Loading...
HomeMy WebLinkAbout04-26-2016 REOC Agenda Packet City of San Luis Obispo, Council Agenda, City Hall, 990 Palm Street, San Luis Obispo Agenda Revenue Enhancement Oversight Commission Tuesday, Apr . 26, 2016 5:30 pm REGULAR MEETING City Council Hearing Room 919 Palm Ave. San Luis Obispo, CA CALL TO ORDER: Chairperson Kardel ROLL CALL: Jeri Carroll, Amy Kardel, Ken Kienow and Michael Multari MINUTES: Minutes of Mar. 10, 2016. Approve or amend. PUBLIC COMMENT PERIOD FOR ITEMS NOT ON THE AGENDA At this time, people may address the Commission about items not on the agenda. Persons wishing to speak should come forward and state their name and city of residence. Comments are limited to five minutes per person. Items raised at this time are generally referred to the staff and, if action by the Commission is necessary, may be scheduled for a future meeting. BUSINESS ITEMS 1. FY 2016-17 Local Revenue Measure Funding Recommendations for Additional Revenue. Recommend to the City Council use of additional Local Revenue Measure funds for the capital and operating expenditures as referenced in the report (Greg Hermann). COMMENT & DISCUSSION 2. Staff Communications 3. Commission Communications ADJOURNMENT CITY OF SAN LUIS OBISPO CITIZENS’ REVENUE ENHANCEMENT OVERSIGHT COMMISSION MINUTES March 10, 2016 5:30 p.m. Ludwick Community Center, 864 Santa Rosa Street San Luis Obispo, California CALL TO ORDER A special meeting of the Citizens’ Revenue Enhancement Oversight Commission was called to order on Thursday March 10, 2015, at 5:30 p.m. in the Council Hearing Room at 990 Palm Street, San Luis Obispo, California, by Chair Kardel. ROLL CALL Commission Members Present: Commission Members Jeri Carroll, Michael Multari, Vice Chair Ken Kienow, and Chair Amy Kardel, Commission Members Absent: None Others Present: Derek Johnson, Assistant City Manager and Interim Finance and Information Technology Director; Greg Hermann Principal Analyst; Xenia Bradford, Budget Manager and John Paul Maier, Assistant City Clerk. MINUTES CITIZENS’ REVENUE ENHANCEMENT OVERSIGHT COMMISSION MINUTES OF DECEMBER 14, 2015 ACTION: MOTION BY MULTARI, SECOND BY CARROLL to approve the Citizens’ Revenue Enhancement Oversight Commission meeting minutes of December 14, 2015. PUBLIC COMMENT There were no members of the public desiring to speak. BUSINESS ITEMS 1. Annual Audit Review. Review the audited financial statements contained in the Comprehensive Annual Financial Report for the Local Revenue Measure (Xenia Bradford). Budget Manager Bradford and Assistant City Manager and Interim Finance and Information Technology Director Johnson reviewed the contents of the report and responded to Commission inquiries. Revenue Enhancement Oversight Commission Minutes – March 10, 2015 Page 2 During the course of discussion, by consensus, the Commission received and filed a presentation of the Annual Audit Review. 2. Annual Community Report Review/Annual Citizen Oversight Meeting. Review and take public testimony on the FY 2014-15 Local Revenue Measure Annual Community Report and take input from residents and community members on preferences for the use of the revenues generated by the Local Revenue Measure (Greg Hermann). Principal Analyst Hermann narrated a PowerPoint presentation entitled “Local Revenue Measure Annual Community Report/Citizen Oversight Meeting” and provided a brief overview of 2014-15 Annual Community Report, 2015-16 Project & Service Update, and 2016-17 Supplemental Budget process. Ken Tasseff, San Luis Obispo, inquired about the report regarding expenditures in Chart 3 of the staff report. In response to Mr. Tasseff’s inquiries, Assistant City Manager Johnson clarified that an estimated 2 million dollars has been carried over from the previous fiscal year. Charlene Rosales, Chamber of Commerce, expressed gratitude to staff and the Commission for the presentation of data in the staff report and for staff’s engagement to the community. By consensus, the Commission received and filed the Annual Community Report. COMMENT AND DISCUSSION 3. Staff Communications Principal Analyst Hermann reported that there are three upcoming vacancies for the REOC and advertisements to fill the vacancies have commenced. Principal Analyst Hermann stated that the next REOC meeting is scheduled for April 25, 2016. 4. Commission Communications Chair Kardel expressed gratitude to Principal Analyst Hermann for the completion of the first Annual Community Report. ADJOURNMENT Commission Member Carroll adjourned the meeting at 6:52 p.m. John Paul Maier Assistant City Clerk Approved: XX/XX/16 Revenue Enhancement Oversight Commission April 26, 2016 FROM: Greg Hermann, Principal Analyst SUBJECT: 2016-17 LOCAL REVENUE MEASURE FUNDING RECOMMENDATIONS FOR ADDITIONAL REVENUE RECOMMENDATION As part of 2016-17 Supplemental Budget adoption, recommend to the City Council use of additional Local Revenue Measure funds for the capital and operating expenditures as referenced in the report and listed in Attachment 1. DISCUSSION Background The Supplemental Budget is the second year budget of a two-year Financial Plan. Before the beginning of the second year of the two-year cycle, the City Council reviews progress during the first year, makes adjustments as necessary, and approves appropriations for the second fiscal year. A part of that process is deciding how to allocate additional funds from higher than anticipated growth in revenues. The Local Revenue Measure has experienced significant gains from sales tax revenues beyond what were forecasted resulting in additional funding available for allocation. Role of the Commission The role of the Revenue Enhancement Oversight Commission (REOC) in this process is detailed in section 2.14.040 (E) of the City of San Luis Obispo Municipal Code which states: “E. Budget Recommendations. The REOC shall meet for the purpose of making recommendations to the city council regarding the uses of revenue generated by the essential services measure. The REOC shall take into consideration the input provided by residents and community members during the annual citizen oversight meeting, the purpose of the essential services measure, the major city goals established by the city council, and the amount of revenue available from past fiscal years, and projected to be available during the next fiscal year, in making its budget recommendations to the council.” Additional Revenue Due to adjustments to forecasts, there is an additional $999,389 available for allocation in 2016- 17 from the following sources: 2016-17 Local Revenue Measure Funding Recommendations for Additional Revenue Page 2 2014-15 fund balance $281,935 2015-16 estimated over-realized revenue and fund balance $264,000 2016-17 ongoing Local Revenue Measure increase $453,454 Total $999,389 Recommended Projects In developing the recommended projects for additional funding, staff focused on one-time allocations and prioritized requests based on the following criteria: 1. Current Local Revenue Measure projects that are under-funded. 2. Current Local Revenue Measure projects that can be expanded with increased one- time funds such as street resurfacing, sidewalk and tree replacements, pedestrian and bicycle pathway maintenance, etc. 3. Unfunded CIP projects from the 2015-17 Financial Plan that are connected to Major City Goals and Local Revenue Measure funding priorities. 4. New projects that are critical, time-sensitive and connected to Major City Goals and Local Revenue Measure funding priorities. Project requests were reviewed and ranked by the CIP Committee that has representatives from several City departments. The ranked requests were then reviewed for final recommendations by the City Manager with the Budget Review Team. The follow projects are recommended for Local Revenue Measure funding in 2016-17: Project #1: PulsePoint Local Revenue Measure Priority: Public Safety Funding: Ongoing cost of $8,000 and one-time cost of $18,000 Description: PulsePoint is an enterprise-class, software-as-a-service solution designed to support public safety agencies working to improve out-of-hospital 2016-17 Local Revenue Measure Funding Recommendations for Additional Revenue Page 3 cardiac arrest survival rates through improved bystander CPR prior to arrival of firefighter-paramedics. Where adopted, PulsePoint has empowered everyday citizens to provide life‐saving assistance to victims of sudden cardiac arrest via a smart phone application that is free to end users. Combined with the Fire Department’s High Performance Cardiopulmonary Resuscitation (HPCPR) program, PulsePoint can significantly improve survival rates for San Luis Obispo citizens and visitors who suffer an otherwise fatal heart attack. Project #2: Enhanced Urban Forest Maintenance And Restoration Local Revenue Measure Priority: Bicycle and Pedestrian Improvements Funding: One-time cost of $185,000 Description: Urban Forest Restoration The City’s urban forest is losing its street trees to declining health due to age and drought stress. Approximately 30 street trees were lost in each recent year. There are currently 310 empty street tree wells. This project will replant 30 trees to restore street trees lost over the last year with appropriate drought tolerant species with input from the tree committee. The trees will be watered for the initial establishment period of three years as part of the project. California Street Palm Trees Seven large Canary Island Date Palms on California Street were identified for removal by the City’s service contractor and confirmed by City Forestry staff. Having reached a near critical decay threshold, two of the palms were in imminent danger of failure and were removed. The remaining five palms identified need to be removed soon to avoid failures. Replanting, initial maintenance and watering for the initial establishment period of three years are included as part of the project. Johnson Park Trees 139 Large Blue Gum Eucalyptus Trees along the creek dividing Johnson and Sinsheimer parks, and Sinsheimer Elementary School need much more frequent pruning than provided under the current maintenance rotation. This is due to their enormous size and proximity to school children, scheduled users of the playground equipment coming from YMCA programs, and the frequent users of the park who play amongst the trees. 2016-17 Local Revenue Measure Funding Recommendations for Additional Revenue Page 4 Project #3: Enhanced Sidewalk Replacement Local Revenue Measure Priority: Bicycle and Pedestrian Improvements Funding: One-time cost of $100,000 Description: The City maintains 241 miles of sidewalks. Sidewalk maintenance has historically been incorporated into the Pavement Management Program whereby sidewalks are systematically inspected and repaired when that geographic pavement area is up for resurfacing. In addition, priority sidewalk repairs are addressed on an ongoing basis. There are also instances where tree roots and other factors cause deterioration of the traveling surface. Even with the City’s comprehensive sidewalk management program, there continue to be unmet maintenance needs. A location list has been prepared of potential and actual trip and fall sites and the additional proposed funding will allow for four to five sites to be reconstructed. Project #4: Enhanced Park Maintenance Local Revenue Measure Priority: Parks and Recreation/Senior Programs and Facilities Funding: One-time cost of $220,000 Description: Pedestrian Bridges There are two pedestrian bridges in Meadow Park. The bridge linking the parking lot to the community building and playground is currently scheduled to begin design in the upcoming 2016-17 fiscal year. The second bridge (officially in Exposition Park) crosses the creek at about the mid-point of the park, near the terminus of King Street. The bridge in the middle of the park near King Street has deteriorated to the point where it can no longer be repaired and will need to be closed or removed in the near future. Combining design efforts for these two structures is anticipated to reduce overall design costs. Sinsheimer Stadium Backstop The backstop at Sinsheimer Park at the Stadium is believed to be the original from the Stadium construction in the 1970’s. It is regularly coated on the outside to prevent rusting; however, there is clear evidence that the backstop is rusting from the inside and is in need of replacement or rehabilitation. 2016-17 Local Revenue Measure Funding Recommendations for Additional Revenue Page 5 Project #5: Enhanced Street Reconstruction and Resurfacing Local Revenue Measure Priority: Neighborhood Street Paving Funding: One-time cost of $350,000 Description: The City has a few concrete streets that have never received maintenance since installation in the 1940’s. The City’s most recent Pavement Condition Survey indicated that, while overall Pavement Condition Index (PCI) has increased from 72 to 73; the Concrete streets have declined to 35. A maintenance strategy has now been developed for these streets and will roll out with upcoming area pavement maintenance. However, two intersections have drawn the attention of staff as being in need of immediate attention. Planning and design is nearing completion for work at Palm & Johnson and Nipomo & Dana. These intersections are very uneven and present a challenge to pedestrians crossing the street, particularly those with mobility issues. The proposed funding will allow for complete reconstruction of these intersections, including updated sidewalk ramps. Project #6: Enhanced Open Space Maintenance Local Revenue Measure Priority: Open Space Preservation Funding: One-time cost of $100,000 Description: Additional resources to the specific task of wildland-urban interface fuel reduction through contract labor would be utilized during the 2016 summer season and are of critical importance given the ongoing drought in our region. The City also utilizes grazing as a management tool in several of its open space properties for fuel reduction and other objectives. This project includes fencing and water system improvements for grazing operations as well as the use of hired herds. Lastly, a contract for focused invasive species treatment consistent with the priorities and specifications in the Open Space Maintenance Plan technical appendix is also included. The recommended projects consist almost entirely of one-time funding for capital projects and as such will not negatively affect the direction to maintain a minimum capital to operating cost ratio of 70/30. 2016-17 Local Revenue Measure Funding Recommendations for Additional Revenue Page 6 CONCLUSION The REOC plays an important advisory and oversight role to the City Council and community by reviewing, reporting and making recommendations on the use of Local Revenue Measure funds and expenditures. The REOC’s input, along with community feedback at public meetings helps represent to the City Council how residents envision use of Local Revenue Measure funding. The City Council will discuss the recommendations from the REOC and the 2016-17 Supplemental Budget at their June 14th, 2016 meeting. ATTACHMENT 1. Draft updated list of Local Revenue Measure capital and operating expenditures 2. Agenda correspondence Major City Goal (MCG) = Open Space Preservation (OS); Housing (H); Multi-Modal Transportation (T) Other Important Objective (OIO) = Neighborhood Wellness (N); Laguna Lake Restoration (LL); Downtown (D); Fiscal Sustainability/Responsibility (F)4/18/16 2015-16 2016-17 2015-16 2016-17 1 Laguna Lake Dredging and Sediment Management 450,000 450,000 LL Laguna Lake Conservation Plan implementation 2 Open Space Acquisition 250,000 250,000 500,000 OS Northern greenbelt: Cuesta Canyon area (Miossi and Ahearn Ranches) 3 Open Space Maintenance 285,000 325,000 610,000 OS Trailhead enhancement and deferred maintenance 4 Ranger Program Pickup Truck (3 in 15-16) 139,000 139,000 OS Fleet replacement (1), Fleet expansion (2) 5 Natural Resources (Open Space Wildfire Fuel Reduction) 5,000 5,000 60,000 70,000 OS Open Space maintenance: Fire Prevention 6 Ranger Services (Ranger Staffing; FTE = 2) 121,590 129,530 251,120 OS Two new rangers Subtotal 2,020,120 7 Bicycle Facility Improvements 100,000 100,000 200,000 T Misc projects identified in Bicycle Transportation Plan 8 Bicycle Transportation Plan Implementation 400,000 400,000 T Improvements at Highland/Chorro, Prado, Chorro/Foothill, Laurel/Orcutt 9 Bike Bridge at Phillips Lane 250,000 250,000 T Extending Railroad Trail from California/Phillips to Phillips/Pepper 10 Bob Jones Trail Octagon Barn Connection 50,000 50,000 T Extension of Bob Jones between Octagon Barn and LOVR 11 Downtown Renewal 6,000 6,000 D Complete design of sidewalk replacement projects 12 Pedestrian and Bicycle Pathway Maintenance 100,000 60,000 160,000 T Pavement for pathways and Class I bikeways 13 Replacement of Lighted Crosswalk on Higuera Street 43,500 43,500 D,T Replacement of aging system that has exceeded service life 14 Safe Route to School Improvements-Pacheco and Bishop Peak 45,000 45,000 T On Foothill Road at Ferrini 15 Sidewalk and Tree Replacements 100,000 385,000 485,000 N,D,T Removing trip hazards, rebuilding tree wells, DT mission-style sidewalk 16 Sidewalk Ramp Construction 45,000 45,000 T Accessible curb ramps coordinated with paving projects 17 Traffic, Bicycle & Pedestrian Marking Replacement 20,000 20,000 T Crosswalks, stop bars, lane lines 18 Transportation Planning and Engineering (Engineers, Bike Coordinator; FTE = 1.6) 173,799 175,948 349,747 T Engineers and Bicycle Coordinator Subtotal 2,054,247 19 Monterey & Osos Traffic Signal Safety Upgrade 225,000 225,000 T Reconstruct traffic signal 20 Neighborhood Traffic Improvements 20,000 20,000 40,000 N,T Improve traffic conditions in existing neighborhoods 21 Parking Structures Assessment and Rehabilitation Study 8,333 8,333 Minor contribution from GF, mostly Parking Fund 22 Signals and Lighting Maintenance Lift Truck 91,000 91,000 Fleet replacement 23 South & Parker Traffic Safety Project: Median 30,000 30,000 T Concrete median safety measure 24 Traffic Operation Improvement Projects 30,000 30,000 T Misc projects identified in Annual Traffic Operations Report 25 Traffic Safety Improvement Projects 25,000 25,000 50,000 T Misc projects identified in Annual Traffic Operations Report 26 Transportation Radar Trailer 15,000 15,000 Fleet replacement 27 Signal and Light Maintenance (Technician; FTE = 1) 96,866 98,127 194,993 T Signal Technician Subtotal 684,326 % Complete FY 2015-17 LOCAL REVENUE MEASURE EXPENDITURES The following uses of local sales tax revenue are consistent with Council goals and objectives, the spending priorities of voter-approved Local Revenue Measure G, and the recommendations of the Citizens' Revenue Enhancement Oversight Commission (REOC). Bicycle and Pedestrian Improvements Traffic Congestion Relief / Safety Improvements Duration Details # MCG OIO Public Input New/Existing Open Space Preservation Operating Programs CIP General Fund 2-yr Total Project Title Major City Goal (MCG) = Open Space Preservation (OS); Housing (H); Multi-Modal Transportation (T) Other Important Objective (OIO) = Neighborhood Wellness (N); Laguna Lake Restoration (LL); Downtown (D); Fiscal Sustainability/Responsibility (F)4/18/16 2015-16 2016-17 2015-16 2016-17 % Complete FY 2015-17 LOCAL REVENUE MEASURE EXPENDITURES The following uses of local sales tax revenue are consistent with Council goals and objectives, the spending priorities of voter-approved Local Revenue Measure G, and the recommendations of the Citizens' Revenue Enhancement Oversight Commission (REOC). Duration Details # MCG OIO Public Input New/Existing Operating Programs CIP General Fund 2-yr Total Project Title 28 911 Phone System 245,000 245,000 Scheduled replacement 29 Computer-Aided Dispatch 25,000 25,000 Scheduled replacement of software for connectivity to County dispatch 30 Fire Electronic Patient Care Reporting System 53,800 25,700 79,500 Electronic Patient Records Management for emergency response 31 Fire Emergency Response Forklift 50,000 50,000 Fleet replacement 32 Fire Emergency Response SUV 99,400 99,400 Fleet replacement 33 Fire Emergency Response Van with Ambulance Package 180,000 180,000 Fleet replacement 34 Fire Prevention SUV (2 in 15-16) 91,000 91,000 Fleet replacement 35 Fire Station 2 Exterior Driveway Ramp Replacement 10,000 10,000 Settling and structural problems with existing driveway as Station #2 36 Fire Station 2 Restroom and Dorms Privacy Modifications 160,000 160,000 ADA upgrades & modernize facilities to support female firefighters 37 Police Administration Sedan 38,500 38,500 Fleet replacement 38 Police CAD hardware 250,000 250,000 Additional server space for Police dispatch system 39 Police Investigations Sedans (2 in 15-16) 66,600 66,600 Fleet replacement 40 Police Patrol Sedans (2 in 15-16, 3 in 16-17) 83,500 129,700 213,200 Fleet replacement 41 Police Patrol SUV 53,000 53,000 Fleet replacement 42 Police Support Services Pickup 31,400 31,400 Fleet replacement 43 Police Traffic Safety Motorcycles (2, 1) 63,400 34,200 97,600 Fleet replacement 44 Policy Facility Site Assessment 45,000 45,000 Evaluate space needs and redevelopment potential of existing site 45 Patrol Services (Officers, Sergeant; FTE = 4) 764,741 786,655 1,551,396 Patrol Officers, Police Sergeant 46 PuslePoint CPR Software 8,000 18,000 26,000 Subtotal 3,312,596 47 Capital Engineering Pickup Truck 31,500 31,500 Fleet replacement 48 Street Reconstruction & Resurfacing 1,566,817 1,980,700 3,547,517 T Arterials; Local and Collectors in northern part of City (Areas 1 and 8) 49 Streets Maintenance Asphalt Grinder & Trailer Mount 89,100 89,100 Fleet replacement 50 Streets Maintenance Backhoe 128,000 128,000 Fleet replacement 51 Streets Maintenance Trucks 69,000 69,000 Fleet replacement 52 CIP Project Engineering (Inspector; FTE = 1) 109,234 116,258 225,492 Field Engineering Inspector III 53 Streets and Sidewalk Maintenance (Maintenance Worker; FTE = 1) 80,597 85,003 165,600 Streets Maintenance Worker Subtotal 4,256,209 54 Mission Plaza Railing Upgrade 30,000 30,000 60,000 D,T ADA upgrades required to picket spacing in guardrails 55 Building and Safety (Code Enforcement Officer, Neighborhood Services Specialists; FTE = 3) 247,185 256,639 503,824 N Building Code Enforcement Officer, Neighborhood Services Specialists Subtotal 563,824 Public Safety Neighborhood Street Paving Code Enforcement Major City Goal (MCG) = Open Space Preservation (OS); Housing (H); Multi-Modal Transportation (T) Other Important Objective (OIO) = Neighborhood Wellness (N); Laguna Lake Restoration (LL); Downtown (D); Fiscal Sustainability/Responsibility (F)4/18/16 2015-16 2016-17 2015-16 2016-17 % Complete FY 2015-17 LOCAL REVENUE MEASURE EXPENDITURES The following uses of local sales tax revenue are consistent with Council goals and objectives, the spending priorities of voter-approved Local Revenue Measure G, and the recommendations of the Citizens' Revenue Enhancement Oversight Commission (REOC). Duration Details # MCG OIO Public Input New/Existing Operating Programs CIP General Fund 2-yr Total Project Title 56 Broad Street Bank Reinforcement 40,000 40,000 Old Garden Creek - bank stabilization and sediment removal 57 Flood Control Pickup Truck 28,500 28,500 Fleet replacement 58 Marsh Street Bridge Replacement 734,000 734,000 D,T Built in 1909, needs complete replacement 59 Storm Drain System Replacement 548,500 574,300 1,122,800 N Continued replacement of substandard corrugated metal pipes 60 Toro Street Bank Stabilization 50,000 50,000 San Luis Creek - bank stabilization and sediment removal 61 Creek and Flood Protection (Collection Operators, Stormwater Management Plan; FTE = 6) 577,878 583,794 1,161,672 N Stormwater Code Enforcement Officer, Stormwater Collection Operators, Stormwater Management Plan Subtotal 3,136,972 62 Golf Course Pickup Truck 28,500 28,500 Fleet replacement 63 Olympic Pool Replastering 290,000 290,000 Existing shell plaster is 17 years old, underwater lights are 33 years old 64 Park Major Maintenance & Repairs 86,000 440,000 526,000 Sports Courts, Sports Lights, Bleachers, Fencing 65 Restroom Replacement and Remodeling 400,000 80,000 480,000 D Golf course restroom construction, Mission Plaza restroom design 66 Octagon Barn Facility 206,000 206,000 67 Jack House Elevator Removal 22,000 22,000 68 Parks and Landscape Maintenance (Maintenance Worker; FTE = 1) 77,658 78,657 156,315 Parks Maintenance Worker Subtotal 1,708,815 2,254,548 2,323,611 7,072,850 6,086,100 17,737,109 Parks and Recreation/Senior Programs and Facilities Total Local Revenue Measure Uses Flood Protection