HomeMy WebLinkAbout07-21-2015 Souza Contracting Inc, DBA Souza Construction Inc. AgreementAGREEMENT
THIS AGREEMENT, made on this 21 day of July. 2015, by and between the City of San Luis Obispo, a
municipal corporation and charter city, San Luis Obispo County, California (hereinafter called the Owner)
and SOUZA ENGINEERING CONTRACTING INC., DBA SOUZA CONSTRUCTION INC., (hereinafter
called the Contractor).
WITNESSETH:
That the Owner and the Contractor for the consideration stated herein agree as follows:
ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be performed, shall
provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and
transportation services required to complete all the work of construction of
TORO STREET BANK STABILIZATION, SPECIFICATION NO. 90646
in strict compliance with the plans and specifications therefor, including any and all Addenda, adopted by
the Owner, in strict compliance with the Contract Documents hereinafter enumerated.
It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work
performed and completed under the direction and supervision and subject to the approval of the Owner or its
authorized representatives.
ARTICLE II, CONTRACT PRICE: The Owner shall pay the Contractor as full consideration for the faithful
performance of this Contract, subject to any additions or deductions as provided in the Contract Documents,
the contract prices as follows:
Item
No.
Item
Description
Unit of
Measure
Estimated
Quanti
Item Price
in figures
Total
in figures)
1
Permit Compliance
LS
1
$4,260.00
$4,260.00
2
Sediment Removal
LS
1
$6,445.00
$6,445.00
3
Creek Diversions & Dewatering
LS
1
$12,109.00
$12,109.00
4
Concrete Creek Bank Protection #1
LF
65
$909.00
$59,085.00
5
Concrete Creek Bank Protection #2
LS
1
$21,539.00
$21,539.00
6
Boulder Clusters
TON
34
$225.00
$7,650.00
BID TOTAL: $111,088.00
Payments are to be made to the Contractor in compliance with and subject to the provisions embodied in
the documents made a part of this Contract.
Should any dispute arise respecting the true value of any work omitted, or of any extra work which the
Contractor may be required to do, or respecting the size of any payment to the Contractor, during the
performance of this Contract, said dispute shall be decided by the Owner and its decision shall be final, and
conclusive.
ARTICLE III, COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following
documents, all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto
attached:
1. Notice to Bidders and information for bidders.
2. Standard Specifications, Engineering Standards, Special Provisions, and any Addenda.
3. Accepted Bid.
4. Public Contract code Section 10285.1 Statement and 10162 Questionnaire.
5. Noncollusion Declaration.
6. Plans.
7. List of Subcontractors.
8. Agreement and Bonds.
9. Insurance Requirements and Forms.
ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there be any
conflict between the terms of this instrument and the bid of said Contractor, then this instrument shall control
and nothing herein shall be considered as an acceptance of the said terms of said bid conflicting herewith.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date
first above written.
ATTEST:
APPROVED AS TO FORM:
J. Christine Dietrick
Cit Att&ney
C
12 -28 -09
CITY OF SAN LUIS OBISPO
A Municipal Corporation
By. ,
Ja Nowell Marx
City Mayor
CONTRACTOR:
Souza Engineering Contracting Inc.,
DBA Souza Construction Inc.
By:
eve A. Souza
Its: President
Meeting Date: July 21, 2015
} Council Agenda Report Item Number: C5
FROM: Daryl R. Grigsby, Director of Public Works
Prepared By: Dan Van Beveren, Senior Civil Engineer
SUBJECT: TORO STREET BANK STABILIZATION, SPECIFICATION NO. 90646
PROJECT AWARD
RECOMMENDATION
1. Award a contract to Souza Construction, Inc. in the amount of $111,088 for the construction
of the Toro Street Bank Stabilization project, Specification No. 90646.
2. Approve the transfer of $48,197 from the Completed Projects account into the project's
construction account.
DISCUSSION
The Toro Street Bank Stabilization project consists of stabilizing two existing creek banks along
San Luis Obispo Creek, and the removal of existing sediment which has accumulated beneath
the Toro Street Bridge.
Background
San Luis Obispo Creek crosses under the Toro Street Bridge between Marsh Street and Pacific
Street, and then continues in a northwesterly direction along the edge of Toro Street. The creek
bank supporting Toro Street is very steep and consists of stacked sacks of concrete referred to as
a "sack - crete" wall. The wall contains a void approximately five feet high and 70 feet long where
the concrete sacks have been dislodged by the creek flow and washed away. The project will halt
erosion under the wall. On the opposite side of the creek, a similar situation exists. A smaller
sack -crete wall adjacent to the Toro Street Bridge and supporting the Dalidet Adobe property has
also begun to erode. Both of these locations are in need of repair.
The Toro Street Bridge is immediately upstream from these two creek bank locations. Over the
years, sediment has accumulated on the north side of the bridge. The project includes removal of
the sediment buildup to restore the creek flow capacity beneath the bridge.
In 2014, staff completed the design for the Toro Street Bank Stabilization project. The project
scope includes the restoration of the two damaged creek banks, and the removal of accumulated
sediment beneath the Toro Street Bridge. A detailed discussion of the project scope is included in
Attachment 1 - the City Manager Report authorizing the project advertisement.
Due to the location of the project within the creek, regulatory permits were obtained from the
Army Corps of Engineers, the California Department of Fish and Wildlife, and the California
Regional Water Quality Control Board.
One of the permit restrictions requires the project to be constructed between the dates of
August 1St and October 31s' — the time of the year when the creek flow is at its lowest. On
Toro Street Bank Stabilization (90646) Page 2
March 10, 2015, the final permit was received, and the project was scheduled for construction
later this year.
City Manager Approval to Advertise
The Engineer's Estimate for the construction was $70,000, within the $100,000 limit of City
Manager approval to advertise and award a construction contract. As such, the plans and
specifications were approved by the City Manager on May 11, 2015. Bids were opened on
June 11, 2015, and the lowest bid was $111,088, submitted by Souza Construction, Inc. The
higher than expected bid amount is attributed by staff to the necessary dewatering of the creek,
concrete forming and construction in a creek environment, and environmental permit compliance
requirements, all of which are specialized types of construction activities difficult to estimate as
they are not typical of most City projects.
City Council Approval to Award
Due to the bid amount being over $100,000, the City Council's approval of the project award is
required in accordance with the City's purchasing policy. Staff has reviewed the bid by Souza
Construction, Inc. for irregularities or special award circumstances and has found none.
Therefore, staff recommends a construction contract to be awarded to Souza Construction, Inc.
A copy of the Bid Summary is included as Attachment 2.
FISCAL IMPACT
The current project construction budget consists of $30,000 from $2012 -13, and an additional
$50,000 budgeted in the recently- approved $2015 -16 CIP. With $128,196 needed for
construction, a Budget Amendment Request will transfer $48,196 from the Completed Projects
Account in order to supplement the current project budget as shown in the table below:
Toro Street Bank Stabilization:
Funding by Source
Budget
Construction ,
Construction Costs
Current Project Construction Budget:
$80,000
Construction Contract:
$111,088
* Completed Projects Account
$48,196
Contingencies:
$11,108
Total
$128,196
Total for Construction
$122,196
Materials Testing
$5,000
Printing and other misc. costs:
$1,000
Total for Other Costs
$6,000
Total Construction Budget
$128,196
* Current Amount Available in Completed Projects Account is $111,151.
ALTERNATIVES
Reject all bids and direct staff to re- advertise the project. The alternative to awarding the
contract would be to reject all bids and to re- advertise. There are no indications that the
construction costs would be any lower, and due to the seasonal restrictions of the project, the
project would have to be rescheduled to 2016. This option is not recommended.
Toro Street Bank Stabilization (90646) Page 3
ATTACHMENTS
1. Copy of Original report authorizing advertising
2. Bid Summary
3. Contract Agreement with Souza Construction, Inc.
AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE
Plans and Specifications
IAoouricil agenda rep[xis 201 5120 1 5t7 -2"am street hank sWdilizftn190646 car-a„uard.dacx