From: Davidson, Doug
Sent: Thursday, June 29, 2017 7:53 AM
To: Bergman, Katelin
Subject: FW: Avila Ranch FEIR - Additional comments
Attachments: FEIR Los Verdes Parks 1 & 2 Public Comment VER 2.docx
RECEIVED
CITY OF SAN LUIS OBISPO
JUN 2 9 2017
COMMUNITY DI✓VELOPMENT
From: Andrew Mangano [
Sent: Thursday, June 29, 2017 7:01 AM
To: John Rickenbach <jfrickenbach@aol.com>; Bochum, Tim <tbochum@slocity.org>; Hudson, Jake <jhudson@slocity.org>;
Codron, Michael <mcodron@slocity.org>; Davidson, Doug <ddavidson@slocity.org>
Cc: Andrew Mangano <andymangano7@gmail.com>
Subject: Fwd: Avila Ranch FEIR - Additional comments
FYI
Andy Mangano
MFI Limited
3596 Broad Street, Suite 104
San Luis Obispo Ca 93401
andymangano7Agmai1.com
Office: 805-242-9220
Fax: 805-242-9221
Cell: 805-704-9364
Begin forwarded message:
From: "Sarah Flickinger" <
Subject: Avila Ranch FEIR - Additional comments
Date: June 29, 2017 at 12:51:51 AM PDT
To: Andrew Mangano<andymangano7(r�il.cam>, Stephen Peck
<Steve a)PeckPlanning coma
Cc: "'darrell goo"' <
Attached are the additional comments on behalf of the neighborhoods, which will be sent with mentioned
attachments. If you have any questions, please feel free to give me a call. I am planning to send the comments
first thing in the morning.
Sarah Flickinger
805.215.2561
For instance, MM TRANS-4 includes direction to confer with adjacent property owners regarding the
intersection of Suburban Road and S. Higuera Street, among others. Los Verdes Park 1 has residential
homes whose bedroom and indoor and outdoor living spaces are directly impacted by this intersection
and any changes thereto, though they are not directly adjacent to it, as they do directly face this
intersection with only open space between them. As an older development, these homes depend on
passive cooling features such as open windows, which require clean air to remain healthy. The FEIR cites
permanent significant changes to air quality due to traffic impacts. Additionally, LVP 1 common
ownership parcels directly border this intersection along the west side. While the plan requires
conference with adjacent property owners—so we should be included in such discussions—the
alignments and approaches to the intersection should also be subject to public input and oversight as
they directly address (in the form of mitigation) significant environmental impacts relating to this project
for parcels not adjacent to the intersection. Air quality impacts are also proposed to be addressed in a
separate plan. Air quality impacts—and specifically cumulative impacts to air quality—are one of the
primary reasons CEQA was developed in the first place. The information to be included in these separate
plans should be included in the EIR documents to allow appropriate public feedback prior to any
certification or advancement of the project.
The following are specific concerns formally adopted by both HOA boards, with suggestions for
amenable mitigations. We have been and continue to be willing to work directly with the developer and
the City to work through these issues in the appropriate manner.
1). First and foremost, the proposed mitigation measure of a second lane on Los Osos Valley Road was
the subject a settlement agreement between the two HOAs, the City of San Luis Obispo and CALTRANS,
when it was proposed as part of the LOVR Interchange Project. Its impacts compromised noise levels, air
quality and safety of residential living spaces and safety of vehicle, pedestrian and bicycle travel into, out
of and in the vicinity of our neighborhoods beyond acceptable levels. It also caused degradation of
access for public safety vehicles and put children loading and unloading at school bus stops at the
intersection of Los Verdes Drive and Los Osos Valley Road at risk. The settlement was reached in good
faith by all parties, and any proposed changes to the agreed upon striping and road alignments requires
specific notification prior to consideration (including scoping and DEIR release) under the terms of the
settlement agreement.
Recognizing the response that this mitigation is being proposed for some point following project
completion does not make it any more acceptable to our neighborhoods. Furthermore, it is still stated
as occurring in Phase 1 in Appendix P of the FEIR, so either the staff report and executive summary is
incorrect or the table of mitigations in Appendix P is incorrect. Having such conflicts within the FEIR
document makes it exceedingly difficult to provide appropriate public feedback.
We are doing our best to address cumulative impacts in a way that serves our communities, our
neighbors (including a school), future Avila Ranch residents, the City at large, as well as commuters to
and from the airport and other adjacent City and County development areas. There is a long-term
solution available, and additional lanes in a residential area (between our two neighborhoods) is not a
solution. This has been tried and is now being corrected or has previously been corrected on South
Street, Johnson, portions of Broad Street, and many others around the City. In some of those cases
injuries and/or loss of life were prerequisites for those corrections. In all cases additional expenditures
are involved beyond previous projects’ mitigations, often restoring streets to original configurations. We
are trying to prevent the same cycle from happening in our neighborhood.
This mitigation measure should be removed from the development plan as it presents a real and
significant hazard to citizens’ well-being. A suitable alternative mitigation measure for this area must be
considered in lieu. According to the traffic study contained herein, the additional lane is only needed in
the absence of the LOVR Bypass, which solves the same traffic flow issues. We respectfully request that
Commissioners direct Staff to prioritize the LOVR Bypass as the preferred mitigation for this area,
advancing the LOVR Bypass as a project and programming it to begin fair share funding with the Avila
Ranch Development through the proposed General Plan or Airport Area Specific Plan updates, and so
that it can be considered during development of County and SLOCOG plans in the near future.
Our neighborhoods have provided the attached memorandum regarding the LOVR Bypass – Constraints
Analysis for consideration in support of this long-term planning solution to local circulation issues within
and around our neighborhood. We recognize that this project is outside the scope of this development
and would require additional approvals and steps, but the traffic study also assumes the Prado Road
Interchange and improvements planned as part of the Chevron Tank Farm Development, which are
subject to the same types of constraints, if not more. Developer and TIF funding could be supplemented
with state and regional grant funding for regional connectivity.
2). We appreciate that restriping for additional lanes would not require an adjustment to existing
planted medians, as is consistent with our settlement agreement. However, we still find an additional
northbound lane on LOVR to be a hazard to our residents, including those travelling by bicycle and
motor vehicle in the vicinity, and strongly oppose any such restriping.
3). The intersection of Los Verdes Drive at Los Osos Valley Road is not evaluated nor discussed in the
DEIR. While the document does include impacts at the intersection of LOVR and S. Higuera and the
segment of LOVR from the intersection at S. Higuera to 450’ past the intersection of Los Verdes Drive, it
never specifically addresses or evaluates impacts to the intersection at LOVR and Los Verdes Drive,
which serves as the sole vehicular and bicycle entrance and exit points to our residential neighborhoods.
There are two school bus stops and a City bus stop serving several additional neighborhoods in the
greater area at this intersection, which also go unaddressed. This is also the single access point for public
safety vehicles traveling to homes within the neighborhoods, which will already be subject to additional
delay according to the FEIR documents. That this intersection and impacts to access and public services
caused by the addition of project traffic are not discussed at all in this document makes it insufficient as
those impacts are real and immediate as early as Phase 1.
The addition of project traffic, both near and long term is significant and will have impacts to the safety
of Los Verdes Park residents at the intersection of Los Verdes Drive and Los Osos Valley Road for both
vehicular and bicycle travel. The impacts further compromise the already failing LOS at the unmentioned
and unmitigated intersection and the direct and indirect safety and wellbeing of residents, public
servants, service providers (mail, delivery services, utilities, contractors) and others who travel through
this intersection.
The addition of project traffic should warrant signalization at Los Verdes Drive prior to completion of
Phase 1 to ensure the continued safety of Los Verdes residents and others who travel in and around our
neighborhoods. In a meeting between our representatives and City staff held June 20, 2017, the
addition of a bikeHAWK signal for bicyclists and pedestrians at Los Verdes Drive / Los Osos Valley Road
was suggested by City traffic planning staff. While any improvement to the situation would be welcomed
and appreciated, our neighborhoods maintain that a traffic-activated signal for residents and others who
frequent the neighborhoods would be the safest alternative serving all modes of travel equitably. We
would support a bike/ped HAWK signal, but would prefer a full signal that is triggered by demand for all
movements to and from Los Verdes Drive.
There has been discussion of the proximity of this intersection to the intersection of Los Osos Valley
Road and S. Higuera as an impediment to full signalization. However, from looking at a map printed as
part of the LOVR Interchange Improvement Project (during the aforementioned meeting with City Staff),
the distance between these intersections is equal to or greater than the distance between Calle Joaquin
and the Southbound US-101 on/off ramps intersections which are both signalized. Special consideration
to address a cumulative problem should be made for safety’s sake and to prevent future accidents
before they happen. Even if this developer is not able to contribute any more than fair share, including
such a signal in the plan updates and programming such improvement for funding allows other
improvement or traffic impact fees to be used for this purpose at the Planning Commission’s
recommendation and City Council’s direction.
4. It appears that the traffic study and findings on several mitigation measures and their benefits may be
inherently flawed. Please see the letter from Melissa Streder, Caltrans District 5 dated June 28, 2017 for
several specific concerns, particularly those relating the LOVR Interchange Improvement Project.
Referencing again the aforementioned settlement agreement, many of the yet uncompleted mitigation
measures from the Los Osos Valley Road Interchange Project that were taken into account in that
project’s environmental documents and the subsequent settlement are being proposed as separate
mitigations within the Avila Ranch project’s DEIR. As the traffic study is based on the assumed outcomes
of a completed LOVR Interchange Project—including said mitigation measures—to show them as having
a new additional benefit on the additional traffic generated by the Avila Ranch project as Avila Ranch
mitigation measures would effectively attribute their benefits at twice the level they will actually
achieve. These include, but are not limited to, retiming at the signal of LOVR and S. Higuera, adjustments
to US 101 signage, etc.
The City is required to provide these mitigation measures as part of the LOVR Interchange Project, and
should have done so according to the schedule outlined in the settlement agreement. Their benefits
should not be leveraged as mitigation measures in the Avila Ranch Project as their completion are
already assumed as part of the existing condition. The LOVR Interchange Project was completed
November 2015, and the traffic study in the Avila Ranch DEIR appendix is annotated as February 2016. If
these are meant to be subsequent changes beyond those to be completed, then our neighborhoods’
settlement agreement should be referenced herein as a prevailing consideration to prevent signal timing
changes that reduce safe and timely movements to and from Los Verdes Drive.
5. The environmental impacts to our neighborhoods of additional project traffic on Los Osos Valley Road
with regard to noise, light pollution and air quality are not adequately addressed nor mitigated in the
project’s environmental documents. The proposed additional project traffic between our neighborhoods
is significant to our residents particularly in the cumulative scenario, as are the impacts to residents
living in close proximity to it, and it should be quantified and mitigated in the EIR. We would propose a
mitigation of acoustic and light-blocking (read: solid, noise- absorbing, deflecting and/or dampening
materials) sound wall along both Los Verdes parks’ frontages facing LOVR prior to completion of Phase
1. Landscape features may be used in addition to the sound walls to further mitigate air quality, noise
and light impacts as warranted by future phases. Innovative solutions such as CityTree by Greencity
Solutions (https://greencitysolutions.de/en/solutions/#section1bottom) would be welcome additions to
the region for reducing emissions relating to construction and operation of the project, as air quality
concerns are among the significant and unavoidable impacts identified in the EIR, and are of concern to
the health and safety of our neighborhoods’ residents. Future monitoring of sound and air quality in the
existing neighborhoods should be incorporated in similar future developments’ EIR documents.
If developer fair share funding is not sufficient for addressing these issues, impact fees from this and
other developments throughout the airport area that have impacted this corridor and LOVR Impact Fees
should be applied. Other financing sources may be available through grants and other programs, and
our neighborhoods would be happy to support the City and developer in identifying and working toward
such funding in any way we can.
6. The added traffic, including construction traffic during the early phases of grading and construction,
from the project onto Suburban Road is significant in nature and its impacts to adjacent residents should
be evaluated, included and mitigated in the FEIR, not through a separate plan to be determined later
outside of public review. Suburban Road tees into the side of Los Verdes Park 1, with several residences
with bedrooms and living spaces (both indoor and outdoor) in close proximity to the intersection.
Impacts to these residences should be quantified and mitigated as part of this project. The existing
wrought iron fencing and aging hedge at this location are likely insufficient in addressing the additional
noise, light and air quality impacts from the addition of Avila Ranch project traffic, expansion of the
Suburban Road intersection and the changed designation of Suburban Road to a commercial collector,
including during the construction phase as well as throughout the operation of the project.
These impacts should be mitigated with acoustic and light-blocking sound walls and landscape features
along the Los Verdes Park 1 frontage in direct and near proximity to the Suburban Road and S. Higuera
intersection prior to the beginning of Phase 1. This would effectively include from the beginning of the
Los Verdes Park 1 property north of the intersection to some point past the intersection to the south
along S. Higuera.
As there are noise, air quality and light pollution impacts on residences facing S. Higuera from the
addition of project traffic throughout the S. Higuera corridor in growing significance as phases progress,
this mitigation should likely be extended to include the entirety of the Los Verdes Park 1 frontage facing
S. Higuera from the northern corner of the property up to and around the corner of the property at the
intersection of LOVR and S. Higuera. Additional review and mitigation of these impacts should be
included in the EIR.
If developer fair share funding is not sufficient for addressing these issues, impact fees from this and
other developments throughout the airport area that have impacted this corridor should be used.
7. We understand that there are significant traffic issues at the intersection of LOVR and S. Higuera in
need of correction, both as part of the existing condition as well as with this—and later additional—
developments. As discussed in the DEIR neither those measures nor the proposed extension of Buckley
beyond S. Higuera to connect to LOVR, known in the LUCE and DEIR as the LOVR Bypass, are currently
programmed for TIF, and either would require advancement under updates related to development to
proceed. It is also unclear in the EIR whether or not the cumulative assessments assume the LOVR
Bypass as complete as part of the full buildout of the General Plan scenario, so the findings derived from
the project’s impacts with and without the LOVR Bypass and related mitigations may be inherently
flawed as currently evaluated. The EIR does base findings on a full interchange at Prado Road, which is
not currently fully evaluated or approved.
As other mitigation measures for this intersection may be flawed and are infeasible under the terms of
the settlement agreement, the alternative mitigation of the LOVR Bypass should be advanced as part of
the preferred mitigations for Avila Ranch traffic impacts, with a TIF program established for fair share
contribution by the developer. The LUCE specifically allows the LOVR Bypass to be advanced to
determine final feasibility with or without development of the parcels it crosses. We have attached a
memorandum regarding LOVR Bypass – Constraints analysis to this letter for your review and
consideration. This document assesses and presents a version of the LOVR Bypass that is possible and
amenable to our homeowners’ associations’ concerns regarding long term planning as the City
continues to grow. This addresses concerns of regional commuting, neighborhood preservation and
much more in a way that fixes an existing deficiency while supporting future growth.
Our neighborhoods remain open and available to support the City and developer in achieving the goals
of the General Plan through collaborative efforts that serve existing and contemplated developments, as
well as the greater communities of the City and County of San Luis Obispo.
Sincerely,
Los Verdes Park 1 Homeowners’ Association, Inc.
Special Board Member
Sarah Flickinger
Los Verdes Park 2 Homeowners’ Association, Inc.
Special Board Member
Darrell Goo