HomeMy WebLinkAbout05-17-2016 Item 10 Design Services for Calle Joaquin Lift Station Meeting Date: 5/17/2016 FROM: Carrie Mattingly, Utilities Director Dave Hix, Deputy Director - Wastewater Prepared By: Jennifer Metz, Utilities Project Manager SUBJECT: DESIGN SERVICES FOR CALLE JOAQUIN LIFT STATION REPLACEMENT, SPEC. NO. 91133, CONTRACT AMENDMENT NO. 5 RECOMMENDATION 1. Approve a contract amendment of $13,089 for additional Design Services for the Calle Joaquin Siphon and Lift Station Replacement, Spec. No. 91133; and 2. Adopt a Resolution approving a Mitigated Negative Declaration of Environmental Impact for the Calle Joaquin Siphon and Lift Station Replacement. DISCUSSION Background The Calle Joaquin Lift station and force main was put into service in 1967. A portion of the force main was replaced in 2004 from the lift station on Calle Joaquin to the intersection of Calle Joaquin and Los Osos Valley Road. An additional 2,700 feet of force main was replaced in 2015 prior to the start of the Los Osos Valley Road Interchange Project to mitigate impacts to the construction schedule of the overpass. Construction documents for the Calle Joaquin lift station replacement are approximately 90 percent complete and the project requires permits from various environmental agencies. The City’s contract with AECOM, entered into in 2011, in the amount of $390,800 was amended by $67,939 in August 2012, by $3,900 in December 2012, and by $10,000 in March 2013 in order to accommodate additional design and construction phase support work. In 2014, it was amended by $10,954 to separate the force main construction from the siphon and lift station replacement project. The attached contract amendment includes additions to the work scope to have AECOM make necessary modifications to the alignment of the 101 crossing and add landscape plans and specifications for the area surrounding the lift station. Environmental Review An Initial Study and Mitigated Negative Declaration was prepared by Sage Institute for the project in accordance with the California Environmental Quality Act and noticed on April 9, 2016 (Attachment C). The project requires permits from Regional Water Quality Control Board, California Department of Fish and Wildlife, and the Army Corps of Engineers for the installation 10 Packet Pg. 234 of the siphon under San Luis Obispo Creek, removal of invasive species (Arundo donax), and dewatering at the lift station site. FISCAL IMPACT The Sewer Fund currently has a balance of $43,063 in Completed Projects to accommodate the $13,089 funding request for this amendment. CONCURRENCES Natural Resources and the Community Development Department concur with this recommendation ALTERNATIVES 1. Elect not to approve the contract amendment. The City Council may elect not to approve the contract amendment at this time. Council may select this alternative if it believes the lift station replacement should be deferred. Staff does not recommend this alternative due to the age of the lift station. Attachments: a - Amendment to Agreement No. 5 b - Resolution for Calle Joaquin Lift MND c - Council Reading File - Calle Joaquin Initial Study_Final Sept-2015 10 Packet Pg. 235 AMENDMENT TO AGREEMENT NO. 5 THIS AMENDMENT TO AGREEMENT is made and entered in the City of San Luis Obispo on _______________________, by and between the CITY OF SAN LUIS OBISPO, a municipal corporation, herein after referred to as City, and AECOM, Inc., hereinafter referred to as Contractor. WITNESSETH: WHEREAS, on November 15, 2011 the City entered into an Agreement with Contractor for Engineering Design Services per Specification No. 91133 and WHEREAS, the City desires to amend the scope of services to include additional Engineering Design Services and Contractor has submitted a proposal for this purpose that is acceptable to the City. NOW THEREFORE, in consideration of their mutual promises, obligations and covenants hereinafter contained, the parties hereto agree as follows: 1. The scope of services and related compensation is hereby amended as set forth in Exhibit A attached hereto for additional engineering design work for the Calle Joaquin Lift Station Replacement, at cost not to exceed $13,089 per memorandum dated March 14, 2016. 2. All other terms and conditions of the Agreement remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed the day and year first written above. ATTEST: CITY OF SAN LUIS OBISPO ____________________________________ By:____________________________________ Lee Price, City Clerk Jan Marx, Mayor APPROVED AS TO FORM: CONTRACTOR _____________________________________ By:____________________________________ Christine Dietrick, City Attorney Ben Horn, AECOM, Inc. 10.a Packet Pg. 236 At t a c h m e n t : a - A m e n d m e n t t o A g r e e m e n t N o . 5 ( 1 3 2 9 : C a l l e J o a q u i n S i p h o n L i f t S t a t i o n C o n t r a c t A m e n d m e n t ) AECOM 2400 Professional Parkway Suite 100 Santa Maria CA 93455 www.aecom.com 805 938 0855 tel 805 938 0047 fax March 14, 2016 Jennifer Metz City of San Luis Obispo 879 Morro Street San Luis Obispo, CA 93401 Dear Jennifer, Calle Joaquin Lift Station Replacement Scope Amendment Background The City of San Luis Obispo (City) has requested AECOM amend our currently authorized Scope of Work to realign the 30-inch casing and 12-inch gravity sewer that is planned for installation beneath Highway 101. The City has also requested that AECOM perform additional work to provide plans and specifications for landscaping around the proposed lift station. Due to an extended delay in the project progression, additional work for project restart is also included. SCOPE OF WORK This Scope Amendment includes the following tasks: TASK GROUP 1: Project Management, Coordination, and Restart Task 1.1: Project Meetings AECOM will attend one (1) additional progress and coordination meeting during the design phase of the project. The purpose of the meeting will be to discuss issues related to the realignment with the City. Task 1.2: Project Management AECOM will provide additional project management and coordination with the City’s Project Manager. Task 1.3: Project Restart AECOM will expend additional effort to bring staff back up to speed on project status and restart the completion of the design. TASK GROUP 2: Modifications to the Calle Joaquin Lift Station Construction Documents Task 2.1: Revisions to Highway 101 Crossing 10.a Packet Pg. 237 At t a c h m e n t : a - A m e n d m e n t t o A g r e e m e n t N o . 5 ( 1 3 2 9 : C a l l e J o a q u i n S i p h o n L i f t S t a t i o n C o n t r a c t A m e n d m e n t ) 2 AECOM will revise the Calle Joaquin Lift Station plans to realign the 30-inch casing that is proposed to cross Highway 101. These modifications include changes to the civil plans. These modifications will be incorporated with the Calle Joaquin Lift Station deliverables under the previously authorized scope of work. Deliverables: • No deliverable under this amendment; revisions will be incorporated with Calle Joaquin Lift Station deliverables. Task 2.2: Landscaping Plans and Specifications The City has requested that landscaping and irrigation be incorporated into the design of the Calle Joaquin Lift Station. The landscaping and irrigation system AECOM will revise the Calle Joaquin Lift Station plans, specifications, and cost opinion to include the landscape and irrigation components of the project. These modifications include changes to the specifications, title sheet, sheet index and layout, general sheets, and plans. Also includes Designs, calculations and documentation for compliance with the agency’s adopted Water Efficient Landscape Ordinance or the State model ordinance (CCR Title 23 Chapter 2.7) for a landscape plan submittal including: • Water Efficient Landscape Worksheet • Soil Management Plan • Identify stormwater management practices applicable to this scope of services Deliverables: • Incorporated with Calle Joaquin Lift Station deliverables Additional Engineering Services If requested by City, AECOM will provide the following additional services, beyond the services included in our Scope of Work, on a time and materials basis based on the current rate schedule: A. Attendance to additional meetings beyond those specifically identified. B. Planning, analysis or design of additional or alternative facilities, including facilities offsite from the proposed project site. C. Services associated with prequalification of contractors other than as specifically defined herein. D. Any additional project-related services not specifically included in Scope of Work. Client Furnished Services The following services or information will be provided by City or its consultants: A. Information for inclusion in the cost opinion and/or bid item descriptions on project components not being prepared by AECOM. B. Copies of all relevant reports, studies, drawings, correspondence, and other relevant project information or data. We have assumed that the City will provide all relevant planning information identifying existing and future design flows for both lift stations. 10.a Packet Pg. 238 At t a c h m e n t : a - A m e n d m e n t t o A g r e e m e n t N o . 5 ( 1 3 2 9 : C a l l e J o a q u i n S i p h o n L i f t S t a t i o n C o n t r a c t A m e n d m e n t ) 3 Schedule No changes. Budget AECOM’s budget for the scope items described above is $13,089, and will not be exceeded unless additional authorization is requested and granted by the City in writing. AECOM’s fee and costs will be invoiced on a Time and Materials basis. These services will be provided according to the terms and conditions defined in the Agreement between the City and AECOM for Design Services for the Calle Joaquin and Laguna Lift Station Replacement project, dated Nov. 15, 2011. Scope and deliverables for this work will be as described above. We anticipate this proposed scope of work meets your expectations. Please indicate your authorization by signing in the space provided below, and return this request, or contact me if the City requires revisions to the proposed scope of work. Sincerely, ___________________________ Tyler Hunt, PE Project Manager ___________________________ Ben Horn, PE Managing Engineer Client Authorization ___________________________________ Signed: Title: Date: Enclosed: Scope Amendment Budget AECOM Fee Schedule (2011) 10.a Packet Pg. 239 At t a c h m e n t : a - A m e n d m e n t t o A g r e e m e n t N o . 5 ( 1 3 2 9 : C a l l e J o a q u i n S i p h o n L i f t S t a t i o n C o n t r a c t A m e n d m e n t ) Scope Amendment Budget Design Services for City of San Luis Obispo Amendment No. 5 Utilities Department Personnel Hours Budget Task Description Principal Engineer Senior Engineer I Associate Engineer Design CADD Operator Total Hours Labor Non-Labor Subconsultant Total Non-Labor Total Task 1 - Project Management, Coordination, and Restart 1.1 Project Meetings (1 meeting)2 2 310$25$25$335$ 1.2 Project Management 8 8 1,240$99$99$1,339$ 1.3 Project Restart 12 4 4 20 2,820$226$226$3,046$ Subtotal -22 4 4 30 4,370$350$-$350$4,720$ Task 2 - Modifications to Lift Station Construction Documents 2.1 Revisions to Highway 101 Crossing 6 4 14 24 2,990$239$239$3,229$ 2.2 Landscaping Plans and Specifications 4 8 12 1,500$440$3,200$3,640$5,140$ Subtotal -10 4 22 36 4,490$679$3,200$3,879$8,369$ Total -32 8 26 66 8,860$1,029$3,200$4,229$13,089$ 3/14/2016 Page 1 of 1 10.a Packet Pg. 240 At t a c h m e n t : a - A m e n d m e n t t o A g r e e m e n t N o . 5 ( 1 3 2 9 : C a l l e J o a q u i n S i p h o n L i f t S t a t i o n C o n t r a c t Exhibit B 2011 - Traditional - FEES (Eff 1-1-11).docx AECOM FEE SCHEDULE FOR PROFESSIONAL SERVICES Effective January 1, 2011 Engineers, Planners, Architects, Scientists: Assistant I $ 100.00 per hour Assistant II $ 110.00 per hour Associate $ 130.00 per hour Senior I $ 155.00 per hour Senior II $ 165.00 per hour Managing Engineer Principal $ $ 185.00 per hour 210.00 per hour Construction Administration Personnel: Resident Project Representative $ 115.00 per hour Senior Resident Project Representative $ 125.00 per hour Resident Engineer $ 150.00 per hour Construction Services Manager $ 200.00 per hour Technical Support Staff: Clerical/General Office $ 75.00 per hour Drafter/CADD Technician $ 72.00 per hour Assistant CADD Operator $ 84.00 per hour Designer/CADD Operator $ 95.00 per hour Senior Designer/Design CADD Operator $ 110.00 per hour Design/CADD Supervisor $ 125.00 per hour General Project Expenses 1/ 8% of Labor Direct Project Expenses Other Reproduction (8 1/2 x11/11x17 Color) $1.15/1.50 per page Plan Sheet Printing - In House Bond/Vellum/Mylar $3.00/4.00/7.00 per sheet Subcontracted Services/Reproduction Cost + 10% Subcontracted or Subconsultant Services Cost + 10% Auto Mileage for Construction Phase Services $0.60 per mile Travel & Subsistence (other than mileage) Cost Miscellaneous Materials Cost + 10% If authorized by the Client, an overtime premium multiplier of 1.5 may be applied to the billing rate of hourly personnel who work overtime in order to meet a deadline which cannot be met during normal hours. Applicable sales tax, if any, will be added to these rates. Invoices will be rendered monthly. Payment is due upon presentation. A late payment finance charge of 1.5% per month (but not exceeding the maximum rate allowable by law) will be applied to any unpaid balance commencing 30 days after the date of the original invoice. Fee schedule is subject to change annually. 1/ Includes mail, telephone, fax, office photo copies, personal computers and mileage (except as noted). 10.a Packet Pg. 241 At t a c h m e n t : a - A m e n d m e n t t o A g r e e m e n t N o . 5 ( 1 3 2 9 : C a l l e J o a q u i n S i p h o n L i f t S t a t i o n C o n t r a c t A m e n d m e n t ) R ______ RESOLUTION NO. (2016 SERIES) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN LUIS OBISPO, CALIFORNIA, APPROVING A MITIGATED NEGATIVE DECLARATION OF ENVIRONMENTAL IMPACT FOR THE CALLE JOAQUIN LIFT STATION AND SIPHON PROJECT WHEREAS, the City owns and operates a sewer facility referred to as the Calle Joaquin lift station that is now at the end of its useful life and requires replacement; and WHEREAS, the City owns and operates a sewer facility referred to as the Calle Joaquin siphon under San Luis Obispo Creek that requires replacement; and WHEREAS, an invasive species (Arundo donax) exists in the San Luis Obispo Creek environment in an area that is currently inaccessible. As part of the lift station and siphon project, the City will be removing this invasive species from San Luis Obispo Creek; and WHEREAS, the San Luis Obispo City Council authorized a designer and other consultants to prepare the plans and specifications and necessary documents for the replacement of the lift station, siphon, and for removal of invasive species in the creek environment made accessible during the siphon replacement; and WHEREAS, the replacement of the Calle Joaquin lift station and siphon is consistent with the City’s Wastewater Collection System Infrastructure Renewal Strategy and the Sewer System Management Plan and the State adopted General Waste Discharge Requirements; and WHEREAS, the project is consistent with other goals and policies of the General Plan; and BE IT RESOLVED by the City Council of the City of San Luis Obispo as follows: 1. The attached Mitigated Negative Declaration (“MND”) for the Calle Joaquin lift station and siphon project and each finding contained therein are hereby adopted in accordance with the California Environmental Quality Act; and 2. The Calle Joaquin lift station and siphon project, along with the mitigation measures and mitigation monitoring program set forth in the MND, is hereby approved and the Director of Utilities, or his or her designee, is authorized to prepare, sign and file a Notice of Determination with the County Clerk and/or State Office of Planning and Research, as applicable, within five working days from the date of this Resolution Upon motion of _______________________, seconded by _______________________, and on the following roll call vote: AYES: NOES: ABSENT: 10.b Packet Pg. 242 At t a c h m e n t : b - R e s o l u t i o n f o r C a l l e J o a q u i n L i f t M N D ( 1 3 2 9 : C a l l e J o a q u i n S i p h o n L i f t S t a t i o n C o n t r a c t A m e n d m e n t ) Resolution No. _______________ (2016 Series) Page 2 The foregoing resolution was adopted this _____ day of _____________________, 2016. ____________________________________ Mayor Jan Marx ATTEST: ____________________________________ Lee Price, MMC Interim City Clerk APPROVED AS TO FORM: _____________________________________ J. Christine Dietrick City Attorney IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Luis Obispo, California, this ______ day of ______________, _________. ______________________________ Lee Price, MMC Interim City Clerk 10.b Packet Pg. 243 At t a c h m e n t : b - R e s o l u t i o n f o r C a l l e J o a q u i n L i f t M N D ( 1 3 2 9 : C a l l e J o a q u i n S i p h o n L i f t S t a t i o n C o n t r a c t A m e n d m e n t )