.
ASSUMPTIONS AND EXCLUSIONS
The following assumptions and exclusions apply to this proposal:
• The City will provide record drawings and all documents relating to existing facilities at the
project site in PDF electronic and hard-copy format, including water service laterals and
sewer lateral locations derived from sewer video logs.
• All data prepared by others and provided to Cannon will be made available in a digital
format, compatible with our systems. It is also understood that the information and
technical data provided and prepared by others, on the Client’s behalf or Property
Owner’s behalf, may be used by Cannon in performing its services and is entitled to rely
upon the accuracy and completeness thereof.
• Permit Fees will be paid for by City.
• CEQA, Environmental Permitting, Archeological, botanical, and landscaping services will
be prepared by others.
• Preparation of Stormwater Pollution Prevention Plans, Erosion Control Plans, and
processing of NPDES Stormwater Permits will be prepared by others (if required).
• Right-of-Way mapping and/or determination is excluded from this scope of work.
• Traffic control plans will be prepared by others or will be the responsibility of the
construction contractor hired to perform the work.
• Typical services during construction are excluded from the scope at this time, including,
compaction testing, , construction management, and construction staking.
C10 - 9
Proposal: Monterey Street Water Main Replacement
131033 6
SCHEDULE
A preliminary Project Schedule detailing the Work Program is enclosed for your consideration.
We understand this schedule may be revised with input from the City regarding specific goals
and objectives for this project.
FEES
A detailed breakdown of our proposed fee estimate, including person-hours, rates, and costs, is
included for your review. Items not specifically identified in the Work Program are excluded
from our work and will be submitted to the City for review and approval.
C10 - 10
ID
T
a
s
k
N
a
m
e
Du
r
a
t
i
o
n
S
t
a
r
t
Fi
n
i
s
h
P
r
e
d
e
c
e
s
s
o
r
s
1
Mo
n
t
e
r
e
y
S
t
r
e
e
t
W
a
t
e
r
M
a
i
n
R
e
p
l
a
c
e
m
e
n
t
18
0
d
a
y
s
Mo
n
1
2
/
2
/
1
3
Fr
i
8
/
8
/
1
4
2
**
*
C
i
t
y
I
s
s
u
e
s
N
o
t
i
c
e
t
o
P
r
o
c
e
e
d
*
*
*
0
d
a
y
s
Mo
n
1
2
/
2
/
1
3
Mo
n
1
2
/
2
/
1
3
3
Ph
a
s
e
1
.
P
r
e
l
i
m
i
n
a
r
y
E
n
g
i
n
e
e
r
i
n
g
26
d
a
y
s
Mo
n
1
2
/
2
/
1
3
Mo
n
1
/
6
/
1
4
4
Ta
s
k
1
.
K
i
c
k
-
O
f
f
M
e
e
t
i
n
g
1
d
a
y
Mo
n
1
2
/
2
/
1
3
Mo
n
1
2
/
2
/
1
3
2
5
Ta
s
k
2
.
U
t
i
l
i
t
y
R
e
s
e
a
r
c
h
a
n
d
B
a
s
e
M
a
p
p
i
n
g
21
d
a
y
s
Tu
e
1
2
/
3
/
1
3
Tu
e
1
2
/
3
1
/
1
3
2,
4
6
Ta
s
k
3
.
T
o
p
o
g
r
a
p
h
i
c
S
u
r
v
e
y
5
d
a
y
s
W
e
d
1
2
/
2
5
/
1
3
Tu
e
1
2
/
3
1
/
1
3
5F
F
7
Ta
s
k
4
.
P
o
t
h
o
l
i
n
g
3
d
a
y
s
W
e
d
1
/
1
/
1
4
Fr
i
1
/
3
/
1
4
6
8
Ta
s
k
5
.
P
r
e
l
i
m
i
n
a
r
y
A
l
i
g
n
m
e
n
t
A
n
a
l
y
s
i
s
1
d
a
y
Mo
n
1
/
6
/
1
4
Mo
n
1
/
6
/
1
4
7
9
Ph
a
s
e
2
.
C
o
n
s
t
r
u
c
t
i
o
n
D
o
c
u
m
e
n
t
s
49
d
a
y
s
Tu
e
1
/
7
/
1
4
Fr
i
3
/
1
4
/
1
4
10
Ta
s
k
6
.
7
5
%
C
o
n
s
t
r
u
c
t
i
o
n
D
o
c
u
m
e
n
t
s
20
d
a
y
s
Tu
e
1
/
7
/
1
4
Mo
n
2
/
3
/
1
4
8
11
**
*
C
i
t
y
R
e
v
i
e
w
o
f
7
5
%
S
u
b
m
i
t
t
a
l
*
*
*
5
d
a
y
s
Tu
e
2
/
4
/
1
4
Mo
n
2
/
1
0
/
1
4
10
12
Ta
s
k
7
.
7
5
%
D
e
s
i
g
n
R
e
v
i
e
w
M
e
e
t
i
n
g
1
d
a
y
Tu
e
2
/
1
1
/
1
4
Tu
e
2
/
1
1
/
1
4
11
13
Ta
s
k
8
.
1
0
0
%
C
o
n
s
t
r
u
c
t
i
o
n
D
o
c
u
m
e
n
t
s
15
d
a
y
s
W
e
d
2
/
1
2
/
1
4
Tu
e
3
/
4
/
1
4
12
14
**
*
C
i
t
y
R
e
v
i
e
w
o
f
1
0
0
%
S
u
b
m
i
t
t
a
l
*
*
*
5
d
a
y
s
W
e
d
3
/
5
/
1
4
Tu
e
3
/
1
1
/
1
4
13
15
Ta
s
k
9
.
1
0
0
%
D
e
s
i
g
n
R
e
v
i
e
w
M
e
e
t
i
n
g
1
d
a
y
W
e
d
3
/
1
2
/
1
4
W
e
d
3
/
1
2
/
1
4
14
16
Ta
s
k
1
0
.
F
i
n
a
l
C
o
n
s
t
r
u
c
t
i
o
n
D
o
c
u
m
e
n
t
s
2
d
a
y
s
Th
u
3
/
1
3
/
1
4
Fr
i
3
/
1
4
/
1
4
15
17
Ph
a
s
e
3
.
C
o
n
s
t
r
u
c
t
i
o
n
10
5
d
a
y
s
Mo
n
3
/
1
7
/
1
4
Fr
i
8
/
8
/
1
4
18
**
*
C
i
t
y
A
d
v
e
r
t
i
s
e
,
B
i
d
,
A
w
a
r
d
P
e
r
i
o
d
*
*
*
60
d
a
y
s
Mo
n
3
/
1
7
/
1
4
Fr
i
6
/
6
/
1
4
16
19
Ta
s
k
1
1
.
C
o
n
s
t
r
u
c
t
i
o
n
E
n
g
i
n
e
e
r
i
n
g
S
u
p
p
o
r
t
45
d
a
y
s
Mo
n
6
/
9
/
1
4
Fr
i
8
/
8
/
1
4
18
20
Co
n
s
t
r
u
c
t
i
o
n
C
o
m
p
l
e
t
e
0
d
a
y
s
Fr
i
8
/
8
/
1
4
Fr
i
8
/
8
/
1
4
19
12
/
2
8/8
No
v
De
c
Ja
n
FebMarAprMayJunJulAugSepOct2014
PR
O
J
E
C
T
S
C
H
E
D
U
L
E
CI
T
Y
O
F
S
A
N
L
U
I
S
O
B
I
S
P
O
MO
N
T
E
R
E
Y
S
T
R
E
E
T
W
A
T
E
R
M
A
I
N
R
E
P
L
A
C
E
M
E
N
T
Cannon 1050 Southwood Drive San Luis Obispo, CA 93401 805.544.7407
13
1
0
3
3
_
S
c
h
e
d
u
l
e
Pa
g
e
1
Mon 11/11/13C10 - 11
WO
R
K
B
U
D
G
E
T
Mo
n
t
e
r
e
y
S
t
r
e
e
t
W
a
t
e
r
M
a
i
n
R
e
p
l
a
c
e
m
e
n
t
CI
T
Y
O
F
S
A
N
L
U
I
S
O
B
I
S
P
O
Cannon 1050 Southwood Drive San Luis Obispo, CA 93401 805.544.7407
Su
b
-
C
o
n
s
u
l
t
a
n
t
s
MGE
Un
d
e
r
g
r
o
u
n
d
Hr
s
C
o
s
t
H
r
s
C
o
s
t
H
r
s
C
o
s
t
H
r
s
C
o
s
t
H
r
s
C
o
s
t
H
r
s
C
o
s
t
CostHrsCost
Ta
s
k
1
.
K
i
c
k
-
O
f
f
M
e
e
t
i
n
g
&
S
i
t
e
V
i
s
i
t
4
$
6
2
0
4
$
7
2
0
4
$
4
8
0
12$1,820
Ta
s
k
2
.
U
t
i
l
i
t
y
R
e
s
e
a
r
c
h
a
n
d
B
a
s
e
M
a
p
p
i
n
g
8
$
1
,
2
4
0
8
$
1
,
4
4
0
2
0
$
2
,
4
0
0
36$5,080
Ta
s
k
3
.
T
o
p
o
g
r
a
p
h
i
c
S
u
r
v
e
y
8
$
2
,
2
0
0
1
6
$
1
,
9
2
0
3
$
4
2
0
27$4,540
Ta
s
k
4
.
P
o
t
h
o
l
i
n
g
4
$
6
2
0
2
$
3
6
0
$2
5
,
3
0
0
6
$
2
6
,
2
8
0
Ta
s
k
5
.
P
r
e
l
i
m
i
n
a
r
y
A
l
i
g
n
m
e
n
t
A
n
a
l
y
s
i
s
4
$
6
2
0
2
$
3
6
0
2
4
$
2
,
8
8
0
30$3,960
Su
b
t
o
t
a
l
20
$
3
,
1
0
0
1
6
$
2
,
8
8
0
4
8
$
5
,
7
6
0
8
$
2
,
2
0
0
1
6
$
1
,
9
2
0
3
$
4
2
0
$2
5
,
3
0
0
1
1
1
$
4
1
,
6
8
0
Ta
s
k
6
.
7
5
%
C
o
n
s
t
r
u
c
t
i
o
n
D
o
c
u
m
e
n
t
s
4
$
6
2
0
2
$
3
6
0
4
0
$
4
,
8
0
0
146$5,880
Ta
s
k
7
.
7
5
%
D
e
s
i
g
n
R
e
v
i
e
w
M
e
e
t
i
n
g
2
$
3
1
0
2
$
3
6
0
4$670
Ta
s
k
8
.
1
0
0
%
C
o
n
s
t
r
u
c
t
i
o
n
D
o
c
u
m
e
n
t
s
4
$
6
2
0
2
$
3
6
0
3
0
$
3
,
6
0
0
136$4,680
Ta
s
k
9
.
1
0
0
%
D
e
s
i
g
n
R
e
v
i
e
w
M
e
e
t
i
n
g
2
$
3
1
0
2
$
3
6
0
4$670
Ta
s
k
1
0
.
F
i
n
a
l
C
o
n
s
t
r
u
c
t
i
o
n
D
o
c
u
m
e
n
t
s
4
$
6
2
0
2
$
3
6
0
2
0
$
2
,
4
0
0
226$3,580
Su
b
t
o
t
a
l
16
$
2
,
4
8
0
1
0
$
1
,
8
0
0
9
0
$
1
0
,
8
0
0
516$15,480
Ta
s
k
1
1
.
E
n
g
i
n
e
e
r
i
n
g
S
u
p
p
o
r
t
8
$
1
,
2
4
0
8
$
1
,
4
4
0
16$2,680
Su
b
t
o
t
a
l
8
$
1
,
2
4
0
8
$
1
,
4
4
0
16$2,680
To
t
a
l
s
:
44
$
6
,
8
2
0
3
4
$
6
,
1
2
0
1
3
8
$
1
6
,
5
6
0
8
$
2
,
2
0
0
1
6
$
1
,
9
2
0
3
$
4
2
0
$2
5
,
3
0
0
6
4
3
$
5
9
,
8
4
0
$5
0
0
$4
0
0
$2
0
0
$1
0
0
Re
i
m
b
u
r
s
a
b
l
e
$1
0
0
$1
0
0
Co
s
t
Ph
a
s
e
1
:
P
r
e
l
i
m
i
n
a
r
y
E
n
g
i
n
e
e
r
i
n
g
CA
D
Su
r
v
e
y
$1
2
0
PM
Su
r
v
e
y
$1
4
0
$1
5
5
Pr
o
j
e
c
t
Ma
n
a
g
e
r
C
h
a
r
g
e
Pr
i
n
c
i
p
a
l
i
n
Ca
n
n
o
n
$1
8
0
Tw
o
-
M
a
n
Su
r
v
e
y
C
r
e
w
Ex
p
e
n
s
e
s
Pr
o
j
e
c
t
En
g
i
n
e
e
r
$1
2
0
Ph
a
s
e
3
.
C
o
n
s
t
r
u
c
t
i
o
n
Ph
a
s
e
2
:
C
o
n
s
t
r
u
c
t
i
o
n
D
o
c
u
m
e
n
t
s
Ho
u
r
l
y
R
a
t
e
Mo
n
t
e
r
e
y
S
t
r
e
e
t
W
a
t
e
r
M
a
i
n
R
e
p
l
a
c
e
m
e
n
t
$2
7
5
$1
0
0
Totals C10 - 12
City
Project:
No. :
Item
Number Item Est.
Quan.Unit Unit CostTotal Item Cost
1
Mobilization (not to exceed 5% of bid), complete and in place, in
accordance with the plans and specifications, for the unit price of…1LS$17,206.00 $17,206
2
Traffic Control, complete and in place, in accordance with the plans
and specifications, for the unit price of…1LS$25,000.00 $25,000
3
Potholing, complete and in place, in accordance with the plans and
specifications, for the unit price of…1LS$25,300.00 $25,300
4
10-inch Diameter PVC Water Main on Monterey Street between
Johnson Ave and California Blvd complete and in place, in
accordance with the plans and specifications, for the price of…1026LF$221.07 $226,820
4.01 10" PVC Water Main - Pressure Class 150 @ 4'-6' Depth 1,026LF$60.00 $61,560.00
4.02 Saw Cut Concrete 2,058LF $5.00 $10,290.00
4.03 Concrete Removal 3,078SF $5.00 $15,390.00
4.04 Excavation 684CY$15.00 $10,260.00
4.05 Shoring and Bracing 1,026LF$15.00 $15,390.00
4.06 Bedding 228CY$40.00 $9,120.00
4.07 Backfill and Compaction 352CY$10.00 $3,515.00
4.08 Plastic Wrap and Coating 1,026LF $2.50 $2,565.00
4.09 Connection to Existing Mains (special fittings, labor, etc.)2EA$2,500.00 $5,000.00
4.10 Concrete Road Section Restoration 76CY$750.00 $57,000.00
4.11 Pavement Restoration & Cleanup 342SY$65.00 $22,230.00
4.12 Roadway Striping Replacement 1LS$3,500.00 $3,500.00
4.12 Thrust Blocks 16EA$500.00 $8,000.00
4.13 Testing and Disinfection 1LS$3,000.00 $3,000.00
5
10-inch Tie-in Assembly, complete and in place, in accordance with
the plans and specifications, for the price of…2EA$8,000.00 $16,000
6
10-inch In-line Resilient Wedge Gate Valve Assembly, complete
and in place, in accordance with the plans and specifications, for the
price of…
2EA$3,000.00 $6,000
7
1-inch Water Service Tie-in complete and in place, in accordance
with the plans and specifications, for the price of…10EA$2,500.00 $25,000
8
Fire Hydrant Assembly, complete and in place, in accordance with
the plans and specifications, for the price of…2EA$5,000.00 $10,000
9
Abandon Existing 10-inch Water Line in place, in accordance with
the plans and specifications, for the price of…1LS$10,000.00 $10,000
Subtotal:$361,326
15% Contingency:$54,199
Design Engineering and Construction Support:$34,540
Grand Total:$450,065
EA = Each, LS = Lump Sum, LF = Lineal Feet, SF = Square Feet, CY = Cubic Yard, SY = Square Yard
Opinion of Probable Construction Cost
Monterey Street Waterline Replacement
In providing opinions of probable construction costs, the City must understand that Cannon has no control over the costs or the price of labor, equipment
or materials, or over the Contractor's method of pricing, and that the opinions of probable costs provided herein are made on the basis of Cannon's
qualifications and experience. Cannon makes no warranty, expressed or implied, as to the accuracy of such opinions as compared to bid or actual costs.
Rough Budget Estimate
Monterey Street Water Main Replacement Project1 of 1 November 2013
C10 - 13
Attachment 2
NUMBER
Fund No.
500
Amendment
Amount
TOTAL
Amendment
Project Phase Amount
Monterey Street Waterline Repl 91284500 91284952 59,840.00
Water Completed Projects 99899500 99899999 (59,840.00)
TOTAL -$
Date
Date
Director of Finance
Entered ByDate
Date
City of San Luis Obispo
BUDGET AMENDMENT REQUEST
Program
50055100
EXPENDITURES AND OTHER FINANCING USES
Account Description Revenue Account No.
Capital Project No.
50010100 99899999
Account Description
General Ledger No,
Account
91284952
Page_____of_____
Requesting Department Fund Name
Utilities Water
REVENUES AND OTHER FINANCING SOURCES
Per CAR dated12/10/13, transferring funding to design portion of project
City Administrative Officer
PURPOSE
Department Head
C10 - 14