Loading...
HomeMy WebLinkAbout01-05-2016 Item 09 - Recycled Water Facilities Planning Study Meeting Date: 1/5/2016 FROM: Carrie Mattingly, Utilities Director Prepared By: David Hix, Deputy Director - Wastewater SUBJECT: RECYCLED WATER FACILITIES PLANNING STUDY RECOMMENDATION Approve an agreement with Water Systems Consultants (WSC) for development of a Recycled Water Facilities Planning Study in an amount not to exceed $150,000. DISCUSSION Background On February 3, 2015, the City Council received an update on the Water Resource Recovery Facility (WRRF) Upgrade Project. At that meeting Council approved a resolution to submit a grant application for Proposition 13 funding to study maximizing production and distribution of recycled water. At this same meeting, the City Council additionally authorized the Utilities Director to execute the grant contract if the grant application was successful and approved matching grant funds in the amount of $75,000 (Attachment A). In July of 2015, a grant application was submitted to the State Water Resources Control Board (SWRCB) for a Recycled Water Facil ities Planning Study. On November 9, 2015, the City was notified the grant had been approved and the Utilities Director received and signed the grant document on November 16, 2015 (Attachment B). The Recycled Water Facilities Planning Study The Recycled Water Facilities Planning Study will evaluate five alternatives for the recycled water produced at the WRRF. 1. Cal Poly a. Deliver recycled water to Cal Poly b. Construct a small scale satellite WRRF to serve Cal Poly 2. Irrigation in Edna Valley 3. Potable Reuse a. Provide groundwater recharge for Indirect Potable Reuse (IPR) b. Provide Direct Potable Reuse (DPR) 9 Packet Pg. 47 The scope for the project was developed to strengthen the data required to make knowledge - based decisions for the City’s recycled water program and to provide th e basis for selection of alternatives through a triple bottom line analysis. The five alternatives will be screened and it is anticipated the top two will be carried forward for full evaluation. This study will collect data and perform resource evaluations and is exempt from the California Environmental Quality Act (CEQA). Consultant Selection Staff recommends using WSC for the study. WSC possesses extensive knowledge and experience in the recycled water discipline. WSC is currently working with West Valley Water District on a recycled water master plan, the City of Pismo Beach’s recycled water project, and is the City’s program manager for the WRRF Upgrade project. The WRRF upgrade project has a goal to maximize recycled water production. WSC has submitted a scope of work which will result in a comprehensive study of the alternatives and provide recommendations for recycled water treatment and distribution requirements. The study will coordinate the findings with the WRRF Upgrade project design and future recycled water capital improvements (Attachment C). WSC was selected as an engineering consultant through the City’s on-call services Request for Proposals (RFP) for engineering services in 2014. On-call engineering services were envisioned to be utilized for studies of this nature. FISCAL IMPACT The Recycled Water Facilities Planning Study will cost $150,000, of which $75,000 is reimbursable through the approved grant funding. A total of $450,000 remains available in WRRF Upgrade project (2015-17 Financial Plan, Capital Improvement Plan, pages 3-72 to 3-75) under the study phase for the City’s portion of the study amounting to $75,000. Attachments: a a - Feb 3, 2015 Council Report and RW Resolution b b - Recycled Water Facilities Planning Grant c c - WSC RWFPS Proposal 11-20-2015 9 Packet Pg. 48 9.a Packet Pg. 49 At t a c h m e n t : a - F e b 3 , 2 0 1 5 C o u n c i l R e p o r t a n d R W R e s o l u t i o n ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.a Packet Pg. 50 At t a c h m e n t : a - F e b 3 , 2 0 1 5 C o u n c i l R e p o r t a n d R W R e s o l u t i o n ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.a Packet Pg. 51 At t a c h m e n t : a - F e b 3 , 2 0 1 5 C o u n c i l R e p o r t a n d R W R e s o l u t i o n ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.a Packet Pg. 52 At t a c h m e n t : a - F e b 3 , 2 0 1 5 C o u n c i l R e p o r t a n d R W R e s o l u t i o n ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.a Packet Pg. 53 At t a c h m e n t : a - F e b 3 , 2 0 1 5 C o u n c i l R e p o r t a n d R W R e s o l u t i o n ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.a Packet Pg. 54 At t a c h m e n t : a - F e b 3 , 2 0 1 5 C o u n c i l R e p o r t a n d R W R e s o l u t i o n ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.a Packet Pg. 55 At t a c h m e n t : a - F e b 3 , 2 0 1 5 C o u n c i l R e p o r t a n d R W R e s o l u t i o n ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 56 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 57 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 58 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 59 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 60 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 61 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 62 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 63 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 64 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 65 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 66 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 67 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 68 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 69 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 70 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 71 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 72 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 73 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 74 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 75 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 76 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 77 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 78 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 79 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 80 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) 9.b Packet Pg. 81 At t a c h m e n t : b - R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g G r a n t ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y )   PO Box 4255  l  San Luis Obispo, CA  93403  l  Phone: (805) 457‐8833  l  Fax: (805) 888‐2764  l  www.wsc‐inc.com  11/20/2015    Mr. Dave Hix  Wastewater Division Manager  City of San Luis Obispo  879 Morro Street  San Luis Obispo, CA 93401    SUBJECT:   PROPOSAL TO DEVELOP A RECYCLED WATER FACILITIES PLANNING STUDY  Dear Dave,  Per your request we have prepared a proposal to develop a Recycled Water Facilities Planning Study  (RWFPS) for the City of San Luis Obispo. The purpose of the study is develop and evaluate recycled  water use alternatives, and to identify a preferred alternative with the greatest potential for beneficial  use that will help the City meet their goals. The preferred alternative for increasing recycled water use  would be selected and implemented in coordination with the Water Resource Recovery Facility (WRRF)  Project.  The study will focus on evaluating the following five alternatives:  1. Deliver Title 22 recycled water from the WRRF to agricultural customers in the Edna Valley;   2. Deliver Title 22 recycled water from the WRRF to Cal Poly;  3. Provide groundwater recharge within the San Luis Obispo Valley Basin for indirect potable reuse  (IPR);  4. Construct a new satellite WRRF to serve Cal Poly and the surrounding areas; and  5. Provide direct potable reuse (DPR).   The scope of the study intends to strengthen the quality and quantity of data required to make  knowledge‐based decisions about the City’s recycled water program, and to provide the basis for  selection the most beneficial alternative(s) through a triple bottom line analysis. An initial screening of  the five alternatives will be conducted and the top two alternatives will be carried forward for detailed  evaluation.   The estimated cost for this scope of services is $150,000 as shown in the attached cost proposal.  Thank you for the opportunity to provide you with this proposal.  Please feel free to contact us if you  have any questions.  We can be reached at 457‐8833; Jeff is ext. 101 and Jasmine is at ext. 109.    9.c Packet Pg. 82 At t a c h m e n t : c - W S C R W F P S P r o p o s a l 1 1 - 2 0 - 2 0 1 5 ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) Mr. Dave Hix, page 2  11/20/2015  PO Box 4255  l  San Luis Obispo, CA  93403  l  Phone: (805) 457‐8833  l  Fax: (805) 888‐2764  l  www.wsc‐inc.com  Sincerely,         Water Systems Consulting, Inc.     Jeffery M. Szytel, PE, MBA     Program Manager      Jasmine Diaz, EIT  Assistant Program Manager      Enclosures:  Scope of Work for Recycled Water Facilities Planning Study dated 6/26/15  Cost Proposal for Recycled Water Facilities Planning Study dated 6/26/15    9.c Packet Pg. 83 At t a c h m e n t : c - W S C R W F P S P r o p o s a l 1 1 - 2 0 - 2 0 1 5 ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) City of San Luis Obispo  Scope of Work  Recycled Water Facilities Planning Study  6/26/2015  Page 1 of 12    Introduction The City of San Luis Obispo (City) owns and operates a tertiary treatment Water Resource Recovery  Facility (WRRF) which discharges a portion of the effluent to San Luis Obispo Creek for habitat  enhancement and the rest to a recycled water storage tank before it is distributed to customers  throughout the City.  The City is currently developing a project to upgrade the WRRF (WRRF Project) to  increase effluent water quality through complete nitrogen removal and reduction of disinfection  byproducts.  During the initial planning phase of the WRRF Project, “maximizing sustainable resource  recovery” was identified as a key objective.  Although the City must maintain a minimum effluent  discharge of 1.6 million gallons per day (MGD) to the creek for protection of native wildlife habitat, a  significant portion of the WRRF effluent remains available for recycled water use.  The purpose of this  study is to develop and evaluate recycled water use alternatives, and to identify a preferred alternative  with the greatest potential for beneficial use that will help the City meet their goals.  Through conversations with the City, five (5) recycled water use alternatives were identified for possible  evaluation during the City’s Recycled Water Facilities Planning Study (RWFPS):  1. Deliver Title 22 recycled water from the WRRF to agricultural customers in the Edna Valley;  2. Deliver Title 22 recycled water from the WRRF to Cal Poly;  3. Provide groundwater recharge within the San Luis Obispo Valley Basin for indirect potable reuse  (IPR);  4. Construct a new satellite WRRF to serve Cal Poly and the surrounding areas; and  5. Provide direct potable reuse (DPR).  The scope of this study intends to strengthen the quality and quantity of data required to make  knowledge‐based decisions about the future of the City’s recycled water program, and to provide the  basis for selecting the most beneficial alternative(s) through triple bottom line (TBL) analysis.  An initial  screening of these five alternatives will be conducted and the top two alternatives will be carried  forward for detailed evaluation.  As a result of the study, it is envisioned a preferred alternative for  increasing recycled water use would be selected and implemented in coordination with the WRRF  Project, which is scheduled for completion by 2020.   9.c Packet Pg. 84 At t a c h m e n t : c - W S C R W F P S P r o p o s a l 1 1 - 2 0 - 2 0 1 5 ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) City of San Luis Obispo  Scope of Work  Recycled Water Facilities Planning Study  6/26/2015  Page 2 of 12    Recycled Water Facilities Planning Study Scope of Work TASK 0.0 PROJECT MANAGEMENT AND MEETINGS 0.1 Project administration   Project schedule  (1) Prepare project schedule and update as‐required based upon actual progress and City  direction.  Submit revised schedules to the City as necessary.   Progress reports  (1) Prepare progress reports to be submitted with each monthly invoice. The reports will  include: 1) summary of activities accomplished in the current month; 2) outstanding  information and/or coordination needs; and 3) schedule updates.  Deliverable: WSC will provide a preliminary project schedule at the Kickoff Meeting and will provide updated project schedules as‐needed throughout the project. WSC will provide monthly progress reports with project invoices. 0.2 Kickoff Meeting   WSC will plan, organize and facilitate a Kickoff Meeting with City staff.   The purpose of the meeting will be to:  (1) discuss the goals and objectives of the RWFPS including the Study Parameters identified  in the Plan of Study approval by the SWRCB;  (2) discuss the context of the RWFPS as it relates to the Utilities Department operations and  current projects;   (3) discuss how the project relates to the City’s Water Resource Recovery Facility (WRRF)  Project and WRRF Facilities Plan;  (4) review the scope and schedule of the project including assumptions and proposed  methodologies;  (5) identify data needs and sources;  (6) define coordination requirements;  (7) confirm level and nature of SWRCB involvement during the project;  (8) discuss and develop strategies for stakeholder involvement;   (9) discuss recycled water market/opportunities as identified in prior analyses including the  City’s 2014 Draft Recycled Water Master Plan (RWMP); and  (10)  review and refine previously identified conceptual alternatives.   Budget is based on a 3‐hour meeting attended by WSC’s Project Manager, Project Engineer and  Staff Engineer, and HDR’s Senior Engineer and Project Engineer (by phone).  9.c Packet Pg. 85 At t a c h m e n t : c - W S C R W F P S P r o p o s a l 1 1 - 2 0 - 2 0 1 5 ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) City of San Luis Obispo  Scope of Work  Recycled Water Facilities Planning Study  6/26/2015  Page 3 of 12    0.3 Alternatives Screening Workshop   Coordinate a workshop with City staff to screen the conceptual alternatives and select two (2)  conceptual alternatives for further evaluation.   Review the proposed facility upgrades in the City’s WRRF Facilities Plan as the no project  alternative.   Review the materials prepared under Task 6.2 and perform a preliminary screening of  conceptual alternatives on the basis of volume of use, potable water supply implications, facility  requirements and costs, regulatory requirements, and benefits/beneficiaries.   Select two (2) conceptual alternatives for further evaluation.   Budget is based on a 3‐hour meeting attended by WSC’s Project Manager, Project Engineer and  Staff Engineer, and HDR’s Senior Engineer and Project Engineer (by phone).  Deliverable: Agenda and meeting materials; meeting notes. 0.4 Alternatives Evaluation Workshop   Coordinate a workshop with City staff to evaluate the two (2) conceptual alternatives selected  during the Alternatives Screening Workshop, and to select a preferred alternative.   Review the materials prepared under Task 6.3 and further develop evaluation criteria that are  consistent with the triple bottom line objectives in the WRRF Project Charter.   Evaluate and compare the conceptual alternatives by applying the selected screening/evaluation  criteria.   Select the preferred project alternative, which may combine aspects/components of more than  one conceptual alternative.   Budget is based on a 3‐hour workshop attended by WSC’s Project Manager, Project Engineer  and Staff Engineer, and HDR’s Senior Engineer and Project Engineer (by phone).  Deliverable: Agenda and meeting materials; meeting notes. 0.5 Deliverable Review Meeting   Deliverable Review Meeting: Draft Recycled Water Facilities Planning Study  (1) Plan, schedule and lead a meeting to review the draft recycled water facilities planning  study  (2) Budget is based on a 2‐hour meeting attended by WSC’s Project Manager, Project  Engineer and Staff Engineer, and HDR’s Senior Engineer and Project Engineer (by  phone).  Deliverable: Agenda and meeting materials; meeting notes. 9.c Packet Pg. 86 At t a c h m e n t : c - W S C R W F P S P r o p o s a l 1 1 - 2 0 - 2 0 1 5 ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) City of San Luis Obispo  Scope of Work  Recycled Water Facilities Planning Study  6/26/2015  Page 4 of 12    0.6 Quality Assurance / Quality Control (QA/QC)   WSC will provide quality control of the work items being prepared for delivery to the City.  TASK 1.0 BACKGROUND 1.1 Study area   Utilize the City’s Draft 2014 RWMP, the WRRF Facilities Plan and other references to prepare a  summary of the Study Area that includes:  (1) Narrative description of the Study Area  (2) Descriptive maps and diagrams showing vicinity, jurisdictional boundaries, proposed  annexation areas, regional topography/geography, groundwater basin boundaries,  hydrologic features, and current and projected land use.   The proposed Study Area shall include the current City limits, proposed annexation area(s),  agricultural land inside and outside of City limits and potential locations for offsite recycled  water storage.  1.2 Goals and objectives   Summarize goals and objectives defined during the Kickoff Meeting.  TASK 2.0 WATER SUPPLIES AND CHARACTERISTICS 2.1 Water supply characteristics   Summarize current and projected water supplies from the City’s 2015 Draft Water Master Plan  (2015 WMP).  2.2 Water demand characteristics   Summarize current and projected water demand from the 2015 WMP and customer data.  2.3 Water pricing   Summarize the City’s current water rate structure and any planned or upcoming rate increases.  TASK 3.0 WASTEWATER CHARACTERISTICS AND FACILITIES 3.1 Existing facilities   Utilize the City’s WRRF Facilities Plan, Wastewater Collection System Infrastructure Renewal  Strategy (WCSIRS) and other relevant documents to:  (1) Describe existing WRRF including capacity, current flows, description of treatment  processes and design criteria  (2) Summarize the City’s existing waste discharge requirements  (3) Characterize current and projected future influent flows  (4) Characterize current and projected effluent water quality including any seasonal  variation  (5) Summarize source(s) of industrial or other problem constituents (including high‐TDS  infiltration) and control measures  9.c Packet Pg. 87 At t a c h m e n t : c - W S C R W F P S P r o p o s a l 1 1 - 2 0 - 2 0 1 5 ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) City of San Luis Obispo  Scope of Work  Recycled Water Facilities Planning Study  6/26/2015  Page 5 of 12    (6) Summarize current wastewater flow variations including peaking factors for average dry  weather flow with Cal Poly (ADWFCP), average annual (AA), maximum week (MW),  maximum month (MM), maximum day (MD), and peak hour (PH)  (7) Summarize existing rights to use of treated effluent after discharge   Utilize the City’s 2014 Draft RWMP to:  (8) Describe existing recycling including infrastructure, users, quantities, and contractual  and pricing arrangements  3.2 Future facilities   Outline expected future waste discharge requirements based on the City’s Time Schedule Order  (No. R3‐2014‐0036), conversations with the City staff, review of the Basin Plan, and  conversations with staff from the Regional Water Quality Control Board   Describe plans for new wastewater treatment facilities to achieve regulatory compliance as  identified in the City’s WRRF Facilities Plan  TASK 4.0 TREATMENT REQUIREMENTS 4.1 Recycled water quality requirements   Summarize current recycled water regulations, including water qualities and/or treatment  requirements and approved uses for each category of potential recycled water use:  (1) Title 22 unrestricted use  (2) Indirect and direct potable reuse   Describe Basin Plan requirements for recycled water use   Describe water quality related requirements of the RWQCB to protect surface or ground water    Describe operational and on‐site requirements for recycled water (such as backflow prevention,  buffer zones, etc.)   Describe regulatory requirements and developments related to indirect potable reuse (IPR) and  DPR.  4.2 Tentative water recycling requirements of RWQCB   Contact RWQCB to determine how expansion or modification to the existing recycled water  treatment and distribution system would affect the existing Master Reclamation Permit and the  existing waste discharge requirements.   TASK 5.0 RECYCLED WATER MARKET/OPPORTUNITIES 5.1 Update and expand market analysis   Review and update market analysis in the 2014 RWMP for Title 22 recycled water delivery to Cal  Poly and Edna Valley, and expand market analysis to include potable reuse and groundwater  recharge use types based on discussions from the Kickoff Meeting.  Describe validation and  market update methodology.  For each identified user or category of potential user, summarize:  9.c Packet Pg. 88 At t a c h m e n t : c - W S C R W F P S P r o p o s a l 1 1 - 2 0 - 2 0 1 5 ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) City of San Luis Obispo  Scope of Work  Recycled Water Facilities Planning Study  6/26/2015  Page 6 of 12    (1) type of use;  (2) expected annual use, peak use and seasonal variation;  (3) estimated internal capital investment required (on‐site conversion costs);  (4) desire to use recycled water;  (5) date of possible initial use of recycled water;  (6) present and future source(s) of water and quality of use;  (7) cost, quality and reliability needs; and   (8) wastewater disposal methods.    Develop a tabular summary and map for existing and prospective users, their type of use and  magnitude of existing and/or projected demands.  5.2 Preliminary hydrogeological assessment   Provide description of the geology and hydrogeology of the San Luis basin, including  documented estimates of recharge, basin levels, groundwater production, groundwater quality,  and storage.  Provide descriptive graphics, to the extent available, including basin cross  section(s).   Research and summarize relevant data for considering conceptual alternatives to develop a  groundwater recharge project to utilize recycled water.   Evaluate the conceptual feasibility of disposing of water through the use of injection wells.   Summarize the facilities required to accomplish the disposal/recharge through injection  concept.  The discussion of conceptual facilities will include:  (1) Injection/recharge rates potential  (2) Potential well construction design and materials  (3) Potential well location(s)  (4) Well depths  (5) Well spacing  (6) Estimated construction costs   Evaluate the conceptual feasibility of disposing of water through the use of infiltration basins.   Summarize the facilities required to accomplish the disposal/recharge through surface spreading  concept.  The discussion of conceptual facilities will include:  (1) Infiltration rate potential  (2) Potential infiltration basin design and materials  (3) Potential infiltration basin location(s)  (4) Required setback from municipal wells  9.c Packet Pg. 89 At t a c h m e n t : c - W S C R W F P S P r o p o s a l 1 1 - 2 0 - 2 0 1 5 ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) City of San Luis Obispo  Scope of Work  Recycled Water Facilities Planning Study  6/26/2015  Page 7 of 12    (5) Estimated construction costs  TASK 6.0 PROJECT ALTERNATIVES ANALYSIS 6.1 Planning and design assumptions   Develop relevant planning and design assumptions and criteria that will be used when  evaluating project alternatives.  These assumptions should include:  (1) Delivery and system pressure criteria (average and peak)  (2) Use type regulatory criteria  (3) Cost basis: key assumptions; cost index; cost escalation and contingency factors;  discount rate; evaluation term for present worth analysis; etc.  (4) Planning period  (5) Conceptual infrastructure design criteria  6.2 Preliminary alternatives screening   Prior to the Alternatives Screening Workshop, develop information to support a preliminary  screening of the recycled water use alternatives identified.  Compare each potential alternative.   Screening of each alternative is expected to include:  (1) Use volume  (2) Potable water supply implications  (3) Infrastructure requirements and estimated costs  (4) Regulatory requirements and/or considerations  (5) Potential benefits and beneficiaries  (6) Relevant data and conclusions from prior studies  (7) Abbreviated triple bottom line assessment   It is anticipated that the materials developed under this task will be used to conduct the  screening of conceptual alternatives during the Alternatives Screening Workshop.  Materials will  be distributed to the City one (1) week prior to the workshop.   Based on results of the screening and discussions with City during the Alternatives Screening  Workshop, identify two (2) conceptual alternatives to carry forward for further analysis and  evaluation.  6.3 Alternatives analysis and evaluation   Prior to the Alternatives Evaluation Workshop, develop a preliminary list of TBL evaluation  criteria for the conceptual alternatives that align with the WRRF Project Charter, which may  include:  (1) Cost (capital, O&M, NPV, EAC and $/AF)  (2) Social benefits and impacts  9.c Packet Pg. 90 At t a c h m e n t : c - W S C R W F P S P r o p o s a l 1 1 - 2 0 - 2 0 1 5 ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) City of San Luis Obispo  Scope of Work  Recycled Water Facilities Planning Study  6/26/2015  Page 8 of 12    (3) Environmental benefits and impacts, including basin and watershed water quality  considerations  (4) Consistency with recycled water regulatory framework  (5) Potential impact and/or benefit to local Groundwater Sustainability Plan (GSP)  (6) Water supply benefits  (7) Sustainability and expandability  (8) Sequencing/phasing/schedule considerations  (9) Consistency with project goals/objectives and the WRRF Project   Evaluate two (2) conceptual alternatives identified in Task 6.2.  The analysis for each alternative  will include:  (1) Summary of the anticipated end users and location of use.  (2) Description of potential use types and volume of use, including seasonal variations  (3) Storage, pumping and distribution infrastructure requirements  (a) Narrative description including summary of required infrastructure, key  considerations and land requirements  (b) Conceptual maps depicting locations and layout of necessary infrastructure  (c) Infrastructure sizing estimates with calculations  (4) Required treatment upgrades  (a) Narrative description and summary of required unit processes that were not  previously identified in the WRRF upgrades scope  (b) Simplified process flow diagram  (c) Conceptual maps depicting locations and layout for necessary improvements  (5) Summary of anticipated regulatory requirements specific to the use type of each  conceptual alternative  (6) Triple bottom line benefits to the utility, community and/or region  (7) Costs  (a) Prepare preliminary estimates of construction, non‐construction and annual O&M  costs  (b) Estimate net present value, equivalent annual cost and cost per acre‐foot of supply  (8) Discussion of advantages, disadvantages and potential limitations or concerns   It is anticipated that the materials developed under this task will be used to conduct the  evaluation of conceptual alternatives during the Alternatives Evaluation Workshop.    9.c Packet Pg. 91 At t a c h m e n t : c - W S C R W F P S P r o p o s a l 1 1 - 2 0 - 2 0 1 5 ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) City of San Luis Obispo  Scope of Work  Recycled Water Facilities Planning Study  6/26/2015  Page 9 of 12    6.4 Water rights considerations   Working with City water rights counsel, summarize impacts the expansion of the recycled water  program will have on the City’s water rights and the local efforts related to compliance with the  Sustainable Groundwater Management Act (SGMA).  WSC assumes that City water rights  counsel will be available to assist in the development of water rights considerations section.  6.5 No project alternative   Utilize the City’s WRRF Facilities Plan to define the no project alternative   Include a brief evaluation of the no project alternative based on the information presented in  the WRRF Facilities Plan and include in alternatives analysis  6.6 Water conservation/reduction analysis   Summarize the City’s current and future plans for water conservation.  WSC will utilize the City’s  2010 UWMP, 2015 Draft WMP and current water conservation program documentation as basis  for water conservation summary.   Describe potential impacts to the recycled water program due to conservation.  6.7 Conceptual alternatives analysis results   Summarize the outcome from Alternatives Evaluation Workshop including:   (1) Evaluation criteria  (2) Results from the evaluation  (3) Preferred conceptual alternative  TASK 7.0 RECOMMENDED FACILITIES PROJECT PLAN 7.1 Preferred alternative   Summarize proposed facilities and basis for selection   Develop preliminary design criteria and conceptual pipeline routes for the preferred alternative   Update conceptual maps, figures, process flow diagram(s), and layouts to reflect the preferred  alternative including treatment, storage and distribution infrastructure   Update cost estimates based on final configuration and expected time of construction   Update list of all potential users, quantity of recycled water use, seasonal variations in use,  water quality considerations or concerns, and peak demand   Summarize on‐site improvements and retrofits required including cost  TASK 8.0 STAKEHOLDER INVOLVEMENT 8.1 Stakeholder outreach   Conduct stakeholder meetings to coordinate project objectives, elements, etc.  Document  stakeholder outreach efforts.     Support City in meetings and outreach to potential partners.  9.c Packet Pg. 92 At t a c h m e n t : c - W S C R W F P S P r o p o s a l 1 1 - 2 0 - 2 0 1 5 ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) City of San Luis Obispo  Scope of Work  Recycled Water Facilities Planning Study  6/26/2015  Page 10 of 12     Budget assumes 11 hours of WSC support.  8.2 Public outreach   Provide project updates at public meetings as requested by the City, including preparation of an  explanatory presentation and/or graphics presenting the analysis and/or conclusions contained  within the Recycled Water Facilities Planning Study   Document public outreach efforts.   Budget assumes 11 hours of WSC support.   TASK 9.0 IMPLEMENTATION PLAN 9.1 Permitting requirements   Identify and summarize the probable permitting requirements for implementing recycled water  projects or retrofitting existing recycled water facilities.  Utilize previously completed recycled  water studies as the basis for developing the summary of probable permitting requirements.  9.2 Environmental documentation requirements (CEQA)   Utilize the City’s WRRF Facilities Plan to summarize the necessary environmental documentation  requirements to expand a recycled water program or retrofit existing recycled water facilities.  9.3 Coordination and governance   Determine needed coordination, agreements, ordinances and/or governance for implementing  the preferred alternative recycled water system.   Discuss ability of users to make on‐site improvements and connect to the recycled water  system.   Summarize any customer assurances obtained to‐date.  Provide recommendations for obtaining  remaining assurances from proposed recycled water customers.  9.4 Construction financing plan and revenue program   Summarize potential grant and loan funding opportunities for which the project may be eligible  based on the WRRF Funding and Financing Plan   Incorporate the recycled water project into the WRRF Project Funding and Financing Plan and  Cash Flow Model, based on conclusions of the Recycled Water Facilities Planning Study.   Support the City in developing a proposed pricing policy for the selected recycled water  alternative   Evaluate costs that can be allocated to water pollution control  9.c Packet Pg. 93 At t a c h m e n t : c - W S C R W F P S P r o p o s a l 1 1 - 2 0 - 2 0 1 5 ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) City of San Luis Obispo  Scope of Work  Recycled Water Facilities Planning Study  6/26/2015  Page 11 of 12    9.5 Conceptual schedule   Prepare a conceptual schedule for the implementation of the recycled water project and  incorporate into the WRRF Project schedule, including permitting, planning, design,  construction, critical milestones from the financing and revenue program and on‐site customer  improvements.  Provide narrative description of phasing considerations/recommendations in  the preferred project plan, specifically considering implications and/or conflicts related to the  WRRF Program schedule presented in the WRRF Facilities Plan.  TASK 10.0 PREPARE RECYCLED WATER FACILITIES PLANNING STUDY 10.1 Prepare Draft Recycled Water Facilities Planning Study   Prepare draft Executive Summary and compile draft report including title page(s),  acknowledgements, table of contents, list of figures, list of tables, draft chapters, reference list  and appendices.  Describe how the recommendations from this project will interface with the  ongoing WRRF Project.  Deliverable: Draft Recycled Water Facilities Planning Study 10.2 Final Draft Recycled Water Facilities Planning Study   Prepare Final Draft Recycled Water Facilities Planning Study based on comments received from  the City and any identified stakeholders on the draft Recycled Water Facilities Planning Study  Deliverable: Final Draft Recycled Water Facilities Planning Study 10.3 Final Recycled Water Facilities Planning Study   Prepare Final Recycled Water Facilities Planning Study based on comments received from the  City on the Final Draft Recycled Water Facilities Planning Study.  Deliverable: Final Recycled Water Facilities Planning Study 9.c Packet Pg. 94 At t a c h m e n t : c - W S C R W F P S P r o p o s a l 1 1 - 2 0 - 2 0 1 5 ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) City of San Luis Obispo  Scope of Work  Recycled Water Facilities Planning Study  6/26/2015  Page 12 of 12    Deliverable Summary Task Deliverable Description Format/Copies Due Date   0.1 Project Schedule Emailed PDF and 11x17  hardcopies for all meeting  attendees  At Kickoff Meeting and  revised as‐needed  0.2 Kickoff Meeting Agenda and Minutes  Emailed PDF See project schedule  0.3 Alternatives Screening Workshop Agenda and  Minutes  Emailed PDF See project schedule  0.4 Alternatives Evaluation Workshop Agenda and  Minutes  Emailed PDF See project schedule  0.5 Deliverable Review Meeting Agenda and  Minutes   Emailed PDF See project schedule  10.1 Draft Recycled Water Facilities Planning Study Emailed PDF and four (4)  hardcopies  See project schedule  10.2 Final Draft Recycled Water Facilities Planning  Study  Emailed PDF and four (4)  hardcopies  See project schedule  10.3 Final Recycled Water Facilities Planning Study Emailed PDF and four (4)  hardcopies  See project schedule    9.c Packet Pg. 95 At t a c h m e n t : c - W S C R W F P S P r o p o s a l 1 1 - 2 0 - 2 0 1 5 ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y ) Ci t y  of  Sa n  Lu i s  Ob i s p o Re c y c l e d  Wa t e r  Fa c i l i t i e s  Pl a n n i n g  St u d y Cleath‐Harris Pr i n c i p a l Se n i o r  En g i n e e r   II I Se n i o r  En g i n e e r   II As s o c i a t e   En g i n e e r  I St a f f  En g i n e e r  II Cl e r i c a l /   Ad m i n To t a l  La b o r  Ho u r s T o t a l  Fe e E n g i n e e r  5 En g i n e e r   5 En g i n e e r  4 E n g i n e e r  1Admin / ClericalTotal Labor HoursTotal FeeLabor CostTotal Labor CostExpensesTotal Fee 0P r o j e c t  Ma n a g e m e n t  an d  Me e t i n g s 2 3 0 0 3 0 2 5 1 0 8 8 $ 1 5 , 8 0 7 2 4 0 1 3 2 1 2 5 1 $ 1 1 , 4 9 3 $ 0 $ 2 5 , 7 6 9 $ 1 , 5 3 1 $ 2 7 , 3 0 0 0. 1 P r o j e c t  ad m i n i s t r a t i o n 15 4 1 0 2 9 $ 4 , 1 0 3 1 2 1 2 $ 1 , 6 2 8 $ 0 $5,430$301$5,731 0. 2 K i c k o f f  Me e t i n g 3 4 6 1 3 $ 2 , 3 4 4 3 3 6 $ 1 , 4 5 9 $ 0 $3,596$208$3,804 0. 3 A l t e r n a t i v e s  Sc r e e n i n g  Wo r k s h o p 3 4 6 1 3 $ 2 , 3 4 4 3 . 5 4 1 8 . 5 $ 1 , 9 4 3 $ 0 $4,043$244$4,287 0. 4 A l t e r n a t i v e s  Ev a l u a t i o n  Wo r k s h o p 3 4 6 1 3 $ 2 , 3 4 4 3 . 5 4 1 8 . 5 $ 1 , 9 4 3 $ 0 $4,043$244$4,287 0. 5 D e l i v e r a b l e  Re v i e w  Me e t i n g 2 3 3 8 $ 1 , 5 1 7 2 2 4 $ 9 7 3 $ 0 $2,318$172$2,490 0. 6 Q u a l i t y  As s u r a n c e / Q u a l i t y  Co n t r o l  (Q A / Q C ) 1 2 12 $ 3 , 1 5 3 1 2 1 2 $ 3 , 5 4 8 $ 0 $6,338$363$6,701 1 B a c k g r o u n d 0 0 0 2 9 0 1 1 $ 1 , 5 5 0 0 0 0 0 0 0 $ 0 $ 0 $ 1 , 5 5 0 $ 0 $ 1 , 5 5 0 1. 1 S t u d y  ar e a 1 6 7 $ 9 7 7 0 $ 0 $ 0 $977$0$977 1. 2 G o a l s  an d  ob j e c t i v e s 1 3 4 $ 5 7 3 0 $ 0 $ 0 $573$0$573 2W a t e r  Su p p l i e s  an d  Ch a r a c t e r i s t i c s 0 0 0 3 1 6 0 1 9 $ 2 , 6 6 3 0 0 0 0 0 0 $ 0 $ 0 $ 2 , 6 6 3 $ 0 $ 2 , 6 6 3 2. 1 W a t e r  su p p l y  ch a r a c t e r i s t i c s 1 4 5 $ 7 0 8 0 $ 0 $ 0 $708$0$708 2. 2 W a t e r  de m a n d  ch a r a c t e r i s t i c s 1 8 9 $ 1 , 2 4 7 0 $ 0 $ 0 $1,247$0$1,247 2. 3 W a t e r  pr i c i n g 1 4 5 $ 7 0 8 0 $ 0 $ 0 $708$0$708 3W a s t e w a t e r  ch a r a c t e r i s t i c s  an d  fa c i l i t i e s 0 0 0 1 0 0 1 $1 6 8 1 0 2 . 5 1 3 0 1 6 . 5 $ 2 , 6 5 5 $ 0 $ 2 , 6 2 6 $ 1 9 7 $ 2 , 8 2 3 3. 1 E x i s t i n g  fa c i l i t i e s 0. 5 0 . 5 $ 8 4 0 . 5 1 . 5 8 1 0 $ 1 , 5 9 2 $ 0 $1,558$118$1,676 3. 2 F u t u r e  fa c i l i t i e s 0. 5 0 . 5 $ 8 4 0 . 5 1 5 6 . 5 $ 1 , 0 6 3 $ 0 $1,068$79$1,147 4T r e a t m e n t  Re q u i r e m e n t s 0 0 0 1 0 0 1 $ 1 6 8 2 0 4 6 0 1 2 $ 2 , 2 2 3 $ 0 $ 2 , 2 2 7 $ 1 6 5 $ 2 , 3 9 1 4. 1 R e c y c l e d  wa t e r  qu a l i t y  re q u i r e m e n t s 0. 5 0 . 5 $ 8 4 1 2 4 7 $ 1 , 2 5 6 $ 0 $1,247$93$1,340 4. 2 T e n t a t i v e  wa t e r  re c y c l i n g  re q u i r e m e n t s  of  RW Q C B 0 . 5 0 . 5 $ 8 4 1 2 2 5 $ 9 6 7 $ 0 $979$72$1,051 5R e c y c l e d  Wa t e r  Ma r k e t / O p p o r t u n i t i e s 1 0 0 6 1 6 0 2 3 $ 3 , 5 2 1 2 0 0 0 0 2 $ 5 9 1 $ 1 5 , 0 0 0 $ 1 8 , 9 6 8 $ 1 4 4 $ 1 9 , 1 1 2 5. 1 U p d a t e  ma r k e t  an a l y s i s 4 1 6 2 0 $ 2 , 9 3 0 0 $ 0 $ 0 $2,830$100$2,930 5. 2 P r e l i m i n a r y  hy d r o g e o l o g i c a l  as s e s s m e n t 1 2 3 $ 5 9 0 2 2 $ 5 9 1 $ 1 5 , 0 0 0 $16,138$44$16,182 6P r o j e c t  Al t e r n a t i v e s  An a l y s i s 6 8 0 2 7 6 6 0 1 0 7 $ 1 7 , 4 6 8 1 4 0 4 5 6 9 0 1 2 8 $ 2 2 , 7 1 7 $ 0 $ 3 7 , 9 0 2 $ 2 , 2 8 3 $ 4 0 , 1 8 5 6. 1 P l a n n i n g  an d  de s i g n  as s u m p t i o n s 1 2 2 5 $ 8 6 0 2 6 8 1 6 $ 2 , 8 9 5 $ 0 $3,540$214$3,755 6. 2 P r e l i m i n a r y  al t e r n a t i v e s  sc r e e n i n g 2 4 8 2 0 3 4 $ 5 , 7 0 2 2 1 4 2 2 3 8 $ 6 , 4 4 8 $ 0 $11,473$678$12,150 6. 3 A l t e r n a t i v e s  an a l y s i s  an d  ev a l u a t i o n 2 4 8 3 6 5 0 $ 7 , 9 6 1 6 2 4 3 2 6 2 $ 1 0 , 9 8 7 $ 0 $17,834$1,114$18,948 6. 4 W a t e r  ri g h t s  co n s i d e r a t i o n s 1 6 2 9 $ 1 , 6 3 2 1 1 $ 2 9 6 $ 0 $1,805$122$1,927 6. 5 N o  pr o j e c t  al t e r n a t i v e 1 1 $ 1 6 8 1 1 3 5 $ 9 2 1 $ 0 $1,021$68$1,089 6. 6 W a t e r  co n s e r v a t i o n / r e d u c t i o n  an a l y s i s 1 6 7 $ 9 7 7 1 1 $ 2 9 6 $ 0 $1,251$22$1,273 6. 7 C o n c e p t u a l  al t e r n a t i v e s  an a l y s i s  re s u l t s 1 1 $ 1 6 8 1 4 5 $ 8 7 5 $ 0 $978$65$1,043 7 R e c o m m e n d e d  Fa c i l i t i e s  Pr o j e c t  Pl a n 0 0 0 4 1 0 0 1 4 $ 2 , 1 2 1 3 0 8 1 8 0 2 9 $ 5 , 0 2 0 $ 0 $ 6 , 6 6 9 $ 4 7 2 $ 7 , 1 4 1 7. 1 P r e f e r r e d  al t e r n a t i v e 4 1 0 1 4 $ 2 , 1 2 1 3 8 1 8 2 9 $ 5 , 0 2 0 $ 0 $6,669$472$7,141 8S t a k e h o l d e r  In v o l v e m e n t 6 0 0 6 1 0 0 2 2 $ 4 , 0 8 3 0 0 0 0 0 0 $ 0 $ 0 $ 3 , 8 8 3 $ 2 0 0 $ 4 , 0 8 3 8. 1 S t a k e h o l d e r  ou t r e a c h 3 3 5 1 1 $ 2 , 0 4 2 0 $ 0 $ 0 $1,942$100$2,042 8. 2 P u b l i c  ou t r e a c h 3 3 5 1 1 $ 2 , 0 4 2 0 $ 0 $ 0 $1,942$100$2,042 9 I m p l e m e n t a t i o n  Pl a n 0 0 0 8 1 4 0 2 2 $ 3 , 4 3 2 5 0 8 1 4 0 2 7 $ 5 , 0 3 2 $ 0 $ 7 , 8 9 1 $ 5 7 3 $ 8 , 4 6 4 9. 1 P e r m i t t i n g  re q u i r e m e n t s 0 $ 0 1 4 8 1 3 $ 2 , 2 1 7 $ 0 $2,053$164$2,217 9. 2 E n v i r o n m e n t a l  do c u m e n t a t i o n  re q u i r e m e n t s  (C E Q A ) 0 $ 0 1 2 6 9 $ 1 , 5 4 6 $ 0 $1,432$115$1,546 9. 3 C o o r d i n a t i o n  an d  go v e r n a n c e 3 6 9 $ 1 , 4 1 3 0 . 5 0 . 5 $ 1 4 8 $ 0 $1,450$111$1,561 9. 4 C o n s t r u c t i o n  fi n a n c i n g  pl a n  an d  re v e n u e  pr o g r a m 3 8 1 1 $ 1 , 6 8 3 0 . 5 0 . 5 $ 1 4 8 $ 0 $1,720$111$1,831 9. 5 C o n c e p t u a l  sc h e d u l e 2 2 $ 3 3 6 2 2 4 $ 9 7 3 $ 0 $1,237$72$1,309 10 P r e p a r e  Re c y c l e d  Wa t e r  Fa c i l i t i e s  Pl a n n i n g  St u d y 3 0 0 3 6 5 6 0 9 5 $ 1 4 , 9 6 3 5 0 4 8 6 0 0 1 1 3 $ 1 9 , 3 2 5 $ 0 $ 3 2 , 2 5 7 $ 2 , 0 3 1 $ 3 4 , 2 8 8 10 . 1 P r e p a r e  Dr a f t  Re c y c l e d  Wa t e r  Fa c i l i t i e s  Pl a n n i n g  St u d y 1 1 0 1 6 2 7 $ 4 , 2 9 2 2 1 4 1 8 3 4 $ 5 , 8 6 9 $ 0 $9,526$635$10,161 10 . 2 P r e p a r e  Fi n a l  Dr a f t  Re c y c l e d  Wa t e r  Fa c i l i t i e s  Pl a n n i n g   1 1 6 2 4 4 1 $ 6 , 3 7 9 2 2 2 2 8 5 2 $ 8 , 8 4 3 $ 0 $14,367$855$15,222 10 . 3 F i n a l  Re c y c l e d  Wa t e r  Fa c i l i t i e s  Pl a n n i n g  St u d y 1 1 0 1 6 2 7 $ 4 , 2 9 2 1 1 2 1 4 2 7 $ 4 , 6 1 3 $ 0 $8,363$542$8,905 39                                    8                                                        ‐                                          12 4                                            22 2                                          10                            40 3 $ 6 5 , 9 4 3 56                      ‐                12 9                      182              12               378.5$69,057$15,000$142,405$7,595$150,000 6/ 2 6 / 2 0 1 5 ALL FIRMS Co l u m n  To t a l s HDR WS C Ta s k  De s c r i p t i o n Ta s k  No . Pa g e  1 of  1 9.c Packet Pg. 96 At t a c h m e n t : c - W S C R W F P S P r o p o s a l 1 1 - 2 0 - 2 0 1 5 ( 1 2 1 9 : R e c y c l e d W a t e r F a c i l i t i e s P l a n n i n g S t u d y )