HomeMy WebLinkAbout0_PC Reading File Madonna on LOVRMadonna on LOVR Specific Plan 3 (SP-3) Initiation Request
PRE 1293-2015
SAN LUIS OBISPO PLANNING COMMISSION READING FILE CONTENTS
Froom / Il Villagio Specific Plan Exhibits (RRM Design Group), Full Size
Sheet A.1 (Environmental Summary Constraints Map, updated December 16, 2015)
Sheet A.2 (Environmental Summary Landform & Slopes Map, April 29, 2015)
Sheet A.3 (April 2015 Pre-Application Basis for Design Studies, April 29, 2015)
Sheet A.4 (Special Design Area 10 Existing Development Exceeding 150’ Elevation, April 29,
2015)
Sheet B.1 (April 2015 Pre-Application Conceptual Land Uses, April 29, 2015)
Sheet B.2 (Open Space Areas Option 6, April 29, 2015)
Sheet C.1 (April 2015 Pre-Application Conceptual Building Heights, April 29, 2015)
Sheet D.1 (Conceptual Creek Corridor Plan and Section, updated December 16, 2015
Note: 11x17 copies of the Applicant’s Exhibits have been provided to each Commissioner
Preliminary Technical Reports and Information
Madonna Froom Authorization to Proceed Response to E-mail dated January 7, 2016 and
attached Exhibits (RRM Design Group, January 11, 2016)
Froom / Il Villagio Specific Plan, Planning Commission January 27, 2016 (Planning Commission
PowerPoint and Narrative, RRM Design Group)
Visual Simulations (RRM Design Group, January 11, 2016)
Biological Resources Inventory (KMA, January 2016)
Request for Preliminary Jurisdictional Determination (KMA, August 4, 2015)
Preliminary Jurisdictional Determination Letter (U.S. Army Corps of Engineers, September 24,
2015)
Section 106 Prehistoric and Historic Report (First Carbon Solutions, February 20, 2015)
Stormwater Memorandum (RRM Design Group, February 26, 2015)
o Drainage Master Plan (Alternative #1, February 2015)
o Drainage Master Plan (Alternative #2, February 2015)
Preliminary Transportation Analysis (Central Coast Transportation Consulting, April 2015)