HomeMy WebLinkAbout01-03-2017 Item 12 Council Reading File - SLO WRRF DrawingsCity of San Luis Obispo
August 5, 2016
Drawings
Water Resource Recovery Facility
FILENAME:PLOT DATE:PLOT TIME:7/20/20164:20:16 PMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARYMENTOSOLANO PLACERSACRA-SONOMALAKENAPAYOLOALPINEMONOINYOMARIPOSATUOLUMNEAMADOREL DORADOSTANISLAUS CALAVERAS DEL NORTEMODOCSUTTERSISKIYOUTRINITYHUMBOLDTLASSENSHASTAYUBA GLENNBUTTEMENDOCINOCOLUSASIERRANEVADATEHAMAPLUMASLUISSAN BARBARAOBISPOTULAREMONTEREYKERNKINGSSANTARIVERSIDESAN BERNARDINOSAN DIEGOIMPERIALVENTURALOSANGELESORANGEALAMEDASANTASANJOAQUINMERCEDMADERACLARACRUZCONTRAFRESNOSANTASANBENITOMARINCOSTASAN MATEOSAN FRANCISCO No. M32099Exp. 09-30-16R EG IS
T
ERED
P ROFESSIONA ELNGINEERBTI
MOT
HY LEE AUERAHCEMNI
CALSTATE OF CALI
FOR
NI
A
01-G-0001 G ENERAL
A HOW EB RO USH01-G-0001_668876.dgnTITLE, VICINITY AND LO CATIO N M APS RECOVERY FACILITY PROJECTWATER RESOURCEPREDESIGN REPORT DRAWINGSCITY OF SAN LUIS OBISPO, CALOS OSOS VALLEY ROADU.S. HI
GHW
AY 101SOUTH HIGUERAMADONNA ROAD
TANK FARMHIGUERALOCATION PLANNTSVICINITY MAPNTSNNVICINITYPROJECTLOCATIONPROJECTAUGUST 2016TL BAUER
FILENAME:PLOT DATE:PLOT TIME:2016\08\03 10:08:36 AM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. M32099
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERBTIMOTHY LEE AU
E
RAHCEM N IC ALSTA
TE O F CA LIFO RNIA
01-G-0002
XXCHECKED BYBD ROUSHBD ROUSH01-G-0002_668876.dgn GENERALINDEX TO DRAWINGS INDEX TO DRAWINGS
FILENAME:PLOT DATE:PLOT TIME:7/15/20162:53:34 PMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY No. M32099Exp. 09-30-16R EG IS
T
ERED
P ROFESSIONA ELNGINEERBTI
MOT
HY LEE AUERAHCEMNI
CALSTATE OF CALI
FOR
NI
A
01-G-0003XXCHECKED BYBD ROUSHBD RO USH01-G-0003_668876.dgnG ENERAL
O VERALL G ENERAL LEG END
DESIGNATIONDETAIL (NUMERAL)SECTION (LETTER) ORDESIGN DETAIL DESIGNATIONON SAME SHEET)IF TAKEN AND SHOWN(REPLACED WITH A LINEDRAWING NUMBERDRAWING NUMBER(S)1.2.NOTES:DETAIL DESIGNATION IS NOT SHOWNAND MUST BE USED IF DESIGNALL DESIGN DETAILS ARE TYPICAL70-S-50011A70-S-2000SCALEA3.SPECIFICALLY REFERENCED OR NOT.THE DESIGN DETAILS SHOWN WHETHER THE DETAILS AREALL ASSOCIATED WORK SHALL BE IN ACCORDANCE WITHNATURE OF THE WORK REQUIRED THROUGHOUT THE PROJECT.THE DESIGN DETAILS REPRESENT THE CHARACTER AND1SCALE70-S-2000IS SHOWN:ON DRAWING WHERE SECTIONIS SHOWN:ON DRAWING WHERE DETAILSECTION TITLEDETAIL TITLECALLOUTSECTIONCALLOUTDETAIL1.SHOWN MAY BE USED ON THIS PROJECT.THEREFORE, NOT ALL OF THE INFORMATIONTHIS IS A STANDARD LEGEND SHEET.GENERAL NOTE:CUTSECTIONDESIGNATIONSECTION LETTERA70-S-3001WHERE SHOWNDRAWING NUMBERSECTION AND DETAIL DESIGNATIONSIS CALLED OUT:ON DRAWING WHERE SECTIONOR DETAIL IS CALLED OUT:ON DRAWING WHERE SECTIONWHERE SHOWNDRAWING NUMBERWHERE CALLED OUTDRAWING NUMBER(S)WHERE CALLED OUTDETAIL DOCUMENT)(SHOWN IN DESIGNDESIGNATIONDESIGN DETAILA - ARCHITECTURALE - ELECTRICALEXAMPLE:DRAWING NUMBERING LEGENDTYPE CODESLEVEL ORDRAWING S - STRUCTURALG - GENERALI - INSTRUMENTATION AND CONTROLP - PLUMBINGR - RENDERINGL - LANDSCAPINGFACILITY / AREA NUMBERFP - FIRE PROTECTIONDISCIPLINE(S) / TYPE CODEDISCIPLINE / TYPE CODESDRAWING LEVEL / TYPE CODESEF - ELECTRICAL FACILITYC - SITE DEVELOPMENT (CIVIL)CG - CIVIL GRADINGCL - CIVIL LOCATIONFACILITY / AREA NUMBERCE - CIVIL EROSION CONTROLINDICATE MULTI - DISCIPLINE / TYPE DRAWINGS.DOUBLE LETTER CODES NOT LISTED TYPICALLYNOTE:SET OF CONTRACT DOCUMENTS.TO THE DESIGN DETAILS FOUND IN THISIS SYNONYMOUS WITH DESIGN DETAIL AND REFERS THE TERM STANDARD DETAIL, OR A FORM OF IT,EC - ELECTRICAL SPECIAL SYSTEMSON DRAWING NO. 05-C-1001FACILITY NAMES AND NUMBERS SHOWNX - DEMOLITION72-A-11003000 - SECTIONS4000 - ENLARGED VIEWS5000 - DETAILS6000 - SCHEMATICS, DIAGRAMS, SCHEDULESD - PROCESSM - MECHANICAL (HVAC)1234-5671000 - PLANS2000 - ELEVATIONSEP - ELECTRICAL PROCESSCY - CIVIL YARD PIPINGCX - CIVIL DEMOLITIONEL - ELECTRICAL LIGHTING
M
M
FILENAME:PLOT DATE:PLOT TIME:2016\07\29 1:40:54 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
M
M
M
M
No. M32099
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERBTIMOTHY LEE AU
E
RAHCEM N IC ALSTA
TE O F CA LIFO RNIA
STRUCTURE
POND CONTROL
EQUALIZATION
POND
EQUALIZATION
FLOW
EQUALIZATION
FLOW TREATMENT
SIDESTREAM
DIGESTER 1
DIGESTER 2
TANK 1
FLOC
TANK 2
FLOC DAF TANK)
TANK (EXISTING
BLENDING
SLUDGE
DRAIN
PLANT
CLARIFIER 1
PRIMARY
CLARIFIER 2
PRIMARY
COMPACTOR
WASHER/
SCREENINGS
BIN
SCREENINGS
BIN
GRIT
PUMPS
SCREENINGS
SCREENINGS HANDLING GRIT HANDLING
SEPARATOR
GRIT
GRIT PUMPS
GR
SGS
WW WW
HEADWORKS AERATED GRITINFLUENT PS
RAKE
CHAIN
RAKE
CHAIN
RAKE
CHAIN
WW
WW
WW
WW FLUME
PARSHALL
FLUME
PARSHALL
WW
WW PE
PE
PSPSC
PSC PS
WW (BYPASS)
WW (RETURN)
WW (BYPASS)
PRESS
SCREW
PRESS
SCREW
SLUDGE PUMP
DIGESTED
SLUDGE PUMP
DIGESTED
COMPOSTING
FILL / OFFSITE
TO LAND
THICKENER 1
DRUM
ROTARY
THICKENER 2
DRUM
ROTARY
THS
SLUDGE PUMP
THICKENED
SLUDGE PUMP
THICKENED
PUMPS
RDT FEED
BS
BS
WAS
PSPSPUMP
SCUM
PRIMARY
PUMPS
SLUDGE
PRIMARY
BS
BOX
JUNCTION
INFLUENT
DIVERSION BOX 1
PRIMARY EFFLUENT
LIQUIDS AND SOLIDS PROCESS FLOW DIAGRAM
PSC
DWG 01-G-0006
DIVERSION BOX 2, SEE
TO PRIMARY EFFLUENT
B
C
A
SEE 01-G-0006
FOR CONTINUATION, 01-G-0005KL MCCOY01-G-0005_668876.dgn
GENERALPROCESS FLOW DIAGRAM TR GREELEYPOLYMER
PUMPS
EQUALIZATION
SEE 01-G-0006
FOR CONTINUATION,
EFFLUENT DIVERSION BOX 2,
PS (BYPASS) TO PRIMARY
POLYMER
POLYMER
D
FC
PE
SEE 01-G-0006
FOR CONTINUATION,
TO PE DIVERSION BOX 2,
FILT
FILT
DS
DS
TF
TF
RETURN PUMPS
EQ POND
LIQUIDS AND SOLIDS 1S
(2)
PUMPS
FILTRATE
(2)
FEED PUMPS
SIDESTREAM
FILENAME:PLOT DATE:PLOT TIME:2016\07\29 1:44:10 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
UV
UV
UV
No. M32099
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERBTIMOTHY LEE AU
E
RAHCEM N IC ALSTA
TE O F CA LIFO RNIA
LIQUIDS PROCESS FLOW DIAGRAM
DWG 01-G-0005
CONTINUATION, SEE
THICKENING, FOR
FROM
COMPACTORS
WASHER
BIN
SCREENINGS
SEE 01-G-0005
SLUDGE PUMPS,
FROM PRIMARY
C
PE SCREENS
PE PE
BI
RAS
BIOREACTOR 1
BIOREACTOR 2
BLOWERS
AERATION
AABIOREACTOR 3
BIOREACTOR 4
RAS
3W
USES
TO PLANT
PUMPS
PERMEATE
SCOUR AIR
PUMPS
WAS
WAS
WAS
PER
1
TANK
2
TANK
3
TANK
4
TANK
5
TANK
3
CHAMBER
2
CHAMBER
1
CHAMBER
EFFEFF
BOX
DIVERSION
WETLANDS
TANK
STORAGE
WATER
RECLAIMED
DISTRIBUTION
WATER
TO RECLAIMED
WETLANDS DIVERSION BOX
NITRIFIED EFFLUENT
CREEK
LUIS OBISPO
TO SAN EFF
STRUCTURE
OUTFALL
EFFLUENT
PLANT
TOWERS
COOLING
PUMPS
COOLING
DWG 01-G-0005
CONTINUATION
BLENDING. FOR
WAS TO SLUDGE
CLEARWELL
EXISTING
PUMPS
MLR
FEED PUMPS
MEMBRANE
PUMPS
WAS
HYDROXIDE
CALCIUM
BOX 2
DIVERSION
EFFLUENT
PRIMARY
PS - BYPASS KL MCCOY01-G-0006_668876.dgn GENERALPROCESS FLOW DIAGRAM TR GREELEYA
B
SEE DWG 01-G-0005
EFFLUENT BOX 1,
FROM PRIMARY
C
NAOCL
NAOCL
NAOCL
BI
BI
D
01-G-0006
LIQUIDS AND SOLIDS 2S
S
FILENAME:PLOT DATE:PLOT TIME:7/27/20162:14:43 PMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY No. M32099Exp. 09-30-16R EG IS
T
ERED
P ROFESSIONA ELNGINEERBTI
MOT
HY LEE AUERAHCEMNI
CALSTATE OF CALI
FOR
NI
A
KL M CCO Y01-G-0007_668876.dgnG ENERAL
TR GREELEY01-G-0007
HYDRAULIC PRO FILE 1101151201251301351401451508085909510010511011512012513013514011011512012513013514014515011011512012513013514014515080859095100105110115120125130135140FO R CONTINUATION, SEE BELOW
FO R CO NTINUATION, SEE BELOW
FO R CONTINUATIO N, SEE ABOVE FOR CONTINUATIO N, SEE ABO VE SCREENSINFLUENTSTATIONINFLUENT PUMPHEAD BOXCHAMBERGRITFLUMEPARSHALLSCREENSFINE1 THRU 4BIOREACTORSBASINSMEMBRANETANK & 3W PUMP STATIONRECYCLED WATERTOWERSCOOLINGCLARIFIERSPRIMARYDISINFECTIONUVOUTFALL STRUCTUREPLANT EFFLUENT100 YR FLOOD110115120125130135140145150100 YR FLOOD100 YR FLOOD100 YR FLOOD100 YR FLOOD133.75130.16130.23130.15130.15135.14136.32134.54136.07134.51135.86133.89134.95XXX.XX134.43132.66132.75131.80132.75133.75131.77132.35131.72132.01130.33130.65133.75140.45127.85121.61121.98120.45110.35--110.05EL 132.95EL 124.45IE 125.65EL 119.70EL 138.45EL 138.4530" WW36" PEEL 122.95132.50WEIR EL42" PEEL 132.95EL 124.75EL 132.45EL 114.45EL 128.0036" RASEL 142.45EL 122.45EL 132.45EL 126.20EL 113.4514" FWEL 112.95EL 97.95CREEKOBISPOSAN LUISEL 110.45WEIR CRESTEL 100.4524" EFFIE 89.95IE 91.4548" WW132.95138.45138.45133.60EL 114.95131.70131.94131.70131.93131.24131.47EL 134.00130.29130.63129.51129.7548" ML36" RASNOTES:1.EL 110.50EL 102.4536" EFF30" EFFDIVERSION BOX 2PLANT EFFLUENT36" EFFIE 85.4554" INFBOX #1DIVERSIONEFFLUENTPRIMARYBOX #2DIVERSIONEFFLUENTPRIMARYNOTE 2EL 130.45,PONDEQUALIZATIONTO FLOWEFFLUENT BOX 1TO WETLANDEL 121.20WEIR CREST36" EFF36" RASTBDTBDWEIR EL TBD2.BYPASS CHANNEL FOR FLOW EQUALIZATION.PRIMARY EFFLUENT DIVERSION BOX #1 TO FLOW IN EXCESS OF 16 MGD OVERFLOWS AT 133.85EL 135.61, NOTE 1OVERFLOW WEIR133.85EL 134.82WEIREL 133.84NOTE 3EL 131.75, 42" PEEL 131.00EL 126.63EL 123.5042" PEEL 129.63WEIR 129.79130.12140.45120.453.HIGH WATER LEVEL.RAISE EXISTING WALL TO ACCOMMODATE36" EFFWETLANDSPROPOSED 36" EFFWET WELLTOWERCOOLING TOWER BASINCOOLING AVERAGEPEAKFLOWINFLUENTTREATMENTPRIMARYTREATMENTSECONDARYSLUDGEACTIVATION RECYCLE6.133.56.16.124.922165624.947LEGENDAVERAGE ANNUALPEAKFLOW (MGD)RECYCLEMIXED LIQUORROUTED TO FLOW EQUALIZATION.DIVERSION BOX #1 BYPASS CHANNEL AND ISPRIMARY CLARIFIERS TO PRIMARY EFFLUENT FLOW IN EXCESS OF 22MGD BYPASSES
FILENAME:PLOT DATE:PLOT TIME:7/21/201610:24:34 AMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY LIC
E
NSED ARCHITECTSTATE OF CALI
F
ORNI
A REN. 10-31-17NETSRIK .B YER
FFOEG
C-33068
01-G-0010XXG B KIRSTENSJ PAYNE01-G-0010_668876.dgnG ENERAL
SD BARD
LEG END AND W ALL TYPES
ARCHITECTURAL NO TES, SYM BO LS,1.2.3.4.5.6.7.8.CONCRETEMETAL STUD WALL (PLAN)GYPSUM WALLBOARDRIGID INSULATIONBATT INSULATIONSTEELPLYWOODWOOD, ROUGH NON-CONTINUOUSWOOD, ROUGH CONTINUOUSMASONRY WALLCMU WALL (PLAN)CMU WALL (SECTION)ALUMINUMGROUTCHECKERED PLATEGRATING, SPAN DIRECTION INDICATEDGRANULAR FILLEARTH OR FINISH GRADE110.50RAILINGSDIRECTION OF SLOPE DOWNCONTROL JOINTEXPANSION JOINTPOSTNEW REFERENCE GRID INDICATORAXX101ROOM IDENTIFIERDOOR IDENTIFIERLOUVER IDENTIFIEREXTERIOR ELEVATION INDICATORAWALL TYPE INDICATORSPOT ELEVATION INDICATORDOOR/HATCH SWING INDICATORSEE STRUCTURAL DRAWINGS.INSTALLED ABOVE THE FLOOR LINE. FOR DEPRESSED FLOORS AND CURBS,"FLOOR LINE" REFERS TO TOP OF CONCRETE SLABS. FINISH FLOORING ISCONTRACT, OR BY OTHERS.VERIFY ALL ROUGH-IN DIMENSIONS FOR EQUIPMENT PROVIDED IN THISOTHER CATEGORIES OR DRAWINGS FOR ADDITIONAL NOTES.REFER TO ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL ANDGENERAL ARCHITECTURAL NOTESDOOR LETTERROOM NUMBERF.EXT-XHINGE SIDEXX101A ROOM NAME"X" = NUMBER IN SPECIFICATIONSFIRE EXTINGUISHERCOMPLETELY PROVIDED AS IF DRAWN IN FULL.REPETITIVE FEATURES ARE NOT DRAWN IN THEIR ENTIRETY AND SHALL BE CONCRETE WALLS.CENTERLINES, NOMINAL SURFACE OF MASONRY, FACE OF STUDS AND FACE OFUNLESS OTHERWISE INDICATED, PLAN DIMENSIONS ARE TO COLUMN GRID ONOF WALL TO EDGE OF ROUGH OPENING AT CONCRETE WALLS, 8" AT CMU WALLS.STUD (WALL) TO FACE OF ROUGH OPENING. DIMENSION SHALL BE 6" FROM FACEDIMENSION ON PLAN OR DETAILS, DIMENSION SHALL BE 3-INCHES FROM FACE OFWHERE DOOR IS LOCATED NEAR CORNER OF ROOM AND IS NOT LOCATED BYSYMBOLLEGENDWALL TYPESSECTION END EXCEPT AS NOTED.ARE APPROXIMATE. THEY ARE AT THE BUILDING FACE, OR ON THELINE OF GRADES, AS SHOWN ON BUILDING ELEVATIONS AND SECTIONS, MECHANICAL, ELECTRICAL AND OTHER EQUIPMENT.INSERTS. PROVIDE ALL BASES AND BLOCKING REQUIRED FOR ACCESSORIES,FLOORS AND WALLS, ACCESS DOORS, FURRING, CURBS, ANCHORS ANDVERIFY SIZE AND LOCATION OF, AND PROVIDE REQUIRED OPENINGS THROUGHNOTES:1.WHICH THEY OCCUR, WITH LOWEST NEAREST THE WALL.HEIGHT OF THE WALL. WALL TYPES ARE SHOWN IN ORDER INSINGLE LOCATION ON PLANS, CONSTRUCTION VARIES IN THEWHERE MORE THAN ONE WALL TYPE IS INDICATED FOR AARCHITECTURAL MATERIAL SYMBOLSAXX-A-3001XXL-1ARCHITECTURAL LEGENDINDICATOR"XX" = FACILITYSYMBOLLEGENDXXW-1WINDOW IDENTIFIERADWGS FOR REINFORCING8" CMU, SEE STRUCTURAL IN ALL NON-GROUTED CELLSMASONRY FILL INSULATION
FILENAME:PLOT DATE:PLOT TIME:7/18/201611:42:09 AMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY LIC
E
NSED ARCHITECTSTATE OF CALI
F
ORNI
A REN. 10-31-17NETSRIK .B YER
FFOEG
C-33068
01-G-0011XXG B KIRSTENSJ PAYNE
G ENERAL
SD BARD
OCCUPANCY GROUP:TYPE OF CONSTRUCTION:MAXIMUM STORIES ALLOWED:ACTUAL NUMBER OF STORIES:MAXIMUM HEIGHT ALLOWED:ACTUAL HEIGHT:ALLOWABLE NUMBER OF OCCUPANTS:ACTUAL NUMBER OF OCCUPANTS:OCCUPANCY SEPARATION / FIRE RATING:IIB1 ACTUAL FLOOR AREA:MAXIMUM AREA ALLOWED:55 FT4NORMALLY UNOCCUPIED2300 FTN/A1/8"=1'-0"15,500 SFLIFE SAFETY LEGENDX : YGENERAL NOTES:GENERAL NOTES:GENERAL NOTES:GENERAL NOTES:
20 FT (ABOVE GRADE)F-1 OCCUPANCYTRAVEL DISTANCE ALLOWED (MAX):
LIFE SAFETY PLAN AND CO DE DATA FACILITY NO. 73ELECTRICAL BUILDINGFACILITY NAME:F-1, MODERATE HAZARD INDUSTRIALNONEHAZARDOUS MATERIALS:FIRE RESISTANCE RATING FOR BUILDING ELEMENTS:0 HOURSOR IMAGINARY LINE BETWEEN BLDGS):SEPARATION DISTANCE (FACE OF BLDG TO LOT LINEEXTERIOR WALL FIRE RESISTANCE BASED ON FIRENOT RATED > 10 FTFIRE SUPPRESSION SYSTEM:HAND-HELD FIRE EXTINGUISHERS PROVIDEDELEMENTROOF:REQUIREDU-0.049R-20WALLS:U-0.650U-0.700R-7U-1.450R-7UNHEATED SLAB:DOOR, SWINGING:DOOR, OVERHEAD COILING:AIR BARRIER:R-1.5NR~NR~LIFE SAFETY PLAN:FACILITY 73, ELECTRICAL BUILDING32" MINIMUM EGRESS WIDTH PROVIDED, TYPTO 'Y', EXIT DESIGNATORTRAVEL DISTANCE 'X' IN FEET FIRE AND SAFETY EQUIPMENT.SEE SPECIFICATIONS SECTION 10 44 00, PORTABLE 73-A-1101. FOR FIRE EXTINGUISHER INFORMATION, FOR FIRE EXTINGUISHER LOCATIONS, SEE DWG 3.AND WALL TYPES SEE SHEET 01-G-0010.FOR ARCHITECTURAL NOTES, SYMBOLS, LEGEND 2.SEE SPECIFICATIONS SECTION 10 14 00, SIGNAGE.FOR SIGN INFORMATION AND TYPE DESCRIPTIONS 1. N
31 : AABUILDING CODE DATA TABLEBUILDING CODE: 2016 CALIFORNIA BUILDING CODEENERGY CODE: 2016 CALIFORNIA ENERGY CODE420 SF73101ELECTRICAL ROOM
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 12:38:09 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
01-G-0024ELECTRICALCHECKED BY GENERALLEGEND - 1 JN HJELMBERGTA TOM01-G-0024_668876.dgn
V
SV
X
L
U
86
DRAWOUT AIR CIRCUIT BREAKER, LOW VOLTAGE
3 POLE, UNO
CIRCUIT BREAKER, THERMAL MAGNETIC TRIP SHOWN,
TRIP AND FRAME RATINGS SHOWN, 3 POLE, UNO
CIRCUIT BREAKER, STATIC TRIP UNIT, SENSOR AMP
TRIP AND FUSE RATING INDICATED, 3 POLE, UNO
CIRCUIT BREAKER WITH CURRENT LIMITING FUSES,
SWITCH, CURRENT RATING INDICATED, 3 POLE, UNO
INDICATED, 3 POLE, UNO
FUSED SWITCH, SWITCH AND FUSE CURRENT RATING
ELECTRONIC STARTER/SPEED CONTROL
CABLE OR BUS CONNECTION POINT
KEY INTERLOCK
SURGE ARRESTER (GAP TYPE)
CAPACITOR - KVAR INDICATED, 3 PHASE
ANALOG METER WITH SWITCH - SCALE RANGE SHOWN
V = VOLTAGE
PF = POWER FACTOR
A = AMPERAGE KVAR = KILOVARS
KW = KILOWATTS
DIGITAL POWER METER (MULTIFUNCTION)
GROUND
QUANTITY INDICATED (3)
CURRENT TRANSFORMER, RATIO(100:5) AND
IN THIS DIVISION
DIVISIONS. RACEWAY, CONDUCTOR AND CONNECTION
CONNECTION POINT TO EQUIPMENT SPECIFIED IN OTHER
NON DRAWOUT FUSED SWITCH, MEDIUM VOLTAGE
VOLTAGE
DRAWOUT FUSED SWITCH AND CONTACTOR, MEDIUM
MEDIUM VOLTAGE
DRAWOUT FUSED SWITCH AND VACUUM CONTACTOR,
GROUND SWITCH, GANG OPERATED
TERMINAL BLOCK LUG
DELTA CONNECTION
WYE GROUNDED CONNECTION, SOLID GROUND
CONNECTION
WYE NEUTRAL GROUND RESISTOR OR IMPEDANCE
RELAY OR DEVICE, FUNCTION NUMBER AS INDICATED
MOTOR OPERATOR, BREAKER OR SWITCH
ENERGY MONITORING UNIT
MOTOR PROTECTION RELAY
NORMALLY OPEN
PUSH-BUTTON SWITCH, MOMENTARY CONTACT,
NORMALLY CLOSED
PUSH-BUTTON SWITCH, MOMENTARY CONTACT,
MECHANICAL INTERLOCK
PUSH BUTTON SWITCH, MAINTAINED CONTACTS WITH
3 POSITION SELECTOR SWITCH MAINTAINED CONTACT
TOGGLE SWITCH, ON-OFF TYPE
SELECTOR SWITCH, ON-OFF TYPE
INDICATES COLOR
INDICATING LIGHT, PUSH-TO-TEST, LETTER
INDICATING LIGHT - LETTER INDICATES COLOR
ELAPSED TIME METER
MOTOR STARTER CONTACTOR COIL
IN CIRCUIT
CONTROL RELAY, X INDICATES NUMERICAL ORDER
IN CIRCUIT
TIME DELAY RELAY, X INDICATES NUMERICAL ORDER
IN CIRCUIT
SOLENOID VALVE, X INDICATES NUMERICAL ORDER
CONTACT - NORMALLY OPEN
CONTACT - NORMALLY CLOSED
REMOTE DEVICE
CLOSES WHEN ENERGIZED AND TIMED OUT
TIME DELAY RELAY CONTACT, NORMALLY OPEN,
OPENS WHEN ENERGIZED AND TIMED OUT
TIME DELAY RELAY CONTACT, NORMALLY CLOSED,
TIMED OUT
ENERGIZED, CLOSES WHEN DE-ENERGIZED AND
TIME DELAY RELAY CONTACT, OPENS WHEN
MOTOR SPACE HEATER
TERMINAL BLOCK, REMOTE
FUSE, RATING INDICATED
TRANSFORMER, CONTROL POWER
O - OPEN CONTACT
X - CLOSED CONTACTCKT
1
2 O
X
HAND OFF
O
O X
O
REMOTE
POSITION
CAPACITOR
BATTERY
OF TRAVEL
LIMIT SWITCH, NORMALLY OPEN, CLOSES AT END
OF TRAVEL
LIMIT SWITCH, NORMALLY CLOSED, OPENS AT END
TEMPERATURE SWITCH, OPENS ON TEMPERATURE RISE
TEMPERATURE SWITCH, CLOSES ON TEMPERATURE RISE
DESCENDING LEVEL
FLOAT SWITCH, NORMALLY OPEN, CLOSES ON
RISING LEVEL
FLOAT SWITCH, NORMALLY OPEN, CLOSES ON
RISING PRESSURE
PRESSURE SWITCH, NORMALLY CLOSED, OPENS ON
RISING PRESSURE
PRESSURE SWITCH, NORMALLY OPEN, CLOSES ON
FLOW SWITCH, CLOSES ON INCREASED FLOW
FLOW SWITCH, OPENS ON INCREASED FLOW
NEUTRAL GROUND CURRENT LIMITING RESISTOR
CALIBRATING RESISTOR
TACHOMETER GENERATOR
GROUND FAULT SENSOR
FLASHER
SEALED CONTACT
BUZZER
POTENTIOMETER
RESISTOR
BLOWN FUSE INDICATOR
COAXIAL CABLE
MULTICONDUCTOR SHIELDED CABLE
DUPLEX RECEPTACLE
RELAY, WITH MECHANICAL LATCH
FULLWAVE DIODE BRIDGE (AC TO DC)
STRUCTURAL/ARCHITECTURAL) SEE OTHER LEGENDS.
2. FOR ADDITIONAL ABBREVIATIONS OF OTHER DIVISIONS (HVAC, MECHANICAL, AND
MAY APPEAR ON THE LEGEND AND NOT ON THE DRAWINGS.
1. THESE ARE STANDARD LEGEND SHEETS. SOME SYMBOLS AND ABBREVIATIONS
NOTES:
400
100/M
400 400
or
400 225
100
60
AF
AS
AF
AT
(3)
1
10
VS
0-600V
(3)
(3)
100:5
R or Z
REMOTEHAND
OFF
CPT
120V
GFS
RATING SHOWN, 3 POLE, UNO
CIRCUIT BREAKER, MAGNETIC TRIP ONLY, TRIP
FUSE, CURRENT RATING AND QUANTITY INDICATED
NEMA SIZE INDICATED, FVNR UNO
MAGNETIC STARTER WITH OVERLOAD,
RVRT = REDUCED VOLTAGE REACTOR TYPE
RVAT = REDUCED VOLTAGE AUTO TRANSFORMER TYPE
DC = DC ADJUSTABLE SPEED DRIVE
AFD = AC ADJUSTABLE FREQUENCY DRIVE
RVSS = REDUCED VOLTAGE SOFT STARTER
500/625
SHIELDED ISOLATION TRANSFORMER
1 PH
480-120/240V
15 KVA
480-120V
AND QUANTITY INDICATED
POTENTIAL TRANSFORMER, VOLTAGE RATING
AND PHASE INDICATED
TRANSFORMER, SIZE, VOLTAGE RATINGS,
UTILITY REVENUE METER
GENERATOR, KW/KVA RATING SHOWN
K
DRAWOUT POWER CIRCUIT BREAKER, MEDIUM VOLTAGE
DRAWOUT VACUUM CONTACTOR, MEDIUM VOLTAGE
TERMINATION, OPEN TERMINATOR OR ELBOW
MEDIUM VOLTAGE CABLE STRESS CONE TYPE
MEDIUM VOLTAGE
SWITCH - LOAD BREAK, GROUP OPERATED,
SWITCH W/ARCING HORNS, MEDIUM VOLTAGE
MEDIUM VOLTAGE
DISCONNECTING FUSE - SOLID MATERIAL,
MEDIUM VOLTAGE
SWITCH - HOOK STICK OPERATED, SINGLE POLE,
SINGLE POLE, MEDIUM VOLTAGE
FUSE - EXPULSION, HOOK STICK OPERATED,
(1)
50:5
(3)
800/1200:5
AND QUANTITY INDICATED
CURRENT TRANSFORMER, ZERO SEQUENCE, RATIO
AND QUANTITY INDICATED
BUSHING CURRENT TRANSFORMER, MULTI-RATIO
IDENTIFIES OPERATION WHEN NEEDED FOR CLARITY:
SELECTOR SWITCH - MAINTAINED CONTACT - CHART
OPENS WHEN DE-ENERGIZED AND TIMED OUT
TIME DELAY RELAY CONTACT, CLOSES WHEN ENERGIZED,
TERMINAL BLOCK, INTERNAL
FUSED TERMINAL BLOCK
THERMOCOUPLE
3
HORSEPOWER INDICATED
AC MOTOR, SQUIRREL CAGE INDUCTION -
G
MO
EUM
MRP
DPM
A
A
ETM
NGR
RES
M
CRX
X
TDR
T
GEN
AFD
OFFON
A - AMBER
B - BLUE
C - CLEAR W - WHITE
R - RED
G - GREEN S - STROBE
MUSHROOM HEAD PUSHBUTTON SWITCH
ONE-LINE DIAGRAM-1 ONE-LINE DIAGRAM-2 CONTROL DIAGRAM-1 CONTROL DIAGRAM-2
SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTIONSYMBOLDESCRIPTION
SPD SURGE PROTECTIVE DEVICE
G
G
N EQUIPMENT NEUTRAL BUS
EQUIPMENT GROUND BUS
CABINET OR FRAME
PIGTAIL FOR CONNECTION TO EQUIPMENT
GROUNDING CONDUCTOR, SIZE AS INDICATED
GROUND ROD IN TEST WELL
GROUND ROD
GROUND SYSTEM PLAN
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 12:39:28 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
01-G-0025ELECTRICALCHECKED BY GENERALLEGEND - 2 JN HJELMBERGTA TOM01-G-0025_668876.dgn
30
2a
or
or
or
BD
or
2
30
60/40
2
2
DB
or
FO
XXXX
G
G
N
T
D
CTC
DS
S
LPXXA
100/40
or
XX
4
4
EX
20
L20R
LIGHTING SYSTEM PLAN
MCC-A
GREEN GROUND WIRE.
NUMBER OF NO. 12 CONDUCTORS. CROSSHATCH WITH SUBSCRIPT "G" INDICATES
CONDUCTORS IN 3/4" CONDUIT. RUNS MARKED WITH CROSSHATCHES INDICATE
ALL UNMARKED CONDUIT RUNS CONSIST OF TWO NO. 12, ONE NO. 12 GROUND
:NOTE
G
G
[A1]
T
or
TTC
M
or
S
S
S
S
F
F
J
G
G
CS
HH
L
44
55
1
OS
LC
EUH
AC
CS
- CORROSION RESISTANT
- CLOCK HANGER
CRE
C
IN THIS DIVISION.
RACEWAY, CONDUCTOR,TERMINATION AND CONNECTION
CONNECTION POINT TO EQUIPMENT SPECIFIED.
OR IDENTIFYING SYMBOL AS SHOWN.
MAJOR ELECTRICAL COMPONENT OR DEVICE - NAME
PANELBOARD - SURFACE MOUNTED
PANELBOARD - FLUSH MOUNTED
TERMINAL JUNCTION BOX
MOTOR, SQUIRREL CAGE INDUCTION
GENERATOR, VOLTAGE AND SIZE AS INDICATED.
HOME RUN - DESTINATION SHOWN
EXPOSED CONDUIT AND CONDUCTORS*
CONCEALED CONDUIT AND CONDUCTORS*
CONTACTOR, MAGNETIC, NEMA SIZE INDICATED
STARTER, MAGNETIC NEMA SIZE INDICATED
OTHERWISE
CONVENIENCE RECEPTACLE - DUPLEX UNLESS NOTED
SUBSCRIPT NUMBER AT RECEPTACLE INDICATES CIRCUIT
240V RECEPTACLE
CONVENIENCE RECEPTACLE - QUADRUPLEX
MULTI OUTLET ASSEMBLY
DUPLEX CONVENIENCE RECEPTACLE - FLUSH IN FLOOR
SINGLE FACE UNLESS INDICATED OTHERWISE
CONVENIENCE RECEPTACLE, PEDESTAL, DUPLEX
AND AMPERAGE INDICATED
RECEPTACLE, SPECIAL PURPOSE-NEMA CONFIGURATION
THERMOSTAT
AND APPLICABLE CODE.
SIZE CONDUIT ACCORDING TO SPECIFICATIONS
CROSSHATCHES WITH BAR INDICATE NO.10 CONDUCTOR.
CONDUIT DOWN
CONDUIT UP
CONDUIT TERMINATION AT CABLE TRAY
EXISTING CONDUIT/ DUCT BANK
BUS DUCT - SEE SPECIFICATIONS
CONCRETE ENCASED CONDUIT
DIRECT BURIED CONDUIT WALL MOUNTED LUMINAIRE, SEE SCHEDULE
LUMINAIRE AND POLE, SEE SCHEDULE
SEE SCHEDULE
LUMINAIRE WITH INTERNAL BATTERY BACKUP,
LUMINAIRE, SEE SCHEDULE
LUMINAIRE, SEE SCHEDULE
(SELF CONTAINED UNIT)
ELECTRIC AIR CONDITIONER
ELECTRIC UNIT HEATER
FIBER OPTIC CONDUIT
CODING DEFINITION
DUCT BANK NAME. SEE CIRCUIT AND RACEWAY
CONCRETE ENCASED DUCT BANK WHERE XXXX IS THE
CONCEALED CONDUIT ROUTING AREA
CONDUIT ROUTING AREA
CABLE TRAY
INDICATE TYPE OF DEVICE
LETTER SYMBOLS OR ABBREVIATIONS
GENERAL CONTROL OR WIRING DEVICE.
FOR CONTROL DEVICE(S) REQUIRED.
CONTROL STATION, SEE CONTROL DIAGRAMS
WALL SWITCH:
AT LUMINAIRE INDICATES CIRCUIT
INDICATES SWITCHING. SUBSCRIPT NUMBER
SMALL LETTER SUBSCRIPT AT SWITCH AND LUMINAIRE
FLOOD LIGHTS - AIM IN THE DIRECTION SHOWN
COMMUNICATION STATION
SOUND SYSTEM RACEWAY
MICROPHONE OUTLET
WITH REMOTE AMPLIFIER, SURFACE MOUNTED
INTERIOR PAGING TRUMPET SOUND REPRODUCER
VOLUME CONTROL, WALL MOUNT 5'-0" AFF
SPEAKER, CONE TYPE, SURFACE MOUNTED
SPEAKER, CONE TYPE, WALL MOUNTED
ARCHITECTURAL DRAWINGS FOR CEILING TYPE
SPEAKER, CONE TYPE, RECESSED IN CEILING, SEE
WITH OVERLOADS
MANUAL STARTER
MOMENTARY 3-WAY
CORROSION RESISTANT
DIMMER
KEY OPERATED
PILOT LIGHT
MS-
L-
CRE-
D-
K-
P-
MOTOR RATED
EXPLOSIONPROOF
WEATHERPROOF
FOUR WAY
THREE WAY
DOUBLE POLE
M-
EX-
WP-
4-
3-
2-
TELEVISION CABLE RECEPTACLE, FLOOR BOX
CLOSED CIRCUIT TELEVISION RECEPTACLE, FLOOR BOX
BOX WITH BARRIER, 12" DOWN FROM CEILING
AND DUPLEX CONVENIENCE RECEPTACLE IN TWO GANG
COMBINATION TELEVISION CABLE RECEPTACLE (TV)
EQUIPMENT NEUTRAL BUS
EQUIPMENT GROUND BUS
CABINET OR FRAME
PIGTAIL FOR CONNECTION TO EQUIPMENT
GANG BOX WITH BARRIER, 12" DOWN FROM CEILING
(CCTV) AND DUPLEX CONVENIENCE RECEPTACLE IN TWO
COMBINATION CLOSED CIRCUIT TELEVISION RECEPTACLE
NUMBER OF PORTS INDICATED
COMBINATION TELEPHONE/DATA RECEPTACLE, FLOOR BOX,
DATA SYSTEM RACEWAY
COMPUTER NETWORK CONNECTION, FLUSH IN FLOOR
COMPUTER NETWORK CONNECTION
COMPUTER SYSTEM TERMINAL CABINET
TELEPHONE SYSTEM RACEWAY
TELEPHONE TERMINAL CABINET
GROUNDING CONDUCTOR, SIZE AS INDICATED
GROUND ROD IN TEST WELL
GROUND ROD
CONTROL STATION
AIR DUCT DETECTOR
FIRE ALARM STROBE LIGHT
FIRE ALARM HORN/STROBE LIGHT
FIRE ALARM HORN
FIRE ALARM BELL
FIRE ALARM SYSTEM, AUTOMATIC, HEAT DETECTOR
FIRE ALARM SYSTEM, AUTOMATIC SMOKE DETECTOR
FIRE ALARM STATION, MANUAL
MONITOR
DOOR SWITCH
CARD KEY ACCESS
SEE SCHEDULE
STANDBY LIGHTING UNIT, SURFACE MOUNTED,
MOUNTED, NUMBER OF PORTS INDICATED
COMBINATION TELEPHONE/DATA RECEPTACLE, WALL
MAGNETIC STARTER, NEMA SIZE INDICATED
COMBINATION CIRCUIT BREAKER AND
3 POLE
(60/40, 60=SWITCH RATING / 40=FUSE RATING)
FUSED DISCONNECT SWITCH, CURRENT RATING INDICATED
INDICATED, 3 POLE
NONFUSED DISCONNECT SWITCH, CURRENT RATING
TRANSFORMER
CE
CONDUIT, STUBBED AND CAPPED
CONDUIT AND CONDUCTOR CALLOUT, SEE LEGEND.
LPXXA
PANELBOARD LETTER OR NUMBER
DP - DISTRIBUTION PANEL
LP - LOW VOLTAGE PANEL
MD MOTION DETECTOR
PHOTOCELL
OCCUPANCY SENSOR
XX = FIXTURE NUMBER, SEE SCHEDULE
ARROW INDICATES EGRESS DIRECTIONAL INDICATORS,
EXIT LIGHTS - FILLED SECTION INDICATES LIGHTED FACE,
UTILITY POLE
UTILITY REVENUE METERING FACILITY
XX
2
- GROUND FAULT CIRCUIT INTERRUPTER
- TWIST LOCK
- WEATHERPROOF
GFCI
TL
WP
LIGHTING CONTACTOR, CURRENT RATING INDICATED
3 POLE
(100/40, 100 = FRAME SIZE; 40 = TRIP RATING)
RATING INDICATED
BREAKER, SEPARATELY MOUNTED, CURRENT
D
EGRESS PUSHBUTTON
DOOR HOLDER
FIRE SPRINKLER TAMPER SWITCH
FIRE SPRINKLER FLOW SWITCH
LIGHTING CONTACTOR
FACILITY NUMBER
M
C
1
1
STRIP LUMINAIRE, SEE SCHEDULE1
3
a
PC
1
1
or
P
F
TS
FS
HD
S
V
CR
EP
T
MOTION SENSOR
ELECTRONIC LOCK
S = STRIKE
M = MAGENITIC
VIDEO CAMERA
F = FIXED
PTZ = PAN/TILT/ZOOM
INTERCOM
TELEPHONE RECEPTACLE FLOOR BOX
TELEPHONE RECEPTACLE
SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION
SOUND SYSTEM PLAN AND RISERFIRE ALARM SYSTEM PLAN AND RISERPOWER SYSTEM PLAN-2POWER SYSTEM PLAN-1
TELEPHONE SYSTEM PLAN AND RISER
COMPUTER SYSTEM (DATA) PLAN AND RISER
PLAN AND RISER
COMBINED TELEPHONE/COMPUTER SYSTEM
CLOSED CIRCUIT/TELEVISION CABLE PLAN AND RISER
SECURITY SYSTEM PLAN AND RISER
GROUND SYSTEM PLAN
FILENAME:PLOT DATE:PLOT TIME:7/18/201611:42:04 AMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY No. E21673Exp. 09-30-16R EG IS
T
ERED
P ROFESSIONA ELNGINEERRYANS
T
EP ENH BERTTCELERI
CALSTATE OF CALI
FOR
NI
AAHR
01-G-0029CHECKED BY G ENERAL
AREA CLASSIFICATIO N AND
M ATERIALS SELECTIO N TABLE
JN HJELM BERGTA TOM01-G-0029_668876.dgn
FILENAME:PLOT DATE:PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
$PWPATH CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.$PWURL
668876
DESIGN STATUSWATER RESOURCE RECOVERYAUGUST 2016APPVD BY--------FACILITY PROJECTSITE WORKCIVILSITE PLANKE KAUOJD DESBROWLY KRAEMER/AO GARZA05-C-1001
05-C-1001_668876.dwg
FACILITY KEY
WATER RESOURCE CENTER
PROCESS LAB
EQUALIZATION POND
HEADWORKS
PRIMARY CLARIFIERS
PRIMARY SLUDGE PUMP STATION
PRIMARY EFFLUENT DIVERSION
BOX 1 EXISTING
RECIRCULATION PUMP STATION
PRIMARY EFFLUENT DIVERSION
BOX 2
PRIMARY EFFLUENT SCREENS
BIOREACTOR MODIFICATIONS
BIOREACTOR BASINS
CHEMICAL STORAGE FACILITY
MEMBRANE BUILDING
FINAL CLARIFIERS
SECONDARY CLARIFIERS
ELECTRICAL BUILDING
FILTERS
EQUALIZATION BASINS
COOLING TOWERS
UV
CHLORINE CONTACT BASINS
RECYCLED WATER TANK
SIDESTREAM TREATMENT
SOLIDS BLEND TANK
THICKENING
SOLIDS AREA ELECTRICAL
BUILDING
DIGESTER NO. 1
DIGESTER NO. 2
DIGESTER FACILITY
COGENERATION
DEWATERING
ODOR CONTROL
10
12
14
15
20
22
30
35
36
40
42
43
44
46
50
52
54
55
60
64
70
72
80
82
83
84
86
88
10
12
14
15
20
20
22
30
35
36
40
42
42
43
44
46
5050
52
5560
64
70
72
80
82
83
84
86
88
54
25
26
27
28
27
25
HWY 101
SL
O
C
R
E
E
K
PRADO ROADSL
O
C
R
E
E
K
0 100 200 300
1" = 100'
73
73
LEGENDGENERAL NOTES
1.THE HORIZONTAL CONTROL FOR THIS PROJECT IS NAD 83 ZONE 5
STATE PLANE COORDINATES AS PUBLISHED IN THE CITY OF SAN
LUIS OBISPO'S HORIZONTAL CONTROL NETWORK.
THE BENCHMARK USED FOR THIS MAPPING WAS THE CITY OF SAN
LUIS OBISPO'S BM NO. 53 HAVING A PUBLISHED NAVD88 ELEVATION
OF 134.44 AND IS DESCRIBED AS A L&T AT THE BCR AT THE NEC OF
PRADO ROAD AND ELKS LANE.
26
28
PREDESIGN REPORTAC PAVEMENT
PAVERS
NO. 75284
EXP.
FILENAME:PLOT DATE:PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
$PWPATH CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.$PWURL
668876
DESIGN STATUSWATER RESOURCE RECOVERYAUGUST 2016APPVD BY--------FACILITY PROJECTSITE WORKCIVILGRADING AND DRAINAGE PLANKE KAUOJD DESBROWLY KRAEMER/AO GARZA05-CG-1111
05-CG-1111_668876.dwg
0 80 160 240
1" = 80'
S
L
O
C
R
E
E
K
SL
O
C
R
E
E
K
PRADO ROADHWY 101
LEGEND
GENERAL NOTES
1.THE HORIZONTAL CONTROL FOR THIS PROJECT IS NAD 83 ZONE 5
STATE PLANE COORDINATES AS PUBLISHED IN THE CITY OF SAN
LUIS OBISPO'S HORIZONTAL CONTROL NETWORK.
THE BENCHMARK USED FOR THIS MAPPING WAS THE CITY OF SAN
LUIS OBISPO'S BM NO. 53 HAVING A PUBLISHED NAVD88 ELEVATION
OF 134.44 AND IS DESCRIBED AS A L&T AT THE BCR AT THE NEC OF
PRADO ROAD AND ELKS LANE.PREDESIGN REPORTNO. 75284
EXP.
137.49
104
107134.89
134.28
135.03
105
109
113
129.41
124.28
130.28
125.29
106
102
103
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S S
S
S S S
S
S
S
S
S
S
S
S
S
S
SWWS
S
S
S
S
C
S
S
WMWMWMARVARVCOMMDIDIDIDI DIDIDIDIDIDIDIDIDIDIDIDIDIDIDIDIDIDIDI
COMMTRANSFORMER128.54
SSMH
129.70
SS
MH
131.91
SS
MH
30" INF WWCONNECTED TO
48" INF WW
30" INF WW
30" INF WW30" WW/PE (BYPASS)48" INF WW
48" INF WW
FILENAME:PLOT DATE:PLOT TIME:2016\08\02 4:27:42 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.ANSI_D_668876.dgn
668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
Exp.
L
STEDNE
I
EST
ATE OF C L FORNIANo. C 66573
06-30-2018REGIER PROF SSEOI
AL
N
GNERHT
OBO
N ANELL
NJAE
ICVI
A I
0 80 160 240
Scale In Feet
10
12
14
15
20
20
22
35
30
40
43
44
46
50 50
52
60
6264
70
72
82
84
86
N
83
36
80
55
42
42
EXST 30" PE
CLARIFIERS
PRIMARY
24" BI
36" RAS
48" ML
GROUND ALP
ABOVE
EXST 42" SE
x DEMO
BE REPLACED
SD SYSTEM TO SAN LUI
S OBI
SPO CREEK88
54
PUMP STATION
WATER REUSE
RECEIVING
FUTURE FOG
2.
1.
NOTES:
NEW ELECTRICAL IS SCREENED WITH EXISTING PIPING FOR CLARITY.
TO ALL AREAS OF EXISTING UTILITIES DURING CONSTRUCTION.
CONTRACTOR TO MAINTAIN ACCESS FOR DELIVERIES AND PLANT PERSONNEL
FACILITY LEGEND
10
12
14
15
20
22
30
35
36
40
42
44
46
50
52
54
55
60
64
70
72
80
82
83
84
86
88
25
26
27
36" PER
EXST PE
CONNECT TO
STATION
FILTRATE PUMP
DEWATERING
25
27
28 06-Y-2000_668876.dgn
A HOWE06-Y-2000
DEMO
X
X
X
X
X
X
X
X
DIVERSION BOX
NITRIFIED EFF YARD PIPINGOVERALL YARD PIPING PLANCIVIL73
73
36" EFF
GENERATOR
GENERATOR
36" PE TO POND
PUMP STATION
30" PE TO FLOW EQ
PE W/ RDCR
PE TO EXST 30"
CONNECT 36"
3W PUMP STATION
8" 3W
1 1/2" 2WL
2" IA
3" SA
12" PD
6" WAS
FACILITIES
AROUND NEW
PIPING IN ROAD
REROUTE EXST
(2) 30" PI
ODOR CONTROL
DEWATERING
COGENERATION
DIGESTER BUILDING
DIGESTER NO. 2
DIGESTER NO. 1
SOLIDS AREA ELECTRICAL BUILDING
THICKENING
SOLIDS BLEND TANK
SIDESTREAM TREATMENT
RECYCLED WATER TANK
CHLORINE CONTACT BASINS
UV
COOLING TOWERS
EQUALIZATION BASINS
FILTERS
ELECTRICAL BUILDING
43
64 J KOCH36" WW / PE
36" WW / PE
26
36" RAS
42" BI
24" BI
SECONDARY CLARIFIER
FINAL CLARIFIERS
MEMBRANE BUILDING
CHEMICAL STORAGE FACILITY
BIOREACTOR BASINS
BIOREACTOR MODIFICATIONS
PRIMARY EFFLUENT SCREENING
BOX 2 (PED B2)
PRIMARY EFFLUENT DIVERSION
RECIRCULATION PUMP STATION
BOX 1 (PED B1)
PRIMARY EFFLUENT DIVERSION
PRIMARY SLUDGE PUMP STATION
PRIMARY CLARIFIERS
HEADWORKS
EQUALIZATION POND
PROCESS LAB
WATER RESOURCE CENTER
28
TRANSFER PUMP STATION
DIGESTED SLUDGE
40" EFF EXST 40" EFF
FILENAME:PLOT DATE:PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
$PWPATH CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.$PWURL
668876
DESIGN STATUSWATER RESOURCE RECOVERYAUGUST 2016APPVD BY--------FACILITY PROJECTSITEWORKLANDSCAPE LANDSCAPE PLANME MILLSJD DESBROWLY KRAEMER07-L-1111
ANSI_D_668876.dgn
0 80 160 240
1" = 80'
SL
O
C
R
E
E
K
SL
O
C
R
E
E
K
PRADO ROADHWY 101
PLANT SCHEDULE
REPLACE TURF WITH
DROUGHT TOLERANT
NATIVE PLANTING
WETLAND
MULTI-USE PATHWAY
BOARDWALK
ENTRY COURTYARD
EQ POND
CISTERN
DECK
PREDESIGN REPORT5/31/17
EXAMPLE SYMBOLSFITLLUU-01ABBSUCCEEDING LETTER(S)FIRST LETTER(S)CLARIFYING ABBREVIATIONSDIGITAL SYSTEM INTERFACESANALOG INPUTANALOG OUTPUTDISCRETE INPUTDISCRETE OUTPUTXXGENERAL INSTRUMENT ORFUNCTIONAL SYMBOLSBBFIELD MOUNTEDMCC MOUNTEDPLC FUNCTIONSHARED DISPLAY,SHARED CONTROLCOMPUTER FUNCTIONTRANSDUCERSEXAMPLEFYI/PCURRENT TO PNEUMATICTRANSDUCER (BACK OFPANEL, IN A FLOW LOOP)LETTERPROCESS ORINITIATING VARIABLE MODIFIERREADOUT ORPASSIVE FUNCTIONREADOUT ORPASSIVE FUNCTIONREADOUT ORPASSIVE FUNCTIONABCDEFGHIJKLMNOPQRSTUVWXYZANALYSIS (+)BURNER, COMBUSTIONVOLTAGEFLOW RATEHAND (MANUAL)CURRENT (ELECTRICAL)POWERTIME, TIME SCHEDULELEVELUSER'S CHOICE (*)PRESSURE, VACUUMQUANTITYRADIATIONSPEED, FREQUENCYTEMPERATUREMULTI VARIABLEWEIGHT, FORCEUNCLASSIFIED (*)POSITION Z AXISY AXISX AXISSAFETYMOMENTARYSCANDIFFERENTIALALARMUSER'S CHOICE (*) USER'S CHOICE (*)CONTROLUNCLASSIFIED (*) UNCLASSIFIED (*) UNCLASSIFIED (*)WELLMULTI FUNCTION MULTI FUNCTION MULTI FUNCTIONTRANSMITSWITCHRECORD OR PRINTUSER'S CHOICE (*) USER'S CHOICE (*) USER'S CHOICE (*)MIDDLE, INTERMEDIATELIGHT (PILOT)CONTROL STATIONGATEINDICATEDRIVE, ACTUATOR,UNCLASSIFIED FINALCONTROL ELEMENTEVENT, STATEOR PRESENCERELAY, COMPUTE,CONVERTVIBRATION,MECHANICAL ANALYSISVALVE, DAMPER,LOUVERINTEGRATE,TOTALIZEPOINT (TEST)CONNECTIONTIME RATEOF CHANGEGLASS, GAUGEVIEWING DEVICEPRIMARY ELEMENT,SENSORRATIO(FRACTION)SUCCEEDING-LETTERSINSTRUMENT IDENTIFICATION LETTERS TABLETABLE BASED ON THE INSTRUMENTATION, SYSTEMS, AND AUTOMATION SOCIETY (ISA) STANDARD.(+) WHEN USED, EXPLANATION IS SHOWN ADJACENT TO INSTRUMENT SYMBOL. SEE ABBREVIATIONS AND LETTER SYMBOLS.(*) WHEN USED, DEFINE THE MEANING HERE FOR THE PROJECT.SPECIAL CASESYLOOHSOOHSSSEXAMPLEACCESSORY DEVICESFITA1TRANSMITTER AS ANACCESSORY TO AFLOW ELEMENTON AND OFF EVENTLIGHTSON-OFF HAND SWITCH,MAINTAINED CONTACTSWITCH (CONTROLLEDDEVICE WILL RESTARTON RETURN OF POWERAFTER POWER FAILURE).STOP-START HAND SWITCHMOMENTARY CONTACTSWITCHES (CONTROLLEDDEVICE WILL NOT RESTARTON RETURN OF POWERAFTER POWER FAILURE).ANALOGDIGITALVOLTAGEFREQUENCYHYDRAULICADEFHCURRENTPNEUMATICPULSE FREQUENCYPULSE DURATIONRESISTANCEIPPFPDRLINE LEGENDPNEUMATIC SIGNALSECONDARY PROCESSPROCESS (OPEN CHANNEL)////XXXLLLHYDRAULIC SYSTEM SIGNALDATA LINKooPARALLELING LINES(A) (B)(2)3(2)TYPICAL BREAKBUILDING ORFACILITY BOUNDARYPACKAGE SYSTEMEQUIPMENT(A)(B)TOTAL OF 2 SIGNALS3 TYPICAL SETS OF2 SIGNALS EACH.TOTAL OF 6 SIGNALS.CONNECTING LINESNON-CONNECTING LINESREAR-OF-PANELMOUNTED (OPERATORINACCESSIBLE)PANEL MOUNTED(OPERATORACCESSIBLE)ABBREVIATIONS & LETTER SYMBOLSDISCRETE(ON/OFF, ETC.)FIRST-LETTERPRIMARY PROCESS(CLOSED CONDUIT,DASHED LINE INDICATESALTERNATE FLOW STREAM)X DESCRIPTIONSAHMSTATUSALARMHOLDMOMENTARYINSTRUMENT AND CONTROLVALVE IDENTIFICATIONLETTER (USED WHENTHERE ARE MULTIPLE DEVICESWITH THE SAME NUMBER)SEQUENCE NUMBERLOOP NUMBERBUILDING/AREA NUMBERTAG: FIT-LLUU-01AA1A2A3ACCESSORY 1ACCESSORY 2ACCESSORY 3EXISTINGFUTURELOCAL-COMPUTERSELECTOR SWITCH WITHMOMENTARY CONTACTSTART-STOP PUSHBUTTONS.LC/SSINTRINSICALLY SAFE RELAYINTRINSICALLY SAFE CIRCUITISRISCFILLED CAPILLARY TUBEFANALOG SIGNAL(4 TO 20 mAdc, ETC.)OR AS NOTED.ETHERNET OR AS NOTED.CLOSE, STOP, DECREASECOMMUNICATIONOPEN, START, INCREASEFAILGAS (NATURAL)HIGH, OPENEDMOTOR, PUMPLOW, CLOSEDORIFICE, RESTRICTION,OVERLOADON, OPERATINGSEE ABBREVIATIONS SHEET DWG G-12, G-13, & G-14PLC I/O TAG NUMBERSFFEEEDDXXSFF-E-DDXXEXAMPLE: 35-P-2201-RUNPLC TAG SUFFIX ABBREVIATIONSACLCL2CMDOENVESLELNH3NO3OLPO4SO3SSSUPTEMPTURBALARMCLOSEDCHLORINE RESIDUALCOMPUTER-MANUALDISSOLVED OXYGENENVIRONMENTALEMERGENCY STOPLOWER EXPLOSIVE LIMITAMMONIANITRATEOVERLOADPHOSPHATESULFITESUSPENDED SOLIDSSUPERVISORYTEMPERATURETURBIDITYHEAT TRACE1. THIS IS A STANDARD LEGEND SHEET.THEREFORE, NOT ALL OF THE INFORMATIONSHOWN MAY BE USED ON THIS PROJECT.GENERAL NOTE:BUILDING/AREA, 2-DIGIT NUMBERISA FUNCTION IDLOOP NUMBER, 2-DIGIT NUMBERSEQUENCE NUMBERTAG SUFFIX ABBREVIATIONINTERFACE SYMBOLSPROCESS INTERFACESIGNAL INTERFACESNNPROCESS OR SIGNALLINE CONTINUATIONN=1,2,3,ETCINTERFACE TOOR FROM PROCESSEXTERNAL TO PROJECTGENERAL NOTESADAVALVE & EQUIPMENTTAG NUMBERSADSINTERFACE NUMBERDESTINATION DRAWING NO.SOURCE DRAWING NO.FE-E-DDXXYFFEEEDDXXYEXAMPLE:EQUIPMENT ACCESSORYTAG NUMBERS(FOR PANELS, DISCONNECT SWITCHES, ETC. ASSOCIATED WITHAN EQUIPMENT ITEM)COMPONENTS AND PANELS SHOWN WITH A SINGLEASTERISK ( ) ARE TO BE PROVIDED AS PART OF APACKAGE SYSTEM.COMPONENTS AND PANELS SHOWN WITH A DOUBLEASTERISK ( ) ARE TO BE PROVIDED UNDERDIVISION 26, ELECTRICAL.1.2.AREA NUMBEREQUIPMENT/VALVE ABBREVIATIONLOOP NUMBERSEQUENCE NUMBERACCESSORY ABBREVIATION40-LIT-1201AMANUFACTURER SUPPLIED CABLEMSCNETWORKED MOTOR CONTROLSMOTOR CONTROL & MONITORING WILL BE VIA ETHERNETNETWORKS TO RESPECTIVE PLC. PARAMETERS AREADJUSTABLE, BUT THE FOLLOWING REPRESENT MINIMUMPARAMETERS COMMUNICATED VIA NETWORK.DI RUNNINGDI FAIL/FAULTDI OVERLOADDI SELECTIBLE INPUT 1DI SELECTIBLE INPUT 2DO RUN CMDAI AMPSAI POWERCS = CONSTANT SPEED MOTORSDI RUNNINGDI FAIL/FAULTDI OVERLOADDI SELECTIBLE INPUT 1DI SELECTIBLE INPUT 2DO RUN CMDAI AMPSAI SPEED FEEDBACKAI POWERAO SPEED CMDAS = ADJUSTABLE SPEED MOTORSCSASFF-E-DDXXFFEDDXXEXAMPLE:BUILDING/ AREA NUMBEREQUIPMENT/VALVE ABBREVIATION (SEE ABBREVIATIONS SHEET DWG G-12, G-13, & G-14)LOOP NUMBERSEQUENCE NUMBER40-P-1101FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 3:18 PMWATER RESOURCE RECOVERYFACILITY PROJECTGENERALPIPING & INSTRUMENTATION DIAGRAMI&C LEGEND08-I-0001.08-I-0001.DWGDM DUTCHER BM APFEL
VALVE SYMBOLSKVGATEKNIFE GATEBUTTERFLYGLOBEBALLVEE-BALLPLUGSEAT PORTECCENTRIC PLUGDIAPHRAGMPINCHNEEDLESWING CHECKBALL CHECKROTARYBACKFLOWPREVENTERSTELESCOPESAMPLEPRESSURE RELIEFAIR AND/ORVACUUM RELEASEPRESSURE CONTROLPRESSURE REGULATION(CLAY-TYPE)REGULATED SIDEANGLE GATEMUDMULTI-PORT VALVE(GATE VALVE SHOWN. FOROTHER VALVE TYPES,APPROPRIATE VALVESYMBOL SHOWN.) SEATPORTS ARE IMPLIED BYINDICATED FLOW PATTERN.GATE SYMBOLSSLUICEBUTTERFLYFLAPFABRICATEDSLIDESTOP LOGACTUATOR SYMBOLSMSHE/HMANUALPNEUMATIC DIAPHRAGMSPRING-OPPOSED, SINGLEOR DOUBLE ACTINGVALVEPOSITIONERELECTRIC MOTORSOLENOIDHYDRAULICELECTROHYDRAULICDIAPHRAGM,DIFFERENTIALPRESSUREPNEUMATIC CYLINDERSINGLE OR DOUBLEACTING ACTUATEDBY ONE INPUTNOTE:ON LOSS OF PRIMARY POWER(PNEUMATIC, ELECTRICAL, ORHYDRAULIC)XX: FOFCFLPFAIL OPENFAIL CLOSEDFAIL TO LAST POSITIONVTSWPFSS120VAIR GAPDRIP TRAPPIG INSERT POINTPIG CATCH POINTWATER PURGE SETFLUSHING CONNECTIONFLEXIBLE CONNECTIONAERATORDIAPHRAGM SEALANNULAR DIAPHRAGM SEALMISCELLANEOUS SYMBOLSVENT TOATMOSPHERETVII480VTV120 VOLT,60 HZ POWER480 VOLT,60 HZ POWERAIR SETXX = SUPPLY PRESSURE IN PSIG.PLUGXXRECEPTACLERUPTURE DISK(VACUUM)RUPTURE DISK(PRESSURE)TV MONITORTV CAMERASKIMMINGMECHANISMSCREW CONVEYORSCREWMIXERINTERLOCK, SEECONTROL DIAGRAMSORRADIO ANTENNAELECTRIC MOTORBLIND FLANGEPIPE CAPCOMPOSITE SAMPLERCALIBRATION COLUMNINLINE SILENCERORLOGIC ELEMENT:IF A OR B THEN CANDLOGIC ELEMENT:IF A AND NOT B THEN CABCABCSTRAINERHORNASELF CONTAINEDAIR SUPPLYAPAIR PURGE SETBASKET STRAINERFFLCPLLLXPANEL CONTINUEDON SAME OR OTHERDRAWINGPANEL OUTLINEPANEL NAMEPRIMARY ELEMENT SYMBOLSPARSHALL FLUMEWEIRORFICE PLATEFLOW TUBEPITOT-STATICVORTEX METERULTRASONICFLOWMETERMELECTROMAGNETICFLOWMETERPROPELLER ORTURBINE METERTHERMALFLOWMETERROTAMETERFIDEXXDENSITY METERGENERICLELEVEL(BUBBLER TUBE)LSLEVEL (FLOAT)PULSATIONDAMPENEREXPANSIONCHAMBERPUMP AND COMPRESSOR SYMBOLSCENTRIFUGALPUMP (DRY PIT)CENTRIFUGAL WET PITPUMP OR TURBINE PUMPRECIPROCATING ORMETERING PUMP(POSITIVE DISPLACEMENT)DIAPHRAGM PUMPGEAR PUMP OR BLOWER(POSITIVE DISPLACEMENT)PISTON PUMPCOMPRESSOR(CENTRIFUGAL)COMPRESSOR(PISTON)BLOWER OR FAN(CENTRIFUGAL)EJECTORSUBMERSIBLESUMP PUMPADJUSTABLE SPEEDCONSTANT SPEED (SINGLE SPEED)CONSTANT SPEED (TWO SPEED)XX:XXXXXXXXXXXXXXXXXXXXXX(FOR REFERENCE ONLY. SEE SITE AND MECHANICAL DRAWINGS)PIPING CHANGEDATABASE SYMBOLVACUUM PUMPSCREW PUMPPROGRESSINGCAVITY PUMPFLOW STREAMIDENTIFICATIONULTRASONIC LEVELLERADAR LEVELMFLOW STREAM (PROCESS FLUID) IDENTIFICATIONASCSCS-2SEAL WATER SET,SEE MECHANICAL DETAIL4442-664FLAME ARRESTORDISCONNECT SWITCHSTATIC MIXERRIRRELAYINTRINSICALLY SAFERELAYPERISTALTICPUMPXXBISEE OVERALL GENERAL LEGEND DWG G-14PIPE CONNECTIONTO A DISTRIBUTIONHEADERFLOW STREAM IDENTIFICATION1. THIS IS A STANDARD LEGEND SHEET.THEREFORE, NOT ALL OF THE INFORMATIONSHOWN MAY BE USED ON THIS PROJECT.GENERAL NOTE:ALPASBCBFEBIBSBSMCCACDCONDCWRCWSXX/DDGDSDSMDSREFFFAFILTFHSFSSHWHWRHWSIWMGMLMLRMSNAOCLNGXX/OFPDPIPEPERPOLPOSPSPSCRASRDRODSASTDTDTFTHSVXX/VTWWAS1W2W3WPROCESS AIRAIR SCOURBIOFILTER CIRCULATIONBIOFILTER EFFLUENTBIOREACTOR INFLUENTBLENDED SLUDGEBLENDED SLUDGE MIXINGSUPPLEMENTAL CARBONCITRIC ACIDCHEMICAL DRAINCONDENSATECHILLED WATER RETURNCHILLED WATER SUPPLYDRAINDIGESTER GASDIGESTED SLUDGEDIGESTED SLUDGE MIXINGDIGESTED SLUDGE RETURNEFFLUENTFOUL AIRDEWATERING FILTRATEFIRE HYDRANT SERVICEFIRE SPRINKLER SERVICEHOT WATER, POTABLEHOT WATER RETURNHOT WATER SUPPLYINDUSTRIAL WATER SERVICEMIXED GASMIXED LIQUORMIXED LIQUOR RECYCLEMIXED SLUDGESODIUM HYPOCHLORITENATURAL GASOVERFLOWPUMPED DRAINAGEPRIMARY INFLUENTPRIMARY EFFLUENTPERMEATEPOLYMERPOLYMER SOLUTIONPRIMARY SLUDGEPRIMARY SCUMRETURN ACTIVATED SLUDGEROOF DRAINROOF OVERFLOW DRAINSERVICE AIRSTORM DRAINTANK DRAINTHICKENING FILTRATETHICKENED SLUDGEVENT, PLUMBINGVENT, PROCESSWASTE, SANITARYWASTE ACTIVATED SLUDGENO. 1 (POTABLE) WATERNO. 2 (NON-POTABLE) WATERNO. 3 (PLANT EFFLUENT WATER)FLOW STREAM SERVICEFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 3:20 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELGENERALPIPING & INSTRUMENTATION DIAGRAMI&C LEGEND08-I-0002.08-I-0002.DWG
15FE100115FIT100115..15FE100215FIT100215..15FE100315FIT100315..FLOWFLOWFLOWFLOW15..?-?W....15TSH158TEMP15UA156-15LY.-15LC.15TSH158TEMP15UA157-15LY.-15LC.15-HWP-112FLUSHING WATER PUMP........WW15-HWP-200INFLUENT PUMP NO. 215-HWP-300INFLUENT PUMP NO. 315-HWP-600INFLUENT PUMP NO. 6-15LY.-15LC.HWV62015TSH1582WLDTEMP15UA15515-HWP-500INFLUENT PUMP NO. 5HWV6202WL-15LY.-15LC.15TSH158DTEMP15UA15515LSH15015LSL15015LIT15015LE150B15LE150AHIGH LEVEL15UA155LOW LEVEL15UA155LEVEL15UA1551AHOAHS150AHOAHS150BASASASAS15-HWV-50015-HWV-40015-HWV-300FROMHEADWORKSTO AERATEDGRIT CHAMBERCSRUNNING15UA.FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:52 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELHEADWORKSPIPING & INSTRUMENTATION DIAGRAMHEADWORKS & INFLUENT PUMPS08-I-0003.08-I-0003.DWG
20HS1001BD..TO PRIMARY SCUM PUMPSCS20NSH100120NSHH100120-M-100120YL1001B20HS1001A20YL1001A20..20..20..20..RESETOOTORQUE ONOO20HS1002BCS20-M-100220NSH100220NSHH1002ON20YL1002BRESET20HS1002ATORQUE20YL1002AE..TO PRIMARY SCUM PUMPSC..TO PRIMARY SLUDGE PUMPSB..TO PE DIVERSION BOX NO. 1A..TO PRIMARY SLUDGE PUMPSHIGH-HIGHOVERLOADONHIGHHIGH20..ON20..OVERLOAD20..HIGH-HIGH20..08-I-000608-I-000608-I-000608-I-000808-I-0006PSCPIPSCPIPSPEPEPSPSPEPSFA...TO ODOR CONTROL08-I-0031FROM AERATEDGRIT CHAMBERFROM AERATEDGRIT CHAMBERFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:53 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELPRIMARY CLARIFIERSPIPING & INSTRUMENTATION DIAGRAMPRIMARY CLARIFIERS08-I-0005.08-I-0005.DWG
22HS1001C..FROM PRIMARY CLARIFIER 2AS22-P-1001PRIMARY SLUDGE PUMP NO. 122PI100122PIT120122FIT1202...TO SLUDGE BLEND TANK...TO PRIMARY EFFLUENT22HS200122HS220122ZS220122..22..22..22..CLOSEDOPENEDOPENCLOSEREMOTE22..22LIT2000LEVEL22..22LSHH2000HIGH-HIGH LEVEL22..22LE2000...TO DIGESTERE..FROM PRIMARY CLARIFIER 2D..FROM PRIMARY CLARIFIER 1DIVERSION BOX 222..22..22-P-1002PRIMARY SLUDGE PUMP NO. 222-PI-100222-HS-100222-HS-2002.FROM PRIMARY CLARIFIER 1A.ASPRESSUREFLOW22FE1202HOA08-I-000508-I-000508-I-000508-I-000508-I-003508-I-000908-I-0032HOAPSPSPSCPSCPSPSPSC22LSLL2000LOW LEVEL22..22-P-2001SCUM SUMP NO. 1AS22-P-2002SCUM SUMP NO. 2AS22TSH130122XSH130122FE120322FIT1203FV220122-HS-220222-ZS-2202FLOW22..22HS120422ZS1204CLOSED22..OPENED22..OPEN22..CLOSE22..REMOTE22..08-I-0035FV-2202FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:53 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELPRIMARY SLUDGE PUMP STATIONPIPING & INSTRUMENTATION DIAGRAMPRIMARY SLUDGE & SCUM PUMPING08-I-0006.08-I-0006.DWG
36-TK-3101ANIONIC POLYMER STORAGE TOTE 136WE310136WIT310136..36-TK-3102ANIONIC POLYMER STORAGE TOTE 236WE310236WIT310236..36-M-3301ANIONIC POLYMERBLEND UNIT 1A..TO GRIT CHAMBER 1-36-M-3302ANIONIC POLYMERBLEND UNIT 236-M-3303ANIONIC POLYMERBLEND UNIT 3A..TO GRIT CHAMBER 2-POLPOLPOL3WWEIGHTWEIGHT36LSHH3400DLEVEL - HIGH36..WEIGH SCALE #2WEIGH SCALE #13WFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:53 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELValuePIPING & INSTRUMENTATION DIAGRAMANIONIC POLYMER08-I-0007.08-I-0007.DWG
14FIT120125..26HS100126LIT100026..26LE1000...FROM PRIMARY CLARIFIERS...TO PE DIVERSION BOX 214HS100114LIT1000LEVEL25..14LE100026HS-100214FE1201HOA26LSHH100026..14LSHH1000HIGH-HIGH LEVEL25..HOALEVELHIGH-HIGH LEVELFLOW25-HS-100208-I-000908-I-0005W/BYPPEPEW/PEWW/PEWW/PEAS26-P-1001EQUALIZATION PUMP NO. 1AS14-P-1001EQ POND RETURN PUMP NO. 125-P-1002EQ POND RETURN PUMP NO. 226-P-1002EQUALIZATION PUMP NO. 2FROM GRITTANKS...TO HEADWORKS08-I-0003ASOFFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:53 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELPRIMARY SLUDGE PUMP STATIONPIPING & INSTRUMENTATION DIAGRAM08-I-0008.08-I-0008.DWG
...FROM PE DIVERSON BOX 1...FROM CARBON STORAGE AREA...FROM ROTARY DRUM THICKENERS...FROM PRIMARY SLUDGE PUMPS...TO PE SCREENS27-M-1001PRIMARY EFFLUENT MIXERCS27HS1001HOACS08-I-001008-I-000808-I-000608-I-0024PEPECSOCTFPS/BYPPE08-I-0034FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:53 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELPRIMARY SLUDGE PUMP STATIONPIPING & INSTRUMENTATION DIAGRAM08-I-0009.08-I-0009.DWG
28LIT100028LIT110128LE1201A28LE1201B...FROM PE DIVERSION BOX NO. 2...TO BIOREACTOR 4...TO BIOREACTOR 2PE SCREENINGSWASHER/COMPACTOR28..CS...TO BIOREACTOR 3...TO ODOR CONTROL28LE100028LSHH100028..LEVELHIGH-HIGH...FROM RAS CHANNEL28HS1101A28HS1101B28HS1101C28YL1101RUNNINGRESETS/FHOA28G-140328G-140228..28..FULLFLOW28HS130128ZS130128..28..28..28..CLOSEDOPENEDOPENCLOSEREMOTE28..CLOSED
OPENED
OPEN
CLOSE
REMOTE 28-M-110228-HS-1102A28-HS-1102B28-HS-1102C28-YL-110228-LE-1202A28-LIT-120228-LE-1202B28G-100228-HS-100228-ZS-100228G-130228-HS-130228-ZS-1302PERASBISCRSCR/DRSCRSCR28G-100128G-130128G-140128HS150128-M-1501CSR28HS140128ZS1401CLOSED28..OPENED28..OPEN28..CLOSE28..REMOTE28..BI-SCSR28-ZS-140228-HS-140228-HS-140328-ZS-140328-HS-140428-ZS-140428G-1404HOA08-I-000908-I-001708-I-001308-I-003108-I-001308-I-0011CS28-LCP-0128-LCP-0228-LCP-02SCR28-M-150228-HS-1502PE SCREENINGSWASHER/COMPACTORLEVELLEVEL28-M-1101BIDUMPSTER28LIT100028LE100028LSHH1000LEVEL28..HIGH-HIGH28..FA...TO BIOREACTOR 108-I-0011BIBIFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:53 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELPRIMARY SLUDGE PUMP STATIONPIPING & INSTRUMENTATION DIAGRAMPRIMARY EFFLUENT SCREENS08-I-0010.08-I-0010.DWG
B..TO MEMBRANE TANKSD..TO PLANT DRAIN PUMP STATIONA..TO PLANT DRAIN PUMP STATION...FROM MEMBRANE TANKS...FROM PE SCREENS30-M-1101ANOXIC MIXER30AE1201B30AIT220130-?30-?30LIT330130-.30-M-1301MIXED LIQUOR RECYCLE PUMP 1...FROM MEMBRANE TANKSCS30HS1101ASAS30LE3301C..TO WAS PUMPS30-M-2101ANOXIC MIXER30-HS-210130-M-2102ANOXIC MIXER30-HS-210230-M-2103ANOXIC MIXER30-HS-210330-M-1102ANOXIC MIXER30-M-1103ANOXIC MIXER30-HS-110330-HS-110230-M-2301MIXED LIQUOR RECYCLE PUMP 208-I-001708-I-001008-I-001708-I-002030HS130130-HS-230130HS340130ZS340130..30..30..30..CLOSEDOPENEDOPENCLOSEREMOTE30..LEVELNITRATE 1NITRATE 208-I-0047RASBIRASTDMLWASTDCS30AIT120130AE2201B30-G-340130AE1201A30AE2201AUNIT 3HIGH LEVEL30-.30LSHH330130TSH130130XSH130130-TSH-230130-XSH-2301AS08-I-0017RASBI...FROM PE SCREENS08-I-0010NITRATE 130-?NITRATE 230-?30ZT3401POSITION30..FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:53 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELAERATION BASINPIPING & INSTRUMENTATION DIAGRAMBIOREACTORS 1 & 2 - LIQUIDS08-I-0011.08-I-0011.DWG
...FROM PROCESS BLOWERS30AE170130FI160130ZC150130AI170130FI3001FIT160130FIT300130-AIT-170230-FIT-160230-AIT-150330-FIT-160330-AIT-250330-FIT-260330-AIT-250430-FIT-260430-AIT-250130-FIT-260130HS150130-1501FLOWPOS CMDREMOTEDISS. OXY.30AE180130AE2801AMMONIA30AI1801AMMONIA30AI2801FLOW30-HS-150230-ZT-150230-ZC-150230-ZI-150230FCV150130-ZC-150330-HS-150330-ZT-150330-ZI-150330-ZC-150430-HS-150430-ZT-150430-ZI-150430-ZC-250130-HS-250130-ZT-250130-ZI-250130-ZC-250430-HS-250430-ZT-250430-ZI-250430-AIT-150430-FIT-160430-ZC-250330-HS-250330-ZT-250330-ZI-250330-AIT-250230-FIT-260230-ZC-250230-HS-250230-ZT-250230-ZI-250208-I-001530AIT170130AIT180130AIT280130ZT1501POSITION30ZI150130---150230---150330---150430---250430---250230---250130---2503ALP30-FCV-250330-FCV-250430-FCV-250130-FCV-150330-FCV-150230-FCV-150430-FCV-250230HS150130ZT1501POS CMD30ZC1501REMOTE30-1501POSITION30ZI1501FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:53 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELAERATION BASINPIPING & INSTRUMENTATION DIAGRAMBIOREACTORS 1 & 2 - AIR08-I-0012.08-I-0012.DWG
35-M-1101ANOXIC MIXER35LIT1401...TO PLANT DRAIN PUMP STATION...TO MEMBRANE TANKS35AIT120135..35..CS...TO WAS PUMPS...FROM RAS CHANNEL35LE1401...FROM PE SCREENSAS35HS110135HS130135AIT220135..AS35-M-2301MIXED LIQUOR RECYCLE35-HS-230135-HS-110235-M-1102ANOXIC MIXER35-M-2101ANOXIC MIXER35-HS-210135-M-1103ANOXIC MIXER35-HS-110335-M-2102ANOXIC MIXER35-HS-210235-M-2103ANOXIC MIXER35-HS-210335-M-1301MIXED LIQUOR RECYCLE08-I-002008-I-001708-I-001708-I-0010NO3NITRATE 1...FROM PE FINE SCREENS08-I-0010CSASLEVELNO3...FROM RAS CHANNEL08-I-001735HS150135..35..35..35..CLOSEDOPENEDOPENCLOSEREMOTE35..35ZS150108-I-0047BIRASRASBITDWASMLHOA HOACSNO335AE1201BNO335AE2201BNITRATE 2NO335AE1201ANO335AE2201A35LSHH1401HIGH LEVEL35..35-G-150135TSH130135XSH130135-TSH-230135-XSH-2301NITRATE 135-?35-?NITRATE 235-?POSITION35ZT1501FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:53 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELAERATION BASINPIPING & INSTRUMENTATION DIAGRAMBIOREACTORS 3 & 4 - LIQUIDS08-I-0013.08-I-0013.DWG
35AIT170435FI160435AI1704...FROM PROCESS BLOWERSFIT1604FCV150435AIT180135AI180135AIT280135AI280135ZC150435HS150435ZT150435ZI1504POSITIONPOSITIONFLOWDISS. OXY.AMMONIAAMMONIA35-FCV-250435-AIT-270435-FIT-260435-AIT-170335-FIT-160335-FCV-250335-AIT-270335-FIT-260335-AIT-270235-FIT-260235-AIT-270135-FIT-260135-AIT-170235-FIT-160235-ZT-250435-HS-250435-ZC-250435-ZI-250435-HS-250135-ZC-250135-ZT-250135-ZI-250135-AIT-170135-FIT-160135-HS-150335-ZC-150335-ZT-150335-ZI-150335-HS-250235-ZC-250235-ZT-250235-ZI-250235-HS-150235-ZC-150235-ZT-150235-ZI-150235-HS-150135-ZC-150135-ZT-150135-ZI-150135-HS-250335-ZC-250335-ZT-250335-ZI-250308-I-001535AE180135AE170435AE2801NH3NH3NH3NH3DODOREMOTE35ZC1504ALP35-FCV-250235-FCV-150135-FCV-250135-FCV-150235-FCV-1503FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:53 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELAERATION BASINPIPING & INSTRUMENTATION DIAGRAMBIOREACTORS 3 & 4 - AIR08-I-0014.08-I-0014.DWG
...TO BIOREACTORS 1 & 234PIT130134.....TO BIOREACTORS 3 & 434..FV1101V34HS110134ZS110134-B-1002BLOWER NO. 234-FV-110234-HS-110234-ZS-110234-FV-110334-B-1003BLOWER NO. 334-HS-110334-ZS-110334-FV-110434-B-1004BLOWER NO. 434-HS-110434-ZS-110434-FV-110534-B-1005BLOWER NO. 534-HS-110534-ZS-110534-B-1001BLOWER 1FCV120134HS120134ZT120134ZS1201POSITIONREMOTE34..POSITION FEEDBACK34..CLOSED34..OPENED34..08-I-001208-I-0014ALPALPALPPRESSURE34-LCP-0134-LCP-0534-LCP-0434-LCP-0334-LCP-0234PIT1302PRESSURE34..BACKUPFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:54 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELAERATION BASINPIPING & INSTRUMENTATION DIAGRAMPROCESS AIR BLOWERS08-I-0015.08-I-0015.DWG
40LIT1101...FROM BIOREACTORS 1 & 240?.40LE110140HS1001...FROM BIOREACTORS 3 & 4...TO BIOREACTOR 1...TO BIOREACTOR 2...TO BIOREACTOR 3...TO BIOREACTOR 440LIT200140LE200140..40-HS-100240-HS-100340-HS-100440-HS-100508-I-001108-I-001108-I-001308-I-0013...TO PE SCREENS08-I-001008-I-001308-I-001140-HS-1006CLOSEDOPENEDOPENCLOSEREMOTELEVELLEVEL40-?-?40-?-?40-?-?40-HS-120240-ZS-120240-?-?40-?-?40-G-120340-G-120440-G-120540-HS-120540-ZS-120540-?-?40-?-?40-?-?40-?-?40-?-?40-HS-120340-ZS-120340-?-?40-?-?40-?-?40-?-?40-?-?40-HS-120440-?-?40-?-?40-?-?40-ZS-120440-?-?40-?-?MLMLRASRASRASRASRASHOA40-G-120140FIT130140..FLOW40FE130140FE130240FIT1302FLOW40..40FE130340FIT1303FLOW40..40FE130440FIT1304FLOW40..40LSHH1101HIGH LEVEL40?.40LSHH2001HIGH LEVEL40?.40-P-1001MEMBRANE FEED PUMP 1AS40-P-1002MEMBRANE FEED PUMP 240-P-1003MEMBRANE FEED PUMP 340-P-1004MEMBRANE FEED PUMP 440-P-1005MEMBRANE FEED PUMP 540-P-1006MEMBRANE FEED PUMP 640-G-120240-HS-120640-ZS-120640-?-?40-?-?40-?-?40-?-?40-?-?40-HS-120840-ZS-120840-?-?40-?-?40-?-?40-?-?40-?-?40-HS-120940-ZS-120940-?-?40-?-?40-?-?40-?-?40-?-?40-G-120840-G-120940-HS-120740-ZS-120740-?-?40-?-?40-?-?40-?-?40-?-?40-G-120740-G-1206FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:54 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELMEMBRANE BUILDINGPIPING & INSTRUMENTATION DIAGRAMMEMBRANE TANK - LIQUIDS08-I-0017.08-I-0017.DWG
...TO PLANT DRAINFV2101REMOTE40..CLOSE40..OPEN40..40HS210140ZS2101CLOSED40..OPENED40..LR/OSC40-FV-210540-?-?40-?-?40-?-?40-HS-210540-ZS-210540-?-?40-?-?40-FV-210440-?-?40-?-?40-?-?40-HS-210440-ZS-210440-?-?40-?-?40-FV-210340-?-?40-?-?40-?-?40-HS-210340-ZS-210340-?-?40-?-?40-?-?40-?-?40-?-?40-HS-210240-ZS-210240-FV-210240-?-?40-?-?-D08-I-0047FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:54 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELMEMBRANE BUILDINGPIPING & INSTRUMENTATION DIAGRAMMEMBRANE TANK - DRAIN08-I-0018.08-I-0018.DWG
...TO UV DISINFECTIONPERPERPERPER-08-I-0027PER40FIT320140..40FE3201FLOW40-P-3101PERMEATE PUMP NO. 1AS40AE350140-?40HS3101TSS40AIT3501TSSTSS N0340AE3601NO340AIT3601NITRATE40-?PH40AE3701PH40AIT3701PH40-?PERPERPERPERPERPER40-P-3102PERMEATE PUMP NO. 240-HS-310240-P-3103PERMEATE PUMP NO. 340-HS-310340-P-3104PERMEATE PUMP NO. 440-HS-310440-P-3105PERMEATE PUMP NO. 540-HS-310540PIT300140..UPSTREAM PRESSURE40PIT3301DOWNSTREAM PRESSURE40..COMPOSITE SAMPLER40-SMP-380140-FIT-320240-FE-320240-FE-320340-FIT-320340-FE-320440-FIT-320440-FE-320540-FIT-320540-PIT-300240-PIT-330240-PIT-300340-PIT-330340-PIT-300540-PIT-330540-PIT-300440-PIT-3304FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:54 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELMEMBRANE TANKPIPING & INSTRUMENTATION DIAGRAMMBR - PERMEATE PUMPS08-I-0019.08-I-0019.DWG
...FROM BIOREACTORS 1 & 230LIT400030..30LE4000...TO SLUDGE BLENDING TANK30FE420130FIT420130HS400230..30..LEVELHIGH-HIGH LEVEL30LSHH400030-HS-4002FLOW08-I-003208-I-0011WASHOAWAS...FROM BIOREACTORS 3 & 408-I-001335FE420135FIT4201FLOW30..35LIT400035LE400035LSHH4000LEVEL30..HIGH-HIGH LEVEL30..30-HS-400330-HS-4004WAS30TSH400130XSH400130-TSH-400430-XSH-400430-TSH-400230-XSH-400230-TSH-400330-XSH-4003WASWASWASWAS30-P-4001WAS PUMP NO. 1AS30-P-4002WAS PUMP NO. 230-P-4003WAS PUMP NO. 330-P-4004WAS PUMP NO. 4ASFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:54 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELValuePIPING & INSTRUMENTATION DIAGRAMWAS PUMPS 1 & 208-I-0020.08-I-0020.DWG
40LIT510140-P-5301PERISTALTIC METERING PUMPASAS40-P-5302PERISTALTIC METERING PUMP....40PI550140PSH5501PRV5501FROM POTABLEWATER SYSTEM40FSH5000CV570140PI560140LSH510140-PI-540240-PSH-540240-PRV-550240HS5301HIGH PRESSURE40..LEVEL40..EYEWASH40..-40LE510140-HS-530240HL510040YL510040LSHH5801LOW LEVEL40..40-TK-5101CITRIC ACID TOTE 140-TK-5102CITRIC ACID TOTE 2HIGH LEVEL40..HOAFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:54 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELCHEMICAL FACILITYPIPING & INSTRUMENTATION DIAGRAMMBR - CITRIC ACID08-I-0021.08-I-0021.DWG
40LIT610140-TK-6101FeCl3 STORAGE TANK IMFO. X .. @.40-P-6301PERISTALTIC METERING PUMP...TO MBR CLEANING40PI640140PSH6401FROM POTABLEWATER SUSTEM40FSH6000CV670140PI660140LSH610140-P-6302PERISTALTIC METERING PUMP40HS630140..40..40..-40LE610140..HIGH LEVELLEVELEYEWASHHIGH PRESSURE40-PI-640240-PSH-640240-PRV-650240-HS-6302HOAASAS40HL600040YL600040LSHH6801LOW LEVEL40..PRV6501FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:54 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELCHEMICAL FACILITYPIPING & INSTRUMENTATION DIAGRAMMBR - SODIUM HYPOCLORITE08-I-0022.08-I-0022.DWG
36LIT110136-TK-1101SODIUM HYPOCLORITE STORAGE TANK36-P-1301PERISTALTIC METERING PUMP...TO GRIT CHANNELS36PI140136PSH1401FROM POTABLEWATER SYSTEM36FSH1001CV170136PI160136LSH110136-P-1302PERISTALTIC METERING PUMP36HS130136..36..36..-36LE110136..HIGH LEVELLEVELEYEWASHHIGH PRESSURE36-PI-140236-PSH-140236-PRV-150236-HS-130236-?-?HOAASAS36-LCP-0136HL110136YL110136LSHH1801HIGH LEVEL36..1WPRV6501FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:54 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELCHEMICAL FACILITYPIPING & INSTRUMENTATION DIAGRAMFERRIC CHLORIDE08-I-0023.08-I-0023.DWG
36-TK-2101CARBON (GLYCEROL) STORAGE TANK. X .. @.36-P-2301PERISTALTIC METERING PUMP NO. 1A..TO SECONDARY EFFLUENT36PI240136PSH240136FSH2001CV270136PI260136LSH210136-P-2302PERISTALTIC METERING PUMP NO. 236HS230136..36..36..CV2201DIVERSION BOX36HS220136ZS220136..36..36..36..CLOSEDOPENEDOPENCLOSEREMOTE36..08-I-0009HIGH LEVELEYEWASH36-PRV-1502?36-PSH-1402?36-PI-1402?36-HS-230236LIT110136..36LE1101LEVELASAS36HL110136YL110136LSHH2801HIGH LEVEL36..HIGH NITRATE36-LCP-01?HOAFROM POTABLEWATER SYSTEM1WPRV2501FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:54 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELGENERALPIPING & INSTRUMENTATION DIAGRAMSUPPLEMENTAL CARBON08-I-0024.08-I-0024.DWG
62LSL100062..62LSLL100062.....FROM SCREW PRESS 1...FROM SCREW PRESS 262HS100162-HS-100262LSH100062..62LSHH100062..MANHOLE62LIT150162..62LE150162LEL160162..62LSL150162..62-TK-1501SIDESTREAM FLOW EQUALIZATION TANK. X .. @.62-P-2001SIDESTREAM FEED PUMP NO. 1AS...TO SIDESTREAM TREATMENT62HS200162-P-2002SIDESTREAM FEED PUMP NO. 262-HS-2002LOW-LOW LEVELLOW LEVELHIGH-HIGH LEVELHIGH LEVELLEVELLOW LEVELLELAS62-P-1001FILTRATE PUMP NO. 162-P-1002FILTRATE PUMP NO. 262FE210162FIT210162..FLOW08-I-002608-I-004408-I-0045HOACSCSHOAFILTFILTD...TO ODOR CONTROL08-I-0031FA62TSH100162XSH100162-XSH-100262-TSH-1002HIGH-HIGH LEVEL62..62LSHH1501FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:54 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELSIDESTREAM EQUALIZATIONPIPING & INSTRUMENTATION DIAGRAMSIDESTREAM EQUALIZATION08-I-0025.08-I-0025.DWGTO PLANT DRAIN
...FROM SIDESTREAM FEED PUMPS...TO PRIMARY INFLUENT08-I-0025-FILTFILTDSIDESTREAM PACKAGE SYSTEM64-TK-1000...TO ODOR CONTROLFA08-I-0031TO PLANT DRAINFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:54 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELSIDESTREAM EQUALIZATIONPIPING & INSTRUMENTATION DIAGRAMSIDESTREAM TREATMENT08-I-0026----08-I-0026.DWG08-I-0025
...FROM PERMEATE PUMPS...TO NITRIFIED EFFLUENT55..55FIT100155FE1001FV210155HS210155ZS210155..55..55..55..55ZT210155..POSITION FEEDBACKCLOSEDOPENPOSITION CONTROLREMOTE55-FIT-100255-FE-100255-?-?55-HS-210255-?-?55-?-?55-FV-210255-?-?55-FIT-100355-FE-100355-HS-210355-ZS-210355-?-?55-?-?55-?-?55-?-?55-ZT-210355-?-?55-ZT-210255-ZS-210255-?-?55-?-?55-?-?55-FV-210355-LCP-1101INLINE UV SYSTEM55-LCP-1102INLINE UV SYSTEM55-LCP-1103INLINE UV SYSTEMPER PERPERPEREFFEFFEFFEFFLR/OSCFLOW08-I-0048DIVERSION BOX55AE100055-?TRANSMITTANCE55AIT1000UVFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:55 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELUVPIPING & INSTRUMENTATION DIAGRAMUV DISINFECTION08-I-0027.08-I-0027.DWG
66-P-1001COOLING TOWER PUMP NO. 1...FROM COOLING TOWERS...FROM COOLING TOWERS...FROM COOLING TOWERS...FROM COOLING TOWERS...FROM COOLING TOWERS...FROM COOLING TOWERS...FROM POND 5...FROM POND 6...TO COOLING TOWERS...TO COOLING TOWERS...TO COOLING TOWERS...TO COOLING TOWERS...TO COOLING TOWERS...TO COOLING TOWERS...TO PLANT EFFLUENT66LIT.66..66LE?CS66HS100166-P-1002COOLING TOWER PUMP NO. 266-HS-100266-P-1003COOLING TOWER PUMP NO. 366-P-1004COOLING TOWER PUMP NO. 466-HS-100466-HS-100666-P-1005COOLING TOWER PUMP NO. 566-HS-100466-HS-100566-P-1006COOLING TOWER PUMP NO. 666TIT?66..OUTLET TEMPLEVEL66LIT.LEVEL66..66LE?66TIT?MID TEMP66..66TIT?INLET TEMP66..HOA08-I-002908-I-002908-I-002908-I-002908-I-002908-I-002908-I-004908-I-002908-I-002908-I-002908-I-002908-I-002908-I-0029DIVERSION BOX 266LSHH.HIGH LEVEL66..66LSHH.HIGH LEVEL66..08-I-004908-I-0049FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:55 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELCOOLING TOWERSPIPING & INSTRUMENTATION DIAGRAMEFFLUENT COOLING PUMPS08-I-0028.08-I-0028.DWG
...FROM CT PUMP 1...FROM CT WASH PUMP...TO EFFLUENT COOLING PUMPS...TO EFFLUENT COOLING PUMPS...TO EFFLUENT COOLING PUMPS...TO EFFLUENT COOLING PUMPS...TO EFFLUENT COOLING PUMPS...TO CT WASH SUMP...FROM CT PUMP 2...FROM CT PUMP 3...FROM CT PUMP 4...FROM CT PUMP 5...FROM CT PUMP 6FV.FV.FV....TO EFFLUENT COOLING PUMPSFV.FV.EFFLUENT COOLING TOWER 1TK-00166HS.66HS.66ZS?66..REMOTEOPENED66..CLOSED66..66HS.66ZS?REMOTE66..OPENED66..CLOSED66..CLOSE66..OPEN66..66HS.66ZS?REMOTE66..OPENED66..CLOSED66..CLOSE66..OPEN66..CLOSE66..OPEN66..66HS.66ZS?REMOTE66..OPENED66..CLOSED66..CLOSE66..OPEN66..66HS.66ZS?REMOTE66..OPENED66..CLOSED66..CLOSE66..OPEN66..EFFLUENT COOLING TOWER 2TK-00266-HS-?66-HS-?66-FV-?66-ZS-?66-HS-?66-ZS-?66-FV-?66-HS-?66-ZS-?66-HS-?66-ZS-?66-FV-?66-FV-?66-HS-?66-ZS-?66-FV-?EFFLUENT COOLING TOWER 3TK-00366-FV-?66-FV-?66-FV-?66-FV-?66-FV-?66-HS-?66-HS-?66-ZS-?66-HS-?66-ZS-?66-HS-?66-ZS-?66-HS-?66-ZS-?66-HS-?66-ZS-?EFFLUENT COOLING TOWER 4TK-00466-FV-?66-FV-?66-FV-?66-FV-?66-FV-?66-HS-?66-HS-?66-ZS-?66-HS-?66-ZS-?66-HS-?66-ZS-?66-HS-?66-ZS-?66-HS-?66-ZS-?EFFLUENT COOLING TOWER 5TK-00566-FV-?66-FV-?66-FV-?66-FV-?66-FV-?66-HS-?66-HS-?66-ZS-?66-HS-?66-ZS-?66-HS-?66-ZS-?66-HS-?66-ZS-?66-HS-?66-ZS-?EFFLUENT COOLING TOWER 6TK-00666-FV-?66-FV-?66-FV-?66-FV-?66-FV-?66-HS-?66-HS-?66-ZS-?66-HS-?66-ZS-?66-HS-?66-ZS-?66-HS-?66-ZS-?66-HS-?66-ZS-?08-I-002808-I-003008-I-002808-I-002808-I-002808-I-002808-I-002808-I-0028HOACSCS08-I-002808-I-002808-I-002808-I-002808-I-003008-I-0028FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:55 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELCOOLING TOWERSPIPING & INSTRUMENTATION DIAGRAMEFFLUENT COOLING TOWERS08-I-0029.08-I-0029.DWG
CV....PRV.....LE..LSHH?FCV....FROM COOLING TOWER...FROM COOLING TOWER...TO COOLING TOWERSCOOLING TOWER WASH SUMPTK-101.HS..ZS?REMOTE...OPENED...CLOSED...CLOSE...OPEN...WASH CHEMICAL TOTETK-102COOLING TOWER CHEMICAL PUMPP-102CSCOOLING TOWER WASH PUMPP-101.HS..ZS?REMOTE...OPENED...CLOSED...CLOSE...OPEN....HS101.HS102.HSH102HIGH LEVEL...08-I-002908-I-002908-I-0029LR/OSCHOAHOALR/OSCCSCSCSFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:55 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELCOOLING TOWERSPIPING & INSTRUMENTATION DIAGRAMEFFLUENT COOLING TOWERS WASH08-I-0030.08-I-0030.DWG
...HEADWORKS...SOLIDS THICKENING...DEWATERING SCREW PRESS...SIDESTREAM EQUALIZATION88PDIT120188PIT100188PIT1301FI1503FV1501FV1502PCV1401...3WVVVV88..88..88..88HS1101OUTLET PRESSUREWASH 188..WASH 288..88HS2601BIOFILTER NO. 1BIOFILTER NO. 288-HS-260288-HS-110288-PDIT-120288-F-1102BIOFILTER FAN NO. 2HOA08-I-002508-I-0003INLET PRESSUREDIFF. PRESSUREHOACSCSFAFAFAFA88-F-200188-F-200208-I-004408-I-003488-F-1101BIOFILTER FAN 1ASAS...PRIMARY CLARIFIERSFA08-I-0005...PRIMARY EFFLUENT SCREENSFA08-I-0010...SLUDGE BLENDING TANKFA08-I-0032...SIDESTREAM TREATMENTFA08-I-0026CDCD88AE260188AIT2601H2S88..H2SH2S88-AE-260288-AIT-2602FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:55 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELODOR CONTROLPIPING & INSTRUMENTATION DIAGRAMODOR CONTROL08-I-0031.08-I-0031.DWG
70LT1101...TO RDT NO. 270PI130170PSH130170-P-1201MIXING PUMP NO. 170TSH120170PE130170PI160170PSH160170PE160170--70LE100170LIT100170HS150170-TK-1001SLUDGE BENDING TANK. X .. @.70-P-1202MIXING PUMP NO. 270-PSH-130270-TSH-120270-PE-130270-PI-130270-PI-160270-PSH-160270-PE-160270--...FROM PRIMARY DIGESTERS...FROM PRIMARY SLUDGE PUMPS...FROM WAS PUMPS70TE140170TIT140170--...TO RDT NO. 170-HS-150270LSH100170--70----?70-TE-140270-TIT-140270--DS/OFPSWAS08-I-0035BSBSMBSMBSBSPRESSURETEMPERATURELEVELHIGH LEVELLEVEL70HS1201HOAHOA08-I-0020PRESSURE70--70-HS-120208-I-003408-I-0034...TO ODOR CONTROL08-I-003108-I-0006BSMMSMS70-P-1501BLENDED SLUDGE PUMP NO. 1ASAS70-P-1502BLENDED SLUDGE PUMP NO. 2FAFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:55 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELSOLIDS BLEND TANKPIPING & INSTRUMENTATION DIAGRAMSLUDGE BLENDING08-I-0032.08-I-0032.DWG
72-TK-1001POLYMER TOTE 1. X .. @.72LIT1101PCV120172PI1301...TO RDT PACKAGE NO. 1...TO RDT PACKAGE NO. 272PIT250172..72..72-TK-1002POLYMER TOTE 2. X .. @.72FSH260172..72YA2601LEVELPRESSUREPOSW3W3POLPOLPOL72-PIT-250272-?-?08-I-003408-I-0034RDT POLYMER BLEND UNIT 2RDT POLYMER BLEND UNIT 172-LCP-0272-LCP-01FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:55 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELBLENDED SLUDGEPIPING & INSTRUMENTATION DIAGRAMBLENDED SLUDGE POLYMER08-I-0033.08-I-0033.DWG
...TO PRIMARY EFFLUENT...FROM THICKENING POLYMER...FROM BLENDING SLUDGE...FROM BLENDED SLUDGE...FROM W3 DISTRIBUTION72LSH320172SV430172-P-4101RDT BOOSTER PUMP72-TK-3601RDT 172-TK-3201FLOCCULATION TANK 172-M-3301MIXER 172-P-3901TS PUMP 172FCV380172PE400172PI400172PSH400172TE390172TSH390172PI420172HS3601B72HS3601A72NSH360172SSL360172..72FIT3001...TO DIGESTER NO. 272FCV350172ZS350172HS350172-M-3302MIXER 272-TK-3202FLOCCULATION TANK 272-TK-3602RDT 272-P-4102RDT BOOSTER PUMP72..72..72CV3101THICKENING POLYMER...TO ODOR CONTROL08-I-0031...TO DIGESTER NO. 172LIT3701BSPOSBSPOS08-I-003308-I-0032W3FA08-I-003508-I-0035FACSCS72HS410172..72..72..72..CLOSEDOPENEDOPENCLOSEREMOTE72..AS72HS330172HS360172HS3901ASAS AS72..LEVELASASCLOSED72..OPENED72..OPEN72..CLOSE72..REMOTE72..72ZS380172HS3801FLOWOPEN CMDHIGH LEVELPUMP NO. 1...FROM BLENDED SLUDGE08-I-0032PUMP NO. 2TF08-I-0009DIVERSION BOX NO. 2TSPOLYMERINJECTIONRING72FE300108-I-0033TS72-P-3902TS PUMP 2FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/29/2016 1:57 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELBLENDED SLUDGEPIPING & INSTRUMENTATION DIAGRAMBLENDED SLUDGE THICKENING08-I-0034.08-I-0034.DWG
...OVERFLOW TO SLDUGE80LT1103...TO DIGESTER SLUDGE80--...FROM DIGESTER HEATING PUMPS80LE110180LIT1101 BLEND TANK80TE120180TIT120180--80-DT-1001PRIMARY DIGESTER NO. 180--...TO DIGESTER SLUDGE...TO DIGESTER MIXING PUMPS...FROM DIGESTER MIXING PUMPS...TO DIGESTER HEATING PUMPS82LT110382--82LIT110182-DT-1001PRIMARY DIGESTER NO. 282--82LE1101...FROM THICKENING...FROM THICKENING80LSH110280--...TO DIGESTER HEATING PUMPS...TO DIGESTER MIXING PUMPS...FROM DIGESTER HEATNG PUMPS82LSH110282--82TE120182TIT120180--...FROM DIGESTER MIXING PUMPSTRANSFER PUMPSTRANSFER PUMPS08-I-003408-I-003408-I-003608-I-003708-I-003608-I-003708-I-003708-I-003608-I-003608-I-0037TSDS/OFPSCDSRDSMDSRDSRDSRDSRDSMDSMDSDSLEVEL 1HIGH LEVELLEVEL 2LEVEL 1HIGH LEVELTEMPERATURELEVEL 208-I-003208-I-004108-I-0041...FROM PRIMARY SLUDGE SCUM PUMPS08-I-0006PSC82ZT110482ZT110482FCV1104POSITION80--POS CMD80--REMOTE80--80ZT110480ZT110480FCV1104POSITION80--POS CMD80--REMOTE80--80HS130180ZS130180..80..80..80..CLOSEDOPENEDOPENCLOSEREMOTE80..80-HS-130280-ZS-1302TEMPERATUREFV-1302FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:55 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELDIGESTER BUILDINGPIPING & INSTRUMENTATION DIAGRAMDIGESTERS 1 & 208-I-0035.08-I-0035.DWG
83PI110183PSH110183TSH100183PE110183-TSH-100283-P-1001DIGESTER MIXING PUMP NO. 1...FROM DIGESTER NO. 183-PI-110383-PSH-110383-TSH-100383-PE-1103...TO DIGESTER NO. 1...TO DIGESTER NO. 208-I-003508-I-0035...FROM DIGESTER NO. 208-I-003508-I-003583HS100183-PSH-110283-PE-110283-PI-110283-HS-100283-HS-1003DSMDSMDSMDSMHOAASAS83..83-P-1002DIGESTER MIXING PUMP NO. 283-P-1003DIGESTER MIXING PUMP NO. 3HIGH PRESSURE83-?-?83-?-?83FIT130183..FLOW83FE130183FE130283FIT1302FLOW83..FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:55 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELDIGESTER BUILDINGPIPING & INSTRUMENTATION DIAGRAMDIGESTER MIXING PUMPS08-I-0036.08-I-0036.DWG
83PI170183PSH170183PE170183HS160183-PI-170283-PSH-170283-PE-170283TE150183TIT150183-HS-160283-P-1601DIGESTER HEATING PUMP NO. 1...FROM DIGESTER NO. 1...TO DIGESTER NO. 183-PI-170383-PSH-170383-PE-1703...FROM DIGESTER NO. 2...FROM HOT WATER PUMP NO. 183-HX-2001HEAT EXCHANGER 1SHELL: . @.TUBE: . @.83--83TIT210183--...TO HOT WATER PUMP NO. 183TE210183-HX-2002HEAT EXCHANGER 2SHELL: . @.TUBE: . @....FROM HOT WATER PUMP NO. 283TIT210383--...TO HOT WATER PUMP NO. 283TE210383-HX-2003HEAT EXCHANGER 3SHELL: . @.TUBE: . @....FROM HOT WATER PUMP NO. 383TIT210583--...TO HOT WATER PUMP NO. 383TE2105...TO DIGESTER NO. 208-I-003808-I-003808-I-003808-I-003808-I-003808-I-003808-I-003508-I-003508-I-003508-I-0035DSRDSRDSRHWRHWRDSRHWRHWSHWSTEMPERATURETEMPERATURETEMPERATURETEMPERATURE83-P-1602DIGESTER HEATING PUMP NO. 283..HOA83-HS-160383-P-1603DIGESTER HEATING PUMP NO. 383-?-?83-?-?CSCSHIGH PRESSURE83TE150283TIT150283TE150383TIT1503TEMPERATURE83--TEMPERATURE83--HWS83TIT2102TEMPERATURE83--83TE210283TIT2104TEMPERATURE83--83TE2104FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:56 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELDIGESTORSPIPING & INSTRUMENTATION DIAGRAMDIGESTER HEATING PUMPS08-I-0037.08-I-0037.DWG
83PI270183-P-2601HOT WATER PUMP NO. 1...HOT WATER RETURN83HS260183TI280183TE280183TIT2801...TO HEAT EXCHANGER NO. 1...FROM HEAT EXCHANGER NO. 1TCV250183ZT250183HS250183..83.....HOT WATER SUPPLY83-PI-270383-P-2603HOT WATER PUMP NO. 383-HS-260383-TI-280383-TE-280383-TIT-280383-TCV-250383-ZT-250383-HS-250383-?-?83-P-2602HOT WATER PUMP NO. 283-ZT-250283-TCV-250283-HS-250283-HS-260283-PI-270283-TI-280283-TE-280283-TIT-280283-?-?...TO HEAT EXCHANGER NO. 2...FROM HEAT EXCHANGER NO. 2...TO HEAT EXCHANGER NO. 3...FROM HEAT EXCHANGER NO. 308-I-003708-I-003708-I-003708-I-003708-I-003708-I-003708-I-003908-I-0039HWSHWRTEMPERATUREPOS CMDPOSITION83..REMOTE83..CSCSHOAHWRHWSHWRHWSHWRHWSFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:56 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELDIGESTOR BUILDINGPIPING & INSTRUMENTATION DIAGRAMHOT WATER SYSTEM NO. 108-I-0038.08-I-0038.DWG
...HOT WATER SUPPLY...HOT WATER RETURN3/4"x2"2 1/2"x2"2 1/2"x2"2 1/2"x3/4"2"x3/4".HS103.ZT102.TE101A.TT101A.TE101B.TT101B....TIC101B.ZC101.TIC101A2"x3/4".x..x.1"x3/4"2"x2 1/2"SUPPLYRETURNCV1HMP-201CIRCULATION PUMPHMP-202PUMP08-I-003808-I-0038HWRW1HWSFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:56 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELHOT WATER SYSTEMPIPING & INSTRUMENTATION DIAGRAMHOT WATER SYSTEM NO. 208-I-0039.08-I-0039.DWG
80-TK-2000DIGESTER NO. 1. X .. @.80PIT210182-TK-2000DIGESTER NO. 2. X .. @.82PIT21011 1/2"x....TO BOILER NO. 13"x3"2"x6"...TO (E) SUMP80..80..82..08-I-003908-I-003982PSV200282PSV200280PSV200280PSV2002PRESSUREPRESSUREDG PDDG3"x10"PDNGNGNG4"x3"W3W382PIT2101DGPRESSURE80..FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:56 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELDIGESTORPIPING & INSTRUMENTATION DIAGRAMDIGESTER GAS HANDLING08-I-0040.08-I-0040.DWG
83PI310183PSH340183PIT3401...TO (E) SCREWPRESS NO. 183FIT350183ZT300183SV3301...DIGESTER NO. 1...DIGESTER NO. 2...TO NEW SCREW PRESS NO. 208-I-003508-I-003583-P-3201DIGESTED SLUDGE TRANSFER PUMP NO. 183ZT300183FCV300183--POSITION83HS3301HOA83FE3501POS CMD83--REMOTE83--FLOW83--83FIT350283FE3502FLOW83--08-I-004408-I-0045DIFFERENTIAL PRESSURE83--83AIT360183AE3601TSS83--83AIT360183AE3601TSS83--83ZT300283ZT300283FCV3002POSITION83--POS CMD83--REMOTE83--83-FISL-330283-PI-340283-PSH-340283-PIT-340283-HS-330283-P-3202DIGESTED SLUDGE TRANSFER PUMP NO. 283TSH3301FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:56 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELGENERALPIPING & INSTRUMENTATION DIAGRAM08-I-0041.08-I-0041B.DWG
.YN121A.YN121B.SC123...TO (E) SCREW PRESS NO. 1?-PTM-01POLYMER TOTE MIXER?-PT-01POLYMER TOTE. X .. @..YN121.YN123CALLSPEED COMMANDRUNREMOTEFAIL...TO SCREW PRESS NO. 2?-PT-01POLYMER TOTE. X .. @.08-I-004408-I-0045PROCESS WATERW3POSFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:56 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELDEWATERING BUILDINGPIPING & INSTRUMENTATION DIAGRAMDEWATERING POLYMER NO. 1 & 208-I-0042.08-I-0042.DWG
.YC14512..POLYMER READY.YN145A.YN145B.YN145C.YC147.YN147A.YN147B.YN147C.YC143.YN143A.YN143B.YN143C.SN143.SC143.YC149.YN149A.YN149B.YN149C.YY191.YY197.YY198.KY191.YAL197.YL191.YA195.HS149.VSH149DBK-405.HS147.VSH147.HS145.VSH145.LE141.LSL141A..FROM DEWATERING PUMP STATIONM..FROM POLYMER FEEDFI133A?-SV-05FI133B?-SV-06FI133C?-SV-07.YN141.LN141.YC133C.YC133B.YC133A14..TO POLYMER FEED PUMP19..SLUDGE FEED PS20..SLUDGE FEED PS.LSHL14110..SLUDGE FEED PS RUNNING.FS199.IS131.YC131.YN131.YN199DBY-302SCREW PRESS.LIT141DBN-203FLOC TANK & MIXER. X .. @....TO ODOR CONTROL08-I-003108-I-004208-I-0041POSDSW3...TO MANHOLE (I-025)08-I-0025FASCREW CONVEYORDBK-404SCREW CONVEYORSCREW CONVEYORDBK-403FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:56 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELDEWATERING BUILDINGPIPING & INSTRUMENTATION DIAGRAMDEWATERING SCREW PRESS NO. 108-I-0044.08-I-0044.DWG
86YC-....86YN-86YN-86YN-86YC-86YN-86YN-86YN-86YC-86YN-86YN-86YN-86SN-86SC-86YC-86YN-86YN-86YN-86YY-86YY-86YY-86KY-86YAL219786YL219786YA219786HS214986VSH214986-M-414986-M-414786HS214786VSH214786HS214586VSH214586LE214186LSL2141...FROM DEWATERING PUMP STATION...FROM POLYMER FEED NO. 1FI2133A86-SV-2005FI2133B86-SV-2006FI2133C86-SV-200786YN-86LN14186YC-86YC-86YC-............86LSHL-86LC-....86FS219986IS213186YC-86YN-86YN-DBN-XXXFLOC TANK & MIXER. X .. @.86-M-2141SCREW PRESS86LIT2141...TO ODOR CONTROL08-I-0031POSDSW308-I-004108-I-0042...TO MANHOLE (I-025)08-I-002586-M-4145SCREW CONVEYORSCREW CONVEYORSCREW CONVEYORFACLOSEDOPENEDOPENCLOSEREMOTEFAIL ALARMCRITICAL FAIL ALARM86-G-300186-G-300286-HS-300286-ZS-300286-G-300386-HS-300386-ZS-300386-G-300486-HS-300486-ZS-3004FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:56 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELGENERALPIPING & INSTRUMENTATION DIAGRAMDEWATERING SCREW PRESS NO. 2DD BA CHECKED BY08-I-0045.08-I-0045.DWG
.FE..FIT?...FLOWFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:56 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELRECLAIMED WATERPIPING & INSTRUMENTATION DIAGRAMRECLAIMED WATER PUMP STATION08-I-0046.08-I-0046.DWG
FE.FIT?..FLOWFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:56 PMWATER RESOURCE RECOVERYFACILITY PROJECTDM DUTCHER BM APFELGENERALPIPING & INSTRUMENTATION DIAGRAMTANK DRAIN PUMP STATION08-I-0047.08-I-0047.DWG
...FROM UV DISINFECTION08-I-0027EFFTO EQUALIZATIONBASINS(OUT OF SERVICE)FROM SODIUMHYPOCHLORITETANKS...TO WETLANDS DIVERSION08-I-0049...TO RECLAIMED WATER08-I-0046BOX 1STORAGE TANKNAOCL.FCV..FE..FIT?FLOW...FLOW...RWREFFEFF EFFFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:57 PMWATER RESOURCE RECOVERYFACILITY PROJECTPLANT EFFLUENTPIPING & INSTRUMENTATION DIAGRAMEFFLUENT DISTRIBUTION08-I-0048.08-I-0048.DWG
...FROM CHLORINE CONTACT08-I-0048EFFEFFLUENT CHANNEL...TO EFFLUENT COOLING08-I-0028EFFEFF...TO EFFLUENT COOLING08-I-0028...TO PLANT EFFLUENT08-I-0028EFFEFFEFFEFFEFFDIVERSION BOX 2BYPASSFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:57 PMWATER RESOURCE RECOVERYFACILITY PROJECTPLANT EFFLUENTPIPING & INSTRUMENTATION DIAGRAMWETLANDS DIVERSION08-I-0049.08-I-0049.DWG
...FROM EFFLUENT08-I-0049DIVERSION BOX 1...FROM EFFLUENT COOLING08-I-0049...TO OUTFALL-...TO OUTFALL-EFFEFFFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:57 PMWATER RESOURCE RECOVERYFACILITY PROJECTPLANT EFFLUENTPIPING & INSTRUMENTATION DIAGRAMOUTFALL08-I-0050.08-I-0050.DWG
HISTORIAN(TIER 2)ETHERNET SWITCHCORP YARDOPS BLDGMCC-A BLDGIDF-A(SCREEN WASH PRESS)PLC-D2(GRIT SEPARATOR)PLC-E(DEWATERING SCREW PRESS #1)PLC-BPLC-FMCC-FPLC-B PLC-GOITPLC-D1OITPLC-S2CAT-5PLC-AI/ORIOI/OI/OI/OETHERNETSWITCHOITI/OCNBENBTCPUI/OCNBI/OI/OI/OETHERNETSWITCHOITI/OENBTCPUETHERNETSWITCHOITI/OENBTCPUETHERNETSWITCHOITI/OENBTCPU(SLUDGE THICKENING)IDFFIBERS 1-96ETHERNET SWITCHIDFFIBERS 1-12CLIENTETHERNETSWITCHCPUI/OCPUI/OCPUI/OIDF-DFIBERS 13-24IDF-EFIBERS 85-96OITOITETHERNETSWITCHETHERNETSWITCHNORTHPATCHING HUBCONTINUED ONSHEET 08-I-1001ETHERNET SWITCHMCC-G COGENFIBERS 49-60 FIBERS 61-72 FIBERS 25-36IDFIDFIDFFIBERS 73-84IDFCLIENTFIBERS 37-48PSPSPSPSPSPSFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:57 PMWATER RESOURCE RECOVERYFACILITY PROJECTNORTH FACILITYNETWORK ARCHITECTURE DIAGRAMNORTH - EXISTINGDD BA CHECKED BY08-I-1002.08-I-1002.DWGDM DUTCHER BM APFEL
FIBER ETHERNET SWITCHADMIN BLDGIFIX WRFPLC-PMCC-RPLC-MNMCC-JETHERNETSWITCH(FILTERS)ETHERNETSWITCHETHERNETSWITCHI/ORIOI/OI/OI/OI/OBAPLC-JIDFFILTER 1 - SOUTH TOWER FILTER 2 - NORTH TOWERETHERNET SWITCHETHERNETSWITCHOITI/OENBTCPUPSETHERNETSWITCHOITI/OCNBENBTCPUI/OCNBI/OPSPSCONTINUED ONSHEET 08-I-1004IDFIDFIDFIDFFIBERS 37-48FIBERS 25-36FIBERS 1-12FIBERS 13-2455-MCC-01ETHERNETSWITCHEN2TRCPUVWARE HOSTI/OI/OEN2TREN2TREN2TRCPUEN2TRI/OI/O55PLC01A 55PLC01B55RIO01IDF(UV)(FILTER INFLUENT)66PLC01ETHERNETSWITCHOITI/OENBTCPUIDF(COOLING TOWERS)66MCC-01(RE-USE PS)PSPSPSPSSOUTHPATCHING HUBIMH-XRM2RM2M/SM/SVFDM/SM/SPM#1 #2#4#3MOTOR NETWORKETAPCONTINUED ONSHEET 08-I-1003IDFETHERNETSWITCHSCSVFD***(NOTE 2)FILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:57 PMWATER RESOURCE RECOVERYFACILITY PROJECTSOUTH FACILITYNETWORK ARCHITECTURE DIAGRAMSOUTH - NEWDD BA CHECKED BY08-I-1003.08-I-1003.DWGDM DUTCHER BM APFEL
HISTORIAN(TIER 2)ETHERNET SWITCHCORP YARDWATER RESOURCE CENTERPLC-FMCC-FPLC-BMCC-BETHERNETSWITCHOITI/OCNBENBTCPUI/OCNBI/OETHERNETSWITCHOITI/OENBTCPUFIBERS 73-84FIBERS 49-60IDFFIBERS 1-96ETHERNET SWITCHSCS/CLIENTNORTHPATCHING HUBCONTINUED ONSHEET 08-I-100340PLC01A40MCC01ETHERNETSWITCHEN2TRCPUI/OI/OEN2TREN2TREN2TRCPUEN2TR40PLC01BI/OI/O40RIO0140PLC02A*ETHERNETSWITCHEN2TRCPUI/OI/OEN2TREN2TREN2TRCPUEN2TR40PLC02B*I/OI/O40RIO02*MBR PLANT PLCMBR PACKAGE PLCCONTINUED ONSHEET 08-I-1005IDFIDF36PLC01ETHERNETSWITCHOITI/OENBTCPUIDF(CHEM BUILDING)CITY VMWAREHISTORIAN(TIER 2)IFIX WRFIFIX WEB WRF2VMWARE HOST 2PSPSPSM/SM/SVFDM/SM/SVFD#1 #2#4#3MOTOR NETWORKPSPSPSPSPSPS(PE SCREENS)PSRM2RM2RM2RM2OIT34PLC01(BLOWERS)CPUI/OOITETHERNETSWITCHPS34PLC02CPUI/OPS34PLC03CPUI/OPS34PLC04CPUI/OPS34PLC05CPUI/OPSOITETHERNETSWITCHOITETHERNETSWITCHOITETHERNETSWITCHOITETHERNETSWITCH27PLC01CPUI/OOITETHERNETSWITCHPS27PLC02CPUI/OPSOITETHERNETSWITCH40PLC03CPUI/OOITETHERNETSWITCHPS40PLC04CPUI/OPS40PLC05CPUI/OPSOITETHERNETSWITCHOITETHERNETSWITCH(MBR AIR SCOUR BLOWERS)M/SM/SVFDM/SM/SVFD#1 #2#4#3MOTOR NETWORKETAPETAPIDFIDFIDFNORTH PATCHINGHUBBCONTINUED ONSHEET 08-I-1003**********(NOTE 3)PMPMSCSSCS/CLIENTDM DUTCHER BM APFELNORTH FACILITYNETWORK ARCHITECTURE DIAGRAMNORTH - NEW08-I-1004.08-I-1004.DWGFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:57 PMWATER RESOURCE RECOVERYFACILITY PROJECT
83PLC-01PLC-S2(COGEN)ETHERNETSWITCHOITI/OENBTCPUETHERNETSWITCHOITI/OENBTCPUFIBERS 61-72FIBERS 25-36(SCREEN WASH PRESS)PLC-D2(GRIT SEPARATOR)PLC-E(DEWATERING SCREW PRESS #1)OITPLC-D1CAT-5ETHERNETSWITCHCPUI/OCPUI/OCPUPSI/OIDF-DFIBERS 13-24IDF-EFIBERS 85-96OITOITETHERNETSWITCHETHERNETSWITCH(DEWATERING SCREW PRESS #2)86PLC01OITCPUI/OETHERNETSWITCHCAT-5CONTINUED ONSHEET 08-I-1004IDFIDFEN2TREN2TREN2TREN2TRPSPS15PLC-01ETHERNETSWITCHOITI/OENBTCPUFIBERS 37-48IDFEN2TREN2TREN2TREN2TRPSIN VAULTIDFPSPSPSPSPS(MCC-A BLDG)M/SM/SVFDM/SM/SVFD#1 #2#4#3MOTOR NETWORK 'A'15MCC-A83MCC-01M/SM/SVFDM/SM/SVFD#1 #2#4#3MOTOR NETWORK 'A'MOTOR NETWORK 'B'(SLUDGE DEWATERING)ETAPMOTOR NETWORK 'B'ETAP(SIDESTREAM EQUALIZATION)64PLC01ETHERNETSWITCHOITFIBERS 1-12IDFCPUI/OPS**PMPMDM DUTCHER BM APFELNORTH FACILITYNETWORK ARCHITECTURE DIAGRAMNORTH - NEW08-I-1005.08-I-1005.DWGFILENAME: PLOT DATE: PLOT TIME:CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.DSGN DRREVISIONCHKAPVDBYAPVDSHEETDWGACH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIGN REPORTAUGUST 2016APPVD BY7/28/2016 2:57 PMWATER RESOURCE RECOVERYFACILITY PROJECT
W.L.125.34-14-144-14-14127.6W.L.4-14-14W.L.4-14-14W.L.4-14-14W.L.4-14-14W.L.SSSSCOCOCOCOCOCOSCOSSSCOCOSSCOCOCOCOCOCOCOCOSCOCOSCOCOSSCOCOSCOCOCOCOCOCOCOSCOSCOCOCOCOCOCOCOSSCOCOSSCOSCOCOCOSCOCOCOCOCOCOSSSCOSCOCOCOSSCOSSSCOSSSSCOSSCOCOSSCOSCOVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVVLVSVLVVLVVLVCOSSVLVVLVWWCOCOSSSSCOSSCOWMWMWMARVDIDIDIDIDIDIDIDIDIDIDIDIDIDICOMMTRANSFORMER130.6130.7131.0131.0129.70SSMH131.91SSMH30" INF WWCONNECTED TO48" INF WW30" INF WW30" INF WW30" WW/PE (BYPASS)48" INF WW48" INF WWCOCOSCOSSSSCOCOVLVDIFILENAME:PLOT DATE:PLOT TIME:7/28/20165:46:27 PMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY No. E21673Exp. 09-30-16R EG IS
T
ERED
P ROFESSIONA ELNGINEERRYANS
T
EP ENH BERTTCELERI
CALSTATE OF CALI
FOR
NI
AAHR
09-E-2001XXELECTRICAL
CHECKED BY
SITE ELECTRICAL
SITE PLAN
O VERALL
JN HJELM BERGTA TOM09-E-2001_668876.dgn060120180Scale In FeetN544242356264707282848380444022203688158610143060432726252073GENERATORFACILITY LEGEND10121415202230353640424446505254556062647072808283848688252627FINAL CLARIFIERSMEMBRANE BUILDINGCHEMICAL STORAGE FACILITYBIOREACTOR BASINSBIOREACTOR MODIFICATIONSPRIMARY EFFLUENT SCREENINGBOX 2 (PED B2)PRIMARY EFFLUENT DIVERSIONBOX 1 (PED B1)PRIMARY EFFLUENT DIVERSIONPRIMARY SLUDGE PUMP STATIONPRIMARY CLARIFIERSHEADWORKSEQUALIZATION PONDPROCESS LABWATER RESOURCE CENTER73ODOR CONTROLDEWATERINGCOGENERATIONDIGESTER BUILDINGDIGESTER NO. 2DIGESTER NO. 1SOLIDS AREA ELECTRICAL BUILDINGTHICKENINGSOLIDS BLEND TANKSIDESTREAM TREATMENTSIDESTREAM EQUALIZATIONRECYCLED WATER TANKCHLORINE CONTACT BASINSUVCOOLING TOWERSEQUALIZATION BASINSFILTERSELECTRICAL BUILDINGGEN-MSGTRANSFORMERNEW SERVICENOTE 1ELECTRICAL OVERALL SITE PLANCIRCUITS AS NECESSARY.DUCTBANK WILL BE CONSTRUCTED TO REROUTE ALL EXISTING DUCTBANK WILL BE DEMOLISHED. A NEW 1.NOTES:73-E-1101SEE DWG SITE PLAN WATER REUSE PARTIALRECEIVINGFUTURE FOGPUMP STATIONTRANFERDIGESTED SLUDGEPUMP STATIONFILTRATEDEWATERING
FILENAME:PLOT DATE:PLOT TIME:2016\07\22 2:01:19 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
10-A-1100
XXCHECKED BY10-A-1100_668876.dgn WATER RESOURCE CENTERFIRST FLOOR PLANARCHITECTURAL MWAMWAFIRST FLOOR PLAN
3/32"=1'-0"
FILENAME:PLOT DATE:PLOT TIME:2016\07\22 3:15:21 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
10-A-1200
XXCHECKED BY10-A-1201_668876.dgn WATER RESOURCE CENTERSECOND FLOOR PLANARCHITECTURAL MWAMWASECOND FLOOR PLAN
3/32"=1'-0"
FILENAME:PLOT DATE:PLOT TIME:2016\07\22 3:32:33 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
10-A-1300
XXCHECKED BY10-A-1300_668876.dgn WATER RESOURCE CENTERROOF PLANARCHITECTURAL MWAMWAROOF PLAN
3/32"=1'-0"
FILENAME:PLOT DATE:PLOT TIME:2016\07\22 3:58:36 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
10-A-2001
XXCHECKED BY10-A-2001_668876.dgn WATER RESOURCE CENTERELEVATIONSARCHITECTURAL MWAMWAELEVATIONS
3/32"=1'-0"
FILENAME:PLOT DATE:PLOT TIME:2016\07\22 4:08:38 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
10-A-2002
XXCHECKED BY10-A-2002_668876.dgn WATER RESOURCE CENTERELEVATIONSARCHITECTURAL MWAMWAELEVATIONS
3/32"=1'-0"
FILENAME:PLOT DATE:PLOT TIME:7/28/20165:46:22 PMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY No. M32099Exp. 09-30-16R EG IS
T
ERED
P ROFESSIONA ELNGINEERBTI
MOT
HY LEE AUERAHCEMNI
CALSTATE OF CALI
FOR
NI
A
15-D-0001KL M CCO YJM CHANG15-D-0001_668876.dgn PLAN
M ECHANICALPLAN1/4"=1'-0"N12'-6"7'-6"4'-0"6'-8"METERFLOW30" NEWMETERFLOWNEW 30"METERFLOW16" NEWMETERFLOW16" NEW4'-0"6'-8"7'-6"12'-6"HEADW ORKS - EXISTING
FILENAME:PLOT DATE:PLOT TIME:7/28/20165:48:31 PMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY No. M32099Exp. 09-30-16R EG IS
T
ERED
P ROFESSIONA ELNGINEERBTI
MOT
HY LEE AUERAHCEMNI
CALSTATE OF CALI
FOR
NI
A
26-D-2001KL M CCO YJM CHANG26-D-2001_668876.dgn
M ECHANICAL
PLAN AND SECTIO N AAASECTION3/8"=1'-0"PLAN3/8"=1'-0"SUMP36" WSREDUCER24" X 36"2'-0"SUMP36" WW24" WWPUMP 2EQUALIZATION30" WW36" WW30" WW30" WW24" WWPUMP 2EQUALIZATIONPUMP 1EQUALIZATIONRECIRCULATIO N PUM P STATIO N - EXISTING
1'-2"FILENAME:PLOT DATE:PLOT TIME:7/28/20163:17:56 PMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY Exp.USTED
NEIESTATE OF CLF
ORNI
A12-31-2017REG
IER P
ROFSSEOIAL NGNERLLALWA CHML
ANHAI
URCTAI No. S5625EITAN
ACERALTS
28-S-2001XXSTRUCTURAL
NM W ALLACEKM BURTON
PRIM ARY EFFLUENT SCREENS
FO UNDATIO N PLAN
LA SCOGGINS28-S-2001_668876.dgnFOUNDATION PLAN3/8"=1'-0"NA28-S-3001A28-S-3001B28-S-3001B28-S-3001C28-S-3001C28-S-30012'-0"4'-0"1'-0"15'-0"1'-0"50'-0"1'-6"TYP1'-0" FTGTYP
1'-6"TYP2'-0"TYP
6'-0"
TYP
3'-0"
1'-0"3'-6"1'-0"4'-0"1'-0"2'-0"6'-0"9'-5"2'-0"25'-7"1'-2"1'-0"15'-0"
12'-8"2'-8"
18'-0"
TYP
3'-0"EXPANSIONFUTUREEL 123.50EL 123.50EL 123.50EL 123.50EL 123.50EL 124.00EL 124.00EL 124.00LOCATIONSTYP OF 4EL 128.50,T.O. WALLEL 123.50EL 123.506"6'-0"6"6"6'-0"6"1'-0"
FILENAME:PLOT DATE:PLOT TIME:7/28/20163:17:58 PMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY Exp.USTED
NEIESTATE OF CLF
ORNI
A12-31-2017REG
IER P
ROFSSEOIAL NGNERLLALWA CHML
ANHAI
URCTAI No. S5625EITAN
ACERALTS
28-S-2002XXSTRUCTURAL
NM W ALLACEKM BURTON
PRIM ARY EFFLUENT SCREENS
LA SCOGGINS28-S-2002_668876.dgn3/8"=1'-0"NA28-S-3001A28-S-3001B28-S-3001B28-S-3001C28-S-3001C28-S-3001TO P PLANTOP PLANAL 2-RAIL RAILING, TYP7'-2"3'-0"GRADE6" SLAB ONAL STAIRS14'-0"32'-0"EL 135.50, TYPT.O. CONCEL 135.50, TYPT.O. CHKD PLAL CHKD PLON GRADE1'-0" SLABEL 133.00T.O. CONCCONC EQPT PAD, TYP
FILENAME:PLOT DATE:PLOT TIME:7/28/20163:18:03 PMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY Exp.USTED
NEIESTATE OF CLF
ORNI
A12-31-2017REG
IER P
ROFSSEOIAL NGNERLLALWA CHML
ANHAI
URCTAI No. S5625EITAN
ACERALTS
28-S-3001XXSTRUCTURAL
NM W ALLACEKM BURTON
PRIM ARY EFFLUENT SCREENS
SECTIO NS
LA SCOGGINS28-S-3001_668876.dgnASECTION3/8"=1'-0"28-S-2001BSECTION3/8"=1'-0"28-S-2001CSECTION3/8"=1'-0"28-S-200128-S-200228-S-200228-S-2002EL 135.50EL 130.50EL 123.503'-0"1'-0"
1'-6"EL 124.00EL 128.50EL 128.50EL 123.501'-0"EL 135.50EL 123.501'-0"EL 135.50EL 133.00
FILENAME:PLOT DATE:PLOT TIME:2016\07\28 5:27:51 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. M32099
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERBTIMOTHY LEE AU
E
RAHCEM N IC ALSTA
TE O F CA LIFO RNIA
28-D-2001MECHANICALKL MCCOY28-D-2001_668876.dgn
TR GREELEYN
PLAN
1/4"=1’-0"
A
A
B
C
A
SECTION
1/4"=1’-0"
B
SECTION
1/4"=1’-0"
C
SECTION
1/4"=1’-0"
1
DETAIL
NTS
24" BI
24" BI
SCREEN 1
BAND
DUMPSTER
SCREEN 2
BAND
SCREEN 1
BAND
SLUICE
SLUICE
24" BI
DUMPSTER
SCREEN 2
BAND
COMPACTOR
SLUICE
24" BI24" BI
TYP OF 4
6’-0" WIDE,
WEIR GATES,
TYP OF 4
4’-0" TALL,
3’-0" WIDE X
SLUICE GATE,
TYP OF 4
6’-0" WIDE,
WEIR GATES,
WIDE X 4’-0" TALL
SLUICE GATE, 3’-0"
42" PE
WIDE X 4’-0" TALL
SLUICE GATE, 3’-0"
DUMPSTER
PRIMARY EFFLUENT SCREENSPLAN, SECTIONS AND DETAIL 6" RAS
SCREEN 2
BAND
COMPACTOR 2
COMPACTOR 1
BIOREACTOR
FOR FUTURE
CONNECTION
GRADE
SLAB ON
COMPACTOR
6" RAS
24" BI
24" BI
35'-0"38'-0"19'-0"FILENAME:PLOT DATE:PLOT TIME:7/28/20163:14:33 PMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARYABCDEFG123 Exp.USTED
NEIESTATE OF CLF
ORNI
A12-31-2017REG
IER P
ROFSSEOIAL NGNERLLALWA CHML
ANHAI
URCTAI No. S5625EITAN
ACERALTS
30-S-2001XXSTRUCTURAL
NM W ALLACEKM BURTON
PLAN
LA SCOGGINS30-S-2001_668876.dgnTOP PLAN3/32"=1'-0"N10'-4"1'-2"8'-0"1'-2"15'-6"1'-2"6'-0" 6'-0"1'-2"1'-2"
8'-0"
TYP
O PNG,EL 130.45, TYPT.O. WALLEL 122.45, TYPOPNG INVERTEL 132.45T.O. WALLSLAB EL 114.45T.O. CONCGRATING1 1/2" AL37'-0"18'-0"TYP1'-0" WALL28'-6"36'-6"13'-8"TYP6'-8"TYPPLATFORM,SUPPORTMIXERBIO REACTO R 1 & 2 M ODIFICATIO NS - EXISTING GRATING, TYP OF 2BELOW EXISTING HEIGHT TO 1" CONC WALL, FULL7'-4"17'-4"TYP
1'-0"
FILENAME:PLOT DATE:PLOT TIME:2016\07\28 6:47:17 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. M32099
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERBTIMOTHY LEE AU
E
RAHCEM N IC ALSTA
TE O F CA LIFO RNIA
30-D-2001KL MCCOY TR GREELEY30-D-2001_668876.dgn
LOWER LEVEL PLAN
1:10
UPPER LEVEL PLAN
1:10
N
N
1
2
3
A B C D E F G
1
2
3
A B C D E F G
WEIR GATE
MOTORIZED
STATION
WAS PUMP
AEROBIC 3 AEROBIC 2 AEROBIC 1 SWING ANOXIC 2 ANOXIC 1
TOP ENTRY MIXERS
2HP VERTICAL
TOP ENTRY MIXERS
4HP VERTICAL
TOP ENTRY MIXERS
4HP VERTICAL
24" ML
24" ML
4" WAS
STATION
WAS PUMP
18’-6"37’-0"37’-0"19’-0"38’-0"34’-6"6’-0"6’-0"8’-0"
EL 112.00
TYP
BAFFLE WALL,BA ENGLESONA A
A A
B
30-D-3001
C
30-D-3001
C
30-D-3001
D
30-D-3001
E
30-D-3001
B
30-D-3001
D
30-D-3001
E
30-D-3001
TYP
VERTICAL MIXER,
PLATFORM FOR
PLANS48" ML
DROP BOX
MIXED LIQUOR
TYP OF 2
PUMP,
LIQUOR
MIXED
20" ALP
GATE, TYP
V690 FLAP
MECHANICAL36" RAS36" RAS
TYP OF 4
VALVE OPERATOR,BIOREACTOR 1 & 2 MODIFICATIONS - EXISTING24" BI
24" BI
FILENAME:PLOT DATE:PLOT TIME:2016\07\28 6:50:53 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. M32099
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERBTIMOTHY LEE AU
E
RAHCEM N IC ALSTA
TE O F CA LIFO RNIA
30-D-3001KL MCCOY TR GREELEY30-D-3001_668876.dgn
BA ENGLESONSECTIONSA
SECTION
3/16"=1’-0"
30-D-2001
B
SECTION
3/16"=1’-0"
30-D-2001
C
SECTION
3/16"=1’-0"
30-D-2001
D
SECTION
3/16"=1’-0"
30-D-2001
E
SECTION
3/16"=1’-0"
30-D-2001
RECYCLE PUMP
MIXED LIQUOR 24" MLR FLAP GATE
48" ML
WAS PUMP 1
WAS PUMP 2
24" MLR
24" MLR
RECYCLE PUMP 1
MIXED LIQUOR
RECYCLE PUMP 2
MIXED LIQUOR
24" MLR 24" MLR
20" ALP
MIXER, TYP
36" RAS
36" RAS
20" ALP
MECHANICAL36" RAS 36" RAS
36" RAS
20" ALP
20" ALP
BIOREACTOR 1 & 2 MODIFICATIONS - EXISTING24" BI
FILENAME:PLOT DATE:PLOT TIME:7/18/201611:43:19 AMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY Exp.USTED
NEIESTATE OF CLF
ORNI
A12-31-2017REG
IER P
ROFSSEOIAL NGNERLLALWA CHML
ANHAI
URCTAI No. S5625EITAN
ACERALTS
35-S-2001XXSTRUCTURAL
NM W ALLACEKM BURTON
BIOREACTOR 3 & 4
FO UNDATIO N PLAN
LA SCOGGINS35-S-2001_668876.dgnFOUNDATION PLAN3/16"=1'-0"N A35-S-3001A35-S-3001B35-S-3001B35-S-3001TYP
4'-0"TYP4'-0"TYP1'-0"39'-0"39'-6"WALL, TYP1'-0" INTERIOR100'-0"WALL, TYP1'-6" EXTERIOREXTENSION, TYP1'-0" SLAB23'-10"16'-10"16'-10"1'-2"1'-2"1'-6"5'-6"1'-0"87'-0"39'-0"19'-0"EXPANSIONFUTURE21'-4"21'-4"21'-6"
FILENAME:PLOT DATE:PLOT TIME:7/18/201611:43:21 AMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY Exp.USTED
NEIESTATE OF CLF
ORNI
A12-31-2017REG
IER P
ROFSSEOIAL NGNERLLALWA CHML
ANHAI
URCTAI No. S5625EITAN
ACERALTS
35-S-2002XXSTRUCTURAL
NM W ALLACEKM BURTON
BIOREACTOR 3 & 4
LA SCOGGINS35-S-2002_668876.dgn3/16"=1'-0"N A35-S-3001A35-S-3001B35-S-3001B35-S-3001TO P PLAN 29'-6"39'-0"17'-3"TYP6'-6"EL 124.45, TYPOPNG INVERTEL 130.45, TYPT.O. WALLTYP
1'-4"
TYP
4'-0"TOP PLANTYP
1'-0"
OPNG , TYP
6'-0"PLATFORM, TYPMIXER SUPPORTRAILING, TYPAL 2-RAIL3'-0"EL 131.75T.O. LANDINGAL STAIRSEL 135.50, TYPT.O. WALKWAYAL GRATING
FILENAME:PLOT DATE:PLOT TIME:7/18/201611:43:22 AMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY Exp.USTED
NEIESTATE OF CLF
ORNI
A12-31-2017REG
IER P
ROFSSEOIAL NGNERLLALWA CHML
ANHAI
URCTAI No. S5625EITAN
ACERALTS
35-S-3001XXSTRUCTURAL
NM W ALLACEKM BURTON
BIOREACTOR 3 & 4
SECTIO NS
LA SCOGGINS35-S-3001_668876.dgnASECTION3/6"=1'-0"35-S-2001BSECTION3/6"=1'-0"35-S-200135-S-200235-S-20028"1'-8"EL 135.50EL 114.45RAILING, TYPAL 2-RAIL1'-8"EL 114.45EL 135.50RAILING, TYPAL 2-RAIL
FILENAME:PLOT DATE:PLOT TIME:7/28/20165:51:36 PMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY No. M32099Exp. 09-30-16R EG IS
T
ERED
P ROFESSIONA ELNGINEERBTI
MOT
HY LEE AUERAHCEMNI
CALSTATE OF CALI
FOR
NI
A
35-D-2001KL M CCO Y
TR GREELEY35-D-2001_668876.dgn BA ENG LESO N
BIOREACTOR 3 & 4
O VERALL PLANOVERALL PLAN1/8"=1'-0"NBIOREACTOR 4BIOREACTOR 336" RAS36" RASMIXER 4-1ANOXICMIXER 4-2ANOXICMIXER 4-3SWING24" BI4" WAS48" ML24" BIANOXIC 1ANOXIC 2ZONESWINGMIXER 3-2ANOXICMIXER 3-3SWINGAEROBIC 3AEROBIC 2AEROBIC 18" ALP8" ALP8" ALPGATE, TYP OF 224" MANUAL WEIRBIOREACTORFUTUREA35-D-3001A35-D-3001B35-D-3001B35-D-3001C35-D-3001D35-D-3001D35-D-3001MIXER 3-1ANOXICMLR PUMPMLR PUMPWEIR GATE10" ALPM ECHANICAL STATIONWAS PUMPPUMP 3WASPUMP 4WAS20" ALPTYPFLOW METER,20" ALP8" ALPVALVE, TYPBUTTERFLY20" ALP10" ALP10" ALP20" ALP10" ALP
FILENAME:PLOT DATE:PLOT TIME:7/28/20165:51:45 PMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY No. M32099Exp. 09-30-16R EG IS
T
ERED
P ROFESSIONA ELNGINEERBTI
MOT
HY LEE AUERAHCEMNI
CALSTATE OF CALI
FOR
NI
A
35-D-3001KL M CCO Y
TR GREELEY35-D-3001_668876.dgn BA ENG LESO N
BIOREACTOR 3 & 4
SECTIO NS ASECTION3/16"=1'-0"35-D-2001BSECTION3/16"=1'-0"35-D-2001CSECTION3/16"=1'-0"35-D-2001DSECTION3/16"=1'-0"35-D-2001WAS PUMP 4WAS PUMP 3STATIONPUMPWASGATEWEIRMIXER 4-3SWINGWEIR GATE24" MANUAL48" ML20" ALP8" ALP10" ALP10" ALP20" ALPWEIR GATE24" MLR24" BIMIXER 4-1ANOXICMIXER 4-2ANOXIC24" BI24" BI24" BIMIXER 4-1ANOXICMLR PUMPMLR PUMPMIXER 3-1ANOXIC24" MLR24" MLR4" WASM ECHANICAL 20" ALP10" ALP8" ALP10" X 8" TEE20" ALP8" ALP20" ALP36" RAS
TYP
4'-0"FILENAME:PLOT DATE:PLOT TIME:7/18/201611:44:13 AMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY231231AB213AB213AB LIC
E
NSED ARCHITECTSTATE OF CALI
F
ORNI
A REN. 10-31-17NETSRIK .B YER
FFOEG
C-33068
36-A-1101XXG B KIRSTENSJ PAYNE
CHEM ICAL STO RAGE FACILITY
PLANS, ELEVATIO NS, AND SECTIO N
ARCHITECTURAL
36-A-1101_668876.dgnFLOOR PLAN1/8"=1'-0"ROOF PLAN1/8"=1'-0"1NORTH ELEVATION1/8"=1'-0"2EAST ELEVATION1/8"=1'-0"3SOUTH ELEVATION1/8"=1'-0"4WEST ELEVATION1/8"=1'-0"ASECTION1/4"=1'-0"1234AANUPUPNABUP212T.O. STEEL EL 152.33TOC EL 136.30FF EL 133.00
24'-0"
22'-0" 19'-0" 19'-0" 40'-0"TYP1'-0"TYP1'-0"TYP
1'-0"
TYP
1'-0"UPTYP4'-0"
30'-0" 46'-0"SD BARD SUMP, TYP OF 2BAGUTTER & DOWNSPOUTPREFABRICATED AND STAIRSCONCRETE LANDINGAND STAIR (EXTERIOR)CONCRETE LANDINGFRP STAIR (INTERIOR)GUARDRAIL, TYPALUMINUMDOWNSPOUT, TYPGUTTER & PREFABRICATED PAD, TYPCONCRETE EQPTPROCESS DWGSCHEMICAL TANK, SEECONTROL WALLCONCRETE FLOOD 2 : 12 ROOF SLOPESHEATHING OVER METAL DECKINGSYSTEM OVER GYPSUMSHEET METAL ROOFING
FILENAME:PLOT DATE:PLOT TIME:7/28/20165:51:59 PMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY No. M32099Exp. 09-30-16R EG IS
T
ERED
P ROFESSIONA ELNGINEERBTI
MOT
HY LEE AUERAHCEMNI
CALSTATE OF CALI
FOR
NI
A1DETAILNTSASECTION1/4"=1'-0"BSECTION1/4"=1'-0"CHEMICAL STORAGE PLAN1/4"=1'-0"NTRUCK UNLOADING
36-D-2001M ECHANICAL
KL M CCO Y36-D-2001_668876.dgn PLAN, SECTIO NS AND DETAIL
BA EAG LESON AABB3WSHOWERSAFETY3WTYPICALSHOWER,SAFETY3W3WCHAMBERTO GRIT CHAMBER TO GRITUNIT 1BLENDPOLYMER UNIT 2BLENDPOLYMER UNIT 3BLENDPOLYMER TYPICALSHOWER,SAFETYTANKSTORAGESOURCECARBON PUMP 2METERING SOURCECARBON PUMP 1METERING SOURCECARBON TANKSTORAGESOURCECARBON FILL TO TANKCARBON SOURCEMETERING PUMPSCARBON SOURCEBOX 2DIVERSIONEFFLUENT TO PRIMARYBOX 2DIVERSIONEFFLUENT TO PRIMARYBOX 2DIVERSIONEFFLUENT TO PRIMARYBOX 2DIVERSIONEFFLUENT TO PRIMARYCHAMBER TO GRITUNIT 1BLENDPOLYMER UNIT 2BLENDPOLYMER UNIT 3BLENDPOLYMER UNIT 3BLENDPOLYMER UNIT 2BLENDPOLYMER SHOWERSAFETYCHEM ICAL STO RAGE FACILITY
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 12:30:11 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. M32099
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERBTIMOTHY LEE AU
E
RAHCEM N IC ALSTA
TE O F CA LIFO RNIA
64-D-2001MECHANICALKL MCCOY64-D-2001_668876.dgn
TR GREELEYSIDESTREAM TREATMENTPLAN
1/4"=1’-0"
N
(IF REQUIRED)
PRE-TREATMENT
FILTRATE
20’ SWD)
(10’x16’,
EQUALIZATION
SIDESTREAM
20’ SWD)
(16’ X 16’
REACTOR
SIDESTREAM
SYSTEM
RETENTION
BIOMASS
BLOWER 1 BLOWER 2
STAIRS UP
NOTES:
1.
VENDOR.
COORDINATED WITH SIDESTREAM PACKAGE
ACTUAL LAYOUT AND EQUIPMENT TO BE
FEED PUMPS
SIDESTREAM
1
ISOMETRIC DETAIL
NTS
PUMP STATION
WET WELL /
EFFLUENT
SIDESTREAM
PLAN AND DETAIL
FILENAME:PLOT DATE:PLOT TIME:7/28/20165:54:00 PMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY No. M32099Exp. 09-30-16R EG IS
T
ERED
P ROFESSIONA ELNGINEERBTI
MOT
HY LEE AUERAHCEMNI
CALSTATE OF CALI
FOR
NI
A
70-D-2001M ECHANICAL
KL M CCO Y70-D-2001_668876.dgn
JL JIANGPLAN1/4"=1'-0"NASECTION1/4"=1'-0"BSECTION1/4"=1'-0"PUMP 1SLUDGEBLENDEDPUMP 2SLUDGEBLENDEDAPUMP 2SLUDGEBLENDEDPUMP 1SLUDGEBLENDED10" BSM4" BS4" BS8" BSM8" BSMBBPLAN AND SECTIO NS BLENDING TANKEXISTING SLUDGEBLENDING TANKEXISTING SLUDGE8" MSASSEMBLY, TYPMIX NOZZLEASSEMBLY, TYPMIX NOZZLETO THICKENINGMIXING PUMP 1MIXING PUMP 28" MSMIXING PUMP 18" BSM8" BS6" DS / OFFROM DIGESTERS6" DS / OF(BYPASS)4" MS8" BSM8" BS4" MS (BYPASS)10" BSM10" BSM(BYPASS)4" MS10" BSMSLUDG E BLEND TANK - EXISTING
FILENAME:PLOT DATE:PLOT TIME:7/18/201611:44:18 AMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARYCBA1234CBA12344321CBA4321CBA LIC
E
NSED ARCHITECTSTATE OF CALI
F
ORNI
A REN. 10-31-17NETSRIK .B YER
FFOEG
C-33068
72-A-1101XXG B KIRSTENSJ PAYNE
THICKENING
PLANS, ELEVATIO NS, AND SECTIO N
ARCHITECTURAL
72-A-1101_668876.dgnFLOOR PLAN1/8"=1'-0"ROOF PLAN1/8"=1'-0"1NORTH ELEVATION1/8"=1'-0"2EAST ELEVATION1/8"=1'-0"3SOUTH ELEVATION1/8"=1'-0"4WEST ELEVATION1/8"=1'-0"ASECTION1/4"=1'-0"1234UPUP157'-0"34'-0"NN 1'-0"21'-6"21'-6"13'-0"UPUPUPUPAA43249'-0"38'-0"TYP3'-0"TYP
3'-0"MONORAIL BEAM122T.O. STEEL EL 149.33FF EL 138.70FF EL 130.20TOC EL 134.20SD BARDDECKINGSHEATHING ON METALSYSTEM OVER GYPSUMSHEET METAL ROOFING2 : 12 SLOPEEL 152.70T.O. STEEL CONTROL WALLCONCRETE FLOODDOWNSPOUTSGUTTER ANDPREFABRICATED1'-0"16'-0"16'-0"1'-0"ALUMINUM GUARDRAIL, TYPCONCRETE EQPT PAD, TYP
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 12:35:50 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. M32099
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERBTIMOTHY LEE AU
E
RAHCEM N IC ALSTA
TE O F CA LIFO RNIA
72-D-2001MECHANICALKL MCCOY72-D-2001_668876.dgn
PLAN, SECTIONS AND DETAIL THICKENINGJL JIANGLOWER LEVEL PLAN
1/4"=1’-0"
B
SECTION
1/4"=1’-0"
1
ISOMETRIC DETAIL
NTS
N
B
A
A
SECTION
1/4"=1’-0"
POLYMER TOTES
POLYMER TOTES
THICKENER 2
ROTARY DRUM
6" THS
BLEND UNIT 2
RDT POLYMER
BLEND UNIT 1
RDT POLYMER
6" FILT4" BS4" BS
4" BS
BLEND UNIT 1
RDT POLYMER
BLEND UNIT 2
RDT POLYMER
PUMP 1 (BELOW)
SLUDGE
THICKENED
PUMP 2 (BELOW)
SLUDGE
THICKENED
6" FILT
THICKENER 2
ROTARY DRUM
THICKENER 1
ROTARY DRUM
FLEX, (TYP 2)
6" THSTHICKENER 1
ROTARY DRUM
6" FILT
6" FILT
4" BS
THICKENER 2
ROTARY DRUM
PUMP 1
SLUDGE
THICKENED
DAMPER
TEST PORT 8" FA
8" FA
12" FA
8" FA
12" FA
8" FA
FILENAME:PLOT DATE:PLOT TIME:7/21/201610:24:52 AMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY LIC
E
NSED ARCHITECTSTATE OF CALI
F
ORNI
A REN. 10-31-17NETSRIK .B YER
FFOEG
C-33068
73-A-1101XXG B KIRSTENSJ PAYNE
PLANS, ELEVATIO NS, AND SECTIO N
ARCHITECTURAL
73-A-1101_668876.dgnFLOOR PLAN1/4"=1'-0"ROOF PLAN1/8"=1'-0"ASECTION1/4"=1'-0"3SOUTH ELEVATION1/8"=1'-0"4WEST ELEVATION1/8"=1'-0"2EAST ELEVATION1/8"=1'-0"11/8"=1'-0"NORTH ELEVATION134A2ADNN
N
RDODFF EL 134.20T.O. CMU EL 150.20ELECTRICAL ROOM73101ELECTRICAL ROOM73101GRADE EL 130.30SOLIDS AREA ELECTRICAL BUILDING AND STAIRLANDINGCONCRETECRICKET, TYPPREFINISHED METAL COPING1/4" / FT SLOPE, TYPCMU WALLCONCRETE WALLHM DOOR AND FRAMEGUARDRAILALUMINUM ON METAL DECKINGOVER R-20 RIGID INSULATIONTPO MEMBRANE ROOFINGSD BARD F. EXT-2ATYPT.O. METAL DECKING EL 146.20 30'-0" 14'-0"M O6'-8" 3'-4"
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 12:36:23 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
73-E-1101
XXELECTRICALCHECKED BY JN HJELMBERGTA TOM73-E-1101_668876.dgn
MCC-G2
MCC-G1
PLC NIP
PLAN
1/2"=1'-0"
N
SOLIDS AREA ELECTRICAL BUILDINGPLANXFMR
PNL
PNL
15'-0"15'-0"15'-0"15'-0"15'-0"15'-0"FILENAME:PLOT DATE:PLOT TIME:7/18/201611:44:40 AMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY Exp.USTED
NEIESTATE OF CLF
ORNI
A12-31-2017REG
IER P
ROFSSEOIAL NGNERLLALWA CHML
ANHAI
URCTAI No. S5625EITAN
ACERALTS
82-S-2001XXSTRUCTURAL
NM W ALLACEKM BURTON
DIG ESTER NO . 2
FO UNDATIO N PLAN
LA SCOGGINS82-S-2001_668876.dgnFOUNDATION PLAN1/4"=1'-0"NA82-S-3001A82-S-3001WALL1'-2"1'-0"EXTENSIONSLAB60'-0" INSIDE DIATYP
8'-0"TYP8'-0"HPT EL 119.00T.O. CONCLPT EL 115.55T.O. CONCTYP OF 424" DIA COLUMN,
FILENAME:PLOT DATE:PLOT TIME:7/18/201611:44:46 AMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY Exp.USTED
NEIESTATE OF CLF
ORNI
A12-31-2017REG
IER P
ROFSSEOIAL NGNERLLALWA CHML
ANHAI
URCTAI No. S5625EITAN
ACERALTS
82-S-2002XXSTRUCTURAL
NM W ALLACEKM BURTON
DIG ESTER NO . 2
LA SCOGGINS82-S-2002_668876.dgnTO P PLANTOP PLAN1/4"=1'-0"NA82-S-3001A82-S-30014'-0"8'-0"HPT EL 149.08T.O. CONC4'-0" DIA OPNGLPT EL 148.50T.O. CONCEL 149.00T.O. CURBCONC CURB10" WIDEAL 2-RAIL RAILINGAT COLUMNSPANEL, TYP6'-0" SQ DROP4'-0" SQ OPNG
1'-0"
1'-0"FILENAME:PLOT DATE:PLOT TIME:7/18/201611:44:43 AMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY Exp.USTED
NEIESTATE OF CLF
ORNI
A12-31-2017REG
IER P
ROFSSEOIAL NGNERLLALWA CHML
ANHAI
URCTAI No. S5625EITAN
ACERALTS
82-S-3001XXSTRUCTURAL
NM W ALLACEKM BURTON
DIG ESTER NO . 2
SECTIO N
LA SCOGGINS82-S-3001_668876.dgnASECTION3/8"=1'-0"82-S-200182-S-2002M IN, TYP
4 1/2"
2'-0"DIA2'-0"EL 147.50T.O. WALLHPT EL 119.00EL 149.00T.O. CURB
FILENAME:PLOT DATE:PLOT TIME:7/28/20165:55:58 PMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY321ABCABC LIC
E
NSED ARCHITECTSTATE OF CALI
F
ORNI
A REN. 10-31-17NETSRIK .B YER
FFOEG
C-33068
83-A-1101XXG B KIRSTENSJ PAYNE
DIGESTER FACILITY
PLANS, ELEVATIO NS, AND SECTIO N
ARCHITECTURAL
83-A-1101_668876.dgn1NORTH ELEVATION1/8"=1'-0"2EAST ELEVATION1/8"=1'-0"3SOUTH ELEVATION1/8"=1'-0"4WEST ELEVATION1/8"=1'-0"ASECTION1/4"=1'-0"FLOOR PLAN1/8"=1'-0"1234AAN50'-0"50'-0"ROOF PLAN1/8"=1'-0"NACB1'-6"23'-6"23'-6"1'-6"1'-6"23'-6"23'-6"1'-6"231231231CBACBA53'-0"53'-0"TYP3'-0"TYP3'-0"AND DOWNSPOUTSPREFABRICATED GUTTERDECKINGSHEATHING OVER METALSYSTEM OVER GYPSUMSHEET METAL ROOFING212GRADE EL 133.00FF EL 133.50T.O. PADS EL 135.00T.O. STEEL EL 144.00SD BARD2 : 12 ROOF SLOPESLAB, TYPCONCRETE EQPT
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 12:37:45 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. M32099
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERBTIMOTHY LEE AU
E
RAHCEM N IC ALSTA
TE O F CA LIFO RNIA
83-D-2001MECHANICALKL MCCOY83-D-2001_668876.dgn
DIGESTER FACILITYE CANDANOZAOVERALL PLAN
1/8"=1’-0"
N
1
ENLARGED PLAN
1/4"=1’-0"
A
SECTION
1/4"=1’-0"
1
A
B
83-D-3001
C
83-D-3001
D
83-D-3001 E
83-D-3001
PUMPS
HEATING
DIGESTER
PUMPS
MIXING
DIGESTER
EXCHANGERS
HEAT
PUMPS
HOT WATER
4" HWS, TYP
4" HWR, TYP
6" DSR
STATION
TRANSFER PUMP
DIGESTED SLUDGE
DSM
DSM
6" DSR
DSM
DSM
ASSEMBLY, TYP
MIXING NOZZLE
TRANSFER PUMP
DIGESTED SLUDGE
TO DEWATERING
TRANSFER PUMP 2
DIGESTED SLUDGE
TRANSFER PUMP 1
DIGESTED SLUDGE
6" DS
(NEW)
DIGESTER NO. 2
PRIMARY
(EXISTING)
DIGESTER NO. 1
PRIMARY
4" DS
4" DS
PLANS AND SECTION
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 12:39:41 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. M32099
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERBTIMOTHY LEE AU
E
RAHCEM N IC ALSTA
TE O F CA LIFO RNIA
83-D-3001MECHANICALKL MCCOY83-D-3001_668876.dgn
DIGESTER FACILITYE CANDANOZASECTIONSB
SECTION
1/4"=1’-0"
C
SECTION
1/4"=1’-0"
83-D-2001
D
SECTION
1/4"=1’-0"
83-D-2001
E
SECTION
1/4"=1’-0"
83-D-2001
12" DSM12" DSM
PUMP 1
MIXING
DIGESTER
PUMP 2
MIXING
DIGESTER
PUMP 3
MIXING
DIGESTER
PUMP 2
HEATING
DIGESTER
PUMP 3
HEATING
DIGESTER
PUMP 1
HEATING
DIGESTER
6" DSR
4" HWS
PUMP 1
WATER
HOT
PUMP 2
WATER
HOT
PUMP 3
WATER
HOT
TYP
6" DSR,TO BOILER
FROM BOILER
4" HWR
EXCHANGER 3
HEAT
HOT WATER
4" HWS, TYP
4" HWR, TYP
EXCHANGER 2
HEAT
HOT WATER
EXCHANGER 1
HEAT
HOT WATER
6" DSR
FILENAME:PLOT DATE:PLOT TIME:7/28/20165:57:20 PMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY No. M32099Exp. 09-30-16R EG IS
T
ERED
P ROFESSIONA ELNGINEERBTI
MOT
HY LEE AUERAHCEMNI
CALSTATE OF CALI
FOR
NI
A
86-D-2001M ECHANICAL
KL M CCO Y86-D-2001_668876.dgn PLAN, SECTIO NS AND DETAIL
JL JIANGPLAN1/8"=1'-0"ASECTION1/4"=1'-0"PUMPSFILTRATE6" SNEL 123.00EL 131.55IE 127.336" SN,3" FILT5'-0"STATIONPUMPFILTRATECONVEYORNEW SCREWMIXERTANK ANDNEW FLOC4" DSFLOC TANKEXISTINGFLOC TANKNEWTANKNEW FLOCPOLYMER TOTESPRESSNEW SCREWABTREATMENTSIDESTREAM3" FILT TONEW SCREW PRESSBSECTION1/4"=1'-0"PRESSNEW SCREWCONVEYORNEW SCREWDAMPER, TYPTYPCONNECTIONFLEXIBLE28" FASCREW PRESSEXISTINGSYSTEMNEW POLYMER4" DS8" FA10" FA6" FA4" FATYP OF 4W/DAMPER12" FA 18" FA8" FA6" FA4" FA4" DSN4" FA4" FA4" FA8" FA6" FA4" DSDEW ATERING BUILDING - EXISTING
FILENAME:PLOT DATE:PLOT TIME:7/18/201611:45:59 AMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY Exp.USTED
NEIESTATE OF CLF
ORNI
A12-31-2017REG
IER P
ROFSSEOIAL NGNERLLALWA CHML
ANHAI
URCTAI No. S5625EITAN
ACERALTS
88-S-2001XXODOR CONTROL
STRUCTURAL
NM W ALLACEKM BURTON
FO UNDATIO N PLAN
LA SCOGGINS88-S-2001_668876.dgnFOUNDATION PLAN1/4"=1'-0"N A88-S-3001A88-S-30013'-0"86'-9"9"9"45'-0"TYP1'-0"TYP3'-0"1'-0"24'-0"9"3'-0"1'-0"1'-0"21'-0"1'-0"1'-0"
1'-0"3'-0"1'-0"EL 129.67, TYPT.O. FTGON GRADE6" CONC SLAB3'-0"
FILENAME:PLOT DATE:PLOT TIME:7/18/201611:46:03 AMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY Exp.USTED
NEIESTATE OF CLF
ORNI
A12-31-2017REG
IER P
ROFSSEOIAL NGNERLLALWA CHML
ANHAI
URCTAI No. S5625EITAN
ACERALTS
88-S-2002XXODOR CONTROL
STRUCTURAL
NM W ALLACEKM BURTON
LA SCOGGINS88-S-2002_668876.dgnTO P PLAN
N
TOP PLAN1/4"=1'-0"A88-S-3001A88-S-3001T.O. CONC EL 136.00T.O. CONC EL 142.50EQPT PAD, TYPRAILING, TYPAL 2-RAILGALV STEEL STAIR3'-3"3'-0"3'-0"10'-0"
FILENAME:PLOT DATE:PLOT TIME:7/18/201611:45:56 AMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARY Exp.USTED
NEIESTATE OF CLF
ORNI
A12-31-2017REG
IER P
ROFSSEOIAL NGNERLLALWA CHML
ANHAI
URCTAI No. S5625EITAN
ACERALTS
88-S-3001XXODOR CONTROL
STRUCTURAL
NM W ALLACEKM BURTON
SECTIO N
LA SCOGGINS88-S-3001_668876.dgnASECTION1/4"=1'-0"88-S-200188-S-20021'-2"1'-2"EL 129.67EL 136.001'-8"1'-2"SLAB
8"EQPT PAD, TYPAL 2-RAIL RAILINGAL COVERPREFABRICATEDEL 142.50
FILENAME:PLOT DATE:PLOT TIME:7/21/201610:24:32 AMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARYNo. M29146Exp. 06-30-18TS
C
OT COWDENFR EG I
T
S
ERED RP
OESSIONA LENGNIEERIMECH ANCALSTATE OFC ALI
FOR
NI
A
88-M-2001XXODOR CONTROL
M ECHANICAL
CHECKED BY
NR FO RESTER88-M-2001_668876.dgnN
1/4"=1'-0"SL HO STETLER
PLANPLAN A 88-M-3001BIOFILTER NO. 2BIOFILTER NO. 1FILTERFOUL AIR BIOFILTER FAN 236" DIA FABIOFILTER FAN 136" DIA FADAMPER36" DIA FAWATER PANEL30" DIA FASTACK FANBIOFILTER 1STACK FANBIOFILTER 2
FILENAME:PLOT DATE:PLOT TIME:7/21/201610:25:08 AMCH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUM ENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUM ENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUM ENTS:123456BCDVERIFY SCALEBAR IS ONE INCH ONORIGINAL DRAWING.1"0cPROJDATEDATENO.
DSGN DR
REVISIO N
CHK
APVDBY
APVDSHEETDWG ACH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT W ITHO UT THE W RITTEN AUTHORIZATION OF CH2M HILL.668876PREDESIG N REPO RT
APPVD BY
FACILITY PRO JECT
W ATER RESOURCE RECO VERYAUGUST 2016NOT FOR CONSTRUCTIONPRELIMINARYNo. M29146Exp. 06-30-18TS
C
OT COWDENFR EG I
T
S
ERED RP
OESSIONA LENGNIEERIMECH ANCALSTATE OFC ALI
FOR
NI
A
88-M-3001XXODOR CONTROL
M ECHANICAL
CHECKED BY
NR FO RESTER88-M-3001_668876.dgnSL HO STETLER
SECTIO N ASECTION3/8"=1'-0"BIOFILTER FAN 2BIOFILTER FAN 136" DIA FAWATER PANELDAMPERFOUL AIR FILTER30" DIA FA30" DIA FA
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 11:50:21 AM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-X-6001
XXELECTRICALCHECKED BYPLANTWIDE ELECTRICALMAIN SINGLE LINE DIAGRAMDEMOLITIONJN HJELMBERGTA TOM98-X-6001_668876.dgn
32
86
KMH
3
AUXILIARY LOADS)
(INDUCTION GENERATOR
ENGINE BUILDING
SLUDGE GAS
MCC-D
3
EME 151 EME 152
POND
EQUALIZATION
MCC-C
3
EME 251
3
EME 251
3 3
EME 851 EME 852
3 3
TREATMENT)
(SECONDARY
AIR
AERATION
MCC-F1
STRUCTURE
DAF
MCC-G1
STRUCTURE
DAF
MCC-G2
TREATMENT)
(SECONDARY
AIR
AERATION
MCC-F2
3
EME 805
BUILDING
SWITCHGEAR
MCC-HAAS3
GND BUS
74
FOR KW RECORDER
TERMINAL STRIP
480-120V
480-120V
480-120V
2
2
48V DC BUS
SWITCHGEAR
GENERATOR
IDUCTION
EXISTING
EMZ 004
TO
TO DPC
400 A
M
48V-480Y/277V
260KVA
4W, NON-FUSED
600A
400A
NET GENERATOR OUTPUT METER
150KW, 480V, 3HP, 3-W
CHP
NZMN3-400VE-NA
CHP SWGR
SCREENINGS
INFLUENT/
MCC-A1
SCREENINGS
INFLUENT/
MCC-A2
BIOFILTERS
CLARIFIERS
MCC-B1
BIOFILTERS
CLARIFIERS
MCC-B2
AREA
UNIT 4
MCC J1
AREA
UNIT 4
MCC J1
MCC-J1E MCC-J2E
EG/CB-5
FROM SWBD
EG/CB-4
FROM SWBD
EG/CB-7
FROM SWBD
EG/CB-4
FROM SWBD
EG/CB-3
FROM SWBD
EG/CB-1
FROM SWBD
EG/CB-2
FROM SWBD LOSS OF DCBUILDING
LOCATED IN SWITCHGEAR
MAIN SWITCHGEAR "MSG"
P.G. & E. METERING SECTION
P.G. & E. SECTIONS
MCC B BUILDING
LOCATED IN
MCC A BUILDING
LOCATED IN
SWITCH
DISCONNECT
200A, 3P, 600V
DS EMZ 004
BUS EXTENSION
PROVISIONS FOR FUTURE
480V, 3PH, 4W, 3000A COOPER BUS
480V, 3PH, 4W, 3000A COOPER BUS
A
AS
A
AS
A
AS
A
AS
A
AS
A
AS
A
AS
A
AS
A
AS
V
VSALARMCONTROL PWRTO DPC
3000:5
3000:5
3000:5
3000AF
3000AT
52-M
800 AT
800 AF
52-10
400 AT
800 AF
52-9
1200 AT
1600 AF
52-8
1200 AT
1600 AF
52-7
800 AT
800 AF
52-6
400 AT
800 AF
52-1
400 AT
800 AF
52-2
300 AT
800 AF
52-3
300 AT
800 AF
52-4
800 AT
800 AF
52-5
SECTION
INCOMING
MCC J BUILDING
LOCATED IN
BUILDING
SWITCHGEAR
LOCATED IN
THAT THESE EXISTING CONDUCTORS MUST BE REPLACED.
TRANSFORMER REPLACEMENT, IT SHOULD BE ASSUMED
DESIGN. DUE TO THE INCREASE IN LOAD AND ASSOCIATED
PRIMARY CONDUCTORS IS UNKNOWN AT THIS STAGE OF
SIZE, EXACT LOCATION, AND OWNERSHIP OF EXISTING 3.
ENSURE SERVICE INTERRUPTIONS ARE MINIMIZED.
OWNED BY THE CITY. PHASE WORK WITH NEW WORK TO
DEMOLISH EXISTING TRANSFORMER. TRANSFORMER IS 2.
AND LOAD FEEDER CONDUIT FOR REUSE.
FEEDER. PROTECT "NORMAL" SOURCE FEEDER CONDUIT
AND ALL EXPOSED CONDUIT FOR THE "STANDBY" SOURCE
DEMOLISH ATS, ALL SOURCE AND LOAD CONDUCTORS, 1.
NOTES:
PAD MOUNTED TRANSFORMER
12KV DISTRIBUTION LINE
NOTE 2
NOTE 3
ALL ATSs
NOTE 1, TYP OF
FILENAME:PLOT DATE:PLOT TIME:2016\08\01 12:17:25 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
AA A A A A A A
B
B
B
BB
BB
C
C
C C
C
D
D
DD
SPACE SPACE SPACE
1 2 3 4 5 6 7 8
90"20"20"20"20"20"20"20"25"
SPACE
SPACE
SPACE
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-X-6002
XXCHECKED BYDEMOLITIONJN HJELMBERGTA TOM98-X-6002_668876.dgn MCC A1SINGLE LINE DIAGRAM AND ELEVATIONPLANTWIDE ELECTRICAL
BELOW
SEE
2
15
RF1
1.5
VFD
22
20
2
20
2
15
75
VFD
20
800/600
2
1.5
2
2
600A, 480V, 3PH, 3W (42 000 AMP SYMMETRICAL BRACING, MINIMUM)MCC-A1
(REF DWG XX)SWITCH EME 151AUTOMATIC TRANSFERINCOMING FROMIFLUENT SCREEN 1HWY 101INFLUENT PUMP 1HWP 500INFLUENT PUMP 2HWP 200GRIT PUMP 1AGP 100GRIT PUMP 3AGP 300AGITATION AIR BLOWER 1AGB 101 AIR BLOWERCHANNEL AGITATIONAGB 101SPARESPARESUMP PUMP 1GRIT TANK AGP 115GRIT TANKSSUPPLY FANAGB 131
MCC-A1
600 AMP GND BUS
2
1.5
GRIT TANKSEXHAUST FAN 1AGB 132
1/3
3PH, 4W
480-120/208V
30 KVA
TFR-A
3PH, 4W
480-480/277V
500 KVA
HW
3PH, 4W
480-480/277V
200 KVA
HW LIGHTING PANEL LPA2LIGHTING PANEL LPALIGHTING PANEL LPA1RECEPTACLEWELDINGEME-015HOT WATER PUMP 1HMP 20110
MOYON SLUDGE PUMPDBP 002RF1
1 1
5
COMPRESSORDIGESTER 2HMC 351 ENGINE BUILDINGSLUDGE GASTO MCC D
1PH, 3W
480-120/240V
37.5KVA
TFR-L
CONTROL BUILDINGLIGHTING PANEL L
2
AREA ALARM CONTROLEMO 1104.7
BUILDING AIR HANDLING UNIT MCC AEMB 103175A TRIP
225 A BREAKER ABOVE
SEE
ELEVATION
MOTOR CONTROL CENTER A1
7 225 70
100 100 175 15100
20
1A 8A 6A3A 4A 4B 5A 5B 2C 5C 4D 3C
4C 8B 5D 3B 3D 2B 2A 6B 8C 6D
7A 7B 6C
50/M 50/M 30/M 30/M 50/M 15/M 7/M
3/M 3/M 30/M 15/M 15/M
DEMOLISH EXISTING CONDUCTORS.
PROTECT EXISTING CONDUIT FOR REUSE.1.
NOTES:
NOTE 1
SPACE
SPACE
SPACE
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 12:21:23 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
234567
90"25"20"20"20"20"20"20"
A A A A A A
B
B
B
B
B
B
C
C
C
C
C
C
D
D
D
SPACE SPACE SPACE
A
1
SPACESPACESPACE
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-X-6003
XXCHECKED BYDEMOLITIONJN HJELMBERGTA TOM98-X-6003_668876.dgn SINGLE LINE DIAGRAM AND ELEVATIONPLANTWIDE ELECTRICAL
BELOW
SEE
VFD
2
75
VFD
20
800/600 30
600A, 480V, 3PH, 3W (42 000 AMP SYMMETRICAL BRACING, MINIMUM)MCC-A2
(REF DWG XX)SWITCH EME 152AUTOMATIC TRANSFERINCOMING FROMIFLUENT SCREEN 2HWY 201INFLUENT PUMP 6HWP 600INFLUENT PUMP 3HWP 300GRIT PUMP 4AGP 200GRIT PUMP 4AGP 400AGITATION AIR BLOWER 2AGB 201SPARE
MCC-A2
3PH, 4W
480-480/277V
600 KVA
HW
3PH, 4W
480-480/277V
300 KVA
HW RECEPTACLEWELDINGEME-015HOT WATER PUMP 2HMP 202 ABOVE
SEE
ELEVATION
MOTOR CONTROL CENTER A2 MCC A2 & SUPERNATANT LAGOONRF1
1.5
2
20
2
20
2
15
2
2
SUMP PUMP 2GRIT TANK AGP 215
1
5
FLUSH WATER PUMP 1HPW 112LOW WATER LEVEL INTERLOCKINFLUENT PUMPSHWO 150EQUILIZATION PONDTO MCC C SPARE11
1/3 20
MIXER COMPRESSORDIGESTER 1HMC 301
1
5
POTABLE WATER PUMPWMP 1001
3
1
3
1
5
SUPERNATANT PUMP 1DBP 300SUPERNATANT PUMP 2DBP 301 SURFACE MIXERHORIZONTALDBN 302LAGGON 120V PWR CENTERSUPERNATANTLTG PANEL SLA SL
PNL
PWR
7 225 70 50 50 30 100 15 100 15 150
100 30 40
DP-WRF14
DSP-Z-01 LP-WRF14 SWPCP-1GWCP-1
20 60 3 50 15 100
1A 7A 6B 7C 6C 6A 3A 3B 3C 4B 3D 5C 4C 1A 5D 4A
5B 5A 2B 2A 2C 2D BELT PRESSTO NEWDEMOLISH EXISTING CONDUCTORS.
PROTECT EXISTING CONDUIT FOR REUSE.1.
NOTES:
NOTE 1
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 12:22:47 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
A
1 2 3 4
90"20"20"20"25"
SPACE SPACE
A A A
B B
B
C C
C
D
D
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-X-6004
XXCHECKED BYDEMOLITIONJN HJELMBERGTA TOM98-X-6004_668876.dgn SINGLE LINE DIAGRAM AND ELEVATIONPLANTWIDE ELECTRICAL
600A, 480V, 3PH, 3W (42 000 AMP SYMMETRICAL BRACING, MINIMUM)MCC-B1
(REF DWG XX)SWITCH EME 251AUTOMATIC TRANSFERINCOMING FROM600 AMP GND BUS
ELEVATION
MOTOR CONTROL CENTER B1
1
1/2
1
1315
1A 4A 3D 4C2D
MCC B1600
1
7/5
15
2A
1
15
2B
1
15
4B
2
10
30
3A
1
1/2
3B
30
SPARE3C RECEPTACLEWELDINGEME-01760
2C
AREA ALARM CONTROLSEMO 210PRIMARY SLIDGE PUMP 1CSP 100PRIMARY SCUM PUMPCSP 300SLUDGE PUMP 5CSP 500RECIRCULATION PUMP 1ASBP 001RECIRCULATION PUMP 1PBP 100PRIMARY CLARIFIERPBD 10055
100 3 7
3
FEED PUMP 2CAUSTIC SODA ASP 131MIXING PUMPCAUSTIC SODAASP132SF3
30/20
PROTECT EXISTING CONDUIT FOR REUSE. DEMOLISH EXISTING CONDUCTORS.1.
NOTES:
NOTE 1
FILENAME:PLOT DATE:PLOT TIME:2016\07\20 10:47:10 AM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
2345 1
A
MCC B2
A
B
C
D
A
B
C
D
A
B
C
D
SPACE
A
B
C
90"25"20"20"20"20"
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
1
800/600 15
600A, 480V, 3PH, 3W (42 000 AMP SYMMETRICAL BRACING, MINIMUM)MCC-B2
600 AMP GND BUS
ELEVATION
MOTOR CONTROL CENTER B2
1 1
1A 5A 5B 4B2C
SWITCH EME 252AUTOMATIC TRANSFERINCOMING FROM1
15
2B
PRIMARY SLUDGE PUMP 2CSP 2001
7.5
15
2A
1
15
4A
1
10
30
3B
1
1/2
3C
1
7.5
11
3A
1
3/4
4C RECEPTACLEWELDINGEME-01860
5C
5 5 1/2
3 3 100 25 3
3PH, 4W
480-120/208V
15 KVA
TFR-B
PRIMARY SCUM PUMP 4CSP 400SLUDGE PUMP 6CSP 600SPARERECIRCULATION PUMP 2PBP 200PRIMARY CLARIFIER 2PBD 200PUMPSWING RECIRCULATIONPBP 300SECONDARY CLARIFIER 3SBD 002PUMP 1BRECIRCULATION SBP 002LIGHTING PANEL BFEED PUMP 1CAUSTIC SODAASP 130100
SF3
30/20
NOTE 1
DEMOLISH EXISTING CONDUCTORS.
PROTECT EXISTING CONDUIT FOR REUSE.1.
NOTES: 98-X-6005
XXCHECKED BY98-X-6005_668876.dgn PLANTWIDE ELECTRICALMCC B2SINGLE LINE DIAGRAM AND ELEVATIONDEMOLITIONJN HJELMBERGTA TOM
FILENAME:PLOT DATE:PLOT TIME:2016\08\01 12:55:34 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
1 2 3 4 5 6 7
A90"MCC F1
20"20"20"20"20"20"30"
A A A A A A
SPACE SPACE SPACE SPACE
SPACE
SPACE
B B B
B
B B
C C C
C
CC
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-X-6006
XXCHECKED BYDEMOLITIONJN HJELMBERGTA TOM98-X-6006_668876.dgn MCC F1SINGLE LINE DIAGRAM AND ELEVATIONPLANTWIDE ELECTRICAL
BELOW
SEE
1
1200A, 480V, 3PH, 3W (65 000 AMP SYMMETRICAL BRACING, MINIMUM)MCC-F1
SPARE
MCC-F1
600 AMP GND BUS
3PH, 4W
480-120/208V
30 KVA
TFR-F
LIGHTING PANEL LPFLIGHTING PANEL LPF1RECEPTACLEWELDINGEME-0191
CMP100-PC
3
ABOVE
SEE
ELEVATION
MOTOR CONTROL CENTER F1
400
15175
1A 6A7A 3B 6B 2C
5B 4C 2B5A 7B
2B
15
1A
SF2
SPARE3C
AS 100
RVSS
AS 300
RVSS
15
4B
DMC
RNL AS 117
15
7C
TELEMETRY SHOP(MAINT.)250 250
AERATION BLOWER 1ASB 100AERATION BLOWER 3ASB 3003PH, 4W
480-480/277V
XX KVA
HW
3PH, 4W
480-480/277V
XX KVA
TR-ASB100
400
1.5 1.5
WAS PUMP 1ASP 415FUTURE WAS PUMP11
RAS PUMPS INTERLOCKAGP 413/5131
3
1
1/2
PUMP 1PLANT DRAINAGEASP 11540
SCUM PUMP 1FINAL CLARIFIERASP 405COLLECTOR 4FINAL CLARIFIERASR 41050
EG/REF1
FROM SWBD
EME 605
60
CL
TO MCC G1 SUMP LEVEL INTERLOCKWASTE MIXED LIQUORASO 180WATER PUMP 1RECLAIMEDCMP 100(SWITCHGEAR BUILDING)AREA ALARM CONTROLSEMO 910VFD
RAS PUMP 1ASP 411RAS PUMP 3ASP 511VFD
2A 3A
10/1 10/1
MAIN SWITCHGEARINCOMING FROMNOTE 1
4A
DEMOLISH EXISTING CONDUCTORS.
PROTECT EXISTING CONDUIT FOR REUSE.1.
NOTES:
7/M 7/M 7/M 30/M 7/M 3/M
7/M
30 30
FILENAME:PLOT DATE:PLOT TIME:2016\08\01 12:59:05 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
234567 1
A
SPACESPACESPACESPACE
SPACE
A
B
C
A
B
C
A
B
C
AAA
SPACE
B
B
C
C
MCC F2
30"20"20"20"20"20"20"90"
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-X-6007
XXCHECKED BYDEMOLITIONJN HJELMBERGTA TOM98-X-6007_668876.dgn MCC F2SINGLE LINE DIAGRAM AND ELEVATIONPLANTWIDE ELECTRICAL
BELOW
SEE
1200A, 480V, 3PH, 3W (65 000 AMP SYMMETRICAL BRACING, MINIMUM)MCC-F2
MCC-F2
600 AMP GND BUS
1
3 ABOVE
SEE
ELEVATION
MOTOR CONTROL CENTER F2
400
1A 7A6A 2B
5C
2C
SF2
3B
AS 200
RVSS
15
4B
DMC
RNL AS 117
250
AERATION BLOWER 1ASB 1003PH, 4W
480-480/277V
XX KVA
TR-ASB200
400
1.5
WAS PUMP 2ASP 5151 1
3
1
1/2
PUMP 2PLANT DRAINAGEASP 11640
SCUM PUMP 2FINAL CLARIFIERASP 505COLLECTOR 5FINAL CLARIFIERASR 510WATER PUMP 2RECLAIMEDCMP 200VFD
RAS PUMP 4ASP 512VFD
2A 3A
10/1 10/1
MAIN SWITCHGEARINCOMING FROM2RAS PUMP ASP 412SPARE4A 6C
100
2
4C
HP
1.34
HOIST/TROLLEYCHLORINE CYLINDERCMK 001SHOPTO MAINTANCE RECEPTACLEWELDINGEME-020
175
6B 5A
60
TO MCC G2
20
5B
1
3C
30A, NF
SPARESPAREDEMOLISH EXISTING CONDUCTORS.
PROTECT EXISTING CONDUIT FOR REUSE.1.
NOTES:
NOTE 1
7/M 30/M 7/M 3/M 15/M
7/M 7/M
30 30
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 12:29:38 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
1234
MCC G1
90"25"20"20"20"
B B
B
C C
C
D
SPACE SPACE SPACE
AAAA
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-X-6008
XXCHECKED BYDEMOLITIONJN HJELMBERGTA TOM98-X-6008_668876.dgn MCC G1SINGLE LINE DIAGRAM AND ELEVATIONPLANTWIDE ELECTRICAL
1
7
600A, 480V, 3PH, 3W (42 000 AMP SYMMETRICAL BRACING, MINIMUM)MCC-G1
SPARE600 AMP GND BUS
1PH, 3W
480-120/240V
15 KVA
TFR-F
LIGHTING PANEL LPGRECEPTACLEWELDINGEME-021ELEVATION
MOTOR CONTROL CENTER G1
1A 2A4C2C
20
2B
SPARE
5
3B
15 25
EME 705
60
CL
7
1
2
3 1 1
5
15
2D
800/800
3C 3A
FROM MCC F1EQUIPMENTCOLLECTORDAF THICKENERAFR 10130
PUMP 1PRESSURIZATIONAFR 111100
AF301
PNL GRINDER 1MIXED SLUDGEAFF 301SLUDGE PUMP 1THICKENEDAFP 2017.5
15
4A
15
4B
UNITODOR REDUCTUINAFB 125FROM SWBD EG
(MCC G BLDG)MISC. CONTROLSAREA ALARM ANDEMO 7101
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 12:31:33 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
1
20"20"20"25"90"MCC G2
2 3 4
B
B B
C
C
SPACE
SPACE
SPACE
A A A A
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-X-6009
XXCHECKED BYDEMOLITIONJN HJELMBERGTA TOM98-X-6009_668876.dgn MCC G2SINGLE LINE DIAGRAM AND ELEVATIONPLANTWIDE ELECTRICAL
1
7
600A, 480V, 3PH, 3W (42 000 AMP SYMMETRICAL BRACING, MINIMUM)MCC-G2
600 AMP GND BUS
EME022-P
ELEVATION
MOTOR CONTROL CENTER G2
1A 4B 2C
20
2B
SPARE
5
3B
15 60
AFF302-P1
AFP202-PC
1
15
3C
800/800
EME702-X
EME702-P
FROM MCC F2AF302
PNL GRINDER 2MIXED SLUDGEAFF 30215
4A
1
AFF302-PC
1
7
2A
SPAREAFP112-PC
3
100
3A
30
PUMP 2PRESSURIZATIONAFP 1127.5
SLUDGE PUMP 2THICKENEDAFP 202(MAINTANCE BLDG)RECEPTACLEWELDINGEME-022SYSTEM CONTROLSSNAIL REMOVALAFF 401
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 12:32:44 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-X-6010
XXCHECKED BYPLANTWIDE ELECTRICALDEMOLITIONJN HJELMBERGTA TOM98-X-6010_668876.dgn EMERGENCY POWERSINGLE LINE DIAGRAMVSVAASWTDW800/400 800/400 250/100 250/100 800/400 100/100 100/100
TD
A
TD
V
AND LOAD TRANSFER
CONTROL LOGIC
START/STOP
AND GENERATOR
ATS STATUS/CONTROL
(TYP) ATS STATUS(TYP) ATS FORCE TFR(TYP) ATS INHIBIT SIGNAL(AMPS XDCR)FROM MSG(VOLTS XDCR)FROM MSG100/50 100/25 250/150
MCC A1TO EME 151MCC A2TO EME 152MCC B1TO EME 251MCC B2TO EME 252PANEL LP-FEME 605TO LP-GTO EME 705MCC HTO EME 805MCC J1ETO EME 851SPAREMCC J2ETO EME 852BUS EG 480V, 30, 4W 2000A 50000A RMS SYM BRACING
CONTROL SECTION DISTRIBUTION SECTION
1000:5
GENERATOR
EMERGENCY / PEAK SHAVING
NATURAL GAS/PROPANE
KW/ 560 KW
EME 930
PROPANE ENGINE
NATURAL GAS
CONTROL PANEL
EMERGENCY GENERATOR
400A, 10 SEC
GROUNDING RESISTOR
NEUTRAL
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 12:34:10 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-X-6011
XXCHECKED BYPLANTWIDE ELECTRICALDEMOLITIONJN HJELMBERGTA TOM98-X-6011_668876.dgn SINGLE LINE DIAGRAM AND ELEVATIONSWBD RNG
KWH
1200AF
1000AT
K
KEY INTERLOCK
ST
PSR
UNIT TRIP
CAPACITOR
(3)
480VAC, 3PH, 3W
PORTABLE GENERATOR
ST
UNIT TRIP
CAPACITOR
(3)
PSR
400AF
400AT
PSR MONITOR
3-PHASE
METER
POWER
DPC
KW TO
(3)
PFR
RELAY
POWER FAIL
PFR TO DPC
C.T.
FILTER
HARMONIC
(3)
400AF
400AT
400AF
400AT
400AF
250AT
400AF
250AT
400AF
250AT
400AF
250AT
400AF
250AT
480V, 1200A, 3PH, 3W, 65 000A RMS SYM BRACING
MCC R
G
300A
VFD 301
125
VFD 501
125
400A 400A
VFD 701
125
400A
REUSE PUMP 3WRP 301TSSP HTRHS 301APS 301SV 302REUSE PUMP 5WRP 305TSSP HTRHS 501APS 501SV 502REUSE PUMP 7WRP 701TSSP HTRHS 701APS 701SV 702SWBD R
METERING SWITCHBOARD
PG&E UTILITY
SPARESPARENOTE 1
3PH, 4W
480/277VAC
PG&E TRANSFORMER
TRANSFORMER SIZE NEEDS TO BE VERIFIED.1.
NOTES:
32
86
KMH
74
M
3
AUXILIARY LOADS)
(INDUCTION GENERATOR
ENGINE BUILDING
SLUDGE GAS
MCC-D
3
POND
EQUALIZATION
MCC-C
3 3 3 3 3 3
TREATMENT)
(SECONDARY
AIR
AERATION
MCC-F1
TREATMENT)
(SECONDARY
AIR
AERATION
MCC-F2
3
BUILDING
SWITCHGEAR
MCC-HAAS3
GND BUS
FOR KW RECORDER
TERMINAL STRIP
480-120V
480-120V
480-120V
2
2
48V DC BUS
TO DPC
400 A
480V-480Y/277V
260KVA
4W, NON-FUSED
600A
400A
NET GENERATOR OUTPUT METER
150KW, 480V, 3HP, 3-W
CHP
SCREENINGS
INFLUENT/
MCC-A1
SCREENINGS
INFLUENT/
MCC-A2
BIOFILTERS
CLARIFIERS
MCC-B1
BIOFILTERS
CLARIFIERS
MCC-B2
AREA
UNIT 4
MCC J1
AREA
UNIT 4
MCC J1
MCC-J1E MCC-J2E
EG/CB-7
FROM SWBD
EG/CB-4
FROM SWBD
EG/CB-3
FROM SWBD
EG/CB-1
FROM SWBD
EG/CB-2
FROM SWBD LOSS OF DCBUILDING
LOCATED IN SWITCHGEAR
MAIN SWITCHGEAR "MSG"
P.G. & E. METERING SECTION
P.G. & E. SECTIONS
MCC B BUILDING
LOCATED IN
MCC A BUILDING
LOCATED IN
BUS EXTENSION
PROVISIONS FOR FUTURE
MCC J BUILDING
LOCATED IN
BUILDING
SWITCHGEAR
LOCATED IN
TO DPC
ALARMCONTROL PWR800 AT
800 AF
52-10
400 AT
800 AF
52-9
1200 AT
1600 AF
52-8
1200 AT
1600 AF
52-7
800 AT
800 AF
52-6
400 AT
800 AF
52-1
400 AT
800 AF
52-2
300 AT
800 AF
52-3
300 AT
800 AF
52-4
800 AT
800 AF
52-5
A
AS
A
AS
A
AS
A
AS
A
AS
A
AS
A
AS
A
AS
A
AS
V
VS
300 AT
800 AF
52-G
480V, 3PH, 4W, 3000A COOPER BUS
480V, 3PH, 4W, 3000A COOPER BUS
3000:5
3000:5
3000:5
3000AF
3000AT
52-M
CHP SWGR
SECTION
INCOMING
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 11:01:56 AM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-E-6001
XXELECTRICALCHECKED BYPLANTWIDE ELECTRICALMAIN SINGLE LINE DIAGRAMJN HJELMBERGTA TOM98-E-6001_668876.dgn
STRUCTURE
DAF
MCC-G1
STRUCTURE
DAF
MCC-G2
MCC G BUILDING
LOCATED IN NEW REVISED98-E-6020
SEE DWG
TO 44-MSG-1
CONDUCTORS FROM SOURCE TO LOAD.
CONDUIT FROM EXISTING ATS LOCATION TO LOAD. REPLACE WITH NEW
EXISTING ATS LOCATION. SEE 98-X-6001 FOR DEMOLITION REQUIREMENTS. EXTEND
PROTECT AND REUSE EXISTING CONDUIT FROM "NORMAL" POWER SOURCE TO 1.
NOTES:
NOTE 1 NOTE 1
NOTE 1NOTE 1NOTE 1NOTE 1NOTE 1
151.5
VFD
2020 1575
VFD
20 1.52
MCC-A1
MCC-A1
1.5 1/3 10 5 4.7
AA A A A A A A
B
B
B
BB
BB
C
C C
D
D
DD
SPACE SPACE
1 2 3 4 5 6 7 8
SPACE
20"20"20"20"20"20"20"25"90"SPACE
BELOW
SEE
2
RF1
22 2
800/600
2
2
600A, 480V, 3PH, 3W (42 000 AMP SYMMETRICAL BRACING, MINIMUM)IFLUENT SCREEN 1HWY 101INFLUENT PUMP 1HWP 500INFLUENT PUMP 2HWP 200GRIT PUMP 1AGP 100GRIT PUMP 3AGP 300AGITATION AIR BLOWER 1AGB 101 AIR BLOWERCHANNEL AGITATIONAGB 101SPARESUMP PUMP 1GRIT TANK AGP 115GRIT TANKSSUPPLY FANAGB 131
600 AMP GND BUS
2
GRIT TANKSEXHAUST FAN 1AGB 1323PH, 4W
480-120/208V
30 KVA
TFR-A
3PH, 4W
480-480/277V
500 KVA
HW
3PH, 4W
480-480/277V
200 KVA
HW LIGHTING PANEL LPA2LIGHTING PANEL LPALIGHTING PANEL LPA1RECEPTACLEWELDINGEME-015HOT WATER PUMP 1HMP 201(MCC B)(MCC A)MOYON SLUDGE PUMPDBP 002RF1
1 1
COMPRESSORDIGESTER 2HMC 351(MCC B)ENGINE BUILDINGSLUDGE GASTO MCC D1PH, 3W
480-120/240V
37.5KVA
TFR-L
CONTROL BUILDINGLIGHTING PANEL LAREA ALARM CONTROLEMO 110175A TRIP
225 A BREAKER
ABOVE
SEE
ELEVATION
MOTOR CONTROL CENTER A1
7 225 70 50 50 30 30 7
3 100 100 3 30 15 175 15100
2015
1A 8A 6A3A 4A 4B 5A 5B 5C 4D 3C
4C 8B 5D 3B 3D 2B 2A 6B 8C
BUILDING AIR HANDLING UNIT MCC AEMB 1032
15
6D
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 12:16:31 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
C
D D D
C
C
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-E-6002
XXCHECKED BYJN HJELMBERGTA TOM98-E-6002_668876.dgn MCC A1SINGLE LINE DIAGRAM AND ELEVATIONPLANTWIDE ELECTRICAL
80
2C
8D
REVISED7D
VFD
5
PRESS NO. 2SCREW5
7C
5
2D
MANHOLE PUMP NO.1DEWATERING PUMP NO. 1FILTRATEVFD
40
FAN NO.1ODOR CONTROL
5
FAN NO.1STACK1 1
1
15 15/M 15/M
15/M
NOTE 1
6A
400
GENERATOR CHPTO COGENERATIONDWG 98-E-6001FROM SWGR-MSG, SEEVFD
15
35
VFD
5
15
MIXERSIDESTREAMBLOWER 1SIDESTREAMPROVIDE BLANK DOOR FOR EMPTY BUCKET. 1.
NOTES:
25"20"20"20"20"20"20"90"VFD VFD
1
1.5
2
20
2
20
2
15
1
5
1
1/3
1
5
234567
A A A A A A
B
B
B
B
B
B
C
C
C
C
C
D
D
D
SPACE SPACE SPACE
A
1
BELOW
SEE
75
20
800/600
600A, 480V, 3PH, 3W (42 000 AMP SYMMETRICAL BRACING, MINIMUM)MCC-A2
IFLUENT SCREEN 2HWY 201INFLUENT PUMP 6HWP 600INFLUENT PUMP 3HWP 300GRIT PUMP 4AGP 200GRIT PUMP 4AGP 400AGITATION AIR BLOWER 2AGB 201
MCC-A2
600 AMP GND BUS
3PH, 4W
480-480/277V
600 KVA
HW
3PH, 4W
480-480/277V
300 KVA
HW RECEPTACLEWELDINGEME-015HOT WATER PUMP 2HMP 202(MCC B)
ABOVE
SEE
ELEVATION
MOTOR CONTROL CENTER A2
RF
2
2
SUMP PUMP 2GRIT TANK AGP 215 FLUSH WATER PUMP 1HPW 112LOW WATER LEVEL INTERLOCKINFLUENT PUMPSHWO 150EQUILIZATION PONDTO MCC C SPAREWMP100-PC
POTABLE WATER PUMPWMP 1001
3
1
3
1
5
SUPERNATANT PUMP 1DBP 300SUPERNATANT PUMP 2DBP 301 SURFACE MIXERHORIZONTALDBN 302LAGGON 120V PWR CENTERSUPERNATANTLTG PANEL SLA SL
PNL
PWR
7 225 70 50 50 30 100 15 100 15 150
100 30 40
DP-WRF14
DSP-Z-01 LP-WRF14 SWPCP-1GWCP-1
20 60 3 15 100
1A 7A 6B 7C 6C 6A 3A 3B 3C 4B 3D 5C 1A 5D 4A
5B 5A 2B 2A 2C 2D BELT PRESSTO NEWFILENAME:PLOT DATE:PLOT TIME:2016\08\01 12:12:08 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
C
D
D D
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-E-6003
XXCHECKED BYJN HJELMBERGTA TOM98-E-6003_668876.dgn SINGLE LINE DIAGRAM AND ELEVATIONPLANTWIDE ELECTRICALMCC A2 & SUPERNATANT LAGOON4C
REVISED1
5 5
1
7D 6D
MANHOLE PUMP NO. 2DEWATERINGPUMP NO. 2FILTRATE40
VFD
5
1
FAN NO.2STACK15/M15/M 15/M 80
4D
DWG 98-E-6001FROM SWGR-MSG, SEE35
VFD
15
BLOWER 2SIDESTREAMODOR CONTROL FAN 2
1
1/2
11
5 3
A
1 2 3 4
SPACE SPACE
B
C C
C
D
D
20"20"20"25"90"
600A, 480V, 3PH, 3W (42 000 AMP SYMMETRICAL BRACING, MINIMUM)MCC-B1
600 AMP GND BUS
ELEVATION
MOTOR CONTROL CENTER B1
1315
1A 3D 4C2D
600 15
4B 3A
30
SPARE3C RECEPTACLEWELDINGEME-01760
2C
AREA ALARM CONTROLSEMO 210SLUDGE PUMP 5CSP 5007
FEED PUMP 2CAUSTIC SODA ASP 131MIXING PUMPCAUSTIC SODAASP132SPAREFILENAME:PLOT DATE:PLOT TIME:2016\08\01 12:47:34 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
B B
A A A
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-E-6004
XXCHECKED BYJN HJELMBERGTA TOM98-E-6004_668876.dgn SINGLE LINE DIAGRAM AND ELEVATIONPLANTWIDE ELECTRICAL4A
MCC B12A 2B 3B
PRIMARY CLARIFIERPBD 100REVISED3
1
3
1
1/2
1
PUMP 1PRIMARY SLUDGE CSP 100PUMPPRIMARY SCUM CSP 3003/M7/M 7/M
SEE DWG 98-E-6001.FROM SWGR-MSG, SPAREPROVIDE BLANK DOOR FOR EMPTY BUCKET.1.
NOTES:
NOTE 1
11
5 1/2
1
2345 1
A
C
DD
A
B
D
SPACE
B
C
90"25"20"20"20"20"
1
800/600 15
600A, 480V, 3PH, 3W (42 000 AMP SYMMETRICAL BRACING, MINIMUM)MCC-B2
600 AMP GND BUS
ELEVATION
MOTOR CONTROL CENTER B2
1
1A 5B 4B2C
15
4A 3B RECEPTACLEWELDINGEME-01860
5C
25 3
3PH, 4W
480-120/208V
15 KVA
TFR-B
SLUDGE PUMP 6CSP 600SPARELIGHTING PANEL BFEED PUMP 1CAUSTIC SODAASP 13030
SPAREFILENAME:PLOT DATE:PLOT TIME:2016\07\15 12:18:27 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
MCC B2
BB
CC
A A A
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-E-6005
XXCHECKED BYJN HJELMBERGTA TOM98-E-6005_668876.dgn SINGLE LINE DIAGRAM AND ELEVATIONPLANTWIDE ELECTRICAL5A
MCC B22B
PRIMARY SLUDGE PUMP 2CSP 2002A 3C 3A 4C
PRIMARY SCUM PUMP 4CSP 400PRIMARY CLARIFIER 2PBD 200REVISED1
10
1
53
1
PROVIDE BLANK DOOR FOR EMPTY BUCKET. 1.
NOTES:
NOTE 1
NOTE 1
NOTE 1DWG 98-E-6001FROM SWGR-MSG, SEE15/M7/M 30/M
1 2 3 4 5 6 7
A90"20"20"20"20"20"20"30"
A A A
SPACE SPACE SPACE
B
B
B
C C
C
CC
C
BELOW
SEE
1200A, 480V, 3PH, 3W (65 000 AMP SYMMETRICAL BRACING, MINIMUM)MCC-F1
MCC-F1
600 AMP GND BUS
3PH, 4W
480-120/208V
30 KVA
TFR-F
LIGHTING PANEL LPFLIGHTING PANEL LPF1RECEPTACLEWELDINGEME-0191
3
ABOVE
SEE
ELEVATION
MOTOR CONTROL CENTER F1
400
7 15175
1A 6A7A
5B 4C 2B5A 7B
15
1A
AS 100
RVSS
AS 300
RVSS
15
4B
DMC
RNL AS 117
15
7C
TELEMETRY SHOP(MAINT.)250 250
AERATION BLOWER 1ASB 100AERATION BLOWER 3ASB 3003PH, 4W
480-480/277V
XX KVA
HW
3PH, 4W
480-480/277V
XX KVA
TR-ASB100
400
RAS PUMPS INTERLOCKAGP 413/513PUMP 1PLANT DRAINAGEASP 11550 60
CL
TO MCC G1 SUMP LEVEL INTERLOCKWASTE MIXED LIQUORASO 180WATER PUMP 1RECLAIMEDCMP 100(SWITCHGEAR BUILDING)AREA ALARM CONTROLSEMO 910FILENAME:PLOT DATE:PLOT TIME:2016\08\01 1:03:51 PM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
MCC F1
B B
B
C
D
A A A
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-E-6006
XXCHECKED BYJN HJELMBERGTA TOM98-E-6006_668876.dgn MCC F1SINGLE LINE DIAGRAM AND ELEVATIONPLANTWIDE ELECTRICAL1
3B 4A 2C2B 3C
11
VFD
2A 3A
REVISED2
VFD
5
WAS PUMP NO. 15 5 5
MIXER NO. 1BIOREACTOR IMIXER NO. 2BIOREACTOR I MIXER NO. 3BIOREACTOR I MIXER NO. 2BIOREACTOR 35
MIXER NO. 2BIOREACTOR 3
1
6B
VFD
5
7D
MLR NO. 1BIOREACTOR 35
MIXER NO. 3BIOREACTOR 31
VFD
5
MLR NO. 1BIOREACTOR I2
VFD
WAS PUMP 3151515151515/M 15/M 15/M 15/M 15/M
DWG 98-E-6001FROM SWGR-MSG, SEE
234567 1
SPACESPACESPACE
B
C
A
B
C
C
30"20"20"20"20"20"20"90"B
A
BELOW
SEE
1200A, 480V, 3PH, 3W (65 000 AMP SYMMETRICAL BRACING, MINIMUM)MCC-F2
MCC-F2
600 AMP GND BUS
1
3 ABOVE
SEE
ELEVATION
MOTOR CONTROL CENTER F2
7
1A
5C
SF2
30
15
4B
DMC
RNL AS 117
PUMP 2PLANT DRAINAGEASP 11640
WATER PUMP 2RECLAIMEDCMP 200SPARE4A 6C
100
2
15
4C
HP
1.34
HOIST/TROLLEYCHLORINE CYLINDERCMK 001SHOPTO MAINTANCE RECEPTACLEWELDINGEME-020
175
6B 5A
60
TO MCC G2
30A, NF
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 11:27:03 AM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
B
MCC F2
D
D
AA
B
C
B
C
AA A
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-E-6007
XXCHECKED BYREVISEDJN HJELMBERGTA TOM98-E-6007_668876.dgn MCC F2SINGLE LINE DIAGRAM AND ELEVATIONPLANTWIDE ELECTRICAL 7A6A 2B2C 3B
200
AERATION BLOWER 1ASB 1001
2A 3A
5B
VFD
2
WAS PUMP NO. 4VFD
2
WAS PUMP NO. 25
MIXER NO. 1BIOREACTOR 25
MIXER NO. 2BIOREACTOR 21
5
MIXER NO. 3BIOREACTOR 215
MLR NO. 1BIOREACTOR 2VFD
5
MIXER NO. 1BIOREACTOR 41
5D
1
5
MIXER NO. 3BIOREACTOR 4VFD
15
MLR NO. 1BIOREACTOR 36D
5
MLR NO. 2BIOREACTOR 43C
1
1
RVSS
15/M15/M15/M 35
3515/M15/M15/M1515350
DWG 98-E-6001FROM SGWR-MSG, SEE
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 11:16:42 AM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-E-6008
XXCHECKED BYJN HJELMBERGTA TOM98-E-6008_668876.dgn MCC G1SINGLE LINE DIAGRAM AND ELEVATIONPLANTWIDE ELECTRICAL
MCC-G1
3
2
25
DPM
400AT
600AF
TO MCC-F1
SPD
30/M
15
NOTE 1
VFD
10
15
VFD
15
VFD
1
15
VFD
3
1
15/M
5
40
VFD
20
100/M
3
40
15/M
1
5
100/M
3
15/M
1
5
15/M
1
5
15/M
1
5
600A, 480V, 3PH, 3W (65,000 AMP SYMMETRICAL BRACING, MINIMUM)400AT
TO MCC-G2
1. SIZED BY MANUFACTURER
NOTES:PUMP NO.1SLUDGE MIXBLENDINGPUMP NO. 1WATER BOOSTERMIXER NO. 1THICKENERROTARY DRUMNO.1THICKENERROTARY DRUMBOOSTER PUMP NO. 1THICKENERROTARY DRUMSLUDGE PUMPTHICKENED40 5
1
15/M
PUMP NO. 3HOT WATER15/M
1
5
PUMP NO. 1HOT WATER150
PUMP NO. 3TRANSFER SLUDGEPUMP NO. 1TRANSFER SLUDGE PUMP NO. 3HEATING DIGISTERPUMP NO. 1HEATING DIGISTERPUMP NO. 1HEATING DIGISTERPUMP NO. 1MIXING DIGISTERPUMP NO.1SLUDGE BLENDEDK
TO ATS-G
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 11:29:21 AM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-E-6009
XXCHECKED BYJN HJELMBERGTA TOM98-E-6009_668876.dgn MCC G2SINGLE LINE DIAGRAM AND ELEVATIONPLANTWIDE ELECTRICAL
MCC-G2
3
2
25
SPD
30/M
15
VFD
10
15
VFD
15
VFD
1
15
VFD
3
15/M
1
5
100/M
3
15/M
1
5
15/M
1
5
15/M
1
5
600A, 480V, 3PH, 3W (65,000 AMP SYMMETRICAL BRACING, MINIMUM)
1. SIZED BY MANUFACTURER
NOTES:PUMP NO.1SLUDGE MIXBLENDINGPUMP NO. 2WATER BOOSTERMIXER NO. 2THICKENERROTARY DRUM40 5
1
15/M100/M
1
150A
DPM
400AT
600AF
TO MCC-F2
TO MCC-G1
NOTE 1
ATS-G
TO MCC-G1
480Y/277V
DP
208Y/120V
LP
208Y-120V
480Y/
45 kVA PUMP NO. 2HOT WATERPUMP NO.4HEATING DIGESTERPUMP NO. 2HEATING DIGESTER40
PUMP NO. 2TRANSFER SLUDGEPUMP NO. 4MIXINGDIGESTER PUMP NO. 2MIXINGDIGESTERBOOSTER PUMP NO. 2THICKENERROTARY DRUMNO. 2THICKENERROTARY DRUMPUMP NO. 2SLUDGE BLENDED
3PH, 4W
480/277VAC
PG&E TRANSFORMER
NG
KWH
1200AF
1000AT
K
KEY INTERLOCK
ST
PSR
UNIT TRIP
CAPACITOR
(3)
ST
UNIT TRIP
CAPACITOR
(3)
PSR
PSR MONITOR
3-PHASE
METER
POWER
DPC
KW TO
(3)
PFR
RELAY
POWER FAIL
PFR TO DPC
C.T.
FILTER
HARMONIC
(3)
400AF
400AT
400AF
400AT
400AF
250AT
400AF
250AT
400AF
250AT
400AF
250AT
400AF
250AT
480V, 1200A, 3PH, 3W, 65 000A RMS SYM BRACING
MCC R
G
300A
VFD 301
125
VFD 501
125
400A 400A
VFD 701
125
400A
REUSE PUMP 3WRP 301TSSP HTRHS 301APS 301SV 302REUSE PUMP 5WRP 305TSSP HTRHS 501APS 501SV 502REUSE PUMP 7WRP 701TSSP HTRHS 701APS 701SV 702SWBD R
METERING SWITCHBOARD
PG&E UTILITY
SPARESPAREFILENAME:PLOT DATE:PLOT TIME:2016\07\15 11:33:44 AM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-E-6011
XXCHECKED BYPLANTWIDE ELECTRICALJN HJELMBERGTA TOM98-E-6011_668876.dgn SINGLE LINE DIAGRAM AND ELEVATIONSWBD R1200AF
1200AT
REVISED900kW
480VAC, 3PH, 4W
GEN-R
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 11:35:30 AM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-E-6015
XXELECTRICALCHECKED BYPLANTWIDE ELECTRICALJN HJELMBERGTA TOM98-E-6015_668876.dgn SINGLE LINE DIAGRAM44-MCC-017/M
1
2
40
AFD
20
40
AFD
20
40
AFD
20
35
AFD
15
35
AFD
15
35
AFD
15
100
AFD
50
100
AFD
50
SCREEN NO. 1EFFLUENTPRIMARYNO. 1FEED PUMPNO. 3FEED PUMPNO. 5FEED PUMPPUMP NO. 1PERMEATEPUMP NO. 3PERMEATEPUMP NO. 5PERMEATEBLOWER NO. 1AIR SCOWERBLOWER NO. 3AIR SCOWER K
TO 40-ATS-1 SPD
NOTE 1
2000AF
2000AT
K
40-MCC-2
TO
40-MCC-1
44-MSG-01
TO
15015
AFD
5
EXHAUST FANBLOWER ROOMN.O.
NC
DPM
L.S.I.G.
1200AF
1200AT
480V, 3PH, 3W, 1200A, 65KAIC
250
125
RVSS
PUMP 1RECIRCULATIONPBP 100INVERTER
PV
NOTE 2
PROVIDED AS THE DESIGN PROGRESSES.
YET TO BE DETERMINED AND WILL BE
PV SYSTEM SIZING AND LOCATIONS ARE2.
SIZED BY MANUFACTURER.1.
NOTES:
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 11:43:41 AM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-E-6016
XXELECTRICALCHECKED BYPLANTWIDE ELECTRICALJN HJELMBERGTA TOM98-E-6016_668876.dgn SINGLE LINE DIAGRAM44-MCC-027/M
1
2
40
AFD
20
40
AFD
20
40
AFD
20
35
AFD
15
35
AFD
15
100
AFD
50
SCREEN NO. 2EFFLUENTPRIMARYNO. 2FEED PUMPNO. 4FEED PUMPNO. 6FEED PUMPPUMP NO. 2PERMEATEPUMP NO. 4PERMEATEBLOWER NO. 2AIR SCOWER K
TO 40-MCC-1SPD
NOTE 1
40-MCC-1
TO
40-MCC-2
44-MSG-01
TO
1505/M
1
5
40-ATS-1
3/M
1
0.5
WASHER/COMPACTORSCREENINGSPRIMARY EFFLUENTMIXERPRIMARY EFFLUENT208Y/120V
480V-
45kVA
40-XFMR-1
208Y/120V
40-LP-1
SIZED BY MANUFACTURER.1.
NOTES:
DPM
NC L.S.I.G.
1200AF
1200AT
100
AFD
55
ROOM MAUELECTRICAL480V
40-DP-1
480V, 3PH, 3W, 1200A, 65KAIC
250
125
RVSS
PUMP 2RECIRCULATIONPBP 200
FILENAME:PLOT DATE:PLOT TIME:2016\07\15 11:45:06 AM CH2M HILL 2015. ALL RIGHTS RESERVED.THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OFREUSE OF DOCUMENTS:1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 cPROJ
DATE DATENO.DSGNDRREVISIONCHKAPVDBYAPVDSHEET
DWG
A
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2M HILL.668876
PREDESIGN REPORTAPPVD BYFACILITY PROJECTWATER RESOURCE RECOVERYAUGUST 2016
NOT FOR CONSTRUCTION
PRELIMINARY
No. E21673
Exp. 09-30-16REGISTEREDP RO FESS
IO
NA E
L
NGI
NEERR
YANSTEP EN
H
B
E
RTTCELE
R IC ALSTA
TE O F CA LIFO RNIAAHR
98-E-6020
XXELECTRICALCHECKED BYPLANTWIDE ELECTRICALJN HJELMBERGTA TOM98-E-6020_668876.dgn SINGLE LINE DIAGRAM44-MSG-013000AF
3000AT
1200AF
1200AT
800AF
800AT
800AF
400AT
AFD
200
800AF
400AT
AFD
200
800AF
400AT
AFD
200
800AF
400AT
AFD
200
800AF
400AT
AFD
200
800AF
300AT
ATC
44-MSG-01
TO SWGR-MSGTO 40-MCC-01TO 40-MCC-02CENTERWATER RESOURCETO 10-DP-01BLOWER #1BLOWER #2BLOWER #3BLOWER #4(EXST)BLOWER #5UV DISINFECTIONTO 55-DP-011200AF
1200AT
DPM
NC
L.S.I.G.
DPM
L.S.I.G.
NC
G
BOND NEUTRAL POINT TO GROUND IN MAIN SERVICE ENTRANCE SWITCHGEAR.1.
NOTES:
4000AF
4000AT
4000AF
4000AT
2500kW
480VAC, 3 PH, 4W
GEN-MSG
480V, 3Φ, 3W, 4000A, 85KA SCCR
L.S.I.G.L.S.I.G.L.S.I.G.L.S.I.G.L.S.I.G.L.S.I.G.L.S.I.G.L.S.I.G.L.S.I.G.L.S.I.G.
G
N
TO UTILITY
3500kVA
12kV-480/277V
T1