HomeMy WebLinkAbout07-13-2016 Cooperative Agreement - Cal Trans Recitals05 -SLO -101 -26.8
Project Number: 0516000105
EA: 1 H640
Agreement 05 - 0313
COOPERATIVE AGREEMENT
Project Study Report — Project Development Support (PSR -PDS)
This Agreement, effective on _ _, is between the State of
California, acting through its Department of Transportation, referred to as CALTRANS, and:
City of San Luis Obispo, a chartered city of the State of California, referred to hereinafter as
CITY.
RECITALS
PARTNERS are authorized to enter into a cooperative agreement for improvements to the
state highway system (SHS) per Government Code 65086.5.
2. CITY desires that a project initiation document (PID) be developed for construction of
overcrossing on Route 101 in San Luis Obispo 0.9 mile North of Los Osos Valley Road
Overcrossing or Interchange at Prado Road within the State Highway System (SHS),
referred to herein as PROJECT.
3. PARTNERS acknowledge that this Agreement is to complete a Project Study Report-
Project Development Support (PSR -PDS) PID.
4. California Government Code section 65086.5 mandates that CALTRANS review and
approve all PIDs developed by entities other than CALTRANS.
CITY is willing to develop the PID and is willing to fund one hundred percent (100 %) of
the PID's costs and fees, including costs to reimburse CALTRANS. If, in the future,
CALTRANS is allocated state funds and Personnel Years (PYs) for PID review of this
PROJECT, CALTRANS will agree to amend this Agreement to change the reimbursement
arrangement for PID review to relieve CITY of commensurate financial obligations.
6. CALTRANS will: review and approve the PID prepared by CITY; provide relevant
proprietary information in the form of existing data transfer, spreadsheets, and maps,
actively participate in the project delivery team (PDT) meetings; and complete any work
elements identified in the SCOPE SUMMARY of this Agreement. All CALTRANS
activities will be done as reimbursed work. PARTNERS hereby set forth the terms,
covenants, and conditions of this Agreement, under which they will complete the PID.
Project Initiation Document (PID) Agreement 2012_10_30 Page 1 of 10
Agreement 05 - 0313
ROLES AND RESPONSIBILITIES
7. CITY will prepare a PID for PROJECT at its sole cost and expense and at no cost to
CALTRANS. The PID shall be signed on behalf of CITY by a Civil Engineer registered in
the State of California.
8. CALTRANS will complete the work elements that are assigned to it on the SCOPE
SUMMARY, which is attached to and made a part of this Agreement. CITY will complete
the work elements assigned to it on the SCOPE SUMMARY. Work elements marked with
"N /A" on the SCOPE SUMMARY are not included within this Agreement. Work
elements are outlined in the Workplan Standards Guide for the Delivery of Capital Projects
available at www. drat. ca .gov /hgiprojmg!nt/jzuidance.htm.
9. The PID shall be prepared in accordance with all State and Federal laws, regulations,
policies, procedures, and standards that CALTRANS would normally follow if
CALTRANS was to prepare the PID.
10. CALTRANS will complete a review of the draft PID and provide its comments to CITY
within sixty (60) calendar days from the date CALTRANS receives the draft PID from
CITY. CITY will address the comments provided by CALTRANS. If any interim reviews
are requested of CALTRANS by CITY, CALTRANS will complete those reviews within
thirty (30) calendar days from the date CALTRANS received the draft PID from CITY.
11. After CITY revises the PID to address all of CALTRANS' comments and submits a
revised draft PID and all related attachments and appendices, CALTRANS will complete
its review and final determination of the revised draft PID within thirty (30) calendar days
from the date CALTRANS receives the revised draft PID from CITY. Should
CALTRANS S require supporting data necessary to defend facts or claims cited in the
revised draft PID, CITY will provide all available supporting data in a reasonable time so
that CALTRANS may conclude its review. The thirty (30) day CALTRANS review period
will be stalled during that time and will continue to run after CITY provides the required
data.
12. CALTRANS will perform its review and approval in accordance with the provisions of the
current Project Development Procedures Manual. CALTRANS' review and approval will
consist of performing independent quality assurance (IQA) to verify that quality
control /quality assurance (QC /QA) meets department standards and determination that the
work is acceptable for the next project component. However, CALTRANS' review and
approval does not involve any work necessary to actually develop or complete the PID. No
liability will be assignable to CALTRANS, its officers and employees by CITY under the
terms of this Agreement or by third parties by reason of CALTRANS' review and approval
of the PID.
Project Initiation Document (PID) Agreement 2012_10_30 Page 2 of 10
Agreement 05 - 0313
13. PID preparation, except as set forth in this Agreement, is to be performed by CITY.
Should CITY request CALTRANS to perform any portion of PID preparation work, except
as otherwise set forth in this Agreement, CITY shall first agree to reimburse CALTRANS
for such work and PARTNERS will amend this Agreement.
INVOICE AND PAYMENT
14. CITY agrees to pay CALTRANS, an amount not to exceed $147,000.
15. CALTRANS will draw from state and federal funds that are provided by CITY without
invoicing CITY when CALTRANS administers those funds and CALTRANS has been
allocated those funds by the CTC and whenever else possible.
16. The cost of any engineering support performed by CALTRANS, when allowed, will be
charged according to current law.
17. CALTRANS will invoice CITY for a $49,000 initial deposit after execution of this
Agreement and thirty (30) working days prior to the commencement of PROJECT
expenditures.
18. Thereafter, CALTRANS will submit to CITY monthly invoices for estimate monthly costs
based on the prior month's expenditures.
19. If an executed Program Supplement Agreement (PSA) or STIP (Statewide Transportation
Improvement Program) Planning, Programming, and Monitoring Program Fund Transfer
Agreement (PPM) exists for this PROJECT then CITY will abide by the billing and
payment conditions detailed for the fund types identified in the PSA or PPM.
20. If CITY has received Electronic Funds Transfer (EFT) certification from CALTRANS then
CITY will use the EFT mechanism and follow all EFT procedures to pay all invoices
issued from CALTRANS.
21. If CALTRANS reimburses CITY for any costs later determined to be ineligible, CITY will
reimburse those funds.
22. Except as otherwise provided in this Agreement, PARTNERS will pay invoices within
thirty (30) calendar days of receipt of invoice.
23. If CITY issues a Stop Work Notice to the CALTRANS Project Manager, CALTRANS
agrees to cease work within 5 working days until a notice to resume is issued by CITY.
Any work conducted beyond 5 working days after Stop Work Notice is issued is not
eligible for payment.
Project Initiation Document (PID) Agreement 2012_10_30 Page 3 of 10
Agreement 05 - 0313
GENERAL CONDITIONS
24. Per Chapter 603, amending item 2660 -001 -0042 of Section 2.00 of the State Budget Act of
2012, the cost of any engineering services performed by CALTRAN S towards any local
government agency- sponsored PID project will only include direct costs. Indirect or
overhead costs will not be applied during the development of the PID document.
25. If any hazardous materials, pursuant to Health and Safety Code 25401.1, are found within
PROJECT limits, PARTNER will notify CALTRANS within 24 hours of discovery.
26. PARTNERS agree to consider alternatives to PROJECT scope and/or alignment, to the
extent practicable, in an effort to avoid any known hazardous materials within the proposed
PROJECT limits.
27. If hazardous materials are discovered within PROJECT limits, but outside of SHS right of
way, it is the responsibility of CITY in concert with the local agency having land use
jurisdiction over the property, and the property owner, to remedy before CALTRANS will
acquire or accept title to such property.
28. CALTRANS' acquisition or acceptance of title to any property on which any hazardous
materials are found will proceed in accordance with CALTRANS' policy.
29. CALTRANS' obligations under this Agreement are subject to the appropriations of
resources by the Legislature, the State Budget Act authority, and the allocation of funds by
the California Transportation Commission.
30. Neither CITY nor any officer or employee thereof is responsible for any injury, damage or
liabilitv occurrinLy by reason of anvthina done or omitted to be done by CALTRANS, its
contractors, sub - contractors, and/or its agents under or in connection with any work,
authority, or jurisdiction conferred upon CALTRANS under this Agreement. It is
understood and agreed that CALTRANS, to the extent permitted by law, will defend,
indemnify, and save harmless CITY and all of its officers and employees from all claims,
suits, or actions of every name, kind, and description brought forth under, but not limited
to, tortious, contractual, inverse condemnation, or other theories and assertions of liability
occurring by reason of anything done or omitted to be done by CALTRANS, its
contractors, sub - contractors, and/or its agents under this Agreement.
Project Initiation Document (PID) Agreement 2012_10_30 Page 4 of 10
Agreement 05 - 0313
31. Neither CALTRANS nor any officer or employee thereof is responsible for any injury,
damage, or liability occurring by reason of anything done or omitted to be done by CITY,
its contractors, sub - contractors, and/or its agents under or in connection with any work,
authority, or jurisdiction conferred upon CITY under this Agreement. It is understood and
agreed that CITY, to the extent permitted by law, will defend, indemnify, and save
harmless CALTRANS and all of its officers and employees from all claims, suits, or
actions of every name, kind, and description brought forth under, but not limited to,
tortious, contractual, inverse condemnation, or other theories and assertions of liability
occurring by reason of anything done or omitted to be done by CITY, its contractors, sub-
contractors, and/or its agents under this Agreement.
32. If work is done under contract (not completed by CITY's own employees) and is governed
by the California Labor Code's definitions of a "public works" (section I 720(a)), CITY will
conform to sections 1720 -1815 of the California Labor Code and all applicable regulations
and coverage determinations issued by the Director of Industrial Relations.
33. This Agreement is intended to be PARTNERS' final expression and supersedes all prior
oral understanding pertaining to PROJECT.
34. This Agreement will terminate one hundred eighty (180) days after PID is signed by
PARTNERS or as mutually agreed by PARTNERS in writing. However, all
indemnification articles will remain in effect until terminated or modified in writing by
mutual agreement.
Project Initiation Document (PID) Agreement 2012_10_30 Page 5 of 10
Agreement 05 - 0313
DEFINITIONS
PARTNER — Any individual signatory party to this Agreement.
PARTNERS — The term that collectively references all of the signatory agencies to this
Agreement. This term only describes the relationship between these agencies to work
together to achieve a mutually beneficial goal. It is not used in the traditional legal sense in
which one PARTNER's individual actions legally bind the other parties.
SCOPE SUMMARY — The attachment in which each PARTNER designates its responsibility
for the completion of specific work elements as outlined by the Guide to Capital Project
Delivery Workplan Standards (previously known as WBS Guide) available at
http: / /www.dot.ca. og v/hglprojmgmtlguidance.htm.
Project Initiation Document (PID) Agreement 2012_10_30 Page 6 of 10
Agreement 05 - 0313
CONTACT INFORMATION
The information provided below indicates the primary contact information for each
PARTNER to this Agreement. PARTNERS will notify each other in writing of any
personnel or location changes. Contact information changes do not require an amendment
to this Agreement.
The primary Agreement contact person for CALTRANS is:
Paul Martinez, Project Manager
50 Higuera Street
San Luis Obispo, CA 93401
Office Phone: 805 -549 -3407
The primary Agreement contact person for CITY is:
Jake Hudson, Transportation Manager
919 Palm Street
San Luis Obispo, CA 93401
Office Phone: (805) 781 -7023
Project Initiation Document (PID) Agreement 20121030 Page 7 of 10
Agreement 05 - 0313
SIGNATURES
PARTNERS declare that:
1. Each PARTNER is an authorized legal entity under California state law.
2. Each PARTNER has the authority to enter into this Agreement.
3. The people signing this Agreement have the authority to do so on behalf of their public
agencies.
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
M.
Timothy M. Gubbins
District Director
Certified as to funds:
0
Julia Bolger
Resource Manager
By:
Ka ie Lichtig
Cit Manager
Attes
Interim City Clerk
Approved as to form and procedure:
CVine Dietrick
C' Attorney
Project Initiation Document (PID) Agreement 2012_10_30 Page 8 of 10
Agreement 05 - 0313
SCOPE SUMMARY
WORK ELEMENT
p�
F
U
U
4
0.100.05.05.xx - Quality Management Plan
X
0.100.05.05.xx - Risk Management Plan
X
0.100.05.05.xx - Communication Plan
X
0.100.05.10.xx - Cooperative Agreement for PA &ED Phase
X
0.100.05.10.xx - Independent Quality Assurance (IQA)
X
0.100.05.10.xx - Project Development Team Meetings
X
X
1.150.05.05 - Review of Existing Reports Studies and Mapping
X
1.150.05.05.xx - Provision of Existing Reports, Data, Studies, and Mapping
X
1.150.05.10 - Geological Hazards Review
X
1.150.05.10.xx - Provision of Existing Geological Information
X
1.150.05.15 - Utility Search
X
1.150.05.15.xx - Provision of Existing Utility Information
X
1.150.05.20 - Environmental Constraints Identification
X
1.150.05.20.xx - Provision of Environmental Constraints Information
X
1.150.05.25 - Traffic Forecasts /Modeling
X
1.150.05.25.xx - Provision of Existing Traffic Forecasts /Modeling Information
X
1.150.05.30 - Surveys and Maps for PID
X
1.150.05.30.xx - Provision of Existing Surveys and Mapping
X
1.150.05.35 - Problem Definition
X
1.150.05.45 - As -Built Centerline and Existing Right of Way
X
1.150.05.xx - Provision of Existing District Geotechnical Information
X
1.150.10.05 - Public /Local Agency Input
X
1.150.15.05 - Right of Way Data Sheets
X
1.150.15.10 - Utility Relocation Requirements Assessment
X
1.150.15.15 - Railroad Involvement Determination
X
1.150.15.25 - Preliminary Materials Report
X
1.150.15.35 - Multimodal Review
X
Project Initiation Document (PID) Agreement 20121030 Page 9 of 10
Agreement 05 - 0313
WORK ELEMENT
U
1.150.15.40 - Hydraulic Review
X
1.150.15.50 - Traffic Studies
X
1.150.15.55 - Construction Estimates
X
1. 150,20,05 - Initial Noise Study
X
1.150.20.10 - Hazardous Waste Initial Site Assessment
X
1.150.20.15 - Scenic Resource and Landscape Architecture Review
X
1.150.20.30 - Initial Records and Literature Search for Cultural Resources
X
1.150.20.50 - Initial Water Quality Studies
X
1.150.20.60 - Preliminary Environmental Analysis Report Preparation
X
1.150.20.65 - Initial Paleontology Study
X
1.150.25.05 - Draft PID
X
1.150.25.20 - PID Circulation, Review, and Approval
X
1.150.25.25 - Storm Water Data Report
X
1.150.35 - Required Permits During PID Development
X
1.150.40 - Permit Identification During PID Development
X
1.150.45 - Base Maps and Plan Sheets for PID
X
Project Initiation Document (PID) Agreement 2012_10_30 Page 10 of 10