HomeMy WebLinkAbout07-18-2017 Item 02 - Water and Wastwater Rate Structure Review Meeting Date: 7/18/2017
FROM: Carrie Mattingly, Utilities Director
Prepared By: Jennifer Metz, Utilities Project Manager
SUBJECT: WATER AND WASTEWATER RATE STRUCTURE REVIEW
RECOMMENDATION
Participate in the first of four water and wastewater rate structure study sessions with HDR
Engineering, Inc.
DISCUSSION
Background
The City’s Water and Sewer Funds are enterprise funds separate from the City’s General Fund
with each fund’s operating, capital, and debt service expenditures are covered by rates and fees
paid for the services provided to San Luis Obispo customers. The Water Fund is comprised of
five programs that support the different elements involved in providing water service. The Sewer
Fund is comprised of five operating programs that support the different tasks required to provide
services that are highly regulated by state and federal mandates. In 2017, the Water Fund collects
revenue from approximately 15,100 accounts to cover the cost for water services. operation, and
infrastructure. Similarly, the Sewer Fund collects revenue from approximately 14,500 accounts
to provide wastewater service, operation, and infrastructure.
The City experienced a significant decline in water and wastewater revenue when the
community’s water conservation efforts reduced consumption under State-mandated drought
restrictions in place from 2015 into 2017. Though drought restrictions were rescinded by the City
Council on June 20, resource protection and water conservation continues to remain a way of
life. This water consumption pattern creates volatility under the current rate structures, which
secure up to 87 percent of revenue through volumetric rates. The City must critically re-examine
how to attain revenue stability in support of the provision of water and wastewater services now
and into the future. If left unaddressed, the decrease in revenues will lead to structural deficits
impacting the City’s ability to sufficiently fund operating costs, current and future capital
improvement needs, maintain required coverage ratios for favorable debt financing, and
mandated reserve levels.
The City last reviewed its water rate structure in 2015 when a three-year increase to the base fee
and drought surcharges were added to both the base fee and the volumetric charge. This
surcharge was subsequently removed from the base fee in March 2017 and the volumetric charge
in July 2017. Prior to that, the water rate structure was modified in 2013 when a base fee was
added, a third volumetric tier was eliminated, and the number of units on the first tier of usa ge
was changed from five to eight.
Minor modifications were made to the wastewater rate structure in 2014 when the school
category was eliminated and changed to non-residential. The wastewater rate structure was last
Packet Pg. 23
2
comprehensively reviewed in 2007 when the City went to a volume-based residential rate
structure. Commercial customers have historically been on a volume-based wastewater rate
structure.
The City’s current water rate structure includes a base account fee and a unit rate charged on the
volume of water used. The City applies a two-tier rate structure with water usage over eight units
charged at a higher rate than the first eight units. The City’s wastewater rate is likewise
composed of a base rate and unit rate charged on the ratepayer’s water consumption. The
wastewater charges for residential ratepayers are capped based on a three-month average winter
water consumption; new customers are assigned a charge based on a historical, system -wide
average winter water consumption (eight units).
Rate Structure Review Scope
The water and wastewater rate structure study sessions will be guided by HDR Engineering, Inc.
(HDR). The outcome of the study sessions will be a recommended water and wastewater rate
structure which will meet the Council’s rate philosophies and values established during the rate
structure review process. It is important to understand the Council will not be considering actual
water and wastewater rates during this study but only the structure that would be used for future
rate setting processes.
There are four study sessions planned between July and October 2017 and a final meeting for a
final report on the recommended rate structure in December. These sessions will introduce the
rate setting process and ultimately provide guidance to the City Council through its selection of a
water and wastewater rate structure. A cost of services study will be proposed separately to
review the City’s water and wastewater rates.
Session Topic Outcome
1 Fundamentals of Rate Structures
Basic understanding of water and wastewater
rate structure design and review prior rate
design goals and objectives
2 Rate Design Goals and Objectives Prioritize the City Council’s rate structure
goals and objectives
3 Developing Conceptual Rate Structures Review conceptual water and wastewater
rate structures
4 Technical Review of Rate Structures Review the final selected conceptual water
and wastewater rate structures
5 Selection of Rate Structures Receive a report with final recommended
water and wastewater rate structures
Study Session 1. Fundamentals of Rate Structures – July 18, 2017
HDR will guide a thorough discussion on the fundamentals of developing cost-based water and
wastewater rate structures and the philosophy of rate setting, underlying rate sett ing goals and
objectives, terminology, and technical aspects of rate structure design. The presentation and
interactive dialogue with the City Council will provide an overview of the rate setting
methodology and the correlation between rate structure design and revenue generation to lay the
foundation for the process.
Packet Pg. 24
2
Study Session 2. Rate Design Goals and Objectives – August 15, 2017
HDR will lead a discussion of commonly accepted rate design goals and objectives, their
meanings and implications to an overall rate structure design, and discuss typical rate structure
design goals. From this dialogue, the City Council will be asked to prioritize its top six rate
structure goals for use in developing the conceptual rate structures for review and discussion at
Study Session 3.
Study Session 3. Conceptual Rate Structures – September 2017 (working on specific date)
At Study Session 3, HDR will present the results of the City Council weighting of recommended
rate structure goals for discussion. Based on the City’s prioritized rate design goals and
objectives, conceptual water and wastewater rate designs (rate structures only, no actual rates,
meaning no dollars) will be presented. Based on input from the meeting, HDR and staff will then
narrow the field and select the top three rate structures. These three rate structures will be
evaluated and presented to the Council in Study Session 4.
Study Session 4. Technical Review of Rate Structures – October 2017 (working on specific
date)
A fourth Study Session with the City Council is planned where HDR will present the “road test”
of the final selected conceptual rate structure which will support the prioritized goals and
financial policies. Actual rates and bill comparisons will be used to review any impacts to
ratepayers based on current revenue levels (i.e. current rates). Although there will be numbers
associated with the “road test” it is not an exercise in setting the actual rates.
Meeting 5. Selection of the Final Rate Structures – December 5, 2017
After completion of the study sessions, HDR will provide the Council with a report summarizing
the steps taken to review the rate structure, an overview of the rate structures reviewed during the
study, recommendations of the analysis HDR will undertake, and recommended final proposed
water and wastewater rate structure.
ENVIRONMENTAL REVIEW
No environmental review is required for Water and Wastewater Rate Structure Review study
sessions.
CONCURRENCES
Concurrence from other City departments is not required for Water and Wastewater Rate
Structure Review study sessions.
FISCAL IMPACT
On January 3, 2017, the City Council approved Request for Qualifications for On-Call Water and
Wastewater Engineering Services and authorized the City Manager to execute agreements with
the selected consulting firms. The City Manager awarded contracts to 12 engineering consulting
firms on May 23, 2017, including HDR. Staff solicited a proposal from HDR for the Water and
Wastewater Rate Structure Review. The project was funded from Water and Sewer Fund general
carry-over totaling $29,885.