Loading...
HomeMy WebLinkAbout11-03-2015 Item 07 - CDBG Curb Ramps 2015, Specification No. 91308 Meeting Date: 11/3/2015 FROM: Daryl Grigsby, Director of Public Works Prepared By: Gerardo Carrillo, Engineer II SUBJECT: CDBG CURB RAMPS 2015, SPECIFICATION NO. 91308 RECOMMENDATION 1. Award a contract to Maino Construction Company, Inc. for the construction of the CDBG Curb Ramps 2015 project, for the lowest responsible base bid amount of $238,000, and additive alternate bid of $26,000, for a total contract amount of $264,000. 2. Approve the transfer of $130,000 from the Master Street Reconstruction and Resurfacing Account to this project’s construction phase. DISCUSSION Background This project is part of an ongoing program to construct sidewalk ramps throughout the City of San Luis Obispo. The program is funded through Community Development Block Grant (CDBG) and City General funds. The ramps provide access, and implement the requirements of the Americans with Disabilities Act (ADA) and state accessibility requirements. As such, they meet one of the basic criteria of CDBG funding – to remove barriers to disabled access. Bids and Award Recommendation On August 18, 2015, the City Council authorized advertisement of the CDBG Curb Ramps 2015 project with award by the City Manager if the bids were within the Engineer’s Estimate (Attachment A). The bid opening occurred on Thursday October 1, 2015 and Maino Construction Company was determined to be the lowest responsive bidder (Attachment B). Maino Construction’s base bid exceeds the Engineer’s Estimate, requiring Council award. All three bids were higher than the Engineer’s Estimate of $170,000, with Maino Construction’s base bid of $238,000, being the lowest. The difference in costs is attributed to the rapid increase in construction activity around the County. An increase was anticipated during preparation of the Engineer’s Estimate, but not of the magnitude seen in the bids. The project was bid with an additive alternate in addition to the base bid. An additive alternative provides some flexibility in awarding the contract in the event bids were over the estimate. An additive alternative allows the project scope to be reduced without rebidding the project. The project is being recommended for award, including the additive alternate, as cost of the additional work is minimal compared to the benefit. The project as a whole removes the 7 Packet Pg. 97 remaining ramp accessibility barriers along Los Osos Valley and Madonna Roads and brings these streets into accessibility compliance. In addition to the pedestrian ramp upgrades, both streets are in need of extensive roadway repairs. The needed roadway repairs will also trigger the construction of these same ramps, under accessibility laws. Therefore, constructing all of the ramps now enables the City to rapidly complete roadway repairs in the event a revenue source is secured. After sealed bids were publicly opened, Public Works staff evaluated the bid documents for cost and responsiveness. All bids were reviewed for mathematical errors and were then ranked from lowest to highest. A bid summary sheet has been created and provided as Attachment B to this report. The lowest bid package was then reviewed in more detail to assure responsiveness. In the case of federally funded projects, the established Disadvantaged Business Enterprise (DBE) goal must be met or documentation of a “good faith effort” must be provided by the contractor. A “good faith effort” documents the contractor’s effort to obtain project DBE participation. This effort includes such things as dividing the work up to make specialized areas of the work available to DBEs, and advertising and direct contact with known DBEs. The lowest bidder, Maino Construction, submitted a complete and responsive bid package. Almost half of their DBE goal is met by hiring a DBE subcontractor to handle the demolition, trucking and grading work for the project. In addition, they provided the necessary information that shows that a “good faith effort” was performed by the contractor. Even though the bid is higher than originally anticipated, their proposal preparation indicates that they are prepared to complete the work as required. It is important to complete this work in advance of future paving projects on Madonna and Los Osos Valley Roads. Staff recommends moving forward with this contractor to avoid delays, impacts and costs associated with re-bidding. FISCAL IMPACT This project is included in the 2013-15 Financial Plan, pages 3-295 to 3-297. The project was originally budgeted at $105,000. The budget was increased to $152,892, as shown in Attachment D, Resolution No. 10510 (2014 Series). Also, the remaining $8,921 from the CDBG Curb Ramps 2012 project is available to support this project. Lastly, additional funds to support this request are also available in the Street Reconstruction and Resurfacing Master Account, which has a current available balance of $1,436,817 for construction. The large dollar amount in the Street Reconstruction and Resurfacing Master Account reflects money that will be used for the 2016 Slurry Sealing project. Use of Street Reconstruction and Resurfacing Master Account funding is appropriate as curb ramp installation is an integral component of major street paving work. Staff anticipates there will be enough money to complete the 2016 Slurry Sealing Project if the $130,000 is allocated to the CDBG 2015 Curb Ramp Project. 7 Packet Pg. 98 CDBG CURB RAMPS 2015, SPECIFICATION NO. 91308 Funding by source Construction Costs 2015 Sidewalk Ramps (99868): $161,813 Construction: $264,000  CDBG Funds: $152,892 Contingencies: $25,813  2012 CDBG: $8,921 Materials Testing: $1,500 R&R Master Account (90346): $130,000 Printing: $500 Total Funding $291,813 Total for Construction* $291,813 *Any remaining funding will be returned to the Street Reconstruction and Resurfacing Master Account. ALTERNATIVES 1. Reject all bids and direct staff to re-advertise the project. The City Council may choose to reject all bids and direct staff to re-bid a smaller project. This alternative is not recommended because this will delay the project without guaranteeing future bid am ounts will be lower. The ramps will need to be constructed prior to completion of the next street resurfacing project. 2. Award without the Additive Alternate. The City Council may choose to award the project’s base bid without including the additive alternate. Staff does not recommend this option because the cost of the additional work is minimal compared to the benefit it provides to long–term pedestrian access. Attachments: a - Council Agenda Report authorizing advertising b - Bid summary c - Contract, Maino Construction d - Resolution No.10510 (2014 Series) 7 Packet Pg. 99 City of San Luis Obispo, Council Agenda Report, Meeting Date, Item Number FROM: Daryl Grigsby, Director of Public Works Prepared By: Gerardo Carrillo, Engineer II SUBJECT: CDBG CURB RAMPS 2015, SPECIFICATION NO. 91308 RECOMMENDATION 1. Approve Plans and Specifications for the Community Development Block Grant (CDBG) Curb Ramps 2015 project, Specification No. 91308. 2. Authorize staff to advertise for bids and authorize the City Manager to award the contract if the lowest responsible bid is within the Engineer’s Estimate of $170,000. DISCUSSION Background This project is part of an ongoing program to construct sidewalk ramps throughout the City of San Luis Obispo. The program is partially funded through Community Development Block Grant (CDBG) and City General funds. The ramps provide access, and implement the requirements of the Americans with Disabilities Act (ADA) and state accessibility requirements. As such, they meet one of the basic criteria of CDBG funding – to provide access to the disabled. In anticipation of future paving work to arterial streets such as Los Osos Valley Road and Madonna Road, non-compliant curb ramps will be upgraded. The project has Eighteen (18) corners with existing ramps that do not meet current accessibility regulations. This project will consist of removing the existing ramps and installing new ramps to meet the accessibility requirements. Attachment 1 shows the locations where work will be completed. Recent data collection shows the City has 1,846 intersection locations s where pedestrians cross the street. More than 40% of these crossing locations already have a transition ramp provided. However, many of these ramps were built years ago and do not conform to the latest accessibility standards. The remaining 60% of crossing points continue to have a curb between the street and sidewalk. Because of the high cost to construct or retrofit ramps at all non-complaint corners, priority, as required by law, is given to streets scheduled for future paving and to individual requests made by citizens. 8/18/15 C5 7.a Packet Pg. 100 At t a c h m e n t : a - C o u n c i l A g e n d a R e p o r t a u t h o r i z i n g a d v e r t i s i n g ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) CDBG Curb Ramps 2015, Specification No. 91308 Page 2 ENVIRONMENTAL REVIEW Because this project uses Federal CDBG funds, National Environmental Protection Act clearance has been obtained. Staff is also in the process of obtaining a Categorical Exemption of Environmental Impact from the Community Development Department, in compliance with the California Environmental Quality Act. The project will not be bid until the CEQA process is complete. FISCAL IMPACT This project is included in the 2013-15 Financial Plan, pages 3-295 to 3-297. The project was originally budgeted at $105,000. The budget was increased to $152,892, as shown in Resolution No. 10510 (2014 Series). Also, the remaining $8,921 from the CDBG Curb Ramps 2012 project is available to support this project. Lastly, additional funds to support this request are also available in Street Reconstruction and Resurfacing Master Account, which has a current available balance of $934,300 for construction. A Budget Amendment Request will be completed at the time of contract award to transfer funding into this project’s account. CDBG CURB RAMPS 2015, SPECIFICATION NO. 91308 Proposed Funding by Source Construction Costs Estimate 2014 CDBG Grant: $152,892 Construction: $170,000 2012 CDBG Grant: $8,921 Contingencies: $25,500 R&R Master Account (90346): $35,687 Materials Testing: $1,500 Printing: $500 Total $197,500 Total for Construction $197,500 ATTACHMENTS Vicinity Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Plans and Special Provisions g:\projects\activeprojects\curb ramps\91308 cdbg curb ramps 2015\_documents\1- staff reports\91308 council agenda report.docx 7.a Packet Pg. 101 At t a c h m e n t : a - C o u n c i l A g e n d a R e p o r t a u t h o r i z i n g a d v e r t i s i n g ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) Item #Item DescriptionQuantity Unit of Measure Unit Price Item TotalUnit Price Item TotalUnit Price Item TotalUnit Price Item Total 1 CURB RAMP IMPROVEMENTS AT LOS OSOS  VALLEY RD AND DESCANSO ST NORTH  CORNER (SHEET 3)1LS $5,000.00 $5,000.00 $11,000.00 $11,000.00 $13,850.00 $13,850.00 $13,000.00 $13,000.00  2 CURB RAMP IMPROVEMENTS AT LOS OSOS  VALLEY RD AND DESCANSO ST EAST  CORNER (SHEET 4)1LS $8,000.00 $8,000.00 $13,000.00 $13,000.00 $16,640.00 $16,640.00 $18,000.00 $18,000.00  3 CURB RAMP IMPROVEMENTS AT LOS OSOS  VALLEY RD AND DESCANSO ST SOUTH  CORNER (SHEET 5)1LS $10,000.00 $10,000.00 $16,000.00 $16,000.00 $17,320.00 $17,320.00 $24,000.00 $24,000.00  4 CURB RAMP IMPROVEMENTS AT LOS OSOS  VALLEY RD AND DESCANSO ST WEST  CORNER (SHEET 6)1LS $8,500.00 $8,500.00 $15,000.00 $15,000.00 $20,780.00 $20,780.00 $23,000.00 $23,000.00  5 CURB RAMP IMPROVEMENTS AT LOS OSOS  VALLEY ROAD AND PREFUMO CANYON RD  WEST CORNER (SHEET 7)1LS $10,500.00 $10,500.00 $19,000.00 $19,000.00 $21,940.00 $21,940.00 $23,000.00 $23,000.00  6 CURB RAMP IMPROVEMENTS AT LOS OSOS  VALLEY ROAD AND PREFUMO CANYON RD  SOUTH CORNER (SHEET 8)1LS $12,000.00 $12,000.00 $19,000.00 $19,000.00 $20,040.00 $20,040.00 $25,000.00 $25,000.00  7 CURB RAMP IMPROVEMENTS AT  MADONNA RD AND DALIDIO DR WEST  CORNER (SHEET 9)1LS $8,500.00 $8,500.00 $14,000.00 $14,000.00 $15,620.00 $15,620.00 $22,500.00 $22,500.00  8 CURB RAMP IMPROVEMENTS AT  MADONNA RD AND DALIDIO DR NORTH  CORNER (SHEET 10)1LS $8,500.00 $8,500.00 $15,000.00 $15,000.00 $19,340.00 $19,340.00 $23,000.00 $23,000.00  9 CURB RAMP IMPROVEMENTS AT  MADONNA RD AND DALIDIO DR EAST  CORNER (SHEET 11)1LS $8,500.00 $8,500.00 $17,000.00 $17,000.00 $13,630.00 $13,630.00 $25,000.00 $25,000.00  10 CURB RAMP IMPROVEMENTS AT  MADONNA RD AND DALIDIO DRSOUTH  CORNER (SHEET 12)1LS $10,000.00 $10,000.00 $16,000.00 $16,000.00 $16,370.00 $16,370.00 $21,000.00 $21,000.00  11 CURB RAMP IMPROVEMENTS AT  MADONNA RD AND EL MERCADO SOUTH  CORNER (SHEET 13)1LS $6,500.00 $6,500.00 $14,000.00 $14,000.00 $16,460.00 $16,460.00 $20,000.00 $20,000.00  12 CURB RAMP IMPROVEMENTS AT  MADONNA RD AND EL MERCADO EAST  CORNER (SHEET 14)1LS $6,000.00 $6,000.00 $14,000.00 $14,000.00 $14,770.00 $14,770.00 $15,000.00 $15,000.00  13 CURB RAMP IMPROVEMENTS AT  MADONNA RD AND MADONNA PLAZA  SOUTH CORNER (SHEET 15)1LS $6,000.00 $6,000.00 $13,000.00 $13,000.00 $14,710.00 $14,710.00 $19,000.00 $19,000.00  14 CURB RAMP IMPROVEMENTS AT  MADONNA RD AND MADONNA PLAZA EAST  CORNER (SHEET 16)1LS $8,000.00 $8,000.00 $16,000.00 $16,000.00 $19,650.00 $19,650.00 $25,000.00 $25,000.00  15 TRAFFIC STRIPES AND PAVEMENT  MARKINGS1LS $3,000.00 $3,000.00 $4,000.00 $4,000.00 $20,500.00 $20,500.00 $5,300.00 $5,300.00  16REPLACE TRAFFIC LOOP DETECTORS10EA $2,000.00 $20,000.00 $2,000.00 $20,000.00 $5,200.00 $52,000.00 $2,290.00 $22,900.00  17RESET BENCHMARKS1EA $2,500.00 $2,500.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $1,800.00 $1,800.00  Bid $141,500.00 $238,000.00 $318,620.00 $326,500.00  Item #Item DescriptionQuantity Unit of Measure Unit Price Item TotalUnit Price Item TotalUnit Price Item TotalUnit Price Item Total 18 CURB RAMP IMPROVEMENTS AT LOS OSOS  VALLEY RD AND DIABLO DR NORTH CORNER  (SHEET 17)1LS $7,000.00 $7,000.00 $7,000.00 $7,000.00 $15,480.00 $15,480.00 $20,000.00 $20,000.00  19 CURB RAMP IMPROVEMENTS AT LOS OSOS  VALLEY RD AND DIABLO DR EAST CORNER  (SHEET 18)1LS $7,500.00 $7,500.00 $7,000.00 $7,000.00 $19,430.00 $19,430.00 $20,500.00 $20,500.00  20 CURB RAMP IMPROVEMENTS AT LOS OSOS  VALLEY RD AND DIABLO DR SOUTH CORNER  (SHEET 19)1LS $7,000.00 $7,000.00 $6,000.00 $6,000.00 $16,510.00 $16,510.00 $16,000.00 $16,000.00  21 CURB RAMP IMPROVEMENTS AT LOS OSOS  VALLEY RD AND DIABLO DR WEST CORNER  (SHEET 20)1LS $7,000.00 $7,000.00 $6,000.00 $6,000.00 $16,220.00 $16,220.00 $16,000.00 $16,000.00  Bid $28,500.00 $26,000.00 $67,640.00 $72,500.00  $170,000.00 $264,000.00 $386,260.00 $399,000.00  CDBG Curb Ramps 2015, Specification No. 91308 Bid Opening: 10/01/15 * marks an allowance Engineer's EstimateMaino Construction Co., R. Burke CorporationSouza Construction Base Bid Total Bid Amount Bid Alternate A 7.b Packet Pg. 102 At t a c h m e n t : b - B i d s u m m a r y ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 1 of 79 CITY OF SAN LUIS OBISPO CALIFORNIA AGREEMENT THIS AGREEMENT, made on this ______ day of ___________, 2015, by and between the City of San Luis Obispo, a municipal corporation and charter city, San Luis Obispo County, California (hereinafter called the Owner) and MAINO CONSTRUCTION COMPANY, INC., (hereinafter called the Contractor). WITNESSETH: That the Owner and the Contractor for the consideration stated herein agree as follows: ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be performed, shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required to complete all the work of construction of CDBG CURB RAMPS 2015, Specification No. 91308 in strict accordance with the plans and specifications therefor, including any and all Addenda, adopted by the Owner, in strict compliance with the Contract Documents hereinafter enumerated. It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed and completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives. ARTICLE II, CONTRACT PRICE: The Owner shall pay the Contractor as full consideration for the faithful performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contract prices as follows: Item No. Item Unit of Measure Estimated Quantity Item Price (in figures) Total (in figures) BASE BID 1 Curb Ramp Improvements At Los Osos Valley Rd And Descanso St North Corner (Sheet 3) LS 1 $11,000.00 $11,000.00 2 Curb Ramp Improvements At Los Osos Valley Rd And Descanso St East Corner (Sheet 4) LS 1 $13,000.00 $13,000.00 3 Curb Ramp Improvements At Los Osos Valley Rd And Descanso St South Corner (Sheet 5) LS 1 $16,000.00 $16,000.00 4 Curb Ramp Improvements At Los Osos Valley Rd And Descanso St West Corner (Sheet 6) LS 1 $15,000.00 $15,000.00 5 Curb Ramp Improvements At Los Osos Valley Road And Prefumo Canyon Rd West Corner (Sheet 7) LS 1 $19,000.00 $19,000.00 6 Curb Ramp Improvements At Los Osos Valley Road And Prefumo Canyon Rd South Corner (Sheet 8) LS 1 $19,000.00 $19,000.00 7.c Packet Pg. 103 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 2 of 79 7 Curb Ramp Improvements At Madonna Rd And Dalidio Dr West Corner (Sheet 9) LS 1 $14,000.00 $14,000.00 8 Curb Ramp Improvements At Madonna Rd And Dalidio Dr North Corner (Sheet 10) LS 1 $15,000.00 $15,000.00 9 Curb Ramp Improvements At Madonna Rd And Dalidio Dr East Corner (Sheet 11) LS 1 $17,000.00 $17,000.00 10 Curb Ramp Improvements At Madonna Rd And Dalidio Drsouth Corner (Sheet 12) LS 1 $16,000.00 $16,000.00 11 Curb Ramp Improvements At Madonna Rd And El Mercado South Corner (Sheet 13) LS 1 $14,000.00 $14,000.00 12 Curb Ramp Improvements At Madonna Rd And El Mercado East Corner (Sheet 14) LS 1 $14,000.00 $14,000.00 13 Curb Ramp Improvements At Madonna Rd And Madonna Plaza South Corner (Sheet 15) LS 1 $13,000.00 $13,000.00 14 Curb Ramp Improvements At Madonna Rd And Madonna Plaza East Corner (Sheet 16) LS 1 $16,000.00 $16,000.00 15 Traffic Stripes And Pavement Markings LS 1 $4,000.00 $4,000.00 16 Replace Traffic Loop Detectors EA 10 $2,000.00 $20,000.00 17 Reset Benchmarks EA 1 $2,000.00 $2,000.00 Base Bid Total: $238,000.00 BID ALTERNATE A 18 Curb Ramp Improvements At Los Osos Valley Rd And Diablo Dr North Corner (Sheet 17) LS 1 $7,000.00 $7,000.00 19 Curb Ramp Improvements At Los Osos Valley Rd And Diablo Dr East Corner (Sheet 18) LS 1 $7,000.00 $7,000.00 20 Curb Ramp Improvements At Los Osos Valley Rd And Diablo Dr South Corner (Sheet 19) LS 1 $6,000.00 $6,000.00 21 Curb Ramp Improvements At Los Osos Valley Rd And Diablo Dr West Corner (Sheet 20) LS 1 $6,000.00 $6,000.00 Bid Alternate A Total: $26,000.00 BID TOTAL $264,000.00 Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the documents made a part of this Contract. Should any dispute arise respecting the true value of any work omitted, or of any extra work which the Contractor may be required to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, said dispute shall be decided by the Owner and its decision shall be final, and conclusive. 7.c Packet Pg. 104 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 3 of 79 ARTICLE III, COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following documents, all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached: 1. Notice to Bidders and information for bidders. 2. Standard Specifications, Engineering Standards, Special Provisions and any Addenda. 2. Accepted Proposal. 4. Public Contract code Section 10285.1 Statement and 10162 Questionnaire. 5. Noncollusion Declaration. 6. Plans. 7. List of Subcontractors. 8. Agreement and Bonds. 9. Insurance Requirements and Forms. 10. Federal Prevailing Wage Determination (attached) 11. Certification Concerning Labor Standards And Prevailing Wage Requirements (attached) ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date first above written. ATTEST: CITY OF SAN LUIS OBISPO __________________________ By: _________________________ City Clerk Jan Howell Marx, Mayor APPROVED AS TO FORM: CONTRACTOR: Maino Construction Company, Inc. By: __________________________ J. Christine Dietrick Thomas M. Maino City Attorney Its: President (Rev. 4-15-10) 7.c Packet Pg. 105 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 4 of 79 CONTRACTOR'S CERTIFICATION CONCERNING LABOR STANDARDS AND PREVAILING WAGE REQUIREMENTS Applies to all Contracts To: City of San Luis Obispo Public Works Dept. Date: 919 Palm Street, San Luis Obispo, CA Project Number: 91308 Project Name: CDBG CURB RAMPS 2015 C/O: City Engineer 1. The undersigned, having executed a contract with the City of San Luis Obispo for the construction of the above-identified project, acknowledges that: (a) The Labor Standards Provisions are included in the aforesaid contract. (b) Correction of any infractions of the aforesaid conditions, including infractions by any of his subcontractors and any lower tier subcontractors, is his responsibility: 2. He certifies that: (a) Neither he nor any firm, partnership or association in which he has substantial interest is designated as an ineligible contractor by the Comptroller General of the United States pursuant to Section 5.6(b) of the Regulations of the Secretary of Labor, Part 5 (29 CFR, Part 5) or pursuant to Section 3(a) of the Davis-Bacon Act, as amended (40 U.S.C. 276a-2(a)). (b) No part of the aforementioned contract has been or will be subcontracted to any subcontractor if such subcontractor or any firm, corporation, partnership or association in which such subcontractor has a substantial interest is designated as an eligible contractor pursuant to any of the aforementioned regulatory or statutory provisions. 3. He agrees to obtain and forward to the aforementioned recipient within ten days after the execution of any subcontract, including those executed by his subcontractors and an lower tier subcontractors, a Subcontractor's Certification Concerning Labor Standards and Prevailing Wage Requirements executed by the subcontractors. 4. He certifies that: (a) The legal name and the business address of the undersigned are: _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ (b) The undersigned is:  A Single proprietorship  A Corporation organized in the State of  A Partnership  Other Organization (Describe)_________________________________ Signature: Name and Title: 7.c Packet Pg. 106 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 5 of 79 Federal Wage Determination General Decision Number: CA150019 09/04/2015 CA19 Superseded General Decision Number: CA20140019 State: California Construction Types: Building, Heavy (Heavy and Dredging) and Highway County: San Luis Obispo County in California. BUILDING, DREDGING (does not include hopper dredge work), HEAVY (does not include water well drilling, AND HIGHWAY CONSTRUCTION PROJECTS Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/02/2015 1 01/16/2015 2 02/06/2015 3 02/20/2015 4 03/27/2015 5 05/08/2015 6 06/19/2015 7 07/10/2015 8 07/17/2015 9 07/24/2015 10 07/31/2015 11 08/07/2015 12 08/14/2015 13 09/04/2015 ASBE0005-002 06/30/2014 Rates Fringes Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems).....$ 35.44 19.36 Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain 7.c Packet Pg. 107 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 6 of 79 walls)...........................$ 24.34 16.09 ---------------------------------------------------------------- ASBE0005-004 06/24/2013 Rates Fringes Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)....$ 16.95 10.23 ---------------------------------------------------------------- BOIL0092-004 10/01/2012 Area within a 25 mile radius of City of Santa Maria Rates Fringes BOILERMAKER......................$ 41.17 28.27 ---------------------------------------------------------------- BOIL0549-007 01/01/2013 Remainder of County outside a 25 mile radius of City of Santa Maria Rates Fringes BOILERMAKER......................$ 38.37 31.32 ---------------------------------------------------------------- * BRCA0004-006 05/01/2015 Rates Fringes BRICKLAYER; MARBLE SETTER........$ 36.26 13.70 *The wage scale for prevailing wage projects performed in Blythe, China lake, Death Valley, Fort Irwin, Twenty-Nine Palms, Needles and 1-15 corridor (Barstow to the Nevada State Line) will be Three Dollars ($3.00) above the standard San Bernardino/Riverside County hourly wage rate ---------------------------------------------------------------- BRCA0018-008 06/01/2014 Rates Fringes MARBLE FINISHER..................$ 28.45 11.38 TILE FINISHER....................$ 23.78 9.84 ---------------------------------------------------------------- BRCA0018-011 06/01/2014 Rates Fringes TILE LAYER.......................$ 35.14 14.33 ---------------------------------------------------------------- 7.c Packet Pg. 108 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 7 of 79 CARP0409-001 07/01/2010 Rates Fringes CARPENTER (1) Carpenter, Cabinet Installer, Insulation Installer, Hardwood Floor Worker and acoustical installer...................$ 37.35 11.08 (2) Millwright..............$ 37.85 11.08 (3) Piledrivermen/Derrick Bargeman, Bridge or Dock Carpenter, Heavy Framer, Rock Bargeman or Scowman, Rockslinger, Shingler (Commercial)................$ 37.48 11.08 (4) Pneumatic Nailer, Power Stapler...............$ 37.60 11.08 (5) Sawfiler...............$ 37.44 11.08 (6) Scaffold Builder.......$ 28.55 11.08 (7) Table Power Saw Operator....................$ 37.45 11.08 FOOTNOTE: Work of forming in the construction of open cut sewers or storm drains, on operations in which horizontal lagging is used in conjunction with steel H-Beams driven or placed in pre- drilled holes, for that portion of a lagged trench against which concrete is poured, namely, as a substitute for back forms (which work is performed by piledrivers): $0.13 per hour additional. ---------------------------------------------------------------- CARP0409-005 07/01/2010 Rates Fringes Drywall DRYWALL INSTALLER/LATHER....$ 37.35 11.08 STOCKER/SCRAPPER............$ 10.00 6.67 ---------------------------------------------------------------- CARP0409-008 08/01/2010 Rates Fringes Modular Furniture Installer......$ 17.00 7.41 ---------------------------------------------------------------- ELEC0639-001 06/01/2015 Rates Fringes Electricians Wireman/Technician..........$ 39.30 18.66 FOOTNOTES: CABLE SPLICER: 10% additional per hour above Wireman/Technician basic hourly rate. Work from trusses, swinging scaffolds, open ladders, scaffolds, bosun chairs, stacks or towers, where subject to 7.c Packet Pg. 109 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 8 of 79 a direct fall from the ground floor or support structure from a distance of fifty (50) feet to ninety (90) feet: to be paid time and one-half. Work from trusses, swinging scaffolds, open ladders, scaffolds, bosun chairs, stacks or towers, where subject to a direct fall from the ground floor or support structure from a distance over ninety (90) feet: to be paid double the regular straight time rate of pay. Where workers are required to work under compressed air or in areas where injurious gases, dust or fumes are present in amounts necessitating the use of gas masks or self-contained breathing apparatus (particle masks are not considered self-contained breathing apparatus) or where workers work on poles at a distance of seventy-five (75) feet or more from the ground: to be paid a bonus of straight time pay. This shall be at a minimum of one hour, and thereafter, each succeeding hour or fraction thereof shall constitute an hour at the bonus rate. Tunnel work: to be paid at the time and one-quarter hourly rate. All employers may request workmen to report direct to a job within a free zone to include everything west of ten (10) miles east of Highway 101, as the crow flies, and then (10) miles north and south of Highway 46, as the crow flies, to the junction of Highway 41 and Highway 46. Everything outside this area shall be paid at full subsistence provide said job is of five (5) days duration or more and provide there is storage on the job for the Employee's tools. The Employer will be responsible for loss of tools under such circumstances. (Road: The most direct route on a surfaced road). On all jobs or projects outside the free zone, as stated above, Employees may be required to report to the job site in their own transportation at the regular starting time and remain on the job site until the regular quitting time and these shall be paid at fifty dollars ($50.00) per day or fifty-one cents ($0.51) per mile for each road mile from shop to job and job to shop (round trip). (Day worked shall mean at least four (4) hours on the job unless sent home on account of weather, emergency, sickness, or injury). The Employer shall pay for traveling time and furnish transportation from shop to job, job to job, and job to shop. Travel time shall be at the appropriate rate of pay for that day of the week. (Monday through Friday, straight time, Saturday and Sunday, double time.) ---------------------------------------------------------------- ELEC0639-003 05/26/2014 COMMUNICATIONS AND SYSTEMS WORK SAN LUIS OBISPO COUNTY Rates Fringes Communications System Installer...................$ 29.09 11.60 Technician..................$ 30.89 11.66 SCOPE OF WORK: Installation, testing, service and maintenance 7.c Packet Pg. 110 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 9 of 79 of systems utilizing the transmission and/or transference of voice, sound, vision and digital for commercial, educational, security and entertainment purposes for the following: TV monitoring and surveillance, background - foreground music, intercom and telephone interconnect, microwave transmission, multi-media, multiplex, nurse call systems, radio page, burglar alarms and fire alarm (see last paragraph below). Communication Systems that transmit or receive information and/or control systems that are intrinsic to the above listed systems; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding all other data systems or multiple systems which include control function or power supply; excluding installation of raceway systems, conduit systems, line voltage work, and energy management systems. Fire alarm work shall be performed at the current inside electrician total cost package. ---------------------------------------------------------------- ELEC1245-001 06/01/2015 Rates Fringes LINE CONSTRUCTION (1) Lineman; Cable splicer..$ 52.85 15.53 (2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 42.21 14.32 (3) Groundman...............$ 32.28 14.03 (4) Powderman...............$ 47.19 14.60 HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day ---------------------------------------------------------------- ELEV0008-003 01/01/2015 Rates Fringes ELEVATOR MECHANIC................$ 60.39 28.38 FOOTNOTE: PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day. ---------------------------------------------------------------- ENGI0012-003 07/06/2015 7.c Packet Pg. 111 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 10 of 79 Rates Fringes OPERATOR: Power Equipment (All Other Work) GROUP 1....................$ 39.95 23.35 GROUP 2....................$ 40.73 23.35 GROUP 3....................$ 41.02 23.35 GROUP 4....................$ 42.51 23.35 GROUP 5....................$ 41.86 23.35 GROUP 6....................$ 41.83 23.35 GROUP 8....................$ 42.84 23.35 GROUP 9....................$ 42.19 23.35 GROUP 10....................$ 42.96 23.35 GROUP 11....................$ 42.31 23.35 GROUP 12....................$ 43.13 23.35 GROUP 13....................$ 43.23 23.35 GROUP 14....................$ 43.26 23.35 GROUP 15....................$ 43.34 23.35 GROUP 16....................$ 43.46 23.35 GROUP 17....................$ 43.63 23.35 GROUP 18....................$ 43.73 23.35 GROUP 19....................$ 43.84 23.35 GROUP 20....................$ 43.96 23.35 GROUP 21....................$ 44.13 23.35 GROUP 22....................$ 44.23 23.35 GROUP 23....................$ 44.34 23.35 GROUP 24....................$ 44.46 23.35 GROUP 25....................$ 44.63 23.35 OPERATOR: Power Equipment (Cranes, Piledriving & Hoisting) GROUP 1....................$ 41.30 23.35 GROUP 2....................$ 42.08 23.35 GROUP 3....................$ 42.37 23.35 GROUP 4....................$ 42.51 23.35 GROUP 5....................$ 42.73 23.35 GROUP 6....................$ 42.84 23.35 GROUP 7....................$ 42.96 23.35 GROUP 8....................$ 43.13 23.35 GROUP 9....................$ 43.30 23.35 GROUP 10....................$ 44.30 23.35 GROUP 11....................$ 45.30 23.35 GROUP 12....................$ 46.30 23.35 GROUP 13....................$ 47.30 23.35 OPERATOR: Power Equipment (Tunnel Work) GROUP 1....................$ 41.80 23.35 GROUP 2....................$ 42.58 23.35 GROUP 3....................$ 42.87 23.35 GROUP 4....................$ 43.01 23.35 GROUP 5....................$ 43.23 23.35 GROUP 6....................$ 43.34 23.35 GROUP 7....................$ 43.46 23.35 PREMIUM PAY: $3.75 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton 7.c Packet Pg. 112 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 11 of 79 Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator. SEE ZONE DEFINITIONS AFTER CLASSIFICATIONS POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch Witch, with seat or similar type equipment; Elevator operator-inside; Engineer Oiler; Forklift operator (includes loed, lull or similar types under 5 tons; Generator operator; Generator, pump or compressor plant operator; Pump operator; Signalman; Switchman GROUP 2: Asphalt-rubber plant operator (nurse tank operator); Concrete mixer operator-skip type; Conveyor operator; Fireman; Forklift operator (includes loed, lull or similar types over 5 tons; Hydrostatic pump operator; oiler crusher (asphalt or concrete plant); Petromat laydown machine; PJU side dum jack; Screening and conveyor machine operator (or similar types); Skiploader (wheel type up to 3/4 yd. without attachment); Tar pot fireman; Temporary heating plant operator; Trenching machine oiler GROUP 3: Asphalt-rubber blend operator; Bobcat or similar type (Skid steer); Equipment greaser (rack); Ford Ferguson (with dragtype attachments); Helicopter radioman (ground); Stationary pipe wrapping and cleaning machine operator GROUP 4: Asphalt plant fireman; Backhoe operator (mini-max or similar type); Boring machine operator; Boxman or mixerman (asphalt or concrete); Chip spreading machine operator; Concrete cleaning decontamination machine operator; Concrete Pump Operator (small portable); Drilling machine operator, small auger types (Texoma super economatic or similar types - Hughes 100 or 200 or similar types - drilling depth of 30' maximum); Equipment greaser (grease truck); Guard rail post driver operator; Highline cableway signalman; Hydra-hammer-aero stomper; Micro Tunneling (above ground tunnel); Power concrete curing machine operator; Power concrete saw operator; Power-driven jumbo form setter operator; Power sweeper operator; Rock Wheel Saw/Trencher; Roller operator (compacting); Screed operator (asphalt or concrete); Trenching machine operator (up to 6 ft.); Vacuum or much truck GROUP 5: Equipment Greaser (Grease Truck/Multi Shift). GROUP 6: Articulating material hauler; Asphalt plant engineer; Batch plant operator; Bit sharpener; Concrete joint machine operator (canal and similar type); Concrete planer operator; Dandy digger; Deck engine operator; Derrickman (oilfield type); Drilling machine operator, bucket or auger types (Calweld 100 bucket or similar types - Watson 1000 auger or similar types - Texoma 330, 500 or 600 auger or similar types - drilling depth of 45' maximum); Drilling machine operator; Hydrographic seeder machine operator (straw, pulp or seed), Jackson track 7.c Packet Pg. 113 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 12 of 79 maintainer, or similar type; Kalamazoo Switch tamper, or similar type; Machine tool operator; Maginnis internal full slab vibrator, Mechanical berm, curb or gutter(concrete or asphalt); Mechanical finisher operator (concrete, Clary-Johnson-Bidwell or similar); Micro tunnel system (below ground); Pavement breaker operator (truck mounted); Road oil mixing machine operator; Roller operator (asphalt or finish), rubber-tired earth moving equipment (single engine, up to and including 25 yds. struck); Self-propelled tar pipelining machine operator; Skiploader operator (crawler and wheel type, over 3/4 yd. and up to and including 1-1/2 yds.); Slip form pump operator (power driven hydraulic lifting device for concrete forms); Tractor operator-bulldozer, tamper-scraper (single engine, up to 100 h.p. flywheel and similar types, up to and including D-5 and similar types); Tugger hoist operator (1 drum); Ultra high pressure waterjet cutting tool system operator; Vacuum blasting machine operator GROUP 8: Asphalt or concrete spreading operator (tamping or finishing); Asphalt paving machine operator (Barber Greene or similar type); Asphalt-rubber distribution operator; Backhoe operator (up to and including 3/4 yd.), small ford, Case or similar; Cast-in-place pipe laying machine operator; Combination mixer and compressor operator (gunite work); Compactor operator (self-propelled); Concrete mixer operator (paving); Crushing plant operator; Drill Doctor; Drilling machine operator, Bucket or auger types (Calweld 150 bucket or similar types - Watson 1500, 2000 2500 auger or similar types - Texoma 700, 800 auger or similar types - drilling depth of 60' maximum); Elevating grader operator; Grade checker; Gradall operator; Grouting machine operator; Heavy-duty repairman; Heavy equipment robotics operator; Kalamazoo balliste regulator or similar type; Kolman belt loader and similar type; Le Tourneau blob compactor or similar type; Loader operator (Athey, Euclid, Sierra and similar types); Mobark Chipper or similar; Ozzie padder or similar types; P.C. slot saw; Pneumatic concrete placing machine operator (Hackley-Presswell or similar type); Pumpcrete gun operator; Rock Drill or similar types; Rotary drill operator (excluding caisson type); Rubber-tired earth-moving equipment operator (single engine, caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. up to and including 50 cu. yds. struck); Rubber-tired earth-moving equipment operator (multiple engine up to and including 25 yds. struck); Rubber-tired scraper operator (self-loading paddle wheel type-John Deere, 1040 and similar single unit); Self- propelled curb and gutter machine operator; Shuttle buggy; Skiploader operator (crawler and wheel type over 1-1/2 yds. up to and including 6-1/2 yds.); Soil remediation plant operator; Surface heaters and planer operator; Tractor compressor drill combination operator; Tractor operator (any type larger than D-5 - 100 flywheel h.p. and over, or similar-bulldozer, tamper, scraper and push tractor single engine); Tractor operator (boom attachments), Traveling pipe wrapping, cleaning and bendng machine operator; Trenching machine operator (over 6 ft. depth capacity, manufacturer's rating); trenching Machine with Road Miner attachment (over 6 ft depth capacity): Ultra high pressure waterjet cutting tool system mechanic; Water pull 7.c Packet Pg. 114 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 13 of 79 (compaction) operator GROUP 9: Heavy Duty Repairman GROUP 10: Drilling machine operator, Bucket or auger types (Calweld 200 B bucket or similar types-Watson 3000 or 5000 auger or similar types-Texoma 900 auger or similar types-drilling depth of 105' maximum); Dual drum mixer, dynamic compactor LDC350 (or similar types); Monorail locomotive operator (diesel, gas or electric); Motor patrol-blade operator (single engine); Multiple engine tractor operator (Euclid and similar type-except Quad 9 cat.); Rubber-tired earth-moving equipment operator (single engine, over 50 yds. struck); Pneumatic pipe ramming tool and similar types; Prestressed wrapping machine operator; Rubber-tired earth-moving equipment operator (single engine, over 50 yds. struck); Rubber tired earth moving equipment operator (multiple engine, Euclid, caterpillar and similar over 25 yds. and up to 50 yds. struck), Tower crane repairman; Tractor loader operator (crawler and wheel type over 6-1/2 yds.); Woods mixer operator (and similar Pugmill equipment) GROUP 11: Heavy Duty Repairman - Welder Combination, Welder - Certified. GROUP 12: Auto grader operator; Automatic slip form operator; Drilling machine operator, bucket or auger types (Calweld, auger 200 CA or similar types - Watson, auger 6000 or similar types - Hughes Super Duty, auger 200 or similar types - drilling depth of 175' maximum); Hoe ram or similar with compressor; Mass excavator operator less tha 750 cu. yards; Mechanical finishing machine operator; Mobile form traveler operator; Motor patrol operator (multi-engine); Pipe mobile machine operator; Rubber-tired earth- moving equipment operator (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck); Rubber-tired self- loading scraper operator (paddle-wheel-auger type self-loading - two (2) or more units) GROUP 13: Rubber-tired earth-moving equipment operator operating equipment with push-pull system (single engine, up to and including 25 yds. struck) GROUP 14: Canal liner operator; Canal trimmer operator; Remote- control earth-moving equipment operator (operating a second piece of equipment: $1.00 per hour additional); Wheel excavator operator (over 750 cu. yds.) GROUP 15: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine-up to and including 25 yds. struck) GROUP 16: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system 7.c Packet Pg. 115 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 14 of 79 (multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck) GROUP 17: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine, Euclid, Caterpillar and similar, over 50 cu. yds. struck); Tandem tractor operator (operating crawler type tractors in tandem - Quad 9 and similar type) GROUP 18: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - single engine, up to and including 25 yds. struck) GROUP 19: Rotex concrete belt operator (or similar types); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds.and up to and including 50 cu. yds. struck); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - multiple engine, up to and including 25 yds. struck) GROUP 20: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps, and similar types in any combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck) GROUP 21: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck) GROUP 22: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, up to and including 25 yds. struck) GROUP 23: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired earth-moving equipment operator, operating with the tandem push-pull system (multiple engine, up to and including 25 yds. struck) GROUP 24: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck) 7.c Packet Pg. 116 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 15 of 79 GROUP 25: Concrete pump operator-truck mounted; Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck) CRANES, PILEDRIVING AND HOISTING EQUIPMENT CLASSIFICATIONS GROUP 1: Engineer oiler; Fork lift operator (includes loed, lull or similar types) GROUP 2: Truck crane oiler GROUP 3: A-frame or winch truck operator; Ross carrier operator (jobsite) GROUP 4: Bridge-type unloader and turntable operator; Helicopter hoist operator GROUP 5: Hydraulic boom truck; Stinger crane (Austin-Western or similar type); Tugger hoist operator (1 drum) GROUP 6: Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boom and similar type); Lift mobile operator; Lift slab machine operator (Vagtborg and similar types); Material hoist and/or manlift operator; Polar gantry crane operator; Self Climbing scaffold (or similar type); Shovel, backhoe, dragline, clamshell operator (over 3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator GROUP 7: Pedestal crane operator; Shovel, backhoe, dragline, clamshell operator (over 5 cu. yds. mrc); Tower crane repair; Tugger hoist operator (3 drum) GROUP 8: Crane operator (up to and including 25 ton capacity); Crawler transporter operator; Derrick barge operator (up to and including 25 ton capacity); Hoist operator, stiff legs, Guy derrick or similar type (up to and including 25 ton capacity); Shovel, backhoe, dragline, clamshell operator (over 7 cu. yds., M.R.C.) GROUP 9: Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons mrc); Highline cableway operator; Hoist operator, stiff legs, Guy derrick or similar type (over 25 tons up to and including 50 tons mrc); K-crane operator; Polar crane operator; Self erecting tower crane operator maximum lifting capacity ten tons GROUP 10: Crane operator (over 50 tons and up to and including 100 tons mrc); Derrick barge operator (over 50 tons up to and including 100 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 50 tons up to and including 100 tons mrc), Mobile tower crane operator (over 50 tons, up to and including 100 tons M.R.C.); Tower crane operator and tower gantry GROUP 11: Crane operator (over 100 tons and up to and including 200 tons mrc); Derrick barge operator (over 100 tons up to and including 200 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 100 tons up 7.c Packet Pg. 117 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 16 of 79 to and including 200 tons mrc); Mobile tower crane operator (over 100 tons up to and including 200 tons mrc) GROUP 12: Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge operator (over 200 tons up to and including 300 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 200 tons, up to and including 300 tons mrc); Mobile tower crane operator (over 200 tons, up to and including 300 tons mrc) GROUP 13: Crane operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons); Mobile tower crane operator (over 300 tons) TUNNEL CLASSIFICATIONS GROUP 1: Skiploader (wheel type up to 3/4 yd. without attachment) GROUP 2: Power-driven jumbo form setter operator GROUP 3: Dinkey locomotive or motorperson (up to and including 10 tons) GROUP 4: Bit sharpener; Equipment greaser (grease truck); Slip form pump operator (power-driven hydraulic lifting device for concrete forms); Tugger hoist operator (1 drum); Tunnel locomotive operator (over 10 and up to and including 30 tons) GROUP 5: Backhoe operator (up to and including 3/4 yd.); Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shield operator; Heavy-duty repairperson; Loader operator (Athey, Euclid, Sierra and similar types); Mucking machine operator (1/4 yd., rubber-tired, rail or track type); Pneumatic concrete placing machine operator (Hackley-Presswell or similar type); Pneumatic heading shield (tunnel); Pumpcrete gun operator; Tractor compressor drill combination operator; Tugger hoist operator (2 drum); Tunnel locomotive operator (over 30 tons) GROUP 6: Heavy Duty Repairman GROUP 7: Tunnel mole boring machine operator ENGINEERS ZONES $1.00 additional per hour for all of IMPERIAL County and the portions of KERN, RIVERSIDE & SAN BERNARDINO Counties as defined below: That area within the following Boundary: Begin in San Bernardino County, approximately 3 miles NE of the intersection of I-15 and the California State line at that point which is the NW corner of Section 1, T17N,m R14E, San Bernardino Meridian. Continue W in a straight line to that point which is the SW corner of the northwest quarter of Section 6, T27S, R42E, Mt. Diablo Meridian. Continue North to the intersection with the Inyo County Boundary at that point which is the NE corner of the western half of the northern quarter of Section 7.c Packet Pg. 118 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 17 of 79 6, T25S, R42E, MDM. Continue W along the Inyo and San Bernardino County boundary until the intersection with Kern County, as that point which is the SE corner of Section 34, T24S, R40E, MDM. Continue W along the Inyo and Kern County boundary until the intersection with Tulare County, at that point which is the SW corner of the SE quarter of Section 32, T24S, R37E, MDM. Continue W along the Kern and Tulare County boundary, until that point which is the NW corner of T25S, R32E, MDM. Continue S following R32E lines to the NW corner of T31S, R32E, MDM. Continue W to the NW corner of T31S, R31E, MDM. Continue S to the SW corner of T32S, R31E, MDM. Continue W to SW corner of SE quarter of Section 34, T32S, R30E, MDM. Continue S to SW corner of T11N, R17W, SBM. Continue E along south boundary of T11N, SBM to SW corner of T11N, R7W, SBM. Continue S to SW corner of T9N, R7W, SBM. Continue E along south boundary of T9N, SBM to SW corner of T9N, R1E, SBM. Continue S along west boundary of R1E, SMB to Riverside County line at the SW corner of T1S, R1E, SBM. Continue E along south boundary of T1s, SBM (Riverside County Line) to SW corner of T1S, R10E, SBM. Continue S along west boundary of R10E, SBM to Imperial County line at the SW corner of T8S, R10E, SBM. Continue W along Imperial and Riverside county line to NW corner of T9S, R9E, SBM. Continue S along the boundary between Imperial and San Diego Counties, along the west edge of R9E, SBM to the south boundary of Imperial County/California state line. Follow the California state line west to Arizona state line, then north to Nevada state line, then continuing NW back to start at the point which is the NW corner of Section 1, T17N, R14E, SBM $1.00 additional per hour for portions of SAN LUIS OBISPO, KERN, SANTA BARBARA & VENTURA as defined below: That area within the following Boundary: Begin approximately 5 miles north of the community of Cholame, on the Monterey County and San Luis Obispo County boundary at the NW corner of T25S, R16E, Mt. Diablo Meridian. Continue south along the west side of R16E to the SW corner of T30S, R16E, MDM. Continue E to SW corner of T30S, R17E, MDM. Continue S to SW corner of T31S, R17E, MDM. Continue E to SW corner of T31S, R18E, MDM. Continue S along West side of R18E, MDM as it crosses into San Bernardino Meridian numbering area and becomes R30W. Follow the west side of R30W, SBM to the SW corner of T9N, R30W, SBM. Continue E along the south edge of T9N, SBM to the Santa Barbara County and Ventura County boundary at that point whch is the SW corner of Section 34.T9N, R24W, SBM, continue S along the Ventura County line to that point which is the SW corner of the SE quarter of Section 32, T7N, R24W, SBM. Continue E along the south edge of T7N, SBM to the SE corner to T7N, R21W, SBM. Continue N along East side of R21W, SBM to Ventura County and Kern County boundary at the NE corner of T8N, R21W. Continue W along the Ventura County and Kern County boundary to the SE corner of T9N, R21W. Continue North along the East edge of R21W, SBM to the NE corner of T12N, R21W, SBM. Continue West along the north edge of T12N, SBM to the SE corner of T32S, R21E, MDM. [T12N SBM is a think strip between T11N SBM and T32S MDM]. Continue North along the East side of R21E, MDM to the Kings County and Kern County border at the NE corner of T25S, R21E, MDM, continue West along the Kings County and Kern County Boundary until the intersection of San Luis Obispo County. Continue west along the Kings County and San Luis 7.c Packet Pg. 119 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 18 of 79 Obispo County boundary until the intersection with Monterey County. Continue West along the Monterey County and San Luis Obispo County boundary to the beginning point at the NW corner of T25S, R16E, MDM. $2.00 additional per hour for INYO and MONO Counties and the Northern portion of SAN BERNARDINO County as defined below: That area within the following Boundary: Begin at the intersection of the northern boundary of Mono County and the California state line at the point which is the center of Section 17, T10N, R22E, Mt. Diablo Meridian. Continue S then SE along the entire western boundary of Mono County, until it reaches Inyo County at the point which is the NE corner of the Western half of the NW quarter of Section 2, T8S, R29E, MDM. Continue SSE along the entire western boundary of Inyo County, until the intersection with Kern County at the point which is the SW corner of the SE 1/4 of Section 32, T24S, R37E, MDM. Continue E along the Inyo and Kern County boundary until the intersection with San Bernardino County at that point which is the SE corner of section 34, T24S, R40E, MDM. Continue E along the Inyo and San Bernardino County boundary until the point which is the NE corner of the Western half of the NW quarter of Section 6, T25S, R42E, MDM. Continue S to that point which is the SW corner of the NW quarter of Section 6, T27S, R42E, MDM. Continue E in a straight line to the California and Nevada state border at the point which is the NW corner of Section 1, T17N, R14E, San Bernardino Meridian. Then continue NW along the state line to the starting point, which is the center of Section 18, T10N, R22E, MDM. REMAINING AREA NOT DEFINED ABOVE RECIEVES BASE RATE ---------------------------------------------------------------- ENGI0012-004 08/01/2015 Rates Fringes OPERATOR: Power Equipment (DREDGING) (1) Leverman................$ 49.50 23.60 (2) Dredge dozer............$ 43.53 23.60 (3) Deckmate................$ 43.42 23.60 (4) Winch operator (stern winch on dredge)............$ 42.87 23.60 (5) Fireman-Oiler, Deckhand, Bargeman, Leveehand...................$ 42.33 23.60 (6) Barge Mate..............$ 42.94 23.60 ---------------------------------------------------------------- IRON0377-002 07/01/2015 Rates Fringes Ironworkers: Fence Erector...............$ 27.08 20.21 Ornamental, Reinforcing and Structural..............$ 33.50 28.85 7.c Packet Pg. 120 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 19 of 79 PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- LABO0220-001 07/01/2014 Rates Fringes LABORER (TUNNEL) GROUP 1.....................$ 35.74 16.48 GROUP 2.....................$ 36.06 16.48 GROUP 3.....................$ 36.52 16.48 GROUP 4.....................$ 37.21 16.48 LABORER GROUP 1.....................$ 30.19 16.48 GROUP 2.....................$ 30.74 16.48 GROUP 3.....................$ 31.29 16.48 GROUP 4.....................$ 32.84 16.48 GROUP 5.....................$ 33.19 16.48 LABORER CLASSIFICATIONS GROUP 1: Cleaning and handling of panel forms; Concrete screeding for rough strike-off; Concrete, water curing; Demolition laborer, the cleaning of brick if performed by a worker performing any other phase of demolition work, and the cleaning of lumber; Fire watcher, limber, brush loader, piler and debris handler; Flag person; Gas, oil and/or water pipeline laborer; Laborer, asphalt-rubber material loader; Laborer, general or construction; Laborer, general clean-up; Laborer, landscaping; Laborer, jetting; Laborer, temporary water and air lines; Material hose operator (walls, slabs, floors and decks); Plugging, filling of shee bolt holes; Dry packing of concrete; Railroad maintenance, repair track person and road beds; Streetcar and railroad construction track laborers; Rigging and signaling; Scaler; Slip form raiser; Tar and mortar; Tool crib or tool house laborer; Traffic control by any method; Window cleaner; Wire mesh pulling - all concrete pouring operations GROUP 2: Asphalt shoveler; Cement dumper (on 1 yd. or larger mixer and handling bulk cement); Cesspool digger and 7.c Packet Pg. 121 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 20 of 79 installer; Chucktender; Chute handler, pouring concrete, the handling of the chute from readymix trucks, such as walls, slabs, decks, floors, foundation, footings, curbs, gutters and sidewalks; Concrete curer, impervious membrane and form oiler; Cutting torch operator (demolition); Fine grader, highways and street paving, airport, runways and similar type heavy construction; Gas, oil and/or water pipeline wrapper - pot tender and form person; Guinea chaser; Headerboard person - asphalt; Laborer, packing rod steel and pans; Membrane vapor barrier installer; Power broom sweeper (small); Riprap stonepaver, placing stone or wet sacked concrete; Roto scraper and tiller; Sandblaster (pot tender); Septic tank digger and installer(lead); Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredder; Underground laborer, including caisson bellower GROUP 3: Buggymobile person; Concrete cutting torch; Concrete pile cutter; Driller, jackhammer, 2-1/2 ft. drill steel or longer; Dri-pak-it machine; Gas, oil and/or water pipeline wrapper, 6-in. pipe and over, by any method, inside and out; High scaler (including drilling of same); Hydro seeder and similar type; Impact wrench multi-plate; Kettle person, pot person and workers applying asphalt, lay-kold, creosote, lime caustic and similar type materials ("applying" means applying, dipping, brushing or handling of such materials for pipe wrapping and waterproofing); Operator of pneumatic, gas, electric tools, vibrating machine, pavement breaker, air blasting, come-alongs, and similar mechanical tools not separately classified herein; Pipelayer's backup person, coating, grouting, making of joints, sealing, caulking, diapering and including rubber gasket joints, pointing and any and all other services; Rock slinger; Rotary scarifier or multiple head concrete chipping scarifier; Steel headerboard and guideline setter; Tamper, Barko, Wacker and similar type; Trenching machine, hand-propelled GROUP 4: Asphalt raker, lute person, ironer, asphalt dump person, and asphalt spreader boxes (all types); Concrete core cutter (walls, floors or ceilings), grinder or sander; Concrete saw person, cutting walls or flat work, scoring old or new concrete; Cribber, shorer, lagging, sheeting and trench bracing, hand-guided lagging hammer; Head rock slinger; Laborer, asphalt- rubber distributor boot person; Laser beam in connection with laborers' work; Oversize concrete vibrator operator, 70 lbs. and over; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in the ditch until completion of operation, including any and all forms of tubular material, whether pipe, metallic or non-metallic, conduit and any other stationary type of tubular device used for the conveying of any substance or element, whether water, sewage, solid gas, air, or other product whatsoever and without regard to the nature of material from which the tubular material is fabricated; No-joint pipe and stripping of same; Prefabricated manhole installer; Sandblaster (nozzle person), water blasting, Porta Shot-Blast GROUP 5: Blaster powder, all work of loading holes, placing and blasting of all powder and explosives of whatever type, 7.c Packet Pg. 122 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 21 of 79 regardless of method used for such loading and placing; Driller: All power drills, excluding jackhammer, whether core, diamond, wagon, track, multiple unit, and any and all other types of mechanical drills without regard to the form of motive power; Toxic waste removal TUNNEL LABORER CLASSIFICATIONS GROUP 1: Batch plant laborer; Changehouse person; Dump person; Dump person (outside); Swamper (brake person and switch person on tunnel work); Tunnel materials handling person; Nipper; Pot tender, using mastic or other materials (for example, but not by way of limitation, shotcrete, etc.); GROUP 2: Bull gang mucker, track person; Chucktender, Cabletender; Concrete crew, including rodder and spreader; Loading and unloading agitator cars; Vibrator person, jack hammer, pneumatic tools (except driller) GROUP 3: Blaster, driller, powder person; Chemical grout jet person; Cherry picker person; Grout gun person; Grout mixer person; Grout pump person; Jackleg miner; Jumbo person; Kemper and other pneumatic concrete placer operator; Miner, tunnel (hand or machine); Nozzle person; Operating of troweling and/or grouting machines; Powder person (primer house); Primer person; Sandblaster; Shotcrete person; Steel form raiser and setter; Timber person, retimber person, wood or steel; Tunnel Concrete finisher GROUP 4: Diamond driller; Sandblaster; Shaft and raise work ---------------------------------------------------------------- LABO0220-004 07/01/2014 Rates Fringes Brick Tender.....................$ 29.12 15.78 ---------------------------------------------------------------- LABO0300-005 01/01/2014 Rates Fringes Asbestos Removal Laborer.........$ 28.00 15.25 SCOPE OF WORK: Includes site mobilization, initial site cleanup, site preparation, removal of asbestos-containing material and toxic waste, encapsulation, enclosure and disposal of asbestos- containing materials and toxic waste by hand or with equipment or machinery; scaffolding, fabrication of temporary wooden barriers and assembly of decontamination stations. ---------------------------------------------------------------- LABO0345-001 07/01/2014 Rates Fringes LABORER (GUNITE) GROUP 1.....................$ 34.79 17.92 GROUP 2.....................$ 33.84 17.92 7.c Packet Pg. 123 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 22 of 79 GROUP 3.....................$ 30.30 17.92 FOOTNOTE: GUNITE PREMIUM PAY: Workers working from a Bosn'n's Chair or suspended from a rope or cable shall receive 40 cents per hour above the foregoing applicable classification rates. Workers doing gunite and/or shotcrete work in a tunnel shall receive 35 cents per hour above the foregoing applicable classification rates, paid on a portal-to-portal basis. Any work performed on, in or above any smoke stack, silo, storage elevator or similar type of structure, when such structure is in excess of 75'-0" above base level and which work must be performed in whole or in part more than 75'-0" above base level, that work performed above the 75'-0" level shall be compensated for at 35 cents per hour above the applicable classification wage rate. GUNITE LABORER CLASSIFICATIONS GROUP 1: Rodmen, Nozzlemen GROUP 2: Gunmen GROUP 3: Reboundmen ---------------------------------------------------------------- * LABO1184-001 08/01/2015 Rates Fringes Laborers: (HORIZONTAL DIRECTIONAL DRILLING) (1) Drilling Crew Laborer...$ 32.60 12.16 (2) Vehicle Operator/Hauler.$ 32.77 12.16 (3) Horizontal Directional Drill Operator..............$ 34.62 12.16 (4) Electronic Tracking Locator.....................$ 36.62 12.16 Laborers: (STRIPING/SLURRY SEAL) GROUP 1.....................$ 33.76 15.04 GROUP 2.....................$ 35.06 15.04 GROUP 3.....................$ 37.07 15.04 GROUP 4.....................$ 38.81 15.04 LABORERS - STRIPING CLASSIFICATIONS GROUP 1: Protective coating, pavement sealing, including repair and filling of cracks by any method on any surface in parking lots, game courts and playgrounds; carstops; operation of all related machinery and equipment; equipment repair technician GROUP 2: Traffic surface abrasive blaster; pot tender - removal of all traffic lines and markings by any method (sandblasting, waterblasting, grinding, etc.) and preparation of surface for coatings. Traffic control person: controlling and directing traffic through both conventional and moving lane closures; operation of all related machinery and equipment 7.c Packet Pg. 124 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 23 of 79 GROUP 3: Traffic delineating device applicator: Layout and application of pavement markers, delineating signs, rumble and traffic bars, adhesives, guide markers, other traffic delineating devices including traffic control. This category includes all traffic related surface preparation (sandblasting, waterblasting, grinding) as part of the application process. Traffic protective delineating system installer: removes, relocates, installs, permanently affixed roadside and parking delineation barricades, fencing, cable anchor, guard rail, reference signs, monument markers; operation of all related machinery and equipment; power broom sweeper GROUP 4: Striper: layout and application of traffic stripes and markings; hot thermo plastic; tape traffic stripes and markings, including traffic control; operation of all related machinery and equipment ---------------------------------------------------------------- LABO1414-001 08/05/2015 Rates Fringes LABORER PLASTER CLEAN-UP LABORER....$ 30.16 17.11 PLASTER TENDER..............$ 32.71 17.11 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- PAIN0036-007 07/01/2015 Rates Fringes Painters: (1) Repaint Including Lead Abatement...................$ 24.19 12.83 (2) High Iron & Steel.......$ 30.70 12.83 (3) Journeyman Painter including Lead Abatement....$ 28.70 12.83 (4) Industrial..............$ 32.02 12.83 (5) All other work..........$ 28.70 12.83 REPAINT of any previously painted structure. Exceptions: work involving the aerospace industry, breweries, commercial recreational facilities, hotels which operate commercial establishments as part of hotel service, and sports facilities. HIGH IRON & STEEL: Aerial towers, towers, radio towers, smoke stacks, flag poles (any flag poles that can be finished from the ground with a ladder excluded), elevated water towers, steeples and domes in their entirety and any other extremely high and hazardous work, cooning steel, bos'n chair, or other similar devices, painting in other high hazardous work shall be classified as high iron & steel ---------------------------------------------------------------- PAIN0036-008 10/01/2014 Rates Fringes 7.c Packet Pg. 125 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 24 of 79 DRYWALL FINISHER/TAPER...........$ 35.18 15.91 ---------------------------------------------------------------- PAIN0169-002 01/01/2015 Rates Fringes GLAZIER..........................$ 34.83 19.75 ---------------------------------------------------------------- PAIN1247-002 01/01/2015 Rates Fringes SOFT FLOOR LAYER.................$ 29.85 13.56 ---------------------------------------------------------------- PLAS0200-001 08/05/2015 Rates Fringes PLASTERER........................$ 38.44 13.77 ---------------------------------------------------------------- PLAS0500-002 07/01/2015 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 32.30 20.65 ---------------------------------------------------------------- PLUM0016-001 07/01/2015 Rates Fringes PLUMBER/PIPEFITTER Plumber and Pipefitter All other work except work on new additions and remodeling of bars, restaurant, stores and commercial buildings not to exceed 5,000 sq. ft. of floor space and work on strip malls, light commercial, tenant improvement and remodel work.......................$ 45.96 20.71 Work ONLY on new additions and remodeling of bars, restaurant, stores and commercial buildings not to exceed 5,000 sq. ft. of floor space.................$ 44.54 19.73 Work ONLY on strip malls, light commercial, tenant improvement and remodel work........................$ 35.16 18.06 ---------------------------------------------------------------- PLUM0345-001 07/01/2014 Rates Fringes PLUMBER Landscape/Irrigation Fitter.$ 29.27 19.75 7.c Packet Pg. 126 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 25 of 79 Sewer & Storm Drain Work....$ 33.24 17.13 ---------------------------------------------------------------- ROOF0036-002 08/01/2014 Rates Fringes ROOFER...........................$ 35.02 13.57 FOOTNOTE: Pitch premium: Work on which employees are exposed to pitch fumes or required to handle pitch, pitch base or pitch impregnated products, or any material containing coal tar pitch, the entire roofing crew shall receive $1.75 per hour "pitch premium" pay. ---------------------------------------------------------------- SFCA0669-014 07/01/2013 Rates Fringes SPRINKLER FITTER.................$ 32.98 19.35 ---------------------------------------------------------------- SHEE0273-002 08/01/2015 Rates Fringes SHEET METAL WORKER...............$ 40.50 26.67 HOLIDAYS: New Year's Day, Martin Luther King Day, President's Day, Good Friday, Memorial Day, Indepdendence Day, Labor Day, Veterans Day,Thankisgiving Day & Friday after, Christmas Day ---------------------------------------------------------------- TEAM0011-002 07/01/2014 Rates Fringes TRUCK DRIVER GROUP 1....................$ 27.99 24.14 GROUP 2....................$ 28.14 24.14 GROUP 3....................$ 28.27 24.14 GROUP 4....................$ 28.46 24.14 GROUP 5....................$ 28.49 24.14 GROUP 6....................$ 28.52 24.14 GROUP 7....................$ 28.77 24.14 GROUP 8....................$ 29.02 24.14 GROUP 9....................$ 29.22 24.14 GROUP 10....................$ 29.52 24.14 GROUP 11....................$ 30.02 24.14 GROUP 12....................$ 30.45 24.14 WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 per hour additional. [29 palms Marine Base, Camp Roberts, China Lake, Edwards AFB, El Centro Naval Facility, Fort Irwin, Marine Corps Logistics Base at Nebo & Yermo, Mountain Warfare Training Center, Bridgeport, Point Arguello, Point Conception, Vandenberg AFB] TRUCK DRIVERS CLASSIFICATIONS 7.c Packet Pg. 127 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 26 of 79 GROUP 1: Truck driver GROUP 2: Driver of vehicle or combination of vehicles - 2 axles; Traffic control pilot car excluding moving heavy equipment permit load; Truck mounted broom GROUP 3: Driver of vehicle or combination of vehicles - 3 axles; Boot person; Cement mason distribution truck; Fuel truck driver; Water truck - 2 axle; Dump truck, less than 16 yds. water level; Erosion control driver GROUP 4: Driver of transit mix truck, under 3 yds.; Dumpcrete truck, less than 6-1/2 yds. water level GROUP 5: Water truck, 3 or more axles; Truck greaser and tire person ($0.50 additional for tire person); Pipeline and utility working truck driver, including winch truck and plastic fusion, limited to pipeline and utility work; Slurry truck driver GROUP 6: Transit mix truck, 3 yds. or more; Dumpcrete truck, 6-1/2 yds. water level and over; Vehicle or combination of vehicles - 4 or more axles; Oil spreader truck; Dump truck, 16 yds. to 25 yds. water level GROUP 7: A Frame, Swedish crane or similar; Forklift driver; Ross carrier driver GROUP 8: Dump truck, 25 yds. to 49 yds. water level; Truck repair person; Water pull - single engine; Welder GROUP 9: Truck repair person/welder; Low bed driver, 9 axles or over GROUP 10: Dump truck - 50 yds. or more water level; Water pull - single engine with attachment GROUP 11: Water pull - twin engine; Water pull - twin engine with attachments; Winch truck driver - $1.25 additional when operating winch or similar special attachments GROUP 12: Boom Truck 17K and above ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- 7.c Packet Pg. 128 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 27 of 79 The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. 7.c Packet Pg. 129 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 28 of 79 A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. 7.c Packet Pg. 130 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 29 of 79 Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION   7.c Packet Pg. 131 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 30 of 79   General Decision Number: CA150019 09/04/2015 CA19 Superseded General Decision Number: CA20140019 State: California Construction Types: Building, Heavy (Heavy and Dredging) and Highway County: San Luis Obispo County in California. BUILDING, DREDGING (does not include hopper dredge work), HEAVY (does not include water well drilling, AND HIGHWAY CONSTRUCTION PROJECTS Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/02/2015 1 01/16/2015 2 02/06/2015 3 02/20/2015 4 03/27/2015 5 05/08/2015 6 06/19/2015 7 07/10/2015 8 07/17/2015 9 07/24/2015 10 07/31/2015 11 08/07/2015 12 08/14/2015 13 09/04/2015 ASBE0005-002 06/30/2014 Rates Fringes Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems).....$ 35.44 19.36 Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain 7.c Packet Pg. 132 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 31 of 79 walls)...........................$ 24.34 16.09 ---------------------------------------------------------------- ASBE0005-004 06/24/2013 Rates Fringes Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)....$ 16.95 10.23 ---------------------------------------------------------------- BOIL0092-004 10/01/2012 Area within a 25 mile radius of City of Santa Maria Rates Fringes BOILERMAKER......................$ 41.17 28.27 ---------------------------------------------------------------- BOIL0549-007 01/01/2013 Remainder of County outside a 25 mile radius of City of Santa Maria Rates Fringes BOILERMAKER......................$ 38.37 31.32 ---------------------------------------------------------------- * BRCA0004-006 05/01/2015 Rates Fringes BRICKLAYER; MARBLE SETTER........$ 36.26 13.70 *The wage scale for prevailing wage projects performed in Blythe, China lake, Death Valley, Fort Irwin, Twenty-Nine Palms, Needles and 1-15 corridor (Barstow to the Nevada State Line) will be Three Dollars ($3.00) above the standard San Bernardino/Riverside County hourly wage rate ---------------------------------------------------------------- BRCA0018-008 06/01/2014 Rates Fringes MARBLE FINISHER..................$ 28.45 11.38 TILE FINISHER....................$ 23.78 9.84 ---------------------------------------------------------------- BRCA0018-011 06/01/2014 Rates Fringes TILE LAYER.......................$ 35.14 14.33 ---------------------------------------------------------------- 7.c Packet Pg. 133 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 32 of 79 CARP0409-001 07/01/2010 Rates Fringes CARPENTER (1) Carpenter, Cabinet Installer, Insulation Installer, Hardwood Floor Worker and acoustical installer...................$ 37.35 11.08 (2) Millwright..............$ 37.85 11.08 (3) Piledrivermen/Derrick Bargeman, Bridge or Dock Carpenter, Heavy Framer, Rock Bargeman or Scowman, Rockslinger, Shingler (Commercial)................$ 37.48 11.08 (4) Pneumatic Nailer, Power Stapler...............$ 37.60 11.08 (5) Sawfiler...............$ 37.44 11.08 (6) Scaffold Builder.......$ 28.55 11.08 (7) Table Power Saw Operator....................$ 37.45 11.08 FOOTNOTE: Work of forming in the construction of open cut sewers or storm drains, on operations in which horizontal lagging is used in conjunction with steel H-Beams driven or placed in pre- drilled holes, for that portion of a lagged trench against which concrete is poured, namely, as a substitute for back forms (which work is performed by piledrivers): $0.13 per hour additional. ---------------------------------------------------------------- CARP0409-005 07/01/2010 Rates Fringes Drywall DRYWALL INSTALLER/LATHER....$ 37.35 11.08 STOCKER/SCRAPPER............$ 10.00 6.67 ---------------------------------------------------------------- CARP0409-008 08/01/2010 Rates Fringes Modular Furniture Installer......$ 17.00 7.41 ---------------------------------------------------------------- ELEC0639-001 06/01/2015 Rates Fringes Electricians Wireman/Technician..........$ 39.30 18.66 FOOTNOTES: CABLE SPLICER: 10% additional per hour above Wireman/Technician basic hourly rate. Work from trusses, swinging scaffolds, open ladders, scaffolds, bosun chairs, stacks or towers, where subject to 7.c Packet Pg. 134 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 33 of 79 a direct fall from the ground floor or support structure from a distance of fifty (50) feet to ninety (90) feet: to be paid time and one-half. Work from trusses, swinging scaffolds, open ladders, scaffolds, bosun chairs, stacks or towers, where subject to a direct fall from the ground floor or support structure from a distance over ninety (90) feet: to be paid double the regular straight time rate of pay. Where workers are required to work under compressed air or in areas where injurious gases, dust or fumes are present in amounts necessitating the use of gas masks or self-contained breathing apparatus (particle masks are not considered self-contained breathing apparatus) or where workers work on poles at a distance of seventy-five (75) feet or more from the ground: to be paid a bonus of straight time pay. This shall be at a minimum of one hour, and thereafter, each succeeding hour or fraction thereof shall constitute an hour at the bonus rate. Tunnel work: to be paid at the time and one-quarter hourly rate. All employers may request workmen to report direct to a job within a free zone to include everything west of ten (10) miles east of Highway 101, as the crow flies, and then (10) miles north and south of Highway 46, as the crow flies, to the junction of Highway 41 and Highway 46. Everything outside this area shall be paid at full subsistence provide said job is of five (5) days duration or more and provide there is storage on the job for the Employee's tools. The Employer will be responsible for loss of tools under such circumstances. (Road: The most direct route on a surfaced road). On all jobs or projects outside the free zone, as stated above, Employees may be required to report to the job site in their own transportation at the regular starting time and remain on the job site until the regular quitting time and these shall be paid at fifty dollars ($50.00) per day or fifty-one cents ($0.51) per mile for each road mile from shop to job and job to shop (round trip). (Day worked shall mean at least four (4) hours on the job unless sent home on account of weather, emergency, sickness, or injury). The Employer shall pay for traveling time and furnish transportation from shop to job, job to job, and job to shop. Travel time shall be at the appropriate rate of pay for that day of the week. (Monday through Friday, straight time, Saturday and Sunday, double time.) ---------------------------------------------------------------- ELEC0639-003 05/26/2014 COMMUNICATIONS AND SYSTEMS WORK SAN LUIS OBISPO COUNTY Rates Fringes Communications System Installer...................$ 29.09 11.60 Technician..................$ 30.89 11.66 SCOPE OF WORK: Installation, testing, service and maintenance 7.c Packet Pg. 135 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 34 of 79 of systems utilizing the transmission and/or transference of voice, sound, vision and digital for commercial, educational, security and entertainment purposes for the following: TV monitoring and surveillance, background - foreground music, intercom and telephone interconnect, microwave transmission, multi-media, multiplex, nurse call systems, radio page, burglar alarms and fire alarm (see last paragraph below). Communication Systems that transmit or receive information and/or control systems that are intrinsic to the above listed systems; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding all other data systems or multiple systems which include control function or power supply; excluding installation of raceway systems, conduit systems, line voltage work, and energy management systems. Fire alarm work shall be performed at the current inside electrician total cost package. ---------------------------------------------------------------- ELEC1245-001 06/01/2015 Rates Fringes LINE CONSTRUCTION (1) Lineman; Cable splicer..$ 52.85 15.53 (2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 42.21 14.32 (3) Groundman...............$ 32.28 14.03 (4) Powderman...............$ 47.19 14.60 HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day ---------------------------------------------------------------- ELEV0008-003 01/01/2015 Rates Fringes ELEVATOR MECHANIC................$ 60.39 28.38 FOOTNOTE: PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day. ---------------------------------------------------------------- ENGI0012-003 07/06/2015 7.c Packet Pg. 136 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 35 of 79 Rates Fringes OPERATOR: Power Equipment (All Other Work) GROUP 1....................$ 39.95 23.35 GROUP 2....................$ 40.73 23.35 GROUP 3....................$ 41.02 23.35 GROUP 4....................$ 42.51 23.35 GROUP 5....................$ 41.86 23.35 GROUP 6....................$ 41.83 23.35 GROUP 8....................$ 42.84 23.35 GROUP 9....................$ 42.19 23.35 GROUP 10....................$ 42.96 23.35 GROUP 11....................$ 42.31 23.35 GROUP 12....................$ 43.13 23.35 GROUP 13....................$ 43.23 23.35 GROUP 14....................$ 43.26 23.35 GROUP 15....................$ 43.34 23.35 GROUP 16....................$ 43.46 23.35 GROUP 17....................$ 43.63 23.35 GROUP 18....................$ 43.73 23.35 GROUP 19....................$ 43.84 23.35 GROUP 20....................$ 43.96 23.35 GROUP 21....................$ 44.13 23.35 GROUP 22....................$ 44.23 23.35 GROUP 23....................$ 44.34 23.35 GROUP 24....................$ 44.46 23.35 GROUP 25....................$ 44.63 23.35 OPERATOR: Power Equipment (Cranes, Piledriving & Hoisting) GROUP 1....................$ 41.30 23.35 GROUP 2....................$ 42.08 23.35 GROUP 3....................$ 42.37 23.35 GROUP 4....................$ 42.51 23.35 GROUP 5....................$ 42.73 23.35 GROUP 6....................$ 42.84 23.35 GROUP 7....................$ 42.96 23.35 GROUP 8....................$ 43.13 23.35 GROUP 9....................$ 43.30 23.35 GROUP 10....................$ 44.30 23.35 GROUP 11....................$ 45.30 23.35 GROUP 12....................$ 46.30 23.35 GROUP 13....................$ 47.30 23.35 OPERATOR: Power Equipment (Tunnel Work) GROUP 1....................$ 41.80 23.35 GROUP 2....................$ 42.58 23.35 GROUP 3....................$ 42.87 23.35 GROUP 4....................$ 43.01 23.35 GROUP 5....................$ 43.23 23.35 GROUP 6....................$ 43.34 23.35 GROUP 7....................$ 43.46 23.35 PREMIUM PAY: $3.75 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton 7.c Packet Pg. 137 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 36 of 79 Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator. SEE ZONE DEFINITIONS AFTER CLASSIFICATIONS POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch Witch, with seat or similar type equipment; Elevator operator-inside; Engineer Oiler; Forklift operator (includes loed, lull or similar types under 5 tons; Generator operator; Generator, pump or compressor plant operator; Pump operator; Signalman; Switchman GROUP 2: Asphalt-rubber plant operator (nurse tank operator); Concrete mixer operator-skip type; Conveyor operator; Fireman; Forklift operator (includes loed, lull or similar types over 5 tons; Hydrostatic pump operator; oiler crusher (asphalt or concrete plant); Petromat laydown machine; PJU side dum jack; Screening and conveyor machine operator (or similar types); Skiploader (wheel type up to 3/4 yd. without attachment); Tar pot fireman; Temporary heating plant operator; Trenching machine oiler GROUP 3: Asphalt-rubber blend operator; Bobcat or similar type (Skid steer); Equipment greaser (rack); Ford Ferguson (with dragtype attachments); Helicopter radioman (ground); Stationary pipe wrapping and cleaning machine operator GROUP 4: Asphalt plant fireman; Backhoe operator (mini-max or similar type); Boring machine operator; Boxman or mixerman (asphalt or concrete); Chip spreading machine operator; Concrete cleaning decontamination machine operator; Concrete Pump Operator (small portable); Drilling machine operator, small auger types (Texoma super economatic or similar types - Hughes 100 or 200 or similar types - drilling depth of 30' maximum); Equipment greaser (grease truck); Guard rail post driver operator; Highline cableway signalman; Hydra-hammer-aero stomper; Micro Tunneling (above ground tunnel); Power concrete curing machine operator; Power concrete saw operator; Power-driven jumbo form setter operator; Power sweeper operator; Rock Wheel Saw/Trencher; Roller operator (compacting); Screed operator (asphalt or concrete); Trenching machine operator (up to 6 ft.); Vacuum or much truck GROUP 5: Equipment Greaser (Grease Truck/Multi Shift). GROUP 6: Articulating material hauler; Asphalt plant engineer; Batch plant operator; Bit sharpener; Concrete joint machine operator (canal and similar type); Concrete planer operator; Dandy digger; Deck engine operator; Derrickman (oilfield type); Drilling machine operator, bucket or auger types (Calweld 100 bucket or similar types - Watson 1000 auger or similar types - Texoma 330, 500 or 600 auger or similar types - drilling depth of 45' maximum); Drilling machine operator; Hydrographic seeder machine operator (straw, pulp or seed), Jackson track 7.c Packet Pg. 138 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 37 of 79 maintainer, or similar type; Kalamazoo Switch tamper, or similar type; Machine tool operator; Maginnis internal full slab vibrator, Mechanical berm, curb or gutter(concrete or asphalt); Mechanical finisher operator (concrete, Clary-Johnson-Bidwell or similar); Micro tunnel system (below ground); Pavement breaker operator (truck mounted); Road oil mixing machine operator; Roller operator (asphalt or finish), rubber-tired earth moving equipment (single engine, up to and including 25 yds. struck); Self-propelled tar pipelining machine operator; Skiploader operator (crawler and wheel type, over 3/4 yd. and up to and including 1-1/2 yds.); Slip form pump operator (power driven hydraulic lifting device for concrete forms); Tractor operator-bulldozer, tamper-scraper (single engine, up to 100 h.p. flywheel and similar types, up to and including D-5 and similar types); Tugger hoist operator (1 drum); Ultra high pressure waterjet cutting tool system operator; Vacuum blasting machine operator GROUP 8: Asphalt or concrete spreading operator (tamping or finishing); Asphalt paving machine operator (Barber Greene or similar type); Asphalt-rubber distribution operator; Backhoe operator (up to and including 3/4 yd.), small ford, Case or similar; Cast-in-place pipe laying machine operator; Combination mixer and compressor operator (gunite work); Compactor operator (self-propelled); Concrete mixer operator (paving); Crushing plant operator; Drill Doctor; Drilling machine operator, Bucket or auger types (Calweld 150 bucket or similar types - Watson 1500, 2000 2500 auger or similar types - Texoma 700, 800 auger or similar types - drilling depth of 60' maximum); Elevating grader operator; Grade checker; Gradall operator; Grouting machine operator; Heavy-duty repairman; Heavy equipment robotics operator; Kalamazoo balliste regulator or similar type; Kolman belt loader and similar type; Le Tourneau blob compactor or similar type; Loader operator (Athey, Euclid, Sierra and similar types); Mobark Chipper or similar; Ozzie padder or similar types; P.C. slot saw; Pneumatic concrete placing machine operator (Hackley-Presswell or similar type); Pumpcrete gun operator; Rock Drill or similar types; Rotary drill operator (excluding caisson type); Rubber-tired earth-moving equipment operator (single engine, caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. up to and including 50 cu. yds. struck); Rubber-tired earth-moving equipment operator (multiple engine up to and including 25 yds. struck); Rubber-tired scraper operator (self-loading paddle wheel type-John Deere, 1040 and similar single unit); Self- propelled curb and gutter machine operator; Shuttle buggy; Skiploader operator (crawler and wheel type over 1-1/2 yds. up to and including 6-1/2 yds.); Soil remediation plant operator; Surface heaters and planer operator; Tractor compressor drill combination operator; Tractor operator (any type larger than D-5 - 100 flywheel h.p. and over, or similar-bulldozer, tamper, scraper and push tractor single engine); Tractor operator (boom attachments), Traveling pipe wrapping, cleaning and bendng machine operator; Trenching machine operator (over 6 ft. depth capacity, manufacturer's rating); trenching Machine with Road Miner attachment (over 6 ft depth capacity): Ultra high pressure waterjet cutting tool system mechanic; Water pull 7.c Packet Pg. 139 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 38 of 79 (compaction) operator GROUP 9: Heavy Duty Repairman GROUP 10: Drilling machine operator, Bucket or auger types (Calweld 200 B bucket or similar types-Watson 3000 or 5000 auger or similar types-Texoma 900 auger or similar types-drilling depth of 105' maximum); Dual drum mixer, dynamic compactor LDC350 (or similar types); Monorail locomotive operator (diesel, gas or electric); Motor patrol-blade operator (single engine); Multiple engine tractor operator (Euclid and similar type-except Quad 9 cat.); Rubber-tired earth-moving equipment operator (single engine, over 50 yds. struck); Pneumatic pipe ramming tool and similar types; Prestressed wrapping machine operator; Rubber-tired earth-moving equipment operator (single engine, over 50 yds. struck); Rubber tired earth moving equipment operator (multiple engine, Euclid, caterpillar and similar over 25 yds. and up to 50 yds. struck), Tower crane repairman; Tractor loader operator (crawler and wheel type over 6-1/2 yds.); Woods mixer operator (and similar Pugmill equipment) GROUP 11: Heavy Duty Repairman - Welder Combination, Welder - Certified. GROUP 12: Auto grader operator; Automatic slip form operator; Drilling machine operator, bucket or auger types (Calweld, auger 200 CA or similar types - Watson, auger 6000 or similar types - Hughes Super Duty, auger 200 or similar types - drilling depth of 175' maximum); Hoe ram or similar with compressor; Mass excavator operator less tha 750 cu. yards; Mechanical finishing machine operator; Mobile form traveler operator; Motor patrol operator (multi-engine); Pipe mobile machine operator; Rubber-tired earth- moving equipment operator (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck); Rubber-tired self- loading scraper operator (paddle-wheel-auger type self-loading - two (2) or more units) GROUP 13: Rubber-tired earth-moving equipment operator operating equipment with push-pull system (single engine, up to and including 25 yds. struck) GROUP 14: Canal liner operator; Canal trimmer operator; Remote- control earth-moving equipment operator (operating a second piece of equipment: $1.00 per hour additional); Wheel excavator operator (over 750 cu. yds.) GROUP 15: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine-up to and including 25 yds. struck) GROUP 16: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system 7.c Packet Pg. 140 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 39 of 79 (multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck) GROUP 17: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine, Euclid, Caterpillar and similar, over 50 cu. yds. struck); Tandem tractor operator (operating crawler type tractors in tandem - Quad 9 and similar type) GROUP 18: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - single engine, up to and including 25 yds. struck) GROUP 19: Rotex concrete belt operator (or similar types); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds.and up to and including 50 cu. yds. struck); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - multiple engine, up to and including 25 yds. struck) GROUP 20: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps, and similar types in any combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck) GROUP 21: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck) GROUP 22: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, up to and including 25 yds. struck) GROUP 23: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired earth-moving equipment operator, operating with the tandem push-pull system (multiple engine, up to and including 25 yds. struck) GROUP 24: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck) 7.c Packet Pg. 141 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 40 of 79 GROUP 25: Concrete pump operator-truck mounted; Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck) CRANES, PILEDRIVING AND HOISTING EQUIPMENT CLASSIFICATIONS GROUP 1: Engineer oiler; Fork lift operator (includes loed, lull or similar types) GROUP 2: Truck crane oiler GROUP 3: A-frame or winch truck operator; Ross carrier operator (jobsite) GROUP 4: Bridge-type unloader and turntable operator; Helicopter hoist operator GROUP 5: Hydraulic boom truck; Stinger crane (Austin-Western or similar type); Tugger hoist operator (1 drum) GROUP 6: Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boom and similar type); Lift mobile operator; Lift slab machine operator (Vagtborg and similar types); Material hoist and/or manlift operator; Polar gantry crane operator; Self Climbing scaffold (or similar type); Shovel, backhoe, dragline, clamshell operator (over 3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator GROUP 7: Pedestal crane operator; Shovel, backhoe, dragline, clamshell operator (over 5 cu. yds. mrc); Tower crane repair; Tugger hoist operator (3 drum) GROUP 8: Crane operator (up to and including 25 ton capacity); Crawler transporter operator; Derrick barge operator (up to and including 25 ton capacity); Hoist operator, stiff legs, Guy derrick or similar type (up to and including 25 ton capacity); Shovel, backhoe, dragline, clamshell operator (over 7 cu. yds., M.R.C.) GROUP 9: Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons mrc); Highline cableway operator; Hoist operator, stiff legs, Guy derrick or similar type (over 25 tons up to and including 50 tons mrc); K-crane operator; Polar crane operator; Self erecting tower crane operator maximum lifting capacity ten tons GROUP 10: Crane operator (over 50 tons and up to and including 100 tons mrc); Derrick barge operator (over 50 tons up to and including 100 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 50 tons up to and including 100 tons mrc), Mobile tower crane operator (over 50 tons, up to and including 100 tons M.R.C.); Tower crane operator and tower gantry GROUP 11: Crane operator (over 100 tons and up to and including 200 tons mrc); Derrick barge operator (over 100 tons up to and including 200 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 100 tons up 7.c Packet Pg. 142 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 41 of 79 to and including 200 tons mrc); Mobile tower crane operator (over 100 tons up to and including 200 tons mrc) GROUP 12: Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge operator (over 200 tons up to and including 300 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 200 tons, up to and including 300 tons mrc); Mobile tower crane operator (over 200 tons, up to and including 300 tons mrc) GROUP 13: Crane operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons); Mobile tower crane operator (over 300 tons) TUNNEL CLASSIFICATIONS GROUP 1: Skiploader (wheel type up to 3/4 yd. without attachment) GROUP 2: Power-driven jumbo form setter operator GROUP 3: Dinkey locomotive or motorperson (up to and including 10 tons) GROUP 4: Bit sharpener; Equipment greaser (grease truck); Slip form pump operator (power-driven hydraulic lifting device for concrete forms); Tugger hoist operator (1 drum); Tunnel locomotive operator (over 10 and up to and including 30 tons) GROUP 5: Backhoe operator (up to and including 3/4 yd.); Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shield operator; Heavy-duty repairperson; Loader operator (Athey, Euclid, Sierra and similar types); Mucking machine operator (1/4 yd., rubber-tired, rail or track type); Pneumatic concrete placing machine operator (Hackley-Presswell or similar type); Pneumatic heading shield (tunnel); Pumpcrete gun operator; Tractor compressor drill combination operator; Tugger hoist operator (2 drum); Tunnel locomotive operator (over 30 tons) GROUP 6: Heavy Duty Repairman GROUP 7: Tunnel mole boring machine operator ENGINEERS ZONES $1.00 additional per hour for all of IMPERIAL County and the portions of KERN, RIVERSIDE & SAN BERNARDINO Counties as defined below: That area within the following Boundary: Begin in San Bernardino County, approximately 3 miles NE of the intersection of I-15 and the California State line at that point which is the NW corner of Section 1, T17N,m R14E, San Bernardino Meridian. Continue W in a straight line to that point which is the SW corner of the northwest quarter of Section 6, T27S, R42E, Mt. Diablo Meridian. Continue North to the intersection with the Inyo County Boundary at that point which is the NE corner of the western half of the northern quarter of Section 7.c Packet Pg. 143 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 42 of 79 6, T25S, R42E, MDM. Continue W along the Inyo and San Bernardino County boundary until the intersection with Kern County, as that point which is the SE corner of Section 34, T24S, R40E, MDM. Continue W along the Inyo and Kern County boundary until the intersection with Tulare County, at that point which is the SW corner of the SE quarter of Section 32, T24S, R37E, MDM. Continue W along the Kern and Tulare County boundary, until that point which is the NW corner of T25S, R32E, MDM. Continue S following R32E lines to the NW corner of T31S, R32E, MDM. Continue W to the NW corner of T31S, R31E, MDM. Continue S to the SW corner of T32S, R31E, MDM. Continue W to SW corner of SE quarter of Section 34, T32S, R30E, MDM. Continue S to SW corner of T11N, R17W, SBM. Continue E along south boundary of T11N, SBM to SW corner of T11N, R7W, SBM. Continue S to SW corner of T9N, R7W, SBM. Continue E along south boundary of T9N, SBM to SW corner of T9N, R1E, SBM. Continue S along west boundary of R1E, SMB to Riverside County line at the SW corner of T1S, R1E, SBM. Continue E along south boundary of T1s, SBM (Riverside County Line) to SW corner of T1S, R10E, SBM. Continue S along west boundary of R10E, SBM to Imperial County line at the SW corner of T8S, R10E, SBM. Continue W along Imperial and Riverside county line to NW corner of T9S, R9E, SBM. Continue S along the boundary between Imperial and San Diego Counties, along the west edge of R9E, SBM to the south boundary of Imperial County/California state line. Follow the California state line west to Arizona state line, then north to Nevada state line, then continuing NW back to start at the point which is the NW corner of Section 1, T17N, R14E, SBM $1.00 additional per hour for portions of SAN LUIS OBISPO, KERN, SANTA BARBARA & VENTURA as defined below: That area within the following Boundary: Begin approximately 5 miles north of the community of Cholame, on the Monterey County and San Luis Obispo County boundary at the NW corner of T25S, R16E, Mt. Diablo Meridian. Continue south along the west side of R16E to the SW corner of T30S, R16E, MDM. Continue E to SW corner of T30S, R17E, MDM. Continue S to SW corner of T31S, R17E, MDM. Continue E to SW corner of T31S, R18E, MDM. Continue S along West side of R18E, MDM as it crosses into San Bernardino Meridian numbering area and becomes R30W. Follow the west side of R30W, SBM to the SW corner of T9N, R30W, SBM. Continue E along the south edge of T9N, SBM to the Santa Barbara County and Ventura County boundary at that point whch is the SW corner of Section 34.T9N, R24W, SBM, continue S along the Ventura County line to that point which is the SW corner of the SE quarter of Section 32, T7N, R24W, SBM. Continue E along the south edge of T7N, SBM to the SE corner to T7N, R21W, SBM. Continue N along East side of R21W, SBM to Ventura County and Kern County boundary at the NE corner of T8N, R21W. Continue W along the Ventura County and Kern County boundary to the SE corner of T9N, R21W. Continue North along the East edge of R21W, SBM to the NE corner of T12N, R21W, SBM. Continue West along the north edge of T12N, SBM to the SE corner of T32S, R21E, MDM. [T12N SBM is a think strip between T11N SBM and T32S MDM]. Continue North along the East side of R21E, MDM to the Kings County and Kern County border at the NE corner of T25S, R21E, MDM, continue West along the Kings County and Kern County Boundary until the intersection of San Luis Obispo County. Continue west along the Kings County and San Luis 7.c Packet Pg. 144 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 43 of 79 Obispo County boundary until the intersection with Monterey County. Continue West along the Monterey County and San Luis Obispo County boundary to the beginning point at the NW corner of T25S, R16E, MDM. $2.00 additional per hour for INYO and MONO Counties and the Northern portion of SAN BERNARDINO County as defined below: That area within the following Boundary: Begin at the intersection of the northern boundary of Mono County and the California state line at the point which is the center of Section 17, T10N, R22E, Mt. Diablo Meridian. Continue S then SE along the entire western boundary of Mono County, until it reaches Inyo County at the point which is the NE corner of the Western half of the NW quarter of Section 2, T8S, R29E, MDM. Continue SSE along the entire western boundary of Inyo County, until the intersection with Kern County at the point which is the SW corner of the SE 1/4 of Section 32, T24S, R37E, MDM. Continue E along the Inyo and Kern County boundary until the intersection with San Bernardino County at that point which is the SE corner of section 34, T24S, R40E, MDM. Continue E along the Inyo and San Bernardino County boundary until the point which is the NE corner of the Western half of the NW quarter of Section 6, T25S, R42E, MDM. Continue S to that point which is the SW corner of the NW quarter of Section 6, T27S, R42E, MDM. Continue E in a straight line to the California and Nevada state border at the point which is the NW corner of Section 1, T17N, R14E, San Bernardino Meridian. Then continue NW along the state line to the starting point, which is the center of Section 18, T10N, R22E, MDM. REMAINING AREA NOT DEFINED ABOVE RECIEVES BASE RATE ---------------------------------------------------------------- ENGI0012-004 08/01/2015 Rates Fringes OPERATOR: Power Equipment (DREDGING) (1) Leverman................$ 49.50 23.60 (2) Dredge dozer............$ 43.53 23.60 (3) Deckmate................$ 43.42 23.60 (4) Winch operator (stern winch on dredge)............$ 42.87 23.60 (5) Fireman-Oiler, Deckhand, Bargeman, Leveehand...................$ 42.33 23.60 (6) Barge Mate..............$ 42.94 23.60 ---------------------------------------------------------------- IRON0377-002 07/01/2015 Rates Fringes Ironworkers: Fence Erector...............$ 27.08 20.21 Ornamental, Reinforcing and Structural..............$ 33.50 28.85 7.c Packet Pg. 145 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 44 of 79 PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- LABO0220-001 07/01/2014 Rates Fringes LABORER (TUNNEL) GROUP 1.....................$ 35.74 16.48 GROUP 2.....................$ 36.06 16.48 GROUP 3.....................$ 36.52 16.48 GROUP 4.....................$ 37.21 16.48 LABORER GROUP 1.....................$ 30.19 16.48 GROUP 2.....................$ 30.74 16.48 GROUP 3.....................$ 31.29 16.48 GROUP 4.....................$ 32.84 16.48 GROUP 5.....................$ 33.19 16.48 LABORER CLASSIFICATIONS GROUP 1: Cleaning and handling of panel forms; Concrete screeding for rough strike-off; Concrete, water curing; Demolition laborer, the cleaning of brick if performed by a worker performing any other phase of demolition work, and the cleaning of lumber; Fire watcher, limber, brush loader, piler and debris handler; Flag person; Gas, oil and/or water pipeline laborer; Laborer, asphalt-rubber material loader; Laborer, general or construction; Laborer, general clean-up; Laborer, landscaping; Laborer, jetting; Laborer, temporary water and air lines; Material hose operator (walls, slabs, floors and decks); Plugging, filling of shee bolt holes; Dry packing of concrete; Railroad maintenance, repair track person and road beds; Streetcar and railroad construction track laborers; Rigging and signaling; Scaler; Slip form raiser; Tar and mortar; Tool crib or tool house laborer; Traffic control by any method; Window cleaner; Wire mesh pulling - all concrete pouring operations GROUP 2: Asphalt shoveler; Cement dumper (on 1 yd. or larger mixer and handling bulk cement); Cesspool digger and 7.c Packet Pg. 146 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 45 of 79 installer; Chucktender; Chute handler, pouring concrete, the handling of the chute from readymix trucks, such as walls, slabs, decks, floors, foundation, footings, curbs, gutters and sidewalks; Concrete curer, impervious membrane and form oiler; Cutting torch operator (demolition); Fine grader, highways and street paving, airport, runways and similar type heavy construction; Gas, oil and/or water pipeline wrapper - pot tender and form person; Guinea chaser; Headerboard person - asphalt; Laborer, packing rod steel and pans; Membrane vapor barrier installer; Power broom sweeper (small); Riprap stonepaver, placing stone or wet sacked concrete; Roto scraper and tiller; Sandblaster (pot tender); Septic tank digger and installer(lead); Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredder; Underground laborer, including caisson bellower GROUP 3: Buggymobile person; Concrete cutting torch; Concrete pile cutter; Driller, jackhammer, 2-1/2 ft. drill steel or longer; Dri-pak-it machine; Gas, oil and/or water pipeline wrapper, 6-in. pipe and over, by any method, inside and out; High scaler (including drilling of same); Hydro seeder and similar type; Impact wrench multi-plate; Kettle person, pot person and workers applying asphalt, lay-kold, creosote, lime caustic and similar type materials ("applying" means applying, dipping, brushing or handling of such materials for pipe wrapping and waterproofing); Operator of pneumatic, gas, electric tools, vibrating machine, pavement breaker, air blasting, come-alongs, and similar mechanical tools not separately classified herein; Pipelayer's backup person, coating, grouting, making of joints, sealing, caulking, diapering and including rubber gasket joints, pointing and any and all other services; Rock slinger; Rotary scarifier or multiple head concrete chipping scarifier; Steel headerboard and guideline setter; Tamper, Barko, Wacker and similar type; Trenching machine, hand-propelled GROUP 4: Asphalt raker, lute person, ironer, asphalt dump person, and asphalt spreader boxes (all types); Concrete core cutter (walls, floors or ceilings), grinder or sander; Concrete saw person, cutting walls or flat work, scoring old or new concrete; Cribber, shorer, lagging, sheeting and trench bracing, hand-guided lagging hammer; Head rock slinger; Laborer, asphalt- rubber distributor boot person; Laser beam in connection with laborers' work; Oversize concrete vibrator operator, 70 lbs. and over; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in the ditch until completion of operation, including any and all forms of tubular material, whether pipe, metallic or non-metallic, conduit and any other stationary type of tubular device used for the conveying of any substance or element, whether water, sewage, solid gas, air, or other product whatsoever and without regard to the nature of material from which the tubular material is fabricated; No-joint pipe and stripping of same; Prefabricated manhole installer; Sandblaster (nozzle person), water blasting, Porta Shot-Blast GROUP 5: Blaster powder, all work of loading holes, placing and blasting of all powder and explosives of whatever type, 7.c Packet Pg. 147 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 46 of 79 regardless of method used for such loading and placing; Driller: All power drills, excluding jackhammer, whether core, diamond, wagon, track, multiple unit, and any and all other types of mechanical drills without regard to the form of motive power; Toxic waste removal TUNNEL LABORER CLASSIFICATIONS GROUP 1: Batch plant laborer; Changehouse person; Dump person; Dump person (outside); Swamper (brake person and switch person on tunnel work); Tunnel materials handling person; Nipper; Pot tender, using mastic or other materials (for example, but not by way of limitation, shotcrete, etc.); GROUP 2: Bull gang mucker, track person; Chucktender, Cabletender; Concrete crew, including rodder and spreader; Loading and unloading agitator cars; Vibrator person, jack hammer, pneumatic tools (except driller) GROUP 3: Blaster, driller, powder person; Chemical grout jet person; Cherry picker person; Grout gun person; Grout mixer person; Grout pump person; Jackleg miner; Jumbo person; Kemper and other pneumatic concrete placer operator; Miner, tunnel (hand or machine); Nozzle person; Operating of troweling and/or grouting machines; Powder person (primer house); Primer person; Sandblaster; Shotcrete person; Steel form raiser and setter; Timber person, retimber person, wood or steel; Tunnel Concrete finisher GROUP 4: Diamond driller; Sandblaster; Shaft and raise work ---------------------------------------------------------------- LABO0220-004 07/01/2014 Rates Fringes Brick Tender.....................$ 29.12 15.78 ---------------------------------------------------------------- LABO0300-005 01/01/2014 Rates Fringes Asbestos Removal Laborer.........$ 28.00 15.25 SCOPE OF WORK: Includes site mobilization, initial site cleanup, site preparation, removal of asbestos-containing material and toxic waste, encapsulation, enclosure and disposal of asbestos- containing materials and toxic waste by hand or with equipment or machinery; scaffolding, fabrication of temporary wooden barriers and assembly of decontamination stations. ---------------------------------------------------------------- LABO0345-001 07/01/2014 Rates Fringes LABORER (GUNITE) GROUP 1.....................$ 34.79 17.92 GROUP 2.....................$ 33.84 17.92 7.c Packet Pg. 148 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 47 of 79 GROUP 3.....................$ 30.30 17.92 FOOTNOTE: GUNITE PREMIUM PAY: Workers working from a Bosn'n's Chair or suspended from a rope or cable shall receive 40 cents per hour above the foregoing applicable classification rates. Workers doing gunite and/or shotcrete work in a tunnel shall receive 35 cents per hour above the foregoing applicable classification rates, paid on a portal-to-portal basis. Any work performed on, in or above any smoke stack, silo, storage elevator or similar type of structure, when such structure is in excess of 75'-0" above base level and which work must be performed in whole or in part more than 75'-0" above base level, that work performed above the 75'-0" level shall be compensated for at 35 cents per hour above the applicable classification wage rate. GUNITE LABORER CLASSIFICATIONS GROUP 1: Rodmen, Nozzlemen GROUP 2: Gunmen GROUP 3: Reboundmen ---------------------------------------------------------------- * LABO1184-001 08/01/2015 Rates Fringes Laborers: (HORIZONTAL DIRECTIONAL DRILLING) (1) Drilling Crew Laborer...$ 32.60 12.16 (2) Vehicle Operator/Hauler.$ 32.77 12.16 (3) Horizontal Directional Drill Operator..............$ 34.62 12.16 (4) Electronic Tracking Locator.....................$ 36.62 12.16 Laborers: (STRIPING/SLURRY SEAL) GROUP 1.....................$ 33.76 15.04 GROUP 2.....................$ 35.06 15.04 GROUP 3.....................$ 37.07 15.04 GROUP 4.....................$ 38.81 15.04 LABORERS - STRIPING CLASSIFICATIONS GROUP 1: Protective coating, pavement sealing, including repair and filling of cracks by any method on any surface in parking lots, game courts and playgrounds; carstops; operation of all related machinery and equipment; equipment repair technician GROUP 2: Traffic surface abrasive blaster; pot tender - removal of all traffic lines and markings by any method (sandblasting, waterblasting, grinding, etc.) and preparation of surface for coatings. Traffic control person: controlling and directing traffic through both conventional and moving lane closures; operation of all related machinery and equipment 7.c Packet Pg. 149 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 48 of 79 GROUP 3: Traffic delineating device applicator: Layout and application of pavement markers, delineating signs, rumble and traffic bars, adhesives, guide markers, other traffic delineating devices including traffic control. This category includes all traffic related surface preparation (sandblasting, waterblasting, grinding) as part of the application process. Traffic protective delineating system installer: removes, relocates, installs, permanently affixed roadside and parking delineation barricades, fencing, cable anchor, guard rail, reference signs, monument markers; operation of all related machinery and equipment; power broom sweeper GROUP 4: Striper: layout and application of traffic stripes and markings; hot thermo plastic; tape traffic stripes and markings, including traffic control; operation of all related machinery and equipment ---------------------------------------------------------------- LABO1414-001 08/05/2015 Rates Fringes LABORER PLASTER CLEAN-UP LABORER....$ 30.16 17.11 PLASTER TENDER..............$ 32.71 17.11 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- PAIN0036-007 07/01/2015 Rates Fringes Painters: (1) Repaint Including Lead Abatement...................$ 24.19 12.83 (2) High Iron & Steel.......$ 30.70 12.83 (3) Journeyman Painter including Lead Abatement....$ 28.70 12.83 (4) Industrial..............$ 32.02 12.83 (5) All other work..........$ 28.70 12.83 REPAINT of any previously painted structure. Exceptions: work involving the aerospace industry, breweries, commercial recreational facilities, hotels which operate commercial establishments as part of hotel service, and sports facilities. HIGH IRON & STEEL: Aerial towers, towers, radio towers, smoke stacks, flag poles (any flag poles that can be finished from the ground with a ladder excluded), elevated water towers, steeples and domes in their entirety and any other extremely high and hazardous work, cooning steel, bos'n chair, or other similar devices, painting in other high hazardous work shall be classified as high iron & steel ---------------------------------------------------------------- PAIN0036-008 10/01/2014 Rates Fringes 7.c Packet Pg. 150 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 49 of 79 DRYWALL FINISHER/TAPER...........$ 35.18 15.91 ---------------------------------------------------------------- PAIN0169-002 01/01/2015 Rates Fringes GLAZIER..........................$ 34.83 19.75 ---------------------------------------------------------------- PAIN1247-002 01/01/2015 Rates Fringes SOFT FLOOR LAYER.................$ 29.85 13.56 ---------------------------------------------------------------- PLAS0200-001 08/05/2015 Rates Fringes PLASTERER........................$ 38.44 13.77 ---------------------------------------------------------------- PLAS0500-002 07/01/2015 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 32.30 20.65 ---------------------------------------------------------------- PLUM0016-001 07/01/2015 Rates Fringes PLUMBER/PIPEFITTER Plumber and Pipefitter All other work except work on new additions and remodeling of bars, restaurant, stores and commercial buildings not to exceed 5,000 sq. ft. of floor space and work on strip malls, light commercial, tenant improvement and remodel work.......................$ 45.96 20.71 Work ONLY on new additions and remodeling of bars, restaurant, stores and commercial buildings not to exceed 5,000 sq. ft. of floor space.................$ 44.54 19.73 Work ONLY on strip malls, light commercial, tenant improvement and remodel work........................$ 35.16 18.06 ---------------------------------------------------------------- PLUM0345-001 07/01/2014 Rates Fringes PLUMBER Landscape/Irrigation Fitter.$ 29.27 19.75 7.c Packet Pg. 151 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 50 of 79 Sewer & Storm Drain Work....$ 33.24 17.13 ---------------------------------------------------------------- ROOF0036-002 08/01/2014 Rates Fringes ROOFER...........................$ 35.02 13.57 FOOTNOTE: Pitch premium: Work on which employees are exposed to pitch fumes or required to handle pitch, pitch base or pitch impregnated products, or any material containing coal tar pitch, the entire roofing crew shall receive $1.75 per hour "pitch premium" pay. ---------------------------------------------------------------- SFCA0669-014 07/01/2013 Rates Fringes SPRINKLER FITTER.................$ 32.98 19.35 ---------------------------------------------------------------- SHEE0273-002 08/01/2015 Rates Fringes SHEET METAL WORKER...............$ 40.50 26.67 HOLIDAYS: New Year's Day, Martin Luther King Day, President's Day, Good Friday, Memorial Day, Indepdendence Day, Labor Day, Veterans Day,Thankisgiving Day & Friday after, Christmas Day ---------------------------------------------------------------- TEAM0011-002 07/01/2014 Rates Fringes TRUCK DRIVER GROUP 1....................$ 27.99 24.14 GROUP 2....................$ 28.14 24.14 GROUP 3....................$ 28.27 24.14 GROUP 4....................$ 28.46 24.14 GROUP 5....................$ 28.49 24.14 GROUP 6....................$ 28.52 24.14 GROUP 7....................$ 28.77 24.14 GROUP 8....................$ 29.02 24.14 GROUP 9....................$ 29.22 24.14 GROUP 10....................$ 29.52 24.14 GROUP 11....................$ 30.02 24.14 GROUP 12....................$ 30.45 24.14 WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 per hour additional. [29 palms Marine Base, Camp Roberts, China Lake, Edwards AFB, El Centro Naval Facility, Fort Irwin, Marine Corps Logistics Base at Nebo & Yermo, Mountain Warfare Training Center, Bridgeport, Point Arguello, Point Conception, Vandenberg AFB] TRUCK DRIVERS CLASSIFICATIONS 7.c Packet Pg. 152 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 51 of 79 GROUP 1: Truck driver GROUP 2: Driver of vehicle or combination of vehicles - 2 axles; Traffic control pilot car excluding moving heavy equipment permit load; Truck mounted broom GROUP 3: Driver of vehicle or combination of vehicles - 3 axles; Boot person; Cement mason distribution truck; Fuel truck driver; Water truck - 2 axle; Dump truck, less than 16 yds. water level; Erosion control driver GROUP 4: Driver of transit mix truck, under 3 yds.; Dumpcrete truck, less than 6-1/2 yds. water level GROUP 5: Water truck, 3 or more axles; Truck greaser and tire person ($0.50 additional for tire person); Pipeline and utility working truck driver, including winch truck and plastic fusion, limited to pipeline and utility work; Slurry truck driver GROUP 6: Transit mix truck, 3 yds. or more; Dumpcrete truck, 6-1/2 yds. water level and over; Vehicle or combination of vehicles - 4 or more axles; Oil spreader truck; Dump truck, 16 yds. to 25 yds. water level GROUP 7: A Frame, Swedish crane or similar; Forklift driver; Ross carrier driver GROUP 8: Dump truck, 25 yds. to 49 yds. water level; Truck repair person; Water pull - single engine; Welder GROUP 9: Truck repair person/welder; Low bed driver, 9 axles or over GROUP 10: Dump truck - 50 yds. or more water level; Water pull - single engine with attachment GROUP 11: Water pull - twin engine; Water pull - twin engine with attachments; Winch truck driver - $1.25 additional when operating winch or similar special attachments GROUP 12: Boom Truck 17K and above ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- 7.c Packet Pg. 153 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 52 of 79 The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. 7.c Packet Pg. 154 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 53 of 79 A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. 7.c Packet Pg. 155 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 54 of 79 Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION   7.c Packet Pg. 156 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 55 of 79   General Decision Number: CA150019 09/04/2015 CA19 Superseded General Decision Number: CA20140019 State: California Construction Types: Building, Heavy (Heavy and Dredging) and Highway County: San Luis Obispo County in California. BUILDING, DREDGING (does not include hopper dredge work), HEAVY (does not include water well drilling, AND HIGHWAY CONSTRUCTION PROJECTS Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/02/2015 1 01/16/2015 2 02/06/2015 3 02/20/2015 4 03/27/2015 5 05/08/2015 6 06/19/2015 7 07/10/2015 8 07/17/2015 9 07/24/2015 10 07/31/2015 11 08/07/2015 12 08/14/2015 13 09/04/2015 ASBE0005-002 06/30/2014 Rates Fringes Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems).....$ 35.44 19.36 Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain 7.c Packet Pg. 157 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 56 of 79 walls)...........................$ 24.34 16.09 ---------------------------------------------------------------- ASBE0005-004 06/24/2013 Rates Fringes Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)....$ 16.95 10.23 ---------------------------------------------------------------- BOIL0092-004 10/01/2012 Area within a 25 mile radius of City of Santa Maria Rates Fringes BOILERMAKER......................$ 41.17 28.27 ---------------------------------------------------------------- BOIL0549-007 01/01/2013 Remainder of County outside a 25 mile radius of City of Santa Maria Rates Fringes BOILERMAKER......................$ 38.37 31.32 ---------------------------------------------------------------- * BRCA0004-006 05/01/2015 Rates Fringes BRICKLAYER; MARBLE SETTER........$ 36.26 13.70 *The wage scale for prevailing wage projects performed in Blythe, China lake, Death Valley, Fort Irwin, Twenty-Nine Palms, Needles and 1-15 corridor (Barstow to the Nevada State Line) will be Three Dollars ($3.00) above the standard San Bernardino/Riverside County hourly wage rate ---------------------------------------------------------------- BRCA0018-008 06/01/2014 Rates Fringes MARBLE FINISHER..................$ 28.45 11.38 TILE FINISHER....................$ 23.78 9.84 ---------------------------------------------------------------- BRCA0018-011 06/01/2014 Rates Fringes TILE LAYER.......................$ 35.14 14.33 ---------------------------------------------------------------- 7.c Packet Pg. 158 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 57 of 79 CARP0409-001 07/01/2010 Rates Fringes CARPENTER (1) Carpenter, Cabinet Installer, Insulation Installer, Hardwood Floor Worker and acoustical installer...................$ 37.35 11.08 (2) Millwright..............$ 37.85 11.08 (3) Piledrivermen/Derrick Bargeman, Bridge or Dock Carpenter, Heavy Framer, Rock Bargeman or Scowman, Rockslinger, Shingler (Commercial)................$ 37.48 11.08 (4) Pneumatic Nailer, Power Stapler...............$ 37.60 11.08 (5) Sawfiler...............$ 37.44 11.08 (6) Scaffold Builder.......$ 28.55 11.08 (7) Table Power Saw Operator....................$ 37.45 11.08 FOOTNOTE: Work of forming in the construction of open cut sewers or storm drains, on operations in which horizontal lagging is used in conjunction with steel H-Beams driven or placed in pre- drilled holes, for that portion of a lagged trench against which concrete is poured, namely, as a substitute for back forms (which work is performed by piledrivers): $0.13 per hour additional. ---------------------------------------------------------------- CARP0409-005 07/01/2010 Rates Fringes Drywall DRYWALL INSTALLER/LATHER....$ 37.35 11.08 STOCKER/SCRAPPER............$ 10.00 6.67 ---------------------------------------------------------------- CARP0409-008 08/01/2010 Rates Fringes Modular Furniture Installer......$ 17.00 7.41 ---------------------------------------------------------------- ELEC0639-001 06/01/2015 Rates Fringes Electricians Wireman/Technician..........$ 39.30 18.66 FOOTNOTES: CABLE SPLICER: 10% additional per hour above Wireman/Technician basic hourly rate. Work from trusses, swinging scaffolds, open ladders, scaffolds, bosun chairs, stacks or towers, where subject to 7.c Packet Pg. 159 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 58 of 79 a direct fall from the ground floor or support structure from a distance of fifty (50) feet to ninety (90) feet: to be paid time and one-half. Work from trusses, swinging scaffolds, open ladders, scaffolds, bosun chairs, stacks or towers, where subject to a direct fall from the ground floor or support structure from a distance over ninety (90) feet: to be paid double the regular straight time rate of pay. Where workers are required to work under compressed air or in areas where injurious gases, dust or fumes are present in amounts necessitating the use of gas masks or self-contained breathing apparatus (particle masks are not considered self-contained breathing apparatus) or where workers work on poles at a distance of seventy-five (75) feet or more from the ground: to be paid a bonus of straight time pay. This shall be at a minimum of one hour, and thereafter, each succeeding hour or fraction thereof shall constitute an hour at the bonus rate. Tunnel work: to be paid at the time and one-quarter hourly rate. All employers may request workmen to report direct to a job within a free zone to include everything west of ten (10) miles east of Highway 101, as the crow flies, and then (10) miles north and south of Highway 46, as the crow flies, to the junction of Highway 41 and Highway 46. Everything outside this area shall be paid at full subsistence provide said job is of five (5) days duration or more and provide there is storage on the job for the Employee's tools. The Employer will be responsible for loss of tools under such circumstances. (Road: The most direct route on a surfaced road). On all jobs or projects outside the free zone, as stated above, Employees may be required to report to the job site in their own transportation at the regular starting time and remain on the job site until the regular quitting time and these shall be paid at fifty dollars ($50.00) per day or fifty-one cents ($0.51) per mile for each road mile from shop to job and job to shop (round trip). (Day worked shall mean at least four (4) hours on the job unless sent home on account of weather, emergency, sickness, or injury). The Employer shall pay for traveling time and furnish transportation from shop to job, job to job, and job to shop. Travel time shall be at the appropriate rate of pay for that day of the week. (Monday through Friday, straight time, Saturday and Sunday, double time.) ---------------------------------------------------------------- ELEC0639-003 05/26/2014 COMMUNICATIONS AND SYSTEMS WORK SAN LUIS OBISPO COUNTY Rates Fringes Communications System Installer...................$ 29.09 11.60 Technician..................$ 30.89 11.66 SCOPE OF WORK: Installation, testing, service and maintenance 7.c Packet Pg. 160 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 59 of 79 of systems utilizing the transmission and/or transference of voice, sound, vision and digital for commercial, educational, security and entertainment purposes for the following: TV monitoring and surveillance, background - foreground music, intercom and telephone interconnect, microwave transmission, multi-media, multiplex, nurse call systems, radio page, burglar alarms and fire alarm (see last paragraph below). Communication Systems that transmit or receive information and/or control systems that are intrinsic to the above listed systems; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding all other data systems or multiple systems which include control function or power supply; excluding installation of raceway systems, conduit systems, line voltage work, and energy management systems. Fire alarm work shall be performed at the current inside electrician total cost package. ---------------------------------------------------------------- ELEC1245-001 06/01/2015 Rates Fringes LINE CONSTRUCTION (1) Lineman; Cable splicer..$ 52.85 15.53 (2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 42.21 14.32 (3) Groundman...............$ 32.28 14.03 (4) Powderman...............$ 47.19 14.60 HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day ---------------------------------------------------------------- ELEV0008-003 01/01/2015 Rates Fringes ELEVATOR MECHANIC................$ 60.39 28.38 FOOTNOTE: PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day. ---------------------------------------------------------------- ENGI0012-003 07/06/2015 7.c Packet Pg. 161 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 60 of 79 Rates Fringes OPERATOR: Power Equipment (All Other Work) GROUP 1....................$ 39.95 23.35 GROUP 2....................$ 40.73 23.35 GROUP 3....................$ 41.02 23.35 GROUP 4....................$ 42.51 23.35 GROUP 5....................$ 41.86 23.35 GROUP 6....................$ 41.83 23.35 GROUP 8....................$ 42.84 23.35 GROUP 9....................$ 42.19 23.35 GROUP 10....................$ 42.96 23.35 GROUP 11....................$ 42.31 23.35 GROUP 12....................$ 43.13 23.35 GROUP 13....................$ 43.23 23.35 GROUP 14....................$ 43.26 23.35 GROUP 15....................$ 43.34 23.35 GROUP 16....................$ 43.46 23.35 GROUP 17....................$ 43.63 23.35 GROUP 18....................$ 43.73 23.35 GROUP 19....................$ 43.84 23.35 GROUP 20....................$ 43.96 23.35 GROUP 21....................$ 44.13 23.35 GROUP 22....................$ 44.23 23.35 GROUP 23....................$ 44.34 23.35 GROUP 24....................$ 44.46 23.35 GROUP 25....................$ 44.63 23.35 OPERATOR: Power Equipment (Cranes, Piledriving & Hoisting) GROUP 1....................$ 41.30 23.35 GROUP 2....................$ 42.08 23.35 GROUP 3....................$ 42.37 23.35 GROUP 4....................$ 42.51 23.35 GROUP 5....................$ 42.73 23.35 GROUP 6....................$ 42.84 23.35 GROUP 7....................$ 42.96 23.35 GROUP 8....................$ 43.13 23.35 GROUP 9....................$ 43.30 23.35 GROUP 10....................$ 44.30 23.35 GROUP 11....................$ 45.30 23.35 GROUP 12....................$ 46.30 23.35 GROUP 13....................$ 47.30 23.35 OPERATOR: Power Equipment (Tunnel Work) GROUP 1....................$ 41.80 23.35 GROUP 2....................$ 42.58 23.35 GROUP 3....................$ 42.87 23.35 GROUP 4....................$ 43.01 23.35 GROUP 5....................$ 43.23 23.35 GROUP 6....................$ 43.34 23.35 GROUP 7....................$ 43.46 23.35 PREMIUM PAY: $3.75 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton 7.c Packet Pg. 162 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 61 of 79 Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator. SEE ZONE DEFINITIONS AFTER CLASSIFICATIONS POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch Witch, with seat or similar type equipment; Elevator operator-inside; Engineer Oiler; Forklift operator (includes loed, lull or similar types under 5 tons; Generator operator; Generator, pump or compressor plant operator; Pump operator; Signalman; Switchman GROUP 2: Asphalt-rubber plant operator (nurse tank operator); Concrete mixer operator-skip type; Conveyor operator; Fireman; Forklift operator (includes loed, lull or similar types over 5 tons; Hydrostatic pump operator; oiler crusher (asphalt or concrete plant); Petromat laydown machine; PJU side dum jack; Screening and conveyor machine operator (or similar types); Skiploader (wheel type up to 3/4 yd. without attachment); Tar pot fireman; Temporary heating plant operator; Trenching machine oiler GROUP 3: Asphalt-rubber blend operator; Bobcat or similar type (Skid steer); Equipment greaser (rack); Ford Ferguson (with dragtype attachments); Helicopter radioman (ground); Stationary pipe wrapping and cleaning machine operator GROUP 4: Asphalt plant fireman; Backhoe operator (mini-max or similar type); Boring machine operator; Boxman or mixerman (asphalt or concrete); Chip spreading machine operator; Concrete cleaning decontamination machine operator; Concrete Pump Operator (small portable); Drilling machine operator, small auger types (Texoma super economatic or similar types - Hughes 100 or 200 or similar types - drilling depth of 30' maximum); Equipment greaser (grease truck); Guard rail post driver operator; Highline cableway signalman; Hydra-hammer-aero stomper; Micro Tunneling (above ground tunnel); Power concrete curing machine operator; Power concrete saw operator; Power-driven jumbo form setter operator; Power sweeper operator; Rock Wheel Saw/Trencher; Roller operator (compacting); Screed operator (asphalt or concrete); Trenching machine operator (up to 6 ft.); Vacuum or much truck GROUP 5: Equipment Greaser (Grease Truck/Multi Shift). GROUP 6: Articulating material hauler; Asphalt plant engineer; Batch plant operator; Bit sharpener; Concrete joint machine operator (canal and similar type); Concrete planer operator; Dandy digger; Deck engine operator; Derrickman (oilfield type); Drilling machine operator, bucket or auger types (Calweld 100 bucket or similar types - Watson 1000 auger or similar types - Texoma 330, 500 or 600 auger or similar types - drilling depth of 45' maximum); Drilling machine operator; Hydrographic seeder machine operator (straw, pulp or seed), Jackson track 7.c Packet Pg. 163 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 62 of 79 maintainer, or similar type; Kalamazoo Switch tamper, or similar type; Machine tool operator; Maginnis internal full slab vibrator, Mechanical berm, curb or gutter(concrete or asphalt); Mechanical finisher operator (concrete, Clary-Johnson-Bidwell or similar); Micro tunnel system (below ground); Pavement breaker operator (truck mounted); Road oil mixing machine operator; Roller operator (asphalt or finish), rubber-tired earth moving equipment (single engine, up to and including 25 yds. struck); Self-propelled tar pipelining machine operator; Skiploader operator (crawler and wheel type, over 3/4 yd. and up to and including 1-1/2 yds.); Slip form pump operator (power driven hydraulic lifting device for concrete forms); Tractor operator-bulldozer, tamper-scraper (single engine, up to 100 h.p. flywheel and similar types, up to and including D-5 and similar types); Tugger hoist operator (1 drum); Ultra high pressure waterjet cutting tool system operator; Vacuum blasting machine operator GROUP 8: Asphalt or concrete spreading operator (tamping or finishing); Asphalt paving machine operator (Barber Greene or similar type); Asphalt-rubber distribution operator; Backhoe operator (up to and including 3/4 yd.), small ford, Case or similar; Cast-in-place pipe laying machine operator; Combination mixer and compressor operator (gunite work); Compactor operator (self-propelled); Concrete mixer operator (paving); Crushing plant operator; Drill Doctor; Drilling machine operator, Bucket or auger types (Calweld 150 bucket or similar types - Watson 1500, 2000 2500 auger or similar types - Texoma 700, 800 auger or similar types - drilling depth of 60' maximum); Elevating grader operator; Grade checker; Gradall operator; Grouting machine operator; Heavy-duty repairman; Heavy equipment robotics operator; Kalamazoo balliste regulator or similar type; Kolman belt loader and similar type; Le Tourneau blob compactor or similar type; Loader operator (Athey, Euclid, Sierra and similar types); Mobark Chipper or similar; Ozzie padder or similar types; P.C. slot saw; Pneumatic concrete placing machine operator (Hackley-Presswell or similar type); Pumpcrete gun operator; Rock Drill or similar types; Rotary drill operator (excluding caisson type); Rubber-tired earth-moving equipment operator (single engine, caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. up to and including 50 cu. yds. struck); Rubber-tired earth-moving equipment operator (multiple engine up to and including 25 yds. struck); Rubber-tired scraper operator (self-loading paddle wheel type-John Deere, 1040 and similar single unit); Self- propelled curb and gutter machine operator; Shuttle buggy; Skiploader operator (crawler and wheel type over 1-1/2 yds. up to and including 6-1/2 yds.); Soil remediation plant operator; Surface heaters and planer operator; Tractor compressor drill combination operator; Tractor operator (any type larger than D-5 - 100 flywheel h.p. and over, or similar-bulldozer, tamper, scraper and push tractor single engine); Tractor operator (boom attachments), Traveling pipe wrapping, cleaning and bendng machine operator; Trenching machine operator (over 6 ft. depth capacity, manufacturer's rating); trenching Machine with Road Miner attachment (over 6 ft depth capacity): Ultra high pressure waterjet cutting tool system mechanic; Water pull 7.c Packet Pg. 164 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 63 of 79 (compaction) operator GROUP 9: Heavy Duty Repairman GROUP 10: Drilling machine operator, Bucket or auger types (Calweld 200 B bucket or similar types-Watson 3000 or 5000 auger or similar types-Texoma 900 auger or similar types-drilling depth of 105' maximum); Dual drum mixer, dynamic compactor LDC350 (or similar types); Monorail locomotive operator (diesel, gas or electric); Motor patrol-blade operator (single engine); Multiple engine tractor operator (Euclid and similar type-except Quad 9 cat.); Rubber-tired earth-moving equipment operator (single engine, over 50 yds. struck); Pneumatic pipe ramming tool and similar types; Prestressed wrapping machine operator; Rubber-tired earth-moving equipment operator (single engine, over 50 yds. struck); Rubber tired earth moving equipment operator (multiple engine, Euclid, caterpillar and similar over 25 yds. and up to 50 yds. struck), Tower crane repairman; Tractor loader operator (crawler and wheel type over 6-1/2 yds.); Woods mixer operator (and similar Pugmill equipment) GROUP 11: Heavy Duty Repairman - Welder Combination, Welder - Certified. GROUP 12: Auto grader operator; Automatic slip form operator; Drilling machine operator, bucket or auger types (Calweld, auger 200 CA or similar types - Watson, auger 6000 or similar types - Hughes Super Duty, auger 200 or similar types - drilling depth of 175' maximum); Hoe ram or similar with compressor; Mass excavator operator less tha 750 cu. yards; Mechanical finishing machine operator; Mobile form traveler operator; Motor patrol operator (multi-engine); Pipe mobile machine operator; Rubber-tired earth- moving equipment operator (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck); Rubber-tired self- loading scraper operator (paddle-wheel-auger type self-loading - two (2) or more units) GROUP 13: Rubber-tired earth-moving equipment operator operating equipment with push-pull system (single engine, up to and including 25 yds. struck) GROUP 14: Canal liner operator; Canal trimmer operator; Remote- control earth-moving equipment operator (operating a second piece of equipment: $1.00 per hour additional); Wheel excavator operator (over 750 cu. yds.) GROUP 15: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine-up to and including 25 yds. struck) GROUP 16: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system 7.c Packet Pg. 165 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 64 of 79 (multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck) GROUP 17: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine, Euclid, Caterpillar and similar, over 50 cu. yds. struck); Tandem tractor operator (operating crawler type tractors in tandem - Quad 9 and similar type) GROUP 18: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - single engine, up to and including 25 yds. struck) GROUP 19: Rotex concrete belt operator (or similar types); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds.and up to and including 50 cu. yds. struck); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - multiple engine, up to and including 25 yds. struck) GROUP 20: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps, and similar types in any combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck) GROUP 21: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck) GROUP 22: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, up to and including 25 yds. struck) GROUP 23: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired earth-moving equipment operator, operating with the tandem push-pull system (multiple engine, up to and including 25 yds. struck) GROUP 24: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck) 7.c Packet Pg. 166 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 65 of 79 GROUP 25: Concrete pump operator-truck mounted; Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck) CRANES, PILEDRIVING AND HOISTING EQUIPMENT CLASSIFICATIONS GROUP 1: Engineer oiler; Fork lift operator (includes loed, lull or similar types) GROUP 2: Truck crane oiler GROUP 3: A-frame or winch truck operator; Ross carrier operator (jobsite) GROUP 4: Bridge-type unloader and turntable operator; Helicopter hoist operator GROUP 5: Hydraulic boom truck; Stinger crane (Austin-Western or similar type); Tugger hoist operator (1 drum) GROUP 6: Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boom and similar type); Lift mobile operator; Lift slab machine operator (Vagtborg and similar types); Material hoist and/or manlift operator; Polar gantry crane operator; Self Climbing scaffold (or similar type); Shovel, backhoe, dragline, clamshell operator (over 3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator GROUP 7: Pedestal crane operator; Shovel, backhoe, dragline, clamshell operator (over 5 cu. yds. mrc); Tower crane repair; Tugger hoist operator (3 drum) GROUP 8: Crane operator (up to and including 25 ton capacity); Crawler transporter operator; Derrick barge operator (up to and including 25 ton capacity); Hoist operator, stiff legs, Guy derrick or similar type (up to and including 25 ton capacity); Shovel, backhoe, dragline, clamshell operator (over 7 cu. yds., M.R.C.) GROUP 9: Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons mrc); Highline cableway operator; Hoist operator, stiff legs, Guy derrick or similar type (over 25 tons up to and including 50 tons mrc); K-crane operator; Polar crane operator; Self erecting tower crane operator maximum lifting capacity ten tons GROUP 10: Crane operator (over 50 tons and up to and including 100 tons mrc); Derrick barge operator (over 50 tons up to and including 100 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 50 tons up to and including 100 tons mrc), Mobile tower crane operator (over 50 tons, up to and including 100 tons M.R.C.); Tower crane operator and tower gantry GROUP 11: Crane operator (over 100 tons and up to and including 200 tons mrc); Derrick barge operator (over 100 tons up to and including 200 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 100 tons up 7.c Packet Pg. 167 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 66 of 79 to and including 200 tons mrc); Mobile tower crane operator (over 100 tons up to and including 200 tons mrc) GROUP 12: Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge operator (over 200 tons up to and including 300 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 200 tons, up to and including 300 tons mrc); Mobile tower crane operator (over 200 tons, up to and including 300 tons mrc) GROUP 13: Crane operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons); Mobile tower crane operator (over 300 tons) TUNNEL CLASSIFICATIONS GROUP 1: Skiploader (wheel type up to 3/4 yd. without attachment) GROUP 2: Power-driven jumbo form setter operator GROUP 3: Dinkey locomotive or motorperson (up to and including 10 tons) GROUP 4: Bit sharpener; Equipment greaser (grease truck); Slip form pump operator (power-driven hydraulic lifting device for concrete forms); Tugger hoist operator (1 drum); Tunnel locomotive operator (over 10 and up to and including 30 tons) GROUP 5: Backhoe operator (up to and including 3/4 yd.); Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shield operator; Heavy-duty repairperson; Loader operator (Athey, Euclid, Sierra and similar types); Mucking machine operator (1/4 yd., rubber-tired, rail or track type); Pneumatic concrete placing machine operator (Hackley-Presswell or similar type); Pneumatic heading shield (tunnel); Pumpcrete gun operator; Tractor compressor drill combination operator; Tugger hoist operator (2 drum); Tunnel locomotive operator (over 30 tons) GROUP 6: Heavy Duty Repairman GROUP 7: Tunnel mole boring machine operator ENGINEERS ZONES $1.00 additional per hour for all of IMPERIAL County and the portions of KERN, RIVERSIDE & SAN BERNARDINO Counties as defined below: That area within the following Boundary: Begin in San Bernardino County, approximately 3 miles NE of the intersection of I-15 and the California State line at that point which is the NW corner of Section 1, T17N,m R14E, San Bernardino Meridian. Continue W in a straight line to that point which is the SW corner of the northwest quarter of Section 6, T27S, R42E, Mt. Diablo Meridian. Continue North to the intersection with the Inyo County Boundary at that point which is the NE corner of the western half of the northern quarter of Section 7.c Packet Pg. 168 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 67 of 79 6, T25S, R42E, MDM. Continue W along the Inyo and San Bernardino County boundary until the intersection with Kern County, as that point which is the SE corner of Section 34, T24S, R40E, MDM. Continue W along the Inyo and Kern County boundary until the intersection with Tulare County, at that point which is the SW corner of the SE quarter of Section 32, T24S, R37E, MDM. Continue W along the Kern and Tulare County boundary, until that point which is the NW corner of T25S, R32E, MDM. Continue S following R32E lines to the NW corner of T31S, R32E, MDM. Continue W to the NW corner of T31S, R31E, MDM. Continue S to the SW corner of T32S, R31E, MDM. Continue W to SW corner of SE quarter of Section 34, T32S, R30E, MDM. Continue S to SW corner of T11N, R17W, SBM. Continue E along south boundary of T11N, SBM to SW corner of T11N, R7W, SBM. Continue S to SW corner of T9N, R7W, SBM. Continue E along south boundary of T9N, SBM to SW corner of T9N, R1E, SBM. Continue S along west boundary of R1E, SMB to Riverside County line at the SW corner of T1S, R1E, SBM. Continue E along south boundary of T1s, SBM (Riverside County Line) to SW corner of T1S, R10E, SBM. Continue S along west boundary of R10E, SBM to Imperial County line at the SW corner of T8S, R10E, SBM. Continue W along Imperial and Riverside county line to NW corner of T9S, R9E, SBM. Continue S along the boundary between Imperial and San Diego Counties, along the west edge of R9E, SBM to the south boundary of Imperial County/California state line. Follow the California state line west to Arizona state line, then north to Nevada state line, then continuing NW back to start at the point which is the NW corner of Section 1, T17N, R14E, SBM $1.00 additional per hour for portions of SAN LUIS OBISPO, KERN, SANTA BARBARA & VENTURA as defined below: That area within the following Boundary: Begin approximately 5 miles north of the community of Cholame, on the Monterey County and San Luis Obispo County boundary at the NW corner of T25S, R16E, Mt. Diablo Meridian. Continue south along the west side of R16E to the SW corner of T30S, R16E, MDM. Continue E to SW corner of T30S, R17E, MDM. Continue S to SW corner of T31S, R17E, MDM. Continue E to SW corner of T31S, R18E, MDM. Continue S along West side of R18E, MDM as it crosses into San Bernardino Meridian numbering area and becomes R30W. Follow the west side of R30W, SBM to the SW corner of T9N, R30W, SBM. Continue E along the south edge of T9N, SBM to the Santa Barbara County and Ventura County boundary at that point whch is the SW corner of Section 34.T9N, R24W, SBM, continue S along the Ventura County line to that point which is the SW corner of the SE quarter of Section 32, T7N, R24W, SBM. Continue E along the south edge of T7N, SBM to the SE corner to T7N, R21W, SBM. Continue N along East side of R21W, SBM to Ventura County and Kern County boundary at the NE corner of T8N, R21W. Continue W along the Ventura County and Kern County boundary to the SE corner of T9N, R21W. Continue North along the East edge of R21W, SBM to the NE corner of T12N, R21W, SBM. Continue West along the north edge of T12N, SBM to the SE corner of T32S, R21E, MDM. [T12N SBM is a think strip between T11N SBM and T32S MDM]. Continue North along the East side of R21E, MDM to the Kings County and Kern County border at the NE corner of T25S, R21E, MDM, continue West along the Kings County and Kern County Boundary until the intersection of San Luis Obispo County. Continue west along the Kings County and San Luis 7.c Packet Pg. 169 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 68 of 79 Obispo County boundary until the intersection with Monterey County. Continue West along the Monterey County and San Luis Obispo County boundary to the beginning point at the NW corner of T25S, R16E, MDM. $2.00 additional per hour for INYO and MONO Counties and the Northern portion of SAN BERNARDINO County as defined below: That area within the following Boundary: Begin at the intersection of the northern boundary of Mono County and the California state line at the point which is the center of Section 17, T10N, R22E, Mt. Diablo Meridian. Continue S then SE along the entire western boundary of Mono County, until it reaches Inyo County at the point which is the NE corner of the Western half of the NW quarter of Section 2, T8S, R29E, MDM. Continue SSE along the entire western boundary of Inyo County, until the intersection with Kern County at the point which is the SW corner of the SE 1/4 of Section 32, T24S, R37E, MDM. Continue E along the Inyo and Kern County boundary until the intersection with San Bernardino County at that point which is the SE corner of section 34, T24S, R40E, MDM. Continue E along the Inyo and San Bernardino County boundary until the point which is the NE corner of the Western half of the NW quarter of Section 6, T25S, R42E, MDM. Continue S to that point which is the SW corner of the NW quarter of Section 6, T27S, R42E, MDM. Continue E in a straight line to the California and Nevada state border at the point which is the NW corner of Section 1, T17N, R14E, San Bernardino Meridian. Then continue NW along the state line to the starting point, which is the center of Section 18, T10N, R22E, MDM. REMAINING AREA NOT DEFINED ABOVE RECIEVES BASE RATE ---------------------------------------------------------------- ENGI0012-004 08/01/2015 Rates Fringes OPERATOR: Power Equipment (DREDGING) (1) Leverman................$ 49.50 23.60 (2) Dredge dozer............$ 43.53 23.60 (3) Deckmate................$ 43.42 23.60 (4) Winch operator (stern winch on dredge)............$ 42.87 23.60 (5) Fireman-Oiler, Deckhand, Bargeman, Leveehand...................$ 42.33 23.60 (6) Barge Mate..............$ 42.94 23.60 ---------------------------------------------------------------- IRON0377-002 07/01/2015 Rates Fringes Ironworkers: Fence Erector...............$ 27.08 20.21 Ornamental, Reinforcing and Structural..............$ 33.50 28.85 7.c Packet Pg. 170 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 69 of 79 PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- LABO0220-001 07/01/2014 Rates Fringes LABORER (TUNNEL) GROUP 1.....................$ 35.74 16.48 GROUP 2.....................$ 36.06 16.48 GROUP 3.....................$ 36.52 16.48 GROUP 4.....................$ 37.21 16.48 LABORER GROUP 1.....................$ 30.19 16.48 GROUP 2.....................$ 30.74 16.48 GROUP 3.....................$ 31.29 16.48 GROUP 4.....................$ 32.84 16.48 GROUP 5.....................$ 33.19 16.48 LABORER CLASSIFICATIONS GROUP 1: Cleaning and handling of panel forms; Concrete screeding for rough strike-off; Concrete, water curing; Demolition laborer, the cleaning of brick if performed by a worker performing any other phase of demolition work, and the cleaning of lumber; Fire watcher, limber, brush loader, piler and debris handler; Flag person; Gas, oil and/or water pipeline laborer; Laborer, asphalt-rubber material loader; Laborer, general or construction; Laborer, general clean-up; Laborer, landscaping; Laborer, jetting; Laborer, temporary water and air lines; Material hose operator (walls, slabs, floors and decks); Plugging, filling of shee bolt holes; Dry packing of concrete; Railroad maintenance, repair track person and road beds; Streetcar and railroad construction track laborers; Rigging and signaling; Scaler; Slip form raiser; Tar and mortar; Tool crib or tool house laborer; Traffic control by any method; Window cleaner; Wire mesh pulling - all concrete pouring operations GROUP 2: Asphalt shoveler; Cement dumper (on 1 yd. or larger mixer and handling bulk cement); Cesspool digger and 7.c Packet Pg. 171 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 70 of 79 installer; Chucktender; Chute handler, pouring concrete, the handling of the chute from readymix trucks, such as walls, slabs, decks, floors, foundation, footings, curbs, gutters and sidewalks; Concrete curer, impervious membrane and form oiler; Cutting torch operator (demolition); Fine grader, highways and street paving, airport, runways and similar type heavy construction; Gas, oil and/or water pipeline wrapper - pot tender and form person; Guinea chaser; Headerboard person - asphalt; Laborer, packing rod steel and pans; Membrane vapor barrier installer; Power broom sweeper (small); Riprap stonepaver, placing stone or wet sacked concrete; Roto scraper and tiller; Sandblaster (pot tender); Septic tank digger and installer(lead); Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredder; Underground laborer, including caisson bellower GROUP 3: Buggymobile person; Concrete cutting torch; Concrete pile cutter; Driller, jackhammer, 2-1/2 ft. drill steel or longer; Dri-pak-it machine; Gas, oil and/or water pipeline wrapper, 6-in. pipe and over, by any method, inside and out; High scaler (including drilling of same); Hydro seeder and similar type; Impact wrench multi-plate; Kettle person, pot person and workers applying asphalt, lay-kold, creosote, lime caustic and similar type materials ("applying" means applying, dipping, brushing or handling of such materials for pipe wrapping and waterproofing); Operator of pneumatic, gas, electric tools, vibrating machine, pavement breaker, air blasting, come-alongs, and similar mechanical tools not separately classified herein; Pipelayer's backup person, coating, grouting, making of joints, sealing, caulking, diapering and including rubber gasket joints, pointing and any and all other services; Rock slinger; Rotary scarifier or multiple head concrete chipping scarifier; Steel headerboard and guideline setter; Tamper, Barko, Wacker and similar type; Trenching machine, hand-propelled GROUP 4: Asphalt raker, lute person, ironer, asphalt dump person, and asphalt spreader boxes (all types); Concrete core cutter (walls, floors or ceilings), grinder or sander; Concrete saw person, cutting walls or flat work, scoring old or new concrete; Cribber, shorer, lagging, sheeting and trench bracing, hand-guided lagging hammer; Head rock slinger; Laborer, asphalt- rubber distributor boot person; Laser beam in connection with laborers' work; Oversize concrete vibrator operator, 70 lbs. and over; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in the ditch until completion of operation, including any and all forms of tubular material, whether pipe, metallic or non-metallic, conduit and any other stationary type of tubular device used for the conveying of any substance or element, whether water, sewage, solid gas, air, or other product whatsoever and without regard to the nature of material from which the tubular material is fabricated; No-joint pipe and stripping of same; Prefabricated manhole installer; Sandblaster (nozzle person), water blasting, Porta Shot-Blast GROUP 5: Blaster powder, all work of loading holes, placing and blasting of all powder and explosives of whatever type, 7.c Packet Pg. 172 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 71 of 79 regardless of method used for such loading and placing; Driller: All power drills, excluding jackhammer, whether core, diamond, wagon, track, multiple unit, and any and all other types of mechanical drills without regard to the form of motive power; Toxic waste removal TUNNEL LABORER CLASSIFICATIONS GROUP 1: Batch plant laborer; Changehouse person; Dump person; Dump person (outside); Swamper (brake person and switch person on tunnel work); Tunnel materials handling person; Nipper; Pot tender, using mastic or other materials (for example, but not by way of limitation, shotcrete, etc.); GROUP 2: Bull gang mucker, track person; Chucktender, Cabletender; Concrete crew, including rodder and spreader; Loading and unloading agitator cars; Vibrator person, jack hammer, pneumatic tools (except driller) GROUP 3: Blaster, driller, powder person; Chemical grout jet person; Cherry picker person; Grout gun person; Grout mixer person; Grout pump person; Jackleg miner; Jumbo person; Kemper and other pneumatic concrete placer operator; Miner, tunnel (hand or machine); Nozzle person; Operating of troweling and/or grouting machines; Powder person (primer house); Primer person; Sandblaster; Shotcrete person; Steel form raiser and setter; Timber person, retimber person, wood or steel; Tunnel Concrete finisher GROUP 4: Diamond driller; Sandblaster; Shaft and raise work ---------------------------------------------------------------- LABO0220-004 07/01/2014 Rates Fringes Brick Tender.....................$ 29.12 15.78 ---------------------------------------------------------------- LABO0300-005 01/01/2014 Rates Fringes Asbestos Removal Laborer.........$ 28.00 15.25 SCOPE OF WORK: Includes site mobilization, initial site cleanup, site preparation, removal of asbestos-containing material and toxic waste, encapsulation, enclosure and disposal of asbestos- containing materials and toxic waste by hand or with equipment or machinery; scaffolding, fabrication of temporary wooden barriers and assembly of decontamination stations. ---------------------------------------------------------------- LABO0345-001 07/01/2014 Rates Fringes LABORER (GUNITE) GROUP 1.....................$ 34.79 17.92 GROUP 2.....................$ 33.84 17.92 7.c Packet Pg. 173 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 72 of 79 GROUP 3.....................$ 30.30 17.92 FOOTNOTE: GUNITE PREMIUM PAY: Workers working from a Bosn'n's Chair or suspended from a rope or cable shall receive 40 cents per hour above the foregoing applicable classification rates. Workers doing gunite and/or shotcrete work in a tunnel shall receive 35 cents per hour above the foregoing applicable classification rates, paid on a portal-to-portal basis. Any work performed on, in or above any smoke stack, silo, storage elevator or similar type of structure, when such structure is in excess of 75'-0" above base level and which work must be performed in whole or in part more than 75'-0" above base level, that work performed above the 75'-0" level shall be compensated for at 35 cents per hour above the applicable classification wage rate. GUNITE LABORER CLASSIFICATIONS GROUP 1: Rodmen, Nozzlemen GROUP 2: Gunmen GROUP 3: Reboundmen ---------------------------------------------------------------- * LABO1184-001 08/01/2015 Rates Fringes Laborers: (HORIZONTAL DIRECTIONAL DRILLING) (1) Drilling Crew Laborer...$ 32.60 12.16 (2) Vehicle Operator/Hauler.$ 32.77 12.16 (3) Horizontal Directional Drill Operator..............$ 34.62 12.16 (4) Electronic Tracking Locator.....................$ 36.62 12.16 Laborers: (STRIPING/SLURRY SEAL) GROUP 1.....................$ 33.76 15.04 GROUP 2.....................$ 35.06 15.04 GROUP 3.....................$ 37.07 15.04 GROUP 4.....................$ 38.81 15.04 LABORERS - STRIPING CLASSIFICATIONS GROUP 1: Protective coating, pavement sealing, including repair and filling of cracks by any method on any surface in parking lots, game courts and playgrounds; carstops; operation of all related machinery and equipment; equipment repair technician GROUP 2: Traffic surface abrasive blaster; pot tender - removal of all traffic lines and markings by any method (sandblasting, waterblasting, grinding, etc.) and preparation of surface for coatings. Traffic control person: controlling and directing traffic through both conventional and moving lane closures; operation of all related machinery and equipment 7.c Packet Pg. 174 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 73 of 79 GROUP 3: Traffic delineating device applicator: Layout and application of pavement markers, delineating signs, rumble and traffic bars, adhesives, guide markers, other traffic delineating devices including traffic control. This category includes all traffic related surface preparation (sandblasting, waterblasting, grinding) as part of the application process. Traffic protective delineating system installer: removes, relocates, installs, permanently affixed roadside and parking delineation barricades, fencing, cable anchor, guard rail, reference signs, monument markers; operation of all related machinery and equipment; power broom sweeper GROUP 4: Striper: layout and application of traffic stripes and markings; hot thermo plastic; tape traffic stripes and markings, including traffic control; operation of all related machinery and equipment ---------------------------------------------------------------- LABO1414-001 08/05/2015 Rates Fringes LABORER PLASTER CLEAN-UP LABORER....$ 30.16 17.11 PLASTER TENDER..............$ 32.71 17.11 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- PAIN0036-007 07/01/2015 Rates Fringes Painters: (1) Repaint Including Lead Abatement...................$ 24.19 12.83 (2) High Iron & Steel.......$ 30.70 12.83 (3) Journeyman Painter including Lead Abatement....$ 28.70 12.83 (4) Industrial..............$ 32.02 12.83 (5) All other work..........$ 28.70 12.83 REPAINT of any previously painted structure. Exceptions: work involving the aerospace industry, breweries, commercial recreational facilities, hotels which operate commercial establishments as part of hotel service, and sports facilities. HIGH IRON & STEEL: Aerial towers, towers, radio towers, smoke stacks, flag poles (any flag poles that can be finished from the ground with a ladder excluded), elevated water towers, steeples and domes in their entirety and any other extremely high and hazardous work, cooning steel, bos'n chair, or other similar devices, painting in other high hazardous work shall be classified as high iron & steel ---------------------------------------------------------------- PAIN0036-008 10/01/2014 Rates Fringes 7.c Packet Pg. 175 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 74 of 79 DRYWALL FINISHER/TAPER...........$ 35.18 15.91 ---------------------------------------------------------------- PAIN0169-002 01/01/2015 Rates Fringes GLAZIER..........................$ 34.83 19.75 ---------------------------------------------------------------- PAIN1247-002 01/01/2015 Rates Fringes SOFT FLOOR LAYER.................$ 29.85 13.56 ---------------------------------------------------------------- PLAS0200-001 08/05/2015 Rates Fringes PLASTERER........................$ 38.44 13.77 ---------------------------------------------------------------- PLAS0500-002 07/01/2015 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 32.30 20.65 ---------------------------------------------------------------- PLUM0016-001 07/01/2015 Rates Fringes PLUMBER/PIPEFITTER Plumber and Pipefitter All other work except work on new additions and remodeling of bars, restaurant, stores and commercial buildings not to exceed 5,000 sq. ft. of floor space and work on strip malls, light commercial, tenant improvement and remodel work.......................$ 45.96 20.71 Work ONLY on new additions and remodeling of bars, restaurant, stores and commercial buildings not to exceed 5,000 sq. ft. of floor space.................$ 44.54 19.73 Work ONLY on strip malls, light commercial, tenant improvement and remodel work........................$ 35.16 18.06 ---------------------------------------------------------------- PLUM0345-001 07/01/2014 Rates Fringes PLUMBER Landscape/Irrigation Fitter.$ 29.27 19.75 7.c Packet Pg. 176 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 75 of 79 Sewer & Storm Drain Work....$ 33.24 17.13 ---------------------------------------------------------------- ROOF0036-002 08/01/2014 Rates Fringes ROOFER...........................$ 35.02 13.57 FOOTNOTE: Pitch premium: Work on which employees are exposed to pitch fumes or required to handle pitch, pitch base or pitch impregnated products, or any material containing coal tar pitch, the entire roofing crew shall receive $1.75 per hour "pitch premium" pay. ---------------------------------------------------------------- SFCA0669-014 07/01/2013 Rates Fringes SPRINKLER FITTER.................$ 32.98 19.35 ---------------------------------------------------------------- SHEE0273-002 08/01/2015 Rates Fringes SHEET METAL WORKER...............$ 40.50 26.67 HOLIDAYS: New Year's Day, Martin Luther King Day, President's Day, Good Friday, Memorial Day, Indepdendence Day, Labor Day, Veterans Day,Thankisgiving Day & Friday after, Christmas Day ---------------------------------------------------------------- TEAM0011-002 07/01/2014 Rates Fringes TRUCK DRIVER GROUP 1....................$ 27.99 24.14 GROUP 2....................$ 28.14 24.14 GROUP 3....................$ 28.27 24.14 GROUP 4....................$ 28.46 24.14 GROUP 5....................$ 28.49 24.14 GROUP 6....................$ 28.52 24.14 GROUP 7....................$ 28.77 24.14 GROUP 8....................$ 29.02 24.14 GROUP 9....................$ 29.22 24.14 GROUP 10....................$ 29.52 24.14 GROUP 11....................$ 30.02 24.14 GROUP 12....................$ 30.45 24.14 WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 per hour additional. [29 palms Marine Base, Camp Roberts, China Lake, Edwards AFB, El Centro Naval Facility, Fort Irwin, Marine Corps Logistics Base at Nebo & Yermo, Mountain Warfare Training Center, Bridgeport, Point Arguello, Point Conception, Vandenberg AFB] TRUCK DRIVERS CLASSIFICATIONS 7.c Packet Pg. 177 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 76 of 79 GROUP 1: Truck driver GROUP 2: Driver of vehicle or combination of vehicles - 2 axles; Traffic control pilot car excluding moving heavy equipment permit load; Truck mounted broom GROUP 3: Driver of vehicle or combination of vehicles - 3 axles; Boot person; Cement mason distribution truck; Fuel truck driver; Water truck - 2 axle; Dump truck, less than 16 yds. water level; Erosion control driver GROUP 4: Driver of transit mix truck, under 3 yds.; Dumpcrete truck, less than 6-1/2 yds. water level GROUP 5: Water truck, 3 or more axles; Truck greaser and tire person ($0.50 additional for tire person); Pipeline and utility working truck driver, including winch truck and plastic fusion, limited to pipeline and utility work; Slurry truck driver GROUP 6: Transit mix truck, 3 yds. or more; Dumpcrete truck, 6-1/2 yds. water level and over; Vehicle or combination of vehicles - 4 or more axles; Oil spreader truck; Dump truck, 16 yds. to 25 yds. water level GROUP 7: A Frame, Swedish crane or similar; Forklift driver; Ross carrier driver GROUP 8: Dump truck, 25 yds. to 49 yds. water level; Truck repair person; Water pull - single engine; Welder GROUP 9: Truck repair person/welder; Low bed driver, 9 axles or over GROUP 10: Dump truck - 50 yds. or more water level; Water pull - single engine with attachment GROUP 11: Water pull - twin engine; Water pull - twin engine with attachments; Winch truck driver - $1.25 additional when operating winch or similar special attachments GROUP 12: Boom Truck 17K and above ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- 7.c Packet Pg. 178 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 77 of 79 The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. 7.c Packet Pg. 179 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 78 of 79 A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. 7.c Packet Pg. 180 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 79 of 79 Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION     7.c Packet Pg. 181 At t a c h m e n t : c - C o n t r a c t , M a i n o C o n s t r u c t i o n ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 7.d Packet Pg. 182 At t a c h m e n t : d - R e s o l u t i o n N o . 1 0 5 1 0 ( 2 0 1 4 S e r i e s ) ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 7.d Packet Pg. 183 At t a c h m e n t : d - R e s o l u t i o n N o . 1 0 5 1 0 ( 2 0 1 4 S e r i e s ) ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d ) 7.d Packet Pg. 184 At t a c h m e n t : d - R e s o l u t i o n N o . 1 0 5 1 0 ( 2 0 1 4 S e r i e s ) ( 1 1 5 5 : C u r b R a m p s 2 0 1 5 A w a r d )