Loading...
HomeMy WebLinkAbout1485ORDINANCE NO. 1485 (2005 Series) AN ORDINANCE OF THE COUNCIL OF THE CITY OF SAN LUIS OBISPO REZONING THE TUMBLING WATERS PROJECT SITE FROM M -PD TO R- 4-PD AND APPROVING THE DEVELOPMENT PLAN FOR THE PROJECT; PD 151 -03 (861 AND 953 ORCUTT ROAD) WHEREAS, the Council of the City of San Luis Obispo conducted a public hearing in the Council Chamber of City Hall, 990 Palm Street, San Luis Obispo, California, on November 15, 2005, for the purpose of considering Planning Application PD 151 -03, a development plan providing for 178 new homes; and WHEREAS, said public hearing was for the purpose of formulating and forwarding recommendations to the City Council of the City of San Luis Obispo regarding the proposed development plan, including modified property development standards; and WHEREAS, notices of said public hearings were made at the time and in the manner required by law; and WHEREAS, the Planning Commission of the City of San Luis Obispo conducted public hearings in the Council Chamber of City Hall, 990 Palm Street, San Luis Obispo, California, on December 3, 2003, July 28, 2004, May 25, 2005 and October 12, 2005 for the varied purposes of directing the scope of the environmental review for the project, reviewing revised plans and making recommendations to staff and the applicant, and considering a final recommendation to the City Council on the project; and WHEREAS, the City Council has reviewed and considered the Final EIR and has determined that the environmental document represents the independent analysis of the City and adequately addresses the potentially significant environmental impacts of the proposed project; and WHEREAS, the City Council has duly considered all evidence, including the testimony of the applicant, interested parties, and the evaluation and recommendations of the Planning Commission and staff, presented at said hearing. NOW, THEREFORE, BE IT ORDAINED by the Council of the City of San Luis Obispo as follows: Section 1. Environmental Review. The City Council hereby adopts all mitigation measures approved as part of the Final EIR (ER 114 -02) as conditions of approval of the project. Section 2. Planned Development Project Findings. The following findings are required by the Zoning Regulations (SLOMC 17.62.045) and are hereby made in support of the proposed Planned Development rezoning. X Ordinance No. 1485 (2005 Series) Page 2 1. The project is consistent with the General Plan, and the proposed land uses are allowed within the applicable primary zoning districts because the project design has been evaluated for consistency with Chapter 2.0 of the Land Use Element and further specific Housing Element Goals, including goals for mixed - income housing (HE Goal 4.1), housing variety and tenure (HE Goal 5. 1), and housing production (HE Goal 6.1). 2. The project complies with all applicable provisions of the Zoning Regulations other than those modified by the PD rezoning. 3. The approved modifications to the development standards are necessary and appropriate to accommodate the superior design of the proposed project, its compatibility with adjacent land uses, and its successful mitigation of environmental impacts. 4. The project complies with all applicable City Design Guidelines, because the project has been evaluated for consistency and the Final EIR identifies specific design guidelines for consideration by the Architectural Review Commission. 5. All affected public facilities, services and utilities are adequate to serve the proposed project because the plans have been evaluated by staff from the City's Public Works and Utilities Departments and it has been determined that the City can conditionally serve the project with all required utilities and services. 6. The location, size, site planning, building design features, and operating characteristics of the project are highly suited to the characteristics of the site and surrounding neighborhood, and will be compatible with the character of the site, and the land uses and development intended for the surrounding neighborhood by the General Plan because the General Plan identifies the project site as a location to consider for High Density residential development and the project has been evaluated for its impacts on the environment and the ability of the project to be developed in a manner that is consistent with the General Plan; 7. The site is adequate for the project in terms of size, configuration topography, and other applicable features, and has appropriate access to public streets with adequate capacity to accommodate the quantity and type of traffic expected to be generated by the use; and 8. The establishment, maintenance, or operation of the proposed project will not, in the circumstances of the particular case, be detrimental to the health, safety, or general welfare of persons residing or working in the vicinity of the proposed use, or detrimental or injurious to property and improvements in the neighborhood or to the general welfare of the City because the project will provide housing opportunities and commercial services appropriate for the location and will be developed in a manner that is consistent with all City building codes and other safety related requirements. Section 3. Creek Setback Findings. The City Council hereby makes the following findings in support of reduced creek setback requirements. 1. . The location and design of the feature receiving the exception will minimize impacts to Ordinance No. 1485 (2005 Series) Page 3 scenic resource, water quality, and riparian habitat, including opportunities for wildlife habitation, rest and movement because the project provides a continuous wildlife corridor through the site and maintains a large percentage of the project site in creek setback areas. The overall area where encroachments are permitted is small and in each case is minimized to insure the protection of the riparian habitat area. 2. The exception does not limit the City's design options for providing flood control measures that are needed to achieve adopted City flood policies because the project has been designed in a manner that is consistent with the City's Waterways Management Plan and Flood Damage Prevention Guidelines. 3. The exception will not prevent the implementation of City- adopted plans, nor increase the adverse environmental effects of implementing such plans because the proposed exceptions are evaluated in the Final EIR and all environmental impacts associated with development adjacent to riparian areas are mitigated to less than significant levels. 4. There are circumstances applying to the site, such as size, shape or topography, which do not apply generally to land in the vicinity with the same zoning, that would deprive the property of privileges enjoyed by other property in the vicinity with the same zoning because a large percentage of the project site (approximately 20% of the net site area) is dedicated to creek setbacks, which normally cannot be developed. The proposed exception allows for minor creek setback exceptions where alternatives have a significant impact on project design. 5. The exception will not constitute a grant of special privilege — an entitlement inconsistent with the limitations upon other properties in the vicinity with the same zoning - because the proposed creek setback exceptions will occur as part of PD rezoning, which requires a project to provide substantial public amenities and the restoration of a major natural feature on the project site. 6. The exception will not be detrimental to the public welfare or injurious to other property in the area of the project or downstream because the exceptions are minor and will not affect the ability of the project to comply with the City's Waterways Management Plan, Drainage Design Manual or the Flood Damage Prevention Guidelines. 7. Site development cannot be accomplished with a redesign of the project because Sacramento Drive is an important part of the City's street network and the connection to Orcutt Road is necessary to insure that surrounding intersections and road segments operate safely and consistent with City standards for Level of Service. The size of the roadway has been diminished in order to reduce potential impacts to riparian and wetland resources and habitat areas. 8. Redesign of the project would deny the property owner reasonable use of the property because if Sacramento Drive does not provide a connection to Orcutt Road, the project Ordinance No. 1485 (2005 Series) Page 4 could not be developed in a manner consistent with City expectations for High Density Residential development and significant off -site improvements would be required to address traffic impacts along Sacramento Drive and at the CapitolioBroad and Industrial /Broad intersections. Section 4. Action. The City Council hereby rezones the project site from M -PD to R -4- PD, as shown in Exhibit A. Property Development standards for the site shall be as provided in the City's Zoning Regulations, except for the approved deviations as shown in Exhibit B. Planned Development zoning is approved subject to the following requirements. PD Mandatory Project Features 1. The applicants shall submit a Revegetation and Restoration Plan for the riparian corridors on -site as part of a complete application for Architectural Review. The Plan shall be consistent with the requirements of BIO /mm -8, the Community Design Guidelines and the Open Space Element of the General Plan. Implementation of the plan shall be required prior to occupancy of more than 10% of the residential units on the project site. 2. Plans submitted for construction permits shall detail the project's energy saving features and provide a quantitative analysis of how the proposed measures exceed the 2004 California Code of Regulations Title 24 energy efficiency requirements by a minimum of 30 %. 3. Prior to issuance of construction permits for the project, the applicant shall provide the City with an agreement between the applicant and adjacent property owner for construction of the proposed bridge over the creek, between project sites. The design of the bridge shall be submitted to the City as part of a complete application for Architectural Review and shall be constructed prior to occupancy of any commercial floor area developed along Orcutt Road, to the approval of the Community Development Director. 4. A complete application for Architectural Review shall include a detailed description of all private and common outdoor areas on the project site, and how these areas comply with the noise attenuation requirements provided in the Final EIR. 5. A complete application for Architectural Review shall include a detailed description, including product samples and maintenance requirements, for the proposed on -site decorative paving. The enhanced paving at the village hall and driveway intersection with Sacramento Drive shall meet the access requirements for emergency vehicles and garbage collection, including the ability to support the imposed loads of a 60,000 pound fire apparatus. Any enhanced paving proposed in the public right -of -way shall be designed to the approval of the City Engineer and shall include agreements to insure on- going maintenance of the paving by the Homeowner's Association, even in the event that City crews unearth the roadway in order to service utilities. Ordinance No. 1485 (2005 Series) Page 5 6. The site plan submitted to the Architectural Review Commission shall be designed in a manner consistent with the requirements of SLO Garbage Company. Residents of the project shall be required to have individual, on -site garbage collection. Refuse and recycling containers (waste wheelers) may not be collected on Sacramento Drive. 7. Modifications to the City's Property Development Standards approved as part of this Planned Development are limited to those listed in Exhibit B of the resolution (Attachment 3). 8. Avigation easements, consistent with City and County procedures, shall be recorded for the entire project site, prior to recordation of the Final Map for the project, to the approval of the Community Development Director. 9. All owners, potential purchasers, occupants (whether as owners or renters), and potential occupants (whether as owners or renters), will receive full and accurate disclosure concerning the noise, safety, and overflight impacts associated with airport operations prior to entering any contractual obligation to purchase, lease, rent or otherwise occupy any property or properties on the project site. Real estate disclosure forms and notifications in the project's CC &R's shall be used to satisfy this requirement, to the approval of the Community Development Director. 10. No more than 50% of the units in any one building may be designated for guaranteed affordability. 11. A minimum of four Motorcycle parking spaces shall be provided for guests of the project, with the location to be approved by the Architectural Review Commission during their review of the project design. 12. A minimum setback of 20 feet from the back of sidewalk is required for all garage doors that face the public right -of -way. All garage and uncovered parking on the project site must be designed so that maneuvering into and out of spaces occurs on -site, and not in the street right -of -way. 13. An open space easement shall be recorded covering the creek corridors and setback areas to provide for the long -term maintenance and preservation of the creeks, to the approval of the City's Natural Resources Manager. Conditions, Covenants and Restrictions 1. The project CC &R's shall stipulate that garages within the project shall be used exclusively for parking vehicles and may not be used for general storage, recreation or other uses that would prevent the parking of vehicles as required by the Zoning Regulations. Ordinance No. 1485 (2005 Series) Page 6 2. CC &R's shall address use of facilities by non - resident guests, alcoholic beverage consumption in common areas, and shall provide sufficient penalties to address violations, to the approval of the Community Development Director. 3. The CC &R's for the project shall stipulate that maintenance and replacement of all decorative paving installed as part of the project will be the responsibility of the HOA. This includes replacement of on -site and off -site paving damaged by City crews as part of utilities maintenance. The installation of decorative paving in the City's street right -of- way shall require prior approval of agreements to insure on -going maintenance of the paving by the Homeowner's Association, even in the event that City crews unearth the roadway in order to service utilities. INTRODUCED on the 15th day of November, 2005, AND FINALLY ADOPTED by the Council of the City of San Luis Obispo on the 6th day of December 2005, on the following roll call vote: AYES: NOES: ABSENT: 1:1111 36 Council Members Brown and Ewan and Mayor Romero Council Member Mulholland Vice Mayor Settle Mayor David F. Romero Audrey Hooper City Clerk APPROVED AS TO FORM: rll__� Jonathan Lowell City Attorney I hereby ce. tify that this document is a true and accurate copy of Ordinance No. r' l K5 and that the ordinance was published pursuant to Charter Sectio 02. pate City Clerk Tumbling Waters - Planned Development Rezoning - Exhibit A Existing: Proposed: Exhibit B — Tumbling Waters PD Overlay - Development Standards Setbacks Street Yard Buildings Garages Facing Street Sacramento 10 feet from PL 20 feet from back of sidewalk Side Yards: Internal Property line setbacks subject to building code requirements and design review Height Above Finished Grade 147 feet Creek Setbacks (permitted encroachments) Realigned Portion of Escorp Drainage — 10 feet Pedestrian Bridge to Creekston — Per approved Development Plan Parking Requirements Parking requirements for the project are per Zoning Regulations Standards and the approved Development Plan, except for motorcycle parking, which shall be provided as follows: A minimum of 4 motorcycle parking spaces shall be provided for guests, with the location to be approved by the Architectural Review Commission. Parking and Driveway Standards Tandem Parking is permitted in garages, per the approved Development Plan. The minimum depth of the garages must accommodate one standard space and one compact space. Additional exceptions to the Parking and Driveway Standards may be approved by the Community Development Director, per the Zoning Regulations (17.16.070). Drainage Design Manual Full compliance with the Drainage Design Manual is required, except that 1' of freeboard is permitted for the detention basins instead of a 2' freeboard, to insure that fencing is not required and to facilitate recreational uses of the basins when they are dry. Tumbling Waters PD Standards Exhibit B Open Space Requirements The numerical standards of the Property Improvement Standards for New Condominium Projects (SLOMC 17.82.140.A, B, C and D) shall be waived in favor of a qualitative review of the requirements to insure compliance with the intent of the standards, while accommodating the superior design of the proposed project and its successful mitigation of noise impacts. The Architectural Review Commission shall be responsible for evaluating the project for compliance with the following project imperative: 1) The project meets the open space requirements of the High- Density Residential zone by providing "common outdoor areas and very compact private outdoor spaces," except where outdoor use areas would expose residents to excessive noise levels and where the design of noise attenuation measures (such as stand -alone sound walls) would be inconsistent with the City's Community Design Guidelines. Decks that are 3 feet in depth or less shall be considered architectural features instead of usable open space areas and shall not be subject to noise attenuation requirements. �.� ° mot. c a 4