HomeMy WebLinkAbout03-08-2017 PC Agenda PacketCity of San Luis Obispo, Agenda, Planning Commission
Any writings or documents provided to a majority of the Planning Commission regarding any item on this agenda
will be made available for public inspection in the Community Development, 919 P alm Street, during normal
business hours.
Agenda
Planning Commission
Wednesday, March 8, 2017
6:00 p.m. REGULAR MEETING Council Chamber
990 Palm Street
San Luis Obispo, CA
CALL TO ORDER: Chair Stevenson
PLEDGE OF
ALLEGIANCE : Chair Stevenson
ROLL CALL : Commissioners Kim Bisheff, Daniel Knight, Ronald Malak, John Larson,
Hemalata Dandekar, Vice-Chair John Fowler, and Chair Charles Stevenson.
ACCEPTANCE OF AGENDA: Commissioners or staff may modify the order of items.
PUBLIC COMMENT: At this time, people may address the Commission about items not on the
agenda. Persons wishing to speak should come forward and state their name and address.
Comments are limited to three minutes per person. Items raised at this time are generally referred
to staff, and, if action by the Commission is necessary, may be scheduled for a future meeting.
BUSINESS ITEMS
1. Citywide. GENP-0244-2017: General Plan Annual Report for 2016; City of San Luis Obispo
– Community Development Department. (Steven Orozco)
2. Presentation and Information Regarding Land Use Regulations and the Planning
Commission’s Role and Responsibilities Under the California Environmental Quality Act.
(Shawna Scott and Jon Ansolabehere)
Planning Commission Agenda Page 2
The City of San Luis Obispo is committed to include the disabled in all of its services, programs , and
activities. Please contact the City Clerk or staff liaison prior to the meeting if you require assistance.
COMMENT AND DISCUSSION
1. STAFF
a. Agenda Forecast
ADJOURNMENT
The next Regular Planning Commission meeting is scheduled for Wednesday, March 22, 2017
at 6:00 p.m., in the Council Chamber, 990 Palm Street, San Luis Obispo, California.
APPEALS: Any decision of the Planning Commission is final unless appealed to the City Council
within 10 days of the action (Recommendations to the City Council cannot be appealed since they are
not a final action.). Any person aggrieved by a decision of the Commission may file an appeal with
the City Clerk. Appeal forms are available at the Community Development Department office, City
Clerk’s office, or on the City’s website (www.slocity.org). The fee for filing an appeal is $281, and
must accompany the appeal documentation.
PC 1-1
PLANNING COMMISSION AGENDA REPORT
SUBJECT: Planning Commission consideration of the 2016 General Plan Annual Report
PROJECT ADDRESS: Citywide BY: Steven Orozco, Planning Technician
Phone Number: 781-7596
e-mail: sorozco@slocity.org
FILE NUMBER: GENP-0244-2017 FROM: Xzandrea Fowler, Deputy Director
RECOMMENDATION: Forward the 2016 General Plan Annual Report to the City Council for
consideration.
SUMMARY: Each year, the City publishes an Annual Report on the status of its General Plan and
the actions taken to implement it during the past year (Attachment 1). The General Plan Annual
Report is developed to comply with state law, which says that “the planning agency shall …
provide an annual report to the legislative body on the status of the general plan and progress in
its implementation, including the progress in meeting its share of regional housing needs…”
(California Government Code §65400). The General Plan Annual Report also implements City of
San Luis Obispo’s General Plan Land Use Element Policy 11.3.
1.0 COMMISSION’S PURVIEW
The Planning Commission provides input on long range planning efforts, such as specific plans,
community plans and all the elements of the General Plan. The purpose of this agenda item is to
provide an opportunity for the Planning Commission to review the proposed 2016 General Plan
Annual Report and for staff to gather Commission input and recommendations before forwarding
the final report to the City Council for consideration.
2.0 BACKGROUND
According to Land Use Element Policy 11.3 the City shall prepare an annual report on the status
of the General Plan, which is to include the following items:
A) A summary of private development activity and a brief analysis of how it helped meet
General Plan goals;
B) A summary of major public projects and a brief analysis of how they contributed to meeting
General Plan goals;
C) An overview of programs, and recommendations on any new approaches that may be
necessary;
Meeting Date: March 8, 2017
Item Number: 1
2016 General Plan Annual Report
Page 2
PC 1-2
D) A status report for each General Plan program scheduled to be worked on during that year,
including discussion of whether that program's realization is progressing on schedule, and
recommendations for how it could better be kept on schedule if it is lagging;
E) A status report on how the City is progressing with implementing its open space
preservation policies and programs;
F) Updated population or other information deemed important for the plan.
The General Plan Annual Report is an opportunity for the City to keep the General Plan current
by reflecting on how well the Plan continues to meet the City’s goals and objectives. It is also an
opportunity to review how well the programs identified in the Plan are being implemented and to
determine if programs are still relevant or if priorities should be reassigned.
In addition, assessment of the implementation of the General Plan informs the City Council about
the availability of resources and about programs and projects that might be initiated as the City
develops a new financial plan. During the budgeting process, the City Council reviews the progress
being made to implement the General Plan and decides whether or not to move forward with
additional work program items over the next two years.
3.0 DISCUSSION
The General Plan contains an array of policies and implementing programs covering most types
of City actions. The General Plan Annual Report touches on the major programs that saw activity
in 2016. The report is organized around the following key implementation areas:
General Plan Updates
Planning and Building Activity
Housing and Residential Growth
Nonresidential Growth
Specific Plan Implementation and Development
Water Supply
Historic Preservation
Circulation
Safety
Neighborhood Wellness
Open Space Protection
Parks and Recreation
The 2016 Annual Report also includes a discussion of the following:
Plans Under Development
Climate Action Plan Implementation
2016 General Plan Annual Report
Page 3
PC 1-3
Economic Development
New Policy Initiatives
Provided below are a few highlights from the General Plan Annual Report:
2016 saw the initial implementation of the newly revised Water and Wastewater Management
Element, updated Housing Element, and Land Use and Circulation Elements. The recent update
of the Land Use and Circulation Elements (LUCE) established implementation of programs in
2016, such as such as the Downtown Concept Plan, Subdivision Regulations, Sign Regulations,
Neighborhood Matching Grants, Mission Plaza Master Plan, and Zoning Regulations Update,
among many others.
Program Implementation and Proposition 64
As a result, 2016 concluded with more than 75% of the implementation programs in the Land Use
Element and more than 97% of the implementation programs in the Circulation Element were
completed or are in progress.
In 2016 the Disaster Preparedness Training program was initiated and in January 2016 the Rental
Housing Inspection Program was launched. On November 8, 2016 California voters approved
Proposition 64, the Adult Use of Marijuana Act (AUMA).
Building Permits Issued
Development activity remained strong in 2016 even though there were only 568 permits issued,
which was 128 less than in 2015. The building valuation for 2016 shows how strong development
activity was because 2016 saw an increase of $11,587,323 over 2015.
Residential Growth
Based on the Community Development Department’s running total of residential construction
permits (as shown in Table 6 on page 20) the annual growth rate in 2016 was 0.65 percent, which
includes new single-family and multi-family market-rate residential construction. This is well
within the limit of the one percent annual residential growth rate identified in the Land Use
Element. The five-year average growth rate was at 0.39 percent.
Non-residential Growth
Based on final building permits issued, 81,278 square feet of net new non-residential floor area
was added to the City in 2016. This is an increase of 21 percent from 2015, which saw 67,141
square feet of net new non-residential space, and an annual growth rate of .70 percent. Virtually
all of the new non-residential growth was in the retail sector. Not reflected in the non-residential
growth rate is the rehabilitation of existing vacant properties listed below. These properties are not
reflected because they are not considered new structures but rather occupying an existing structure
(see Figure 4, page 26).
2016 General Plan Annual Report
Page 4
PC 1-4
Updated employment numbers provided from SLOCOG highlighted the jobs housing balance in
the City of San Luis Obispo, and concluded that the City is currently experiencing a jobs housing
imbalance. The updated data depicted the jobs to housing ratio at 2.4:1 for 2016, compared to 1:6:1
for 2015. Table 10 provides the current statistics.
Table 10 - Current Jobs/Housing Balance
Estimated jobs in City limits 50,985
Housing units 21,155
Jobs to housing ratio 2.4:1
Cal Poly jobs (not in City) 3,093
California Men's Colony jobs (not in City) 1,899
Jobs to housing ratio including neighboring
major employers (CP and Men’s Colony) 2.6:1
The FY 2015-17 Housing, Open Space, and Transportation Major City Goals resulted in a
significant amount of activity in these General Plan program areas. Housing and residential
growth program accomplishments are highlighted below.
Table 8 - Affordable Housing Project Highlights from 2016
Project Affordable
Units Status Special Notes
Moylan
Terrace
(860
Humbert)
27 units
(2 very-low;
14 low-
income; 11
moderate)
All units in Moylan
Terrace have now been
complete and sold. The 80
units were developed in
four phases and were
completed in late 2016.
The City contributed an Affordable Housing
Fund (AHF) grant of $709,900 for property
acquisition and an impact fee deferral loan
for the affordable units.
South Hills
Crossing
(313 South)
43
Construction was finalized
in Summer 2016 and all
units are now occupied.
The City provided a loan in the amount of
$650,000 from the Affordable Housing Fund
and a development impact fee deferral loan
in the amount of $716,166. A lottery for the
units opened in Winter 2015 and all units
were occupied by Summer 2016.
860 On the
Wye
19 (10 units
set aside for
homeless
veterans)
Construction kicked off in
May 2016. Construction is
on track and willl be
completed in Spring 2017.
The project received low-income housing
tax credits in September 2015. AHF award of
$352,029 awarded to HASLO in Fall 2015.
Iron Works 46
All planning entitlements
have been awarded.
HASLO sucessfuly
obtained low income
housing tax credits in 2016
This mixed-use project located at 3680 Broad
Street is being devevloped by HASLO. The
City has awarded a $920,000 AHF award to
the project.
2016 General Plan Annual Report
Page 5
PC 1-5
and is currnetly working to
obtain building permits
and begin construction in
early 2017.
Bishop
Street
Studios
34
All entitlements for this
new affordable housing
development were
awarded in late 2016.
HASLO will apply for low
income housing tax credits
in Summer 2017.
HASLO and Transitions Mental Health
Assocation have teamed up to renovate the
existing Sunny Acres building and create
new affordable housing for TMHA clients.
867
Humbert 1
The City successfully
purchased an affordable
unit in which the tenant
was out of compliance
In August 2016 the City purhased one
moderate income unit using Affordable
Housing Funds. The unit was then resold to a
new moderate income household in
December 2016.
Courtyard
at the
Meadows
36
Courtyard at the
Meadows, HASLO’s new
affordable housing
development in the Serra
Meadows Tract was fully
entitled in Fall 2016.
HASLO will apply for tax credits in Summer
2017 and hope to start construction by
Winter 2017.
Specific Plan Areas
Orcutt Area 73 proposed
at this time
Staff has entered into
affordable housing
agreements for two
separate subdivisions in
the Orcutt Area.
The Orcutt Area Specific Plan projects up to
1,000 units. At full build out, up to 150 new
affordable units will be created.
Margarita
Area
36 propsed at
this time
Courtyard at the
Meadows, HASLO’s new
affordable housing
development in the Serra
Meadows Tract was fully
entitled in Fall 2016. Land
dedication for affordable
housing on the Toscano
Tract is scheduled for late
2017.
The Margarita Area Specific Plan projects up
to 850 units. Up to 130 new affordable units
are expected at build out.
Rehabilitation
Highland
Drive –
Habitat for
Humanity
1 single
family
residence
Completed Winter 2016.
Under Habitat for Humanity’s Home
Rehabilitation Project, one low income single
family home was fully renovated. The City
provided a $35,000 grant to assist the project.
Circulation Element program accomplishments include SLO Transit’s increase in ridership,
transporting over 1,209,701 during calendar year 2016. This represents a new all-time record high
in ridership for SLO Transit; the prior record was set only a year ago.
2016 General Plan Annual Report
Page 6
PC 1-6
4.0 CONCLUSION
As the Community Development Department’s Long Range Planning Division leads the City in
the implementation and updating of the General Plan, it also takes the lead in the update of the
General Plan Annual Report. However, staff from all City departments contributed significantly
to the report.
Any comments made by the Commission during review of the General Plan Annual Report will
be addressed by staff before the report is forwarded to the City Council for consideration. The
Planning Commission can also direct staff to provide the Commission with additional information
or analysis on specific topics from 2016 program implementation.
5.0 ALTERNATIVES
1. The Commission may direct staff to make revisions to the report, or to include additional
information, and forward it to the City Council.
2. The Commission may continue action if more information or more significant changes to
the report are needed before it can be forwarded to the City Council.
6.0 ATTACHMENTS
1. 2016 General Plan Annual Report
GENERAL PLAN
ANNUAL REPORT
City of San Luis Obispo
WWW.SLOCITY.ORG
2016
GPAR
2
Community Development Department
Our Mission Statement
Our mission is to serve all persons in a positive and courteous manner and help ensure that San
Luis Obispo continues to be a healthy, safe, attractive, and enjoyable place to live, work, or visit.
We help plan the City’s form and character, support community values, preserve the
environment, promote wise use of resources, and protect public health and safety.
Our Service Philosophy
The City of San Luis Obispo Community Development Department (CDD) staff provides high
quality service when you need it. We will:
•Listen to understand your needs;
•Give clear, accurate and prompt answers to your questions;
•Explain how you can achieve your goals under the City’s rules;
•Help resolve problems in an open, objective manner;
•Maintain high ethical standards; and
•Work to improve our service.
General Plan Annual Report 2016
3
Acknowledgements
City Council
Heidi Harmon, Mayor
Jan Marx, Former Mayor
Dan Rivoire, Vice Mayor
Dan Carpenter, Former Vice Mayor
Carlyn Christianson
Aaron Gomez
Andy Pease
John Ashbaugh, Former Council Member
Planning Commission
Chuck Stevenson, Chair
John Fowler, Vice Chair
Michael Multari, Former Vice Chair
Hemalata Dandekar
Kim Bisheff
John Larson
Ronald Malak
Daniel Knight
William Riggs, Former Commissioner
Michael Draze, Former Commissioner
Katie Lichtig, City Manager
Project Manager
Steven Orozco, Planning Technician, Long Range Planning
Staff Contributors
Michael Codron, Community Development Director
Xzandrea Fowler, Deputy Director, Long Range Planning
Doug Davidson, Deputy Director, Development Review
Anne Schneider, Deputy Director, Building and Safety
The 2016 General Plan
Annual Report was
prepared by the
Community Development
Department for review
by the Planning
Commission and
acceptance by the City
Council. The Community
Development
Department’s Long-
range Planning Division
often takes the lead for
staff work involving the
General Plan. However,
all City departments and
advisory bodies are
involved in General Plan
implementation and have
contributed to the 2016
General Plan Annual
Report.
General Plan Annual Report 2016
4
Adam Fukushima, Active Transportation Manager
Alexander Fuchs, Parking Services Supervisor
Andrew Collins, Facilities Maintenance Supervisor
Bob Hill, Natural Resources Manager
Brian Leveille, Senior Planner
Bryan Wheeler, Transportation Planner/Engineer II
Cassia Cocina, Permit Services Coordinator
Chris Staley, Police Captain
Christine Wallace, Neighborhood Services
David Athey, Supervising Civil Engineer
Diane Dostalek, Senior Civil Engineer
Deanna Cantrell, Police Chief
Devin Hyfield, Recreation Supervisor
Doug Carscaden, Recreation Supervisor
Freddy Otte, Biologist
Gamaliel Anguiano, Transit Manager
Garret Olson, Fire Chief
Greg Hermann, Principal Analyst
Hal Hannula, Supervising Civil Engineer
Jake Hudson, Traffic Operations Manager
Januar Saptono, Planning Technician
Jeff Hendricks, Parks Maintenance Supervisor
Jennifer Metz, Utilities Project Manager
Jennifer Rice, Transportation Planner/Engineer I
Jenny Wiseman, Acting Housing Programs Manger
Kyle Bell, Associate Planner
Kyle Van Leeuwen, Planning Technician
Lee Johnson, Economic Development Manager
Luke Schwartz, Transportation Planner/ Engineer III
Marcus Carloni, Special Projects Manager
Mark Sadowski, Building and Safety Supervisor
Melissa Mudgett, Recreation Manager
Molly Cano, Tourism Manager
Mychal Boerman, Water Resources Program Manager
Pam Ouellette, WRRF Chief Operator
Rebecca Gershow, Associate Planner
Rodger Maggio, Fire Marshal
Shawna Scott, Associate Planner
General Plan Annual Report 2016
5
Teresa Purrington, Code Enforcement Supervisor
Tyler Corey, Principal Planner
General Plan Annual Report 2016
6
Table of Contents
Community Development Department……………………................................................................... 2
Our Mission Statement ..................................................................................................... 2
Our Service Philosophy ..................................................................................................... 2
Introduction .................................................................................................................................. 9
Background ..................................................................................................................................10
General Plan Element Updates ................................................................................................... 12
Land Use and Circulation Elements ................................................................................. 12
Housing Element ............................................................................................................. 12
Water and Wastewater Element .................................................................................... 13
Community Development Department ...................................................................................... 14
Customer Service/Process Improvements ...................................................................... 14
Coordination with Other Agencies .................................................................................. 15
Planning and Building Activity..................................................................................................... 18
Yearly Planning Application Trends.................................................................................. 18
Monthly PlanningApplicationTrends................................................................................ 18
Building Permits and Plan Reviews ................................................................................. 19
Valuation of Construction ............................................................................................... 21
Housing and Residential Growth ................................................................................................ 22
Quantified Objectives ..................................................................................................... 24
Affordable Housing ......................................................................................................... 25
Funding and Grant Programs .......................................................................................... 27
Homeless Services Support ............................................................................................. 28
Non-Residential Growth ............................................................................................................. 29
Commercial and Industrial Growth Management .......................................................... 32
Jobs-Housing Balance ...................................................................................................... 33
Specific Plan Implementation and Development ........................................................................ 34
Margarita Area Specific Plan ........................................................................................... 34
Orcutt Area Specific Plan ................................................................................................ 34
Avila Ranch Specific Plan.................................................................................................. 35
San Luis Ranch Specific Plan............................................................................................. 35
Madonna on LOVR Specific Plan ......................................................................................36
South Broad Street Area Plan ......................................................................................... 37
Plans Under Development .......................................................................................................... 38
Downtown Concept Plan Update .................................................................................... 38
Mission Plaza Master Plan............................................................................................... 39
Zoning Regulations Update ............................................................................................. 39
Subdivision Regulations Update. .................................................................................... 40
Sign Regulations Update ................................................................................................. 41
Public Infrastructure Financing........................................................................................ 41
Climate Action Plan ..................................................................................................................... 42
Municipal Actions ............................................................................................................ 42
City and Community Partner Actions............................................................................... 45
General Plan Annual Report 2016
7
Economic Development .............................................................................................................. 47
Break Down Barriers to Job Creation .............................................................................. 48
Actively Support Knowledge & Innovation ..................................................................... 49
Promote and Enhance Quality of Life ............................................................................. 50
Homestay Rentals ........................................................................................................... 51
New Policy Initiatives .................................................................................................................. 52
Rental Housing Inspection Program .................................................................................52
Proposition 64: Adult Use of Marijuana Act.................................................................... 52
Historic Preservation................................................................................................................... 53
Historic District Signs………............................................................................................... 53
Historic Resource Numbering System…........................................................................... 53
Mapping……………............................................................................................................. 54
Water Supply............................................................................................................................... 55
Water Conservation......................................................................................................... 56
Circulation ................................................................................................................................... 57
Transportation Network Improvements ......................................................................... 57
Transportation Planning Accomplishments .................................................................... 59
Neighborhood Traffic Management (NTM) .................................................................... 60
Parking Management ...................................................................................................... 61
Safety .......................................................................................................................................... 62
Emergency Preparedness and Response ........................................................................ 62
Hazard Mitigation ........................................................................................................... 63
Staff Training ................................................................................................................... 63
Mutual and Automatic Aid .............................................................................................. 64
Community Action Team (CAT) ....................................................................................... 65
Multi-Dwelling Property Inspection Program ................................................................. 65
Fire and Life Safety Inspections ...................................................................................... 65
Hazardous Materials Inspections .................................................................................... 66
Vegetation Management ................................................................................................ 66
Critical Facilities Locations and Reducing Structural Hazards ......................................... 66
Neighborhood Wellness .............................................................................................................. 68
Neighborhood Matching Grants...................................................................................... 68
Neighborhood Officer Program – Police Department......................................................68
Code Enforcement – Community Development Department ......................................... 69
Code Enforcement and Neighborhood Outreach – Police Department ......................... 70
Open Space Protection ................................................................................................................71
Parks & Recreation ......................................................................................................................73
Collaborative Programs.................................................................................................... 73
Historic Jack House and Gardens .................................................................................... 74
Volunteers ....................................................................................................................... 76
Open Space Maintenance ............................................................................................... 76
Park Improvement Projects ............................................................................................ 77
Public Art Program & Master Plan .............................................................................................. 80
Conclusion ................................................................................................................................... 81
General Plan Annual Report 2016
8
List of Figures
Figure 1 - Total Planning Applications Received per Calendar Year ............................................18
Figure 2 - Total Planning Applications Received Per Month by Calendar Year ........................... 19
Figure 3 - Housing Unit Construction Based on Permits Finaled ................................................ 24
Figure 4 - Net Annual Growth Rates of Non-Residential Sectors (2005–2016) .......................... 30
Figure 5 - San Luis Obispo Payroll & Employment ...................................................................... 47
Figure 6- San Luis Obispo Annual Wages…………………… .............................................................. 48
List of Tables
Table 1- Building Permits Issued 2013-2016 Comparison ........................................................... 20
Table 2- Building Division Project Statistics, 2013-2016 Comparison ......................................... 20
Table 3- Valuation of Construction, 2013-2016 Comparison ...................................................... 21
Table 4- Housing & Population ................................................................................................... 22
Table 5- One Percent City Population Growth Projection (From LUE Table 3) ........................... 22
Table 6- Residential Units Added to the City (01/01/07 – 12/31/16) ......................................... 23
Table 7- Progress towards Meeting Quantified Objectives (01/01/14 to 6/30/19) .................... 25
Table 8 - Affordable Housing Project Highlights from 2016 ........................................................ 26
Table 9- 2016 Projects Under Review with Non-Residential Square Footage ............................ 31
Table 10 - Current Jobs/Housing Balance ................................................................................... 33
Table 11 – City Water Resource Availability ............................................................................... 55
Appendices
Appendix A: General Plan Program Implementation Status List
General Plan Annual Report 2016
9
Introduction
The General Plan is a comprehensive statement of the City’s goals and how those goals will be
achieved over the long-term. Policies and programs in the General Plan provide guidance to the
public, staff and decision-makers on development-related issues. The General Plan is adopted
and amended by the City Council, after considering recommendations by citizens, appointed
advisory bodies, other agencies, and City staff.
Each year, the City publishes an Annual Report on the status of its General Plan and provides an
overview of actions taken to implement the Plan during the past year, as provided by California
Government Code Section 65400. This report is provided to help citizens and City officials gauge
progress towards achieving the City’s stated goals and objectives. It is also an opportunity to
review how well the Plan’s programs are being implemented. The Annual Report fulfills the
requirements of State law, and the General Plan itself. According to Land Use Element Policy 11.3
the City shall prepare an annual report on the status of the General Plan, which is to include the
following items:
A) A summary of private development activity and a brief analysis of how it helped meet
General Plan goals;
B) A summary of major public projects and a brief analysis of how they contributed to
meeting General Plan goals;
C) An overview of programs, and recommendations on any new approaches that may be
necessary;
D) A status report for each General Plan program scheduled to be worked on during that
year, including discussion of whether that program's realization is progressing on
schedule, and recommendations for how it could better be kept on schedule if it is
lagging;
E) A status report on how the City is progressing with implementing its open space
preservation policies and programs;
F) Updated population or other information deemed important for the plan.
General Plan Annual Report 2016
10
Background
State law requires each city and county to adopt a general plan
that addresses seven topics, typically referred to as
“elements.” Additional topics, or general plan elements, may
be included. The law also requires general plans to be
comprehensive, internally consistent and provide a long-term
perspective. The Governor’s Office of Planning and Research
publishes General Plan Guidelines, which includes the
following general plan basics:
1. Geographic Comprehensiveness: The general plan
must cover all of the territory within the jurisdiction’s
boundaries.
2. Regionalism: The general plan must take into account
regional plans for transportation, air quality and water
quality, and must spell out measures needed to meet
federal or state standards for the region.
3. Issue Comprehensiveness: General plans must address
the jurisdiction’s physical development over the long
term, but because the general plan is the most
comprehensive expression of the general welfare, it
should also recognize social and economic concerns.
4. Internal Consistency: All of the general plan elements
must be internally consistent. Each element’s data,
analyses, goals, policies and programs must be
consistent and complement one another. This includes
consistency with area plans and specific plans.
5. Long-Term Perspective: The general plan must address
the welfare of current and future generations,
although the time-frames may vary among the
different elements. The Housing Element, for instance,
must be updated every five years.
State law says a City’s general plan should be kept current. The
City of San Luis Obispo does this through this annual review
process, comprehensive updates, and through amendments.
Updates to entire elements are done as needed and include a
look at underlying conditions and preferences. Amendments
are typically smaller in scope and involve changing one part in
a way that fits within the overall framework. Consideration of
City of
San Luis Obispo
General Plan
Elements
Land Use
Update Adopted December
2014
Circulation
Update Adopted December
2014
Housing
Update Adopted January
2015
Conservation and
Open Space
Revised 2014
Safety
Revised 2012
Parks and Recreation
Adopted 2001
Water and Wastewater
Update Adopted 2016
Noise
Adopted 1996
General Plan Annual Report 2016
11
amendments are triggered by private applications or by direction from the City Council.
Changes to the City of San Luis Obispo General Plan require hearings by the Planning Commission
and by the City Council. The type of notice provided for the hearings depends on the type of
proposed change, but always includes a descriptive item on the meeting agenda, which is
published in the newspaper. The City’s website and public access television channel provide
additional information.
General Plan Annual Report 2016
12
General Plan Element Updates
Land Use and Circulation Elements
The update of the Land Use and Circulation Elements
(LUCE) of the General Plan was approved by the City
Council on December 9, 2014.
In 2016, work continued implementing programs in the
updated Land Use and Circulation Elements, such as the
Downtown Concept Plan, Subdivision Regulations, Sign
Regulations, Neighborhood Matching Grants, Mission Plaza
Master Plan, and Zoning Regulations Update, among many
others.
As of November 2016, more than 75% of the
implementation programs in the Land Use Element and
more than 97% of the implementation programs in the
Circulation Element were completed or are in progress.
The 2016 General Plan Program Status Implementation List
(Appendix A) reflects the updated the programs (and
progress toward implementation) from the LUCE.
Housing Element
On January 20, 2015, the City Council adopted an update to
the City’s Housing Element that will guide City housing
actions through 2019.
Throughout 2016, staff worked to implement programs
which include: an inventory of City owned property which
could be used for housing, initial research into a possible
workforce housing definition, monitoring of inclusionary
housing units, and the continued use of Federal, State and
local funds for development and rehabilitation of
affordable housing.
The 2016 General Plan Program Status Implementation List
(Appendix A) reflects the updated the programs (and
progress toward implementation) from the Housing
Element.
2015-17 Council Goals
Following extensive
community outreach, on
January 24, 2015 the
Council set goals for FY
2015-17:
Major City Goals:
Protect and maintain open
space.
Implement the Housing
Element, facilitate
workforce, affordable,
supportive and transitional
housing option, including
support for needed
infrastructure within the
City’s fair share.
Prioritize implementation of
the Bicycle Master Plan and
improve and maintain
bicycle, pedestrian, and
transit facilities.
Other Important Objectives:
Improve neighborhood
wellness, work with
residents, Cuesta, and Cal
Poly, increase public safety,
code compliance, and
collaborative solutions.
Initiate implementation of
the Laguna Lake Natural
Reserve Conservation Plan.
Adopt a Downtown Concept
Plan, develop a plan for
expansion of Mission Plaza,
and improve safety,
infrastructure, and
maintenance in the
Downtown.
Implement the City’s Fiscal
Responsibility Philosophy
with focus to reduce
unfunded liabilities.
General Plan Annual Report 2016
13
Water and Wastewater Management Element
On June 16, 2016, the City Council adopted an update to the City’s Water and Wastewater
Management Element. The City’s General Plan includes a Water and Wastewater Management
Element because of the vital role of these resources and the far-reaching impacts of water
policies on community growth and character. The updated Water and Wastewater Management
Element was proposed for consistency with the 2015 Urban Water Management Plan and
included the following updates:
• Multi-source water supply and water resource availability, including groundwater policy,
• Water supply and demand projections, including the City’s water use rate policy,
• Water conservation, including the City’s water shortage contingency plan, and
• Recycled water goals, policy, and program language.
The 2016 General Plan Program Status Implementation List (Appendix A) reflects the updated
programs and progress toward implementation of the Water and Wastewater Management
Element.
General Plan Annual Report 2016
14
Community Development Department
Customer Service/Process Improvements
The Community Development Department continued to implement its Organizational
Assessment focusing on monitoring the effectiveness of process improvements and performance
tracking. The Continual Improvement Group (CIG) met weekly to review the development review
process to determine if any recent changes need modification or if a new way to review projects
is appropriate. The CIG worked with IT throughout the year to refine the Key Performance
Indicators s (KPI’s) which are posted on
the City’s website and imbedded into
the Financial Plan. These KPI’s tell the
public the expected time frames in
which to receive Planning approvals
and building permits, amongst other
information.
Other upcoming related tasks to
improve customer service and the
development review process include
utilizing “dashboards” to display the
status of projects and developing more
key performance measures for both
internal and external participants in the
process. One-Stop Shop will start
operation in 2017 to provide a
consolidated development review team (Planning, Building, Engineering, Fire, and Utilities) at the
919 Palm Street front counter during certain hours of the week to review plans as a working
group. This synergy and direct immediate input as a development review team will improve
efficiency of plan checking instead of performing plan reviews without the benefit of the group
present.
Improving customer service and the development review process are helping to carry out one of
the major goals of the City Economic Development Strategic Plan: streamlining the process and
removing barriers to job creation. The Developers Roundtable – a cross-representation of local
architects, engineers, planners, and project representatives – has been a valuable partner in
reviewing process improvements. The idea of opening the front counter at the noon hour was a
direct response to input from the Roundtable in 2015, and was implemented in early 2016. The
Council’s Major City Goal of Housing for the 2015-17 Financial Plan further places emphasis on
the need to be effective and efficient in the review of engineering, planning, and building permit
applications.
Front Counter
General Plan Annual Report 2016
15
Coordination with Other Agencies
In addition to City-initiated efforts to implement the General Plan, City staff responded to
development plans and applications from other agencies in 2016, and coordinated with other
agencies on General Plan priorities. Some examples include:
County: In September 2016 an update to the 2005 Memorandum of Agreement (MOA),
endorsed by the County Board of Supervisors and the City Council, ensuring close coordination
and cooperation between the City and the County on the future planning and development of
areas within the San Luis Obispo Planning Area boundary was executed as part of the Local
Agency Formation Commission (LAFCO) Sphere of Influence (SOI) and Municipal Service Review
(MSR) process. The updated MOA specifically incorporated provisions to address regional
coordination on various interests including growth management, circulation, open space, fire and
emergency response services, and preservation of agricultural lands, in order to be consistent
with recently updated City and County General Plan Elements. Key provisions of the updated
MOA include the following:
1. Written documentation to use other jurisdiction’s services as a way to mitigate an impact
to services;
2. Referral of projects in the fringe area to the City and County;
3. Inclusion of growth management policies;
4. Fair distribution of mitigation/impact fees;
5. Meeting among emergency response agencies to discuss impacts and fiscal issues;
6. Prior City review of projects submitted to County & written documentation that the City
will not consider annexing the project; and
7. Coordination of the City and County agricultural and open space policies.
The MOA establishes a referral process that enables the City to provide input regarding how well
proposed projects meet City policy objectives and whether there are City impact fees that may
apply to projects. There were 12 projects proposed outside of the City’s boundaries but within
the County referral area to which City staff provided responses in 2016. City staff provided input
on a variety of County projects including use permits, subdivisions, environmental impact reports
(EIR), and commercial projects.
General Plan Annual Report 2016
16
Cal Poly Master Plan 2035: In September 2016
the City provided comments on the scope of work
for the Initial Study prepared for the Cal Poly
Master Plan 2035 draft environmental review
report during the public review and comment
period. The City’s comments build upon the 2015
Council-endorsed comments to Cal Poly
regarding the land use concepts that will be
included in the project description and project
alternatives to be analyzed in the draft
environmental impact report for the Cal Poly
Master Plan 2035.
The City’s comments recommended “Guiding
Principles” that support neighborhood wellness
efforts by following the recommendations in the
Neighborhood Wellness/Community Civility
report; providing on campus housing for all
undergraduate students; and for the
development and implementation of programs
to incentivize faculty and staff to locate within
existing neighborhoods close to campus to
stabilize neighborhoods and reduce vehicle trips.
The guiding principles are based on relevant General Plan Policies in the areas of Neighborhood
Wellness, Economic Health, Housing, Multi-Modal Transportation, Open Space, Diversity, and
Public Services. Staff anticipates continued collaboration with Cal Poly on the Master Plan 2035
in the coming year.
Neighborhood Compatibility: In early 2016
staff began the process of implementing
General Plan LUE Program 2.13, which
states the City will consider new
regulations, for Low-Density and Medium-
Density Residential areas, to require special
review for (1) incompatibly large houses, (2)
replacement or infill homes in existing
neighborhoods, and (3) accessory buildings
with plumbing facilities allowing easy
conversion to illegal second dwellings. The
City will periodically update Community
Design Guidelines for larger homes, infill
housing and accessory single-story
buildings. Staff researched efforts
conducted in a number of communities and
Neighborhood Compatibility Workshop
Cal Poly Master Plan
General Plan Annual Report 2016
17
compiled common ways to address neighborhood compatibility; including modifications to
Zoning Regulations as well as Design Guidelines. Staff conducted two public workshops and two
study sessions (one with the ARC and one with PC). The result of the two study sessions was a list
of seven directional items which staff is using to evaluate and update pertinent implementation
documents.
Airport Land Use Commission (ALUC): City staff continued to actively participate in the update
of the San Luis Obispo County Regional Airport Land Use Plan in 2016. Between January and April,
the City participated in a series of meetings with partner agencies to improve communication
and information-sharing related to land use planning issues in the vicinity of the San Luis Obispo
County Regional Airport. The participating partner agencies were referred to as the SLO Airport
Collaborative and included the City of San Luis Obispo, County of San Luis Obispo, San Luis Obispo
County ALUC and Caltrans. At the conclusion of those meetings the SLO Airport Collaborative had
developed a Planning Goals, Objectives and Issues document that identified key
recommendations for ALUC consideration. One of the key recommendations was the formation
of a SLO Airport Technical Advisory Collaborative (TAC) that would provide technical advice to
the ALUC on the update of the San Luis Obispo County Regional Airport Land Use Plan (ALUP).
To support that recommendation, the SLO Airport Collaborative also developed a TAC Operating
Framework to describe the purpose and charge, composition, responsibilities and operating
principles of the TAC. All of the partner agencies endorsed the SLO Airport Collaborative
recommendations, and the City and County executed a Memorandum of Understanding,
agreeing to adhere to the process as outlined by the SLO Airport Collaborative.
Over the summer of 2016 the ALUC made minor modifications to the proposed TAC Operating
Framework, and approved the formation of an Airport Advisory Collaborative (AAC)
subcommittee. In fall 2016 the ALUC appointed members from the partner agencies to serve as
representative on the AAC subcommittee to formally advise the ALUC during the update of the
ALUP.
General Plan Annual Report 2016
18
Planning and Building Activity
Application totals are tracked monthly and maintained on a calendar and fiscal year basis.
Reports are broadly distributed both within the City and to outside organizations. Tracking of
applications and permits serves as an indicator of development trends and a tool for budget
forecasting.
Yearly Planning Application Trends
Planning applications include: use permits, architectural reviews, subdivisions, zoning
amendments, and administrative actions. Figure 1 below shows planning application totals since
2005. The figure highlights the historic highs of 2005, and the effects of the following economic
downturn and recovery. Ten fewer applications were received in 2016 than 2015.
Figure 1 - Total Planning Applications Received per Calendar Year
Source: Community Development Department, 2016
Monthly Planning Application Trends
Figure 2 shows planning applications received on a monthly basis for the last 4 years and the
average since 2001. While 2014 saw greater amounts of applications received from January to
September, applications received in 2016 between June and October were greater than at any
time in the last 4 years.
0
50
100
150
200
250
300
350
400
20
0
5
20
0
6
20
0
7
20
0
8
20
0
9
20
1
0
20
1
1
20
1
2
20
1
3
20
1
4
20
1
5
20
1
6
364 353
315
243
185 202 182 194
259
338 316 306
Nu
m
b
e
r
o
f
A
p
p
l
i
c
a
t
i
o
n
s
General Plan Annual Report 2016
19
Figure 2 - Total Planning Applications Received Per Month by Calendar Year
Source: Community Development Department, 2016
The Community Development Department uses trends and adjusts staffing to correspond to
current development activity. When application numbers decreased during the recession, staff
levels were reduced commensurately. Staff levels have since increased to meet current demand.
Additionally, consultants have been brought on board to manage particularly large and complex
projects, such as Righetti Ranch, San Luis Ranch, and Avila Ranch. The application totals shown
in Figure 1 and 2 only capture numbers of applications and are not reflective of the size and
complexity of individual project applications. In addition to the three complex projects
mentioned above, the City is also processing other large projects in the Margarita and Orcutt
areas, as well as downtown mixed use projects and large multi-family developments.
Building Permits and Plan Reviews
Building permits are issued for various projects ranging from the relatively simple (e.g. water
heaters, window change outs, reroofing, etc.) to the more complex projects (e.g. additions and
new buildings). Plan reviews are typically required for the more complex projects where it is
necessary to review proposed design documents for code compliance.
0
5
10
15
20
25
30
35
40
Ja
n
u
a
r
y
Fe
b
r
u
a
r
y
Ma
r
c
h
Ap
r
i
l
Ma
y
Ju
n
e
Ju
l
y
Au
g
u
s
t
Se
p
t
e
m
b
e
r
Oc
t
o
b
e
r
No
v
e
m
b
e
r
De
c
e
m
b
e
r
Nu
m
b
e
r
o
f
A
p
p
l
i
c
a
t
i
o
n
s
Total Planning Applications Received
Per Month Calendar Year
AVG 2001-
20162013
2014
2015
2016
General Plan Annual Report 2016
20
Table 1- Building Permits Issued 2013-2016 Comparison
BUILDING PERMITS
ISSUED
2016
permits units
2015 2014 2013
permits units permits units permits units
Single Family
55
42
151
157
79
97
54
54
Multi Family
11
51
16
75
22
115
9
43
Commercial
10
11
37
60
5
-
9
2
Public-New Buildings &
Alterations
0
-
0
-
0
-
0
-
Residential
Additions/Alterations
342
3
306
8
230
1
324
3
Commercial
Additions/Alterations
150
3
186
5
162
-
156
Motel Rooms
-
183
0
-
0
-
0
-
TOTAL 568 293 696 305 498 213 552 102
Source: Community Development Department, 2016
Table 1 depicts the number of building permits issued over the past 4 years. In 2016, 66 permits
were issued for single-family and multi-family projects, representing 93 residential units. The
permits issued in 2016 for single-family and multi-family were less than 2015, with 101 less
permits and 139 less residential units. There was a spike in number of single-family residential
units in 2015 due to the construction of the Serra Meadows Subdivision.
Table 2- Building Division Project Statistics, 2013-2016 Comparison
PROJECT STATISTICS 2016 2015 2014 2013
Plan Check Applications Submitted 1273 935 675 687
Source: Community Development Department, 2016
Table 2 shows the number of plan check applications conducted by the Building Division over the
last four years. Plan checks have increased within the last 3 years, and are expected to increase
throughout 2017. In 2016 the Building Division added a contract Assistant Permit Technician to
help with the continued rise of permit applications as well as utilizing plan review consultants for
the more complex and large projects such as Chinatown, SLO Brew, Garden Street Terrace, and
Pacific Courtyards.
General Plan Annual Report 2016
21
Valuation of Construction
Construction valuation is a good indicator of the level of private investment in building
construction. Table 3 depicts the annual construction valuation over the past 4 years. Calendar
year 2016 was the fourth year in a row to see a notable increase in this area.
Table 3- Valuation of Construction, 2013-2016 Comparison
VALUATION OF CONSTRUCTION 2016 2015 2014 2013
Single Family 15,024,481 37,904,420 26,974,176 14,152,752
Multi Family 8,172,054 12,079,291 16,088,664 6,661,543
Commercial 51,109,620 16,159,822 3,739,324 14,856,188
Public-New Buildings & Alteration 0 0 0 0
Residential Additions/ Alterations 10,138,220 6,811,376 7,053,269 7,429,135
Commercial Additions/Alterations 17,572,763 17,473,806 16,169,065 12,859,158
Total Valuation $102, 017,138 $90,429,815 $70,024,498 $55,958,776
Source: Community Development Department, 2016
General Plan Annual Report 2016
22
Housing and Residential Growth
The 2016 Department of Finance data estimated the City’s population to be 46,117, as shown in
Table 4. This equates to 2.2 percent growth since the 2010 Census when the City’s population
was estimated to be 45,119. Total housing units grew by 2.9 percent in the same time period
with a total of 21,155 housing units in the City at the end of 2016.
Table 4- Housing & Population
Housing and
Population 2010 2016
Total Housing Units 20,553 21,155
Total Population 45,119 46,117
Source: Dept. of Finance; Community Development
Department
The Land Use Element policy related to residential growth (LUE 1.11.2) states that the City’s
housing supply shall grow no faster than one percent per year, on average, based on established
thresholds shown in Table 5, from the Land Use Element:
Table 5- One Percent City Population Growth Projection (From LUE Table 3)
Year Approximate Maximum
Number of Dwellings*
Anticipated Number of People based
on 2.2 persons per dwelling
2013 20,697 45,541
2015 21,113 46,456
2020 22,190 48,826
2025 23,322 51,317
2030 24,512 53,934
2035 25,762 56,686
Estimated urban reserve capacity: 57,200
Source: Land Use Element, City of San Luis Obispo General Plan, Table 3, page 1-37.
*2013 population based on CA Department of Finance data and projected based on 1
percent annual growth.
This policy was modified in 2010 under Ordinance No. 1550 to an average of one percent per
year over the five-year Housing Element planning period. The policy change responded to slow
residential growth trends combined with the phasing and financing plans incorporated into the
Margarita and Orcutt Specific Plan Areas.
As of 2016, the City’s population and total housing units are slightly higher than projection for
2015 and remain on track with the Land Use Element’s 2020 projections. Therefore, the increase
General Plan Annual Report 2016
23
in dwellings and population remain consistent with growth management regulations. In addition,
the Residential Growth Management Regulations (MC 17.88) requires each specific plan area to
adopt a phasing schedule for residential growth to ensure that established thresholds in the Land
Use Element are not exceeded.
Based on the Community Development Department’s running total of residential construction
permits, as shown in Table 6, the annual growth rate in 2016 was 0.65 percent, which includes
new single-family and multi-family market-rate residential construction. This is well within the
limit of the 1 percent annual residential growth rate identified in the Land Use Element. The five-
year average growth rate also remains well below 1 percent at 0.39 percent.
Over the last 10 years, the City has experienced a total growth in housing units of 3.4 percent,
while the average annual growth rate for the last decade was 0.34 percent. 2016 marks a 10-year
high for residential units added, with 193 total units. State law requires that affordable units
deed-restricted to extremely low, very low, or low income households are not factored into
residential growth rate calculations. Nonetheless, if those units are added, the average annual
growth rate for the last decade was still only 0.44 percent.
Anticipated growth projections provided in the Land Use Element are the basis for many other
assumptions in the General Plan, such as transportation needs. Since the actual growth rate
continues to be lower than the projection, assumptions based on these projected rates remain
valid.
Table 6- Residential Units Added to the City (01/01/07 – 12/31/16)
Year SFR -
Detach
SFR -
Attach MFR Annex
Units
Total
Units Net Mkt Net Mkt
Growth
Mkt Aff Mkt Aff Mkt Aff Rate
2007 16 0 5 0 99 5 125 120 0.60%
2008 7 0 23 0 -1 28 57 29 0.14%
2009 16 0 3 0 29 10 58 48 0.24%
2010 15 0 17 0 23 34 89 55 0.27%
2011 0 2 0 0 23 42 18 85 41 0.20%
2012 16 0 1 0 17 0 34 34 0.17%
2013 16 3 0 0 63 10 92 79 0.38%
2014 67 0 0 0 25 22 114 92 0.44%
2015 27 0 1 0 34 11 73 62 0.30%
2016 68 2 4 0 63 52 189 135 0.65%
10-yr
Total 248 7 54 0 375 214 18 916 695 3.40%
5 Year Average Annual Growth Rate 0.39%
Source: 2016 Building Permits Finaled, Community Development Department
Note: Units shown are net totals accounting for demolitions.
General Plan Annual Report 2016
24
New housing types in 2016 consisted of a mix between detached single-family (74) and attached
multi-family units (115) with approximately 46 percent of multi-family units deed-restricted for
affordability. Five multi-family units were dedicated at the “extremely-low” income level, 29
multi-family units were dedicated at the “very-low” affordability level, 14 multi-family units were
dedicated at the “low” affordability level, and six multi-family units were dedicated at the
“moderate” affordability level.
It should be noted that over the past 10 years, 47 percent of new housing construction has been
in the form of attached multi-family development, with 24 percent deed restricted for
affordability. Figure 3 shows the construction trends of single-family and multi-family housing
since 2002.
Figure 3 - Housing Unit Construction Based on Permits Finaled
Source: Community Development Department, 2016
Quantified Objectives
State housing law requires that each jurisdiction establish quantified objectives for their fair
share of regional housing needs by income group. Deed-restricted affordable units count towards
meeting the quantified objectives, and housing built at densities the state presumes are
affordable qualify as well. The quantified objectives are for the five-year period between Housing
Element updates. The Housing Element includes goals, policies and programs to accommodate
affordable housing programs that meet the City’s quantified objectives, mixed-income housing,
housing variety and tenure, and special-needs housing.
0
25
50
75
100
125
150
175
200
225
250
2002 2004 2006 2008 2010 2012 2014 2016
Single Family
Multifamily
General Plan Annual Report 2016
25
Table 7- Progress Towards Meeting Quantified Objectives (01/01/14 to 6/30/19)
Income Category
(% of County Median Income)
Regional Housing Need Allocation
SFH
QO2
SFH
Built1
MFH
QO2
MFH
Built1
Total
QO
Total
Built1
Extremely Low (< 30%) 0 0 142 6 142 6
Very Low (30-50%) 0 0 143 30 143 30
Low (51-80%) 72 0 107 38 179 38
Moderate (81-120%) 81 2 121 12 202 14
Above Moderate (> 120%) 191 164 287 122 478 286
TOTAL UNITS 344 166 800 207 1,144 373
Source: 2015 Housing Element, City of San Luis Obispo, Community Development Department
1 Reflects net units constructed 01/01/14 thru 6/30/19.
2 Reflects Quantified Objectives for each category
The City’s most recent Housing Element was adopted in January 2015, with a planning period
from January 1, 2014 through June 30, 2019. As shown in Table 7 above, 88 housing units or
about 24 percent of all housing units added in the City since 2014 were for affordable to
extremely-low, very-low, low and moderate income households. In its first three years (2014-
2016), or about half way through the planning period, the City is at 33 percent of achieving its
Quantified Objectives for housing through 2019. Achieving the quantified objective is not a
requirement, yet it is a way to measure how effective the City has been in terms of housing
programs and policies to advance the construction of affordable housing. It should be noted,
however, that market conditions and the financing environment are the primary drivers that
determine the production of affordable housing.
Affordable Housing
The City’s Housing Programs Manager (HPM) focuses on affordable housing development and
other important General Plan Housing Element goals. The HPM serves on the Board of Directors
for the Workforce Housing Coalition, the Funding Commission for the SLO County Housing Trust
Fund, and contributes to the work of the Homeless Services Oversight Council. These efforts
contribute to an improved environment for planning and development of affordable housing in
the City of San Luis Obispo.
In 2016, the City entered into Affordable Housing Agreements for 85 affordable units (2
extremely-low, 17 very-low, 22 low, and 44 moderate income) through long-term and equity-
share affordability agreements pursuant to the City’s Inclusionary Housing Requirement. Over
$900,000 in affordable housing in-lieu fees were collected.
General Plan Annual Report 2016
26
As part of the zoning regulations update that was kicked off in late 2016; staff will be working
closely with the consultant regarding the possibility of adding workforce housing as an income
category in the City’s Zoning Regulations and Affordable Housing Standards. Table 8 identifies
affordable housing accomplishments for 2016:
Table 8 - Affordable Housing Project Highlights from 2016
Project Affordable
Units Status Special Notes
Moylan
Terrace
(860
Humbert)
27 units
(2 very-low;
14 low-
income; 11
moderate)
All units in Moylan Terrace
have now been complete
and sold. The 80 units
were developed in four
phases and were
completed in late 2016.
The City contributed an Affordable Housing
Fund (AHF) grant of $709,900 for property
acquisition and an impact fee deferral loan
for the affordable units.
South Hills
Crossing
(313 South)
43
Construction was finalized
in Summer 2016 and all
units are now occupied.
The City provided a loan in the amount of
$650,000 from the Affordable Housing Fund
and a development impact fee deferral loan
in the amount of $716,166. A lottery for the
units opened in Winter 2015 and all units
were occupied by Summer 2016.
860 On the
Wye
19 (10 units
set aside for
homeless
veterans)
Construction kicked off in
May 2016. Construction is
on track and willl be
completed in Spring 2017.
The project received low-income housing
tax credits in September 2015. AHF award of
$352,029 awarded to HASLO in Fall 2015.
Iron Works 46
All planning entitlements
have been awarded.
HASLO sucessfuly
obtained low income
housing tax credits in 2016
and is currnetly working to
obtain building permits
and begin construction in
early 2017.
This mixed-use project located at 3680
Broad Street is being devevloped by HASLO.
The City has awarded a $920,000 AHF award
to the project.
Bishop
Street
Studios
34
All entitlements for this
new affordable housing
development were
awarded in late 2016.
HASLO will apply for low
income housing tax credits
in Summer 2017.
HASLO and Transitions Mental Health
Assocation have teamed up to renovate the
existing Sunny Acres building and create new
affordable housing for TMHA clients.
General Plan Annual Report 2016
27
867
Humbert 1
The City successfully
purchased an affordable
unit in which the tenant
was out of compliance
In August 2016 the City purhased one
moderate income unit using Affordable
Housing Funds. The unit was then resold to a
new moderate income household in
December 2016.
Courtyard
at the
Meadows
36
Courtyard at the
Meadows, HASLO’s new
affordable housing
development in the Serra
Meadows Tract was fully
entitled in Fall 2016.
HASLO will apply for tax credits in Summer
2017 and hope to start construction by
Winter 2017.
Specific Plan Areas
Orcutt Area 73 proposed
at this time
Staff has entered into
affordable housing
agreements for two
separate subdivisions in
the Orcutt Area.
The Orcutt Area Specific Plan projects up to
1,000 units. At full build out, up to 150 new
affordable units will be created.
Margarita
Area
36 propsed
at this time
Courtyard at the
Meadows, HASLO’s new
affordable housing
development in the Serra
Meadows Tract was fully
entitled in Fall 2016. Land
dedication for affordable
housing on the Toscano
Tract is scheduled for late
2017.
The Margarita Area Specific Plan projects up
to 850 units. Up to 130 new affordable units
are expected at build out.
Rehabilitation
Highland
Drive –
Habitat for
Humanity
1 single
family
residence
Completed Winter 2016.
Under Habitat for Humanity’s Home
Rehabilitation Project, one low income single
family home was fully renovated. The City
provided a $35,000 grant to assist the
project.
Source: Community Devleopment Department, 2016
Funding and Grant Programs
1. Community Development Block Grant Program (CDBG): The CDBG program provides
annual funding for eligible affordable housing projects and support for the homeless
shelter. Over the past five years the CDBG Program has provided over $1,500,000 towards
affordable housing and approximately $700,000 towards homeless services. Projects
funded for the 2016 Program Year included homeless services, affordable housing land
acquisition, and sidewalk accessibility improvements.
2. Affordable Housing Fund (AHF): In 2016, the City awarded $365,000 in AHF loans to local
non-profits to assist with new affordable housing development or rehabilitation; $35,000
went to Habitat for Humanity’s Home
General Plan Annual Report 2016
28
Renovation Project on Highland Drive; $300,000 was authorized for the City to use on
purchasing an out of compliance affordable unit; and $30,000 went to the Housing Trust
Fund for assistance with affordable housing operations.
3. Down Payment Assistance: $202,000 in down payment assistance loans were awarded to
three low and moderate income households. All three homebuyers purchased affordable
units in the Moylan Terrace Development.
4. Grants in Aid (GIA): The City’s Human Relations Commission approved $138,500 in grants
to non-profit organizations whose focus is homeless prevention (including supportive
services and transitional housing), hunger and malnutrition prevention, supportive
physical and mental health services, and services for seniors and/or people with
disabilities. Awards were approved by Council in July and distributed in August.
5. San Luis Obispo County Housing Trust Fund (HTF): The HTF provides financing, technical
assistance and advocacy to increase the supply of affordable housing in the City. HTF staff
serve as a resource to City staff working with developers on affordable housing projects.
Since 2005, the HTF has provided over $18 million in financing for affordable housing
projects county-wide, contributing to the creation or preservation of over 680 affordable
dwelling units. The City continues to support the HTF with Affordable Housing Funds to
help support the operating costs of the HTF.
Homeless Services Support
1. Homeless Services Center: In
January 2015, the City Council
approved a $250,000 grant for
CAPSLO’s new Homeless Service
Center located at 40 Prado. Building
permits were issued for the facility
in November 2015. Over $4 million
dollars have been raised through
the community for construction
costs. Construction is slated to
begin in March 2017.
2. Safe Parking Program: The program
provides seven parking spaces located at the Prado Day Center. This allows homeless
persons with vehicles a safe place to temporarily park with the goal of eventually
transitioning them into permanent housing. The City provides $10,000 annually to
CAPSLO for the program. The program will likely be expanded once 40 Prado opens in
2017.
40 Prado Project Rendering
General Plan Annual Report 2016
29
3. Homeless Issues Working Group: The City has a Homeless Issues Working Group which
meets bi-monthly to support and implement the 10-Year Plan and to identify, evaluate,
and implement strategies to reduce the impacts of homelessness within the City.
4. Homeless Services Oversight Council (HSOC): Staff continues to participate in HSOC
quarterly general meetings. Priorities and recent accomplishments of the HSOC include:
making Housing First the main priority, joining the 100,000 Homes Campaign, and using
the Housing First approach to assist the most vulnerable, chronically homeless persons
who are at risk of dying on the streets. As part of the 50Now program, over 70 individuals
have been placed into housing under this program.
5. Homeless Veteran Support: In 2016, Mayor Marx accepted the Mayor’s Challenge to End
Veteran Homelessness. As of 2016, over 60 homeless veterans have been placed into
housing by local HUD Veteran’s Assistance programs.
6. Good Neighbor Policy: The City continues to implement the Good Neighbor Policy (GNP)
to communicate community expectations and City commitments as it relates to the City’s
support of homeless services. The GNP provides a framework in which the City will
support and regulate Homeless Service Providers in the Community who are seeking City
permits, entitlements or funding.
Non-Residential Growth
Based on final building permits issued, 81,278 square feet of net new non-residential floor area
was added to the City in 2016. This is an increase of 21 percent from 2015, which saw 67,141
square feet of net new non-residential space, and an annual growth rate of .70 percent. Virtually
all of the new non-residential growth was in the retail sector. Not reflected in the non-residential
growth rate is the rehabilitation of existing vacant properties listed below. These properties are
not reflected because they are not considered new structures but rather occupying an existing
structure.
• The Blackstone, Sauer and Muzio’s buildings on Monterey St., which became part of the
Chinatown Project of retail, business and residential development.
• The Sandercock warehouse on South Higuera Street was split into a two story office
building for Caltrans.
• The first floor of the Sinsheimer building is the new local Giuseppe’s Cucina Rustica
restaurant.
• The Carissa Building rehabilitation for the relocation of SLO Brew and Lofts hotel.
• The grocery store on Foothill which was re-opened as the California Fresh Market.
General Plan Annual Report 2016
30
Figure 4 illustrates the net annual growth rate of non-residential sectors beginning in 2005. Net
annual non-residential growth includes office, services and manufacturing, retail, hotel, and
institutional uses.
Figure 4 - Net Annual Growth Rates of Non-Residential Sectors (2005–2016)
Source: Building Permits Finaled, Community Development Department
Note 1: Annexed floor area excluded from growth rate calculations: 2008, portions of AASP.
Note 2: Demolition of nonresidential square footage included in calculations.
Table 9 describes mixed-use and non-residential projects in different phases of the review
process in 2016. A significant increase in non-residential projects are anticipated to be completed
in 2017, since over 385,000 square feet of non-residential floor area was under construction in
2016. There were also projects containing almost 348,000 square feet of new floor area that
received planning approvals but are not yet under construction.
0.00%
0.50%
1.00%
1.50%
2.00%
2.50%
3.00%
3.50%
4.00%
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
General Plan Annual Report 2016
31
Table 9- 2016 Projects Under Review with Non-Residential Square Footage
Project Name Address Nonres.
Sq. Ft. Type Status
Orcutt Area Specific Plan
Wingate Homes 3725 Orcutt 5,000 Commercial PIP Review
Jones Subdivision 3761 Orcutt 15,070 Commercial PIP Review
Airport Area Specific Plan
Tank Farm Commerce Park 179 Cross 29,280 Industrial Entitled
Digital West 600 Tank Farm 77,370 Office Entitled
Aerovista Place 862 Aerovista 37,230 Office Entitled
Ellsworth Tract 250 Tank Farm TBD Commercial PIP Review
Aerovista Office Buildings 892 Aerovista 37,000 Office Under Construction
SLO Brew Production 855 Aerovista 31,290 Industrial Under Construction
Other Specific Plans
Madonna on LOVR LOVR 45,000 Commercial Pre-application
Avila Ranch Specific Plan Buckley 20,000 Commercial/Office In Planning
San Luis Ranch Specific Plan Madonna 200,000 Commercial/Office/Hotel In Planning
Mixed Use (Residential and Commercial)
San Luis Square 590 Marsh 21,322 Commercial In Planning
*22 Chorro 22 Chorro 2,000 Commercial In Planning
*1185 Monterey 1185 Monterey 2,509 Commercial In Planning
Laurel Lane Mixed Use 1259 Laurel 2,306 Commercial Entitled
Caudill Mixed Use 774 Caudill 5,327 Commercial Entitled
Broad St. Mixed Use 3049 Broad 2,788 Commercial Building Review
The Junction 2120 Santa Barbara 3,000 Commercial Building Review
Iron Works 3680 Broad 4,400 Commercial Building Review
1135 Santa Rosa Mixed Use 1135 Santa Rosa 5,942 Commercial Under Construction
Pacific Courtyards 1321 Osos 8,050 Commercial Under Construction
Hotels and Mixed Use Developments
*Lofts at Nipomo 1027 Nipomo 11,743 Commercial/Hotel In Planning
Motel Inn 2223 Monterey 34,940 Hotel In Planning
*Broad St. Collection 3249 Broad 13,333 Hotel In Planning
Monterey Place 667 Monterey 12,255 Commercial/Hotel In Planning
Olive Mixed Use 1042 Olive 23,957 Commercial/Hotel Entitled
TownePlace Suites 1301 Calle Joaquin 56,975 Hotel Entitled
Granada Hotel Expansion 1128 Morro 9,871 Hotel Building Review
Monterey Hotel 1845 Monterey 60,368 Commercial/Hotel Under Construction
Chinatown Hotel 877 Palm 46,140 Commercial/Hotel Under Construction
Hotel Serra 1125 Garden 25,047 Commercial/Hotel Under Construction
Other Commercial/Office Developments
Bridge St. Project 279 Bridge 21,049 Industrial In Planning
General Plan Annual Report 2016
32
*French Hospital 1911 Johnson 58,600 Office Entitled
Perry Ford & VW Dealership 12200 LOVR 7,895 Commercial Entitled
Shell Station Development 1101 Monterey 10,000 Commercial Entitled
Discovery SLO Bowling Alley 1144 Chorro 29,500 Commercial Building Review
McCarthy Steel 3720 Broad 9,840 Industrial Building Review
*Higuera Brew 6 Higuera 15,300 Industrial/Commercial Building Review
*Long-Bonetti Public Market 120 Tank Farm 46,932 Industrial/Commercial Building Review
*Poly Performance 870 Industrial 30,275 Industrial Building Review
Airport Business Center 4460 Broad 74,883 Industrial Under Construction
BMW Dealership 1251 Calle Joaquin 23,945 Commercial Under Construction
Homeless Service Center 40 Prado 20,000 Office Under Construction
*Direct Injectors 848 Via Esteban 6,207 Industrial Under Construction
*Libertine Market Place 1234 Broad 8,737 Industrial/Commercial Under Construction
Source: Community Development Department, 2017
*New projects in 2016
1. Project Review hierarchy: Pre-application, In Planning, Entitled, Public Improvement Plans (PIP) in review, Building
review, Under construction.
Commercial and Industrial Growth Management
Land Use Element Policy 1.11.4 states that each year, the
Council will evaluate the actual increase in non-
residential floor area over the preceding five years. The
Council shall consider establishing limits for the rate of
non-residential development if the increase in non-
residential floor area for any five-year period exceeds five
percent.
The five-year net non-residential growth rate for 2012
through 2016 was 2.97 percent, and the five-year average
annual average growth rate was 0.59 percent.
According to the policy, any limits so established shall
not apply to:
A. Changed operations or employment levels, or relocation of ownership change, of any
business existing within the City at the time the limit is set;
B. Additional nonresidential floor area within the downtown core;
C. Public agencies;
D. Manufacturing, light industrial, research businesses, or companies providing a significant
number of head of household jobs.
Each year the Council has considered whether or not to implement limits to new non-residential
floor area and has decided against establishing limits. If limits are established they would only
Chinatown Commercial Development under Construction
General Plan Annual Report 2016
33
apply to certain types of new commercial floor area, such as new offices or new retail
establishments outside of the downtown core.
Jobs-Housing Balance
The jobs-housing balance is a planning tool to review whether a community has a healthy balance
between jobs and the housing supply available to potentially house workers for those jobs. This
balance may be impacted by the match between wage levels and housing costs; whether all
workers in a house have employment in the community in which they live; whether preferences
are met within the community for either housing or employment; and whether options are
available nearby for either housing or employment.
The balance of jobs and housing in an area has implications for transportation systems, however
even an ideal balance may not prevent daily in- or out- commute patterns. According to planning
literature, the desired target is a jobs-to-housing unit ratio of 1.5:1, which reflects that there is
more than one worker living in the average household. Table 10 shows that the current jobs-to-
housing ratio inside the City limits is 2.4:1. When you include major employers just outside the
City limits the ratio is 2.6:1. At the current rate of 2.4:1, the City is currently experiencing a jobs-
housing imbalance.
Table 10 - Current Jobs/Housing Balance
Estimated jobs in City limits 50,985
Housing units 21,155
Jobs to housing ratio 2.4:1
Cal Poly jobs (not in City) 3,093
California Men's Colony jobs (not in City) 1,899
Jobs to housing ratio including neighboring
major employers (CP and Men’s Colony) 2.6:1
Sources: SLOCOG 2050 Draft Regional Growth Forecast. Cal Poly
Quick Facts, 2016. CMC,2015; Community Development Department,
2016.
The increase of 17,985 estimated jobs in the City limits shows the stability and strength in the
City’s economy compared to last year. The number of housing units developed is also increasing,
and was at a ten-year high in 2016, however more housing is still needed. With housing as a
Major City Goal in both 2015-17 and 2017-19, the City continues to focus on promoting housing
development to keep pace with job creation in the City.
Implementation strategies in the updated land use and housing elements of the general plan
seek to reduce the jobs/housing ratio through programs targeted at additional housing within
the city limits. Land Use Element Policy 1.5 states that the gap between housing demand (due to
more jobs and college enrollment) and housing supply should not increase.
General Plan Annual Report 2016
34
Specific Plan Implementation and Development
The General Plan requires approval of specific plans as a precursor to development of the City’s
major expansion areas. Specific plans typically contain more detailed land-use and design
standards than the General Plan, and address the timing and financing of public facilities. Specific
plans can supersede the Zoning Regulations, or lead to amendments of the Municipal Code. The
process for adopting a specific plan is similar to the process for adopting or amending a section
of the General Plan.
Margarita Area Specific Plan
The Margarita Area Specific Plan (MASP) was
approved on October 12, 2004, and the
remaining portions of the Margarita Area in
the County were annexed into the City in
2008. By the end of 2016, the Serra
Meadows Tracts 2342 and 2353 were
nearing completion with all 177 units sold
and either completed or under construction.
The tentative map for Toscano Tract 2428
was approved in 2007 and allows creation of
up to 165 single-family lots, 26 affordable
housing lots, six market-rate condominium
units, multiple lots for riparian open space,
and one 71-acre hillside lot for permanent open space. The final map for Phase 1 of Tract 2428
was approved in 2016 and is currently under construction. Phase 1 includes 45 single-family
homes and the 71-acre open space lot. The portion of Prado Road required to be constructed by
the Western Enclave projects (Tracts 2342, 2353, and 2428) is complete. There are no projects
nearing approval that would trigger the extension of Prado Road to Broad Street.
Orcutt Area Specific Plan
Vesting Tentative Tract Maps 3063 (Righetti Ranch) and 3066 (Jones Ranch) projects were
approved in 2016, and site grading has begun. The Righetti Ranch project includes 304 residential
units (272 single-family and 32 multi-family), the Righetti Hill open space, almost 14 acres of
public parks and extensive pedestrian, bicycle, and road improvements. The adjacent Jones
Ranch property is a mixed-use commercial-residential project, including 56 residential units and
a community commercial project of just over 15,000 square feet. Public improvement plans and
final maps for Tract 3066 and Phase 1 of Tract 3063 have been submitted to the City and are
currently under review.
In 2016, the Vesting Tentative Tract Map No. 3083 was approved by Council for the West Creek
project at the corner of Johnson and Orcutt. The West Creek project would create 77 lots for the
New Residences at Serra Meadows
General Plan Annual Report 2016
35
property located at 1299 Orcutt Road. The project has recently submitted an ARC application for
home designs.
The Imel Ranch Vesting Tentative Map No. 3095 consists of 23 lots: 18 single-family residential
lots, 2 detention/drainage lots, and 3 open space lots. Imel Ranch will be brought to Planning
Commission and City Council in early 2017.
Avila Ranch Specific Plan
Review of the Avila Ranch project continued in
2016. The Avila Ranch Project is a proposal for
a new primarily residential development with
up to 720 units on a 150-acre site north of
Buckley Road, located within the Airport Area
Specific Plan (AASP) boundaries. The project
also includes 15,000 square feet of
neighborhood-serving retail next to a
neighborhood park, as well as the
preservation of agricultural uses and open
space.
Based on staff input, as well as preliminary input from various advisory bodies, the proposed
development plan was refined and updated on December 18, 2015. Since then, the Planning
Commission has reviewed the proposal and recommended further refinements. On November
23, 2016, a Draft Environmental Impact Report was completed for the project. On December 21,
2016 the Airport Land Use Commission found the project consistent with the San Luis Obispo
Regional Airport Land Use Plan. The development plan and Final Environmental Impact Report
will undergo review by City advisory bodies during Spring and Summer 2017. The project will
likely be developed in multiple phases over a period of 10-12 years.
San Luis Ranch Specific Plan
Review of the San Luis Ranch Specific Plan project continued through 2016. The San Luis Ranch
project is a Specific Plan Area (formerly referred to as Dalidio) which was identified as an
expansion area in the Land Use and Circulation Element update. The project includes a mix of
580 low-medium, medium, and high-density residential units that would be located primarily at
the north/northwest portion of the site. The project is intended to implement the broad
development parameters set forth in the LUCE update with the provision of housing, commercial
floor space, hotel/visitor serving uses, and preservation of agricultural area. The commercial
portion of the project includes up to 150,000 square feet of general commercial/retail space,
100,000 square feet of office development, and a 200-room hotel. Commercial uses proposed
may include retail anchors, neighborhood retail, restaurants, offices and a hotel. Approximately
53 acres of the site would remain as preserved as open space for agricultural use.
Avila Ranch Site Plan
General Plan Annual Report 2016
36
The site is in unincorporated San Luis Obispo County,
surrounded by areas within the City of San Luis Obispo,
and within the City’s Sphere of Influence, generally
bounded by Madonna Road, Dalidio Drive and U.S.
Highway 101.
The plan has been reviewed conceptually by various
advisory bodies and the Planning Commission. The
Draft EIR was released for public review in December
2016. Staff anticipates review of a final public draft
Specific Plan and Final EIR in the Spring of 2017 with
final Council consideration of the project in Summer of
2017. Airport Land Use Commission review will also
occur in early 2017 for the ALUC to consider a
determination of consistency for the Specific Plan.
A key issue for this project is the timing and need for improvements at the existing Prado Road
interchange with Highway 101, which is called for in the LUCE. Various concepts are currently
under review, with the City coordinating closely with Caltrans on a Project Study Report (PSR).
The Specific Plan’s circulation system will ultimately reflect the outcome of that study, which is
crucial to address long-range circulation issues in the southern end of the City.
Madonna on LOVR Specific Plan
The pre-application and Specific Plan and General Plan Amendment initiation request process for
the Madonna on Los Osos Valley Road (LOVR) Specific Plan was initiated in May 2015. The
applicant’s conceptual proposal included a mix of uses including: 200 multi-family apartments;
75 attached or detached single-family dwellings; 25,000-45,000 square feet of commercial retail;
a Continuing Care Retirement Community (CCRC) consisting of 276 independent living units, 66
independent living villas and assisted living units, 122-bed skilled nursing and memory care
facility, common use area, recreational facilities, and ancillary improvements; and parks and
open space.
Some components of the applicant’s conceptual plan are different from the vision identified in
the Land Use Element for this Specific Plan Area, including a proposed reduction in commercial
retail structural area, the addition of the CCRC, and proposed development above the 150-foot
development limit line. The conceptual project was presented to the City Planning Commission
on December 9, 2015 and January 27, 2016, followed by the City Council on April 5, 2016, to
consider the initiation request and provide feedback to the applicant and staff regarding the
applicant’s proposed mix of uses and plan to amend the Land Use Element to allow development
above 150 feet in ground elevation. The City Council authorized initiation of the Specific Plan
request, and it is anticipated that the applicant will submit a Specific Plan application package in
February 2017.
San Luis Ranch Site Plan
General Plan Annual Report 2016
37
South Broad Street Area Plan
The South Broad Street Area Plan was adopted by the City Council in December 2014 as part of
the Land Use and Circulation Element update.
Since adoption, the following projects have been approved or are under review within the South
Broad Street Area Plan:
• Broad Street Mixed Use
(3049/3099 Broad): Includes
12 residential units and 3,000
square feet of retail space.
The project received
entitlements in August 2016
and is currently under
building Review.
• 860 On the Wye (860
Humbert): Includes 19
affordable rental units and a
community room; 10 units
are set aside for homeless
veterans. The project was
entitled in early 2015, and
received building permits in
March 2016. The project is currently Under Construction.
• The Yard (2450 Victoria): Includes 25 live/work units and 18 residential units. The project
received was entitled in February 2016, and is currently under building Review.
• The Junction (2120 Santa Barbara): Includes 69 residential units and 1,200 square feet of
commercial space. The project received entailments in June 2015, and is currently under
building Review.
• Caudill Mixed Use (774 Caudill): Includes 36 residential units and 5,500 square feet of
commercial space. The project received entitlements in June 2016.
• Broad Street Collection (3249 Broad): 10 live/work units and 6-unit hotel with caretaker’s
quarters (In Planning).
South Broad Street Area Plan Site Overview
South Broad Street Area Plan
General Plan Annual Report 2016
38
Plans Under Development
Downtown Concept Plan Update
Program 4.14 in the Land Use Element
directed the City to update the Downtown
Concept Plan, which was originally
adopted by the City Council in 1993. The
primary objectives of the project are to
assess and update the present
development, vision, goals and concepts
related to downtown, in order to provide
a road map for future public projects and
guidance for private development in the
downtown and surrounding areas.
The City Council appointed a Creative
Vision Team (CVT) of ten volunteers, who
met ten times in 2016 with staff and
consultants to advise the City in the
development of the Downtown Concept
Plan. The project team has also been coordinating with the Mission Plaza Master Plan project.
The first quarter of 2016 included stakeholder interviews, a public open house in Mission Plaza,
a public workshop, and neighborhood meetings. Draft plan development took place the
remainder of the year, with the CVT continuing to meet, and a joint City Council and Planning
Commission study session in October. An Administrative Draft Plan was released in December,
which staff and the CVT reviewed and provided input on. Another public workshop and advisory
committee meetings will take place in the Winter and Spring of 2017, with Plan Adoption
scheduled for the Summer.
CVT Meeting
General Plan Annual Report 2016
39
Mission Plaza Master Plan
Concurrent with the Downtown Concept Plan
is the development of the Mission Plaza
Master Plan. The overall goal of the project is
to revitalize and refresh this important
community hub and provide the City a road
map for planning of future maintenance and
development projects for the Plaza.
Since its inception in the 1970s, Mission Plaza
has served as the cultural and historical
“heart” of the San Luis Obispo’s downtown.
Given the Plaza’s age, popularity, and
extensive use, the Council authorized the
development of the Mission Plaza Master Plan
and Assessment in July 2015 for this important community hub. This was consistent with the
Council-approved 2013-15 Major City Goal to “Assess and Renew the Downtown,” which
included a task for the development of a Mission Plaza Master Plan. Also identified in the update
of the Land Use and Circulation Elements is the expansion of Mission Plaza, originally envisioned
in the 1993 Downtown Concept Plan.
A consultant team has been working with City staff to assess the present condition, uses and
policies related to the existing Mission Plaza; determine impacts of Plaza events on adjacent
residential neighbors, businesses, Old Mission Church operations and San Luis Obispo Creek
habitat; explore expansion of the Plaza into the adjacent Broad/Monterey St. “dogleg” through
permanent or temporary street closures; and provide a vision for the future of the Plaza and
surrounding streets. Public engagement activities took place in early 2016, with two plan
alternatives developed in the Spring, and a second workshop in July. Plans were also reviewed at
a joint City Council and Planning Commission study session in October. A preferred alternative
was developed after the study session, which included input from the Downtown Concept Plan
CVT. Advisory committee meetings will take place in the Winter and Spring of 2017, with Plan
Adoption scheduled for the Summer.
Zoning Regulations Update
City Council included the Zoning Regulations Update project for 2015-17 Financial Plan and
allocated $225,000 for consultant services. The Zoning Regulations are the primary document
for implementation of the LUCE. On September 6, 2016, the City Council reviewed the scope of
work for the Zoning Regulations Update and authorized issuance of a Request for Proposals
(RFP) for consultant services. A consultant was hired in late 2016, and the update will begin in
early 2017 with the scope of work consisting of the following items:
LUCE Implementation:
Mission Plaza Workshop
General Plan Annual Report 2016
40
• Consider new regulations to address neighborhood compatibility for infill development
(Program 2.13)
• Evaluate student housing preferences and consider revising development standards to
better meet them in multifamily housing near campus (Program 2.11.1)
• Adopt special development standards for dwellings in downtown residential areas
(Policy 2.8, Program 2.12)
• Evaluate alternatives to the current maximum number of dwellings units and height,
parking, and setback standards, to regulate residential building intensity (Program 2.15)
• Evaluate the potential to use portions of City-owned parking facilities for residents’
parking (Program 2.16)
Other Features of the Update:
• Reorganize the Zoning Regulations for simplicity and modernize for current and
emerging conditions, and as necessary to meet new State requirements.
• Update Parking Standards (Table 6)
• Update Land Use Table (Table 9)
• Review “S” (Special Considerations) Overlay Zones
• Update Land Use Definitions
• Work with Cal Poly on a possible partnership to establish a form-based code in certain
locations.
Subdivision Regulations Update
Staff continues to refine and prepare a draft public Subdivision Regulations Update hearing draft
with goals to achieve the following objectives:
• Include updated regulations for recent trends in subdivision ownership and design,
including small lot subdivisions, airspace subdivisions, three dimensional subdivisions,
and potentially other forms of infill development ownership.
• Create a more user friendly document with a simple layout that provides clear graphics,
examples, and guides the user through a set of steps to understanding the subdivision
review process and how to prepare a successful application.
• Update the regulations for consistency with recent Map Act updates and base law.
• Include cross references to other applicable City standards and regulations such as
stormwater requirements, building codes, and utility metering requirements.
In 2017, a Planning Commission workshop will be held on the draft update, followed by further
refinements to incorporate PC and public feedback which will result in a final legislative draft
ready for environmental review. Upon completion of the anticipated Negative Declaration, final
Planning Commission recommendations will be incorporated into proposed Ordinance revisions
for Council consideration for final approval. Staff anticipates completion of the project in 2017.
General Plan Annual Report 2016
41
Sign Regulations Update
In 2016, the project consultant conducted stakeholder interviews and public feedback and staff
recommendations were incorporated into an “Issues and Options” report which recommended
revisions to be incorporated into the Sign Regulations Update draft. The Cultural Heritage
Committee and Architectural Review Commission held meetings to provide feedback on the
report. An initial draft update is currently under staff review. Staff anticipates refinement of the
draft Sign Regulations update and CHC and ARC review to occur by mid-year 2017 with
consideration for final approval by the City Council in the Fall of 2017.
Public Infrastructure Financing
In 2016 the City developed a Public Infrastructure Financing Framework (Framework) and draft
policies which describes a comprehensive approach to funding the City’s public facilities and
infrastructure improvements. The Framework provides a systematic way of considering funding
and financing options so that the City is able to construct needed public facilities and
infrastructure in a manner that funds facilities and infrastructure needed to maintain and
enhance the City’s quality of life for current and future residents, employees and visitors, makes
efficient use of available funding sources and financing mechanisms, implements General Plan
policy, is fair and equitable with respect to incidence of burden (who pays), and is consistent with
economic development objectives.
The establishment of development impact fees are subject to conformance with state and local
laws, specifically AB 1600, the Mitigation Fee Act. AB 1600 allows a levy of one-time fees to be
charged on new development to cover the cost of constructing the infrastructure needed to serve
the demands created by the new development. The City is currently in the process of evaluating
the impact fees charged for traffic, parkland, and water and sewer capacity and connections. It
is anticipated that the AB 1600 studies for those fees will be completed in 2017.
General Plan Annual Report 2016
42
Climate Action Plan
The City’s Climate Action Plan (CAP) was adopted in 2012. The Plan contains quantified strategies
to reduce greenhouse gas (GHG) emissions from the community and City operations. It also
serves as the City’s Qualified GHG Reduction Strategy. Several strategies from the Climate Action
Plan were incorporated in the LUCE update. Implementing the CAP includes those actions the
City can directly impact and those actions for which the City engages the community.
In August 2016 two assessments related to the implementation of the CAP were completed. The
first was the Climate Action Plan Progress Report (Progress Report), which evaluated the City’s
progress toward achieving the near-term implementation strategies and measures that are
identified in the CAP to reduce GHG emissions. The second was the City of San Luis Obispo Energy
Baseline Report (Energy Baseline Report), which evaluated the energy use and cost for City
owned facilities and infrastructure between June 2013 to May 2016. Both the assessments also
identified recommended actions designed to further the City’s progress towards achieving its
GHG emissions reduction and energy management objectives.
In October 2016, the City Council reviewed the assessments and held a study session to discuss
the City’s progress towards implementing the CAP. The City Council directed staff to evaluate the
feasibility and resources that would be necessary to implement the recommended actions
identified by the assessments in preparation for the process of identifying budget priorities for
the 2017-19 Financial Plan.
Municipal Actions
Strategies in the CAP include review of City
facilities and operations to identify opportunities
for emissions reductions. In 2016, the City
continued its efforts to make improvements to
municipal facilities that will result in lowered
emissions, including:
Previous Lighting
General Plan Annual Report 2016
43
Facility Upgrades: In 2016, the City Facilities Division continued the work of replacing inefficient
building lighting fixtures to LEDs at a variety of City facilities, including Utilities Administration,
Parking Services, security lighting at sports fields
and hallway lighting at City Hall. The major thrust
this year is replacing dozens of obsolete compact
fluorescent “can lights” with L.E.D. retrofits. This
change represents a 33% reduction (at a
minimum) in power consumption with a 50%
increase in light levels for each fixture.
Water Resource Recovery Facility (WRRF):
The new National Pollutant Discharge Elimination
System (NPDES) permit that went into effect in
December of 2014 is driving many process equipment
changes that will be installed during the WRRF Upgrade. Staff is currently in the middle of this
upgrade, working with the WRRF’s program manager, Water Systems Consultants (WSC), and the
Facility’s design engineers, CH2M. Additionally, the upgrade includes expansion of the facility to
accommodate expected growth rates of the city in the next 20 years. One of the major process
changes will result in a decreased carbon footprint in keeping with the GHG emission reductions
goal of the City’s Climate Action Plan (CAP) by eliminating two chemicals currently being used in
the disinfection process. This change will take approximately 130 tractor trailer chemical trucks
off the road every year. These trucks drive up to San Luis Obispo from chemical facilities in the
LA Basin; this change would eliminate 260 trips (130 trips each way). The added bonus of
eliminating these chemicals is that it will also substantially reduce the amount of salts in the
wastewater, improving effluent to San Luis Obispo Creek and recycled water quality to
customers.
The second major process change will position the WRRF for future expansion of the recycled
water system and enable indirect (IPR) and/or direct potable re-use (DPR) by providing a very
high quality effluent as a first step. An MBR process was chosen over a conventional MLE process
system for this reason; an MBR system will also reduce the overall construction footprint by
eliminating the need for two more clarifiers and 4 more filters. The MBR effluent is so clean that
filtering will not be needed. Additionally, the present day filters currently used for tertiary
treatment can be repurposed in future as part of the processes needed for IPR/DPR, reducing the
future cost of building a filter system needed for IPR/DPR systems.
One of the comments that came out of the public community forums held for the WRRF upgrade
centered on odor control and elimination. In keeping with our commitment to stewardship and
being a good neighbor, the WRRF upgrade has incorporated process changes for biosolids storage
and removal and construction of an odor filtering system that will virtually eliminate all odors
associated with the facility.
New Lighting
General Plan Annual Report 2016
44
Another desire from the public forum was enhancement of the Bob Jones Trail that runs along
the fence line of the facility. The WRRF staff, program manager WSC, and design engineers CH2M
are working closely with regulatory bodies to look at the feasibility of converting acreage south
of the facility into a wetland designed primarily for cooling the effluent to meet temperature
permit limits for the creek. The effluent would already meet all permit limits before entering the
wetlands. The cooling component would be met by running through the wetlands before going
into the creek. If successful, the ‘cooling water wetlands’ would include water features,
vegetation, trees and shrubs designed to cool the water while creating a wetland ecosystem that
would provide a beautiful natural setting that the Bob Jones Trail would wind through for the
community to enjoy.
A new administration building will be built on Prado Road that will house all Utilities staff
currently spread out in various buildings in the City’s Corporation yard. The entrance and exit
will be designed to include all Corp. Yard staff access in preparation for the future Prado Road
overpass. The Water Resource Center will include an Interpretive Center for public education and
outreach as part of the City’s commitment to Water and Wastewater Management. The
landscaping surrounding the new WRC will showcase demonstration gardens and water features
using recycled water and biosolids in a meaningful and practical way. Reduce. Reuse. Recycle.
Repurpose.
Cooling Water Wetlands
General Plan Annual Report 2016
45
As the WRRF moves forward with the Facility Upgrade, guiding documents such as the WRRF’s
Charter, the Triple Bottom Line, and other
tools will aid staff and its partners in
providing the City of San Luis Obispo with
a community asset we can all be proud of.
Municipal Water Conservation:
In 2016, the City of San Luis Obispo’s Park
Maintenance Division continued to
update their technology to improve water
saving capability. The City’s weather
tracking devices allow tracking of
evapotranspiration and fine-tuning of
irrigation systems to apply the optimum
amount of water to turf and plant
materials without the risk of run-off. In
2016, the Public Works Department was
able to reduce potable water use in City
parks by over 38% when compared to
2013 use and over 19% when compared to
2015 use.
City and Community Partner
Actions
Property Assessed Clean Energy (PACE):
Property Assessed Clean Energy (PACE) is a financing mechanism that allows property owners to
finance eligible energy and water efficiency and renewable energy projects by adding the cost as
an assessment to their property tax bill. This mechanism eliminates upfront costs and allows
repayment to be made over a long timeframe, typically from five to twenty years. In early 2016,
the City Council approved contracts and signed resolutions for three PACE programs to operate
within the City: Renew Financial (CaliforniaFIRST), Renovate America Inc. (HERO), and Ygrene.
The County Board of Supervisors also selected these three providers to operate within
unincorporated areas of San Luis Obispo County.
Community Choice Aggregation (CCA): CCA is a system that allows cities and counties to
aggregate the buying power of individual customers within a defined jurisdiction in order to
secure alternative energy supply contracts on a community-wide basis, while allowing consumers
not wishing to participate to opt out. The City Council has directed staff to develop initial
feasibility studies with providers of Community Choice Aggregation programs as well as
General Plan Annual Report 2016
46
participate in a program with the Counties of San Luis Obispo, Santa Barbara and Ventura. In
2016, City and County staff worked with Pilot Power Group to develop a feasibility study for the
intra county effort (feasibility for County and City of San Luis Obispo). The draft feasibility study
was completed in December of 2016 and is currently under review by staff. Staff is working
closely with the County of San Luis Obispo staff to monitor the tri-county CCA effort; of which
the County of San Luis Obispo is a member in the advisory working group.
Civic Spark: CAP strategy implementation in 2016 included continuation of our collaboration with
regional partners for outreach and education. AmeriCorps staff resources were again made
available through the Local Government Commission and funding by the Air Pollution Control
District (called CivicSpark). Civic Spark program staff have0 been working with local cities and the
County to collect information regarding permits issued for energy upgrade projects (to aid in
future reporting on CAP implementation) and to identify permit streamlining opportunities for
small scale photovoltaic installations (a process which the City of San Luis Obispo already has in
place). The CivicSpark team has also developed a web site and handouts to educate residents and
business owners about energy retrofits and energy reduction actions.
In 2016 the CivicSpark program staff collaborated with staff from the San Luis Obispo County
Energy Watch Climate Services Program (Energy Watch) to prepare an Energy Baseline Report of
the City’s facility and infrastructure energy use and cost. This information will be used for the
following purposes: to identify opportunities for energy and cost savings; to help the City finance
and implement energy saving measures and projects; and to track facility performance. The
Energy Baseline Report also identified recommended actions that the City could take to further
manage energy efforts. Those recommendations will be included in the Climate Action Major City
Goal work program for the 2017-2019 budget cycle.
General Plan Annual Report 2016
47
Economic Development
On October 16, 2012 the City Council approved the adoption of the Economic Development
Strategic Plan (EDSP). The EDSP was revised on March 17, 2015. The EDSP focuses on creating a
system that supports and sustains industries creating head of household jobs. The EDSP is
organized into four overarching strategies:
• Break Down Barriers to Job Creation
• Actively Support Knowledge & Innovation
• Promote and Enhance the San Luis Obispo Quality of Life
• Build on Existing Efforts and Strengthen Regional Partnerships
As part of the City’s effort to build on existing efforts and strengthen regional partnerships, in
2015 the City, in cooperation with SLOCOG, the EVC and Beacon Economics, was able to secure
access to the California Employment Development Department’s confidential data. This data is
available from 2008, and City staff was able to use 2015 data for 2016. The City contracted with
Beacon to do a historical analysis as well as annual updates. As an example of the data available,
Figure 5 below compares payrolls in the City of SLO to the County and highlights that payrolls in
the City of San Luis Obispo grew 2.0% from the fourth quarter of 2014 to the fourth quarter of
2015, trailing the 3.1% mark set in the rest of San Luis Obispo County. However, wages in the City
of San Luis Obispo, Figure 6, have also increased over the last year, with the average annual wage
across all sectors growing by 4.1%, compared to 2.1% in the rest of the county. The latest report
can be found on the City’s website.
Figure 5 - San Luis Obispo Payroll & Employment
Source: City of San Luis Obispo, 2015
General Plan Annual Report 2016
48
Figure 6 – San Luis Obispo Annual Wages
Source: City of San Luis Obispo, 2015
Economic Development highlights from 2016 include:
Break Down Barriers to Job Creation
Permit Processing
The Development Review Team (DRT) continued to work to ensure a consistent and expedient
approach across all involved departments. The team continues to use an automated solution to
track all projects in the system and
measure the performance of the
organization in meeting our published
cycle times. The team has also
formalized the process for using
determinant processing agreements
and other tools to streamline the
approval process.
The Continuous Improvement Group
(CIG), a sub-set of the Development
Review Team continues to actively work
on permit process improvements and
accountability measures through cross-
department and cross-functional input, action and alignment with key performance indicators.
The CIG is currently working on a prioritized list of projects to further improve the entitlement
The Fremont Theater
General Plan Annual Report 2016
49
and permitting processes. The major items are reviewing and updating the online checklists and
streamlining the intake process. The team is also working with the relevant departments on
establishing a “One-Stop-Shop” to better serve the Community. The “Doing Business” section on
the City’s website continues to be expanded to enhance the interaction between the business
community and the City.
Cost of Service Fee Study
In August of 2016 City Staff re-initiated a comprehensive review and update of the cost of service
fees charged by Planning, Development Review Engineering, Public Works, Fire, Police, Utilities,
and Parks and Recreation. The goal of the review is to ensure that fees being charged are in line
with the staff costs (e.g. staff time spent, material costs) of providing the service for which the
fee is being collected. The study is being conducted consistent with Financial Plan Section H
(Budget Reference Materials) which requires fees to be reviewed and updated on an ongoing
basis to ensure that they keep pace with changes in the cost-of-living as well as changes in
methods or levels of service delivery. The City is working with NBS Government Finance Group
to prepare the study which will be reviewed by the City Council in early 2017.
Actively Support Knowledge & Innovation
Entrepreneurship
The Economic Development Program was actively working with partners to promote an
environment that supports entrepreneurship and start-ups. The City continued to support the
SLO HotHouse financially and professionally. In 2016, the HotHouse started 12 new businesses,
counseled 128 clients, created 91 jobs and had an overall investment in the community of more
than $5.3 million.
Access to Broadband
The initial feedback from the Tri-County consortium, through the Economic Vitality Corporation
(EVC) project to develop a broadband road map, showed that the City of San Luis Obispo has the
highest level of fiber coverage in the region. The City is continuing to work with the Downtown
Association on possible Wi-Fi solutions in the downtown area.
General Plan Annual Report 2016
50
Promote and Enhance Quality of Life
Tourism and Community Promotions
The 2015-16 fiscal year produced moderate growth in the tourism
industry in San Luis Obispo. The City collected over $7.1 million dollars
(+5.2%) in transient occupancy tax (TOT). The collections met the
City’s forecasted and budgeted growth of 5% which is contributed
directly into the City’s General Fund.
However, the occupancy rate in the City decreased by an annual
average of 1.5%. Occupancy remained consistently the highest
during the summer and fall months between June through October,
then dipped in the winter and spring months of December through
April. The 2015-2016 fiscal year concluded with average annual
occupancy rate over 72%. While the occupancy rate decreased, the Average Daily Rate (ADR) was
up 7% at $138.76. Every month within the year out rated the same month in the prior year.
Additionally, the RevPAR, defined as Revenue Per Available Room, grew by over 5.4% to $101.35.
This means that although the occupancy was down overall for the properties, the lodging
businesses received higher profits based on rate increases with less day-to-day impact on the
properties.
Additionally, the downtown Visitor Center served over 84,000 (+3.1%) in person guests and San
Luis Obispo lodging properties maintained over twenty sell out weekends in 2015-16.
Fiscal year 2015-16, was a very accomplished year for tourism promotion activities. The tourism
efforts lead by the City’s Tourism Business Improvement (TBID) district included:
• Launched the redesigned, fully responsive tourism website for the city
(sanluisobispovacations.com)
• Designed, launched, and leveraged new videography & photography for digital and print
campaign elements
• Enhanced the city’s social media presence through ShareSLO
• Implemented a successful promotional campaign, Money for a Rainy Day, which resulted
in nearly 1,500 new room nights booked during January-March 2016
• Created a new brochure and maps for statewide visitor center distribution
• Received the Visit California’s Poppy Award for Best Overall Marketing Program
• Awarded the Best of Show at the American Advertising Federation Awards
During the 2015-16 fiscal year, tourism promotion activities generated at least 308 total mentions
or media placements that highlighted San Luis Obispo, including in the New York Times, GQ
China, National Geographic Traveler and Travel+Leisure. Additionally, coordinated media visits
General Plan Annual Report 2016
51
or press trips were secured to promote the destination with the goal of earning valuable editorial
coverage. In fiscal year 2015-16, over 60 media outlets, both domestic and international were
hosted in San Luis Obispo. Top domestic and international media outlets hosted include:
Huffington Post, Yahoo Travel, Peter Greenberg Worldwide, and Conde Nast.
The Promotional Coordinating Committee (PCC) continued the commitment to enhance the San
Luis Obispo experience for residents as well as visitors. The PCC funded vital promotional grants
to over 25 local non-profit organizations through the annual grants-in-aid process in an effort to
enrich the social, cultural, and diverse community events and activities available throughout the
City. To support these activities as well as all events in the City, the PCC enhanced the City funded
smart phone app called SLO Happenings to serve as the community go-to resource for all of the
activities in San Luis Obispo. Additionally, the PCC provided financial and program support to
boost the visitor service offerings in the City through the funding of programs like the tear-off
City maps for visitors and financial contribution to the operational costs for the downtown
Visitors Center.
Homestay Rentals
On January 20, 2015 the City Council adopted Ordinance No. 1611 (2015 Series) to protect public
health, safety, and welfare within the City by establishing rules and requirements for homestay
rentals. Following the adoption of the Homestay Ordinance, staff began actively monitoring the
number of advertised short term rentals in San Luis Obispo.
In 2016, staff was able to uncover 39 non-compliant properties throughout the City. The 39
properties uncovered increased the Homestay compliance rate to 33%, but fell short by 17%
percent from what was expected by the end of the second year for the program. In 2016, staff
provided Council and the Tourism Business Improvement District Board (TBID) with an update on
the program and the monitoring effectiveness. Staff will be actively monitoring non-compliant
properties and meeting with the TBID throughout 2017 to discuss the next steps of the program
to increase compliance.
General Plan Annual Report 2016
52
New Policy Initiatives
In 2016, the City completed several policy initiatives across a wide variety of subject areas with
the support of all City departments. Those initiatives included:
Rental Housing Inspection Program
In January 2016 the City launched a Rental Housing Inspection Program. The program includes
all residential rental units which are single family dwellings, duplexes and some condominiums.
Each of the units are required to register annually and have an inspection every 3 years. Those
units which pass an initial city-conducted inspection and have no code violations at the end of
the 3 years can apply for the self-certification program. Inspections began in May of 2016.
Proposition 64: Adult Use of Marijuana Act
On November 8, 2016 California voters approved Proposition 64, the Adult Use of Marijuana Act
(AUMA). AUMA builds on Medical Cannabis Regulation and Safety Act (MCRSA), in that it allows
adults (21 and over) to possess roughly an ounce of cannabis flower, eight grams of concentrate,
or up to six plants. It also creates a regulated market for the cultivation, production,
manufacture, and sale of recreational marijuana.
With the legislative adoption of MCRSA and voter approval of AUMA, most municipal legal
advisors and League of California cities staff have concluded that cities will not be able to rely
on permissive zoning concepts to preclude issuance of state marijuana licenses. Instead, cities
wishing to regulate marijuana uses within their jurisdictions more restrictively than state law
need to adopt express regulations defining local limits of use. Cities that do not adopt such
regulations likely will become subject to state law regulation and the licensing of marijuana uses
and activities within their jurisdiction subject only to state law requirements.
In an effort to determine the community’s interest in the regulation of cannabis-related
businesses and activities, including the potential for taxation as provided for by MCRSA and
AUMA, a study session will be help in early Spring 2017, and by Fall 2017 the City of San Luis
Obispo should be in a position to present recommendations to decision-makers.
General Plan Annual Report 2016
53
Historic Preservation
Historic District Signs
In mid-year 2016, the Historic District Street sign project was completed. Sign locations were
approved by the Cultural Heritage Commitee and the Community Development Department and
Public Works coordinated for final placement and installation. A total of 34 signs have been
installed at major entrances to the City's five historic districts. The artwork and graphic design
for the signs were developed pro bono by local architect
Pierre Rademaker. Each of the signs is intended to reflect
and symbolically represent aspects of each of the
districts. As an example, the Downtown Historic District
sign incorporates a commercial style typographic
treatment reminiscent of the type style that was typical in
19th century graphics. The architecture is suggestive of
the heyday of downtown's construction boom (1895-
1910). The foliage illustrates downtown's ever-present
street trees. The intent is to encourage people to look up
and become more aware of the urban architecture that
surrounds us.
Historic Resource Numbering System
In 2016, the Cultural Heritage Committee reviewed and endorsed a Historic Resource numbering
system for all Master List properies in the City. All Master List Historic Resources have been
assigned Historic Resource Numbers based on the date they were added to the City’s Master List
of Historic Resources.
Historic District Sign
General Plan Annual Report 2016
54
Mapping
With the assistance of the Geographic Information Systems Division, updated historic resource
numbering was incorporated into the online mapping of historic properties in the City in 2016.
Work will be ongoing to update information available for each property.
Mapping Interface
General Plan Annual Report 2016
55
Water Supply
In 2016, the City obtained water from five sources: Salinas Reservoir (Santa Margarita Lake);
Whale Rock Reservoir; Nacimiento Reservoir; recycled water from the City’s Water Resource
Recovery Facility (WRRF); and groundwater.
Table 11– City Water Resource Availability
Water Resource 2016 Annual Availability
Salinas Reservoir (Santa Margarita Lake) and Whale Rock
Reservoir 6,940 AF Safe Annual Yield1
Nacimiento Reservoir 3,380 AF Dependable Yield2
Recycled Water 187 AF 2015 Annual Usage3
Siltation to 2060 (500 AF) WWME Policy4
Nacimiento Reservoir (Full Allocation) 2,102 AF Secondary Supply5
TOTAL 12,109 AF
Source: Water and Wastewater Management Element, 2016, Utilities Department, 2017.
1Safe Annual Yield is the quantity of water which can be withdrawn every year while operating both reservoirs in
coordinated operations under critical drought conditions. Safe Annual Yield is determined from a computer model, which
accounts for siltation loss through 2010 (per WWME Policy A 4.2.1).
2Dependable Yield is the contractual amount of water the City has right to from Nacimiento Reservoir.
3The quantity of recycled water included is the actual prior year’s recycled water usage (2015) per WWEA7.2.2.
4Reservoir siltation is a natural occurrence that reduces storage capacity over long periods, resulting in the reduction of
safe annual yield.
5 In March 2016, the City Council approved the addition of 2,102 afy from Nacimiento Reservoir to the City’s secondary
water supply. Secondary water supplies are used to meet short-term losses to the City’s water supply due to events such
as drought or maintenance and repair of infrastructure.
In 2016, availability from these sources equaled
12,109 acre-feet, as shown in Table 11. This supply
meets the projected primary water supply need at
General Plan build out of 7,496 acre-feet, plus an
additional 1,499 acre-feet for a reliability reserve
and a secondary water supply of 3,114 acre-feet.
The primary water supply was calculated using the
City’s build-out population (57,200 people) and
the water use rate of 7 gallons per capita. The
reliability reserve was calculated using the City’s
2016 population (46,117) and 20 percent of the
aforementioned water use rate. The secondary
water supply includes the remaining water
resources.
Santa Margarita Lake
General Plan Annual Report 2016
56
Water Conservation
During 2016, the State continued its statewide emergency drought declaration which required a
12% reduction in potable water use in the City. The City reduced its water use by 21% over the
course of 2016, and far exceeded the state’s mandated reduction goal. The City was not required
to declare any stage of its Water Shortage Contingency Plan during this time but was required to
limit water use for outdoor irrigation to two days per week to comply with mandates related to
the statewide emergency drought declaration. Several other mandates were required due to the
statewide emergency drought declaration but the majority of the reduction in use was believed
to be achieved through increased public education and voluntary compliance by the community.
Throughout 2016 the City was also an active member of the Partners in Water Conservation
group. This group, which consists of water conservation personnel from local water purveyors,
met periodically during 2016 to address water conservation mandates, discuss effective
conservation measures, and develop regional strategies for reducing water use on the Central
Coast. Acting as a lead agency, the City provided facilities for these meetings along with
assistance in organization of training opportunities such as the California Rural Water and
Department of Water Resources joint drought workshop in September, 2016.
As part of the Urban Water Management Plan, the City’s update to the Water Shortage
Contingency Plan was adopted in June, 2016 and now consists of five water shortage response
stages with the City also continually maintaining a “monitor” stage where compliance with SB x7-
7 is ensured along with continual compliance with the California Urban Water Conservation
Council’s best management practices and any other required state or local mandates.
General Plan Annual Report 2016
57
Circulation
Transportation Network Improvements
The following transportation network
accomplishments implemented the Circulation
Element of the General Plan in 2016:
Vehicular
• Numerous traffic signal and intersection
optimization improvements were
completed as part of the City’s Traffic
Operations Program and ongoing traffic
signal management responsibilities.
• Numerous traffic safety improvements were implemented as part of the City’s Traffic
Safety Program.
• Construction of the Los Osos Valley Road Interchange project was completed under
budget and ahead of schedule in the spring of 2016. This project was awarded the
Transportation Project 2016 by the American Society of Civil Engineers, San Luis Obispo
Branch.
• Two mobile speed feedback trailers were deployed at over 50 locations consistent with
the City’s radar sign program.
Bicycle/Pedestrian
• As part of the City’s Annual Pavement
Management Plan, bike improvements
were installed throughout
neighborhoods downtown and near Cal
Poly including over two miles of
sharrows, and buffered bike lanes on
Longview.
• A “bike slot” was installed in the median
on Highland Drive at Ferrini Road to
accommodate left turning bicycle
movements.
• Railroad Safety Trail Maintenance between the Jennifer Street Bridge and Orcutt Road
was completed in the fall of 2016 including pavement repairs, a new seal coat and fresh
striping.
• The City’s supply of short-term bicycle parking continued to expand as part of the City’s
“Racks with Plaques” bicycle rack donation program.
Bike Slot
Traffic Signal
General Plan Annual Report 2016
58
• Bike valet parking service continued at the weekly Thursday night Farmer’s Market and
during the summertime Concerts in the Plaza.
• Lighted crosswalks downtown on Higuera and Marsh Streets were replaced.
• Crosswalk improvements were installed at Broad and Upham Streets including button
activated flashing beacons and additional striping.
Transit
• Fiscal Year 2015/16 set a new
record for trips taken on public
transit in the City of San Luis
Obispo. Over 1,209,701 rides
were given on the City’s SLO
Transit system, representing a
5.8% increase in ridership over
the previous record set in 2014
(1,142,748 rides).
• Free public Wi-Fi is now
installed on 100% of the Fleet
thanks to a State grant which paid for
Automatic Passenger Counters and
ancillary equipment.
• New Kennedy Library tripper bus service was introduced in response to overcrowding and
high ridership along the Ramona Dr. neighborhood and Cal Poly University.
• The SLO Transit Joint Short Range Transit Plan is now completed with implementation
scheduled for the Summer of 2017. This plan will shape the future of the City’s transit
system and help build continuity with RTA services.
• A new contract was signed with First Transit Incorporated for transit operation and
maintenance services after an extensive RFP process which saw responses from over
seven companies.
• Negotiations with Cal Poly University are underway for the next four to five-year transit
subsidy program which will continue student and faculty access to local public transit.
• SLO Transit will receive in February of 2017 three new 45’ low-floor transit vehicles which
will replace three 2001 models and will feature such amenities as on-board infotainment
system, multiple sun-roofs, LCD dashboard display, free public Wi-Fi, flexible seating
configuration for peak and non-peaks, two-tone flooring, LED lighting, and a new paint
scheme.
New Rebranded SLO Transit Fleet
General Plan Annual Report 2016
59
Transportation Planning Accomplishments
The following transportation planning projects were implemented in 2016, consistent with
programs in the Circulation Element of the General Plan.
Vehicular
• The City of San Luis Obispo received ITE’s 2016 Transportation Achievement Award for
Planning for the Circulation Element Update.
• The City completed its 2016 citywide traffic count project. This data is used for virtually
all transportation studies and assessments in the City.
• The 2015 Traffic Safety Report was presented to City Council in October 2016. The total
number of collisions in 2015 (531) were the lowest on record, down 58 percent since the
program began in 2001. To further build on the success of the traffic safety program, the
City Council formally adopted a resolution supporting the goal of Vision Zero—aimed at
eliminating all traffic-related fatalities and serious injuries by 2030.
• The Railroad Square parking and access plan is currently underway. Initial parking studies
have been completed, an initial public workshop was held with businesses in the area and
staff is continuing to study and develop concepts for consideration.
• Initial design for the California/Taft Roundabout has begun. This project will continue
progress towards improving the intersection of California and Taft, which has been
identified as a problem intersection for years due to traffic congestion and high collision
frequency and severity. Roundabout control has been planned for this location to
improve traffic operations and safety for all road users.
Bicycle/Pedestrian
• Design of the Railroad Safety Trail Extension from Taft to Pepper was underway and
environmental documents are near completion. Pending acquisition of easements,
construction is expected to begin in late 2018.
• Design was completed and a contractor was selected for the Railroad Safety Trail Class I
Connection to Laurel/ Orcutt. Construction is expected to begin in early 2017.
• Planning efforts began for the Broad Street Bicycle Boulevard, including extensive
neighborhood outreach which resulted in two alternate concepts to be analyzed for
traffic impacts. Findings of the traffic study is expected to be available early 2017.
• In May 2016, the City participated in Bike to Work Month activities, encouraging the use
of active transportation.
• In September 2016, the City held its annual Bicycle Rodeo instructing City youth on safe
bicycling techniques and proper riding habits.
• The City collaborated with Bike SLO County and other community volunteers to offer
bicycle safety education training.
• The Public Works Department targeted Cal Poly’s Week of Welcome (WOW) for the
General Plan Annual Report 2016
60
promotion of bicycle-on transit use.
• The City provided annual bicycling awareness training to SLO Transit drivers.
• The City conducted its tenth annual Halloween Traffic Safety campaign passing out 3,700
reflective Halloween bags to elementary school students.
• The Pacheco and Bishop Peak Safe Routes to School Improvements planning effort kicked
off in 2016, with the goal of identifying key transportation improvements to improve
safety and access for walking and bicycling to school. Initial recommendations will be
presented to the community in early 2017, with implementation of prioritized projects to
begin in late 2017 or early 2018.
Neighborhood Traffic Management (NTM)
Permanent improvements were installed as part of the Fixlini NTM project, including a diverter
at Fixlini and Iris Streets.
Temporary neighborhood traffic circles were installed along southern Chorro as part of the
Chorro Street NTM. City staff continues to monitor these traffic calming devices as well as work
with the neighborhood on this effort.
The High Street NTM kicked off in 2016 holding its first neighborhood meeting in the fall. Below
is the current queue of neighborhoods qualifying for a Traffic Improvement Plan. Neighborhoods
are listed in the order they were received:
1. Chorro (Broad to Buchon)—in progress
2. High (Higuera to Broad)—in progress
3. Augusta (Sinsheimer to Laurel)
4. La Entrada and Ramona
5. Mill Street (Santa Rosa to Grand)
General Plan Annual Report 2016
61
Parking Management
Below is a summary of some of the major focus areas related to parking management in 2016.
1. Phase 2 of the Chinatown project (development along Palm Street and Morro
Street) commenced with the removal of approximately 84 metered off-street lot
spaces. Credit card meters from these lots were relocated to on-street areas of
high activity throughout the Downtown area.
2. The City contracted Kimley-Horn and Associates to use dynamic demand modeling
software to analyze existing and future parking demands in the downtown areas
as well as east of Santa Rosa Street.
3. The City optimized adjacent office space for use as the Parking Enforcement
Officers’ office and coin collection / counting area.
4. Equipment at the 919 Palm Street Parking
Structure was installed to allow payments to
made using credit cards.
5. The Downtown Residential Overnight
Parking (DROP) program was formalized in
2016, allowing residents living in the
downtown area the opportunity to park
overnight in either the 842 Palm Street
Parking Structure or the 871 Marsh Street
Parking Structure.
Parking Structure
General Plan Annual Report 2016
62
Safety
Emergency Preparedness and Response
In 2016, the San Luis Obispo Fire Department (SLOFD) continued its new program in which all
staffed City facilities are assigned a different SLOFD crew and/or staff member for disaster
preparedness training and other emergency
response education. In light of tragic events
throughout the nation involving workplace
violence, this program includes a key
partnership from San Luis Police Department
(SLOPD). In addition to fire crews visiting each
facility to provide evacuation training/drills,
emergency preparedness tips, fire extinguisher
training, and disaster service worker
information, a small cadre of SLOFD and SLOPD
trainers visited City workplaces to discuss the
tenants of the “run, hide, fight” workplace
safety curriculum. Supervisors were engaged to
develop evacuation plans specific to violent
incidents.
Related to workplace safety, SLOFD, SLOPD, and City Information Technology (IT) staff partnered
to address a gap in functionality of the 9-1-1 when accessed from City networked computers. The
system was enhanced through the installation of
switches that allow the 9-1-1 system to provide
Emergency Communications Center Dispatchers to
pinpoint the location of an emergency call even
when the caller is unable to speak. This has long
been a function of the traditional 9-1-1 service;
however, this functionality was omitted when the
City transitioned to the networked-based phone
system.
Regarding employee training and preparedness,
SLOFD partnered with all departments to provide
classroom-based National Incident Management
System certified training required for City
employees who may have a critical role to play in
the event of a disaster.
In March 2016, the SLOFD completed an update to
the Fire Master Plan, specifically analyzing the
impact of southern area annexation and
San Luis Obispo Police
Firefighter training
General Plan Annual Report 2016
63
development. The Council approved development triggers designed to position SLOFD for
continued rapid emergency response operations to the developing region. The Council also
approved greater specificity in the response time goals of SLOFD based on a standard established
by the National Fire Protection Agency. The new response time goal stipulates that SLOFD will
have a total call processing time of seven minutes or less for 90% all emergencies requiring the
use of lights and siren. Total call processing time is broken down into a call processing time of
one minute, crew preparation for travel time (“turn out” time) of two minutes, and travel time
of four minutes.
SLOFD implemented two critical technological programs in 2016: Electronic Patient Care
Reporting (EPCR) and PulsePoint.
EPCR transitions SLOFD from a pen-and-paper means of capturing medical patient
documentation to an electronic cloud-based system. This system significantly enhances patient
confidentiality, medical quality control, and crew efficiency. The cloud-based system
communicates with area receiving hospitals and imports diagnostic data from SLOFD’s cardiac
monitor/defibrillators.
PulsePoint is a smartphone application that is free to the end-user. When active on a phone,
PulsePoint alerts “citizen rescuers” to assist with patients who have suffered cardiac arrest in a
public place. According to the American Heart Association, a cardiac arrest victim’s chance of
survival increases 10% for every minute that is saved in providing life-saving care. With a seven-
minute total response time standard, PulsePoint can improve the chance of survival by an
amazing 70%. The national average for out-of-hospital cardiac arrest survival is just less than 10%.
SLOFD also hosted the annual Open House as part of Fire Prevention week activities and provided
emergency preparedness information to residents and visitors.
Hazard Mitigation
In 2016, SLOFD in collaboration with other City departments and community agencies completed
the second annual review of the 2014 Local Hazard Mitigation Plan (LHMP). The LHMP provides
guidance on how to reduce the community’s vulnerability to natural hazards. This plan calls for
annual stakeholder meetings to update progress and identify collaborative opportunities. The
results of this annual meeting were brought back to the City Council in early 2017 and included
new language to ensure the plan addresses the City’s needs regarding the planned closure of the
Diablo Canyon Nuclear Power Plant.
Staff Training
Safety Element Program 9.4 states that the City will train police officers and other City employees
to levels appropriate for their tasks and responsibilities.
General Plan Annual Report 2016
64
The California Commission on Peace Officer Standards and Training (POST), which mandates
minimum content and hours for basic and in-service training, regulates the training of police
officers and communication technicians. The Police Department maintained compliance with
POST requirements for in-service training hours for required employees. This was accomplished
in 2016 by sending employees to POST-certified training courses in various topics, with the
associated costs reimbursed by POST, and by providing in-house training for employees.
The San Luis Obispo Police Department (SLOPD) also conducts in-house training through the use
of employees who are certified instructors in a variety of police-related job functions, including
defensive tactics, mobile field force, active shooter and use of firearms. In addition to the
standard police training the department implemented a Peer Support group to help officers after
tragic or traumatic events. The Peer Support Team has been trained to deal with a wide variety
of potential problems and has the ability to give direct counseling or direct those in need to the
proper resources.
Mutual and Automatic Aid
Section 9.10 of the Safety Element indicates that the City will work with other jurisdictions to
obtain and follow adequate mutual-aid and automatic-aid agreements. In 2016, SLOPD
participated in Mobile Field Force joint operations training with Cal Poly University Police. The
purpose of this training was to coordinate mutual aid response efforts and action directed
towards the gathering of large, unruly crowds that could result in a riot or significant property
damage.
SLOPD also coordinated efforts with the San Luis Coastal Unified School District in facilitating
active shooter training. Both school district staff and law enforcement personnel had an
opportunity to be involved in active shooter/multi-casualty scenario-based training and become
familiar with each other’s policies and practices in the event of an actual significant event.
Firefighter training Training
General Plan Annual Report 2016
65
The City has participated in a regional Special Weapons and Tactics Team (Regional SWAT) since
2008. The Regional SWAT team allows participating cities to leverage limited resources and
maximize coordination and special expertise during critical incidents.
SLOFD deployed on several requests for Mutual Aid throughout the State in 2016, including the
massive Soberanes Fire, which is a record-breaking fire in California history due to its size, cost,
and complexity. Fire personnel deployed to large-scale incidents receive invaluable on-the-job
training, and the costs associated with their deployment are reimbursed to the City.
SLOFD is also a member of the Regional Urban Search and Rescue (USAR), County Hazardous
Materials Response Team, County Fire Investigation Strike Team, and the County Type III Incident
Management Team. These regional teams provide exceptional service to the communities of
participating agencies at a fraction of the cost of providing that service autonomously.
Community Action Team (CAT)
2016 marked the fourth year of the Police Department’s deployment of the two-officer
Community Action Team (CAT). CAT Officers continue to identify problems and crime trends that
negatively impact the quality of life of residents, business owners and visitors. CAT Officers have
focused on several individuals in our community who are involved in adverse and repetitive
criminal activities that negatively impact our community. They have been successful in working
with others to find alternatives to incarceration that include enhanced and focused service
placement and transitional housing. The program has continued to grow and the relationships in
the court system have proven very valuable. Many of the repeat offenders from previous years
have now been placed into treatment programs. The others that refused treatment have been
given significant sentences to reduce their impacts on the community.
CAT officers work collaboratively with a myriad of individuals and groups, including patrol
officers, investigators, the Neighborhood Outreach Manager, other city departments, social
service providers, business groups, and other governmental agencies as appropriate.
Multi-Dwelling Property Inspection Program
Under the direction of the Fire Marshal, the Fire Prevention Bureau inspects all multi-dwelling
properties (three or more units) in the City to ensure that they meet a reasonable degree of fire
and life safety. This state-mandated program helps safeguard residents and visitors who
patronize local hotels, and generates approximately $194,000 in revenue that offsets
implementation costs. The Fire Prevention Bureau completed approximately 677 inspections of
apartments, hotels, and fraternity and sorority houses in 2016.
Fire and Life Safety Inspections
SLOFD engine companies completed over 1,300 fire and life safety inspections in 2016. In
addition, Fire Prevention Bureau staff completed over 200 inspections of schools, hospitals and
nursing homes, day care centers and assisted living centers, and large public assembly
occupancies. A portion of these inspections resulted in Fire Code operating permits, which
generated approximately $133,000 in revenue.
General Plan Annual Report 2016
66
Hazardous Materials Inspections
The Fire Prevention Bureau serves as a “Participating Agency” in the County’s Certified Unified
Program Agency (CUPA). Businesses that use or store hazardous materials in an appreciable
quantity, generate hazardous wastes, or operate underground or aboveground petroleum
storage tanks are subject to inspection. The Hazardous Materials Coordinator conducted 275
facility inspections in 2016, which generated over $90,000 in permit fee revenue.
Vegetation Management
While fewer weed complaints were fielded
by the Fire Prevention Bureau in 2016,
there was again a significant increase in
complaints regarding dead pine trees due
to the pitch canker epidemic. The Fire
Department completed two wildland fuel
reduction projects in City-owned open
space in 2016. Wildland fuel reduction and
chipping projects were conducted in the
Irish Hills Open Space off Royal Way, where
dead pine trees were removed upslope of
homes. Staff also partnered with Public
Works to remove 24 hazardous dead pine
trees in Laguna Lake Natural Preserve.
Critical Facilities Locations and Reducing Structural Hazards
Section 9.19 of the Safety Element tasks the City with identifying and evaluating hazards in
existing structures, with the highest priority given to critical facilities. This effort includes
maintaining and replacing City facilities, routine code inspections of certain commercial and
residential buildings, complaint-based code inspections for all buildings, mitigating hazards
associated with unreinforced masonry buildings (URM), and outreach regarding structural safety
of private wood-frame buildings.
Unreinforced Masonry Hazard Mitigation
The 2004 URM Ordinance required full strengthening by July 2010 unless partial, Level A,
strengthening was completed by July 1, 2007. Where Level A was completed by the deadline,
Level B work could be delayed until July 1, 2012. Level A strengthening consists of installation of
anchors between building walls and roof, walls and floors, and bracing of any parapets. Level B
consists of Level A work plus installation of the steel members that stabilize the storefront and
frame. Distinction between Level A and B was established by ordinance to encourage owners to
complete this significant portion of the strengthening process as soon as possible.
Fire Prevention
General Plan Annual Report 2016
67
Of the 128 URM buildings in the City, 125 have completed seismic strengthening or were
otherwise brought into compliance with the ordinance and the last three are currently under
construction. This includes the Hotel Serra project and 796 Higuera Street.
General Plan Annual Report 2016
68
Neighborhood Wellness
Land Use Element Program 2.14 states the City will help identify neighborhood problems, and
undertake a wide range of focused development review, capital improvement, and code
enforcement efforts to help residents preserve and enhance their neighborhoods.
Neighborhood Matching Grants
The City Council identified Neighborhood Wellness as a Major City Goal in the 2013-15 Financial
Plan and has carried this goal forward into the 2015-17 Financial Plan as an Other Important
Council Objective. One of the implementation strategies identified is to support activities to
establish or bolster neighborhood cohesiveness. Neighborhood Matching Grants are a
mechanism to provide support to neighborhoods for activities and projects that engage
neighbors in positive ways.
Final Applications for the first year of the program were due January 8, 2016, and three
applications were submitted, totaling $7,875.41 in grant requests. At the February 2, 2016
meeting, the HRC selected the first two projects for full funding: Islay Park Creek Restoration and
Trail Clean Up ($1,800), and Cerro San Luis Neighborhood’s Seasonal Social Gatherings ($3,437).
Islay Park held three works parties in July, and volunteers logged 217 hours of work removing
abandoned drip irrigation lines, dead plants, branches and overgrown shrubs along the path.
Cerro San Luis completed two of their four events in 2016, the ice cream social and “Halloween
in the Neighborhood.” The ice cream social included 250 neighborhood participants. The
applicant is on track for successful completion of all four events.
Draft applications for the second year of the program were due on October 14, 2016, and five
applications were received, totaling $12,860 in funding requests. Staff worked with applicants to
refine their proposals, before final application submittal in January, 2017. Staff provided the HRC
(the Advisory Committee charged with awarding grant funds) a program update on December 7,
2016.
Neighborhood Officer Program
In 2013 the Police Department launched a
Neighborhood Officer Program that divides the
City into 13 distinct “neighborhoods,” each
with dedicated patrol officers assigned to
address City neighborhood issues. The
Neighborhood Officers act as liaisons between
the Police Department, the community, and a
variety of city agencies. The Neighborhood
Officers assist with public education, crime
prevention, establishing Neighborhood Watch
groups, and neighborhood specific problems.
The Neighborhood Officer Program offers San Luis Obispo Police
General Plan Annual Report 2016
69
residents and business owners a personal option when police assistance is needed and an
immediate response isn’t needed. Residents and businesses can find their Neighborhood Officer
on the City webpage and contact them directly either by phone or email.
In 2016, Neighborhood Officers along with
the Neighborhood Outreach manager
attended fifteen (15) neighborhood
meetings to help establish neighborhood
watch groups and educate residents on
important crime prevention techniques.
In 2016 the Neighborhood Officers
conducted neighborhood walks where they
contacted a variety of residents within their
assigned areas to introduce themselves,
discuss the Neighborhood Officer program
and make themselves available as needed.
In the neighborhoods near Cal Poly, the Code
Enforcement Neighborhood Services Specialists joined the Neighborhood Officers to help
educate residents to the Neighborhood Enhancement Ordinance. These walks will continue on a
regular basis to keep open lines of communication with the residents in these neighborhoods.
Code Enforcement – Community Development Department
The City’s Code Enforcement Office, which reports directly to the Community Development
Department’s Chief Building Official, deals primarily with violations of building codes and zoning
regulations. Examples of code violations that impact neighborhood quality include:
• Property Maintenance Violations
• Sign Violations
• Unpermitted Construction
• Substandard Buildings
• Occupancy Violations
• Land Use Violations
• Homestay Violations
In 2016, there were 282 code enforcement cases opened in response to requests for field
investigations and proactive enforcement. These included land use and zoning violations,
property maintenance and substandard building violations, among others.
In addition, there were 763 Neighborhood Services code enforcement cases, which included
violations such as visible storage, failure to screen waste containers, dead or overgrown
vegetation and yard parking. Neighborhood Services conducts proactive outreach and
San Luis Obispo Police
General Plan Annual Report 2016
70
enforcement measures in residential areas throughout the city and attends numerous outreach
events at Cal Poly, Cuesta, The San Luis Obispo Board of Realtors, as well as regular Neighborhood
Wellness and RQN meetings. These outreach efforts are ongoing.
In January 2016, the Rental Housing Inspection Program was launched. The Rental Housing
Inspection Program requires all single family, duplexes and some condominium residential
rentals to register annually and have exterior and interior inspections once every three years. As
of December 31, 2016 there were 3326 units registered in the program and 851 inspections had
been performed.
Code Enforcement and Neighborhood Outreach – Police Department
Police Department SNAP employees (Student Neighborhood Assistance Program) continue to
conduct parking enforcement in neighborhoods during evening hours. In 2016 they issued 2,498
parking citations for violations in residential parking permit districts. SNAP issues Disturbance
Advisory Cards (DACs) which are formal warnings, in response to substantiated noise party
complaints. In 2016, SNAP issued 597 DACs. SNAP also assists with graffiti abatement and
identifying abandoned vehicles for towing.
In response to the need for non-adversarial processes that address community conflicts, the City
of San Luis Obispo, Cal Poly, Cuesta College, and Creative Mediation, a local non-profit, developed
the SLO Solutions Program in 2004 to offer free conflict resolution and mediation to City
residents. The program served 1,214 residents in 2016.
Neighborhood Wellness meetings were discontinued in 2015 as attendance had dropped off
considerably. In its place, the police department will now be providing bi-annual “Neighborhood
Forum” to continue to provide the community with information on neighborhood initiatives,
crime prevention techniques and upcoming projects. The first Neighborhood Forum, held on
October 27, 2016 was well attended. The next Neighborhood Forum will be held in Spring 2017.
General Plan Annual Report 2016
71
Open Space Protection
The General Plan contains many goals, policies and programs focused on open space protection.
The policies apply to sensitive lands within the City’s urban reserve as well as land in the greenbelt
area that is protected for its biological, agricultural, aesthetic and/or watershed protection value.
The Land Use and Circulation Element and Conservation and Open Space Element address this
subject in detail.
The highlights of 2016 include:
1. Completed the Natural Resources Roundtable: the 20th Anniversary Proceedings of the San
Luis Obispo Greenbelt.
2. The City Council approved the
acquisition of the Waddell Ranch,
representing an additional 154 acres to
be added to the Irish Hills Natural
Reserve and providing outstanding new
trail opportunities.
3. Continued implementation of the Calle
Joaquin Agricultural Reserve Master
Plan with Central Coast Grown, for
educational and local agriculture
production purposes.
4. The City’s Ranger Service program, in
partnership with the Central Coast
Concerned Mountain Bikers (CCCMB)
and other volunteers, continued to expand both single-use and multi-use trails in the Irish
Hills Natural Reserve, as well as through
the neighboring Bureau of Land
Management (BLM) parcel under a
Memorandum of Agreement with BLM,
increasing the hiking, trail running and
mountain biking opportunities in that
open space by several miles.
5. The Stenner Springs Natural Reserve
continued to be expanded upon and
improved through volunteer and Ranger
work days, including the installation of
the new Stenner Flow trail.
6. A new loop trail was installed at
Reservoir Canyon Natural Reserve.
Waddell Ranch Open Space
The new Reservoir Canyon Loop Trail
General Plan Annual Report 2016
72
7. Continued invasive species vegetation control along Froom Creek and San Luis Obispo Creek
and continued planting native plants to restore the habitat, including a native oak volunteer
planting day at Bishop Peak Natural Reserve.
8. Continued to implement the Stormwater Management Plan as required by the Regional
Water Quality Control Board (RWQCB). The Plan focuses on improving stormwater quality
through Best Management Practices (BMPs), including: construction site monitoring,
municipal operations, development review, and public participation to reduce pollution run-
off.
9. Participated in planning and implementation of several important ongoing City projects,
including: Chevron Tank Farm Remediation and Redevelopment Plan; Los Osos Valley
Road/Hwy 101 interchange project; and the Margarita Area and Orcutt Area Specific Plans.
10. Continued steelhead trout (Oncorhynchus mykiss) surveys along San Luis Obispo Creek with
biologists from California Department of Fish and Wildlife.
11. The Ranger Service and the Natural Resources Program prepared the City of San Luis Obispo
2015 Open Space Maintenance Plan as part of the Open Space Major City Goal. The Open
Space Maintenance Plan provides a comprehensive strategy for day-to-day maintenance
activities, as well as long-term improvements and enhancements, including items such as
signs and kiosks, gates and fencing, or parking and trash. The Open Space Maintenance Plan
also includes two technical appendices: The City of San Luis Obispo Vegetation Management
Plan: The Wildland–Urban Interface and Integrated Vegetation Management Plan for Open
Space Lands of the City of San Luis Obispo 2015-2020. Substantial progress towards
implementation of the Open Space Maintenance Plan was completed in 2016, including new
trailhead kiosks, trash receptacles, and Mutt-MittTM stations.
12. The 2015-17 Council objective to “Initiate Implementation of the Laguna Lake Natural
Reserve Conservation Plan” is underway. To that end, a comprehensive consultant team led
by MNS Engineers is designing dredging and sediment management options, developing
financing options, completing environmental review and securing regulatory agency
permits. City Council provided direction in September 2016 for selection of the preferred
design and financing alternative, leading towards a “shovel ready” project anticipated for
the 2017-19 financial plan period.
General Plan Annual Report 2016
73
Parks & Recreation
In 2016, the Parks and Recreation Department continued to offer a wide variety of programs and
activities that enhance the quality of life in the community. The following tasks were
accomplished implementing the Parks & Recreation Element of the General Plan:
Collaborative Programs
Sports
The City provides recreation sports opportunities for youth, adults and seniors. The City
collaborated with the San Luis Obispo County YMCA to provide activities for over 1,100 local
children through their combined efforts. The City partnered with the Giants Baseball Corporation
to bring the Jr. Giants Program to our community. Junior Giants is a non-competitive baseball
program that focuses on building confidence, teamwork, integrity, and leadership skills. The City
continues to work collaboratively with the Youth Sports Association and San Luis Coastal Unified
School District to meet the needs of youth. Adult recreational sports include adult softball, adult
soccer, ultimate Frisbee, table tennis and volleyball programs. Senior sport activities (55+)
include Pickleball programs and Boomer Softball. In 2016, Pickleball changed its status from a
pilot program to an ongoing regular
recreational program offered by the City
which is currently played weekly at three
City locations.
Community Programs
City-sponsored community programs help
to gather citizens in a healthy, positive
environment. Over 1,000 youth at
Meadow Park participated in a food donation-based
walking Halloween Parade called “Boo Bash”. Other
community programs in 2016 included Movie Nights,
Reindeer Run, Bike Rodeo, September Scramble, Gobble
Wobble, and Garden Clean-up Days. Additional
collaborations, from Health and Wellness Seminars and
Senior Center Contract Classes, have provided much
needed services and programs to the community,
especially underserved populations. Community Gardens
are provided at four locations. There are 100+ garden plots available to City residents to lease
with a fifth community garden location planned at the Laguna Lake Golf Course in 2017. The Parks
and Recreation Department continues to offer online program registration, facility reservations,
and satisfaction surveys to its customers; in 2016 the Department continued to enhance its web
and social media presence.
Pickleball
SLO Senior Center
General Plan Annual Report 2016
74
Historic Jack House and Gardens
The Historic Jack House and Gardens located at
536 Marsh Street provides guided history tours,
programming, and special events. In 2016, the
Jack House was rented for 50+ weddings and
other events. In 2016, the number of visitors to
the hours nearly double and volunteer docents
provided tours for approximately 400
individuals or groups from May to December
with the addition of Art-After-Dark at the Jack
House; a program that provides monthly
opportunities for locals and visitors alike to view
touring art exhibits (every 1st Friday of the
Month) and learn more about the Jack family
estate. The Jack House closed from December
to April for annual maintenance.
SLO Triathlon
In 2016 the City sponsored the 37th annual
SLO Triathlon. The SLO Tri occurred on the
fourth Sunday in July at Sinsheimer Park and
included a .5-mile swim, 15-mile bike and
3.1 mile run course. Approximately 200+
community volunteers made this annual
event possible. The SLO Triathlon focuses on
completion, rather than competition, and
draws over 1,000 participants state-wide
annually to the event.
The Jack House
SLO Triathlon
General Plan Annual Report 2016
75
SLO Skatepark
The SLO Skate Park project at Santa Rosa
Park was completed in 2015 and celebrated
its one-year anniversary in 2016. The 15,500-
square-foot concrete skate park is already an
invaluable addition to the City. With now
over a year in service, the skate park sees an
average of 50-100+ locals and visitors alike
on a daily basis. Programming in 2016
included Winter and Spring Break Skate
Camps, summer events, Friday Night Skates
and DJ and the County-wide Monster Skate
series.
Youth Services
The Transitional Kinder (TK) (Kindergarten), Sun ‘N Fun (Grades 1 – 3), Club STAR (Grades 4-6),
and SLO Teens (Grades 7-8) programs continue to provide necessary child care and social
experiences for over 1,000 elementary and middle school aged youth, incorporating character
development, community service, academic support, tools for resiliency and making positive
choices, in a safe and nurturing environment. In the 2016-17 school year, Youth Services provided
programming at five school sites in support of the Joint Use Agreement with the San Luis Coastal
Unified School District
Other programs during the school year included two Teacher Work Day Camps, a week-long
Spring Break Camp for school-aged youth, two All STAR Fun Zones (open to all local youth in
grades 4-6), one Kids’ Night Out (serving TK-6 grade), as well as numerous onsite special events.
Summer programming also provided
essential care for over 500 families.
KidVENTURE’s Ultimate Day Camp provided
traditional camp experiences to school-age
campers and a training opportunity for the
14-16 aged Counselors-in-Training (CIT). The
Teen Spot Camp, open to 14-16 year olds,
gave teens a place to safely recreate while
focusing on technology, leadership
development and outdoor adventures.
SLO Skatepark
Summer Programs
General Plan Annual Report 2016
76
Volunteers
Over 20,000 volunteer hours in a variety of programs and events were logged in 2016. Volunteers
supported services at the Senior Center, Laguna Lake Golf Course, and Jack House, and events
and activities such as Junior Giants, SLO Triathlon, Movie Night, Youth Sports, Reindeer Run, Bike
Rodeo, and Ranger Work Days. Quest program participants provided volunteer assistance to the
Department to gain work experience and become engaged in positive behaviors.
Open Space Maintenance
The City’s Ranger Service program employs full-
time rangers and other part time staff that
actively maintain the City’s open spaces. Over 22
tons of trash was removed from San Luis Obispo
Creek and City open spaces by staff and
volunteers, with the largest amounts of material
collected during the annual Creek Day clean-up
event.
In 2016, park rangers led 14 hikes through City
open spaces, and held 75 work days. City parks,
open spaces, and joint use facilities were
patrolled nearly every day of the year. Staff
provided environmental education courses
through the City’s STAR and Sun ‘N Fun programs
and had two one-week Junior Ranger Activity
Camps that were attended by children ages 7-10.
Collaboration with the public and the Central
Coast Concerned Mountain Bikers (3CMB)
resulted in new trail being construction at Cerro San Luis, Stenner Springs, and Reservoir Canyon,
and miles of trails being maintained throughout the City’s open space network. Hundreds of
volunteers turned out for multiple events and provided thousands of hours of service taking care
of the City’s open spaces.
In 2016, The City of San Luis Obispo Parks and Recreation
department received an Award of Excellence from the California
Park & Recreation Society for the #PixOnPeaks Campaign.
#PixOnPeaks is an Instagram based social media campaign geared
at making the public aware of many of the City of SLO’s lesser
known open spaces and trails and a conservation effort aimed at
reducing foot-traffic on highly travelled trails.
General Plan Annual Report 2016
77
Park Improvement Projects
Meadow Park Lighting Replacement
Completed in early December 2016, eight path light fixtures
were replaced along the pathway through Meadow Park. The
existing fixtures were last replaced in 2001 and were energy
inefficient and deteriorated. Three of the light fixtures had
collapsed, creating an unsafe condition on the pathway. All of
the existing fixtures were replaced with new energy-efficient
LED lighting that provides more light coverage and reduced
energy usage. A small LED spot light was attached to one path
light pole to provide continuous nighttime illumination of the
flag pole near the parking lot.
Also replaced were five poles for the lighting of the basketball
court, the two sand volleyball courts and the horseshoe pit.
The existing decorative wood utility poles were severely
deteriorated from dry rot and beetle infestation, and some
were on the verge of collapse. The wood poles were removed
and replaced with new metal poles and the existing metal
halide lighting fixtures were reused.
New Lighting
New Lighting
General Plan Annual Report 2016
78
Sinsheimer Pool Re-Plastering
The Sinsheimer Pool Re-plastering project
was completed on January 8, 2016. This
project consisted of re-plastering, retiling,
and re-marking the swimming pool. Other
pool improvements included replacing the
existing pool lights with new energy
efficient LED light fixtures and a drain
system safety upgrade.
Project Completion was critical for the
protection of the pool’s steel reinforced
concrete structure. Pool water is highly
corrosive and pool liner failure would lead
to expensive repairs. The project was
funded through the half cent sales tax approved by City residents.
The SLO Swim Center has agreements for pool use with the SeaHawks, San Luis Obispo Unified
School District, YMCA, Club Polo and Scuba clubs. Swim lessons are provided year-round to
individuals of all ages and abilities. Recreational swim opportunities are provided during Spring
Break and summer while lap swimming is available year-round. The SLO Swim Center had
approximately 83,000 visitors in 2016.
Laguna Lake Golf Course
Golf Course Restroom Replacement: The City
completed work on the Laguna Lake Golf Course
Restroom Replacement project. The project scope
consisted of the construction of a new, standalone
restroom building, which replaced the
deteriorated restrooms at the Laguna Lake Golf
Course.
The previously existing restrooms were
constructed in 1966 and were in need of an
upgrade. In addition to being over 50 years old, the
previous facility was not compliant with the access
requirements of the Americans with Disabilities Act (ADA).
All improvements are compliant with the ADA, including a new pathway which provides an
accessible route from the golf course buildings to the existing sidewalk adjacent to Los Osos
Sinsheimer Pool
Laguna Lake Golf Course Restrooms
General Plan Annual Report 2016
79
Valley Road. The project also incorporates numerous drainage improvements to the exterior of
the restroom facility as well as the adjacent pro shop building.
Golf operations at Laguna Lake includes the management of the pro-shop and golf round sales,
driving range, concessionaire food services, lessons, contract classes and special events (such as
night golf and tournaments). Parks and Recreation maintenance staff manages the expansive and
diverse turf areas and specialized equipment. The Laguna Lake Golf course provided 36,000
rounds of golf in 2016. A new community event, September Scramble, was added in 2016. Over
400 kids and families participated in the September Scramble Adventure Course as a creative way
to get kids healthy, active and at the golf course.
Jack House Elevator Removal:
In 1973 descendants of the Jack Family had an elevator lift
constructed on the exterior of what is now known as the
Jack House. It was installed for a family member who could
no longer navigate the stairs to the second floor of the
house. With the installation, it removed the Dining Room
bay window and the window of the Master Bedroom above.
Since the City took ownership of the Jack House in 1975,
members of the Jack House Committee and Friends of the
Jack House Organization have been petitioning to have the
elevator structure removed from the House and to have the
exterior restored to its original appearance.
Now, over 40 years later, the original bay window and
bedroom window above have been restored. In May 2016,
the Jack House was restored to its original structure with
the removal of the elevator lift and restoration of the
facade. This required fabrication of a new window,
rebuilding an existing window, installing a new roof over
the bay window and milling of wood siding and trim to match the existing. Once all the
improvements were installed, it was all appropriately painted to match the existing colors of the
rest of the House.
The Jack House
General Plan Annual Report 2016
80
Public Art Program & Master Plan
In 2016, the City of San Luis Obispo adopted its first ever Public
Art Master Plan. The Public Art Program began in May 1990 and
today enjoys a robust public art collection of 76 public art pieces
(both temporary and permanent). The primary objective of the
Public Art Master Plan is to assess and update the vision, goals
and concepts related to public art in San Luis Obispo in order to
provide a road map for future public art projects.
In 2016 after Council’s adoption of
the Utility Box Art Policy, another
phase of utility box art murals was
added to the City’s collection of
temporary public art. Currently there are 36 traffic signal utility
boxes that boast beautiful art murals city-wide. The Instagram
media campaign #ThinkOutsideTheBox was created to generate
community awareness about the City’s box art program by
encouraging locals and tourists to visit the painted boxes for a prize.
General Plan Annual Report 2016
81
Conclusion
The City’s General Plan guides the use and protection of the City’s various resources to meet
community purposes. It reflects consensus and compromise among a wide diversity of citizens’
preferences, within a framework set by state law. The General Plan is published in separately
adopted elements, each containing policies and implementing programs. The General Plan
Annual Report summarizes the major programs in these elements that saw activity in 2016.
One outcome of an annual report is the evaluation of whether actions that have occurred indicate
a change in the general vision of the community that requires a more comprehensive update of
the General Plan. The most prominent activities undertaken by the City in 2016 related to efforts
to begin implementation of four key elements of the General Plan that were most recently
updated: Land Use, Circulation, Housing, and Water and Wastewater. The input received as part
of these update processes helped align the General Plan with the community’s vision. That vision
was in part reflected in the City Council’s adopted Major City Goals and Other Important
Objectives for FY 2015-17 as described on page 12 of this report. Staff will continue to implement
these goals and objectives in 2016, and they will be further reported on in the 2016 Annual
Report.
A status list of all General Plan programs is included in the following technical appendix.
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
LAND USE ELEMENT
1 Growth Management
1.14.1 The City will monitor reports from the County “resource management system” and advocate
for adherence to that system. O CDD/Utilitiies
1.14.2 The City shall advocate and help arrange quarterly coordination meetings among planning
directors of local jurisdictions to discuss regional issues. O CDD/Admin
1.14.3.The City will participate with the County in reviewing and providing input on County projects
and general plan amendments that have potential to impact the City or be inconsistent with
City policies. O CDD
1.14.4.The City shall seek County Board of Supervisors approval amending the County Land Use
Element to make it consistent with this element. The City will work with the County during
updates of the County's plan for the San Luis Obispo planning area.
1.14.5.The City shall maintain a memorandum with the County, pledging that neither agency
approve a substantial amendment to its plan for San Luis Obispo's planning area without
considering the recommendation of the other agency O CDD
1.14.6.The City shall prepare and maintain a Planning Area Map in the General Plan. The City will
establish and maintain County concurrence for the map, which applies to the City’s Planning
Area outside the urban reserve.O CDD
1.14.7.The City shall maintain a development fee program that covers costs associated with City
services and facilities. Periodic review of the fees collected will ensure they are adequate to
cover City costs.O CDD
2.1 Conservation and Development of Residential Neighborhoods
2.10.1.The City shall review, revise if deemed necessary, and actively enforce noise, parking, and
property-development and property-maintenance standards. O CDD
2.10.2.The City shall implement, and regularly review and update property-maintenance regulations
focused on proper enclosure of trash, appearance of yards and buildings from the street,
and storage of vehicles.O CDD
2.11.1 The City shall evaluate student housing preferences and consider revising development
standards to better meet them in multifamily housing near campus.O CDD
2.11.2.The City shall review, and revise, if deemed desirable, its standards for multifamily housing
so that apartments will provide usable open space and storage similar to the requirements
for condominiums.O CDD
2.12.The City shall adopt special development standards to guide addition of dwellings within
Downtown residential areas to implement Policy 2.8. O CDD
2.13.The City will consider new regulations, for Low-Density and Medium-Density Residential
areas, to require special review for (1) incompatibly large houses, (2) replacement or infill
homes in existing neighborhoods, and (3) accessory buildings with plumbing facilities
allowing easy conversion to illegal second dwellings.
O CDD
2.14.The City shall implement Neighborhood Wellness Action Plans to help residents preserve
and enhance their neighborhoods. O CDD
2.15.The City will evaluate alternatives to the current maximum number of dwelling units per acre
(based on bedroom count) and height, parking, and setback standards, to regulate
residential building intensity, and bulk and mass. Floor area limits will be considered.O CDD
2.16.The City shall evaluate the potential to use portions of City-owned parking lots and
structures for residents’ parking.O CDD/PW
2.17.The City shall require new housing projects in the Downtown area to provide residents with
information and services to off-set vehicle needs, such as providing transit passes, providing
space for hourly car rental services, and providing on-site bicycle storage facilities.
2.18.The City shall evaluate the potential for development fees to fund new parking spaces in an
additional parking structure for residents of new housing projects in the Downtown core.O CDD
3 Commercial & Industrial Development
A-1
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
3.9.The City shall amend its Zoning Regulations to implement the changes included in the 2014
General Plan update program.O CDD
3.10.Zoning Regulations and Community Design Guidelines will include measures such as
location and shielding of mechanical equipment; location of truck loading, trash collection
areas, and loudspeakers; noise attenuation measures along property lines to prevent
unacceptable noise exposure for residential areas or other noise-sensitive uses.
O CDD
3.11.The City shall investigate ways to encourage more cohesion between the existing shopping
centers on Madonna Road.O CDD
3.12.The City shall amend the Community Design Guidelines to address transitions between
neighborhood commercial development and adjacent residential neighborhoods.O CDD
3.13.The City shall review zoning regulations to consider allowing visitor-service uses in office
zones adjacent to community commercial zones in the Downtown and adjacent to Monterey
Street between Johnson and Santa Rosa.O CDD
3.14.The City will investigate emerging technologies and trends to evaluate whether updates to
zoning regulations are needed.O CDD
3.15.The City shall implement appropriate strategies for business retention and expansion with a
focus on those providing head-of-household jobs. O Admin
3.16.The City shall provide zoning incentives and investigate a program coordinating commercial
and industrial development for the provision of child care and elder care for workers.
4 Downtown
4.24 The City shall update the Downtown Concept Plan by 2016 and shall regularly update the
plan as required to address significant changes in or affecting the Downtown area including
the opportunity for meaningful public input.O CDD
4.25.The City shall consider features of "A Conceptual Physical Plan for the City’s Center"
(Downtown Concept Plan) in the approval of projects in the Downtown, recognizing that the
plan is a concept and is intended to be flexible.O CDD
4.26.The City shall undertake a study of visual resources within the Downtown core area to
identify potential locations for new public-owned open places with access to views of
important scenic resources. The City will consider acquisition of one or more of these open
places as resources permit.
O CDD
4.27.The City shall explore the full or partial closure and re-design of Broad Street between Palm
and Monterey Streets, and Monterey Street between the two connections with Broad Street
to effectively extend, either permanently or for special events.O PW
4.28.The City shall modify zoning regulations to allow efficiency units and variable density in the
Downtown Core.O CDD
4.29.The City shall work with the Downtown businesses and residents, the BID, and Chamber of
Commerce to manage impacts from downtown drinking establishments, and if necessary,
enact additional regulations to ensure that the late night environment in and near Downtown
is safe and pleasant.
O CDD, Admin
4.30.The City shall develop a master plan for San Luis Obispo Creek in the Downtown area.
4.31.The City shall prepare an inventory of uses in the Downtown Core. Particular attention shall
be given to identifying uses at the street level as these uses directly impact the pedestrian
experience and vibrancy of the Downtown. This information shall be used to target business
support and attraction.
O CDD
4.32.The City shall incorporate into its zoning regulations specific criteria for evaluating use
permits for bars/taverns, night clubs and late night drinking establishments.O CDD
4.33.The City will modify its Community Design Guidelines to enhance Safety and Crime
Prevention through Environmental Design. O CDD
4.34.The City, working with the Downtown Association, businesses, landlords, and residents will
consider emergency callboxes at strategic locations in the Downtown.
4.35.The City working with the Downtown Association, Downtown businesses and residents shall
develop a program to encourage lighted storefronts and street frontages throughout the
night.
A-2
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
4.36.All specific plans shall identify design features utilized to enhance public safety.O CDD
4.37.The City shall conduct a nighttime safety audit of key areas of the City to see where
deficiencies in environmental design may exist and should be improved. Key Areas should
be defined as areas experiencing higher crime than City average by SLOPD.
5 Public & Cultural Facilities
5.3.The City shall continue to work to develop a plan for meeting additional space needs in the
Downtown. The City shall work with the County to coordinate site selection, building design,
circulation and utility services, parking, trip reduction, and funding.
5.4.The City, Cal Poly, and the Foundation for the Performing Arts will jointly manage the
performing arts center on the Cal Poly campus.O Admin
5.5.The City shall undertake a study of its surplus facilities for possible reuse by cultural and non-
profit groups.
5.6.The City shall consider incentives to support establishment of social service facilities in the
city.
6 Resource Protection
6.2.1.The City shall prepare and maintain geographic information systems-based maps of the city,
the urban reserve, and the planning area to guide in land use designations and decision-
making.O CDD/IT
6.2.2.The City shall seek to protect resource areas deemed worthy of permanent protection by fee
acquisition, easement, or other means. O CDD/Admin
6.5.1.Subdivision approval in hillside planning areas shall include designation of "sensitive sites,"
which shall be subject to architectural review. O CDD
6.5.2.The City shall create and maintain a GIS layer to accurately document development limit
lines as they are applied in the General Plan.
6.5.3.Consistent with the Community Design guidelines, all hillside areas are considered sensitive
sites, and architectural review is required for new development. The Community
Development Director will screen all proposals to identify any which do not need architectural
review.
O CDD
6.7.1.The City shall ensure new development complies with the City’s flood plain ordinance,
setbacks, specific plans, and design standards to minimize flood damage and flood plain
encroachment.O CDD
6.7.2.The City shall administer the National Flood Insurance Program standards.O CDD/PW
6.7.3.The City shall notify owners of creeks and adjacent properties in advance of work, and use
care in any needed removal of vegetation.O CDD/PW
6.7.4.The City shall evaluate the feasibility of establishing a financing district or districts to address
flood concerns in affected areas.
7 Airport Area
7.13.The City shall continue to work with the County and regional airlines to assure that regional
airline services are continued and expanded to adequately serve the needs of the population
in the service area of the airport.O CDD
7.14.The City will annex the Airport area denoted in the Airport Area Specific Plan and
accommodate incremental development consistent with the growth management policies,
including those concerning adequacy of resources and services and development paying its
own way.
7.15.In approving development proposals, the City will assure that Airport Area properties noted
in the Airport Area Specific Plan secure protection for any on-site resources identified in the
Conservation and Open Space Element. To help maintain the greenbelt, properties shall
also secure open space protection for any contiguous, commonly owned land outside the
urban reserve. If it is not feasible to obtain protection for such land, fees in lieu of dedication
shall be paid when the property is developed.
O CDD/Admin
A-3
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
7.16.The City shall create an Airport Overlay Zone to reflect the boundaries of the San Luis
Obispo County Regional Airport Land Use Plan within the City limits. The purpose of the
Airport Overlay Zone is to codify airport compatibility criteria in areas for which the City may
override the Airport Land Use Commission determination to ensure compliance with the
requirements of the California State Aeronautics Act (Cal. Pub. Utilities Code, Section
21670, et. seq.)
C CDD
7.17.The City shall update its Zoning Regulations to address allowable uses and development
standards for areas the City may override a determination of inconsistency. Zoning
regulations shall be consistent with the requirements of the State Aeronautics Act, use
guidance from the Caltrans Airport Land Use Planning Handbook and comply with related
state and federal requirements relating to airport land use compatibility.
C CDD
7.18.The City shall review of General and Specific Plans and Amendments, Zoning ordinance or
amendments, or Building code changes within the San Luis Obispo County Regional Airport
Land Use Plan boundary. As well as including referral to the Airport Land Use Commission
as specified in Section 21676(b) of the Public Utilities Code for a determination of
consistency with the San Luis Obispo County Airport Land Use Plan.
O CDD
8 Special Focus Areas
8.3.The City will review and update Ordinance 1130 and involve residents to ensure that
neighborhood concerns are addressed.O CDD
8.4.The City will update the Mid-Higuera Area Plan for this multi-block commercial area to reflect
current needs and changes that have occurred since the 2001 plan was adopted.
8.5.The Caltrans site is planned for redevelopment from a Caltrans office and yard complex to a
mixed use development. Commercial uses will be described under the Tourist Commercial
designation, and redevelopment plans shall consider the suitability of realignment of the
Madonna/South Higuera intersection. The site should be developed to serve as a gateway
into the community, with consideration of additional open space uses, retention and
rehabilitation of the Master List historic structure, and retention of Heritage Trees on the site.
The site shall also include a park site north of Madonna Road.
8.6.Lands behind the General Hospital building that are inside the City’s Urban Reserve line will
be designated as Public (for existing public facility) and a range of residential uses (Low
Density and Medium Density Residential) and will include the ability to support residential
care, transitional care use, and other residential uses consistent with the adjacent areas.
The remaining site outside the City’s Urban Reserve line will remain as Open Space. The
City shall seek to secure permanent protection of the open space outside of the urban
reserve line as part of any development proposal.
8.7.The City shall implement the South Broad Street Area Plan to create a safe, attractive and
economically vital neighborhood with a mix of complementary land uses. O CDD
8.8.The Madonna Inn Area includes land west of Highway 101 on the lower slopes of San Luis
Mountain and the northeast slopes of the foothill bordering Laguna Lake Park. This area
may be developed further only if surrounding hillsides including area outside the Urban
Reserve Line are permanently protected as open space.
8.9.The 38-acre area of the Sunset Drive-in Theater / Prado Road Area should be further
developed only if flooding can be mitigated without significant harm to San Luis Obispo
Creek. Once flooding, access, and agricultural preservation issues are resolved, the area
would be suitable for development as a mixed use development with a mix of Commercial
uses. Permanent open space shall be required. A full assessment of the Drive-in Theater
site’s potential as a historic resource will need to be evaluated and addressed. Bicycle
connectivity for this area is an important component for future development.
8.10.The Pacific Beach area is planned for redevelopment from current use as a continuation
school, school office and park uses to commercial retail uses along Los Osos Valley Road
and Froom Ranch Road and the remaining site maintained under a Park designation.
8.11.Development of Calle Joaquin Auto Sales Area is suitable for commercial mixed use and
other uses in the Tourist Commercial designation. Development of the area must address
preservation of and transition to the agricultural parcels/uses to the northwest; connectivity
to the Dalidio Ranch area; viewshed preservation; and treatment as a gateway to the City
visible from Highway 101.
O CDD
A-4
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
8.12.Flooding and access issues must be resolved for the LOVR Creekside Area prior to
developing Medium High Density Residential. Agricultural Designations must be maintained
along the west side of site. Compatibility with adjacent residential areas to the east will be
required. Permanent protection of the adjacent San Luis Obispo Creek will need to be
addressed. The south side of the site will need to accommodate relocation of LOVR right-of-
way and changes related to the planned Highway 101 interchange.
8.13.The Broad Street at Tank farm Road Site will be used as a mixed use site and provide a
strong commercial presence at the intersection. Areas along the creek on the western edge
of the site will be appropriately buffered to provide creek protections. Attention to
connectivity, safety and comfort of bicycle and pedestrian circulation will be especially
important in the development of this corner.
8.14.In regards to the CalFire / Cal Poly-owned property on Highway 1, the City shall collaborate
with Cal Poly in updating the Master Plan for development of campus property. The master
Plan shall address sensitive visual and habitat resources, circulation issues, impacts to City
services, transition and potential impacts to surrounding neighborhoods.
O CDD
8.15.Future development of the North Side of Foothill (Bishop Knoll) shall address open space
requirements under Policy 1.13.8 and open space buffers in accordance with Conservation
and Open Space Element Policy 8.3.2. The steep hillside should be dedicated as Open
Space and residential lots grouped at the bottom of the hill closer to Foothill. Development
shall provide a parking lot and trail access to Bishops Peak. Circulation connectivity shall be
provided to Los Cerros Drive as feasible. Density shall be limited to 7 units / acre.
8.16.Future development of the Alrita Properties shall address hillside planning requirements
under Policy 6.4.7C. Additional analysis will need to occur in the LUCE EIR to evaluate
potential water service issues, and additional analysis is needed to determine if the City’s
water distribution system can adequately serve development in this area. Density shall be
limited to 7 units/acre as modified for slope under the Zoning Ordinance.
9 Sustainability
9.10.The City shall update master tree plan and develop recommendations to renew and maintain
the urban forest and plant more trees.
9.11.The City shall review and regularly update the Climate Action Plan and shall annually report
to the City Council on implementation of the Climate Action Plan.O CDD
9.12.The City shall regularly review and update its building codes and ordinances to identify
revisions that promote energy efficient building design and construction practices. O CDD
9.13.The City shall consider the feasibility of providing incentives for new and renovated projects
that incorporate sustainable design features such as constructing new buildings that are
solar ready, or off-setting significant operational energy use through use of solar water
heating, photovoltaic systems, geothermal or wind energy systems.
O CDD
9.14.The City shall design all new City facilities to meet the requirements specified for certification
as LEED Silver construction or equivalent rating system.
9.15.The City shall promote and pursue a wide range of renewable energy financing options
including a renewable energy fund or loan program.C CDD
9.16.The City shall evaluate the feasibility of a regional Community Choice Aggregation program
to procure electricity from renewable resources.O Admin
10 Healthy Community
10.6.The City shall regularly review and update master plans for City parks to designate areas for
community gardens where appropriate.
10.7.The City shall update the Community Design Guidelines to encourage the inclusion of
communal gardens within multi-family residential developments with 10 or more units.
10.8.The City shall work with the community to develop a resource guide to facilitate design that
promotes a healthy and active lifestyle.
CIRCULATION
2 Traffic Reduction
A-5
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
2.2.1.In coordination with county agencies, the City shall support efforts in establishing county-
wide trip reduction programs.O PW
2.2.2.The City shall maintain and where cost effective improve a trip reduction plan for City
employees.O PW
2.2.3. The City shall work with employers to establish a voluntary commuter benefit options
program that provides commute options for employees. O PW
2.2.4.The City shall continue to work with Cal Poly, Cuesta College, and other educational
institutions to provide incentives to all students, faculty and staff to use alternative forms of
transportation.
O PW
3 Transit Service
3.2.1.The City shall continue to implement the Short Range Transit Plan (5-year time frame) and
coordinate with SLOCOG on implementing the Long Range Transit Plan (20-year time
frame).
O PW
3.2.2 The City shall make available bulk rate transit passes to all groups.C PW
3.2.3.The City shall work with the San Luis Obispo Regional Transit Authority (RTA) to maintain
and expand commuter bus service to and from the City of San Luis Obispo during peak
demand periods. O PW
3.2.4.The City shall coordinate with the San Luis Obispo Regional Transit Authority (RTA) to
evaluate the benefits and drawbacks of consolidated service.O PW
3.2.5.The City shall develop and maintain a comprehensive marketing and promotion program to
reach individual target audiences.O PW
3.2.6 The City shall update its Short Range Transit Plan to evaluate adding mass transit stops at
the high school and the middle school.C PW
3.2.7.When evaluating transportation impacts, the City shall use a Multimodal Level of Service
analysis.C PW
3.2.8.The City shall work with other agencies to develop a regional transit center downtown.O PW
4 Bicycle Transportation
4.2.1.The City shall evaluate a bike share program in coordination with Cal Poly and other
educational institutions.O PW
4.2.2.The City shall maintain and regularly update its Bicycle Transportation Plan as needed to
reflect changes in state law and/or future conditions consistent with the objectives, policies
and standards of this Circulation Element. Future revisions to the Bicycle Transportation
Plan shall consider Safe Routes to School
O PW
4.2.3.The City shall work with Cal Poly and Cuesta College to de-emphasize the use of
automobiles and promote the use of alternative forms of transportation in their master plans.O PW
4.2.4.The City shall revise its zoning regulations to establish and maintain standards for secured
bicycle parking and ancillary facilities.O PW
4.2.5.The City should obtain railroad right-of-way and easements to establish a separated bike
path and pedestrian trail through San Luis Obispo.O PW
4.2.6.The City shall maintain its GOLD level award designation as a Bicycle Friendly Community
and pursue a gold level designation.O PW
4.2.7.The City shall collaborate with SLO County to coordinate planning and development of
county bikeways to support a regional bicycle network.O PW
4.2.8.The City should consider expanding and maintaining its bicycle licensing program to address
bicycle loss, theft, and safety problems.O PD
5 Walking
5.2.1.The City shall adopt and regularly update a Downtown Pedestrian Plan to encourage walking
and to expand facilities that provide pedestrian linkages throughout the Downtown. The plan
shall include pedestrian safety assessments in accordance with State and Federal
guidelines.
O PW
5.2.2.Areas outside of the Downtown, the City shall implement its program for installation of a
continuous and connected pedestrian network giving areas with the heaviest existing or
potential pedestrian traffic priority in funding.O PW
A-6
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
5.2.3.The City shall continue to implement its annual program of enhancing existing curbs with
ADA compliant ramps. O PW
5.2.4.The City shall continue to coordinate with SLOCOG and local schools to pursue Safe Routes
to School programs and grant opportunities.O PW
5.2.5.The City shall consider the benefits and costs of consolidating the Bicycle Transportation
Plan with a citywide Pedestrian Plan.O PW
6 Multi-Modal Circulation
6.2.1.As funding permits the City shall biennially complete a traffic count program for pedestrians,
bikes, vehicles and transit to maintain and update its database of transportation conditions
and to evaluate the state of the transportation system. O PW
7 Traffic Management
7.2.1.Those traffic programs identified in the Circulation Element that have the greatest potential
to reduce traffic increases shall have priority for implementation.O PW
7.2.3.On a bi-annual basis, as funding permits the City shall implement an ongoing and
comprehensive transportation monitoring program. O PW
7.2.4.The City shall regularly, as funding permits, conduct a travel behavior survey of residents to
estimate their use of different types of transportation.O PW
7.2.5.The City shall work with the County to jointly develop and adopt design and construction
standards for streets within the City's Urban Reserve.O PW
7.2.6.The City shall revise its Subdivision Regulations to include right-of-way and design
standards. O PW
7.2.7.The City shall adopt an access management policy to control location, spacing, design and
operation of driveways, median openings, crosswalks, interchanges and street connections
to a particular roadway including navigation routes to direct traffic to preserve the safety and
efficiency of the transportation system.
O PW
7.2.8.The City shall cooperate with State and regional agencies in evaluating the effectiveness of
high occupancy vehicle (HOV) lanes on State highways.O PW
7.2.9.The City shall develop and adopt guidelines that implement Policy 7.1.4 concurrent with the
2015-17 Financial Plan. C PW
8 Neighborhood Traffic Management
8.2.1.As funding permits the City shall provide neighborhood traffic management services for
residential areas that have traffic volumes or speeds which exceed the thresholds
established in Table 4.O PW
8.2.2.The City will undertake measures to control traffic in residential areas where traffic speeds or
volumes exceed standards set by Table 4, Street Classification Descriptions and Standards.O PW
8.2.3.The City shall analyze residential streets for their livability with regards to multi-modal traffic
noise, volumes, speed, and safety as well as the amount of pedestrian and bicycle traffic
and potential excess right-of-way pavement. O PW
8.2.4.The City shall identify and address regional cut-through traffic issues in the City.O PW
9 Street Network Changes
9.2.1.The City will establish building setback lines for routes listed on Table 5.O PW
9.2.2.The City shall ensure that changes to Prado Road (Projects 1, 2, and 19 on Table 5) are
implemented in a sequence that satisfies circulation demands caused by area development.
Sponsors of development projects that contribute to the need for the Prado Road
interchange or overpass will be required to prepare or fund the preparation of a Project
Study Report.
O PW
9.2.3.The City shall adopt and regularly update a plan and standards for the installation and
maintenance of landscaped medians, parkways, signs, utilities, street furniture, sidewalks
and bicycle lanes. Within the Downtown, street amenities shall be consistent with the
Downtown Pedestrian Plan design guidelines.
O PW
A-7
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
9.2.4. The City will evaluate complete street designs to maximize the shared right of way for all
users as a method of achieving an overall objective for the Conceptual Physical Plan of the
City's Center to improve the pedestrian environment in the downtown. O PW, CDD
9.2.5.As part of any proposal to further develop the Dalidio-Madonna Area, the alignment and
design of extensions of Froom Ranch Way connecting with Prado Road (west of Route 101)
shall be evaluated and established if consistent with the Agricultural Master Plan for Calle
Joaquin Reserve.
O PW
9.2.6.The City shall promote the creation of “streetscapes” and linear scenic parkways or corridors
that promote the city’s visual quality and character, enhance adjacent uses, and integrate
roadways with surrounding districts.O PW
10 Truck Transportation
10.2.1.Trucks should turn off motors when parked. The City shall work with the Air Pollution Control
District (APCD) for guidance in establishing standards that address air and noise pollution
from idling trucks.O PW
10.2.2.The City's Home Occupation Permit Regulations should be amended to ensure that
commercial trucks are not used to make regular deliveries to home occupations in residential
areas.O PW
10.2.3.The City shall continue to provide reserved commercial truck loading zones in appropriate
downtown areas.O PW
10.2.4.The City shall adopt an ordinance regulating the movement of heavy vehicles.
11 Air Transportation
11.2.1.The City shall work with the County Airport to encourage the use of quieter and more
environmentally sensitive aircraft.O Admin
11.2.2.The City shall work with the County Airport to support the further development of airport
facilities and attract additional passenger airline services.O Admin
11.2.3.The City shall work with the County Airport to pursue funding opportunities, such as Airport
Improvement Program grants.O PW
11.2.4.The City shall work with the County Airport Land Use Commission to complete updates of
the Airport Land Use Plan for the San Luis Obispo County Airport in regard to significant
changes in noise, adjacent land impacts, and safety zones.O CDD
12 Rail Transportation
12.2.1.The City supports maintaining and increasing daily train service connecting San Luis Obispo
with points north and south, with departures and arrivals in the morning, mid-afternoon and
evening.
O PW
12.2.2.The City shall support San Luis Obispo Council of Governments in evaluating the feasibility
of passenger rail service to connect points within the county.O PW
12.2.3.The City shall coordinate railroad facility infrastructure maintenance with the Union Pacific
Railroad and the Public Utilities Commission. In addition, the City shall work with the Air
Pollution Control District and others to discourage idling train engines in San Luis Obispo.O CDD
12.2.4.The City shall monitor and respond to changes, or proposed changes in passenger and
freight rail traffic that may impact the safety and well-being of residents of the community
including the transport of combustible materials.O PW
12.2.5.The City shall discourage the transportation of oil and other combustible hydrocarbons through
the City.O Admin
13 Parking Management
13.2.1.The City shall maintain and regularly update its Access and Parking Management Plan
(every 5 years) including parking demand reduction strategies and consider emerging best
practices.O PW
13.2.2.The City shall regularly monitor the use of public parking in the downtown.O PW
13.2.3.The City shall coordinate with SLOCOG during periodic updates to SLOCOG’s Park and
Ride Lot Development report to evaluate the need for and location of park-and-ride lots to
serve commuters.
O PW
A-8
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
13.2.4.The City shall only approve construction of additional public parking structures after
considering the findings and results of a parking supply and demand study.O PW
13.2.5.The City shall continue to work with the Downtown Association to evaluate the use of curb
space in the downtown and identify opportunities for creating additional parking spaces.O PW
13.2.6.The City shall continue to operate the downtown trolley as a parking management tool to
reduce congestion.O PW
14 Neighborhood Parking Management
14.2.1.Upon request from residents or other agencies, the City will evaluate the need for
neighborhood parking permit programs or other parking management strategies in particular
residential areas.
O PW
14.2.2.The City will investigate the feasibility and desirability of establishing parking financing
districts.O PW
15 Scenic Roadways
15.2.1. The City will participate with Caltrans, the County and other cities to establish a program for
enhancing the visual character of the Highway 101 corridor consistent with the US 101
Aesthetic Study for San Luis Obispo County. O PW
15.2.2.The City shall revise its Community Design Guidelines to incorporate concern for the
protection of views and vistas from scenic roadways.CDD
15.2.3.The City shall adopt a street corridor landscaping plan for scenic roadways. Indigenous
species will be used unless shown to be inappropriate.O PW
15.2.4.Both the City and the County should enforce an amortization program for the removal of
billboards along scenic roadways.O CDD
16 Circulation Element Implementation, Program Funding and Management
16.2.1.Transportation Work Program shall be regularly updated as part of the City Financial Plan,
and must be consistent with the Circulation Element. Will cover a five-year period, shall be
updated to include modified projects and costs if warranted. O PW
16.2.2.The City shall update its multimodal transportation impact fee ordinance in accordance with
State Law (AB1600). O PW
16.2.3.Prior to implementation of a project identified in this element, the City shall reevaluate its
need and include an analysis of alternatives that can achieve the desired results at lower
costs and with less environmental impacts. O PW
16.2.4.Major development proposals to the City will include displays of the proposal's interfaces
with nearby neighborhoods, and indicate expected significant qualitative transportation
effects on the entire community.O PW
HOUSING
1 Safety
1.4. Provide financial assistance for rehabilitation of affordable rental and ownership units using
Federal, state and local housing funds O CDD
1.5. Continue Code enforcement to expedite removal of illegal/unsafe dwellings. O CDD
1.6. Enact a rental inspection program to improve condition of housing stock. O CDD
1.7. Continue to support local & regional solutions to homelessness by funding programs such
as Maxine Lewis and Prado Center. O CDD
1.8. Create educational campaign to encourage owners of older residences to conduct seismic
upgrades CDD
2 Affordability
2.5. Continue to manage the Affordable Housing Fund to serve as a sustainable resource for
supporting affordable housing development and as a source of both grant funding and
below-market financing for affordable housing projects. O CDD
2.6.Continually review existing and proposed building, planning, engineering and fire policies
and standards as housing developments are reviewed, which determine whether changes
are possible that could assist the production of affordable housing. O CDD
A-9
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
2.7 Continue to implement existing procedures that speed up the processing of applications,
construction permits, and water and sewer service priorities for affordable housing projects O CDD
2.8.Continue to pursue outside funding sources for City impact fees so that new dwellings that
meet the City’s affordable housing standards can mitigate their facility and service impacts. O CDD
2.9.Maintain exemptions for extremely-low, very-low and low-income households. O CDD
2.11.Continue to assist with issuance of bonds, tax credit financing, loan underwriting or other
financial tools to help develop or preserve affordable units through various programs.O CDD
2.12.Consider incorporating HOA fees and a standard allowance for utilities in the calculation for
affordable rents and home sales prices. CDD
2.13.In conjunction with the Housing Authority and local housing agencies, continue to preserve
at-risk units by providing technical assistance and education to tenants, property owners and
the community. O CDD
2.14.In conjunction with local housing providers and the local residential design community,
continue to provide technical assistance as requested by the public, builders, design
professionals and developers regarding design strategies to achieve affordable housing.O CDD
2.15.Evaluate the Inclusionary Housing Ordinance requirements and the effect of Table 2A on the
City’s ability to provide affordable housing in the proportions shown in the Regional Housing
Needs Allocation, per Policy 2.4.CDD
2.16.The City will evaluate and consider including a workforce level of affordability in its
Affordable Housing Standards to increase housing options in the City for those making
between 121 percent and 160 percent of the San Luis Obispo County median income. O CDD
2.17.Continue to consider increasing residential densities above state density bonus allowances
for low, very low and extremely low income households.O CDD
3 Housing Conservation
3.8.Adopt an ordinance that implements policy 3.2 to discourage removal or replacement of
affordable housing.CDD
3.9.Through collaboration of agencies offering rehabilitation programs, the city will use State,
Federal, or housing funds to correct unsafe and unsanitary housing conditions, improve
accessibility and energy efficiency.
O CDD
3.10.Continue to encourage the creation of dwellings in the Downtown Core (C-D Zone) and the
Downtown Planning Area by continuing the "no net housing loss" program.O CDD
3.11.Continue to identify residential properties and districts eligible for local, State or Federal
historic listing in accordance with guidelines and standards to help property owners repair,
rehabilitate and improve properties. O CDD
3.12.Annually monitor and track affordable housing units at-risk of being converted to market rate
housing, to provide resources to support the Housing Authority, and local housing agencies.O CDD
3.13.Work with non-profit organizations, faith-based organizations, or the Housing Authority of the
City of San Luis Obispo, to encourage rehabilitation of residential, commercial or industrial
buildings.
O CDD
4 Mixed-Income Housing
4.5.Review new development proposals for compliance with City regulations and revise projects
or establish conditions of approval to implement the mixed-income policies.O CDD
4.6.Consider amending the City’s Inclusionary Housing Ordinance and Affordable Housing
Incentives to require that affordable units in a development be of similar number of
bedrooms, character and basic quality.
O CDD
5 Housing Variety and Tenure
5.5.Review new developments for compliance with City regulations and revise projects or
establish conditions of approval as needed to implement the housing variety and tenure
policies.
O CDD
6 Housing Production
6.11.Maintain the General Plan and Residential Growth Management Regulations (SLOMC
17.88) exemption for new housing in the Downtown Core that is enforceably restricted for
extremely-low, very low, low- and moderate income households. O CDD
A-10
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
6.12.Continue to allow flexible parking regulations for housing development, especially in the
Downtown Core and possibly use city parking facilities by Downtown residents, where
appropriate guarantees limit occupancies to persons without motor vehicles or who provide
proof of reserved, off-site parking.
O CDD
6.13. Continue to develop incentives to encourage additional housing in the Downtown Core,
particularly in mixed-use developments. Explorer projects density based on average unit size
to encourage development of smaller efficiency units. O CDD
6.15.Consider General Plan amendments to rezone commercial, manufacturing or public facility
zoned areas for higher-density, infill or mixed use housing where land development patterns
are suitable and impact to Low-Density Residential areas is minimal.
O CDD
6.16 Continue to provide resources that support the SLO County Housing Trust fund’s efforts to
provide below-market financing and technical assistance to affordable housing developers to
increase affordable housing production in the City of San Luis Obispo.O CDD
6.17.Encourage residential development through infill development and densification within City
Limits and in designated expansion areas over new annexation of land.O CDD
6.18.Seek opportunities with other public agencies and public utilities to identify, surplus land for
housing, to convert vacant or underutilized public, utility or institutional buildings to housing.O CDD
6.19.Continue to incentivize affordable housing development with density bonuses, parking
reductions, development incentives, and City financial assistance.O CDD
6.2.Continue to financially assist in the development of affordable housing to extremely low,
very-low, low- or moderate income households using State, Federal and local funding
sources, while giving priority to projects that result in the maximum housing benefits for the
lowest household income levels.
O CDD
6.21.Actively seek new revenue sources, including State, Federal and private/non-profit sources,
to assist affordable housing development for different income households and first- time
homebuyers.O CDD
6.22.Continue to exempt the rehabilitation or remodeling of 4 dwellings up to 1200 square feet
each from Architectural Review Commission review. New multi-unit housing may be allowed
with “Minor or Incidental” or staff level architectural review, unless located on a sensitive or
historically sensitive site.
O CDD
6.23.Assist in the production of affordable housing by identifying vacant or underutilized City-
owned property suitable for housing, and dedicate public property, where feasible and
appropriate for such purposes. O CDD
6.24.Community Development staff will proactively provide information for properties suitable for
housing as identified in the Land Use and Housing Elements. O CDD
6.25.Consider amending the General Plan to designate the 46 acres associated with the former
County General Hospital as a “Special Considerations” zone, suitable for housing
development on areas of the site of less than 20 percent average slope, including open
space dedication and public improvements are part of the project.
O CDD
6.26 Continue to update the Affordable Housing Incentives (Chapter 17.90, SLOMC) and Zoning
Regulations to ensure density bonus incentives are consistent with State Law.O CDD
6.27 Evaluate and consider increasing the residential density allowed in the Neighborhood-
Commercial (CN), Office (O) and Downtown Commercial (CD) zoning districts. O CDD
6.28.Evaluate how lot patterns (i.e. size, shape, slope) in the City’s multi-family zones affect the
City’s ability to meet housing production policies. O CDD
6.29.Continue to pursue incentives to encourage development of Secondary Dwelling Units. O CDD
6.3.Consider adopting Subdivision and Zoning Regulation changes to support small lot
subdivisions, ownership of bungalow court developments, and eliminate the one acre
minimum lot area for PD overlay zoning, and other subdivision design alternatives. O CDD
6.31.Consider scaling development impact fees for residential development based on size,
number of bedrooms, and room counts.O CDD
6.32.Continue to submit annual Housing Element progress reports to the State Department of
Housing and Community Development per Government Code Section 65400. O CDD
A-11
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
7 Neighborhood Quality
7.9.Continue to implement strategies, as early notification through electronic media, website
improvements, neighborhood outreach meetings, to ensure residents are aware of and able
to participate in planning decisions affecting their neighborhoods. O CDD
7.1.Continue to work with neighborhood groups and individuals to address concerns, problems,
trends and opportunities for improvements of specific neighborhoods. O CDD
7.11.Continue to fund neighborhood improvements, including sidewalks, traffic calming devices,
crosswalks, parkways, street trees and street lighting to improve aesthetics, safety and
accessibility.
O PW
7.12.Continue to develop and implement neighborhood parking strategies, including parking
districts, to address the lack of on- and off-street parking in residential areas.O CDD/PW
7.13.Continue the City’s Neighborhood Services and proactive enforcement programs to support
neighborhood wellness.O CDD
8 Special Housing Needs
8.13.Continue to provide resources that support local and regional solutions to meeting the needs
of the homeless and displaced women and children and other agencies O CDD
8.14.Continue the mobile home rent stabilization program to minimize increases in the cost of
mobile home park rents.O CDD
8.15.Continue to look for opportunities in specific plan areas suitable for tenant-owned mobile-
home parks, cooperative or limited equity housing, manufactured housing, self-help housing,
or other types of housing that meet special needs.O CDD
8.16.Advocate developing more housing and refurbishing campus housing at Cal Poly University.O CDD
8.17.Work with Cal Poly University Administration to secure designation of on-campus
fraternity/sorority living groups. O CDD
8.18.Jointly develop and implement a student housing plan and continue to support "good
neighbor programs" with Cal Poly State University, Cuesta College and City residents, and
improve communication and cooperation between the City and the schools. O CDD
8.19.Provide public educational information at the Community Development Department public
counter on universal design concepts for new and existing residential dwellings.O CDD
8.2.Continue to allow the establishment of transitional and supportive housing in all zoning
districts where residential uses are allowed. O CDD
8.21.Continually look for (land, retail or commercial space, motels, apartments, housing units,
mobile home parks) that can be acquired and converted to affordable permanent housing
and permanent supportive housing for homeless persons and families.O CDD
8.22.Consider an overlay zone to existing and future mobile home and trailer park sites to provide
additional requirements,such as rent stabilization and a mobile home park conversion
ordinance.
CDD
8.23.Encourage the creation of housing for persons with developmental disabilities. The City will
seek grant opportunities for housing construction and rehabilitation. O CDD
8.24.Continue to coordinate with the County, social services providers and non-profit
organizations for delivery of existing, improved and expanded services,including case
management, drug, alcohol, detoxification, and mental health services. O CDD
8.25.Continue to engage Homeless Services Oversight Council and Friends of Prado Day Center
to identify, evaluate, and implement strategies to reduce the impacts of homelessness. O CDD
9 Sustainable Housing, Site, and Neighborhood Design
9.7.Continue to educate planning and building staff and citizen review bodies on energy
conservation issues, including the City’s energy conservation policies and Climate Action
Plan. Staff shall work with applicants to achieve the City’s energy conservation goals.O CDD
A-12
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
9.8.Continue to provide long-term solar access for new or remodeled housing and adjacent
properties, consistent with historic preservation guidelines, and revise regulations found to
be inadequate.O CDD
9.9.Continue to implement the Water Quality Control Board’s “Post-Construction Stormwater
Management Requirements for Development Projects in the Central Coast Region”, to
reduce the amount of impermeable surface.O CDD
9.1.Implement Climate Action Plan programs to increase production of “green” housing units
and projects and require sustainable and/or renewable materials, water and energy
technologies. O CDD
9.11.Continue to promote building materials reuse and recycling in site development and
residential construction, including flexible standards for use of salvaged, recycled, and
“green” building materials. Continue the City’s construction and demolition debris recycling
program (Chapter 8.05 - Municipal Code)
O CDD
9.12.Consider incentivizing dwelling units to a minimum size of 150 square feet, consistent with
the California Building Code, by reduced impact fees and property development standards.O CDD
9.13.Consider participating in financing programs for sustainable home improvements such as
solar panels, heating and cooling systems, water conservation and energy efficient windows.O CDD
10 Local Preference
10.3.Continue to work with the County of San Luis Obispo for any land use decisions that create
significant expansion of employment in the unincorporated areas adjacent to the City to
mitigate housing impacts on the City. O CDD
10.4.Encourage residential developers to sell or rent their projects to those residing or employed
in the City first before outside markets.O CDD
10.5.Work with Cal Poly to address the link between enrollment and the expansion of campus
housing programs at Cal Poly University to reduce pressure on the City's housing supply.O CDD
10.6.Work with other jurisdictions to advocate for State legislation that would: 1) provide funding
to help Cal Poly University provide adequate on-campus student housing, and 2) allow State
universities and community colleges to enter public-private partnerships to construct student
housing.
O CDD
11 Suitability
11.3.The City will continue to ensure the ability of legal, non-conforming uses to continue where
new development is proposed. O CDD
NOISE
1.12. Review public and private development proposals for Noise Element conformance. O CDD
1.13. Require noise studies early in the review process when project noise may exceed allowable
limits. O CDD
1.14. Assure that noise mitigation measures are carried-out during construction. O CDD
1.15. Monitor compliance with mitigation measures after project completion. O CDD
1.16. The city will work with the California Highway Patrol and the County Sherriff`s Office to
enforce loud vehicle exhaust systems and sound amplication systems.
1.17. The city will purchase and pursue alternatives to the use of noisy equipment for city
operations.
1.18. The will periodically review and update the Noise Element.
1.19. the City will make the Noise Guidebook available to anyone involved in project design and
review.
CONSERVATION AND OPEN SPACE
2 Air
A-13
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
2.3.1. Employ best available practices in City operations. O UT
2.3.2. Consult with APCD on significant development proposals. O CDD
2.3.3. Promote alternative transportation/land use strategies. O CDD
2.3.4. Provide alternative transportation incentives. O PW
2.3.5. Amend the General Plan as needed to achieve air quality goals. O CDD
3 Cultural Heritage
3.6.1. Promote public awareness of cultural resources through activities, including tours & clean-
up events. C ADM
3.6.2. Provide financial assistance and incentives for historic preservation. O CDD
3.6.3. Expand ARC guidelines to address specific guidance for new buildings in historic districts. C CDD
3.6.4. Prepare post-disaster historic preservation standards.
3.6.5. Assist the CHC in preparing archaeological resource guidelines. C ADM
3.6.6. Provide cultural resource awareness public educational programs, which display artifacts
which illuminate past cultures. C ADM
3.6.7. Encourage partnering for preservation. O ADM
3.6.8. Promote adaptive reuse of historic buildings. O CDD
3.6.9. Rehabilitate and maintain City-owned adobes and historic structures. O ADM
3.6.10. Implement Cultural Heritage Committee Whitepaper. C CDD
4 Energy
4.6.1. Promote efficient City energy use. O UT
4.6.2. Manage City operations for energy self-reliance.
4.6.3. Promote Sustainable design in City facilities. O PW
4.6.4. Reduce obstacles to energy conservation. O CDD
4.6.5. Encourage sustainable employee commuting practices. O HR
4.6.6. Promote energy conservation education. O UT
4.6.7. Administer State Building Energy Standards. O CDD
4.6.8. Encourage energy-efficient design in private development projects. O CDD
4.6.9. Address solar access in new development. O CDD
4.6.10. Retrofit City facilities for energy savings. O UT
4.6.11. Seek financial assistance for energy efficiency improvements in City facilities. O UT
4.6.12. Monitor energy use in City facilities and prepare biannual report for City Council. O UT
4.6.13. Prepare energy conservation plan for City facilities. CDD
4.6.14. Adopt green building standards. O CDD
4.6.15. Consider City-owned green energy utility. UT
4.6.16. Promote technology and energy conservation businesses. O ADM
4.6.17. Require solar power for new dwellings. O CDD
A-14
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
4.6.18. Seek Air Pollution Control District support for maintaining air quality. O CDD
5 Materials
5.5.1. Use materials efficiently in City operations (computer technology and copying) O UT
5.5.2. Promote City materials reuse and recycling. O UT
5.5.3. Coordinate waste reduction and recycling efforts. O UT
5.5.4. Use materials with reduced environmental impacts in City operations and facilities. O PW
5.5.5. Maintain inventory of recycling businesses and services. O UT
5.5.6. Expand City public information efforts on energy and materials conservation goals. O UT
5.5.7. Encourage energy efficiency and Green Building in new development. O CDD
5.5.8. Ensure new development projects include space for materials recycling/storage. O CDD
7 Natural Communities
7.7.1. Protect natural communities. O ADM
7.7.2. Implement the Natural Communities policies from program. O ADM
7.7.3. Participate in any area-wide planning efforts such as Habitat Conservation Plans under the
U.S.Endangered Species Act. O ADM
7.7.4. Participate in environmental review conducted by other agencies for projects that could
affect natural communities in the San Luis Obispo planning area. O ADM, CDD
7.7.5. Develop and maintain current benchmark information on habitat types and conditions. O ADM
7.7.6. Replace invasive non-native vegetation with native vegetation. O ADM
7.7.7. Preserve ecotones through changes to or conditions on new development. O ADM
7.7.8. Protect wildlife corridors through changes to or conditions on new development. O ADM
7.7.9. Adopt creek setback requirements. C CDD
7.7.10. Implement natural communities policies through the Tree Committee. O PW
8 Open Space
8.7.1. Protect open space resources. O ADM
8.7.2. Enhance and restore open space. O ADM
9 Views
9.3.1. Locate and design public facilities and utilities consistent with General Plan. O PW
9.3.2. Update community design guidelines to address views from scenic routes.
9.3.3. Maintain and apply Sign Regulations consistent with the General Plan. O CDD
9.3.4. Conduct environmental and architectural review consistent with General Plan. O CDD
9.3.5. Require visual assessments for projects affecting important scenic resources and views
from public places. O CDD
9.3.6. Determine that view blockage along a scenic roadway is a significant impact. O CDD
9.3.7. Review development in unincorporated County for consistency with General Plan. O CDD
A-15
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
9.3.8. Advocate State and County scenic highway designations and protective programs for scenic
routes connecting San Luis Obispo with other communities. O CDD
9.3.9. Place underground existing overhead utilities, with highest priority for scenic roadways,
entries to the City, and historic districts. O PW
9.3.10. Prohibit billboards. C CDD
9.3.11. Remove existing billboards through amortization, conditions of development approval and
grants for enhancing open space and transportation corridors. O CDD
9.3.12. Preserve the Morros, in cooperation with other government agencies, non-profit land trusts
and property owners. O ADM
9.3.13. Establish and maintain a program of describing and monitoring viewsheds within and
adjacent to City limits to establish a photographic baseline of visual setting.
10 Water
10.3.1. Efficient water use O UT
10.3.2. Maintain Water quality O UT
SAFETY
8 Hazardous Trees
8.1. Identify and maintain or remove hazardous trees for City property and assist property
owners. O PW
8.2.5. B Review emergency response plans of utilities and transportation agencies. O FD
9 Avoiding and Preparing For Emergencies In General
9.2. Maintain and annually update emergency response plan. O FD
9.3. Evaluate fire-flow and identify deficiencies. C UT
9.3. A Meet response-time objective of four minutes. O FD
9.3. B Set response-time objective for Public Works. C PW
9.3. C Set response-time objective for Utilities. C UT
9.4. A Train fire fighters, police, building inspectors, public works, & utilities staff. O FD
9.4. B Train building & planning staff in lessons from previous disaster areas. O CDD
9.4. C Conduct non-nuclear disaster-response exercises. O FD
9.5. Obtain information about specific location & type of fire & toxic hazards. O FD
9.6. A Participate in periodic regional disaster-response drills. O FD
9.6. B The city will review the hazard assessment studies and emergency response plans of
utilities and transportation agencies.
9.6. C Work w/CalTrans on hazardous materials approved routes and related safety precautions. O FD
9.7 Establish emergency operation center in Fire Station 1 and backups sites. C FD
9.8. Expand and keep current safety-related information. O FD
9.9. Keep Multi-hazard Emergency Response Plans current. O FD
9.10. Work with other jurisdictions on mutual-aid & automatic-aid agreements. O FD
9.11. Prepare for post-disaster recovery. O FD
9.15. A Develop program to familiarize residents with fire hazards and appropriate responses. O FD
9.15. B Promote efforts of the Fire Safe Council. O FD
A-16
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
9.15. C Continue CERT training program. O FD
9.15. D Support education programs for lower grades to teach fire hazards. O FD
9.16. Help organizations that provide emergency outreach & education. O FD
9.17. Encourage & participate in individual home inspection programs. O FD
9.19. A Identify & evaluate facility hazards for City owned property. C PW
9.19. B Establish routine code inspections for commercial, industrial, public-assembly, & group
housing. O CDD
9.19. C Establish complaint-based code compliance for all buildings. C CDD
9.19. D Implement City-adopted program on Unreinforced masonry buildings. C CDD
9.19. E Provide outreach program for earthquake bracing of wood-frame buildings. O CDD
9.20. Administer zoning, subdivision, & Architectural standards consistent with police & fire
recommendations. O CDD
9.21. Fire, police, public works, & utilities review development applications for safety objectives. O CDD
9.22. A Maintain & administer building regulations in conformance with State requirements. O CDD
9.22. B Maintain & administer fire regulations in conformance with State requirements. O FD
9.23. Conduct fire & hazardous materials inspections in commercial, industrial, & multifamily
buildings. O FD
PARKS AND RECREATION
3 Parks and Recreation Facilities
3.14.2. Partner with schools and other joint users to renovate existing sports fields. O P&R
3.14.5. As space becomes available, additional fields will be added in the vicinity of Damon-Garcia
Sports Complex. O P&R
3.16.2. Acquire property and construct a community center. P&R
3.16.3. Update & improve indoor facilities. C P&R
3.17.1. Implement the revised Laguna Lake Park Master Plan. O P&R
3.18.1.1 Implement the revised Sinsheimer Park Master Plan. O P&R
3.18.1.2. Construct a therapy pool at the SLO Swim Center. C P&R
3.19.1. Continue the Playground Equipment Replacement Program. O P&R
3.19.2. Pursue joint use of SLO High School swimming pool. C P&R
4 Parks and Recreation Activities
4.2.2.1. Regularly evaluate demand and need and modify as appropriate. O P&R
4.2.2.2. Conduct periodic public evaluations of services. O P&R
4.2.2.3. Regularly publicize recreational opportunities. O P&R
4.2.2.4. Consider needs of underserved groups. O P&R
4.2.4. Avoid offering recreation activities classes or activities that unnecessarily duplicate
commercial programs. O P&R
4.2.8. Collaborate with groups providing high risk programs in open space areas. O P&R
4.3.2.1 Recruit at-risk youth to participate in activities. O P&R
4.3.2.2. Collaborate with other agencies in serving at-risk youth. O P&R
4.3.3.1. Evaluate services to determine benefits O P&R
4.3.3.2. Accommodate schedules of working people. O P&R
4.3.3.3. Prioritize new activities from results of public input. O P&R
A-17
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
4.3.6. Continue to maintain publicly accessible open space trails. O P&R
5 Financing
5.1.1. Develop collaborative fee exchange with S.L.C.U.S.D. C P&R
6 Implementation
6.0.1. Continue to improve existing fields. O PW
6.0.2. Transition from multi-use to single use fields. O P&R
6.0.3. Develop joint use agreements with other agencies in addition to schools. C P&R
6.0.4. Develop new programs to not conflict with existing field use. O P&R
6.0.5. Ensure athletic fields are provided within new residential development. O P&R
6.0.6. Add fields in Damon-Garcia Sports Complex. C P&R
6.0.6. Consider additional fields for needs not addressed with Damon Garcia fields. O P&R
6.1.1. Upgrade Recreation Center to provide interim community center. C P&R
6.1.2. Secure funding for a therapy pool to be located at the SLO Aquatics Center. C P&R
6.1.3. Consider revenue enhancement to fund new community center. O P&R
6.2.1. Construct mini-parks at Purple Sage Drive and at Marsh & Santa Rosa. C P&R
6.2.2. Support neighbor efforts to develop mini-parks. O P&R
6.3.1. Acquire open space property to construct trails. O P&R
6.3.2. Use a variety of techniques to acquire open space. O P&R
6.3.3. Design new parks so they can connect to recreational trails. O P&R
6.3.4. Connect existing parks & open space with trails. O P&R
6.4.1. Schedule "unmet needs" projects through the CIP process. O P&R
6.4.2. Look for alternatives to address unmet needs projects. O P&R
6.5.1. Complete implementation of existing master plans, such as those for Sinsheimer and
Laguna Lake Parks. O P&R
WATER AND WASTEWATER
A 2 Water Management (Multi-Source Water Supply)
A 2.3.1. Work cooperatively on regional water issues & resource planning. O UT
Participate with SLO County in Integrated Regional Water Management Plan. O UT
A 2.3.3. Participate with other appropriate agencies in controlling invasive species which could
impact water supplies. O UT
A 2.3.4. Work with agencies to minimize water quality impacts. O UT
A 2.3.5. Continue to work with SLO County-operation of Salinas Reservoir & Nacimiento project. O UT
A 2.3.6. Complete sanitary surveys for Salinas & Whale Rock reservoirs every five years. O UT
A 3 Water Management (Water Resource Availability)
A 3.3.1. Provide water resource update to Council as part of annual report. O UT
A-18
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
A 3.3.2. Update safe annual yield computer model for Salinas & Whale Rock reservoirs following
drought periods. C UT
A 3.3.3. Monitor ongoing research for potential long term impacts to water supplies from climate
change. O UT
A 4 Water Management (Siltation)
A 4.3.1. Work with other agencies to implement Best Management Practices to reduce siltation. O UT
A 4.3.2. Continue education & outreach to owners in watersheds to reduce siltation. O UT
A 4.3.3. Consider periodic siltation studies at each reservoir. UT
A 4.3.4. Provide annual update on siltation to Council. O UT
A 5 Water Management (Water Supply Accounting and Demand Projection)
A 5.3.1. Provide annual update on water supply & demand projections to Council. O UT
A 5.3.2. Conduct periodic updates to water development impact fees. O UT
A 5.3.3. Prepare Urban Water Management Plan every five years. O UT
A 5.3.4. Prepare water supply assessments for large new developments. O UT
A 5.3.5. Analyze water efficiency program impacts to overall reduction in water demand. O UT
A 6 Water Management (Water Conservation)
A 6.3.1. Work with SLO County water agencies to identify cooperative water efficiency measures. O UT
A 6.3.2. Participate in state & regional water conservation efforts. O UT
A 6.3.3. Implement Water Shortage Contingency Plan as required. O UT
A 7 Water Management (Recycled Water)
A 7.3.1. Expand recycled water distribution system. O UT
A 7.3.2. Review development projects to ensure recycled water is used appropriately. O UT
A 7.3.3. Present annual recycled water use as part of annual report to Council. O UT
A 7.3.4. Consider delivery of recycled water to customers outside City limits. O UT
A 7.3.5.Continue to explore potable reuse consistent with statewide regulations.O UT
B 2 Wastewater Management (Wastewater Service)
B 2.3.1.Expand capacity in collection system and Water Resource Recovery Facility.O UT
B 2.3.2. Evaluate wastewater flows of proposed projects. O UT
B 2.3.3. Conduct periodic updates to wastewater development impact fees. O UT
B 3 Wastewater Management (Wastewater Treatment)
B 3.3.1. Prepare & implement Water Resource Recovery Facility master plan. O UT
B 3.3.2. Work cooperatively on regional water quality issues. O UT
B 4 Wastewater Management (Collection System)
B 4.3.1.Investigate cost-effective methods for reducing infiltration and inflow to the wastewater
collection system. O UT
B 4.3.2. Provide education and outreach regarding infiltration and inflow. O UT
B 4.3.3. Support retrofit of sewer laterals to reduce infiltration and inflow. O UT
A-19
Appendix A: General Plan Program Implementation Status List
Status as of
December
2016
Program
No.
Program Summary Completed or
Ongoing Lead Dept
B 4.3.4.Update Sewer System Management Plan to maintain its applicability. O UT
B 4.3.5. Maintain master plans for wastewater service to developing areas of City. O UT
B 4.3.6. Review development proposals to ensure necessary infrastructure is in place. O UT
B 4.3.7. Provide a Pretreatment Program pursuant to Clean Water Act. O UT
A-20