Loading...
HomeMy WebLinkAboutARC-1014-16 (ARCH-2735-2016 -- 12200 Los Osos Valley Road)RESOLUTION NO. ARC- 1014-16 A RESOLUTION OF THE SAN LUIS OBISPO ARCHITECTURAL REVIEW COMMISSION APPROVING THE DEMOLITION OF THE EXISTING FORD DEALERSHIP SHOWROOM, AND THE CONSTRUCTION OF A NEW FORD/LINCOLN SHOWROOM, A NEW VOLKSWAGEN SHOWROOM, AND ASSOCIATED LANDSCAPE AND PARKING LOT IMPROVEMENTS, INCLUDING ADOPTION OF A CATEGORICAL EXEMPTION FROM ENVIRONMENTAL REVIEW, AS REPRESENTED IN THE STAFF REPORT AND ATTACHMENTS DATED JULY 119 2016 12200 LOS OSOS VALLEY ROAD (ARCH -2735-2016) WHEREAS, the Architectural Review Commission of the City of San Luis Obispo conducted a public hearing in the Council Hearing Room of City Hall, 990 Palm Street, San Luis Obispo, California, on July 11, 2016, pursuant to a proceeding instituted under ARCH -2735- 2016, Falk Properties SLO, applicant; and WHEREAS, the Architectural Review Commission of the City of San Luis Obispo has duly considered all evidence, including the testimony of the applicant, interested parties, and evaluation and recommendations by staff, presented at said hearing. WHEREAS, notices of said public hearing were made at the time and in the manner required by law; and NOW, THEREFORE, BE IT RESOLVED by the Architectural Review Commission of the City of San Luis Obispo as follows: SECTION 1. Findings. The Architectural Review Commission hereby grants final approval to the project (ARCH -2735-2016), based on the following findings: 1. That the project will not be detrimental to the health, safety, and welfare of persons living or working at the site or in the vicinity because the project respects site constraints and will be compatible with the scale and character of the neighborhood. 2. That the project's design is appropriate and will be compatible with the surrounding character and scale of the existing neighborhood. 3. That as conditioned, the project design maintains consistency with the City's Community Design Guidelines, specifically CDG 3.4 providing guidance for auto dealerships. 4. That the proposed auto dealership is consistent with the General Plan at the proposed location because it is consistent with Land Use Element Program 3.7.5 that has identified this site (along Auto Parkway) as an appropriate location for auto sales. Resolution No. ARC -1014-16 ARCH -2735-2016 (12200 Los Osos Valley Road) Page 2 5. That the project is categorically exempt under Section 15332 (In -Fill Development Projects) of the CEQA Guidelines because the project is within City limits, consistent with applicable City policy, surrounded by urban uses, and on a project site less than 5 acres in size served by required utilities and public services. SECTION 2. Action. The Architectural Review Commission (ARC) hereby grants final approval to the project with incorporation of the following conditions: Planning The applicant shall defend, indemnify and hold harmless the City and/or its agents, officers and employees from any claim, action or proceeding against the City and/or its agents, officers or employees to attack, set aside, void or annul, the approval by the City of this project, and all actions relating thereto, including but not limited to environmental review ("Indemnified Claims"). The City shall promptly notify the applicant of any Indemnified Claim upon being presented with the Indemnified Claim and the City shall fully cooperate in the defense against an Indemnified Claim. 2. Final project design and construction drawings submitted for a building permit shall be in substantial compliance with the project plans approved by the ARC. A separate, full-size sheet shall be included in working drawings submitted for a building permit that lists all conditions and code requirements of project approval listed as sheet number 2. Reference shall be made in the margin of listed items as to where in plans requirements are addressed. Any change to approved design, colors, materials, landscaping, or other conditions of approval must be approved by the Director or Architectural Review Commission, as deemed appropriate. 3. The locations of all exterior lighting, including landscaping or parking lot lighting shall be included in plans submitted for a building permit. All wall -mounted lighting fixtures shall be clearly called out on building elevations included as part of working drawings. All wall - mounted lighting shall complement building architecture. The lighting schedule for the building shall include a graphic representation of the proposed lighting fixtures and cut - sheets on the submitted building plans. The selected fixture(s) shall be shielded to insure that light is directed downward consistent with the requirements of the City's Night Sky Preservation standards contained in Chapter 17.23 of the Zoning Regulations. 4. Modifications to the Ford/Lincoln sign program shall return to the ARC for review unless the Director determines a minor or incidental architectural review is appropriate because the new signage is similar in size and number to what currently exists on the site for the Ford/Lincoln tenant. The sign program shall include information on the sizes, locations, colors, materials, types, and illumination of signage proposed for the building and the overall site including monument and directional signs. Project signs shall be designed to be compatible with the architecture of proposed buildings and to complement the site's setting. New wall signs for the northern dealership building shall utilize more innovative and Resolution No. ARC -1014-16 ARCH -2735-2016 (12200 Los Osos Valley Road) Page 3 attractive solutions such as raised, backlit metal letters, halo lighting, or external lighting rather than typical strip mall -type plex letters with internal illumination. 5. Mechanical and electrical equipment shall be located internally to the building. With submittal of working drawings, the applicant shall include sectional views of the building, which clearly show the sizes of proposed condensers and other mechanical equipment to be placed on the roof to confirm that parapets and other roof features will adequately screen them. A line -of -site diagram may be needed to confirm that proposed screening will be adequate. This condition applies to initial construction and later improvements. 6. Plans submitted for a building permit shall call out the colors and materials of all proposed building surfaces and other improvements. 7. A final landscaping plan, including irrigation details and plans, shall be submitted to the Community Development Department along with working drawings and shall be consistent with the architectural site plan. The legend for the landscaping plan shall include the sizes and species of all groundcovers, shrubs, and trees with corresponding symbols for each plant material showing their specific locations on plans. 8. Plans submitted for a building permit shall show that the front entry architectural feature is attached to the main structure creating a canopied entry. 9. Plans submitted for a building permit shall note the use of smooth finished plaster on the exterior of the Ford/Lincoln showroom and service canopy. 10. The lighting associated with the auto dealerships shall be significantly dimmed at the close of business hours and include only the lighting essential for security and safety, halo lighting on the Volkswagen showroom shall be dimmable to the satisfaction of the Community Development Director and shall be turned -off at the close of business. Engineering Division — Public Works/Community Development Department 11. Projects involving the construction of new structures requires that complete frontage improvements be installed or that existing improvements be upgraded per city standard. MC 12.16.050 12. The building plan submittal shall show all existing and proposed easements for reference. The building plan submittal shall label all property lines distances and bearings for reference. 13. The building plan submittal shall show any section of damaged or displaced curb, gutter, sidewalk or driveway approach to be repaired or replaced per City Engineering Standards. 14. Development of the driveway and parking areas shall comply with the Parking and Driveway Standards for dimension, maneuverability, slopes, drainage, and materials. Resolution No. ARC -1014-16 ARCH -2735-2016 (12200 Los Osos Valley Road) Page 4 Alternate paving materials are recommended for water quantity and/or quality control purposes and in the area of existing or proposed trees and where the driveway or parking area may occur within the dripline of any tree. Alternate paving material shall be approved to the satisfaction of the Planning Division. 15. The building plan submittal shall include the site operations, security, and circulation plan. 16. The building plan submittal shall include a complete site utility plan. All existing and proposed utilities along with utility company meters shall be shown. Existing underground and overhead services shall be shown along with any proposed alterations or upgrades. Services to the new structures shall be underground. All work in the public right-of-way shall be shown or noted. 17. The building plan submittal shall show all existing and proposed storm drain piping and drainage infrastructure. Any existing oil and sand separators shall be shown on the plans for reference. 18. The building plan submittal shall show the existing water service and water meter to be sized in accordance with the approved fire sprinkler plans. 19. All elevations must be based on a City Bench Mark and noted per City datum elevations. The building plan submittal shall note the benchmark number, location and elevation. Include a clear description of the benchmark referenced on the plans. The plans shall reference the NAVD 88 datum. The Flood Insurance Rate Map (FIRM) is based on the NAVD88. The building plans shall include topographical information prepared by a licensed surveyor or engineer. 20. The building plan submittal shall show all flood zones for reference. This property is located in an XB and AE flood zone. This property is located within a designated flood zone as shown on the Flood Insurance Rate Map (FIRM) for the City of San Luis Obispo. As such, any new or substantially remodeled structures shall comply with all Federal Emergency Management Agency (FEMA) requirements and the city's Floodplain Management Regulations per Municipal Code Chapter 17.84. The building plan submittal shall show and map all flood zones for reference. 21. The proposed buildings are located in an X -shaded (XB or former B) and near the AE Floodzone. The X -shaded flood zone is an area where the 100 -year flood depth is less than one foot. Local ordinance requires that finish floors be located a minimum of 1' above the highest adjacent grade or be floodproofed to a comparable height. Depending on the location of the structures in relation to the AE flood zone, additional elevation certificate and floodproofing documentation may be required. 22. The building plan submittal shall include a complete grading and drainage plan for this project. The plan shall show the existing and proposed contours and/or spot elevations to Resolution No. ARC -1014-16 ARCH -2735-2016 (12200 Los Osos Valley Road) Page 5 clearly depict the proposed grading and drainage. Show and label the high point elevation or grade break at the yard areas and drainage arrows to show historic drainage. Include the finished floor elevation of the residence, existing finish grade elevations, and existing yard drainage. Show all existing and proposed drainage courses, pipes and structures; indicate the size, type and material. 23. This development shall comply with the Waterway Management Plan, Volume III, Drainage Design Manual, Floodplain Management Regulations, and the Post Construction Stormwater Requirements. The building plan submittal shall include a complete hydrologic and hydraulic analysis report. The drainage report shall include a summary of the bulleted items found in Section 2.3.1 of the manual. A comprehensive hydrologic and hydraulic analysis may not be required if the proposed improvements can be shown to be insignificant in accordance with Section 3.0 of the manual. 24. EPA Requirement: General Construction Activity Storm Water Permits are required for all storm water discharges associated with a construction activity where clearing, grading and excavation results in land disturbance of one or more acres. Storm water discharges of less than one acre, but which is part of a larger common plan of development or sale, also require a permit. Permits are required until the construction is complete. To be covered by a General Construction Activity Permit, the owner(s) of land where construction activity occurs must submit a completed "Notice of Intent" (NOI) form, with the appropriate fee, to the State Water Resources Control Board (SWRCB). 25. A copy of the Stormwater Pollution Prevention Plan (SWPPP) required by the SWRCB shall be included as part of the building permit and/or grading permit plan submittal. The WDID Number issued by the board shall be noted on all plans that involve regulated land disturbing activities. 26. The building plan submittal shall show compliance with the Post Construction Stormwater Requirements as promulgated by the Regional Water Quality Control Board for redeveloped sites. Include a complete Post Construction Stormwater Control Plan Template as available on the City's Website. 27. An operations and maintenance manual will be required for the post construction stormwater improvements. The manual shall be provided at the time of building permit application and shall be accepted by the City prior to building permit issuance. A private stormwater conveyance agreement will be required and shall be recorded prior to final inspection approvals. 28. The building plan submittal shall show all existing trees on the property with a trunk diameter of 3" or greater. Offsite trees along the adjoining property lines with canopies and/or root systems that extend onto the property shall be shown for reference. The plan shall note which trees are to remain and which trees are proposed for removal. Include the diameter and species of all trees. Tree canopies should generally be shown to scale for Resolution No. ARC -1014-16 ARCH -2735-2016 (12200 Los Osos Valley Road) Page 6 reference. Tree removals may require approval by the City Arborist and/or Tree Committee. 29. The building plan submittal shall show all required street trees for the property frontage including across the frontage of the adjacent parking lot at 1415 Auto Park Way. One 15 gallon street tree shall be required for each 35 linear feet of frontage. The City Arborist shall approve tree species and planting requirements in accordance with City Engineering Standards. 30. Tree protection measures shall be implemented to the satisfaction of the City Arborist. The City Arborist shall review and approve the proposed tree protection measures prior to commencing with any demolition, grading, or construction. The City Arborist shall approve any safety pruning, the cutting of substantial roots, or grading within the dripline of trees. A city -approved arborist shall complete safety pruning. Any required tree protection measures shall be shown or noted on the building plans. Building Division — Community Development Department 31. The building plan submittal shall show clear widths along exterior paths of travel where vehicles will be parked on sidewalk surface. 32. The building plan submittal shall provide occupant loads and exiting analysis to determine sufficient path of exit travel. 33. The building plan submittal shall provide plumbing fixture calculations to determine required number of restroom facilities based on occupancy classification and occupant load. Code Requirement 34. The City of San Luis Obispo is considered a "Community at Risk" due to the threat of wildfire impacting the urban community. The City shall continue to enhance the fire safety and construction codes for new buildings in order to reduce the risk of urban fires that may result from wildfires. New buildings citywide shall incorporate the following construction methods and materials: Ignition resistant exterior wall coverings; Fire sprinkler protection in attic areas (at least one "pilot head"); Ember resistant vent systems for attics and under floor areas, protected eaves, and Class `A' roof coverings as identified in the California Building Code Chapter 7A. Transportation Division - Public Works Department 35. Autopark Way Driveway shall be 30' wide per City Standards 36. LOVR Driveway shall be designed to include a median to adequately restrict left turns at driveway Resolution No. ARC -1014-16 ARCH -2735-2016 (12200 Los Osos Valley Road) Page 7 37. All parking stalls shall meet City Engineering Standards. 38. The building plan submittal shall show a minimum of 6 long-term bicycle parking spaces and 2 short-term bicycle parking spaces as required by the Zoning Regulations Chapter 17.16.060, Table 6.5. Utilities Department 39. The property's existing sewer lateral to the point of connection at the City main must pass a pipeline video inspection (visual inspection of the interior of the pipeline), including repair or replacement, as part of the project. The pipeline video inspection shall be submitted during the Building Permit Review Process for review and approval by the Utilities Department prior to issuance of a Building Permit. Additional information is provided below related to this requirement: ■ The pipeline video inspection shall be submitted on USB drive and shall be in color. • The inspection shall be of adequate resolution in order to display pipe. • Material submitted shall include the project address and a scaled plan of the building and the lateral location to the connection at the City sewer main. • The inspection shall include tracking of the pipeline length (in feet) from the start of the inspection to the connection at the City sewer main. • It is optional to provide audio on the report to explain the location, date of inspection, and pipeline condition observations. Code Requirements 40. Where automobiles are serviced, greased, repaired, or washed, separators shall be provided to prevent the discharge of oil, grease, and other substances harmful or hazardous to the City's wastewater collection system consistent with City standards. If existing separators are in place, these should be shown on the Utility Plan during Building Permit review. 41. Potable city water shall not be used for major construction activities, such as grading and dust control, as required under Prohibited Water Uses; Chapter 17.07.070.0 of the City's Municipal Code. Recycled water is available through the City's Construction Water Permit program. Information on the program is available at: http://www.siocity.orgitioiiie/showdocument?id=5909 42. The project will not be permitted to use potable water for landscape irrigation as recycled water is available in Los Osos Valley Road (per Section 13.24.010). If using recycled water, the project's irrigation system shall be designed and operated as described consistent with recycled water standards in the City's Procedures for Recycled Water Use, including the requirement that sites utilizing recycled water require backflow protection on all potable service connections (per Section 13.24.020). Three sets of irrigation plans shall be submitted to the Building Decision for review during the City's building permit review Resolution No. ARC -1014-16 ARCH -2735-2016 (12200 Los Osos Valley Road) Page 8 process. The applicant may contact the City's Utilities Project Manager at 781-7239 for more information. Alternatively, well water from the site may be used for irrigation. If well water is proposed, backflow protection must be provided on all potable service connections. Fire Department Code Requirements: 43. All required fire lanes shall be posted. 44. All new buildings, buildings with additions or work exceeding 50% of the building value shall have fire sprinklers installed. On motion by Commissioner Ehdaie, seconded by Commissioner Andreen, and on the following roll call vote: AYES: Commissioners Ehdaie, Andreen, Curtis, Soll, and Wynn NOES: None REFRAIN: None ABSENT: Commissioners Nemcik and Root The foregoing resolution was passed and adopted this 11 `h day of July, 2016. PA-01'�'Id4TPVL-A� — Do g David n, Secretary Architectural Review Commission