Loading...
HomeMy WebLinkAbout1449ORDINANCE NO. 1449 (2004 SERIES) AN ORDINANCE OF THE CITY COUNCIL OF SAN LUIS OBISPO UPHOLDING AN APPEAL OF THE PLANNING COMMISSION'S DENIAL OF THE PROPOSED PREZONING TO ACCOMMODATE THE DALIDIO/MARKETPLACE ANNEXATION AND AMENDING THE ZONING REGULATIONS MAP TO DESIGNATE: 48.7 ACRES AS C-R-PD, RETAIL -COMMERCIAL WITH THE PLANNED DEVELOPMENT OVERLAY (AND APPROVING A PRELIMINARY DEVELOPMENT PLAN FOR THE RETAIL PROJECT KNOWN AS THE SAN LUIS OBISPO MARKETPLACE); 8.1 ACRES AS O-S, OFFICE WITH THE SPECIAL CONSIDERATION OVERLAY; 3.3 ACRES AS R-3-11, MEDIUM - HIGH DENSITY RESIDENTIAL WITH THE SPECIAL CONSIDERATION OVERLAY; 45 ACRES AS AG, AGRICULTURE; 9.7 ACRES AS C/OS-40, CONSERVATION/OPEN SPACE WITH A 40-ACRE MINIMUM PARCEL SIZE; AND 16.2 ACRES SET ASIDE FOR ROADS AND INTERCHANGE RIGHT-OF- WAY, CONTINGENT UPON FINAL APPROVAL OF ANNEXATION OF THE SITE AT 2005 DALIDIO DR. (R 108-02) WHEREAS, the Planning Commission conducted a public hearing on May 26, 2004, and considered the proposed amendments to the Zoning Regulations Map; and WHEREAS, on May 26, 2004, the Planning Commission denied the application; and WHEREAS, in accordance with Municipal Code Section 17.70.030 D., a Planning Commission action to deny a rezoning is final unless appealed; and WHEREAS, on June 7, 2004, the applicant filed with the City Clerk a timely appeal of the Planning Commission's decision; and WHEREAS, the City Council conducted a public hearing on July 6, 2004, and considered testimony of other interested parties, the record of the Planning Commission hearing and action, the submitted appeal of the applicant, and the evaluation and recommendation of staff; and WHEREAS, the City Council finds that the Zoning Regulations Map amendments are consistent with the proposed General Plan Land Use Element (LUE) map designations and the existing text, and the City Council further finds that the Zoning Regulations Map amendments are consistent with the purposes of the Zoning Regulations and other applicable City ordinances; and WHEREAS, the City Council has certified the Final Environmental Impact Report, pursuant to the California Environmental Quality Act Guidelines Section 15090. BE IT ORDAINED by the City Council of the City of San Luis Obispo as follows: 01449 Ordinance No. 1449 (20U4 Series) Page 2 SECTION 1. EIR Findings. The City Council finds and determines that the project's Final Environmental Impact Report adequately addresses the potential significant environmental impacts of the proposed Zoning Map amendments, and reflects the independent judgment of the City Council. The Council through the certification of the Final Environmental Impact Report incorporates the mitigation measures listed in Exhibit A, the Mitigation Monitoring Program, into the project. SECTION 2. Prezoning Approval & Findings. The appeal is upheld and the Zoning map amendments included as part of City Application No. R 108-02, prezoning: 48.7 acres of the property to C-R-PD, Retail -Commercial with the Planned Development overlay zoning; 8.1 acres as O-S, Office with the Special Consideration overlay zoning; 3.3 acres as R-3-S, Medium -High Density Residential with the Special Consideration overlay zoning; 45 acres as AG, Agriculture; 9.7 acres as C/OS-40, Conservation/Open Space with a 40-acre minimum parcel size; with the remainder 16.2 acres allocated toward roads and interchange right-of-way, to be consistent with the amended LUE map designations and as shown on the attached Exhibit B, are hereby approved, based on the following findings: Findings 1. The C-R-PD zoning, Retail -Commercial with the Planned Development overlay, with the related adoption of a Preliminary Development Plan, will address the specific development considerations for this 48.7-acre portion of the site which are: drainage, flooding protection, urban/agricultural buffers, roadway improvements and design, pedestrian linkages with other commercial developments and nearby residential areas, loading area design, compliance with energy conservation requirements, creek and open space protection, site lighting and preservation of scenic vistas. 2. The submitted development information for the entire annexation area and the required Preliminary Development Plan for development of the commercial area of the site fulfills the intention of LUE Policy 1.13.3, Required Plans, which calls for the master planning of proposed annexation areas so that the City has an adopted plan showing the project layout, physical development plan, required open space protection, and provision of streets and utilities. 3. With the proposal for General Retail development of 48.7 acres of the site (C-R- PD zoning), 78.7 acres of on -site and off -site will be dedicated to the City for long-term protection of prime agricultural soils consistent with Land Use Element Policy 1.13.5. 4. The proposed Office with the "S" overlay zoning will document the special considerations for the 8.1-acre Office portion of the site, (O-S) which are: tree preservation; land use compatibility with the adjacent commercial development; pedestrian linkages to adjoining sites; historical preservation; and protection of riparian habitat. Ordinance No. 1449 (20U4 Series) Page 3 5. The proposed Medium -High Density Residential zoning and Land Use Element Map designation for the 3.3-acre portion of the site planned for affordable housing is consistent with the goals and policies of the General Plan, given that the area of the site is outside of the airport safety zone of most severe concern crossing the site and beyond the 55-decibel noise contour, which are the criteria that the Airport Land Use Commission has identified in its preliminary review of the proposal as being acceptable for dwellings. The proposed "S" overlay zoning will document the special considerations for the 3.3-acre Medium -High Density Residential portion of the site (R-3-S), which are: airport safety, creek corridor preservation, flooding, and access. 6. The proposed AG, Agriculture, zoning for the 45 acres of farmland in the eastern and southern portions of the property will help preserve the prime agricultural soils and enable its long-term protection. 7. The proposed C/OS-40, Conservation Open Space with the 40-acre minimum for the 9.7 acre portion of the property identified as an extension of Laguna Lake Park is consistent with the zoning category applied to other less developed and more naturalistic areas of the park. SECTION 3. Preliminary Development Plan Approval. Consistent with San Luis Obispo Municipal Code Chapter 17.62, Planned Development, a Preliminary Development Plan for the 48.7-acre portion of the site prezoned C-R-PD, Retail - Commercial with the Planned Development overlay zoning is hereby approved, based on the following findings, and subject to the following conditions: Findings 1. The project is consistent with the General Plan and the proposed land use is allowed within the applicable primary zoning district. 2. The project complies with all applicable provisions of these Zoning Regulations other than those modified by the PD rezoning. 3. The approved modifications to the development standards of these Zoning Regulations are necessary and appropriate to accommodate the superior design of the proposed project, its compatibility with adjacent land uses, and its successful mitigation of environmental impacts. 4. The project complies with all applicable City Design Guidelines. 5. All affected public facilities, services, and utilities are adequate to serve the proposed project. 6. The location, size, site planning, building design features, and operating characteristics of the project are highly suited to the characteristics of the site and surrounding neighborhood, and will be compatible with the character of the site, and the land uses and development intended for the surrounding neighborhood by the General Plan. Ordinance No. 1449 (20U4 Series) Page 4 7. The site is adequate for the project in terms of size, configuration topography, and other applicable features, and has appropriate access to public streets with adequate capacity to accommodate the quantity and type of traffic expected to be generated by the use. 8. The establishment, maintenance, or operation of the proposed project will not, in the circumstances of the particular case, be detrimental to the health, safety, or general welfare of persons residing or working in the vicinity of the proposed use, or detrimental or injurious to property and improvements in the neighborhood or to the general welfare of the City. 9. A height exception to allow a 51-foot high building for the hotel is supported because: a.) The building is located along a major arterial roadway. b.) The building is significantly separated from other buildings. c.) The proposed pitch of the roof is important to the Craftsman architectural style of the building. 10. The project meets the requirement for mandatory project features contained in 17.62.045 A. by providing an affordable housing component and preserving 54.7 acres of on -site open space and providing funds to protect an additional 24 acres of off -site farmland of a similar soil type. Conditions Planning Requirements 1. As the applicant and the City have been negotiating a Development Agreement and Special Tax Reimbursement Agreement in conjunction with this application, the final development plan shall not be effective until the applicant and the City enter into a Development Agreement and a Special Tax Reimbursement Agreement. 2. Furthermore, construction of the retail and hotel portion of the project cannot begin until the design has been approved for the Prado Road Interchange, the contract for the construction of the interchange has been awarded, and funding for the interchange has been secured. 3. Within six months of approval of the preliminary development plan, the applicant shall file a final development plan, as required by the Zoning Regulations, for consideration by the Community Development Director. The final development plan shall include all items required for final architectural review and final architectural review shall have been conducted prior to the Director's consideration. The final development plan shall be effective only after approval by the Director. Ordinance No. 1449 (20u4 Series) Page 5 , 4. The final development plan shall in general conform to the preliminary site plan dated May 4, 2004, and include a maximum of 615,000 square feet or retail and restaurant uses plus a 150-room hotel. When actual tenants are secured and the project is built, there may be some variation in the sizes of proposed buildings from what is shown on current plans, and such minor variation shall be subject to the review and approval of the Community Development Director. However, the total gross building floor area shall not exceed 615,000 square feet without the processing of a planned Development Amendment to the approval of the Planning Commission. 5. To ensure consistency with Land Use Element Policy 4.3, which seeks to maintain the downtown as the entertainment center of the community, theater uses are not allowed at the project site. 6. Consistent with the recommendation of the Architectural Review Commission (ARC), a height exception, to allow a 51-foot high building where a 45-foot high building is typically allowed, is hereby approved for the proposed hotel. 7. Parking for about 2,743 cars is shown on plans dated May 4, 2004, for the retail and restaurant components and the hotel: The Architectural Review Commission (ARC), in reviewing precise development plans, may need to further reduce the number of parking spaces to provide landscaping, pedestrian pathways or other site amenities. In accordance with ARC direction, accurate parking calculations for all restaurant spaces need to accompany plans for final approval by the ARC and final development plan approval by the Community Development Director. 8. The applicant may utilize up to a 30% shared and mixed -use parking reduction to further reduce the amount of overall parking. 9. Motorcycle parking space consistent with City requirements shall be provided in the project and shown on plans submitted for final review by the ARC. 10. Project plans shall clearly show how bicycle parking will be provided, consistent with Table 6.5 of the Zoning Regulations. Project plans shall be amended to show the location, orientation, type, spacing and clearance from vertical site features of all short- and long-term bicycle parking facilities, consistent with guidance provided by the Community Design Guidelines and the Bicycle Transportation Plan (May 2002). 11. Precise locations of required short-term bicycle spaces in racks near the entries to buildings shall be to the approval of the Public Works Department (Transportation Division) and Community Development Department (Planning) staffs, based on input from the Architectural Review Commission. Bicycle racks shall be of the inverted "U" design consistent with Engineering Standard 7930 or equal as approved by the Public Works Director. Ordinance No. 1449 (20U4 Series) Page 6 12. The project shall provide long-term bicycle spaces for all clusters of buildings, either in a designated storage area in the building or in fully -enclosed lockers, to the approval of the Public Works Department (Transportation Division) and Community Development Department (Planning) staffs, based on input from the Architectural Review Commission. 13. Parking lot lighting shall provide adequate illumination for safety (maximum of 10 footcandles directly below fixtures) and shall be designed to direct light downward to minimize sky glare and horizontal glare. Consistent with review by the ARC, a maximum of 20-foot high light standards shall be used along the perimeter of the project (defined as within 60 feet of site boundaries), and a maximum of 30-foot high light standards may be used for parking lot areas that are more interior to the project. The project shall utilize more pedestrian -scale (defined as about 14 feet in height) light standards along the entry boulevard, and low -scale bollard lighting along pedestrian pathways. 14. Plans submitted for final ARC review shall indicate how walls, fencing, and landscaping will be used to properly screen the loading and outdoor sales areas for the Major J space (Lowe's) in the southwest corner of the project, and the Major K space in the southeast corner of the project near the southbound on -ramp, because of their visibility from the highway. 15. With regard to pedestrian circulation, final plans submitted to the ARC shall: a. Provide enhancement to the central portion of the main pathway that extends from the main Dalidio driveway to Major spaces I & H. b. Strengthen the pedestrian connection between Major spaces K & L. c. Redesign the loading areas for Retail spaces L& M to consolidate them on the east side. d. Provide a west -east pedestrian pathway between the collector street on the west side of the project and Retail space L. 16. When specific tenants are known, a comprehensive sign program, indicating location, size, materials, copy, and lighting of all proposed signs, shall be submitted for the review and approval of the Architectural Review Commission. Signing shall be compatible throughout the project. 17.In terms of Dalidio Road landscaping treatments, final landscaping plans submitted to the ARC for final review shall include taller tree planting where there is the most dramatic grade differential between the site and the roadway, and utilize berming in more level areas. 18. Instead of the extensive use of diamond -shaped tree wells shown on current plan, parking lot planters, similar to those used in the Costco project that allow for clusters of trees, shall be incorporated into the project. Tree wells may be utilized to augment other planters proposed to meet the City's requirement of planter islands after every six parking spaces in a row. Final parking lot plans shall be to the review and approval of the ARC. Ordinance No. 1449 (20U4 Series) Page 7 19. A landscaped buffer area of 30 feet in width shall be provided along the eastern and southern edges of the project between the parking lots and the adjacent agricultural land. Specific planting proposals shall be to the review and approval of the Architectural Review Commission (ARC). Consistent with ARC direction, a more naturalistic and tiered approach to the perimeter treatment on the east side of the project shall be provided with wider planters and varied plantings, including the idea of at adding "finger" planting islands on the edge of the parking lot areas to provide for clusters of tree plantings. 20. In conjunction with the widening of Madonna Road, certain tree removals will be necessary. Prior to the removal of any trees, the applicant shall submit adequate information for the City Arborist to evaluate proposed tree removals. This information shall consist of cross -sections, at those locations where plans indicate that the existing street trees cannot be saved, showing existing and finished grades, as well as accurate base elevations and locations of the existing trees. The ARC will review specific tree removal proposals with their review of project development plans. 21. Any applications for subdivisions which may be required as a result of proposed sale or lease of parts of the development shall indicate the relationship of proposed parcels to the total site, access and utility easements, and parking sufficient for the uses on individual parcels. At the time of filing any required map, the applicant shall provide a draft reciprocal easement agreement for review and approval by the Community Development Department and the City Attorney. 22. The applicant shall provide funds as directed by the City to protect 24 acres of off -site farmland to fulfill the project's open space requirements. Public Rights -of -Way 23. Complete street improvements shall be constructed in accordance with the most current City regulations, City of San Luis Obispo Engineering Standards and Standard Specifications. 24. A public improvement plan, prepared by a registered civil engineer, shall be submitted to the Public Works Director for review and approval. All grades, layout, staking and cut -sheets necessary for the construction of street paving and frontage improvements shall be the responsibility of the developer. 25. Right -of -Way for Dalidio Road and Access Road "A" (from Dalidio Road to the southern property line of the Open Space parcel) shall be dedicated to the City of San Luis Obispo. Access rights along Dalidio Road and Access Road "A", except at approved driveway locations shown, shall be dedicated to the City. 26. The applicant shall dedicate a 2m wide public utility easement and a 3m wide street tree easement across all public street frontages. Said easement shall be adjacent to and contiguous with all public right-of-way lines bordering each lot. Ordinance No. 1449 (20U4 Series) Page 8 27. All proposed private streets shall comply with the City of San Luis Obispo Engineering Standards and pavement design shall be based on a Traffic Index of 6.5. 28. The developer shall install street lighting and all associated facilities (conduits, sidewalk vaults, fusing, wiring, luminaries, etc.) per City standards. 29. No private facilities shall be within the public right-of-way or public pedestrian easement. Water, Sewer & Utilities 30. Final grades and alignments of all public water, sewer and storm drains (including service laterals and meters) shall be subject to change to the satisfaction of the Public Works Director and Utilities Engineer. The water mains entering the project shall be private if not within the public right-of-way. 31. The developer shall place underground, all existing overhead utilities along the public street frontage(s), to the satisfaction of the Public Works Director and utility companies. 32. Separate utilities, including water, sewer, gas, electricity, telephone, and cable TV shall be served to each parcel to the satisfaction of the Public Works Director and serving utility companies. Utilities to new residences shall be underground. 33. The developer shall provide individual electrical, phone, television, natural gas, water service, and sewer connections to the approval of the affected utility companies and the Public Works Director. 34. The irrigation systems for common areas, parks, detention basins, and other large landscape areas shall be designed and constructed in accordance with the standards for reclaimed water use. Appropriately sized reclaimed water mains shall be constructed from the City's trunk system to these irrigation areas. If reclaimed water is not yet available, the system shall be designed and constructed to reclaimed water standards, and temporarily connected to the City's potable water system in the area of the anticipated connection to the reclaimed water system. Appropriate backflow protection shall be installed with this connection to the satisfaction of the County Cross Connection Inspector, Henry Ruiz, who can be reached at 781-5567. Alternatively, for the commercial component of the project, the developer may propose the use of well water for landscaping and irrigation purposes, provided such a plan meets with applicable City requirements and appropriate agreements are in place in the event that such well water crosses property lines. Grading & Drainage Ordinance No. 1449 (20U4 Series) Page 9 35. The project shall comply with all hydrologic and hydraulic mitigation measures identified in the Final EIR along with the City's the City's Waterways Management Plan - Drainage Design Manual including but not limited to the following provisions: a) Post construction stormwater runoff rates shall not exceed the predevelopment runoff rates for the 2-, 10- and 100- year, 24-hour storm events. b) All proposed detention basin and drainage improvements, except those within a public street, shall be privately owned and maintained by the property owner and homeowners' association. c) All construction within the 100- year FEMA floodplain shall meet the following requirements per the Waterways Management Plan: i) There shall be no significant net increase in up -stream or downstream floodwater surface elevations for the 100-year flood at General Plan build -out as a result of changes in floodplain configuration and building construction. A significant threshold of a 64 mm (2.5 in) increase in floodwater surface elevations or 0.1 m/s (0.3 Us) increase in stream velocities shall be used. This shall be demonstrated to the satisfaction of the Public Works Director and based on a final hydraulic analysis pursuant to the Drainage Design Manual. ii) There shall be no significant net decrease in floodplain storage volume as a result of a new development or redevelopment projects. This can be achieved by a zero -net fill grading plan, balancing all fill placed on the 100-year floodplain with cut taken from other portions of the floodplain within the project area of the application, or with cut exported off site. Specifically, all fill placed in a floodplain shall be balanced with an equal amount of soil material removal (cut) and shall not decrease floodplain storage capacity at any stage of a flood (2, 10, 50, or 100-year event). d) All bridging, culverting and modifications to the existing creek channels must be in compliance with the City's Waterways Management — Drainage Design Manual (specifically regarding clear spanning of creeks, etc.) and be approved by the Public Works Director, Army Corp of Engineers, and Fish & Game. e) Any necessary clearing of existing creek and drainage channels, including tree pruning or removals, and any necessary erosion repairs shall be to the satisfaction of the Public Works Director, the City's Natural Resources Manager and the Dept. of Fish & Game. Ordinance No. 1449 (20U4 Series) Page 10 f) All lots shall be graded to preclude cross -lot drainage; or, appropriate easements and drainage facilities shall be provided, to the satisfaction of the Public Works Director. 36. General Construction Activity Storm Water Permits are required for all storm water discharges associated with a construction activity where clearing, grading and excavation results in land disturbance of one or more acre. Permits are required until the construction is complete. To be covered by a General Construction Activity Permit, the owner(s) of land where construction activity occurs must submit a completed "Notice of Intent" (NOI) form, with the appropriate fee, to the State Water Resources Control Board (SWRCB). 37. A copy of the Stormwater Pollution Prevention Plan required by the SWRCB shall be included in the PIP set. The WDID Number issued by the SWRCB shall be noted on all plans that involve land -disturbing activities. Transportation Related 38. Prado Road Interchange. Prior to issuance of building permits the project shall complete the following: design for the Prado Road Interchange subject to approval of the City Director of Public Works, an approved Encroachment Permit has been received from State of California Department of Transportation (Caltrans), and a construction contract for the Interchange has been awarded pursuant to City and Caltrans' requirements. 39. Infrastructure Improvements. Prior to occupancy the project shall complete necessary infrastructure improvements, as determined in the Final EIR, to the satisfaction of the Public Works Director. At a minimum, these improvements shall consist of: Complete Mitigation Measures; T-1(a), T-1(b). T-1(c), T-3(a), T- 3(b), T-4(a), T-6(a), T-7(a), T-7(b), T-9(a), T-10(a), T-12(a), T-13(a), T-13(b), T- 13(c), T-13(d) or T13(e), T-14(a). 40.Turning Radius. Project plans shall show all truck access routes, turning radii and staging areas for deliveries. 41.Transit Turnout and Shelter. The applicant shall work with the City Transit Manager to establish a transit turnout and shelter. The design of the transit shelter and the design and provision of any ancillary facilities (trash container, night lighting, benches, and signs) shall be consistent with standards contained in the City's Engineering Standards and the Short Range Transit Plan (SRTP) 42.Signal, Striping and Signage. The developer shall provide a traffic signal, signing and delineation plan showing changes, as a result of this project, including signal interconnect conduit from Madonna Road to the southbound off -ramp signal at the Prado Road interchange, to the satisfaction of the Public Works Director. Said plans shall be prepared by a registered civil engineer and shall include the existing and any required traffic signals, signal interconnect, existing Ordinance No. 1449 (20U4 Series) Page 11 street and required street lighting, and the existing roadways fronting this site, to the satisfaction of the Public Works Director. 43. Transportation Impact Fees (TIF). Transportation impact fees shall be paid prior to the issuance of a building permit. 44. Bob Jones City -to -Sea Bicycle Trail. The developer shall dedicate right-of-way to accommodate the extension of the Bob Jones City -to -Sea Bicycle Trail through the site. The developer may request that the City modify the Bob Jones City -to - Sea Bicycle Trail — Preliminary Alignment Plan Project Description, September 2002, in order to accommodate the bicycle trail easement through the site. The Preliminary Alignment Plan Project Description and the development plans shall be reconciled prior to subdivision map or final development plan approval. SECTION 4. A summary of this ordinance, together with the names of the Council members voting for and against, shall be published at least five (5) days prior to its final passage, in the Telegram -Tribune, a newspaper published and circulated in this City. This ordinance shall go into effect upon final approval of annexation of the site by the Local Agency Formation Commission or when the possible suspension, pursuant to Elections Code Section 9237, of the effective date of Resolution No. 9590 (2004 Series) is lifted, whichever is later. INTRODUCED on the 71h day of July, 2004, AND FINALLY ADOPTED by the Council of the City of San Luis Obispo on the 3rd day of August, 2004, on the following roll call vote: AYES: NOES: ABSENT: ATTEST: Council Member Ewan, Vice Mayor Schwartz and Mayor Romero Council Member Mulholland Council Member Settle /r iane Reynol s, . .C. Deputy City C 11 Mayor David F. Romero .. `� E•rit is a tray trice •� or�i�r;�rr�c was j,,;bii5h��c, �urs� ,� .:i ' r�r to `414 Lu (� Date i Clerk ,��� Ordinance No. 1449 (20U4 Series) Page 12 APPROVED AS TO FORM: --e J ath P. Lowell Cit ttorney Dalidio/San Luis Marketplace Annexation and Development Project EIR Exhibit A Mitigation Monitoring and Reporting Program MITIGATION MONITORING AND REPORTING PROGRAM CEQA requires that a reporting or monitoring program be adopted for the conditions of project approval that are necessary to mitigate or avoid significant effects on the environment (Public Resources Code 21081.6). The mitigation monitoring and reporting program is designed to ensure compliance with adopted mitigation measures during project implementation. For each mitigation measure recommended in the Environmental Impact Report, specifications are made herein that identify the action required and the monitoring that must occur. In addition, a responsible agency is identified for verifying compliance with individual conditions of approval contained in the Mitigation Monitoring and Reporting Program (MMRP). In order to implement this MMRP, the City of San Luis Obispo shall designate a Project Mitigation Monitoring and Reporting Coordinator ("Coordinator"). . The coordinator shall be responsible for ensuring that the mitigation measures 'incorporated into the project are complied with during project implementation. Further; the. coordinator will.: distribute copies of the MMRP to those responsible agencies identified in the MMRP, which have partial or full responsibility for implementing certain measures. Failure of a responsible agency to implement a mitigation measure shall not in any way prevent the lead agency from implementing the proposed project. The following table shall be used as the coordinator's checklist to determine compliance with required mitigation measures. City of San Luis Obispo 1 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments GEOLOGY/HAZARDS GEO-1(a) Design and construction of Building plans Review designs Review plans SLOCDD, the buildings, roadway infrastructure that demonstrate prior to approval once. Site SLOPWD, and all subgrades shall be engineered design to of Building inspect as Caltrans to withstand the expected ground withstand ground Permit. Building necessary acceleration that may occur at this site. acceleration and inspectors shall during The design should take into meet compliance conduct site construction. consideration the soil type, potential for with the most inspections to liquefaction, and the most current and recent adopted assure that applicable seismic attenuation methods State and City construction that are available. All on -site structures Building Codes occurs consistent shall comply with applicable provisions shall be provided with approved of the Uniform Building Code and the to the SLOCDD plans. most recent California Department of prior to issuance Transportation seismic design of Building standards. Permits. GEO-1(b) For retail stores included in Stack retail goods Site inspect prior Site inspect SLOCDD the San Luis Obispo Marketplace, no more than 8 to approval of once prior to goods for sale may be stacked no feet high or occupancy approval of higher than 8 feet from the floor in any restrain such permits and occupancy area where customers are present, goods. periodically during permits and unless provisions are made to prevent operations. as necessary the goods from falling during an during earthquake of up to 7.5 magnitude. The operations. stacking or restraint methods shall be reviewed and approved by the City before approval of occupancy permits, and shall be a standing condition of occupancy. GEO-2(a) A geotechnical study shall be The applicant SLOPWD staff Review plans SLOPWD prepared for the project site prior to site shall submit the shall review and once. Site development. This report shall include geotechnical approve the inspect as Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans— California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District Wry or aan Luis voispo Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Approval Action Required When Monitoring to Occur Monitoring Frequency Responsible Agency or Party Compliance Verification Initial Date Comments an analysis of the liquefaction potential study for methods to avoid necessary of the underlying materials according to SLOPWD review. or reduce during the most current liquefaction analysis The applicant geotechnical and construction. procedures. If the site is confirmed to shall implement soils related be in an area prone to seismically- all applicable hazards prior to induced liquefaction, appropriate measures to issuance of the techniques to minimize liquefaction reduce Building Permit. potential shall be prescribed and geotechnical and Building implemented. All on -site structures, soils hazards. inspectors shall transportation infrastructure and make site subgrades shall comply with applicable inspections to methods of the Uniform Building Code assure and all transportation infrastructure shall implementation of comply with the most current California approved plans. Department of Transportation design Grading standards. inspectors shall monitor technical Suitable measures to reduce aspects of the liquefaction impacts could include one grading activities. or more of the following techniques, as determined by a registered geotechnical engineer: • specialized design of foundations by a structural engineer, • removal or treatment of liquefiable soils to reduce the potential for liquefaction; • drainage to lower the groundwater table to below the level of liquefiable soil; • in -situ densification of soils or other . alterations to the ground characteristics; or Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District catty or Sall Luis VD/Sp0 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments other alterations to the ground characteristics. GEO-3(a) Measure GEO-2 (Site The applicant SLOPWD staff Review plans SLOPWD Geotechnical Investigation) shall include shall submit the shall review and once. Site an evaluation of the potential for soil geotechnical approve the inspect as settlement beneath the project site. study for methods to avoid necessary SLOPWD review. or reduce during The applicant geotechnical and construction. shall implement soils related all applicable hazards prior to measures to issuance of the reduce Building Permit. geotechnical and Building soils hazards. inspectors shall make site inspections to assure implementation of approved plans. Grading inspectors shall monitor technical aspects of the grading activities. GEO-3(b) If the project site is identified The applicant SLOPWD staff Review plans SLOPWD to be in a high potential for settlement shall submit the shall review and once. Site zone based on the Site Geotechnical geotechnical approve the inspect as Investigation, the building foundations, study for methods to avoid necessary transportation infrastructure and SLOPWD review. or reduce during subgrades shall be designed by a The applicant geotechnical and construction. structural engineer to withstand the shall implement soils related existing conditions, or the site shall be I all applicable hazards prior to Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments graded in such a manner as to address measures to issuance of the the condition. reduce Building Permit. Suitable measures to reduce settlement geotechnical and Building . impacts could include one or more of soils hazards. inspectors shall the following techniques, as determined make site by a qualified geotechnical engineer: inspections to assure • excavation and recompaction of on- implementation of site or imported soils; approved plans. • treatment of existing soils by mixing Grading a chemical grout into the soils prior inspectors shall to recompaction; or monitor technical • foundation design that can aspects of the accommodate certain amounts of grading activities. differential settlement such as post tensional slab and/or ribbed foundations designed in accordance with Chapter 18, Division Ill of the Uniform Building Code(UBC). GEO-5(a) Measure GEO-2 (Site The applicant SLOPWD staff Review plans SLOPWD Geotechnical Investigation) shall include shall submit the shall review and once. Site soil parameter analyses to determine geotechnical approve the inspect as the potential for subsidence at the study for methods to avoid necessary project site. If the potential for SLOPWD review. or reduce during subsidence is found to be significant, The applicant geotechnical and construction. then structural and grading engineering shall implement soils related measures shall be implemented to all applicable hazards prior to incorporate the results of the measures to issuance.of.the geotechnical study. These measures reduce Building Permit. would be similar to those recommended geotechnical and Building to mitigate impacts to soil settlement. soils hazards. inspectors shall make site inspections to Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC— Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District uny or San LUIS VD/Sp0 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments assure implementation of approved plans. Grading inspectors shall monitor technical aspects of the grading activities. GEO-6(b) During future droughts, Assess and SLOPWD staff During the SLOPWD groundwater pumping limitations for the potentially limit shall review beginning of unconsolidated aquifer underlying the groundwater assessments of each project site shall be assessed and pumping at the groundwater designated implemented to prevent soil subsidence. site during future pumping provided drought droughts. by a qualified condition. engineer and limit pumping as necessary during drought conditions. GEO-6(a) Prior to grading activities, a Assess soil and Prior to issuance Review soil SLOPWD, soil and groundwater assessment shall groundwater at of grading and SLOCDD be completed by a registered soils the project site. permits, groundwater engineer or remediation specialist to Coordinate with SLOPWD staff assessment determine the on -site presence or applicable shall review the once. absence of regulated contaminants that regulatory soil and Review may have migrated from off -site agencies groundwater remediation properties, or that occur on off -site regarding any assessment. certification properties that would be acquired for identified Prior,to; issuance ' or written proposed improvements. This contamination. of grading confirmation assessment shall target agricultural permits, SLOCDD once. chemicals throughout the historically shall review a farmed portions of the site, TPH copy of applicable Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC— Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Approval Action Required When Monitoring to Occur Monitoring Frequency Responsible Agency or Party Compliance Verification Initial Date Comments contamination associated with off -site remediation LUST sites along Madonna Road north certification from of the Dalidio property boundary, and RWQCB and/or on -site PCE associated with off -site dry DTSC, or written cleaning operations. If soil or confirm ation.that groundwater sampling indicates the a certification is presence of any contaminant in not required. hazardous quantities, the Regional Water Quality'Control Board (RWQCB) and Department of Toxic Substances Control (DTSC) shall be contacted by the project applicant or authorized agent thereof to determine the level of any necessary remediation efforts, and these soils and/or groundwater shall be remediated in compliance with applicable laws. Site assessments that result in the need for soil excavation are required to include: an assessment of air impacts and health impacts associated with excavation activities; identification of any applicable local standards that may be exceeded by the excavation activities, including dust levels and noise; transportation impacts from the removal or remedial activities; and risk of upset practices should an accident occur at the site. A copy of applicable remediation certification from RWQCB and/or DTSC, or written confirmation that a certification is not required shall be submitted to the Community Development Department. Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB—: Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments GEO-6(b) In the event that hazardous Halt work, During As necessary SLOPWD, waste and/or materials, including evacuate area, construction. during DTSC chemical odors or stained soils, are secure site, and construction. encountered during construction, the contact following actions shall be taken by the hazardous applicant or authorized agent thereof: waste/materials (1) all work in the vicinity of the coordinator if suspected contaminant will be halted; hazardous (2) all persons shall be removed from materials are the area; (3) the site shall be secured encountered under the direction of the City Fire during Department; and (4) the City of San Luis construction. Obispo Hazardous Waste/Materials Coordinator shall be notified. Work shall not recommence until such time as the find is evaluated and appropriate measures are implemented as necessary to the satisfaction of the California Department of Toxic Substances Control. GEO-6(c) In the event that groundwater Halt work, test, During As necessary SLOPWD, is encountered during construction, all and remediate, as construction. during RWQCB construction work in the vicinity of the applicable if construction. groundwater will be halted. RWQCB groundwater is shall be contacted to determine encountered appropriate remediation actions. This during could involve testing groundwater for construction. TPH and PCE, treatment of affected groundwater to a concentration below RWQCB standards, by a City approved registered environmental assessor or environmental engineer in consultation with RWQCB before the water can be Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis pbispo Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments released into the watershed, and/or other remediation actions required by RWQCB. GEO-6(d) Prior to issuance of Building Prepare and Prior to issuance Review study SLOPWD Permits, a soils engineering study and submit to City of Building and analysis hazardous materials screening analysis Engineer a soils Permits. once. Site of all imported fill materials shall be engineering study inspect as . prepared by a qualified professional and and hazardous. necessary submitted to the City Engineer for materials during review. The soils engineer study and screening construction. hazardous materials screening analysis analysis. shall demonstrate that all imported fill materials maintain engineering properties that are suitable for site development, and are free from contaminants that exceed threshold health and public safety levels. GEO-7(a) Prior to issuance of grading Prepare and Prior to issuance Review P.SI SLOPWD, permits for the proposed Prado submit to of Building once. Site Caltrans Road/U.S. Highway 101 interchange SLOPWD and Permits for the inspect as and associated improvements, a Caltrans a interchange. necessary Preliminary Site Investigation shall be Preliminary Site during performed within the areas of site Investigation of construction. disturbance proposed within 40 feet of the Prado Road the edge of U.S. Highway 101, in interchange area. compliance with Caltrans ADL Testing Implement the Guidance (March 16, 2001). The applicable Preliminary Site Investigation shall requirements of include soil borings to a minimum depth the PSI. of 2.5 below ground surface (bgs) using hand auger sampling methods. All soil samples from the ADL investigation Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Approval Action Required When Monitoring to Occur Monitoring Frequency Responsible Agency or Party Compliance Verification Initial Date Comments shall be analyzed for the presence of total lead following EPA Test Method 6010. The regulatory criteria for determining whether soils are to be classified as "hazardous waste" for materials handling and disposal purposes based on metal content are contained in the California Code of Regulations Title 22, Section 66261.24. The Total Threshold Limit Concentration (TTLC) for ADL is 1,000 milligrams per kilogram (mg/kg) and the Soluble Threshold Limit Concentration (STCL) for lead is 5.0 milligrams per liter (mg/1). The results of the Preliminary Site Investigation shall be summarized and submitted to the Community Development Department for review. In the event that ADL is discovered in excess of regulatory standards, the following measures shall be implemented: • The construction contractor shall prepare and implement a Lead Compliance Plan to prevent or minimize worker exposure to lead during the handling and treatment of ADL. Handling material containing ADL shall be in conformance with rules and regulations including, but not limited to, those of the California Division of Occupational Safety and Health Administration Cal -OSHA Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District G/ty Or Jan LUIS VDISPO 10 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Approval Action Required When Monitoring to Occur Monitoring Frequency Responsible Agency or Party Compliance Verification Initial Date Comments and the Regional Water Quality Control Board (RWQCB). The Lead Compliance Plan shall contain the elements listed in Title 8, California Code of Regulations, Section 1532.1(e)(2)(B). The Lead Compliance Plan shall be reviewed and approved by an Industrial Hygienist certified in Comprehensive Practice by the American Board of Industrial Hygiene. The Lead Compliance Plan shall be submitted to the City Fire Department at least 7 days prior to beginning work in areas containing aerially deposited lead. Prior to performing work in areas containing lead, personnel who have no prior training, including Caltrans personnel, shall complete a safety training program provided by the contractor, that meets the requirements of Title 8, California Code of Regulations, Section 1532.1, "Lead," and the Contractor's Lead Compliance Program. Personal protective equipment, training, and washing facilities, required by the Lead Compliance Plan shall be supplied to all applicable construction workers. • Handling of materials containing Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC— Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo 11 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Approval Action Required When Monitoring to Occur Monitoring Frequency Responsible Agency or Party Compliance Verification Initial Date Comments ADL shall result in no visible dust migration. The contractor shall have a means of dust control available at all times while handling material in work areas containing ADL. • Project construction activities shall be conducted in compliance with Caltrans Guidelines associated with aerially deposited lead. This requirement shall be included in construction contracts. • The project applicant shall contact Caltrans, the RWQCB, and San Luis Obispo Fire Department, to investigate the feasibility of capping materials containing hazardous levels of lead within the project limits in the existing State right-of- way under the pavement or contained by a clean fill cap. If this option is determined to be feasible by the applicable reviewing agencies, then the applicant shall fumish to the Community Development Department written statements of concurrence by these agencies. The project applicant shall comply with all requirements of the reviewing agencies. If on -site capping of contaminated soils is determined to be infeasible, then Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans— California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District utry or san ►_u►s vD►spo 12 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments the contaminated soils shall be transported and disposed of in a Class I landfill in conformance with Federal and State laws and regulations, as amended, and county and municipal ordinances and regulations, as amended. • Surplus material excavated from areas containing aerially deposited lead shall remain in the area of soil disturbance. The surplus soil shall not be disposed of outside the highway right of way. DRAINAGE AND WATER QUALITY DW-1(a) Reduce Impervious Implement SLOPWD staff to Review plans SLOPWD Surfaces. Consistent with Land Use pervious paving review project once. Site Element Policy 6.4.7 (General Plan and landscape final design plans inspect as Digest), the applicant shall be swales where prior to issuance necessary encouraged to use pervious paving feasible. of Building during and material to facilitate rainwater Permits. following percolation. Parking lots and paved construction. outdoor storage areas shall, where feasible, use pervious paving to reduce surface water runoff and aid in groundwater recharge. The applicant shall implement landscape swales as feasible and appropriate to allow for increased percolation of water on the project site. DW-2(a) Notice of Intent. Prior to File a NOI with SLOPWD and j Once. SLOPWD, I beginning construction, the applicant RWQCB and RWQCB staff to I RWQCB Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans— California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC— Department ofTozic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo 13 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring . Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur . Party Initial Date Comments shall file a Notice of Intent (NOI) for SLOPWD. review NOI prior discharge from the proposed to issuance of development site. grading permits. DW-2(b) Storm Water Pollution The applicant SLOPWD and Once. SLOPWD RWQCB Prevention Plan. The applicant shall shall submit a RWQCB shall require the building contractor to SWPPP to review the prepare and submit a SWPPP to the SLOPWD and SWPPP and City forty-five (45) days prior to the start RWQCB. NPDES permit of work for approval. The contractor is documentation responsible for understanding the State prior to issuance General Permit and instituting the of grading SWPPP during construction. A SWPPP permits. for site construction shall be developed prior to the initiation of grading and implemented for all construction activity on the project site in excess of one acre. The SWPPP shall include specific BMPs to control the discharge of material from the site. BMP methods may include, but would not be limited to, the use of temporary detention basins, straw bales, sand bagging, mulching, erosion control blankets, silt fencing, and soil stabilizers. Additional BMPs should be implemented for any fuel storage or fuel handling that could occur on -site during construction. The SWPPP must be prepared in accordance with the guidelines adopted by the State Water Resources Control Board (SWRCB). The SWPPP shall be also submitted to the City along with grading/development tans for review and approval. Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — , Air Pollution Control District City of San Luis Obispo 14 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments DW-2(c) Notice of Completion of File a Notice of SLOPWD and Once. SLOPWD, Construction. The applicant shall file a Completion of RWQCB staff to RWQCB notice of completion of construction of Construction with review notice of the development, identifying that RWQCB and completion prior pollution sources were controlled during SLOPWD. to occupancy the construction of the project, including clearance. the Prado Road Interchange, and implementing a closure SWPPP for the site. DW-3(a) Storm Water Quality Basins. Plan SLOPWD shall Review plans SLOPWD A Best Management Practice (BMP) requirements review plans prior once. Site device shall be installed to intercept shall be submitted to issuance of inspect as water flowing off of proposed parking lot by the applicant grading permits necessary and roadway surfaces for each sub- for review and and monitor during and basin of the Dalidio property. Whenever approval by compliance following feasible, the preferred approach to SLOPWD. during construction. treating surface runoff will be the use of Z.. construction. drainage swales rather than mechanical devices. The chosen method for treating runoff shall be a proven and documented pollution prevention technology device that removes oil and sediment from stormwater runoff, and retains the contaminants for safe and easy removal. The chosen device shall possess design features to prevent resuspension of previously collected contaminants and materials, and contain a built-in diversion structure to divert intense runoff events and prevent scouring of the previously collected sediments. The filter devices shall be sized to capture all dry weather surface Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - ' San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC— Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo 15 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments runoff and accommodate the first flush (one inch) during storm events. The storm water quality system must be reviewed and approved by the City. BMP's shall also be incorporated into the drainage plan for the Prado Road Interchange. The devices shall be sited and sized to intercept and treat all dry weather surface runoff and accommodate the first flush (one inch) during storm events. The storm water quality system must be reviewed and approved by the City. DW-3(b) Stormwater BMP Stormwater BMP SLOPWD shall As necessary SLOPWD Maintenance Plan. The stormwater devices shall be review devices prior to the BMP devices shall be inspected, maintained by the and/or inspection, rainy season cleaned and maintained in accordance applicant or and maintenance and after with the manufacturer's maintenance authorized agent reports annually major storm specifications. The devices shall be thereof. The prior to the onset events. cleaned prior to the onset of the rainy results of of the rainy season (i.e. November 1st) and inspection and season, and after immediately after the end of the rainy maintenance major storm season (i.e. May 1 st). All devices will be reports shall be events. checked after major storm events. The submitted by the results of the inspection and applicant for maintenance report shall be submitted review and to the City of San Luis Obispo Public approval by Works Department. SLOPWD. DW-3(c) NPDES Permit. The The applicant SLOPWD shall Once. SLOPWD applicant shall procure a National shall obtain an review the RWQCB Pollution Discharge Elimination System NPDES pe it. NPDES permit Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District city or San LUIS VDISPO 16 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments permit that adheres with all documentation requirements of the Federal Clean prior to issuance Water Act. Additionally, certain of grading occupants of the General Retail permits. component may require individual NPDES permits due to the processes or materials they use. AIR QUALITY AQ-1(a) The applicant shall implement The project SLOCDD shall As SLOCDD the following Best Available Control applicant shall perform periodic necessary, Technology (CBACT) for diesel -fueled identify for review site inspections during construction equipment, where feasible: by SLOCDD and during construction APCD staff the construction. • Maintain all construction equipment CBACT measures in proper tune according to that would be manufacturer's specifications; implemented. • Fuel all off -road and portable diesel Upon powered equipment, including but confirmation by not limited to bulldozers, graders, SLOCDD and cranes, loaders, scrapers, APCD, CBACT backhoes, generator sets, features shall be compressors, auxiliary power units, applied. The with ARB certified motor vehicle application of diesel fuel (non -taxed version these features suitable for use off -road); shall occur prior • Maximize to the extent feasible, the to project use of diesel construction equipment construction. meeting the ARB's 1996 or newer certification standard for off -road heavy-duty diesel engines; • Install diesel oxidation catalysts (DOC), catalyzed diesel particulate filters CDPF or other District Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo 17 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of. Approval Action Required When Monitoring to Occur Monitoring Frequency Responsible Agency or Party Compliance Verification Initial Date Comments approved emission reduction retrofit devices (the number of catalysts or filters required and the equipment on which they should be installed shall be determined in consultation with APCD); • Electrify equipment where feasible; • Develop and implement a Diesel Emission Control Plan (DECP) that describes the diesel emission controls to be used during construction and specifies the use of DOCs and CDPFs, in consultation with APCD prior to the start of construction; • Substitute gasoline powered for diesel powered equipment, where feasible; • Use alternatively fueled construction equipment on -site where feasible, such as compressed natural gas (CNG), liquefied natural gas (LNG), propane, or biodiesel; and • Use equipment that has Caterpillar pre -chamber diesel engines; If any of the above CBACT's is considered infeasible, the applicant shall notify the Community Development Department, by letter, and clearly state why any of the measures of are considered infeasible. The Community Development Department, in consultation with the San Luis Obispo Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD— Air Pollution Control District uiry or zian Luis vo►spo 18 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency . Agency or Occur Party Initial Date Comments County APCD would then make a final determination as to whether the measure is infeasible. AQ-1(b) The applicant shall design a Submit for Review plans Review plans SLOCDD, comprehensive construction activity SLOCDD and prior to issuance once. Site SLOPWD management plan designed to minimize SLOPWD review of grading inspect as the amount of large construction a construction permits. Site necessary vehicles operating during any given time activity ' inspect during during period. management construction. construction. Ian. AQ-1(c) Construction truck trips shall Prior to Conditions shall As SLOCDD, be scheduled, to the extent feasible, to occur during non -peak hours. occupancy clearance, the be adhered to throughout all necessary, during SLOPWD, APCD applicant shall grading and construction. AQ-1(d) The amount of disturbed area include, as a note construction shall be minimized and on -site vehicle on a separate periods for all speeds shall be reduced to 15 mph or informational project less. sheet to be components. recorded with any SLOCDD and /or AQ-1(e) Water trucks or sprinkler map, the dust SLOPWD systems shall be used in sufficient control inspectors shall quantities during construction to prevent requirements. All perform periodic airborne dust from leaving the site. requirements spot checks Increased watering frequency would be shall be shown on during grading required whenever wind speeds exceed grading and and construction. 15 mph. Reclaimed (nonpotable) water building plans. APCD inspectors should be used. shall respond to nuisance AQ-1(f) If stockpiling of fill material is complaints. involved, soil that is stockpiled for more than two days shall be covered, kept moist, or treated with soil binders daily to prevent dust generation. Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD— Air Pollution Control District City of San Luis Obispo i&J Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Approval Action Required When Monitoring to Occur Monitoring Frequency Responsible Agency or Party Compliance Verification Initial Date Comments AQ-1(g) Vehicle speed for all construction vehicles shall not exceed 15 mph on any unpaved surface at the construction site. AQ-1(h) All trucks hauling dirt, sand, soil, or other loose materials are to be covered or should maintain at least two feet of freeboard (minimum vertical distance between top of load and top of trailer). AQ-1(1) Install wheel washers where vehicles enter and exit unpaved roads onto streets, or wash off trucks and equipment leaving the site. AQ-1 Q) Sweep streets at the end of each day if visible soil material is carried onto adjacent paved roads. Water sweepers with reclaimed water should be used where feasible. AQ-1(k) Exposed ground areas that are planned to be reworked at dates greater than one month after initial grading should be sown with a fast -germinating native grass seed and watered until vegetation is established. AQ-1(1) Mitigation Measures AQ-1(a) through AQ-1(k) shall be included on all Grading and Construction Plan notes, as well as on all bid requests. A contact Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District wry or aan i-uw vuwNu 20 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When. Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments name and phone number at the San Luis Obispo APCD shall also be provided on these documents so that contractors may consult with APCD staff on the type of construction equipment and emissions controls to be used. AQ-1(m) , The project contractor/builder The name and During As SLOCDD, shall designate a person or person to telephone number construction, necessary, SLOPWD, monitor the dust control program and to of such persons SLOPDD and/or during APCD order increased watering, as necessary, shall be provided SLOPWD shall construction. to prevent transport of dust off -site. to the APCD. contact the Their duties shall include holidays and The dust monitor designated weekend periods when work may not be shall be monitor as in progress. The name and telephone designated prior necessary for number of such persons shall be to issuance of compliance with provided to the Community grading permits. dust control Development Department and APCD measures. prior to land use clearance for map recordation and land use clearance for finish grading of structures. AQ-1(n) A geological analysis shall be Submit for Prior to issuance Review SLOPWD, conducted prior to construction to SLOPWD review of grading geological APCD determine the presence of serpentine a geological permits. analysis rock. If naturally occurring asbestos is analysis of once. found on the project site, the applicant potential Review shall prepare an Asbestos Dust Control serpentine rock. Asbestos Plan and an Asbestos Health and Safety Prepare Asbestos programs, if Program, which shall be approved by programs as necessary,: the APCD prior to commencement of necessary. once. construction activities. Monitor Asbestos program Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD— Air Pollution Control District City of San Luis Obispo 21 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments compliance as necessary during construction. AQ-1(o) Prior to demolition work, areas Conduct asbestos The APCD will . Review SLOPWD, of the on -site structures shall be sampling and review the notification ACPD sampled as part of an asbestos survey notify APCD as demolition once. Field in compliance with the National necessary. ACM notification and verify as Emission Standards for Hazardous Air supervision, if SLOPWD shall necessary Pollutants (NESHAP). If asbestos is necessary, shall review the during found in any building, asbestos -related be undertaken by asbestos demolition. work, including demolition, involving 100 a licensed sampling prior to square feet or more of asbestos asbestos initiation of containing materials (ACMs) shall be consultant demolition performed by a licensed asbestos approved by activities. abatement contractor under the SLOPWD. SLOPWD shall supervision of a certified asbestos field verify ACM consultant and asbestos shall be supervision removed and disposed of in compliance during demolition with applicable State laws. activities. AQ-1(p) If during demolition of an on- Evaluation and SLOPWD shall As necessary SLOPWD site building, paint is separated from the management of field verify proper during building material (e.g. chemically or LBP materials LBP management demolition. physically), the paint waste will be shall be during demolition evaluated independently from the undertaken by a activities building material by a qualified qualified hazardous materials inspector to hazardous determine its proper management. All materials hazardous materials shall be handled inspector during and disposed in accordance with local, demolition state and federal regulations. According activities. All to the Department of Toxic Substances identified LBP Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional. Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG— California. Department of Fish and Game APCD— Air Pollution Control District Gity or San Luis uDispo 22 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments Control (DTSC), if paint is not removed materials shall be from the building material during disposed of prior demolition (and is not chipping or to issuance of peeling), the material can be disposed occupancy of as construction debris (a non- clearance. hazardous waste). The landfill operator will be contacted prior to disposal of building material debris to determine any specific requirements the landfill may have regarding the disposal of lead -based paint materials. The - disposal of demolition debris shall comply with any such requirements. AQ-2(a) Increase building energy The applicant SLOCDD and/or Once. SLOCDD, efficiency ratings by at least 10% above shall incorporate SLOPWD shall SLOPWD what is required by Title 24 the listed site inspect to requirements. Potential energy provisions into ensure consumption reduction measures building and development is in include, but are not limited to, increasing improvement accordance with attic, wall, or floor insulation, the use of plans and shall' approved plans photovoltaic roof tiles, installation of submit proof of prior to energy efficient windows, installation of unfeasibility prior occupancy energy efficient interior lighting, use of to issuance of clearance. high efficiency heating and cooling, use Building Permits. roofing material with a solar reference value that meets the EPA/DOE Energy Star rating, installation of low energy parking lot lights, and the use of R-45 insulation in the roof/attic space of all on -site structures. AQ-2(b) Shade trees shall be planted to The applicant SLOCDD shall Once. SLOCDD, shade on -site structures to the greatest shall incorporate site inspect to I APCD Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo 23 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments extent possible in summer, decreasing the listed ensure indoor temperatures, and reducing provisions into development is in energy demand for air conditioning. landscape plans accordance with Shade trees shall also be planted and shall submit approved plans throughout the parking lots to reduce plans to SLOCDD prior to evaporative emissions from parked and APCD prior occupancy vehicles. The landscape plan shall be to occupancy clearance. submitted to the San Luis Obispo APCD clearance. SLOCDD shall for review and comment. The City's verify landscape Architectural Review Commission (ARC) installation in shall review project landscaping plans accordance with for consistency with this mitigation approved measure. landscape plans. AQ-2(c) The applicant shall implement The applicant Prior to Once. SLOCDD, all of the following mitigation measures shall provide to occupancy APCD in consultation with SLOAPCD: SLOCDD a clearance. certification from Financial contribution and/or an APCD that the agreement between the applicant financial and SLO APCD to provide a park- measures have and -ride lot that could serve the been project area. implemented to • Financial contribution to a bus pass the satisfaction of subsidy program as a means of APCD. reducing vehicle trips elsewhere in the community; • Financial contribution to a vehicle- purchase/pollution offset program designed to remove vehicle that do not meet state emission requirements from area roadways; • Financial contribution to a bus retrofprogram designed to convert Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD— Air Pollution Control District uny or zian L-u►s vo►spo 24 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments area buses to operation by natural gas; • Financial contribution to a bus purchase program designed to increase availability of alternative transportation modes to area residents; • Financial contribution to a low - emission vehicle purchase subsidy program, and • Participate in the Flash Pass Program established by APCD and SLO Transit for all employers of the project. Refer to Mitigation Measures AQ-4(a) and (b) for a discussion of transportation demand management mitigation measures applied to the proposed project. AQ-4(a) The applicant shall develop Develop and SLOCDD and Review plans SLOCDD, and operate an employer -based operate a APCD to review once. Site APCD Transportation Management Program Transportation Transportation inspect as . per Clean Air Plan TCM T-1 C, which Management Management necessary incorporates the following provisions: Program. Program, during project including designs operations. a. Bicycle racks and/or bicycle lockers for bicycle racks at a ratio of 1 bicycle parking space and/or bicycle for every 10 car parking spaces lockers, prior to shall be installed for customers and occupancy employees, or at a ratio otherwise clearance. acceptable the SLOAPCD to be determined prior to occupancy Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD— Air Pollution Control District City of San Luis Ubtspo 25 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments clearance; and b. Carpool, vanpool and transit information shall be posted in employee break/lunch areas. AQ-4(b) To reduce overall project trip Implement SLOCDD and Review plans SLOCDD, generation and associated air employee trip APCD to review once.. Site APCD contaminant emissions, project tenants reduction trip reduction inspect as will be required to establish and programs. programs prior to necessary maintain employee trip reduction occupancy during project programs that will include, but are not clearance and as operations. limited to, the following elements: necessary during ' project • Free or subsidized employee operations. passes for SLO Transit; • Vanpool services provided by Ride - On Transit; • Cash incentives for using alternative travel modes; • On -site rideshare matching services; • On -site shower facilities for bicycle users; • Encourage Guaranteed Ride Home services for employees who use alternative transportation; • A minimum of 25 parking spaces to be shared use as a public Park and Ride lot; • Posted information on alternative travel modes; and • Preferential parking for employee ca ools/van ools where feasible Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC— Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD— Air Pollution Control District ut y or Sall LUIS VDISPO 26 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments AQ-4(c) The applicant shall prepare a Prepare SLOCDD to Review plan SLOCDD Pedestrian Circulation Plan for review Pedestrian review plan prior once. Site and approval by the City. The plan Circulation Plan. to occupancy inspect as shall include methods to improve safe clearance and as necessary pedestrian circulation patterns within the necessary during during project commercial portion of the project, and project operations. between the commercial portion of the operations. project and other nearby commercial uses, as well as other adjacent land uses. This mitigation measure is intended to complement and coordinate with Mitigation Measure LU-1(b). NOISE N-I(a) Stationary construction The applicant SLOCDD shall Periodically SLOCDD equipment that generates noise that shall designate on spot check to during exceeds 65 dBA at the project building and ensure project boundaries shall be shielded with a grading plans an compliance. construction. barrier that meets a sound transmission equipment area class (STC) rating of 25. with acoustical shielding. Equipment and shielding shall remain throughout construction. N-1(b) All diesel equipment shall be The applicant SLOCDD shall Periodically SLOCDD operated with closed engine doors and shall comply with spot check to during shall be equipped with factory- the required ensure project recommended mufflers. equipment compliance. construction. specifications. N-1 c Whenever feasible, electrical The applicant SLOCDD shall Periodically SLOCDD Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San LUIS odiapo 27 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments power shall be used to run air shall comply with spot check to during compressors and similar power tools. the required ensure project equipment compliance. construction. specifications. N-1(d) Construction activity for site The applicant SLOCDD shall Periodically SLOCDD preparation and for future development shall provide and spot check and during shall be limited to the hours between post signs stating respond to project 7:00 AM and 7:00 PM, Monday through construction complaints. construction Friday and Saturday 8:00 AM to 6:00 activity and in PM. No construction shall occur on restrictions prior response to Sundays or State holidays (i.e. to and throughout complaints. Thanksgiving, Labor Day). Construction grading and equipment maintenance shall be limited construction to the same hours. activities. N-I(e) For all construction activity on The applicant SLOCDD shall Periodically SLOCDD the project site, additional noise shall implement spot check and during attenuation techniques shall be noise reduction respond to project employed as needed to ensure that techniques as complaints. construction noise remains within levels allowed by necessary during and in the City of San Luis Obispo noise construction. response to standards. Such techniques may complaints. include, but are not limited to, the use of sound blankets on noise generating equipment and the construction of temporary sound barriers between construction sites and affected uses. N-1(f) The movement of construction- The applicant SLOCDD,shall Periodically SLOCDD related vehicles, with the exception of shall provide and spot check and during passenger vehicles, along roadways post signs stating respond to project adjacent to sensitive receptors shall be construction complaints. construction limited to the hours between 7:00 AM activity and in Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC— Department ofTozic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District G►ry or Jan LUIS VDISPO 28 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments and 7:00 PM, Monday through Friday restrictions prior response to and Saturday 8:00 AM to 6:00 PM. No to and throughout complaints. movement of heavy equipment shall grading and occur on Sundays or State holidays (i.e. construction Thanksgiving, Labor Day). This activities. measure does not apply to roadways where sound walls are currently in place. N-2(a) The applicant must contribute its The applicant SLOCDD shall Once. SLOCDD fair share, as determined by the City, to shall provide receive funds the implementation of one or more of the applicable funds prior to mitigation approaches listed in policy N- to SLOCDD. occupancy 1.2.16 of the Noise Element (refer to clearance. Appendix G of this EIR). Implementation of the measures must occur prior to project occupancy. These measures may include rerouting traffic onto streets that do not adjoin sensitive receptors, construction of noise barriers, retrofitting buildings with noise -reducing features, and the establishment of financial programs to pay for noise mitigation and trip reduction programs. BIOLOGICAL RESOURCES 13I0-1(a) Prior to development of fallow The applicant Prior to Review of SLOCDD, agricultural fields, surveys for shall submit a commencement special- . CDFG Congdon's tarplant should be performed Congdon's of construction;, . status,pl.ant . during the blooming period of this aster tarplant survey SLOCDD shall species (June- November). If the species is consistent with verify that the survey, and found, avoidance is the preferred option. the above survey survey has been preparation If avoidance is not feasible, on -site criteria. The I conducted by a I of. plant Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo 29 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments mitigation is preferred if suitable habitat survey shall be City approved mitigation is present. A restoration plan shall be conducted by a biologist. If monitoring prepared by a qualified plant ecologist. City approved speciakstatus plan, if The restoration plan shall identify the biologist. If species are Ithe needed, . number of plants to be replanted and special -status found, City would occur the methods that will be used to plants are shall verify that once. preserve this species in this location. identified, the DFG has been The plan shall also include a monitoring applicant shall notified, and that program so that the success of the effort submit written a mitigation can be measured. If off -site mitigation proof that the monitoring plan must be performed, Laguna Lake Park DFG has been has been may contain appropriate habitat and contacted. If prepared by a would be a preferred site. Restoration special -status City -approved efforts shall be coordinated with plants are found, biologist. applicable federal, state, and local a mitigation agencies. monitoring plan which includes the above requirements shall be prepared by a City approved biologist. 13I0-1(b) All proposed site disturbance The applicant SLOCDD shall Review plans SLOCDD, shall be set back at least 200-feet shall design review final once. Site CDFG (radius) from great blue heron active improvements to design plans for inspect as nest sites. The perimeter of the setback be setback at compliance with necessary area shall include a buffer and signage least 200 feet setback during regarding the sensitivity of the great from active nest requirements construction. blue heron rookery. The buffer shall be sites and at least prior to issuance of split rail fencing to discourage random 50feet from of grading human entry but to allow the passage of roosting sites. permits. wildlife. The setback around great blue Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis.Obispo Fire.Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional: Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District city Or Sall LUIS UDISPO 30 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments heron roosting sites shall be 50 feet. Eucalyptus or nesting trees within the nesting area shall not be removed unless they are a threat to human health or safety. BIO-1(c) Prior to construction during The applicant Review survey Review SLOCDD the migratory bird/heron/raptor nesting shall submit the results prior to survey results season, a survey for active nests shall results of the issuance of the once. Site be conducted by a qualified biologist at above surveys, as grading permits. inspect as the site no more than two weeks prior to applicable, for Site inspect as necessary any scheduled development. If active approval by the necessary during during nests are located, construction within SLOCDD. construction. construction. 500 feet of Migratory Bird Treaty Act- SLOCDD to bird, heron, or raptor nest trees (e.g., check plans for stands of Monterey pines, cypress, and compliance with eucalyptus, and the riparian corridors any mitigation along San Luis Obispo Creek and measures Prefumo Creek) shall be limited to the recommended by time period after young have fledged the surveys and and prior to next season's breeding. site inspect during This is generally September 1 to construction. February 1, although a qualified biologist shall confirm that breeding/nesting is completed and young have fledged the nest prior to the start of construction. Nest trees shall only be removed outside the nesting season, or after a qualified wildlife biologist verifies that the nest is empty and the nest tree is no longer used by a raptor. BIO-1 d During both the wintering and i The applicant Prior to Review of SLOCDD, Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOP" - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo 31 DalidiolSan Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments nesting seasons (unless the species is shall submit a commencement burrowing CDFG detected on the first survey), a qualified burrowing owl of construction, owl survey, biologist shall conduct surveys for survey consistent SLOCDD shall and burrowing owls in potential habitat areas with the above verify that the preparation prior to construction in accordance with survey criteria. survey has been of mitigation the guidelines described in the CDFG The survey shall conducted by a monitoring Staff Report on Burrowing Owl be conducted by City approved plan, if Mitigation, 1995. Winter surveys shall a City approved biologist. If needed, be conducted between December 1 and biologist. If burrowing owls would occur January 31, and the nesting season burrowing owls are found, the once. survey shall be conducted between April are identified, the City shall verify 15 and July 15. If burrowing owls are applicant shall that DFG has detected within the proposed submit written been notified, and disturbance area, CDFG shall be proof that the that a mitigation contacted immediately to develop and DFG has been monitoring plan implement a mitigation plan to protect contacted. If has been owls and their nest sites. burrowing owls prepared by a are found, a City -approved mitigation biologist. monitoring plan which includes the above requirements shall be prepared by a City approved biologist. 13I0-1(e) The setback around Monarch The applicant SLOCDD shall Review. plans SLOCDD, butterfly wintering site habitat shall be shall design review final. and survey CDFG 50 feet from the perimeter of the habitat. improvements to design plans for results once. A survey to determine the extent of the be setback at compliance with Site inspect Monarch butterfly habitat shall be least 50 feet from setback as necessary conducted between the months of wintering site requirements during Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG— California Department of Fish and Game APCD — Air Pollution Control District wry or Jan Luis VDlspo 32 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments January and March within 1 year prior to habitat. A prior to issuance construction. construction by a qualified biologist or Monarch butterfly of grading lepidopterist. survey shall be permits. conducted. SLOCDD shall verify completion of Monarch butterfly survey. BIO-1(f) Trees removed for project The applicant SLOCDD shall Once prior to SLOCDD, development shall be replaced at a ratio shall prepare a review the plan occupancy CDFG of at least 1:1 and of a height to shield tree replacement and tree clearance. on -site Monarch butterfly wintering sites plan and replace replacement prior Review the. and sensitive avian nesting habitat. In trees in the to occupancy establishment addition to review by the City Arborist, a vicinity of clearance. of replaced qualified biologist shall review the identified trees annually replacement plan. Evergreen trees shall Monarch butterfly for the first be selected that reach a height capable wintering sites. five years of forming a suitable windbreak, as following determined by a qualified biologist. planting. 13I0-1(g) The proposed permanent Prohibit active SLOCDD shall Once prior to SLOCDD Open Space area along Prefumo Creek uses within the review plans prior occupancy shall preserve the habitat and allow only proposed to occupancy clearance those passive recreational uses that will permanent open clearance and and as not significantly disturb sensitive wildlife space area along site inspect as necessary species. Prefumo Creek. necessary during project during project construction and construction operations._ and ,. _ . .,.. operations. . 13I0-1(h) Prior to recordation of the final The applicant Review plans Review plans SLOCDD map or issuance of building permits, the shall submit a prior to final map once. Site applicant shall prepare a detailed lighting Ian for clearance. Site inspect once. Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC— Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — . California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo 33 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments lighting plan for review and approval by approval by the inspect.one year City staff, a qualified biologist, and the SLOCDD. after completion Architectural Review Board to ensure SLOCDD shall of development the size and brightness of fixtures is check plans and for compliance. minimized and that lights are hooded site inspect for and directed toward the ground. compliance. 13I0-1(i) If riparian vegetation is The applicant Review plans Review plans SLOCDD, removed for construction of the shall submit to , prior to issuance once. CDFG secondary road connecting to Los Osos SLOCDD Written of grading Valley Road or the Prado Road confirmation of permits. interchange, it shall be replaced with compliance with locally occurring native species applicable CDFG according to a restoration plan prepared permitting by a qualified plant ecologist (See programs or Mitigation Measure BIO-3(d) below). written This plan shall be subject to the confirmation from approval by the City of San Luis Obispo, CDFG that such specifically by the City's Natural permitting is not Resources Manager and the City required. Arborist. Construction for the portion of the road through Prefumo Creek and any riparian habitat shall not be conducted until all required federal, state and local permitting is approved and issued by those agencies with jurisdiction, (e.g. USACE, CDFG, NMFS, and USFWS). Best Management Practices shall be employed to reduce impacts to water quality (see Section 4.2 of this EIR). BI0-10) Prior to development of the A eucalyptus tree Prior to Once. SLOCDD, office/business park or park components survey shall be occupancy SLOPWD Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC— Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG— California Department of Fish and Game APCD — Air Pollution Control District Glty Or San LUIS VDISPO 34 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments of the proposed project or any roadway conducted and clearance. modifications, including but not limited to the results modifications to Madonna Road, or the submitted to site's internal roadway system, a SLOCDD and qualified arborist, selected by the City, SLOPWD. Upon shall survey the eucalyptus grove on the SLOCDD and Dalidio Property. The purpose of the SLOPWD survey shall be to identify trees whose verification, the health status would pose a risk to the eucalyptus tree health and safety of residents, thinning program employees, or people present within the shall be " park or open space areas. Based on implemented. the results of this survey a tree -thinning program shall be created, which provides for the thinning or maintenance of the unhealthy trees only. The thinning program shall be reviewed and approved by the City of San Luis Obispo Community Development and Public Works Departments. No thinning -" activities shall occur that conflict with the previous or following mitigation measures in this document regarding time constraints on construction activities and/or sensitive species utilizing these trees. BIO-2(a) With the submittal of a precise Submit tree Prior to issuance Once. SLOCDD development plan for the project, the information with of grading developer shall submit plans for review precise permits. by the City Arborist and for eventual development review and approval by the Architectural plan. Review Commission, which show the following information: Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo 35 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments 1. The locations of all existing trees, noting location, species, diameter, and condition; 2. Note whether existing trees will be retained, removed, or relocated; and 3. The location of proposed utilities, driveways, street tree locations, and the size and species of proposed street trees. 4. A landscaping plan which shows the size and species of all trees proposed to be planted in the project. 13I0-2(b) The developer shall abide by Implement the During As necessary SLOCDD the requirements of the City Arborist for recommendations construction. during construction. Requirements shall of the City construction. include but not be limited to: the Arborist during protection of trees with construction construction. setbacks from trees; construction fencing around trees; grading limits around the base of trees as required; and a Replacement Plan for trees removed including replacement at a minimum 1:1 ratio. BI0-3(a) Proposed site disturbances The applicant SLOCDD shall Review: plans SLOCDD shall be set back at least 35 feet from shall design review final . and survey Prefumo Creek and 20 feet from the improvements to design plans for results once. drainage channel on the Dalidio be setback at compliance with Site inspect property as measured from the top of least 35 feet from setback as necessary bank or from the edge of the Prefumo Creek I requirements I during Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC— Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District utry or zian Luis vorspo 36 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments predominant pattern of riparian and 20 feet from prior to issuance construction. vegetation, whichever is farther from the the drainage of grading creek's flowline. channel. permits. BIO-3(b) The location of top of bank Depict the top of SLOCDD shall Review plans SLOCDD and of riparian vegetation shall be bank and riparian review plans for once. shown on all project plans, subject to vegetation on compliance. the review and approval of the City's project plans. Natural Resources Manager. BI0-3(c) If wetlands and/or riparian The applicant Review plans Review plans SLOCDD, habitat are subject to permitting or shall submit to prior to issuance once. CDFG, consultation with public agencies, such SLOCDD written of grading USFWS, NMFS as USFWS, CDFG, or NMFS, required confirmation of permits. setbacks or conditions regarding compliance with wetlands and riparian habitat shall be applicable observed. permitting programs - written confirmation from permitting agencies that permitting is not required. 13I0-3(d) If wetlands and/or riparian The applicant Evidence of Plan check SLOCDD, habitat are removed for project shall submit the permits or. shall occur CDFG, development, the following shall apply: habitat Mitigation confirmation that once. Site RWQCB, Plan and a copy permits.are not inspections USACE The applicant shall submit a Mitigation of the Corps required to be shall be . . Plan for areas of disturbance to permit, RWQCB submitted prior to conducted wetlands and/or riparian habitat. The 401 water quality issuance of throughout plan shall be designed by a biologist certification, and grading permits. all phases of familiar with restoration and mitigation CDFG Streambed development. Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG— California.Department of Fish and Game APCD — Air Pollution Control District City of San Luis vbtspo 37 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Approval Action Required When Monitoring to Occur Monitoring Frequency Responsible Agency or Party Compliance Verification Initial Date Comments techniques. Restoration and mitigation Alteration Monitoring of shall be with locally occurring native Agreement or grading and species at a ratio of 1:1 for riparian written construction habitat and 2:1 for delineated wetland confirmation that activities shall habitat. The plan shall include, but not all sensitive occur throughout be limited to the following components: biological construction. resources on the 1. Performance criteria (i.e.: what is an site have been acceptable success level of avoided and a revegetation to mitigate past permit is not impacts); required to 2. Monitoring effort (who is to check on SLOCDD for the success of the revegetation review and plan, how frequently); approval. All 3. Contingency planning (if the effort aspects of the fails to reach the performance plan shall be crfteria, what remediation steps implemented as need to be taken); approved. 4. Irrigation method /schedule for A qualified wetland elements (how much water biologist/ is needed where and for how long); wetland scientist and knowledgeable 5. Provisions for the removal of non- about wetland native invasive species (including permit details regarding the type and use of requirements, and herbicides in and near aquatic approved by habitat and sensitive species). SLOPBD shall oversee In addition to the above mitigation monitoring of all measures, measures included in grading activities Section 4.2, Drainage and Water within 100 feet of Quality, would also serve to reduce any jurisdictional potentially significant long and short- Waters of the term impacts to wetlands and biological I U.S., including Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG— California Department of Fish and Game APCD — Air Pollution Control District city of San Luis ObiSPO 38 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments resources to less than significant. wetlands, to These mitigation measures include DW ensure 1(a); DW.2(a) through (c); and DW-3(a) compliance with through (c). permit conditions. The monitor shall prepare inspection reports and submit them to SLOCDD on a quarterly; basis. AGRICULTURAL RESOURCES AG-1(a) Access for agricultural All applicable Prior to Review plans SLOCDD equipment shall be provided to the project plans shall occupancy once. remaining agricultural land from the identify the clearance. proposed collector street and from provision of Dalidio Road and Elks Lane. Curbing agricultural shall be designed or cut to provide wide access.. "driveway - like" access to the cropland for all farm equipment. AG-1(b) Irrigation water sources and infrastructure shall be provided to the Provide irrigation water sources During project operations. As necessary during project SLOPWD remaining 58.8 acres of prime farmland and infrastructure operations. on the Dalidio property. Water cost to the remaining shall be at current rates. on -site farmland at current rates. The proposed project's development plan states that water for continuing agricultural operations shall be supplied through existing wells from the underlying aquifer. This is consistent with how water is currently provided for on -site agricultural operations and would Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans— California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Udispo 39 Dalidio/San Luis Marketplace Annexation and Development Project EAR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments fulfill the requirements of the above measure. AGA(c) Agricultural Easement. The Provide an Prior to issuance Review SLOCDD remaining approximately 58.8 acres of agricultural of grading easement prime agricultural land on the Dalidio easement over permits. once. Site Property shall remain as a single parcel the remaining on- inspect as and be placed under a permanent site agricultural necessary agricultural easement held by the Land parcel. during project Conservancy of San Luis Obispo operations. County, Coastal San Luis Resource Conservation District, or other qualified conservation organization. Fee title to the property may continue to be held by a private party or may be transferred to the City of San Luis Obispo. Cropland production shall have preference over all other open space uses and shall be encouraged through competitive lease rates and protection through the San Luis Obispo County Right to Farm Ordinance. The current farmer would consider the 52 acres as an agriculturally viable unit for row crop production and has expressed interest in continuing to farm on -site. AGA(d) Off -Site Open Space Dedicate off -site Prior to Once. SLOCDD Dedication Agricultural open space with occupancy: Characteristics. The 20 acres of off- similar overall clearance. site open space proposed to be funded agricultural by the applicant shall be characterized suitability as the by similar overall agricultural suitability on -site as the on -site agricultural lands. agricultural lands. Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG— California Department of Fish and Game APCD — Air Pollution Control District wry or san LUIS UO/SPO 40 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments AG-2(a) A 100-foot buffer between Depict 100-foot Prior to issuance Once. SLOCDD urban and agricultural uses shall be buffer between of building incorporated into the design the San on -site urban and permits. Luis Marketplace, and other urban uses agricultural uses on the Dalidio property. Agricultural on all site plans. buffers can include non -habitable structures, roadways, parking, landscaped areas, and non -habitable buildings. AG-2(b) All future uses on the Depict 100-foot Prior to issuance Once. SLOCDD designated open space areas shall be buffer between of building compatible with continued farming of the on -site urban and permits. remaining cropland. Adequate buffer agricultural uses zones of at least 100 feet between on all site plans. human occupied structures, or other areas as required by the Agricultural Commissioners Office, and the - remaining cropland shall be provided and landscaping along the west side of the potential collector road shall be part of the project approval requirements. These buffer zones shall be provided within the designated open space areas, and shall not diminish the amount of farmland available for use. AG-2(c) For the construction activities on the Dalidio property as well as for the Confine construction During construction Review construction SLOCDD, SLOPWD Prado Road interchange, construction staging to non- plans once. equipment storage and construction open space or Site inspect staging shall be confined to the areas agricultural areas. as necessary planned for conversion from agricultural during to urban uses. All construction construction. Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans— California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo 41 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments equipment maintenance shall be confined to these areas. No construction equipment staging or storage shall occur on areas designated as Open Space or in agricultural production. In addition, Section 4.3, Air Quality, specifies dust control measures during project construction. These measures would incrementally reduce potential impacts to the productivity of neighboring agricultural uses. AESTHETICS AES-1(a) Foreground Views of Plant replacement Prior to Review SLOCDD Madonna Road. As thinning of the trees to provide occupancy annually for eucalyptus groves occurs for every tree visual screening. clearance. the removed the applicant shall replace the establishment tree on a 1:1 basis with a tree of of trees for minimum 36-inch box size. As feasible, each of the the replacement trees shall be placed in first five years an area where they will continue to following screen the proposed development from replanting. existing views. AES-1(b) Foreground Views from Plant landscaping Prior to Review SLOCDD U.S. Highway 101. At the time of to provide visual occupancy annually for occupancy planted landscaping shall screening. clearance. the screen views of structures at 30% of establishment their designed intent. Within five years of landscape of planting, landscaping shall screen screening for 75% of the commercial structures of the each of the project. All failed specimens shall be I first five years Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans— California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District Glty Or Sail LUIS UDISPO 42 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments replaced within one month. Screening following ratio and landscape vegetation health planting. shall be achieved under the supervision of a qualified arborist, which shall be approved by the Community Development Director in consultation with the City Arborist. AES-3(a) The applicant shall submit Submit for Prior to issuance Once. SLOCDD plans to the Architectural Review SLOCDD and of building Committee (ARC) for review prior to ARC review the permits. applying for construction permits. Plans designs of retail shall specifically be evaluated.for structures. consistency with Chapter 3.2, Large - Scale Retail Projects, of the City's Community Design Guidelines. AES-3(b) The applicant shall submit Submit for Prior to issuance Once. SLOCDD plans with design measures to conceal SLOCDD and of building rooftop equipment, before issuance of ARC review the permits. construction permits. The plans shall designs of retail depict precise cross -sections and structures. sightline indicators to assure that the rooftop equipment will not be visible from surrounding locations. AES-3(c) Areas within commercial Submit for Prior to issuance Once. SLOC.DD development for outdoor storage, truck SLOCDD and of building parking, trash collection, or loading shall ARC review the permits.. not be visible from abutting streets. designs of retail Such facilities shall be thematically structures. incorporated into the overall site design, and non -enclosed areas shall be permanently defined and screened with Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District Gify of San Luis UDIspo 43 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments walls and/or fences. Materials, colors and design of screening walls shall conform to those used as predominant materials and colors on the building, subject to Architectural Review Commission approval. AES-4(a) All lighting fixtures in The applicant SLOCDD shall Once. SLOCDD customer parking and rear loading areas shall submit site inspect prior that are visible from surrounding lighting plan to occupancy residences shall be designed to fully subject to the clearance contain glare on -site. All lighting poles review of shall be hooded, shielded, and located SLOCDD. to direct light pools downward and prevent glare on the nearby residential lots. Non -glare lighting shall be used throughout the proposed project. Searchlights and strobe lights shall be prohibited. AES-4(b) All windows shall be of low- Submit for Prior to issuance Once. SLOCDD glare specification. Paint used for SLOCDD and of building exterior fagades shall be of low- ARC review the permits. reflectivity. Metal surfaces shall be designs of brush -polished, and not highly reflective. structures. AES-4(c) The Architectural Review Submit for Prior to issuance Once. SLOCDD Committee shall review all proposed SLOCDD and of building buffering methods, including exterior ARC review the permits. wall and landscape treatments, along designs of the western edge of the site to ensure structures, that all automobile and parking lot lights including all are prevented from spilling over the I buffering Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District f_1W Or Jan Lens UL115PO 44 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments property line. This may include, but is methods. not limited to, the use of mature trees throughout the site. All ARC recommendations shall be implemented. It should be noted that mature trees often grow more slowly than smaller more vigorous trees, and that the younger trees often overtake the larger trees within a matter of years. Therefore, it is recommended that a mix of mature and immature trees be planted as part of the buffering methods. AES-4(d) The Architectural Review Submit for Prior to issuance Once. SLOCDD Committee shall review proposed SLOCDD and of building material and color plans to be submitted ARC review the permits. by the project applicant prior to issuance designs of of building permits. These plans shall structures. indicate that proposed exterior wall surfaces that face public viewing corridors, such as U.S. Highway 101, Los Osos Valley Road, and Madonna Road, would be of materials and colors that would not produce substantial glare, as determined by the ARC. AES-5(a) Prior to approval by Caltrans of final design documents for the Submit for SLOCDD and Prior to issuance of building Once. SLOCDD, Caltrans interchange, plans for the proposed ARC review the permits. overpass and retaining walls shall be designs of the reviewed by the City's Architectural Prado Road Review Commission. The ARC shall interchange. make recommendations to Caltrans on the design of the overpass and retaining Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC— Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis vbtspo 45 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments walls. Caltrans shall consider and implement all feasible design recommendations from the ARC. The bridge and retaining wall design should incorporate features that reflect the general character of the area. In its review of the bridge and retaining wall design, the ARC should focus on, but not be limited to, the following elements: massing, decorative treatments, landscaping, lighting, color and texture. PUBLIC UTILITIES PU-1(a) The applicant shall prepare Submit to Prior to Once. SLOPWD plans to use reclaimed wastewater for SLOPWD plans occupancy on -site landscaping, when such supplies for the use of clearance. become available. By establishing an reclaimed irrigation system which uses reclaimed wastewater for on - wastewater, water supply impacts from site landscaping. the proposed project, and other cumulative development, would be reduced. PU-3(a) A Utility Relocation Plan shall Submit for Prior to the Review plans SLOPWD be prepared by the applicant and SLOPWD a Utility issuance of once. Site submitted with final construction Relocation Plan. grading permits. inspect as drawings for the review and approval of Coordinate with necessary the City Utilities Department. The Utility affected utility during Relocation Plan shall identify all existing agencies. construction. and proposed water lines, sewer lines, telephone, cable, gas, electric or other services located on the project site. The applicant shall coordinate with any affected agencies as part of the design Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans— California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District crry or san LUIS UDlspo 46 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments process. The Utility Relocation Plan shall specify the phasing and scheduling of utility relocations to ensure minimal disruption between removal/relocation of existing utility lines and the installation of new lines. PU-3(b) During construction, The applicant Prior to issuance Verify . SLOPWD underground utility alert services shall shall provide of grading contract with be used to identify the location of all verification to permits. utility alert underground services and to avoid the SLOPWD that services unplanned disruption of pipes or service utility alert once. Site lines. services'will be inspect as used during necessary construction. during construction. PU-3(c) A construction period public Submit to Prior to issuance Review plan SLOPWD outreach and communications plan and SLOPWD a draft of grading once. Site program shall be developed by the construction permits. inspect as applicant for all phases of the project. period public necessary Weekly assessments of upcoming utility outreach and during and service disruptions shall be communications construction. undertaken by the applicant or plan. Upon authorized agents thereof. These receipt of assessments and an identification of the SLOPWD affected service areas shall be verification of the coordinated with the public outreach plan, the program. The public outreach program applicant shall shall ensure that advance notice for any implement the utility or service disruptions is extended plan throughout to affected businesses and residents. the construction period. Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC— Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo 47 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Approval Action Required When Monitoring to Occur Monitoring Frequency Responsible Agency or Party Compliance Verification Initial Date Comments PU-4(a) Construction Solid Waste The applicant Review plans Review plans SLOCDD, Minimization. During the construction shall submit a prior to issuance once, site SLOPWD phases of the project, the following Construction of a building inspect mitigation measures will be Solid Waste permit. periodically implemented to reduce solid waste Minimization Plan during generation to the maximum extent to SLOCDD and construction. feasible: SLOPWD for review. • Prior to construction, the contractor will arrange for construction recycling service with a waste collection provider. Roll -off bins for the collection of recoverable construction materials will be located onsite. The applicant, or authorized agent thereof, shall arrange for pick-up of recycled materials with a waste collection provider or shall transport recycled materials to the appropriate service center. Wood, concrete, drywall, metal, cardboard, asphalt, soil, and land clearing debris may all be recycled. • The contractor will designate a person to monitor recycling efforts and collect receipts for roll -off bins and/or construction waste recycling. All subcontractors will be informed of the recycling plan, including which materials are to be source - separated and placed in proper bins. Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG— California Department of Fish and Game APCD — Air Pollution Control District cny or san Luis vo►spo 48 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments The contractor will use recycled materials in construction wherever feasible. The above construction waste recycling measures will be incorporated into the construction specifications for the contractor. PU-4(b) Operational Solid Waste The applicant Review plans Review plans SLOCDD, Minimization. The project applicant or authorized agent thereof shall provide shall submit a Solid Waste prior to map recordation. once. Site inspect as SLOPWD commercial and office/business park Management necessary. tenants with educational material on the Program to City's waste management efforts upon SLOCDD and occupancy and transfer of ownership. SLOPWD for The design of the proposed buildings review, and facilities shall include provision of adequate space and capacity for recycling containers. CULTURAL RESOURCES CRA (a) As part of the annexation The Cultural Prior to demolition Review SLOCDD process for the property, the Cultural Heritage of any potentially Cultural Heritage Committee of the City of San Committee of the historic on -site Heritage Luis Obispo shall determine if the two City of San Luis structures. Committee buildings of significance should be Obispo shall findings once. added to the Master List of Historic determine if the Properties. As described above, these two buildings of buildings fit the criteria in the City significance Historical Preservation Program should be added Guidelines. to the Master List of Historic Properties. Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis vbfspo 49 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments CR-1(b) Future development plans for Design all project Prior to demolition Review SLOCDD the property should be designed to features to of any potentially building plans preserve and interpret the important preserve and historic on -site once. historical buildings and structures interpret the on- structures. Review identified in this report. If preservation site important preservation and interpretation are not feasible, then historical buildings or relocation other mitigation measures (e.g., video and structures. If measures documentation, relocation of structures, necessary, video once. etc.) may be necessary. document and/or relocate these structures. CR-2(a) A qualified historical The applicant Prior to issuance Review SLOCDD archaeologist shall survey the portions shall submit to of grading survey report of the Dalidio property proposed for SLOCDD a report permits. once. development not covered by the May of the required 1999 report to search for surface survey... evidence of historical archaeological remains. This shall include the area along the U.S. Highway 101 frontage, if development is proposed in this area. CR-2(b) Prior to development of the A qualified Prior to issuance Once. SLOCDD property, test excavation within the archaeologist of grading presumed original track location and shall test excavate permits. other archaeologically sensitive areas as noted and shall be conducted to determine if evaluate the buried archaeological remains exist. If importance of any such remains are discovered, their identified importance should be evaluated and resources. impacts to significant resources mitigated. CR-2 c At the commencement of A qualified Prior to issuance Once. JSLOCDD Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis UDIspo 50 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments project construction, all workers archaeologist of grading associated with earth disturbing shall provide permits. procedures shall be given an orientation cultural resources regarding the possibility of exposing orientation to unexpected cultural remains by an construction archaeologist and directed as to what workers. steps are to be taken if such a find is encountered. CR-2(d) A qualified archaeologist and A qualified SLOCDD shall Spot check SLOCDD Native American representative shall archaeologist and spot check in the periodically monitor initial earth moving activities Native American field. during within native soil. In the event that representative construction. archaeological and historic artifacts are shall monitor encountered during project construction, initial earth all work in the vicinity of the find will be moving activities halted until such time as the find is within native soil. evaluated by a qualified archaeologist The applicant shall and appropriate mitigation (e.g., halt construction if curation, preservation in place, etc.), if human remains necessary, is implemented. After the are unearthed. find has been appropriately mitigated, work in the area may resume. In the event of the accidental discovery or recognition of any human remains in any location other than a dedicated cemetery, the following steps will be taken: I. There shall be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains until: Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC— Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San LUIS VDISPo 51 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Approval Action Required When Monitoring to Occur Monitoring Frequency Responsible Agency or Party Compliance Verification Initial Date Comments A. The coroner of the county in which the remains are discovered must be contacted to determine that no investigation of the cause of death is required, and B. If the coroner determines the remains to be Native American: 1. The coroner has 24 hours to notify the Native American Heritage Commission. 2. The Native American Heritage Commission shall identify the person or persons it believes to be most likely descended from the deceased Native American. 3. The most likely descendent may make recommendations to the landowner or the person responsible for the excavation work, for means of treating or disposing of, with appropriate dignity, the human remains and any associated grave goods as provided in Public resources Code Section 5097.98. Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District Glty Or Sall Luis UD/SPO 52 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Approval Action Required When Monitoring to Occur Monitoring Frequency Responsible Agency or Party Compliance Verification Initial Date Comments Il. Where the following conditions occur, the landowner. or his authorized representatives shall repatriate the Native American human remains and associated grave items with appropriate dignity on the property in a location not subject to further subsurface disturbance. However, any such activity will be pursuant to the discretion of a Chumash representative if a. descendent is either not identified or fails to respond to notification. A. The Native American Heritage Commission is unable to identify a most likely descendent or the most likely descendent failed to make a recommendation within 24 hours after being notified by the commission. B. The descendent identified fails to make a recommendation; or C. The landowner or his authorized representative rejects the recommendation of the descendent, and the mediation by the Native American Heritage Commission fails to provide measures acceptable to the landowner. Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOP" - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo 53 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments If human remains are unearthed, State Health and Safety Code Section 7050.5 requires that no further disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains shall occur until the County Coroner has made the necessary findings as to origin and disposition pursuant to Public Resources Code Section 5097.98. If the remains are determined to be of Native American descent, the coroner has 24 hours to notify the Native American Heritage Commission. TRAFFIC AND CIRCULATION T-1(a) To mitigate significant impacts to The applicant Prior to Once. SLOPWD the Madonna Road/LOUR intersection shall construct the occupancy resulting in improved LOS F operation required clearance. (with a delay of 46 seconds/vehicle), the improvements to project shall construct the following the Madonna improvements: Road/LOVR intersection • Provide a westbound right -turn overlap traffic signal phase • Prohibit southbound and westbound U-turn movements, • Make appropriate modifications to signal heads, poles, controller settings, signing and striping, and bike lanes as necessary to implement mitigation. T-1 b To mitigate significant queuing The applicant Prior to Once. SLOPWD Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOP" - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District Glty or San LUIS VDISPO 54 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments on the northbound approach (Dalidio shall construct the occupancy Drive) at the Madonna Road/Dalidio required clearance. Drive intersection resulting in LOS C improvements to operation (with a delay of 34 the Madonna seconds/vehicle), the project shall Road/Dalidio construct the following improvements: Drive intersection • Install right -turn overlap phasing on the northbound Dalidio Drive approach (which would prohibit westbound U-tums); • Add a second northbound left-tum lane on Dalidio Drive; • Change the permitted phasing on Dalidio Drive to split phasing northbound and southbound • Construct second southbound lane on Dalidio Drive between Madonna Road and project boundary which would eliminate on -street parking. • Establish bicycle lanes on Dalidio Drive which would require up to an additional 10 feet of right-of-way to accommodate five -travel lane section (2 southbound receiving lanes, one northbound left-tum, one northbound shared left-tumAhrough, and one northbound right -turn lane) and bicycle lanes in both directions. T-1(c) To mitigate significant impacts to rTheapplicant Prior to final map Once. SLOPWD the Prado Road/Higuera Street shall provide recordation. intersection resulting in LOS C operation funding for the 30 seconds of delay/vehicle), the re uired Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis 55 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Approval Action Required When Monitoring to Occur Monitoring Frequency Responsible Agency or Party Compliance Verification Initial Date Comments project shall fund the following improvements to improvement prior to 50% occupancy of the Prado the total project: Road/Higuera Street intersection • Reconstruct curb gutter and sidewalk (including utility undegrounding) in order to add a second northbound left -turn lane on Higuera Street, which may require IeadNag phasing with the souhbound left-tum movement. Implementation of this measure will require right-of-way acquisition on the northwest comer of the intersection. A review of the volumes under Baseline No Project Conditions indicate that the San Luis Obispo Creek bridge would not need to be widened to accommodate the projected volumes. The proposed project would increase the number of northbound left -turn vehicles to approximately 700 vehicles. Due to the wide receiving lane on Prado Road between the San Luis Obispo Creek bridge and Higuera Street, it is possible to construct two receiving lanes to accommodate the proposed dual northbound left -turn lanes. However, due to the relatively short distance (approximately 200 to 250 feet) between the bridge and Higuera Street, vehicles will have to merge into one lane, which Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC— Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District crry or san LUIS UDrspo 56 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments would limit the effectiveness of the two receiving lanes. Therefore, it is also recommended that the San Luis Obispo Creek bridge be widened to accommodate four lanes in conjunction with the dual northbound left -turn lanes at the Prado Road/Higuera Street intersection. T-3(a) To mitigate the projected impact The applicant Prior to Once. SLOPWD to the Madonna Road/Dalidio Drive shall construct the occupancy intersection (i.e., to maintain LOS D required clearance. operations with 36 seconds of delay), improvements to the project shall construct the following the Madonna intersection improvements in addition to Road/Dalidio Mitigation Measure T-1(b): Drive intersection • widen the eastbound approach (Madonna Road) to provide one left - turn lane, two through lanes, and one right -turn lane with overlap phasing (this would require prohibition of northbound U-tums from Dalidio Drive) T-3(b) To mitigate the projected impact to the Madonna Road/US 101 The applicant shall provide Prior to final map recordation, Once. SLOPWD, Caltrans Southbound Ramps intersection the funding for the compliance shall project should contribute it's fair share required be monitored by as calculated by the City to: improvements to SLOPWD, in the Madonna consultation with 1. Install an additional third Road/US 101 Caltrans. northbound left -turn lane on the off- Southbound ramp which will result in LOS D Ramps Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC— Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG— California Department of Fish and Game APCD— Air Pollution Control District City of San Luis vbispo 57 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments operation (with 43 seconds of intersection. delay). This improvement would require coordination with Caltrans and would require widening of the intersection. Design issues, such as horizontal curve alignment and encroachment into the drainage culvert, would need to be addressed with the widening: or, 2. Install an exclusive eastbound right- tum lane pocket which would reduce the delay to 51.3 seconds (LOS D). However, this alternative improvement would also encroach into the drainage culvert and impact the adjacent bicycle lane and sidewalk. T-4(a) Coordinate with Caltrans to The applicant Prior to Once. SLOPWD, include the pedestrian crossing shall coordinate occupancy Caltrans movement with the northbound off -ramp with Caltrans to clearance, phase in addition to the protected north- provide the compliance shall south pedestrian phase during the required be monitored by eastbound left -turn movement at the US pedestrian SLOPWD, in 101/Madonna Road Northbound Ramps crossing consultation with in order to improve operations for improvements. Caltrans. vehicles. This would require pedestrians to cross during the northbound off -ramp phase when pedestrian movement would not be protected (i.e., right -turning vehicles from the off -ramp would have to yield to pedestrians). However, this modification Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD— Air Pollution Control District Wry or )an L-uts vw5pu 58 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments may include more pedestrian crossing time than is currently given to pedestrians. This phasing modification would result in LOS D operations (37 seconds of delay). T-5(a) To mitigate impacts at the LOVR The applicant Prior to final map Once. SLOPWD, southbound on -ramp to US 101, the shall provide recordation, Caltrans project applicant will pay Transportation funding for the compliance shall Impact Fees (TIF), some of which will be required be monitored by applied to reconstruction of the LOVR improvements to SLOPWD, in interchange. The city will incorporate, the LOUR consultation with via the City's TIF program, for the southbound on- Caltrans. lengthening of the merging area for a ramp to US 101. total distance of 700 feet [measured from the gore point (i.e., the point where the right edge of the freeway shoulder and left edge of the merge lane meet) to the end of the merge area] in the ongoing design of the interchange. T-6(a) To mitigate significant impacts to The applicant Prior to Once. SLOPWD the Madonna Road/Dalidio Drive shall construct the occupancy intersection resulting in LOS D operation required clearance. (delay 32 seconds/vehicle), the project improvements to shall construct the following the Madonna improvement in addition to Mitigation Road/Dalidio Measures T-1(b) and T-3(a): Drive intersection • Add a second westbound left -turn lane on Madonna Road. T-7(a) To mitigate significant impacts The applicant Prior to final map Once. SLOPWD, to the ramp junctions on southbound shall provide recordation, Caltrans Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB—Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis UDISPo 59 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments U.S. 101, the project shall contribute its funding for the compliance shall fair share, as determined by the City, to required be monitored by the construction of a southbound improvements. SLOPWD, in auxiliary lane between Prado Road and consultation with LOUR. Caltrans: T-7(b) To mitigate significant impacts to The applicant Prior to final map Once. SLOPWD, the northbound off -ramp from US 101 to shall provide recordation, Caltrans LOUR, the project will pay fair share funding for the compliance shall traffic mitigation fees to the City, some required be monitored by of which will be applied to the improvements to SLOPWD, in reconstruction of the LOVR interchange, the LOVR consultation with including the lengthening of the interchange. Caltrans. deceleration area to City and Caltrans standards in the on -going design of the interchange. T-9(a) To mitigate significant impacts to The applicant Prior to Once. SLOPWD pedestrian and bicycle safety and shall construct the occupancy facilities, the project should implement required clearance. the following measures: improvements bicycle and • Construct sidewalks along the pedestrian project's frontage on Madonna Road facilities. to close existing gaps, • Provide public pedestrian access to the proposed open space areas and trail easement along the Laguna Lake Park Extension southwest of the project site. T-10(a) To mitigate potential transit The applicant Prior to Once. SLOPWD, SLO impacts, the project shall construct shall construct the occupancy Transit appropriate transit stops, including required clearance. Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG— California Department of Fish and Game APCD— Air Pollution Control District t;ny Or Jan L.UIS LJOISPO 60 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Approval Action Required When Monitoring to Monitoring Frequency Responsible Agency or Compliance Verification Occur Party Initial Date Comments turnouts in and around the project site. improvements to Potential locations for transit stops transit facilities. include the intersection of Madonna/Dalidio, Prado Road at the main project driveway and an internal project transit stop. Locations for the shelters/turnouts shall be developed in consultation with SLO Transit and City of San Luis Obispo staff. Potential locations include northbound Madonna Road adjacent to the multi -family residential parcel, both sides of Dalidio Drive near the planned signalized intersections serving the site, the intersection of Madonna/Dalidio and an internal project transit stop. T-12(a) The proposed project shall fund The applicant Prior to final map Once. SLOPWD a monitoring study of the segment of shall provide recordation, Oceanaire Drive between Madonna funding for the compliance shall Road and LOVR to assess the effect of required be monitored by traffic from the retail portion of the monitoring study SLOPWD. proposed project. The study shall and associated monitor both traffic volumes and travel traffic calming speeds using traffic counts and/or measures. origin -destination surveys to determine if traffic is diverting to Oceanaire Drive from the adjacent arterial streets. Surveys should be conducted just prior to the issuance of occupancy permits and after one year of full project occupancy. If the surveys show evidence of an increase in volume (with the threshold to be determined by the Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District city or $all Luis uDispo 61 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments City), the project should pay for appropriate mitigation measures. To mitigate potentially significant impacts of excessive speed, traffic calming measures such as curb extensions, traffic circles, speed humps, raised crosswalks or intersections, or street narrowing could be installed. Horizontal displacement measures should be favored over vertical displacement measures to minimize impacts to emergency vehicles, and all measures would have to be acceptable to the City's Public Works Department. More drastic measures such as diverters and street closures could be implemented if the volume of cut -through traffic becomes excessive. Implementation of traffic calming measures should only occur after a comprehensive neighborhood participation process. The City's NTM Guidelines details the process for citizen participation and development of neighborhood traffic improvements. T-13(a) Install traffic signals at The applicant Prior to Once. SLOPWD intersections A and C which provide full shall construct the occupancy access including signal interconnect and required traffic clearance. communications from Madonna Road to signals and Higuera Street, and install raised associated medians at the intersections B and D to improvements. restrict turning movements at those locations to right turns in and out. No Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— . Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG— California Department of Fish and Game APCD— Air Pollution Control District city or Salt LUIS UD/SPO 62 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments left-tum in access should be permitted at intersections B and D. Provide an additional exit lane and a second westbound left -turn lane on Dalidio Drive at intersection C. Required lane configurations at each intersection are illustrated on Figure 4-10-22. All traffic signals on Dalidio Drive should be interconnected between Madonna Road and the U.S. 101 northbound ramps. T-13(b) Coordinate with the SLO The applicant Prior to Once. SLOPWD Promenade to realign the north shall coordinate occupancy approach of intersection A to provide with the SLO clearance, signalized ingress and egress and to Promenade to compliance shall provide a more direct travel path across realign the north be monitored by Dalidio Drive. Obtain reciprocal access approach of SLOPWD. agreements for use of parking drive intersection A and aisles. obtain reciprocal access agreements. T-13(c) Coordinate with the Post Office The applicant Prior to Once. SLOPWD to reverse vehicle flow through its lot shall coordinate occupancy (i.e., require vehicles to enter at the east with the post office clearance, end of the property and exit at the west to revise post compliance shall end). In addition, delivery vehicles must office access. be monitored by be required to use the same driveways SLOPWD. as customers, or provide a new connection through the project office property or construct a new driveway over the adjacent drainage channel to intersect with the collector street at least 250 feet south of Dalidio Drive. Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOP" - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG— California Department of Fish and Game APCD— Air Pollution Control District City of San Luis Obispo 63 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Approval Action Required When Monitoring to Occur Monitoring Frequency Responsible Agency or Party Compliance Verification Initial Date Comments In addition to the measures listed above, The applicant Prior to Once. SLOPWD the project will modify its proposed site shall preserve the occupancy plan and construct one of the following required right -of- clearance. improvements in order to mitigate way or implement impacts to Dalidio Drive under buildout Mitigation conditions: Measure T-13(e). T-13(d) To mitigate long-term (Buildout Plus Project) impacts, the applicant shall preserve right-of-way to construct Dalidio Drive from the U.S. 101 southbound ramp intersection to Madonna Road as a five- to six --lane Parkway Arterial including appropriate building setbacks pursuant to City code. The third westbound travel lane should begin at the southbound ramps 'intersection and terminate into the westbound right -turn lane at the Dalidio Drive/Collector Street intersection. The third eastbound through lane should begin immediately east of the signalized main driveway (intersection C) and extend to the southbound ramps intersection. The cross-section should contain 12-foot wide travel lanes, 10- foot minimum width left turn bays, and a 6-foot wide Class II bike lane in each direction separated by a raised median. On both sides of the street, a 6-foot Wide sidewalk separated from the traveled way by an 8-foot wide landscaped parkway should also be provided. Initial roadway improvements Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans— California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District Wry yr -)an Ltn5 vui5pv 64 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments should be constructed with sidewalks curb and gutter in their ultimate location, with a wider than necessary landscaped median where future widening for the additional lanes will take place; or, T-13(e) To mitigate long-term (Buildout The applicant Prior to Once. SLOPWD Plus Project) impacts, the applicant shall shall redesign the occupancy redesign the project site so that the new site or implement clearance. collector street will access Dalidio Drive Mitigation at the main signalized project driveway Measure T-13(d). (C) and construct Dalidio Drive as a five - to six --lane Parkway Arterial including appropriate building setbacks pursuant to City code from the U.S. 101 southbound ramp intersection to Driveway C. Construct a raised median island at the existing Promenade Center private road/driveway so as to preclude left turns out (to eastbound Dalidio) but still maintain left turns onto the private road from Dalidio Drive. This realignment is illustrated on Figure 4.10- 23. T-14(a) Construct the proposed The applicant Prior to Once. SLOPWD collector street from Dalidio Drive to the shall construct the occupancy south edge of the property as a two-lane required collector clearance. roadway with sidewalks. Preserve right- street and provide of -way and setbacks on -site to funding for accommodate a three -lane roadway associated. with a center two-way left -turn lane, sidewalks and bicycle lanes in both directions from the south edge of the Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo 65 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments property to LOVR. The project will be responsible for bonding or providing another appropriate security for roadway improvements not constructed as part of initial project development. T-15(a) The office portion of the site Design the office Prior to Once. SLOPWD should be designed to provide at least portion of the occupancy two vehicular access driveway on the project to provide clearance. proposed collector street and/or at least two Madonna Road. Additional driveways vehicular access could be gated with keys provided to fire driveways on the department staff for emergency use proposed only. collector street and/or Madonna Road. LAND USE LU-1(a) Pedestrian Access to Identify Prior to Once. SLOPWD Commercial Center. All commercial pedestrian occupancy buildings that abut a public street should circulation and clearance. have an entrance onto the street or improvements on provide a continuous sidewalk from the project access street to the main entrance of the plans. Upon building. The project shall provide SLOPWD review explicit and clear pedestrian of pedestrian connections from its commercial retail plans, implement component to the commercial retail required development immediately north across pedestrian the Prado Road extension, with safe improvements. and visually prominent street crossings in accordance with the City's Policy on Pedestrian Crosswalks, adopted January 2000. Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC— Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District c►ry or san LUIS VDISpo 66 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments LU-2(a) Avigation easements, which The avigation SLOCDD staff Once. SLOCDD provide important disclosure information easement and shall review the to prospective buyers and lessees, shall disclosure shall disclosure be required. Easements shall be in the be provided by statement at the form approved by the County of San the property time of project Luis Obispo, (per Part_150, Airport transferor to completion. Compatibility Planning, of the Federal prospective Aviation Regulations) which stipulates property owners that commercial and office property on or lessees upon the site would be exposed to aircraft the transfer of noise, and provides legal protection to real property or the airport, City and County against rental agreements noise lawsuits. These easements shall on the project also grant the airport the right to site. maintain the safety of airspace, including the right to clear any obstructions into that airspace. LU-2(b) In accordance with state law, The disclosure SLOCDD staff Once. SLOCDD the seller or lessor of property within the shall be provided shall review the project site shall disclose to potential by the property disclosure buyers or lessees that aircraft overflights transferor to statement at the occur, and that such flights may result in prospective time of project periodic increases in noise levels within property owners completion. the area. or lessees upon the transfer of real property or rental agreements on the project site. LU-2(c) Buildings within the project Building design SLOCDD staff Once. SLOCDD area shall incorporate non -reflective materials shall be shall review roofing material and roof -mounted submitted for buildinq materials Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC— Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District City of San Luis Obispo 67 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments equipment in order to minimize glare SLOCDD review. prior to issuance impacts to passing aircraft. of building permits. LU-3(a) All real property transactions The applicant SLOCDD staff Once. SLOCDD shall comply with the property shall provide to shall review acquisition and relocation standards of SLOCDD compensation the State of California, the Caltrans evidence of prior to Relocation Assistance Program, and the compensation of displacement. federal Uniform Relocation Assistance affected and Real Property Acquisition Policies businesses. Act of 1970, as amended. Property owners shall be compensated in accordance with fair market values based on appraisals. Business owners shall be compensated based on an assessment of the value of the business and any loss of goodwill. All efforts shall be made to identify relocation opportunities for affected businesses that would reduce the loss of goodwill and historic patronage. Wherever feasible, assistance shall be made available in identifying suitable relocation sites within the service area of existing businesses. LU-4(a) Provisions for future access to The applicant Prior to issuance Review plans SLOPWD undeveloped parcels located at the shall design the of grading permits once. Site northeastern quadrant of the interchange and for the inspect. as interchange (APN 053-04-034) shall be associated. interchange. necessary incorporated into the design of the improvements to during interchange and associated maintain future construction. improvements. I access. Key: SLOCDD- San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District city of Sall LUIS VDISPO 68 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments LU-4(b) Prior to the initiation of The applicant Prior to issuance Review SLOPWD construction of the proposed shall provide a of grading permits program interchange and associated public for the once. Site improvements, the applicant shall outreach/commun interchange. inspect as coordinate with the City to establish a ity liaison necessary public outreach/community liaison program to during program to provide a point of contact provide a. point of construction. with businesses that will be affected by contact with construction. The program shall businesses that maintain a hotline to take messages and will be affected by to provide updates in construction construction. scheduling and road closures, detours, and alternative access points. LU-4(c) As feasible and appropriate, The project Prior to issuance Review SLOPWD temporary signage shall be installed by applicant shall of grading signage the project applicant in consultation with install .temporary permits. once. Site the City Public Works Department signage. inspect as notifying the public of road closures or necessary detours and the expected duration of the during closure. construction. LU-4(d) The applicant shall minimize The applicant During As necessary SLOPWD temporary disruptions of access to shall coordinate construction. during businesses in the area of the proposed construction to construction. interchange and associated provide alternate improvements by coordinating access points and construction to provide alternate access ensure that all points and by ensuring that all businesses have businesses have at least one open at least one open driveway during construction. driveway during construction. Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC— Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD— Air Pollution Control District City of San Luis Obispo 69 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Approval Action Required When Monitoring to Occur Monitoring Frequency Responsible Agency or Party Compliance Verification Initial Date Comments LU-4(e) Provisions for emergency The applicant Review plan prior Review plan SLOPWD, access to the area located south of San shall prepare a to issuance of once. Site SLOFD Luis Obispo Creek along Elks Lane shall Construction grading permits. inspect as be made'by the project applicant Period Emergency Site inspect as necessary throughout the construction period and Access Plan and necessary during during following completion of construction. provide construction. construction. Plans for interim access shall be emergency provided by the applicant to the City of access to the San Luis Obispo Fire, Police, and Public area located Works Departments. Prior to the south of San Luis initiation of construction, the applicant Obispo Creek shall coordinate with the California along Elks Lane Highway Patrol, San Luis Obispo City Police Department, San Luis Obispo City Fire Department, San Luis Obispo City Public Works Department, County Sheriffs Department, County Fire Districts, and local public and private ambulance and paramedic providers in the area to prepare a Construction Period Emergency Access Plan. The Emergency Access Plan shall identify phases of the project and construction scheduling, and shall identify appropriate alternative emergency access routes. During construction, the applicant shall review and update the Emergency Access Plan as necessary based on the work scheduling. The public outreach program shall be responsible for notifying emergency services of any changes in emergency access and providing details regarding alternative access routes. In addition, Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB— Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District ciry Or -)an z-uts vuspu 70 Dalidio/San Luis Marketplace Annexation and Development Project EIR Mitigation Monitoring and Reporting Program Mitigation Measure/Condition of Action When Monitoring Responsible Compliance Verification Approval Required Monitoring to Frequency Agency or Occur Party Initial Date Comments the Emergency Access Plan shall specify alternative access routes in the event of flooding to this area during and following construction. Key: SLOCDD - San Luis Obispo Community Development Department SLOFD - San Luis Obispo Fire Department Caltrans — California Department of Transportation SLOPWD - San Luis Obispo Public Works Department RWQCB — Regional Water Quality Control Board DTSC — Department of Toxic Substances Control SLOAPCD - San Luis Obispo County Air Pollution Control District CDFG — California Department of Fish and Game APCD — Air Pollution Control District city of San LUIS UDISp0 71 ( `rpR - 0��gdzs �Lt��� �, `�l gpon, t61� MID �-? U ,�, ac frr,:l •� r ; c� CG�� s 3' a 3 4-0 y' SLO ��to c�, Cj t}Yl(T2 �:,O(, �� �:,v r'`���`��� rt�y> � C d.� r•_�r� -�S S-d G . 3�y- �t �C��c C.� � ,SLD ROAD RIGI rl�4' 0 500 1000 1 INCH = 500 FEET EXHIBIT B: PREZONING LEGEND ® C-R-PD, RETAIL - COMMERCIAL WITH THE PLANNED DEVELOPMENT OVERLAY ® OS, OFFICE WITH SPECIAL CONSIDERATION OVERLAY Ka C/OS-40, CONSERVATION/OPEN SPACE, WITH A 40 -ACRE MINIMUM PARCEL SIZE AG, AGRICULTURAL ® RJS, MEDIUM - HIGH DENSITY RESIDENTIAL WITH THE SPECIAL CONSIDERATION OVERLAY ® ROAD RIGHT OF WAY SOURCE: CANNON ASSOCIATES, JUNE 28, 2004