Loading...
HomeMy WebLinkAbout03-21-16 ARC Correspondence Item 2 (Leopold)Meeting:figL 3 1 Item: C� 04/28/2016 Dear Serra Meadows Neighbor — RECEIVED CITY OF SAN LUIS OBISPo MAY 0 4 2016 COMMUNITY DEVELOPMENT MAA 069 1()16 This letter is not intended to question the appropriateness or need for low-cost public housing — the purpose of this letter is to bring the proposed design of the Serra Meadows subsidized housing project to the attention of adjoining homeowners. The San Luis Obispo City Architectural Review Commission (ARC) recently reviewed the Serra Meadows Public Housing project, which is to be constructed on a manufactured building pad — a "plateau" — overlooking the Serra Meadows neighborhood. The Commissioners appeared to "approve in concept" the 36 -unit apartment project. However, more than one Commissioner and members of the public (from the neighborhood) made the following observations: • The subsidized public housing should be better integrated into the neighborhood in order to minimize visual impacts. The Commissioners did not want four large, three-story apartment buildings to "dominate" the neighborhood. One Commissioner commented that she did not want the complex to look like "Hearst Castle on the hill" overlooking Serra Meadows. Unfortunately, as proposed, the top of the proposed building will tower approximately 50' above the elevation of Plum Street. • There is minimal on-site parking for residents and their guests. The proposed plan for the entire 36 -unit apartment complex included only one on-site parking space for each apartment unit, and only 3 parking spaces for guests. "Spillover parking" into the existing neighborhood will be a significant problem. A slight reduction in the number of apartment units would allow more on-site parking for the apartment residents and their guests — resulting in a lesser impact on the street parking in the surrounding neighborhood. The proposed plan also did not include an on-site area for children to play, nor did it include any outdoor bicycle racks. Curiously, however, at that same meeting the Commissioners apparently granted a tentative "OK" to a 3 foot height extension (increasing overall height of each of the four buildings from 30 feet to 33 feet) and additionally granted an allowance for a very minimum building setback (from the "top of bank") of only 10 feet — such a small setback will make the front of the building appear even taller on the plateau, further contrasting it from the surrounding neighborhood. We hope all of the Commissioners will have a chance to visit the site. As it stands, the "manufactured building pad" sits high above the neighborhood, with view angles such that third -story windows will look directly down into the back yards of some Serra Meadows homes. View sheds and the privacy of existing homes should be considered. The four photographs (attached) demonstrate the height of the proposed three-story building, contemplated to be constructed on top of the existing building pad with only a 10 foot building setback. In fairness to those who purchased homes in Serra Meadows, the ARC and the City Planning Commission should also consider the impact to the surrounding neighbors. The visual impact can be mitigated by the following: 1. Increasing the building setback at the top of the bank from 10 foot to 20 foot. 2. The "front building" (located at the top of the bank, bordering Plum Street) could be restricted to a two-story building, which would mitigate the visual impact from the neighborhood below. 3. The landscaping plan for the banks located above Plum and Violet Streets need to be developed in a manner that will truly mitigate the visual impact with appropriate trees, shrubs and groundcover. We also would like to note that in the photos enclosed, the 10 foot setback with poles is shown from the top of the plateau, not 10 feet from the property line. If the exception were allowed and the building was actually placed 10 feet from the property line, it would appear much closer and higher than shown. Again, we emphasize that we are all in support of this development and the need for affordable housing within our community. We simply want to ensure the privacy, safety and cohesiveness of this project with the already existing surrounding neighborhood. We are also expecting the City to notify all people that are currently "vested" in their homes that are currently under construction, within 300' but not yet closed escrow — this has been a problem, because the City has not obtained their mailing addresses from the Developer, and yet these people deserve to be informed. Please place this letter on public record where appropriate. Sincerely, Ian & Jacqueline Leopold Serra Meadows: The building site for four buildings, each three-story, for 36 units of public housing. Only one on-site parking space per unit 50 a 331 17' '•UVJ This photo was taken from the SFR building pad, Lot #129, across the street at approximately 9'above Plum Street Height of proposed three-story building Holding a 33'tall pole located at the 10' ?tback from top of bank as the proposed site of the front of the 33'tall building. Pr # - - _. __ice __ _ M•�n.. Plum Street •4. 0 m r s } J � r .�Y r ib• Y .y "s r � i. J. J • J