Loading...
HomeMy WebLinkAbout7/18/2017 Item 14, Flickinger Christian, Kevin From:Sarah Flickinger <sarah@flickimc.com> Sent:Tuesday, July 18, To:E-mail Council Website Subject:RE: Los Verdes Parks 1 and 2; Specific Mitigation Measure Concern Attachments:Los Verdes Parks FEIR SL Ranch LOVR.docx Good morning, Please find attached a letter sent to the Planning Commission dated June 7, 2017 for City Councilmembers’ review. As the Commissioners stated they would leave the policy questions relating to infrastructure for Council to set, we thought it important to share this letter with Council. Please include this letter as public comment relating to the continued hearing of San Luis Ranch on this evening’s agenda. Sincerely, Special Board Member Los Verdes Park 1 Homeowners’ Association, Inc. On behalf of the Los Verdes Parks 1 & 2 joint partnership Sarah Flickinger 1 Los Verdes Park 1 Homeowners’ Association, Inc.  Los Verdes Park 2 Homeowners’ Association, Inc.  attn: Sarah Flickinger, Los Verdes Park 1 Homeowners’ Association, Inc.  c/o: Farrell Smyth  21 Santa Rosa Street, Ste. 250  San Luis Obispo, CA 93405    June 7, 2017    re: Planning Commission Hearing, San Luis Ranch Resolution proposed for review prior to advancement of the  documents to City Council  To the City of San Luis Obispo, City Planning Commission and the developers of San Luis Ranch:  The Boards of Directors of the Los Verdes Park 1 and Los Verdes Park 2 homeowners’ associations specifically oppose  that finding T‐2(i) [PC 1‐114] is feasible, as proposed in the resolution before you tonight, and ask that you specifically  exclude this mitigation from the resolution to be adopted and forwarded to City Council. This mitigation would alter the  lane configurations agreed to in a previous settlement between our neighborhoods, CALTRANS and the City of San Luis  Obispo. As such, any changes to the lane striping at this location would be subject to the terms of said agreement,  including, but not limited to, the commitment by the City to consider a new roadway known as the LOVR/Buckley Road  Bypass via the LUCE as part of future projects’ considerations.  Understanding that this new roadway is outside the scope of this project’s environmental documents, it is the preferred  planning solution for local circulation improvement in this vicinity as identified and vetted through the LUCE adoption  process. A lane extension at this location was not, and is inconsistent with stated goals relating to multimodal adoption.  An overriding statement of specific social and/or legal consideration should be made with regard to this proposed  mitigation to allow for appropriate long term planning.  The Prado Road overpass has not yet completed required environmental review and project advancement, so an  overriding consideration must be found; the same should be done for the LOVR Bypass with relation to any proposed  changes to lane striping which increase motor vehicle capacity stacking adjacent to the school and residential dwellings  in this vicinity.  In lieu of proposed mitigation T‐2(i), we suggest that the developer begin fair share contribution to this new roadway via  contribution to general TIF for future allocation when the roadway is advanced, and/or provide additional bicycle and/or  pedestrian safety enhancements to the intersections of Los Osos Valley Road at South Higuera and/or Los Verdes Drive  or the surrounding roadway segments. Additional vehicle capacity at the intersection of Los Osos Valley Road and South  Higuera should not be allowed, as it directly and significantly impacts the environment of existing neighborhoods. A  reasonable alternative could be incorporated into the terms and/or development agreement as that process moves  forward.   As always, the safety of our residents and neighboring community members‐‐including school children at a bus stop in  this location—is our primary concern. Noise and air quality concerns and their impacts are included in those safety  considerations. Those of us who live and breathe here and use this segment of roadway regularly for all modes of  transportation remain committed to ensuring long term solutions that enhance safety are implemented, rather than  allowing compacting of existing hazards through short‐lived temporary mitigations which put pedestrians, bicyclists, bus  riders and our residents in harm’s way.   While our neighborhoods maintain additional concerns relating to other intersections and roadway segments impacted  by this proposed development, as well as concerns regarding the CEQA compliance of the DEIR and FEIR documents and  significant changes being handled outside of the process prescribed therein, we recognize that the City and Developer  are working hard to accommodate existing neighborhoods’ concerns. We remain committed to participating in the  public processes that provide appropriate long term planning for our City as it continues to move forward.  Sincerely,  Los Verdes Park 1 Homeowners’ Association, Inc.  Special Board Member  Representing the Joint Partnership of the Los Verdes Parks 1 & 2 HOAs      Sarah Flickinger