COMPLEX OVERVIEW
Cal Poly's Student Housing South is a residential community for first -year students, located
at the Grand Avenue entrance to campus and across the street from the existing freshman
residence halls. The project will consist of seven 3- to 5 -story residence hall buildings
containing a total of 1,475 beds, an adjacent four -level parking structure, large open spaces
for outdoor activities, and community /retail spaces for a small caf6, community room, game
room, mail room, welcome center, and office /work spaces.
Cal Poly is focused on providing the foundation for student success, Research has shown
that students who live on campus their first two years stay in school and graduate at a
higher rate.
PROJECT FACTS
Site Size Approximately 12 acres
Beds 1,475
Residence Rooms 696
Total Building Area* 436,139 square feet
Parking Stalls* 492
Bicycle Parking Spaces* 872
Total Project Cost $198M
Construction Work Force 250 -300 crew members
Architect of Record Valerio Dewalt Train Associates
Owner's Design Consultant AC Martin
*These are estimates and may be subject to change,
h 6kAA.
PROJECT FEATURES
LEED Certification
This project will be guaranteed LEED certified.
Solar Energy
Planning for a 1.1 megawatt solar system to be installed on the rooftops of the residential
buildings and parking structure,
Pedestrian Pathways
A sidewalk will be constructed along Slack Street, between Grand Avenue and the G -2
parking lot along Longview Lane, and continue toward campus. As well, a pathway
through the complex will connect with Mustang Way in the heart of campus.
Low - Impact Development Features
Storm -water management features such as bio swales, permeable paving, and gabion
walls will be used throughout the project and displayed on signs.
GENERAL TIMELINE
• Site and foundation construction start date: We September 2015 (shortly after fall
quarter begins)
• Building construction start date: January 2016
• Estimated completion date: July 2018
FOR ADDITIONAL INFORMATION, VISIT
https: / /afd.calpoly.edu /facilities /project news.asp
Stephanie Teaford
Community Liaison
805 - 756 -2166
steaford @calpoly.edu
California Polytechnic State University • 1 Grand Avenue • San Luis Obispo . CA . 93407
CAL POLY