HomeMy WebLinkAbout11-15-2016 Item 1 - Bochum, Codron (amended)Council Memorandum
DATE: November 14, 2016
TO: City Council
FROM: Timothy Scott Bochum, Deputy Director of Public Works
Michael Codron, Director of Community Development
VIA: Katie Lichtig, City Manager
SUBJECT: November 15th, Public Hearing #1 — Update to OASP PFFP
The Council Memorandum that was sent out this morning contained an incorrect value in the table
shown on Page #2.
The table below shows the corrected amount for the OASP Single Family Unit (SFU) fee that was
initially recommended as part of the Council Agenda report.
The result of this correction is the "Change" value showed between the CAR recommended fee
and the final revised fee is now $296 as opposed to $565 as previously shown.
Residential
2016
2016 OASP
Change
TYpe
GASP Fee
Fee (Revised)
Single Family
-$!-044:=
$18,736
-$296
Multiple Family
$13,594
$13,387
-$207
The revised recommended OASP fees remain the same as discussed in the Memorandum. Please
contact Tim Bochum at 781-7203 if there are any questions.
tAcouncil agenda reports\2016\2016-11-15\oasp pffp\ph 1 council memo correspondence #2.docx
COUNCIL MEETING:—N
ITEM NO_:
.,.
Council Memorandum
DATE: November 14, 2016
TO: City Council
FROM: Timothy Scott Bochum, Deputy Director of Public Works
Michael Codron, Director of Community Development
VIA: Katie Lichtig, City Manager
SUBJECT: November 15th, Public Hearing #1 — Update to OASP PFFP
ENC: Revised OASP PFFP Tables 2, 4 & 7
Item #1 on the November 15, 2016 City Council agenda is an update to the Orcutt Area Specific
Plan Public Facilities Financing Plan (PFFP).
As discussed in the report the item includes recommendations for Council to update the PFFP
based upon more recent project cost estimates, additional area -wide public improvements that
should have shared funding and changes to development units that are resulting from subdivision
approvals. Staff has continued to work on issues for the PFFP including analyzing OASP property
owner questions and suggestions.
One question that came out of a meeting with OASP property owners was a request that staff
analyze the increase in cost of one particular project on the PFFP: Project T-5 Broad Street/Prado
Road Extension. As discussed in the OASP Environmental Impact Report, it was identified that
the OASP had a project specific impact at this location that resulted in the need for the construction
of a second NB left turn lane on Broad. The cost of this improvement was included in existing
OASP and the cost was updated by Wallace as part of this update.
Staff reviewed the work by Wallace and has determined that the cost estimate includes additional
work that would not be the responsibility of the OASP PFFP. In essence, the cost estimate included
work (SB Right turn lane) that will be constructed by the Margarita Area as part of the future Prado
Road extension and connection to Broad.
As a result, the project cost estimate for project T-5 in the OASP PFFP has been reduced to a total
of $264,000 that represents half of the project estimate included in the Agenda Report and
attachments.
Attachments 1-3 of this memo shows Tables 2, 4 and 7 as revised for the PFFP with this cost
reduction for the property owners and the resulting reduction in impact fees that result.
PH 1 — OASP PFFP
Residential
2016 OASP
2016 OASP
Change
Tye
Fee
Fee Revised
Single Family
$19,301
$18,736
-$565
Multiple Family
Q,�4
$13,387
-$207
The proposed change reduces the SFR impact fee by approximately $565 and the MFR fee by
$207. Please contact Tim Bochum at 781-7203 if there are any questions.
\\chstore7\team\council agenda reports\2016\2016-11-15\oasp pffp\ph 1 council memo correspondence.docx
Table 2 (Revised 11-14-2016)
City of San Luis Obispo
Orcutt Area Specific Plan Public Facilities Financing Plan
Summary of Project -Specific Infrastructure Costs
I Project Cost has been adjusted to resect actual cost minus SHA Grant on project; adjusted for CPI ($645,557). Funds to reimburse City TIF advance to GASP.
r 2010 project estimate = $300,000, adjusted for ENR Changes (March 2010 to August 2016).
3 Wallace estimate included additional impovements beyond GASP. Participation set at 50% of $528,000. OASP cost adjusted to $264,000
4 Total project cost set by Council in 2011 at $357,057, adjusted by CPI to 2016 = $383,400. OASP participation set at 89.88% for reimbursement to Orcutt Assoc
s OASP participation cost reduced to 20% to reflect potential local match for HSIP program, or for independent work at intersection -
6 Tank Farm Roundabout (T10) is split 50% to Tract 3063 (Righetti Ranch) and 50% divided between all OASP properties.
r Orcutt Road Roundabout (Til) is split 50% to Tract 3083 (West Creek) and 50% divided between all OASP properties
a By previous action of City Council, the full contribution to the Industrial Way bike/pedestrian overcrossing by the OASP is 50%.
9 OASP participation amount adjusted to 25% to reflect future local match of Grant Request, j� F -,\
i30 Parks construction and contingency estimates updated; "soft" costs limited to 15% of estimated projectsII `t1 0.9 acre expansion of Neighborhood Park into Garay omitted from fee schedule.
32 Includes passive park improvements only. Active improvements deleted from the estimate.
33 Acquisition Fee corrected to reflect approved Neighborhood Park design and revised acreage,
Sources: The Wallace Group, City of San Luis Obispo, Goodwin Consulting Group, Inc (2009)
Updated: City of San Luis Obispo, The Wallace Group, Watson Planning Consultants, Inc, November 14, 2016
Copy of TB Changes PFFP 11-14-16 - Tvble2 Applies 2016 projection Current as af: 11/14/2016
Gross
OASP Fair Share
Net
Ref. Item
Total Cost
Percentage
Total Cost
Transportation
Sym 1.mpfQWmer±ti
Tl Orcutt Road/Tank Farm Road
$
1,111,000
100.0%
$
1,111,000
T2 Broad Street/South St -Santa Barbara Road
$
707,100 3
25-4%
$
179,603
T3 Broad Street/Tank Farm Rd
$
599,000
50.0%
$
299,500
T4 Orcutt Road/Johnson Ave
5
359,300 r
100.0%
$
359,300
TS Broad Street/Prado Road Extension
5
264,000 a
100.0%
$
264,000
Second Northbound Left Turn Lane
T6 Orcutt Road Widening
$
383,400 4
89.9%
$
344,592
T7 Bullock Lane Realignment
$
1,418,000
70.0%
$
992,600
T8 Relocating Hanson Road
$
1,452,000 s
20.0%
$
290,400
or Reducing the Grade on Orcutt at Hanson Rd
T9 Transit5tops (5 at$25,000 each)
$
125,000
100.0%
$
125,000
T30 Tank Farm Roundabout (at Righetti Ranch Road)
$
650,000 c
50.0%
$
325,000
Tll Orcutt Road Roundabout (at "A"Street)
$
650,000 r
50.0%
$
325,000
Subtotal Street Improvements
$
7,718,800
$
4,615,995
0auf t fxpvng14lt 71rgrr Srirlge_3
T12 Bridge A
$
680,000
100.0%
$
680,000
T13 Bridge B
$
1,800,000
100.0%
$
1,800,000
T14 Bridge C
$
1,600,000
100.0%
$
1,600,000
Subtotal Orcutt Expansion Area Bridges
$
4,080,000
$
4,080,000
Total Street and Bridges Improvements
$
11,798,800
$
8,695,995
Pedestrian and Bicycle Paths
Bl Pedestrian and Bicycle Paths
$
841,000
100.0%
$
841,000
B2 Pedestrian/Bike Overpass at Industrial Way
$
2,108,000 9
50.0%
$
1,054,000
B3 Bike Path Extension Over Tank Farm Rd
$
1,008,000 9
25.0%
$
252,000
Total Pedestrian and Bicycle Paths
$
3,957,000
$
2,147,000
Total Transportation Improvements
$
15,755,800
$
10,842,995
Parks & Recreation
Pl Central Neighborhood Park - Main Portion South of Creeks (Righetti)
$
4,800,341 3e
100.0%
$
4,800,341
P2 Central Neighborhood Park - Phase 2(Garay)
$
- 33
10010%
$
-
P3 Packet Park
$
339,849
100.0%
$
339,849
P4 Linear Park System
$
813,527
100.0%
$
813,527
P5 Trail Junction Park
$
91,997
$
91,997
Total Parks & Recreation
$
6,045,714
$
6,045,714
Total Project -Specific Infrastructure Costs
$
21,801,514
$
16,886,709
Parkland Acquisition Fee (11.80 acres g's $300,000/acre)
$
3,540,000
1000%
$
3,540,000
Totals
$
25,341,514
$
20,428,709
I Project Cost has been adjusted to resect actual cost minus SHA Grant on project; adjusted for CPI ($645,557). Funds to reimburse City TIF advance to GASP.
r 2010 project estimate = $300,000, adjusted for ENR Changes (March 2010 to August 2016).
3 Wallace estimate included additional impovements beyond GASP. Participation set at 50% of $528,000. OASP cost adjusted to $264,000
4 Total project cost set by Council in 2011 at $357,057, adjusted by CPI to 2016 = $383,400. OASP participation set at 89.88% for reimbursement to Orcutt Assoc
s OASP participation cost reduced to 20% to reflect potential local match for HSIP program, or for independent work at intersection -
6 Tank Farm Roundabout (T10) is split 50% to Tract 3063 (Righetti Ranch) and 50% divided between all OASP properties.
r Orcutt Road Roundabout (Til) is split 50% to Tract 3083 (West Creek) and 50% divided between all OASP properties
a By previous action of City Council, the full contribution to the Industrial Way bike/pedestrian overcrossing by the OASP is 50%.
9 OASP participation amount adjusted to 25% to reflect future local match of Grant Request, j� F -,\
i30 Parks construction and contingency estimates updated; "soft" costs limited to 15% of estimated projectsII `t1 0.9 acre expansion of Neighborhood Park into Garay omitted from fee schedule.
32 Includes passive park improvements only. Active improvements deleted from the estimate.
33 Acquisition Fee corrected to reflect approved Neighborhood Park design and revised acreage,
Sources: The Wallace Group, City of San Luis Obispo, Goodwin Consulting Group, Inc (2009)
Updated: City of San Luis Obispo, The Wallace Group, Watson Planning Consultants, Inc, November 14, 2016
Copy of TB Changes PFFP 11-14-16 - Tvble2 Applies 2016 projection Current as af: 11/14/2016
Table 4 (Revised 11-14-2016)
City of San Luis Obispo
Orcutt Area Specific Plan Public Facilities Financing Plan
Cost Allocation Table
Transportation
Land Use
Units
Net
Acres
Daily
Trip Rate
Total
Trips
Percent
Allocation
Total
Costs
Cost per
Unit
Cost $8,695,995
per Unit
Single Family
497
87.4
9.09
4,518
55.69%
$4,843,070
$9,745
Multi -Family
566
25.9
6.35
3,594
44.31%
$3,852,925
$6,807
Total
1063
113.3
8,112
100%
$8,695,995
e;
Sources: Orcutt Area Specific Plan (Final, May 2010); City of San Luis Obispo; CA Department of Finance;
OASP Public Facilities Financing Plan - Goodwin Consulting Group, Inc (2009)
Updated: Watson Planning Consultants, Inc.
D F 13 � F r'i-
November 14, 2016
Copy of TB Changes PFFP 11-14-16 - Table 4 Current as of: 11/14/2016
Table 7 Table 4 (Revised 11-14-2016)
City of San Luis Obispo
Orcutt Area Specific Plan Public Facilities Financing Plan
Project -Specific Infrastructure Cost Allocation Summary
Capital
Pedestrian and
Parks &
Total Cost
Total
Facility:
Transportation
Bicycle Paths
Recreation
Allocation
Facility Costs
Benefit
Daily
Daily
Residents
Unit:
Trip Rate
Trip Rate
Served
Capital Costs:
$8,695,995
$2,147,000
$6,045,714
$16,888,709
Cost per Unit
Per Unir
Single Family
$9,745
$2,406
$6,585
$18,736
$9,311,742
Multi -Family
$6,807
$1,681
$4,899
$13,387
$7,576,967
Total
$16,888,709
ouf6r
Sources: Orcutt Area Specific Plan (Final, May 2010); City of San Luis Obispo;
GASP Public Facilities Financing Plan - Goodwin Consulting Group, Inc. (2009)
Updated: Watson Planning Consultants, Inc.
°rte
A Fr__
November 14, 2016
Copy of T8 Changes PFFP 11-14-16 - Table 7 Current as of. 1111412016