HomeMy WebLinkAbout11-07-2016 Agreement between SLO and TESCO CONTROLS, INC (city wants SCADA Programmable Logic Controller equiptment)A(lItla M1..N L'
fl JS t1 t:rlils 311) N I` is imide and eratered inti) in thea City of San Luis; Obispo on rhis
__. -riA eloy eaf l?Sw6mee—f�2, l jai , by and bgiAVwn to Cs TY OF SAV
LUM OMSK , ;a munieiptal wrportr(ivn, here naf cr reiirracd to gas City, ;arid 'J'ESCO € ONTROLS, INC,
lteroiaber refiaimd 5 dsC mdt.antot.
INITNESSETH:
IMEMf'il~1' % an °Iia: City wants SCADA i'ro,gran),Y.akin LOg;ic COWI'oller eifui[Ynieut; and
VACREAS, Cain muorr is quta heel ts, pudlonn In typo orservice and Jos Submitted a propea ni to
do so wNch hu bom uc.xplcd by do City.
NOW 1'LIERE,FORI'r:, in rta,.asiduation of Mel mutual Iia-atui,,cs, ohligafions and c:oventims
hemintiller contained, the prrlics Fore'.ea agrr,*Ct its follows':
1. TRRh1_ 'Vic Win) of this. Agreonent MWI bo frwo the (WW lhih r'1gmemotat is rntnle hail
ode'rtA, <Is tirsi'v rfltrra ittaove, until ConIrnot expiration.
2. CITY'S OBLICaA'1`IONS, h(ar providing wrviccs as specificd in this agreerncnt, C:it.y
Al Irsty, cartel Cow tact+rr shaall rccWvq cutW nsutietaa in, as Iealtal sttrr hart to exceed S97NHA.
•`J, C:C NTIMC;'TOWN (tI3UGATIONS. I. -or ;and in considomaliou (if the poynaettu arid
o)gmr ouwnls r ioptioned to be maadc and peil'rwrCd by C-iiy, Coat "I'aur agrt cs wiih' (city pfovidu
xII sgaec.Jlied Wces as 6wr°ibcd in CJonstiltnrtl's ['roOe,9al ;a;f,�cltstl horcto nand incorporated into chic
.AgYraScuaacnl by iet6vnco. C ontr7c�ror Ji0her ngwes to the �cotatnnu and p oikiravii4ex Wrrns as set florlh 'n
Oer,ertal 11mis aW s°wdi€ ons attubctl 1wreto and inccg)oralcd into thi,� Ag wernun_byrefetence-
s, ANI):!,i`` DIWE''NTS. Any wnearcime:rnt, roodilic.at.iou or vaariaticaat frow Ilan or this
Agrectnent WE be A w:-itir.g and sh.a€.l tic effeetivc 011:Y upon appreoval by the City Adniinisit-ative C1.fTiew.
6. C.'(WPt..I:'J`R AC;l2EVA1ENT. This wvitfemn Agrucinent, including; all wrAing;s
specifically incorponit d llet'elta by rofcronce, shall cunstii;trte tltc croaaahlete agree n eat I�twoen the p antics
l auW. No ornd u€;wce;t:mt, trrrclemarac N& or roprese:r idon not reduced to writing n id specifically
Worjaor, wd huda shall bo of any We or etho no€ ,shil any swh oA .Oreermmd, aandumimuhng;, or
relvesmation be binding upon tl,a purti�„s hareto.
,r. INOTHT, rill written ntrtWm to tlae pai'ties bereto slaaill'Lav sod by UniNd Sluter, iunil,
Poslagee prepaid by registered or certified mail a ddresscd as ro lows:
Page 2
City City C I.cTk
Ciry of San ],alis obkpo
990 Palm Strect
San Ujis ON.T�o, CA 93401
Confroctor TESCO Cottink, (tic
8440 Florist RwA
Sacramento, CA 95:829
& AUTHORITV TO EXECUTE AGREEMENT. Both City and Conh-actor do cow-natil
tical: each individual executing this ngrwmew. on Lwlialf of emli patty is a porsot, d1l[y atl(Ijurize(l a[ld
empowored to exatil'o Agrownents for gul il party,
IN WITNESS WHEItHOF, tho purti(:s hereto have 040W this imtrun.l.ent to bo exwmed the day
and your first above written.
ATTEST:
�Wojl
A Vf - I j AS TO FORM:
it", J10Y
ary0l'SANI LUIS OBISPO:
By: . 9A�4-
Jan llaw � nr N 3I.Yor,
1 1 1krx, N 31y",
CONT]tACTOR:
Z
City Manager Report
Final City Manager Approval Approver Name Date ADnroved
City Administration DJJ 11/1/16
Reviewer Routing List
Reviewer Name Date Reviewed
City Attorney
JMA 10/13/16
Utilities
Carrie Mattingly October 31, 2016
Finance
XB 10/29/16
October 7, 2016
FROM:
PREPARED BY:
SUBJECT
Garret Olson, Fire Chief
GMO
Steve Schmidt, Information Technology Manager
Miguel Guardado, Network Services Supervisor
UTILITIES DEPARTMENT - LIFT STATION PLC UPGRADES
RECOMMENDATION
1. Approve a purchase order in the amount of $97,988 to TESCO Controls, Inc. for the purchase,
configuration and installation of Programmable Logic Controllers (PLCs) at four critical
Utilities Department wastewater lift stations; and
2. Approve utilizing the General Services Administration (GSA) Contract #GS -07F -0513X
(attached), cooperative purchasing agreement to award this contract to TESCO Controls,
Inc. and waive the RFP process.
DISCUSSION
The attached TESCO Controls proposal and purchase order totaling $97,988 is necessary to
upgrade Programmable Logic Controllers (PLCs) at four of the City's wastewater collection sites;
1) Prefumo Canyon Lift Station, 2) SLO Airport Lift Station, 3) Silver City Lift Station, and the
4)Cal Poly Flow Meter. The sites will be upgraded from the current obsolete Bristol Babcock
equipment to modern, open -sourced Allen Bradley Programmable Logic Controllers (PLCs).
This proposal is part of a larger initiative to upgrade the City's SCADA systems from old Bristol
Babcock PLCs to modern Allen Bradley PLCs, which are more reliable, maintainable and non-
proprietary, which will allow staff more flexibility when selecting a vendor or consultant to support
the equipment.
The TESCO proposal includes new Allen Bradley CompactLogix PLCs, C -More touchpanels,
24VDC power systems, new cabling, programming, removal of the old equipment as well as any
required testing, labeling, documentation, and training.
Utilities Department - Lift Station Communications Upgrade Page 2
Sole Source Justification
The design, hardware, and installation work that that is required is covered under a GSA Contract
#GS -07F -0513X that TESCO has been awarded. Staff is recommending waiving the local bidding
process and piggybacking on GSA Contract #GS -07F -0513X. This GSA contract was
competitively solicited and was awarded to TESCO Controls, Inc. Municipal Code 3.24.060 E
allows for this; when the purchase will be made cooperatively with one, or more, other units of
government, or from a local dealer within the city limits that can provide the same brand, model
and configuration of item(s) identified in cooperative purchase agreements) at or below the
cooperative purchasing net cost within the same terms and conditions;
FISCAL IMPACT
There is sufficient funding for this project in the Wastewater Collection Telemetry System
Improvements CIP - 52055300-91370956-91370520-91370956 and the Wastewater
Collection System Improvements Master Account.
Fiscal Impact Summary
Wastewater Collection Communications CIP
Wastewater Collection Communications CIP
Current
Proposed
Remaining
Balance
52055300-90239953-90239520-90239953
2,335,055
5,193
2,329,862
52055300-91370956-91370520-91370956
94,807
92,795
2,012
ALTERNATIVES
Do not approve this request - There is no viable alternative as the PLCs at these lift stations are
obsolete and increasingly difficult to support. The upgraded PLCs are a necessary component to
achieve basic functionality, maintain alarming, remote control functionality and prevent system
failures and spills.
ATTACHMENTS
TESCO Quote
TESCO GSA Contract #GS -07F -0513X
Form of Agreement — TESCO Controls.doc
General Terms and Conditions — TESCO Controls.doc
TACity Manager ReportsTinance & InInformation Technology\2016\Utilities Department - TESCO Controls\CM Report -Utility Lift Station PLC
Upgrade.docx
,F
1 �
TESCO CONTROLS, INC.
An Employee -Owned Company
General Services Administration
Federal Supply Service
Authorized Federal Schedule Price List
® Advantpe!'
Contract #: GS -07F -0513X
Federal ID: 94-2218097
Cage Code: 1 G2M3
DUNS: 073792939
On-line access to contract ordering information, terms and conditions, up-to-date
pricing, and the option to create an electronic delivery order are available through
GSA Advantage!, a menu -driven database system. The INTERNET address GSA
Advantage! is http://GSAAdyantage.gov.
Schedule for: 056 - Buildings and Building Materials/Industrial
Services and Supplies
FSC: 61 - Power Distribution Equipment, Generators, and
Batteries
Contract number: GS -07F -0513X
Contract period: 6-1-2011 through 5-31-2016
Contractor:
TESCO CONTROLS, INC.
8440 Florin Road
Sacramento, CA 95828
Telephone No:
(916) 395-8800
Fax No:
(916) 429-2817
Business size:
Small Business Concern
Website:
http://www.tescocontrols.com
Email:
abrowne-tescocontrols.com
Contract administrator: Andrew W. Brown
For more information on ordering from Federal Supply Schedules click on the FS
Schedules button at http://www.fss.gsa.gov.
Page -1
CUSTOMER INFORMATION:
la. Table of awarded special items number(s) with appropriate cross reference
to item descriptions and awarded price(s):
Special Items DESCRIPTION
Numbers i
412-14 Uninterruptible Power Supplies
412-17 Switchgear, Panelboards, Switchboards, Load Centers,
Metering
412-21 Electrical, Voltage, Generator Controls, Electric Motors,
Motor Controllers/Motor Control Centers
412-50 Ancillary Services related to Power Distribution Equipment
412-52 Power Systems Engineering Support
1 b. Lowest priced model number for each special item number awarded.
SIN # Description Gov't
Price with
IFF
412-14 Uninterruptible Power Supplies
Traffic Signal Battery Backup System:
Model 22 BBS — 4-6 hrs of battery back up power. $4,624.69
412-17 Switchgear, Panelboards, Switchboards, Load
Centers, Metering
Electrical Service Pedestal:
412-21
24-200 — Underground Fed Utility Metering Panel, $4,171.28
up to 200 AMPS.
Electrical, Voltage, Generator Controls, Electric
Motors, Motor Controllers / Motor Control Centers
Instrumentation
72-501 - Air Pressure Transmitter — Pressure $1,015.62
Sensor.
36-001 - Reactive Air Level Monitoring System — $3,309.82
Level Sensor.
1 Programmable Pump Control Panel
66-662 — Duplex Programmable Pump Control
$6,256.93 _
Page -2
Panel.
RTU (Remote Terminal Unit) I $22,670.03
1 c. Description of all corresponding commercial job titles, experience, functional
responsibility and education.
SIN # Description
412-50 - Ancillary Services
Gov't
Price with
IFF
Senior Field Engineer
$149.62
Field Engineer
$131.49
Factory Repairs
$95.21
Training Engineer
Senior Start Up Technician
$131.49
$149.62
Start Up Technician
$131.49
412-52 - Power Systems Engineering Support
Chief System Architect — Sr. System Analyst
Senior System Engineer
Senior Project Manager
Project Manager
Senior Project Engineer
Project Engineer
IC Engineer
CAD Drafter
Engineering Support/ Admin
Senior Software Engineer
Software Engineer
$163.22
$131.49
$149.62
$122.42
$149.62
$122.42
$131.49
$113.35
$95.21
$149.62
$131.49
Page -3
SIN 412-50 - Ancillary Services
Position Functional Responsibilities
Senior
Provide senior level technical field
Field
expertise in overseeing project
Engineer
organization, scheduling and
or GED equivalent.
implementation. Assist Project
electronics and mechanical skills in
Manager with business development
strategies to enable product line
electrical / electronic
growth.
Field
-FUnder minimal supervision, plan,
Engineer
direct, coordinate field services. Plan
theories.
and conduct work requiring judgment
Training
in the independent evaluation,
B.S. Electrical
selection, and substantial adaptation
Engineer
and modification of standards
Engineering or
techniques, procedures, and criteria.
Education / Min Yrs
Certifications of Exp.
M.S., B.S. Electrical 5-10
Engineering or
related P.E.
B.S. Electrical
Engineering or
related P.E.
5
Factory
Determine equipment malfunctions
High School diplomat
5
Repairs
and applies knowledge of electrical /
or GED equivalent.
electronics and mechanical skills in
Understanding of
restoring equipment to operation.
electrical / electronic
and mechanical
theories.
Training
Under minimal supervision, plan,
B.S. Electrical
5
Engineer
direct, coordinate training services.
Engineering or
Able to present material clearly and
related P.E.
concisely utilizing technical and
standard techniques, procedures and
criteria.
Senior
Provide senior level technical field
M.S., B.S. Electrical 5-10
Start Up
start up and managerial expertise.
Engineering or
Technician
Works independently to perform
related P.E.
Start Up
Technician
trouble shooting and repairs.
Communicate status and
recommendations of equipment to
internal departments and customers.
Under minimal supervision, provide
technical field start up expertise.
Works independently to perform
trouble shooting and repairs.
Communicate status of project to
internal departments and customers.
High School diplon'
or GED equivalent.
A.A. Electronics or
related field.
5
Page -4
SIN 412-52 - Power Systems Engineering Support
Position
Functional Responsibilities
Chief
Responsible for the overall system
System
design and configuration of TESCO
Architect-
products. Document developmental
Senior
requirements for database,
System
applications, and operation systems.
Analyst
Consults with end users to test and
debug applications to meet client
needs. Serve as an expertise in all
aspects of designing and application
development.
Education / Min Yrs
Certifications of Exp.
B.S. Information 5
Technology
Senior Under minimal supervision responsible B.S. Computer 5
System for the design, configuring, startup, Science MS SQC
Engineer testing, and commissioning of software Server
integration systems to control water
and wastewater processes. Ensure
that the customer's needs are satisfied
by monitoring system requirements
from startup to implementation.
Senior Responsible for leading and managing B.S. Construction 5
Project all logistics of the Project Management Management and/or
Manager department. Delegate work, train, and PMP certification
mentor subordinate staff. Establish
procedures and guidelines based on
conceptual Project Management
principles. Oversees and directs larger
more complex projects to ensure proper
monitoring and assist in facilitating clear
communication amongst internal parties,
customers, and end users.
Project
Manager
Establish project objectives, policies, B.S. Construction
procedures and performance standards
within boundaries of company policy
and contract specifications. Monitor and
control project through administrative
direction of on-site production to ensure
project is completed on schedule and
within budget. Investigate potentially
serious situations and implement
corrective measures.
Management and/or
PMP certification
Page -5
Position
Senior
Project
Engineer
Functional Responsibilities
Education / Min Yrs
Certifications of Exp.
Provide senior level technical expertise M.S., B.S. Electrical 5-10
in developing projects, overseeing
project organization, scheduling and
implementation. Assist Project
Manager with business development
strategies to enable product line
growth. Responsible for full product
development; including mechanical and
manufacturing aspects of design using
support staff.
Project Under minimal supervision, plan, direct,
Engineer coordinate, the development and
construction of company specified
products. Plan and conduct work
requiring judgment in the independent
evaluation, selection, and substantial
adaptation and modification of
standards techniques, procedures, and
criteria.
Instrumen
tation and
Control
Engineer
'CAD
Drafter
Assist in the design of new products up
to full production. This includes
specification reviews, development
program timelines and reports, design
reviews, simple mechanical designs,
documentation packages,
preproduction builds and transfers to
production. Provide technical support of
mature electronic products currently in
production.
Engineering or
related P.E.
B.S. Electrical
Engineering or
related P.E.
B.S. Electrical
Engineering or
related
Under direct supervision transform High School diplom
initial rough product designs using or GED equivalent.
computer aided design (CAD) into AutoCAD
working documents. Works closely with Certification
Project Engineers and Project
Managers; reviews engineering
drawing and designs to ensure
adherence to established specifications
and standards.
Eng Under moderate supervision provide High School diploma
Support - support to the Engineering department or GED equivalent.
Administr by making copies of submittals and
ation creating operations and maintenance
5
Page -6
Position I Functional Responsibilities
manuals through the full scope of
projects. Convert submittal and O & M
manuals into electronic files and update
information as directed by engineering
staff.
Senior Under minimal supervision responsible
Software I for the design, configuring, startup,
Engineer testing, and commissioning of software
systems to control water and
wastewater processes.
Software The Software Engineer must be
Engineer capable of writing PLC and SCADA
programs, plus associated Operator
Interface Terminal (OIT) software, used
to control water and/or wastewater
processes. Responsible for the
analysis, design, programming,
debugging and modification of existing
applications.
2. Maximum order:
SIN 412-14
$500,000
SIN 412-17
$300,000
SIN 412-21
$200,000
SIN 412-50
$200,000
SIN 412-52
$200,000
3. Minimum order: N/A
Education /
Certifications
B.S. Computer
Science
MS SQC Server
I
BS degree in
Engineering,
Computer
Technology, or
related field
Min Yrs
of Exp. f
5
5
4. Geographic coverage: 48 Contiguous States, Alaska, Hawaii, Washington
DC, Puerto Rico and US territories.
5. Point(s) of production: Sacramento, CA USA
6. Discount from list prices or statement of net price: Negotiated price divided
by 0.9925
7. Quantity discounts: Not Offered
8. Prompt payment terms: Net 30 Days
"Information for Ordering Offices: Prompt payment terms cannot be negotiated
out of the contractual agreement in exchange for other concessions."
Page -7
9a. Notification that Government purchase cards are accepted up to the micro -
purchase threshold: Government purchase cards, MasterCard and Visa
are accepted for orders up to the micro -purchase threshold.
9b. Notification whether Government purchase cards are accepted or not
accepted above the micro -purchase threshold: MasterCard and Visa are
accepted for above the micro -purchase threshold.
10. Foreign items: NA
11 a. Time of delivery: 30 days ARO
11 b. Expedited Delivery: 5-25 days ARO based on call and product
availability.
11 c. Overnight and 2 -day delivery: Contact the Contractor
11d. Urgent Requirements. Agencies can contact the Contractor's
representative to effect a faster delivery. Customers are encouraged
to contact the contractor for the purpose of requesting accelerated
delivery.
12. F.o.b. point(s): FOB destination CONUS, otherwise the terms are FOB
origin prepay.
13.
14
15.
ILP
Ordering address:
Payment address:
Tesco Controls, Inc.
8440 Florin Road
Sacramento, CA 95828
Tesco Controls, Inc.
PO Box 299007
Sacramento, CA 95829
Warranty provision: Contact the contractor for a complete copy. A
15% return/restocking policy applies.
Export packing charges: N/A
17. Terms and conditions of Government purchase card acceptance (any
thresholds above the micro -purchase level): All payments accepted up
to $25,000.
18. Terms and conditions of rental, Maintenance, and repair (if applicable):
N/A
19. Terms and conditions of installation (if applicable): N/A
Page -8
20. Terms and condition of repair parts indicating date of parts price lists and
any discounts from list prices (if applicable): N/A
20a. Terms and conditions for any other services (if applicable): NA
21. List of service and distribution points (if applicable): N/A
22. List of participating dealers (if applicable): N/A
23. Preventive maintenance (if applicable): N/A
24a. Special attributes such as environmental attributes (e.g. recycled content,
energy efficiency, and/or reduced pollutants): N/A
24b. If applicable, indicate the Section 508 compliance information is available
on Electronic and Information Technology (EIT) supplies and services and
show where full details can be found (e.g. contractor's website or other
location.) The EIT standards can be found at www.Section 508.gov/: N/A
25. Data Universal Number System (DUNS) number: 073792939
26. Notification regarding registration in System for Award Management
(SAM) database. Tesco Controls, Inc. is SAM registration.
Page -9