HomeMy WebLinkAbout1322i-
ORDINANCE NO. 1322 (1997 SERIES)
AN ORDINANCE OF THE CITY OF SAN LUIS OBISPO
AMENDING THE ZONING REGULATIONS MAP TO DESIGNATE
1) A N APPROXIMATELY 18 -ACRE PORTION OF THE SITE NEAR
PREFUMO CREEK WHERE DEVELOPMENT LOTS ARE PROPOSED
AS R -1 -S, SINGLE - FAMILY RESIDENTIAL, WITH THE SPECIAL
CONSIDERATION OVERLAY, AND 2) APPROXIMATELY 366 ACRES OF
THE SITE AS C /OS -400, CONSERVATION OPEN SPACE WITH A 400 -ACRE
MINIMUM PARCEL SIZE, CONTINGENT UPON FINAL APPROVAL
OF ANNEXATION OF THE SITE AT 1855 PREFUMO CANYON RD. (R 26 -95)
WHEREAS, the Planning Commission conducted a public hearing on March 3,
1997, and recommended approval of amendments to the Zoning Regulations map; and
WHEREAS, the City Council conducted a public hearing on April 1, 1997, ' and
has considered testimony of other interested parties, the records of the Planning
Commission hearing and action, and the evaluation and recommendation of staff; and
WHEREAS, the City Council finds that map amendments are consistent with the
General Plan Land Use Element (LUE) map and text, with the proposed text amendment,
and the City Council finds that the map amendments are consistent with the purposes of
the Zoning Regulations and other applicable City ordinances; and
WHEREAS, the City Council has certified the Final Environmental Impact Report,
pursuant to the California Environmental Quality Act Guidelines Section 15090.
BE IT ORDAINED by the Council of the City of San Luis Obispo as follows:
SECTION 1. The City council finds and determines that the project's Final
Environmental Impact Report adequately addresses the potential significant environmental
impacts of the proposed Zoning map amendments, and reflects the independent judgment
of the City Council. The Council through the certification of the Final Environmental
Impact Report incorporates the mitigation measures listed in Exhibit A into the project.
SECTION 2. The Zoning map amendment (prezoning) R 26 -95, designating the
developable portion of the site as R -1 -S, Single - Family Residential with the Special
Consideration overlay zone, and the remainder as C /OS -400, Conservation Open Space
with 400 -acre minimum parcel size as shown on the attached Exhibit B, is hereby
approved, based on the following findings:
Findings:
1. The proposed "S" overlay zoning will document the special considerations for the
site which are: protection of and access to the riparian corridor, protection of
wildlife habitat and corridors, preservation of hillside open space, geological
0 - 1122
Ordinance No. 1322 (1997 Series)
Page 2
constraints including landslides, aesthetic concerns with development of visually
prominent sites, creek setback and access, fire protection issues; and provision of
City utilities and services.
2. The required administrative use permit will serve as a master use permit that fulfills
the intention of LUE Policy 1.13.3, Required Plans, which calls for the master
planning of proposed annexation areas so that the City has an adopted plan
showing the project layout, required open space protection and provision of streets
and utilities.
SECTION 3. A summary of this ordinance, together with the names of the
Council Members voting for and against, shall be published at least five (5) prior to its
final passage, in the Telegram - Tribune, a newspaper published and circulated in this City.
This ordinance shall go into effect upon final approval of annexation of the site by the
Local Agency Formation Commission.
INTRODUCED AND PASSED TO PRINT by the Council of the City of San Luis
Obispo at a meeting held on the 1st day of April 1997, on motion of
Romero ,seconded by Williams ,
and on the following roll call vote:
AYES: Council Members Romero,..:Williams and Smith
NOES: Vice Mayor Roalman and Mayor Settle
ABSENT: None
Mayor Allen Settle
ATTEST:
City Clerk Bonnie Gawf
APPROVED AS TO FORM:
i
to ensen
Haguna\R 26 -95 (Ord)
Prefumo Creek Homes EIR
Mitigation Measures
Land Use
EXHIBIT A
D -7. To achieve consistency with policy 1.13.3. of the Land Use Element
(development plans), any of the following actions is required:
a. A specific plan must be prepared, or
b. The proposal must be amended to include a PD (Planned Development) or an
S (Special Conditions) overlay district and a development plan must be prepared,
or
C. City planning officials may determine that the submitted subdivision map
allows for adequate review of the project.
D -8. To achieve consistency with policy 1.9.3 of the Land Use Element, policy 4C of
the Circulation Element and policy 2 of the Open Space Element (pedestrian
paths /trails) either of the following actions are required:
a. City planning officials may determine that the policy does not apply in this
instance because of security and privacy considerations; or
b. Require the applicant. to identify and install a trail system as a condition of the
tentative subdivision map approval.
D -9. To achieve consistency with policy 6.1.1, 6.2.0, 6.2.1, and 6.2.2 of the Land Use
Element (geologic hazards), the City must take either of the following actions:
a. Eliminate lots 22 -25 and lots 28 -30 from the proposed subdivision; or,
b. Adopt the mitigation measures proposed by the Geotechnical Conditions
section in this EIR.
D -10. To achieve consistency with policy 6.2.6 J of the Land Use Element (density
and development of Prefumo Creek area), the City must take either of the following
actions:
a. The policy must be deleted, or
b. It must be amended to allow the proposed density.
D -I1. To avoid inconsistency with policy 6.2.6 J of the Land Use Element (density
and development of Prefumo Creek area), lot 12 must be deleted from the tentative
subdivision map (also see mitigation measure K -7).
D -12. To achieve consistency with policy 2:2.11 and 6.4.6 of the Land Use Element
(creek corridor protection), and policies 1.A, LE, and 3.A of the Open Space Element
(creek corridor protection), the tentative subdivision map must be redrawn to
exclude areas within the top of the bank of Prefumo Creek within privately owned
lots.
D -13. To achieve consistency with policy I.C.4, 2.A, 2.B.1, 2.B.2 and 2.0 (grasslands)
of the Open Space Element, the City must, include findings, in its approval of the
tentative subdivision map, that these policies are. -discretionary along with the
reasons why these policies should not be applied in this instance.
D -14. To achieve consistency with objective 5 and policy 1.5 (air quality) of the
Circulation Element, the City must include the residential portion of the project
within the urban reserve line. The City must also make a finding .that adjustment
of the urban reserve line does not violate the City's commitment to supporting the
efforts of the Air Pollution Control District to implement its Clean Air Plan.
D -15. To .achieve consistency with policy 1.31.2 of the Housing Element. (consistency
with other general plan policies), the City must adopt mitigation measures, D -1
through D -15.
D -16. To achieve consistency with policy 1.31.2 of the Housing Element (housing on
geologic hazards), the mitigation measures required by the Geotechnical Conditions
section in this EIR must be followed.
D -17. To achieve consistency with program 2.22.1 of the Park and Recreation
Master Plan (provision of athletic fields), the project shall be required to pay park
and recreation fees, in addition to the dedication of open space, to help finance new
athletic fields in the area.
Traffic and Circulation
E -2. To mitigate the existing deficiencies on Prefumo Canyon Road and Descanso
Drive and the additional impact created by the proposed project, the City shall take
either of the following actions:
a. Reclassify Prefumo Canyon Road as a residential arterial between Del Rio
Avenue and Los Osos Valley Road and develop a neighborhood traffic
management plan to reduce travel speeds and divert traffic from Descanso
Drive to Prefumo Canyon Road, or
b. Amend the Circulation Element to increase the desired maximum average
daily traffic volumes and desired maximum speed for Prefumo Canyon Road
and Descanso Drive.
E -3. To maintain consistency with the City's Bicycle Transportation Plan, the City
shall take either of the following actions:
a. Require construction of a bicycle route along Prefumo Canyon Road, or
b. Require construction of a bicycle route through the project on the main
access road and along the emergency only access road.
E-4. To improve safety conditions along Prefumo Canyon Road „sight distance to
the east must be improved by moving the main access road eastward as far as
possible. The final main access road shall be approved by the Public Works
Department.
E -5. Cumulative impacts can be mitigated by implementing mitigation. measure E -2
Noise
F -1. Require the applicant to complete grading within a four -month period. Assess
liquidated damages if the grading exceeds this time period.
F -2. Limit all project- related construction to daytime hours (lam to 6pm). Prohibit
any construction activity, not including grading, from occurring at least one day a
week.
F -3. Clearly post noise restrictions on -site until the proposed project is completed.
Air Quality
G -1. All material excavated or graded shall be sufficiently watered to revent
excessive amounts of dust. During the time period in which grading will occur,
watering shall occur at least twice daily including weekends with complete
coverage, preferably in the late morning and after work is finished for the day.
Reclaimed, nonpotable water from a source other than Prefumo Creek shall be used
whenever possible.
G -2. All clearing, grading earth- moving, or excavating activities shall cease during
periods of high winds (greater than 15 mph averaged over one hour) so as to
prevent excessive amounts of dust.
G -3. If soil materials are transported off -site, they shall be either sufficiently watered
or securely covered to prevent excessive amounts of dust.
G -4. Exposed ground areas that are, planned to be reworked at dates greater than one
month after initial grading shall be sown with fast- germinating native grass seed
and watered until vegetation becomes established.
G -5. All disturbed areas not subject to revegetation shall be stabilized using
approved chemical soil binders, jute netting, or other methods approved in
advance by APCD.
G -6. On -site vehicle speed during construction shall be limited to 15 mph for any
unpaved surface.
G -7. All unpaved areas with vehicle traffic shall be watered, at least twice per day
including weekends, using nonpotable water from a.,source other than Prefumo
Creek.
G -8. Wheel washers shall be installed where vehicles enter and exit unpaved roads
and streets, or provisions shall be made to wash off trucks and equipment leaving
the site.
G -9. "Best Available Control Technologies for Construction Equipment" (CBACT)
shall be applied to+we one piece& of diesel - fueled construction equipment involved
in grading operations. APCD- recommended modifications are the following:
a. Injection timing retard of two degrees,
b. Installation of high pressure injections, and
C. Use of reformulated diesel fuel.
G -10. APCD recommends the following measures to address concerns of asbestos -
containing material:
a. A sampling and survey work plan shall be prepared for APCD approval.
Elements should include but are not limited to geological mapping of the
site, sampling strategy, and lab analysis methodology.
b. After APCD approval of the work plan, the sampling and survey activities
and lab analysis shall be carried out. Results should be submitted to the
District for review 30 days prior to the start of construction.
c. If asbestos - containing material is determined to be present, an asbestos
health and safety program /work plan for construction activities in serpentine
to comply with state and federal law will be required. Work plan elements
should include construction and project strategy to prevent emissions to
ambient air, a 10- working day advance notice of project start date to APCD,
protection methods to prevent worker exposure, and the presence of a
California- certified asbestos environmental monitor or registered geologist
with asbestos certification on -site during construction activities to identify
potential unmapped or subsurface serpentinite and to initiate
contractor/ worker emergency procedures if required.
d. If asbestos - containing material is determined to be present, none of it shall
be used as surface -layer material on any part of the project such as road
beds, building pads, or landscaped area.
e. If asbestos - containing material is determined to be .present, notification to
buyers shall be required.
f. If asbestos - containing material is not found in the serpentine deposits on
the proposed project site, the APCD requires the preparation of an
emergency work plan to address potential unmapped or subsurface
serpentinite, the presence of a certified asbestos environmental monitor or
registered geologist during construction activities to initiate an emergency
work plan if necessary, and notification of APCD of the project start date.
Geotechnical Conditions
H-4. Additional geotechnical engineering shall be performed during preparation of
the grading and improvement plans for the project. This work will include the
development of foundation recommendations, grading specifications, and other
final engineering details for individual lots or smaller areas of the project.
Geotechnical engineering performed at this point should consider. grading
throughout the entire project to avoid the need for repetitive .studies as individual
lots are developed in the future. The resulting plans will incorporate walls,
buttresses, subsurface drains, and other features to remove and /or stabilize the
landslide deposits on the project site. Appropriate stability analyses documenting
the performance of all slopes under ground- shaking conditions will be provided.
These will include an analysis of the new conditions affecting the 12rgyiqqgX
analyzed landslides. an analysis of the landslide d posits not previou- vTandYa -d.
an analysis of new cut and fill slopes and an analysis of natural slopes in the
vicinity of the development All plans and studies will be subject to review and
approval by the City Engineering Department.
Drainage and Water Quality
I -4. As part of the grading and improvement plans for the project, the applicant
shall prepare more detailed drainage and erosion control plans and install erosion
control improvements in appropriate locations. These plans must also indicate
points of access for maintenance of the creek and must be approved by the City
Engineering Department.
I -5. To ensure coordination of streambed alterations and to minimize .repetitive
construction projects within the streambed, the developer shall design and disclose
to regulatory agencies all proposed structures and activities within the streambed.
These would include all road construction, pipeline installation, erosion protection,
water and sewer improvements, drainage control and discharge structures, debris
removal, vegetation removal, revegetation, and any other activities that would
involve work in or adjacent to the streambed or within the jurisdictional wetlands.
The agencies to be notified and authorizations to be obtain include the U.S. Army
Corps of Engineers - Section 404 Permit; the Regional Water Quality Control Board -
Section 401 Water Quality Certification; and the California Department of Fish and
Game - Section 1603 Streambed Alteration Agreement.
I -6. To reduce the potential for short -term debris transport and ,accumulation
within the streambed and to improve the capability of. the City to provide long -term
maintenance, prior to transferring the creek open space area to the City, the
applicant shall prepare and implement a program to remove excessive,vegetative
debris, old lumber, and other material that would tend to accumulate and obstruct -
flows within the streambed. This measure is not: intended to remove live
vegetation or to disrupt' biological habitat and should be oriented towards removal
of downed eucalyptus branches and similar material. The program should be
designed and implemented with input from a qualified biologist-and with approval
of regulatory agencies as part of the larger program. of streambed alterations
discussed below.
Biological Resources
J-4. A 30 -foot building. setback from the edge of the riparian vegetation shall be
established for lots 1 -14, 37, and 38. No disturbances other than those required to
mitigate erosion problems or to ensure adequate drainage shall be allowed.
J -5. In the vicinity of lots 31 -38, the main road shall be reduced to 30 feet and moved
at least 20 feet from the top of the creek bank or from the edge of the dripline
whichever is greater. If substandard -size lots result from this action, these lots shall
be eliminated from the. tentative subdivision map.
J -6. The stands .of perennial, native bunch grasses left in the open areas in the
southeastern corner above the building envelopes of lots 14, 15, and 19 shall be
protected. No ornamental plantings or other homeowner - related disturbances will
be allowed in this area.
J -7. The tentative subdivision map shall be redrawn so that the freshwater marsh,
located on lot 15, shall be located in the open space area.
J -8. Once bridge and road construction drawings and a more detailed grading plan
are available, a plant ecologist/ restoration specialist shall prepare a restoration plan
. The plan shall survey the site for sensitive plan t species
as identified in the Draft EIR• identify suitable sites for replanting the species affected, establi h replantin ratios, and co tain n a monitoring 121an to n sure the
success of the replanting. Preparation of the restoration plan Shall b the
responsibility of the project sponsors.
J -9. Disturbed areas around the bridge construction site shall be revegetated with
native riparian vegetation as soon as possible following the construction. Any
necessary pruning of trees in the vicinity shall be conducted by a certified arborist.
J -10. Trenching needed for the waterline which will cross Prefumo Creek shall be by
auguring or by hand-trenching. If roots over one -inch in diameter are. encountered, .
these roots shall be cleanly cut along the sides of the trench.
J -11. CC &R's shall ensure that the oak and riparian woodlands in .the adjacent open
space areas are left undisturbed and managed properly after. development, and no
ornamental plantings or other related disturbances occur following development.
J -12. The disruption of the riparian and creek area will be mitigated by complying
with the California Department of Fish and Game streambed alteration permits and
the U.S. Army Corps of Engineers, wetland permits. The applicants (or their
successors) for the proposed project will ..prepare the necessary
documentation /mitigation plans to obtain the permitting 4rom -these agencies.
Aesthetics
K -7. Lot 12 should be eliminated from the tentative subdivision .map.
K -8. As a part of the application, the applicant shall submit a landscape, irrigation,
and maintenance plan to the City Architectural Review Commission for review
and approval.. The plan shall be prepared by a licensed landscape architect and a
qualified plant restoration ecologist and shall include the following:
a. Planting along either side of the riparian corridor where necessary to provide
complete screening of the interior of the site from viewing areas along Prefumo
Canyon Road. Screen planting shall be of the scale such that at maturity, views
of the hills above the development are not blocked.
b. All planting near the creek and between the creek and Prefumo Canyon Road
shall be site - appropriate native vegetation.
c. Planting of trees and shrubs on both sides of the proposed entry road between
the creek and Prefumo Canyon Road in a way should block direct views into the
site as seen from the straight section of Prefumo Canyon Road to the east.
d. Screen planting along the north side of lot 13 would help block views from
Prefumo Canyon Road through the gap created by the bridge and into the site.
e. Planting shall be placed between lot 12 as shown on the tentative subdivision
map dated 8 -1 -95 and Prefumo Canyon Road so that views from Prefumo
Canyon Road will be screened from both east and westbound views.
f. Planting around the entry road between the creek and Prefumo Canyon Road
shall be designed to duplicate a naturally occurring. native plant. community, not
a formal entry, to a subdivision.:The planting shall include appropriate trees and
associated understory.
g. Appropriate existing on -site planting such as native perennial grasses and
coastal shrubs shall be integrated into the excavated slope -in order to blend
visually the cut area with the adjacent land cover. The excavated, slope, shall not
be aesthetically "landscaped" or irrigated in such away which would create an
artificial green appearance during the summer months.
h. Trees, shrubs, and groundcover within the interior of the development shall
be included which are native to the area or are drought- tolerant and have a
native appearance.
L All screen planting along the creek and along the north �.side.,of Prefumo
Canyon Road shall commence either concurrently
or before the initial site grading commences. Where screen planting would be
impacted by construction of the bridge or entry road, planting in .those specific
areas shall occur immediately after construction in. that area. Screen planting
shall be comvleted within 90 days unless more time is granted by the
ommunity Development Department Planting within the development
indicated on the landscape plan shall be planted prior to the sale of any of the
residential lots which would be created as a result of this project.
j. Where slow - growing plant material is used for screening purposes, larger -size
container plants shall be used.
k. After construction, seed shall be applied to all disturbed slopes. The seed shall
consist of species existing on the site prior to disturbance.
Aesthetics
K -9. The height of residences on lots 1 -29 shall be restricted to 25 feet, measured as
provided under Section 17.16.040 of the City's zoning regulations.
K -10. Individual lot owners shall submit plans to the Community Development
Department for architectural review and approval. The applicant's submittal shall
follow Community Development Department guidelines and include a site plan,
general project statistics, grading and drainage plan, landscape development plan,
material samples board, sectional drawings, and other information.
K -11. All excavated slopes shall incorporate slope- rounding as part of their design.
The slope- rounding shall be of the largest radius practical to blend visually with
adjacent slopes.
K -12. A geotextile capable of allowing grass - growth shall be used to line the rock-
lined swale above lots 19, 20, 23, and 24.
K -13. All topsoil removed from graded areas shall be stockpiled and redistributed to
the greatest extent possible throughout the site where - landscaping and -revegetation .
will likely occur.
K -14. All street and home lighting shall be shielded in order to screen. light sources
' from neighboring properties and from Prefumo Canyon-Road.,-Lighting details
shall be reviewed through the architectural review process.
K -15. Covenants, conditions and restrictions (CC &R's) shall be submitted for
consideration along with the tentative subdivision map to ensure the on -going
protection of the oak. woodland, grasslands, existing._ individual. trees, and all
riparian vegetation including shrubs.
Public Services
M -5: A fire management plan. shall be prepared by a landscape architect to identify
specific fire safety measures that. will reduce the possibility of a severe fire in the
area. The plan will provide precise dimensions and standards for a fuel -break
around each residential lot which borders the oak woodland or riparian area and for
the emergency access road. The fire management plan will clearly define the
responsibilities of each homeowner and the responsibility of the homeowner's
association for maintaining fire safety. The final subdivision map shall not be
approved until the fire management plan has been submitted and approved by
SLOFD and the City's Architectural Review Commission.
M -6. Based on the fire management plan, covenants, conditions, and restrictions
(CC &R's) shall be developed to identify clearly the fire safety responsibilities of the
homeowners association and of the individual lot owners.
M -7.. For lots 1 -11, 13,14, and 38 as shown on the tentative subdivision map dated
8 -1 -95, any, or any combination, of the following options may be used to provide an
adequate fuel- break:
a. A variance from the front yard setback requirements may be granted to
allow the building envelopes for these lots to be closer to the street.
b. Redrawing the building envelopes would result in compliance with the 30-
foot greenbelt requirement.
c. If after item a. and b. above have been implemented and the 30 -foot
greenbelt requirement still cannot be met, structures shall be constructed of
nonflammable exterior materials.
Public Services Cumulative Impacts
M -8. By following the mitigation measures already adopted for. the LUCEEIR for
fire protection and law enforcement, cumulative impacts can be mitigated to a less
than significant level.. No further mitigation is, therefore,. required.
Utilities
N -3. To minimize the potential for failure of the project's -sewer.pump station and
force main, a program and documentation for emergency responses must be
provided to the City prior to final approval. This emergency response plan must
identify a most probable type of failure and specify contacts and responsibilities for
the emergency response. Arrangements with a private contractor capable of
providing emergency repairs must be shown to the satisfaction. of the -City as °.part of
.this plan. ,If required by the City, the pump station hall be-provided with an
y
-emergenc power supper
NA A single well . not all to provide irrigation water to multiple
single family residential lots To be consistent with City policy, the City
must take either of the following actions-
a. Require the applicant to use another source of water for irrigation
needs.
b. Amend the policy to allow an irrigation well to serve multiple single
family residential lots
Cultural Resources
0-1. If any prehistoric cultural materials or buried concentrations of historic
cultural materials are unearthed, work within 1,000 feet of the find should be halted
until they can be examined and evaluated by a qualified archaeologist.
RELOCATE CITY LIMIT-TO.-HERE...
DESIGNATE LAND
R- 1 -$
C /OS -400
F�
MA
CT <
vO 9�C` !' VA LLECI
TO CT.
0
• dF v�eT ��,P,b G�.
G� C', 9O
GO p�
-ly
�t, C2 o
(9.4 ACRES) `� GP5 �s -2-P
R -1_s y
(17.8 ACRES7- 0
C /0S-400
(356.8 ACRES)
` �eF 0
C /OS -40
......... ................. .
. .......................
..............::..
•ENGINEERING
DEVELOPMENT
ASSOCIATES
PREFUMO CREEK HOMES
REZONING
REQUEST.B
-
EXHIBIT
:Ws OSWF . CA 93401 BOa/64s -s668�
i�ii•.SF6�2iii 6El!x80 ROBLEB, CA 93446 806/237.1033
R.
% W E P
/ AN OP SSCE
\ ` R L CA.. E R L
TQ H E
..................... ...... :..
.. ......... ...............
..............:
............ N�
PREFUMO CREEK HOMES
:: :::..
•� ••�•��
DEVELOPMENT
associATES
GENERAL PLAN
AMENDMENT
REQUEST
EXHIBIT
13
.'•.:.' . ........iS . ....i. .... ................ uo5wo, CA 03401 805/549 -8868
I ..... : : : : :PK80 ROBlE8, CA 83446 805/237 -1035
Ordinance No. 1322 (1997 Series)
FINALLY PASSED this 15th day of April, 1997, on motion of Council
Member Romero, seconded by Council Member Williams, and on the following roll call
vote:
ATTEST:
AYES: Council Members Romero, Williams and Smith
NOES: Vice Mayor Roalman and Mayor Settle
ABSENT: None
Mayor Allen K. Settle
WE" ;t-i YA
— 01P—
'AN LUIS OBISPO COUNTY •
e r am une
3825 South Higuera • Post Office Box 112 • San Luis Obispo, California 93406 -0112 • (805) 781 -7800
In The Superior Court of The State of California
In and for the County of San Luis Obispo
AFFIDAVIT OF PUBLICATION
DV# 76136 -0-6
City of SLO
STATE OF CALIFORNIA,
ss.OR[
County of San Luis Obispo
-AN,C
:Cl
I am a citizen of the United States and a resident of I oBls
the County aforesaid; I am over the age of eighteen ! °FF
and not interested in the above entitled matter; I am !' APPI
now, and at all times embraced in the publication' - MAP,
herein mentioned was, the principal clerk of the
printers and publishers of the SAN LUIS OBISPO .., (GF
COUNTY TELEGRAM- TRIBUNE, a newspaper of Clty',c
general circulation, printed and published daily, to-', .uii
Sundays excepted, at the City of San .Luis Obispo in theot
the above named county and state; that notice at', °P5 °
h' h the annexed cli in s is a true rinted copy' Manu
Roadito service Commer- The Council must
cial with Spe W1Consid. again to approve th
t.
•-_�±' erationsi'(C- S- S)�;In7anticl• ordinances before t
BtSjO0 pation}ofJannexation;i,Tihe can, take,effact. That
two`. lots�that,compdse tlon is tentatively act
1320 this roe are owned uled for Tuesday, . A
P P ab 75 1997 at: a Re ular
by SonlcCableSandSplca <.. e 9
'THE; _ r, Council, eetin to'be
IlS , Hunter :Spice' , unter,.,,in , g
)aTH�y tend
sttofconstruct al new ati7,:00 p m .inahe,Cou
! commercial!'�k4ildingo at Chambers ,of.;,City,, i
MAP ! 11.9;1 ;TanktFarm, Road 990)Palm Street.,
SonicCebleahas no,plans Copies of the.comp
13 46 for: developiri its 71ot at ordinance are availabl
this. time.The, ordinance. the.City :Clerk's Office
nFOR - Room City.Hall,,.
determines,thatlthereyvvll
DAD , bejnosignifcant adverse; Palm'-Street. For rc
erivlron pnteillimpaeisaas informatiori, contact
•96) a "result of7amendingtth Community Developn
5 -,.t he zoning.map: Department at (805)
5-,.to ORDINANCE•,"NO 11322 71,72. ;,
nance :,j1997FSERIES► =^ Bonnie Gawf -
vends ;AN.0RD1NANCE,OF THE City,.Clerk
W IC PP 9 P "" "
c d °n`ra o` ns
MAPTOtDESIGNATEAN
was p ublished in the above -named newspaper and Thi, propety!Woicupied
AP.P.ROXIMATELY.'18-
not in any supplement thereof - on the following by:, Ernie,-., B ;lcr <Inc. The. ,ACRE,PORTION:OF THE
dates, to -wit: April 10 1997 ordinance; *.determines SITE�NEARPREFUMO
p that: therein wills„ be no CREEK'WHERE
that said newspaper was duly and regularly ,
'significant"
,,,ackyerse envl
ronmental Impacts!