Loading...
HomeMy WebLinkAboutAppendix H-CalEEMod Estimate and Fuel Consumption AttachmentAPPENDIX H California Emissions Estimator Model (CalEEMod) Worksheets Avila Ranch Development Project Final EIR This Page Intentionally Left Blank. San Luis Obispo County, Annual Avila Ranch Development Project 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Parking Lot 1,652.00 Space 14.87 660,800.00 0 Other Asphalt Surfaces 7.03 Acre 7.03 306,226.80 0 City Park 16.00 Acre 16.00 696,960.00 0 Regional Shopping Center 15.00 1000sqft 3.34 15,000.00 0 Apartments Mid Rise 125.00 Dwelling Unit 4.71 125,000.00 287 Condo/Townhouse 185.00 Dwelling Unit 11.05 185,000.00 424 Single Family Housing 105.00 Dwelling Unit 17.45 189,000.00 240 Single Family Housing 305.00 Dwelling Unit 35.03 549,000.00 698 1.2 Other Project Characteristics Urbanization Climate Zone Urban 4 Wind Speed (m/s)Precipitation Freq (Days)3.2 44 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Pacific Gas & Electric Company 2030Operational Year CO2 Intensity (lb/MWhr) 641.35 0.029CH4 Intensity (lb/MWhr) 0.006N2O Intensity (lb/MWhr) CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 1 of 109 Project Characteristics - Land Use - Taken from project description Construction Phase - taken from updated construction schedule september 29 2016 Architectural Coating - using at least 50 EF paint from mitigation Woodstoves - no woodstoves or fireplaces Area Coating - EF is 50 from mitigation Water And Wastewater - based on city water use factors Solid Waste - from estimated solid waste production under the table based on CalRecycle waste generation factors Sequestration - Construction Off-road Equipment Mitigation - based on mitigation Mobile Land Use Mitigation - Area Mitigation - 50 EF per mitigation Energy Mitigation - Water Mitigation - Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 2 of 109 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblAreaCoating Area_EF_Nonresidential_Exterior 250 50 tblAreaCoating Area_EF_Nonresidential_Interior 250 50 tblAreaCoating Area_EF_Residential_Exterior 250 50 tblAreaCoating Area_EF_Residential_Interior 250 50 tblAreaMitigation UseLowVOCPaintNonresidentialInteriorV alue 250 50 tblAreaMitigation UseLowVOCPaintResidentialExteriorValu e 250 50 tblAreaMitigation UseLowVOCPaintResidentialInteriorValu e 250 50 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 17.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 18.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 7.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 26.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 54.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 3 of 109 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstructionPhase NumDays 3,100.00 665.00 tblConstructionPhase NumDays 120.00 15.00 tblConstructionPhase NumDays 120.00 60.00 tblConstructionPhase NumDays 220.00 46.00 tblConstructionPhase NumDays 310.00 125.00 tblConstructionPhase NumDays 310.00 155.00 tblConstructionPhase NumDays 220.00 15.00 tblConstructionPhase NumDays 220.00 55.00 tblConstructionPhase NumDays 120.00 15.00 tblConstructionPhase NumDays 310.00 30.00 tblConstructionPhase NumDays 3,100.00 100.00 tblConstructionPhase NumDays 220.00 15.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 4 of 109 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 120.00 20.00 tblConstructionPhase NumDays 310.00 35.00 tblConstructionPhase NumDays 3,100.00 340.00 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 120.00 40.00 tblConstructionPhase NumDays 310.00 135.00 tblConstructionPhase NumDays 3,100.00 625.00 tblConstructionPhase NumDays 220.00 35.00 tblConstructionPhase NumDays 220.00 30.00 tblConstructionPhase NumDays 120.00 5.00 tblConstructionPhase NumDays 310.00 15.00 tblConstructionPhase NumDays 3,100.00 150.00 tblConstructionPhase NumDays 220.00 18.00 tblConstructionPhase NumDays 220.00 5.00 tblConstructionPhase PhaseStartDate 9/29/2029 9/30/2029 tblGrading AcresOfGrading 387.50 0.00 tblLandUse LotAcreage 0.34 3.34 tblLandUse LotAcreage 3.29 4.71 tblLandUse LotAcreage 11.56 11.05 tblLandUse LotAcreage 34.09 17.45 tblLandUse LotAcreage 99.03 35.03 tblLandUse Population 358.00 287.00 tblLandUse Population 529.00 424.00 tblLandUse Population 300.00 240.00 tblLandUse Population 872.00 698.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 5 of 109 tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 3.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 4.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 3.00 tblOffRoadEquipment UsageHours 8.00 7.00 tblProjectCharacteristics OperationalYear 2014 2030 tblSequestration NumberOfNewTrees 0.00 525.00 tblSolidWaste SolidWasteGenerationRate 57.50 121.13 tblSolidWaste SolidWasteGenerationRate 1.64 0.00 tblSolidWaste SolidWasteGenerationRate 90.62 179.28 tblSolidWaste SolidWasteGenerationRate 15.75 6.84 tblSolidWaste SolidWasteGenerationRate 373.92 733.29 tblTripsAndVMT VendorTripNumber 0.00 475.00 tblTripsAndVMT VendorTripNumber 475.00 0.00 tblTripsAndVMT WorkerTripNumber 25.00 15.00 tblTripsAndVMT WorkerTripNumber 30.00 18.00 tblTripsAndVMT WorkerTripNumber 35.00 20.00 tblTripsAndVMT WorkerTripNumber 30.00 1,393.00 tblTripsAndVMT WorkerTripNumber 35.00 15.00 tblTripsAndVMT WorkerTripNumber 1,393.00 279.00 tblWater IndoorWaterUseRate 8,144,253.20 4,472,304.06 tblWater IndoorWaterUseRate 12,835,343.05 6,619,019.72 tblWater IndoorWaterUseRate 1,111,087.82 909,125.22 tblWater IndoorWaterUseRate 25,931,302.20 18,992,412.22 tblWater OutdoorWaterUseRate 5,134,420.50 2,859,341.94 tblWater OutdoorWaterUseRate 22,733,464.15 10,427,245.00 tblWater OutdoorWaterUseRate 8,091,846.70 4,231,832.28 tblWater OutdoorWaterUseRate 680,989.31 557,205.78 tblWater OutdoorWaterUseRate 16,347,994.86 12,142,689.78 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 6 of 109 2.0 Emissions Summary tblWoodstoves WoodstoveDayYear 60.00 0.00 tblWoodstoves WoodstoveDayYear 60.00 0.00 tblWoodstoves WoodstoveDayYear 60.00 0.00 tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 7 of 109 2.1 Overall Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2019 0.8828 9.1757 7.3548 0.0104 1.7837 0.4416 2.2253 0.9741 0.4069 1.3810 0.0000 927.8427 927.8427 0.2851 0.0000 933.8296 2020 0.6575 5.9008 6.2384 0.0111 0.9669 0.2855 1.2524 0.3765 0.2647 0.6412 0.0000 902.8801 902.8801 0.2046 0.0000 907.1763 2021 0.3625 2.6119 3.6510 7.8200e- 003 0.3505 0.1392 0.4897 0.0932 0.1316 0.2248 0.0000 585.5877 585.5877 0.0864 0.0000 587.4016 2022 0.3288 2.3418 3.5235 7.7900e- 003 0.3492 0.1177 0.4669 0.0928 0.1113 0.2041 0.0000 579.4709 579.4709 0.0849 0.0000 581.2538 2023 11.0549 2.8888 6.9873 0.0162 1.1624 0.1058 1.2682 0.3690 0.0985 0.4675 0.0000 1,174.938 3 1,174.938 3 0.1046 0.0000 1,177.135 3 2024 5.3746 4.0956 11.1419 0.0268 1.8675 0.1331 2.0006 0.5745 0.1238 0.6983 0.0000 1,923.983 0 1,923.983 0 0.1384 0.0000 1,926.889 5 2025 8.1773 3.3805 8.7070 0.0212 2.1077 0.1115 2.2192 0.7531 0.1035 0.8565 0.0000 1,527.054 6 1,527.054 6 0.1314 0.0000 1,529.813 9 2026 0.7929 3.9029 9.6215 0.0240 1.8526 0.1310 1.9837 0.5831 0.1215 0.7045 0.0000 1,735.967 0 1,735.967 0 0.1645 0.0000 1,739.421 3 2027 0.9858 4.0623 12.3758 0.0335 2.0263 0.1165 2.1427 0.5442 0.1087 0.6529 0.0000 2,342.916 5 2,342.916 5 0.1233 0.0000 2,345.505 4 2028 8.2315 3.2422 9.4658 0.0268 1.6169 0.0961 1.7130 0.4341 0.0897 0.5238 0.0000 1,865.140 8 1,865.140 8 0.1032 0.0000 1,867.308 9 2029 8.0624 2.6254 7.1479 0.0203 1.3017 0.0816 1.3833 0.3717 0.0760 0.4477 0.0000 1,417.537 0 1,417.537 0 0.0900 0.0000 1,419.427 4 Total 44.9108 44.2279 86.2149 0.2058 15.3853 1.7596 17.1449 5.1661 1.6361 6.8022 0.0000 14,983.31 87 14,983.31 87 1.5164 0.0000 15,015.16 28 Unmitigated Construction CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 8 of 109 2.1 Overall Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2019 0.3586 8.5726 6.4251 0.0104 0.8149 0.2397 1.0545 0.4416 0.2397 0.6813 0.0000 927.8417 927.8417 0.2851 0.0000 933.8285 2020 0.3698 6.6485 6.3650 0.0111 0.5942 0.2026 0.7968 0.2119 0.2022 0.4141 0.0000 902.8793 902.8793 0.2046 0.0000 907.1755 2021 0.2424 3.5185 3.8197 7.8200e- 003 0.3505 0.1324 0.4829 0.0932 0.1322 0.2254 0.0000 585.5873 585.5873 0.0864 0.0000 587.4012 2022 0.2363 3.4948 3.7194 7.7900e- 003 0.3492 0.1319 0.4811 0.0928 0.1317 0.2245 0.0000 579.4706 579.4706 0.0849 0.0000 581.2534 2023 10.9824 3.9109 7.1415 0.0162 1.0164 0.1158 1.1321 0.2983 0.1143 0.4126 0.0000 1,174.938 0 1,174.938 0 0.1046 0.0000 1,177.134 9 2024 5.2948 5.4826 11.3427 0.0268 1.6847 0.1580 1.8427 0.4852 0.1552 0.6404 0.0000 1,923.982 6 1,923.982 6 0.1384 0.0000 1,926.889 1 2025 8.1108 4.9509 8.9505 0.0212 1.5870 0.1438 1.7307 0.5103 0.1417 0.6520 0.0000 1,527.054 2 1,527.054 2 0.1314 0.0000 1,529.813 5 2026 0.7150 5.9705 10.0907 0.0240 1.5307 0.1710 1.7016 0.4495 0.1687 0.6182 0.0000 1,735.966 5 1,735.966 5 0.1645 0.0000 1,739.420 7 2027 0.9488 5.5046 12.6060 0.0335 2.0263 0.1656 2.1919 0.5442 0.1619 0.7061 0.0000 2,342.916 2 2,342.916 2 0.1233 0.0000 2,345.505 0 2028 8.2020 4.5093 9.6748 0.0268 1.6169 0.1377 1.7546 0.4341 0.1348 0.5689 0.0000 1,865.140 5 1,865.140 5 0.1032 0.0000 1,867.308 6 2029 8.0292 3.7377 7.3420 0.0203 1.2411 0.1129 1.3540 0.3432 0.1108 0.4540 0.0000 1,417.536 7 1,417.536 7 0.0900 0.0000 1,419.427 1 Total 43.4901 56.3006 87.4773 0.2058 12.8116 1.7113 14.5229 3.9043 1.6931 5.5975 0.0000 14,983.31 34 14,983.31 34 1.5164 0.0000 15,015.15 74 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 3.16 -27.30 -1.46 0.00 16.73 2.74 15.29 24.42 -3.49 17.71 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 9 of 109 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 11.6898 0.1130 9.8036 5.2000e- 004 0.0545 0.0545 0.0545 0.0545 0.0000 16.0654 16.0654 0.0154 0.0000 16.3887 Energy 0.1031 0.8812 0.3758 5.6200e- 003 0.0712 0.0712 0.0712 0.0712 0.0000 2,444.484 8 2,444.484 8 0.0840 0.0320 2,456.177 1 Mobile 2.7570 5.4102 24.5521 0.0863 6.0518 0.1066 6.1584 1.6218 0.0984 1.7202 0.0000 5,711.615 3 5,711.615 3 0.1583 0.0000 5,714.938 8 Waste 0.0000 0.0000 0.0000 0.0000 211.2202 0.0000 211.2202 12.4828 0.0000 473.3581 Water 0.0000 0.0000 0.0000 0.0000 9.8326 79.5545 89.3871 1.0135 0.0246 118.2936 Total 14.5499 6.4044 34.7314 0.0925 6.0518 0.2323 6.2841 1.6218 0.2241 1.8459 221.0528 8,251.719 9 8,472.772 8 13.7539 0.0566 8,779.156 3 Unmitigated Operational CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 10 of 109 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 10.8935 0.1130 9.8036 5.2000e- 004 0.0545 0.0545 0.0545 0.0545 0.0000 16.0654 16.0654 0.0154 0.0000 16.3887 Energy 0.0816 0.6975 0.2974 4.4500e- 003 0.0564 0.0564 0.0564 0.0564 0.0000 1,773.811 7 1,773.811 7 0.0592 0.0239 1,782.446 3 Mobile 2.6112 4.6995 21.8951 0.0722 5.0236 0.0906 5.1143 1.3463 0.0837 1.4300 0.0000 4,774.765 5 4,774.765 5 0.1341 0.0000 4,777.581 2 Waste 0.0000 0.0000 0.0000 0.0000 211.2202 0.0000 211.2202 12.4828 0.0000 473.3581 Water 0.0000 0.0000 0.0000 0.0000 7.8661 64.3262 72.1923 0.8107 0.0197 95.3076 Total 13.5863 5.5099 31.9960 0.0772 5.0236 0.2015 5.2251 1.3463 0.1945 1.5408 219.0863 6,628.968 8 6,848.055 1 13.5021 0.0435 7,145.081 9 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 6.62 13.97 7.88 16.56 16.99 13.27 16.85 16.99 13.20 16.53 0.89 19.67 19.18 1.83 23.17 18.61 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 11 of 109 3.0 Construction Detail 2.3 Vegetation CO2e Category MT New Trees 371.7000 Total 371.7000 Vegetation Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Offsite Construction – Site Preparation Site Preparation 1/1/2019 3/25/2019 5 60 2 Offsite Construction – Grading Grading 3/26/2019 10/28/2019 5 155 3 Offsite Construction – Paving Paving 10/29/2019 12/31/2019 5 46 4 Phase I – Site Preparation Site Preparation 1/1/2020 1/21/2020 5 15 5 Phase I, III, IV – Grading Grading 1/22/2020 7/14/2020 5 125 6 Phase I – Building Construction Building Construction 7/15/2020 1/31/2023 5 665 7 Phase I – Paving Paving 2/1/2023 2/21/2023 5 15 8 Phase I – Architectural Coating Architectural Coating 2/22/2023 5/9/2023 5 55 9 Phase II – Site Preparation Site Preparation 5/10/2023 5/30/2023 5 15 10 Phase II – Grading Grading 5/31/2023 7/11/2023 5 30 11 Phase II – Building Construction Building Construction 7/12/2023 11/28/2023 5 100 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 12 of 109 12 Phase II – Paving Paving 11/29/2023 12/19/2023 5 15 13 Phase II – Architectural Coating Architectural Coating 12/20/2023 1/16/2024 5 20 14 Phase III – Site Preparation Site Preparation 1/17/2024 2/13/2024 5 20 15 Phase III – Grading Grading 2/14/2024 4/2/2024 5 35 16 Phase III – Building Construction Building Construction 4/3/2024 7/22/2025 5 340 17 Phase III – Architectural Coating Architectural Coating 7/23/2025 8/19/2025 5 20 18 Phase III – Paving Paving 8/20/2025 9/16/2025 5 20 19 Phases IV & V – Site Preparation Site Preparation 9/17/2025 11/11/2025 5 40 20 Phases IV & V – Grading Grading 11/12/2025 5/19/2026 5 135 21 Phases IV & V – Building Construction Building Construction 5/20/2026 10/10/2028 5 625 22 Phases IV & V – Architectural Coating Architectural Coating 10/11/2028 11/28/2028 5 35 23 Phases IV & V – Paving Paving 11/29/2028 1/9/2029 5 30 24 Phase VI – Site Preparation Site Preparation 1/10/2029 1/16/2029 5 5 25 Phase VI – Grading Grading 1/17/2029 2/6/2029 5 15 26 Phase VI – Building Construction Building Construction 2/7/2029 9/4/2029 5 150 27 Phase VI – Architectural Coating Architectural Coating 9/5/2029 9/28/2029 5 18 28 Phase VI – Paving Paving 9/30/2029 10/5/2029 5 5 OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Phase I – Building Construction Air Compressors 1 6.00 78 0.48 Residential Indoor: 2,102,760; Residential Outdoor: 700,920; Non-Residential Indoor: 2,716,339; Non-Residential Outdoor: 905,446 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 0 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 13 of 109 Offsite Construction – Site Preparation Excavators 3 8.00 162 0.38 Offsite Construction – Site Preparation Concrete/Industrial Saws 1 8.00 81 0.73 Offsite Construction – Paving Excavators 2 8.00 162 0.38 Phase I – Site Preparation Cranes 1 7.00 226 0.29 Phase I – Site Preparation Forklifts 3 8.00 89 0.20 Phase I – Site Preparation Generator Sets 1 8.00 84 0.74 Phase I, III, IV – Grading Pavers 2 8.00 125 0.42 Phase I, III, IV – Grading Rollers 2 8.00 80 0.38 Offsite Construction – Site Preparation Rubber Tired Dozers 2 8.00 255 0.40 Offsite Construction – Paving Rubber Tired Dozers 1 8.00 255 0.40 Phase I – Site Preparation Tractors/Loaders/Backhoes 3 7.00 97 0.37 Offsite Construction – Paving Graders 1 8.00 174 0.41 Offsite Construction – Paving Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase I, III, IV – Grading Paving Equipment 2 8.00 130 0.36 Offsite Construction – Grading Tractors/Loaders/Backhoes 4 8.00 97 0.37 Offsite Construction – Grading Rubber Tired Dozers 3 8.00 255 0.40 Offsite Construction – Paving Scrapers 2 8.00 361 0.48 Phase I – Site Preparation Welders 1 8.00 46 0.45 Phase II – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase III – Architectural Coating Air Compressors 1 6.00 78 0.48 Phases IV & V – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase VI – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase I – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase II – Building Construction Cranes 1 7.00 226 0.29 Phase III – Building Construction Cranes 1 7.00 226 0.29 Phases IV & V – Building Construction Cranes 1 7.00 226 0.29 Phase VI – Building Construction Cranes 1 7.00 226 0.29 Phase I – Building Construction Cranes 1 7.00 226 0.29 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 14 of 109 Phase II – Grading Excavators 2 8.00 162 0.38 Phase III – Grading Excavators 2 8.00 162 0.38 Offsite Construction – Grading Excavators 2 8.00 162 0.38 Phases IV & V – Grading Excavators 2 8.00 162 0.38 Phase VI – Grading Excavators 2 8.00 162 0.38 Phase I, III, IV – Grading Excavators 2 8.00 162 0.38 Phase II – Building Construction Forklifts 3 8.00 89 0.20 Phase III – Building Construction Forklifts 3 8.00 89 0.20 Phases IV & V – Building Construction Forklifts 3 8.00 89 0.20 Phase VI – Building Construction Forklifts 3 8.00 89 0.20 Phase I – Building Construction Forklifts 3 8.00 89 0.20 Phase II – Building Construction Generator Sets 1 8.00 84 0.74 Phase III – Building Construction Generator Sets 1 8.00 84 0.74 Phases IV & V – Building Construction Generator Sets 1 8.00 84 0.74 Phase VI – Building Construction Generator Sets 1 8.00 84 0.74 Phase I – Building Construction Generator Sets 1 8.00 84 0.74 Phase II – Grading Graders 1 8.00 174 0.41 Phase III – Grading Graders 1 8.00 174 0.41 Offsite Construction – Grading Graders 1 8.00 174 0.41 Phases IV & V – Grading Graders 1 8.00 174 0.41 Phase VI – Grading Graders 1 8.00 174 0.41 Phase I, III, IV – Grading Graders 1 8.00 174 0.41 Phase II – Paving Pavers 2 8.00 125 0.42 Phase III – Paving Pavers 2 8.00 125 0.42 Phases IV & V – Paving Pavers 2 8.00 125 0.42 Phase VI – Paving Pavers 2 8.00 125 0.42 Offsite Construction – Paving Pavers 2 8.00 125 0.42 Phase I – Paving Pavers 2 8.00 125 0.42 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 15 of 109 Phase II – Paving Paving Equipment 2 8.00 130 0.36 Phase III – Paving Paving Equipment 2 8.00 130 0.36 Phases IV & V – Paving Paving Equipment 2 8.00 130 0.36 Phase VI – Paving Paving Equipment 2 8.00 130 0.36 Offsite Construction – Paving Paving Equipment 2 8.00 130 0.36 Phase I – Paving Paving Equipment 2 8.00 130 0.36 Phase II – Paving Rollers 2 8.00 80 0.38 Phase III – Paving Rollers 2 8.00 80 0.38 Phases IV & V – Paving Rollers 2 8.00 80 0.38 Phase VI – Paving Rollers 2 8.00 80 0.38 Offsite Construction – Paving Rollers 2 8.00 80 0.38 Phase I – Paving Rollers 2 8.00 80 0.38 Phase II – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase III – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phases IV & V – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase VI – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase I, III, IV – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase III – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phases IV & V – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase VI – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase I – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase II – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase II – Grading Scrapers 2 8.00 361 0.48 Phase III – Grading Scrapers 2 8.00 361 0.48 Offsite Construction – Grading Scrapers 2 8.00 361 0.48 Phases IV & V – Grading Scrapers 2 8.00 361 0.48 Phase VI – Grading Scrapers 2 8.00 361 0.48 Phase I, III, IV – Grading Scrapers 2 8.00 361 0.48 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 16 of 109 Phase II – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase III – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phases IV & V – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase VI – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase I – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase II – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase III – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phases IV & V – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase VI – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase I, III, IV – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Offsite Construction – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase III – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phases IV & V – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase VI – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase II – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase II – Building Construction Welders 1 8.00 46 0.45 Phase III – Building Construction Welders 1 8.00 46 0.45 Phases IV & V – Building Construction Welders 1 8.00 46 0.45 Phase VI – Building Construction Welders 1 8.00 46 0.45 Phase I – Building Construction Welders 1 8.00 46 0.45 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Offsite Construction – Site Preparation 10 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Offsite Construction – Grading 12 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Offsite Construction – Paving 14 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Site Preparation 12 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 17 of 109 3.1 Mitigation Measures Construction Phase I, III, IV – Grading 14 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Building Construction 10 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 18 of 109 3.2 Offsite Construction – Site Preparation - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.3613 0.0000 0.3613 0.1986 0.0000 0.1986 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1276 1.2987 1.2005 1.5700e- 003 0.0681 0.0681 0.0632 0.0632 0.0000 140.4159 140.4159 0.0405 0.0000 141.2655 Total 0.1276 1.2987 1.2005 1.5700e- 003 0.3613 0.0681 0.4294 0.1986 0.0632 0.2618 0.0000 140.4159 140.4159 0.0405 0.0000 141.2655 Unmitigated Construction On-Site Use Cleaner Engines for Construction Equipment Water Exposed Area Reduce Vehicle Speed on Unpaved Roads Clean Paved Roads CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 19 of 109 3.2 Offsite Construction – Site Preparation - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2800e- 003 2.2000e- 003 0.0186 5.0000e- 005 4.3300e- 003 3.0000e- 005 4.3600e- 003 1.1500e- 003 3.0000e- 005 1.1800e- 003 0.0000 3.2922 3.2922 1.6000e- 004 0.0000 3.2956 Total 1.2800e- 003 2.2000e- 003 0.0186 5.0000e- 005 4.3300e- 003 3.0000e- 005 4.3600e- 003 1.1500e- 003 3.0000e- 005 1.1800e- 003 0.0000 3.2922 3.2922 1.6000e- 004 0.0000 3.2956 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1626 0.0000 0.1626 0.0894 0.0000 0.0894 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0562 1.3648 1.0390 1.5700e- 003 0.0426 0.0426 0.0426 0.0426 0.0000 140.4157 140.4157 0.0405 0.0000 141.2653 Total 0.0562 1.3648 1.0390 1.5700e- 003 0.1626 0.0426 0.2052 0.0894 0.0426 0.1320 0.0000 140.4157 140.4157 0.0405 0.0000 141.2653 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 20 of 109 3.2 Offsite Construction – Site Preparation - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2800e- 003 2.2000e- 003 0.0186 5.0000e- 005 4.3300e- 003 3.0000e- 005 4.3600e- 003 1.1500e- 003 3.0000e- 005 1.1800e- 003 0.0000 3.2922 3.2922 1.6000e- 004 0.0000 3.2956 Total 1.2800e- 003 2.2000e- 003 0.0186 5.0000e- 005 4.3300e- 003 3.0000e- 005 4.3600e- 003 1.1500e- 003 3.0000e- 005 1.1800e- 003 0.0000 3.2922 3.2922 1.6000e- 004 0.0000 3.2956 Mitigated Construction Off-Site 3.3 Offsite Construction – Grading - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 1.4001 0.0000 1.4001 0.7696 0.0000 0.7696 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.5747 6.2756 4.8019 6.6400e- 003 0.2972 0.2972 0.2734 0.2734 0.0000 596.9588 596.9588 0.1889 0.0000 600.9251 Total 0.5747 6.2756 4.8019 6.6400e- 003 1.4001 0.2972 1.6973 0.7696 0.2734 1.0430 0.0000 596.9588 596.9588 0.1889 0.0000 600.9251 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 21 of 109 3.3 Offsite Construction – Grading - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.9500e- 003 6.8300e- 003 0.0578 1.5000e- 004 0.0134 9.0000e- 005 0.0135 3.5700e- 003 8.0000e- 005 3.6500e- 003 0.0000 10.2058 10.2058 5.0000e- 004 0.0000 10.2163 Total 3.9500e- 003 6.8300e- 003 0.0578 1.5000e- 004 0.0134 9.0000e- 005 0.0135 3.5700e- 003 8.0000e- 005 3.6500e- 003 0.0000 10.2058 10.2058 5.0000e- 004 0.0000 10.2163 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.6301 0.0000 0.6301 0.3463 0.0000 0.3463 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2027 5.5716 4.0286 6.6400e- 003 0.1502 0.1502 0.1502 0.1502 0.0000 596.9581 596.9581 0.1889 0.0000 600.9244 Total 0.2027 5.5716 4.0286 6.6400e- 003 0.6301 0.1502 0.7803 0.3463 0.1502 0.4965 0.0000 596.9581 596.9581 0.1889 0.0000 600.9244 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 22 of 109 3.3 Offsite Construction – Grading - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.9500e- 003 6.8300e- 003 0.0578 1.5000e- 004 0.0134 9.0000e- 005 0.0135 3.5700e- 003 8.0000e- 005 3.6500e- 003 0.0000 10.2058 10.2058 5.0000e- 004 0.0000 10.2163 Total 3.9500e- 003 6.8300e- 003 0.0578 1.5000e- 004 0.0134 9.0000e- 005 0.0135 3.5700e- 003 8.0000e- 005 3.6500e- 003 0.0000 10.2058 10.2058 5.0000e- 004 0.0000 10.2163 Mitigated Construction Off-Site 3.4 Offsite Construction – Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1453 1.5901 1.2570 1.9300e- 003 0.0762 0.0762 0.0701 0.0701 0.0000 173.6048 173.6048 0.0549 0.0000 174.7583 Paving 0.0287 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.1740 1.5901 1.2570 1.9300e- 003 0.0762 0.0762 0.0701 0.0701 0.0000 173.6048 173.6048 0.0549 0.0000 174.7583 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 23 of 109 3.4 Offsite Construction – Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.3000e- 003 2.2500e- 003 0.0191 5.0000e- 005 4.4300e- 003 3.0000e- 005 4.4600e- 003 1.1800e- 003 3.0000e- 005 1.2000e- 003 0.0000 3.3653 3.3653 1.7000e- 004 0.0000 3.3688 Total 1.3000e- 003 2.2500e- 003 0.0191 5.0000e- 005 4.4300e- 003 3.0000e- 005 4.4600e- 003 1.1800e- 003 3.0000e- 005 1.2000e- 003 0.0000 3.3653 3.3653 1.7000e- 004 0.0000 3.3688 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0645 1.6249 1.2620 1.9300e- 003 0.0468 0.0468 0.0468 0.0468 0.0000 173.6046 173.6046 0.0549 0.0000 174.7581 Paving 0.0287 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0932 1.6249 1.2620 1.9300e- 003 0.0468 0.0468 0.0468 0.0468 0.0000 173.6046 173.6046 0.0549 0.0000 174.7581 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 24 of 109 3.4 Offsite Construction – Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.3000e- 003 2.2500e- 003 0.0191 5.0000e- 005 4.4300e- 003 3.0000e- 005 4.4600e- 003 1.1800e- 003 3.0000e- 005 1.2000e- 003 0.0000 3.3653 3.3653 1.7000e- 004 0.0000 3.3688 Total 1.3000e- 003 2.2500e- 003 0.0191 5.0000e- 005 4.4300e- 003 3.0000e- 005 4.4600e- 003 1.1800e- 003 3.0000e- 005 1.2000e- 003 0.0000 3.3653 3.3653 1.7000e- 004 0.0000 3.3688 Mitigated Construction Off-Site 3.5 Phase I – Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1355 0.0000 0.1355 0.0745 0.0000 0.0745 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0375 0.3715 0.3046 4.0000e- 004 0.0188 0.0188 0.0175 0.0175 0.0000 34.9154 34.9154 9.9100e- 003 0.0000 35.1236 Total 0.0375 0.3715 0.3046 4.0000e- 004 0.1355 0.0188 0.1543 0.0745 0.0175 0.0920 0.0000 34.9154 34.9154 9.9100e- 003 0.0000 35.1236 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 25 of 109 3.5 Phase I – Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0362 0.1881 0.4383 6.0000e- 004 0.0159 2.5800e- 003 0.0184 4.5400e- 003 2.3700e- 003 6.9100e- 003 0.0000 50.8093 50.8093 4.0000e- 004 0.0000 50.8178 Worker 0.0267 0.0465 0.3898 1.1300e- 003 0.1006 6.7000e- 004 0.1013 0.0267 6.2000e- 004 0.0274 0.0000 73.3579 73.3579 3.5100e- 003 0.0000 73.4316 Total 0.0630 0.2346 0.8281 1.7300e- 003 0.1165 3.2500e- 003 0.1197 0.0313 2.9900e- 003 0.0343 0.0000 124.1672 124.1672 3.9100e- 003 0.0000 124.2494 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0610 0.0000 0.0610 0.0335 0.0000 0.0335 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0129 0.3439 0.2389 4.0000e- 004 0.0103 0.0103 0.0103 0.0103 0.0000 34.9154 34.9154 9.9100e- 003 0.0000 35.1235 Total 0.0129 0.3439 0.2389 4.0000e- 004 0.0610 0.0103 0.0713 0.0335 0.0103 0.0438 0.0000 34.9154 34.9154 9.9100e- 003 0.0000 35.1235 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 26 of 109 3.5 Phase I – Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0362 0.1881 0.4383 6.0000e- 004 0.0159 2.5800e- 003 0.0184 4.5400e- 003 2.3700e- 003 6.9100e- 003 0.0000 50.8093 50.8093 4.0000e- 004 0.0000 50.8178 Worker 0.0267 0.0465 0.3898 1.1300e- 003 0.1006 6.7000e- 004 0.1013 0.0267 6.2000e- 004 0.0274 0.0000 73.3579 73.3579 3.5100e- 003 0.0000 73.4316 Total 0.0630 0.2346 0.8281 1.7300e- 003 0.1165 3.2500e- 003 0.1197 0.0313 2.9900e- 003 0.0343 0.0000 124.1672 124.1672 3.9100e- 003 0.0000 124.2494 Mitigated Construction Off-Site 3.6 Phase I, III, IV – Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.5421 0.0000 0.5421 0.2248 0.0000 0.2248 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.3675 3.9480 3.2986 5.2500e- 003 0.1876 0.1876 0.1726 0.1726 0.0000 461.4433 461.4433 0.1492 0.0000 464.5773 Total 0.3675 3.9480 3.2986 5.2500e- 003 0.5421 0.1876 0.7296 0.2248 0.1726 0.3973 0.0000 461.4433 461.4433 0.1492 0.0000 464.5773 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 27 of 109 3.6 Phase I, III, IV – Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e- 003 4.1700e- 003 0.0350 1.0000e- 004 9.0300e- 003 6.0000e- 005 9.0900e- 003 2.4000e- 003 6.0000e- 005 2.4500e- 003 0.0000 6.5827 6.5827 3.1000e- 004 0.0000 6.5893 Total 2.4000e- 003 4.1700e- 003 0.0350 1.0000e- 004 9.0300e- 003 6.0000e- 005 9.0900e- 003 2.4000e- 003 6.0000e- 005 2.4500e- 003 0.0000 6.5827 6.5827 3.1000e- 004 0.0000 6.5893 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.2439 0.0000 0.2439 0.1012 0.0000 0.1012 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1753 4.4154 3.4294 5.2500e- 003 0.1270 0.1270 0.1270 0.1270 0.0000 461.4427 461.4427 0.1492 0.0000 464.5768 Total 0.1753 4.4154 3.4294 5.2500e- 003 0.2439 0.1270 0.3710 0.1012 0.1270 0.2282 0.0000 461.4427 461.4427 0.1492 0.0000 464.5768 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 28 of 109 3.6 Phase I, III, IV – Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e- 003 4.1700e- 003 0.0350 1.0000e- 004 9.0300e- 003 6.0000e- 005 9.0900e- 003 2.4000e- 003 6.0000e- 005 2.4500e- 003 0.0000 6.5827 6.5827 3.1000e- 004 0.0000 6.5893 Total 2.4000e- 003 4.1700e- 003 0.0350 1.0000e- 004 9.0300e- 003 6.0000e- 005 9.0900e- 003 2.4000e- 003 6.0000e- 005 2.4500e- 003 0.0000 6.5827 6.5827 3.1000e- 004 0.0000 6.5893 Mitigated Construction Off-Site 3.7 Phase I – Building Construction - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1436 1.2668 1.1370 1.8200e- 003 0.0747 0.0747 0.0706 0.0706 0.0000 156.2713 156.2713 0.0355 0.0000 157.0165 Total 0.1436 1.2668 1.1370 1.8200e- 003 0.0747 0.0747 0.0706 0.0706 0.0000 156.2713 156.2713 0.0355 0.0000 157.0165 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 29 of 109 3.7 Phase I – Building Construction - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0435 0.0757 0.6350 1.8400e- 003 0.1638 1.1000e- 003 0.1649 0.0435 1.0200e- 003 0.0446 0.0000 119.5002 119.5002 5.7200e- 003 0.0000 119.6202 Total 0.0435 0.0757 0.6350 1.8400e- 003 0.1638 1.1000e- 003 0.1649 0.0435 1.0200e- 003 0.0446 0.0000 119.5002 119.5002 5.7200e- 003 0.0000 119.6202 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0727 1.5747 1.1985 1.8200e- 003 0.0608 0.0608 0.0608 0.0608 0.0000 156.2711 156.2711 0.0355 0.0000 157.0163 Total 0.0727 1.5747 1.1985 1.8200e- 003 0.0608 0.0608 0.0608 0.0608 0.0000 156.2711 156.2711 0.0355 0.0000 157.0163 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 30 of 109 3.7 Phase I – Building Construction - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0435 0.0757 0.6350 1.8400e- 003 0.1638 1.1000e- 003 0.1649 0.0435 1.0200e- 003 0.0446 0.0000 119.5002 119.5002 5.7200e- 003 0.0000 119.6202 Total 0.0435 0.0757 0.6350 1.8400e- 003 0.1638 1.1000e- 003 0.1649 0.0435 1.0200e- 003 0.0446 0.0000 119.5002 119.5002 5.7200e- 003 0.0000 119.6202 Mitigated Construction Off-Site 3.7 Phase I – Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.2756 2.4622 2.3954 3.8900e- 003 0.1369 0.1369 0.1295 0.1295 0.0000 334.3538 334.3538 0.0748 0.0000 335.9248 Total 0.2756 2.4622 2.3954 3.8900e- 003 0.1369 0.1369 0.1295 0.1295 0.0000 334.3538 334.3538 0.0748 0.0000 335.9248 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 31 of 109 3.7 Phase I – Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0868 0.1497 1.2556 3.9300e- 003 0.3505 2.3300e- 003 0.3529 0.0932 2.1600e- 003 0.0953 0.0000 251.2339 251.2339 0.0116 0.0000 251.4767 Total 0.0868 0.1497 1.2556 3.9300e- 003 0.3505 2.3300e- 003 0.3529 0.0932 2.1600e- 003 0.0953 0.0000 251.2339 251.2339 0.0116 0.0000 251.4767 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1556 3.3687 2.5641 3.8900e- 003 0.1301 0.1301 0.1301 0.1301 0.0000 334.3534 334.3534 0.0748 0.0000 335.9244 Total 0.1556 3.3687 2.5641 3.8900e- 003 0.1301 0.1301 0.1301 0.1301 0.0000 334.3534 334.3534 0.0748 0.0000 335.9244 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 32 of 109 3.7 Phase I – Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0868 0.1497 1.2556 3.9300e- 003 0.3505 2.3300e- 003 0.3529 0.0932 2.1600e- 003 0.0953 0.0000 251.2339 251.2339 0.0116 0.0000 251.4767 Total 0.0868 0.1497 1.2556 3.9300e- 003 0.3505 2.3300e- 003 0.3529 0.0932 2.1600e- 003 0.0953 0.0000 251.2339 251.2339 0.0116 0.0000 251.4767 Mitigated Construction Off-Site 3.7 Phase I – Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.2475 2.2028 2.3584 3.8700e- 003 0.1154 0.1154 0.1092 0.1092 0.0000 333.1869 333.1869 0.0739 0.0000 334.7394 Total 0.2475 2.2028 2.3584 3.8700e- 003 0.1154 0.1154 0.1092 0.1092 0.0000 333.1869 333.1869 0.0739 0.0000 334.7394 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 33 of 109 3.7 Phase I – Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0813 0.1390 1.1652 3.9200e- 003 0.3492 2.3200e- 003 0.3515 0.0928 2.1500e- 003 0.0949 0.0000 246.2840 246.2840 0.0110 0.0000 246.5144 Total 0.0813 0.1390 1.1652 3.9200e- 003 0.3492 2.3200e- 003 0.3515 0.0928 2.1500e- 003 0.0949 0.0000 246.2840 246.2840 0.0110 0.0000 246.5144 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1550 3.3558 2.5542 3.8700e- 003 0.1296 0.1296 0.1296 0.1296 0.0000 333.1865 333.1865 0.0739 0.0000 334.7390 Total 0.1550 3.3558 2.5542 3.8700e- 003 0.1296 0.1296 0.1296 0.1296 0.0000 333.1865 333.1865 0.0739 0.0000 334.7390 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 34 of 109 3.7 Phase I – Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0813 0.1390 1.1652 3.9200e- 003 0.3492 2.3200e- 003 0.3515 0.0928 2.1500e- 003 0.0949 0.0000 246.2840 246.2840 0.0110 0.0000 246.5144 Total 0.0813 0.1390 1.1652 3.9200e- 003 0.3492 2.3200e- 003 0.3515 0.0928 2.1500e- 003 0.0949 0.0000 246.2840 246.2840 0.0110 0.0000 246.5144 Mitigated Construction Off-Site 3.7 Phase I – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0193 0.1718 0.1982 3.3000e- 004 8.4400e- 003 8.4400e- 003 7.9900e- 003 7.9900e- 003 0.0000 28.2015 28.2015 6.2000e- 003 0.0000 28.3317 Total 0.0193 0.1718 0.1982 3.3000e- 004 8.4400e- 003 8.4400e- 003 7.9900e- 003 7.9900e- 003 0.0000 28.2015 28.2015 6.2000e- 003 0.0000 28.3317 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 35 of 109 3.7 Phase I – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.4700e- 003 0.0110 0.0917 3.3000e- 004 0.0296 2.0000e- 004 0.0297 7.8500e- 003 1.8000e- 004 8.0300e- 003 0.0000 20.5320 20.5320 8.9000e- 004 0.0000 20.5507 Total 6.4700e- 003 0.0110 0.0917 3.3000e- 004 0.0296 2.0000e- 004 0.0297 7.8500e- 003 1.8000e- 004 8.0300e- 003 0.0000 20.5320 20.5320 8.9000e- 004 0.0000 20.5507 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0131 0.2840 0.2161 3.3000e- 004 0.0110 0.0110 0.0110 0.0110 0.0000 28.2015 28.2015 6.2000e- 003 0.0000 28.3316 Total 0.0131 0.2840 0.2161 3.3000e- 004 0.0110 0.0110 0.0110 0.0110 0.0000 28.2015 28.2015 6.2000e- 003 0.0000 28.3316 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 36 of 109 3.7 Phase I – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.4700e- 003 0.0110 0.0917 3.3000e- 004 0.0296 2.0000e- 004 0.0297 7.8500e- 003 1.8000e- 004 8.0300e- 003 0.0000 20.5320 20.5320 8.9000e- 004 0.0000 20.5507 Total 6.4700e- 003 0.0110 0.0917 3.3000e- 004 0.0296 2.0000e- 004 0.0297 7.8500e- 003 1.8000e- 004 8.0300e- 003 0.0000 20.5320 20.5320 8.9000e- 004 0.0000 20.5507 Mitigated Construction Off-Site 3.8 Phase I – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 7.6000e- 003 0.0750 0.1071 1.7000e- 004 3.7600e- 003 3.7600e- 003 3.4600e- 003 3.4600e- 003 0.0000 14.7006 14.7006 4.7500e- 003 0.0000 14.8004 Paving 0.0287 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0363 0.0750 0.1071 1.7000e- 004 3.7600e- 003 3.7600e- 003 3.4600e- 003 3.4600e- 003 0.0000 14.7006 14.7006 4.7500e- 003 0.0000 14.8004 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 37 of 109 3.8 Phase I – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e- 004 4.0000e- 004 3.3600e- 003 1.0000e- 005 1.0800e- 003 1.0000e- 005 1.0900e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.7526 0.7526 3.0000e- 005 0.0000 0.7533 Total 2.4000e- 004 4.0000e- 004 3.3600e- 003 1.0000e- 005 1.0800e- 003 1.0000e- 005 1.0900e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.7526 0.7526 3.0000e- 005 0.0000 0.7533 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 6.8400e- 003 0.1478 0.1270 1.7000e- 004 4.9100e- 003 4.9100e- 003 4.9100e- 003 4.9100e- 003 0.0000 14.7006 14.7006 4.7500e- 003 0.0000 14.8004 Paving 0.0287 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0355 0.1478 0.1270 1.7000e- 004 4.9100e- 003 4.9100e- 003 4.9100e- 003 4.9100e- 003 0.0000 14.7006 14.7006 4.7500e- 003 0.0000 14.8004 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 38 of 109 3.8 Phase I – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e- 004 4.0000e- 004 3.3600e- 003 1.0000e- 005 1.0800e- 003 1.0000e- 005 1.0900e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.7526 0.7526 3.0000e- 005 0.0000 0.7533 Total 2.4000e- 004 4.0000e- 004 3.3600e- 003 1.0000e- 005 1.0800e- 003 1.0000e- 005 1.0900e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.7526 0.7526 3.0000e- 005 0.0000 0.7533 Mitigated Construction Off-Site 3.9 Phase I – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 7.4455 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 5.2700e- 003 0.0358 0.0498 8.0000e- 005 1.9500e- 003 1.9500e- 003 1.9500e- 003 1.9500e- 003 0.0000 7.0215 7.0215 4.2000e- 004 0.0000 7.0303 Total 7.4508 0.0358 0.0498 8.0000e- 005 1.9500e- 003 1.9500e- 003 1.9500e- 003 1.9500e- 003 0.0000 7.0215 7.0215 4.2000e- 004 0.0000 7.0303 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 39 of 109 3.9 Phase I – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0162 0.0275 0.2293 8.3000e- 004 0.0739 4.9000e- 004 0.0744 0.0196 4.5000e- 004 0.0201 0.0000 51.3301 51.3301 2.2200e- 003 0.0000 51.3766 Total 0.0162 0.0275 0.2293 8.3000e- 004 0.0739 4.9000e- 004 0.0744 0.0196 4.5000e- 004 0.0201 0.0000 51.3301 51.3301 2.2200e- 003 0.0000 51.3766 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 7.4455 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 3.1300e- 003 0.0647 0.0504 8.0000e- 005 2.6100e- 003 2.6100e- 003 2.6100e- 003 2.6100e- 003 0.0000 7.0214 7.0214 4.2000e- 004 0.0000 7.0303 Total 7.4486 0.0647 0.0504 8.0000e- 005 2.6100e- 003 2.6100e- 003 2.6100e- 003 2.6100e- 003 0.0000 7.0214 7.0214 4.2000e- 004 0.0000 7.0303 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 40 of 109 3.9 Phase I – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0162 0.0275 0.2293 8.3000e- 004 0.0739 4.9000e- 004 0.0744 0.0196 4.5000e- 004 0.0201 0.0000 51.3301 51.3301 2.2200e- 003 0.0000 51.3766 Total 0.0162 0.0275 0.2293 8.3000e- 004 0.0739 4.9000e- 004 0.0744 0.0196 4.5000e- 004 0.0201 0.0000 51.3301 51.3301 2.2200e- 003 0.0000 51.3766 Mitigated Construction Off-Site 3.10 Phase II – Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1355 0.0000 0.1355 0.0745 0.0000 0.0745 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0226 0.2245 0.2161 2.9000e- 004 0.0104 0.0104 9.6000e- 003 9.6000e- 003 0.0000 25.8136 25.8136 8.3500e- 003 0.0000 25.9890 Total 0.0226 0.2245 0.2161 2.9000e- 004 0.1355 0.0104 0.1459 0.0745 9.6000e- 003 0.0841 0.0000 25.8136 25.8136 8.3500e- 003 0.0000 25.9890 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 41 of 109 3.10 Phase II – Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.8000e- 004 4.8000e- 004 4.0300e- 003 1.0000e- 005 1.3000e- 003 1.0000e- 005 1.3100e- 003 3.5000e- 004 1.0000e- 005 3.5000e- 004 0.0000 0.9032 0.9032 4.0000e- 005 0.0000 0.9040 Total 2.8000e- 004 4.8000e- 004 4.0300e- 003 1.0000e- 005 1.3000e- 003 1.0000e- 005 1.3100e- 003 3.5000e- 004 1.0000e- 005 3.5000e- 004 0.0000 0.9032 0.9032 4.0000e- 005 0.0000 0.9040 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0610 0.0000 0.0610 0.0335 0.0000 0.0335 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 9.2200e- 003 0.2582 0.1755 2.9000e- 004 7.2100e- 003 7.2100e- 003 7.2100e- 003 7.2100e- 003 0.0000 25.8136 25.8136 8.3500e- 003 0.0000 25.9889 Total 9.2200e- 003 0.2582 0.1755 2.9000e- 004 0.0610 7.2100e- 003 0.0682 0.0335 7.2100e- 003 0.0407 0.0000 25.8136 25.8136 8.3500e- 003 0.0000 25.9889 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 42 of 109 3.10 Phase II – Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.8000e- 004 4.8000e- 004 4.0300e- 003 1.0000e- 005 1.3000e- 003 1.0000e- 005 1.3100e- 003 3.5000e- 004 1.0000e- 005 3.5000e- 004 0.0000 0.9032 0.9032 4.0000e- 005 0.0000 0.9040 Total 2.8000e- 004 4.8000e- 004 4.0300e- 003 1.0000e- 005 1.3000e- 003 1.0000e- 005 1.3100e- 003 3.5000e- 004 1.0000e- 005 3.5000e- 004 0.0000 0.9032 0.9032 4.0000e- 005 0.0000 0.9040 Mitigated Construction Off-Site 3.11 Phase II – Grading - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1301 0.0000 0.1301 0.0540 0.0000 0.0540 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0530 0.5241 0.5128 9.3000e- 004 0.0233 0.0233 0.0215 0.0215 0.0000 81.4484 81.4484 0.0263 0.0000 82.0016 Total 0.0530 0.5241 0.5128 9.3000e- 004 0.1301 0.0233 0.1534 0.0540 0.0215 0.0754 0.0000 81.4484 81.4484 0.0263 0.0000 82.0016 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 43 of 109 3.11 Phase II – Grading - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.3000e- 004 1.0700e- 003 8.9700e- 003 3.0000e- 005 2.8900e- 003 2.0000e- 005 2.9100e- 003 7.7000e- 004 2.0000e- 005 7.9000e- 004 0.0000 2.0070 2.0070 9.0000e- 005 0.0000 2.0089 Total 6.3000e- 004 1.0700e- 003 8.9700e- 003 3.0000e- 005 2.8900e- 003 2.0000e- 005 2.9100e- 003 7.7000e- 004 2.0000e- 005 7.9000e- 004 0.0000 2.0070 2.0070 9.0000e- 005 0.0000 2.0089 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0586 0.0000 0.0586 0.0243 0.0000 0.0243 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0284 0.7642 0.5692 9.3000e- 004 0.0207 0.0207 0.0207 0.0207 0.0000 81.4483 81.4483 0.0263 0.0000 82.0015 Total 0.0284 0.7642 0.5692 9.3000e- 004 0.0586 0.0207 0.0792 0.0243 0.0207 0.0450 0.0000 81.4483 81.4483 0.0263 0.0000 82.0015 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 44 of 109 3.11 Phase II – Grading - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.3000e- 004 1.0700e- 003 8.9700e- 003 3.0000e- 005 2.8900e- 003 2.0000e- 005 2.9100e- 003 7.7000e- 004 2.0000e- 005 7.9000e- 004 0.0000 2.0070 2.0070 9.0000e- 005 0.0000 2.0089 Total 6.3000e- 004 1.0700e- 003 8.9700e- 003 3.0000e- 005 2.8900e- 003 2.0000e- 005 2.9100e- 003 7.7000e- 004 2.0000e- 005 7.9000e- 004 0.0000 2.0070 2.0070 9.0000e- 005 0.0000 2.0089 Mitigated Construction Off-Site 3.12 Phase II – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0783 0.7156 0.8105 1.3400e- 003 0.0348 0.0348 0.0328 0.0328 0.0000 115.4223 115.4223 0.0274 0.0000 115.9980 Total 0.0783 0.7156 0.8105 1.3400e- 003 0.0348 0.0348 0.0328 0.0328 0.0000 115.4223 115.4223 0.0274 0.0000 115.9980 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 45 of 109 3.12 Phase II – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2063 0.7678 2.5225 3.9800e- 003 0.1058 0.0138 0.1196 0.0303 0.0127 0.0430 0.0000 336.8968 336.8968 2.5800e- 003 0.0000 336.9510 Worker 0.1467 0.2493 2.0817 7.5200e- 003 0.6705 4.4400e- 003 0.6750 0.1782 4.1200e- 003 0.1823 0.0000 465.9680 465.9680 0.0201 0.0000 466.3906 Total 0.3530 1.0170 4.6041 0.0115 0.7763 0.0182 0.7946 0.2085 0.0168 0.2253 0.0000 802.8648 802.8648 0.0227 0.0000 803.3416 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0539 1.1731 0.8908 1.3400e- 003 0.0451 0.0451 0.0451 0.0451 0.0000 115.4222 115.4222 0.0274 0.0000 115.9979 Total 0.0539 1.1731 0.8908 1.3400e- 003 0.0451 0.0451 0.0451 0.0451 0.0000 115.4222 115.4222 0.0274 0.0000 115.9979 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 46 of 109 3.12 Phase II – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2063 0.7678 2.5225 3.9800e- 003 0.1058 0.0138 0.1196 0.0303 0.0127 0.0430 0.0000 336.8968 336.8968 2.5800e- 003 0.0000 336.9510 Worker 0.1467 0.2493 2.0817 7.5200e- 003 0.6705 4.4400e- 003 0.6750 0.1782 4.1200e- 003 0.1823 0.0000 465.9680 465.9680 0.0201 0.0000 466.3906 Total 0.3530 1.0170 4.6041 0.0115 0.7763 0.0182 0.7946 0.2085 0.0168 0.2253 0.0000 802.8648 802.8648 0.0227 0.0000 803.3416 Mitigated Construction Off-Site 3.13 Phase II – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 7.6000e- 003 0.0750 0.1071 1.7000e- 004 3.7600e- 003 3.7600e- 003 3.4600e- 003 3.4600e- 003 0.0000 14.7006 14.7006 4.7500e- 003 0.0000 14.8004 Paving 0.0287 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0363 0.0750 0.1071 1.7000e- 004 3.7600e- 003 3.7600e- 003 3.4600e- 003 3.4600e- 003 0.0000 14.7006 14.7006 4.7500e- 003 0.0000 14.8004 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 47 of 109 3.13 Phase II – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e- 004 4.0000e- 004 3.3600e- 003 1.0000e- 005 1.0800e- 003 1.0000e- 005 1.0900e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.7526 0.7526 3.0000e- 005 0.0000 0.7533 Total 2.4000e- 004 4.0000e- 004 3.3600e- 003 1.0000e- 005 1.0800e- 003 1.0000e- 005 1.0900e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.7526 0.7526 3.0000e- 005 0.0000 0.7533 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 6.8400e- 003 0.1478 0.1270 1.7000e- 004 4.9100e- 003 4.9100e- 003 4.9100e- 003 4.9100e- 003 0.0000 14.7006 14.7006 4.7500e- 003 0.0000 14.8004 Paving 0.0287 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0355 0.1478 0.1270 1.7000e- 004 4.9100e- 003 4.9100e- 003 4.9100e- 003 4.9100e- 003 0.0000 14.7006 14.7006 4.7500e- 003 0.0000 14.8004 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 48 of 109 3.13 Phase II – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e- 004 4.0000e- 004 3.3600e- 003 1.0000e- 005 1.0800e- 003 1.0000e- 005 1.0900e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.7526 0.7526 3.0000e- 005 0.0000 0.7533 Total 2.4000e- 004 4.0000e- 004 3.3600e- 003 1.0000e- 005 1.0800e- 003 1.0000e- 005 1.0900e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.7526 0.7526 3.0000e- 005 0.0000 0.7533 Mitigated Construction Off-Site 3.14 Phase II – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 2.9782 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 7.7000e- 004 5.2100e- 003 7.2400e- 003 1.0000e- 005 2.8000e- 004 2.8000e- 004 2.8000e- 004 2.8000e- 004 0.0000 1.0213 1.0213 6.0000e- 005 0.0000 1.0226 Total 2.9790 5.2100e- 003 7.2400e- 003 1.0000e- 005 2.8000e- 004 2.8000e- 004 2.8000e- 004 2.8000e- 004 0.0000 1.0213 1.0213 6.0000e- 005 0.0000 1.0226 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 49 of 109 3.14 Phase II – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.3500e- 003 3.9900e- 003 0.0334 1.2000e- 004 0.0107 7.0000e- 005 0.0108 2.8600e- 003 7.0000e- 005 2.9200e- 003 0.0000 7.4662 7.4662 3.2000e- 004 0.0000 7.4730 Total 2.3500e- 003 3.9900e- 003 0.0334 1.2000e- 004 0.0107 7.0000e- 005 0.0108 2.8600e- 003 7.0000e- 005 2.9200e- 003 0.0000 7.4662 7.4662 3.2000e- 004 0.0000 7.4730 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 2.9782 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 4.6000e- 004 9.4100e- 003 7.3300e- 003 1.0000e- 005 3.8000e- 004 3.8000e- 004 3.8000e- 004 3.8000e- 004 0.0000 1.0213 1.0213 6.0000e- 005 0.0000 1.0226 Total 2.9787 9.4100e- 003 7.3300e- 003 1.0000e- 005 3.8000e- 004 3.8000e- 004 3.8000e- 004 3.8000e- 004 0.0000 1.0213 1.0213 6.0000e- 005 0.0000 1.0226 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 50 of 109 3.14 Phase II – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.3500e- 003 3.9900e- 003 0.0334 1.2000e- 004 0.0107 7.0000e- 005 0.0108 2.8600e- 003 7.0000e- 005 2.9200e- 003 0.0000 7.4662 7.4662 3.2000e- 004 0.0000 7.4730 Total 2.3500e- 003 3.9900e- 003 0.0334 1.2000e- 004 0.0107 7.0000e- 005 0.0108 2.8600e- 003 7.0000e- 005 2.9200e- 003 0.0000 7.4662 7.4662 3.2000e- 004 0.0000 7.4730 Mitigated Construction Off-Site 3.14 Phase II – Architectural Coating - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 4.4673 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.0800e- 003 7.3100e- 003 0.0109 2.0000e- 005 3.7000e- 004 3.7000e- 004 3.7000e- 004 3.7000e- 004 0.0000 1.5320 1.5320 9.0000e- 005 0.0000 1.5338 Total 4.4684 7.3100e- 003 0.0109 2.0000e- 005 3.7000e- 004 3.7000e- 004 3.7000e- 004 3.7000e- 004 0.0000 1.5320 1.5320 9.0000e- 005 0.0000 1.5338 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 51 of 109 3.14 Phase II – Architectural Coating - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.3300e- 003 5.6200e- 003 0.0470 1.8000e- 004 0.0161 1.1000e- 004 0.0162 4.2800e- 003 1.0000e- 004 4.3800e- 003 0.0000 11.0483 11.0483 4.6000e- 004 0.0000 11.0581 Total 3.3300e- 003 5.6200e- 003 0.0470 1.8000e- 004 0.0161 1.1000e- 004 0.0162 4.2800e- 003 1.0000e- 004 4.3800e- 003 0.0000 11.0483 11.0483 4.6000e- 004 0.0000 11.0581 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 4.4673 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 6.8000e- 004 0.0141 0.0110 2.0000e- 005 5.7000e- 004 5.7000e- 004 5.7000e- 004 5.7000e- 004 0.0000 1.5320 1.5320 9.0000e- 005 0.0000 1.5338 Total 4.4680 0.0141 0.0110 2.0000e- 005 5.7000e- 004 5.7000e- 004 5.7000e- 004 5.7000e- 004 0.0000 1.5320 1.5320 9.0000e- 005 0.0000 1.5338 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 52 of 109 3.14 Phase II – Architectural Coating - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.3300e- 003 5.6200e- 003 0.0470 1.8000e- 004 0.0161 1.1000e- 004 0.0162 4.2800e- 003 1.0000e- 004 4.3800e- 003 0.0000 11.0483 11.0483 4.6000e- 004 0.0000 11.0581 Total 3.3300e- 003 5.6200e- 003 0.0470 1.8000e- 004 0.0161 1.1000e- 004 0.0162 4.2800e- 003 1.0000e- 004 4.3800e- 003 0.0000 11.0483 11.0483 4.6000e- 004 0.0000 11.0581 Mitigated Construction Off-Site 3.15 Phase III – Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1807 0.0000 0.1807 0.0993 0.0000 0.0993 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0282 0.2755 0.2760 3.9000e- 004 0.0125 0.0125 0.0115 0.0115 0.0000 34.4215 34.4215 0.0111 0.0000 34.6552 Total 0.0282 0.2755 0.2760 3.9000e- 004 0.1807 0.0125 0.1932 0.0993 0.0115 0.1108 0.0000 34.4215 34.4215 0.0111 0.0000 34.6552 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 53 of 109 3.15 Phase III – Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.6000e- 004 6.0000e- 004 5.0500e- 003 2.0000e- 005 1.7300e- 003 1.0000e- 005 1.7400e- 003 4.6000e- 004 1.0000e- 005 4.7000e- 004 0.0000 1.1880 1.1880 5.0000e- 005 0.0000 1.1890 Total 3.6000e- 004 6.0000e- 004 5.0500e- 003 2.0000e- 005 1.7300e- 003 1.0000e- 005 1.7400e- 003 4.6000e- 004 1.0000e- 005 4.7000e- 004 0.0000 1.1880 1.1880 5.0000e- 005 0.0000 1.1890 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0813 0.0000 0.0813 0.0447 0.0000 0.0447 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0123 0.3442 0.2340 3.9000e- 004 9.6100e- 003 9.6100e- 003 9.6100e- 003 9.6100e- 003 0.0000 34.4214 34.4214 0.0111 0.0000 34.6552 Total 0.0123 0.3442 0.2340 3.9000e- 004 0.0813 9.6100e- 003 0.0909 0.0447 9.6100e- 003 0.0543 0.0000 34.4214 34.4214 0.0111 0.0000 34.6552 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 54 of 109 3.15 Phase III – Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.6000e- 004 6.0000e- 004 5.0500e- 003 2.0000e- 005 1.7300e- 003 1.0000e- 005 1.7400e- 003 4.6000e- 004 1.0000e- 005 4.7000e- 004 0.0000 1.1880 1.1880 5.0000e- 005 0.0000 1.1890 Total 3.6000e- 004 6.0000e- 004 5.0500e- 003 2.0000e- 005 1.7300e- 003 1.0000e- 005 1.7400e- 003 4.6000e- 004 1.0000e- 005 4.7000e- 004 0.0000 1.1880 1.1880 5.0000e- 005 0.0000 1.1890 Mitigated Construction Off-Site 3.16 Phase III – Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1518 0.0000 0.1518 0.0629 0.0000 0.0629 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0588 0.5634 0.5853 1.0800e- 003 0.0249 0.0249 0.0229 0.0229 0.0000 95.0008 95.0008 0.0307 0.0000 95.6460 Total 0.0588 0.5634 0.5853 1.0800e- 003 0.1518 0.0249 0.1767 0.0629 0.0229 0.0859 0.0000 95.0008 95.0008 0.0307 0.0000 95.6460 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 55 of 109 3.16 Phase III – Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.0000e- 004 1.1800e- 003 9.8300e- 003 4.0000e- 005 3.3700e- 003 2.0000e- 005 3.3900e- 003 9.0000e- 004 2.0000e- 005 9.2000e- 004 0.0000 2.3100 2.3100 1.0000e- 004 0.0000 2.3120 Total 7.0000e- 004 1.1800e- 003 9.8300e- 003 4.0000e- 005 3.3700e- 003 2.0000e- 005 3.3900e- 003 9.0000e- 004 2.0000e- 005 9.2000e- 004 0.0000 2.3100 2.3100 1.0000e- 004 0.0000 2.3120 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0683 0.0000 0.0683 0.0283 0.0000 0.0283 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0331 0.8916 0.6640 1.0800e- 003 0.0241 0.0241 0.0241 0.0241 0.0000 95.0007 95.0007 0.0307 0.0000 95.6459 Total 0.0331 0.8916 0.6640 1.0800e- 003 0.0683 0.0241 0.0924 0.0283 0.0241 0.0524 0.0000 95.0007 95.0007 0.0307 0.0000 95.6459 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 56 of 109 3.16 Phase III – Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.0000e- 004 1.1800e- 003 9.8300e- 003 4.0000e- 005 3.3700e- 003 2.0000e- 005 3.3900e- 003 9.0000e- 004 2.0000e- 005 9.2000e- 004 0.0000 2.3100 2.3100 1.0000e- 004 0.0000 2.3120 Total 7.0000e- 004 1.1800e- 003 9.8300e- 003 4.0000e- 005 3.3700e- 003 2.0000e- 005 3.3900e- 003 9.0000e- 004 2.0000e- 005 9.2000e- 004 0.0000 2.3100 2.3100 1.0000e- 004 0.0000 2.3120 Mitigated Construction Off-Site 3.17 Phase III – Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1429 1.3043 1.5730 2.6200e- 003 0.0595 0.0595 0.0560 0.0560 0.0000 225.1168 225.1168 0.0532 0.0000 226.2330 Total 0.1429 1.3043 1.5730 2.6200e- 003 0.0595 0.0595 0.0560 0.0560 0.0000 225.1168 225.1168 0.0532 0.0000 226.2330 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 57 of 109 3.17 Phase III – Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.4019 1.4814 4.8218 7.7600e- 003 0.2063 0.0270 0.2333 0.0591 0.0249 0.0840 0.0000 656.9772 656.9772 5.0600e- 003 0.0000 657.0834 Worker 0.2700 0.4563 3.8130 0.0147 1.3075 8.6500e- 003 1.3162 0.3475 8.0300e- 003 0.3555 0.0000 896.3886 896.3886 0.0376 0.0000 897.1790 Total 0.6719 1.9378 8.6348 0.0224 1.5138 0.0357 1.5495 0.4066 0.0329 0.4395 0.0000 1,553.365 8 1,553.365 8 0.0427 0.0000 1,554.262 4 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1051 2.2875 1.7370 2.6200e- 003 0.0879 0.0879 0.0879 0.0879 0.0000 225.1165 225.1165 0.0532 0.0000 226.2327 Total 0.1051 2.2875 1.7370 2.6200e- 003 0.0879 0.0879 0.0879 0.0879 0.0000 225.1165 225.1165 0.0532 0.0000 226.2327 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 58 of 109 3.17 Phase III – Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.4019 1.4814 4.8218 7.7600e- 003 0.2063 0.0270 0.2333 0.0591 0.0249 0.0840 0.0000 656.9772 656.9772 5.0600e- 003 0.0000 657.0834 Worker 0.2700 0.4563 3.8130 0.0147 1.3075 8.6500e- 003 1.3162 0.3475 8.0300e- 003 0.3555 0.0000 896.3886 896.3886 0.0376 0.0000 897.1790 Total 0.6719 1.9378 8.6348 0.0224 1.5138 0.0357 1.5495 0.4066 0.0329 0.4395 0.0000 1,553.365 8 1,553.365 8 0.0427 0.0000 1,554.262 4 Mitigated Construction Off-Site 3.17 Phase III – Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0987 0.8997 1.1638 1.9500e- 003 0.0381 0.0381 0.0358 0.0358 0.0000 167.4455 167.4455 0.0393 0.0000 168.2708 Total 0.0987 0.8997 1.1638 1.9500e- 003 0.0381 0.0381 0.0358 0.0358 0.0000 167.4455 167.4455 0.0393 0.0000 168.2708 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 59 of 109 3.17 Phase III – Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2915 1.0913 3.5334 5.7700e- 003 0.1534 0.0202 0.1736 0.0439 0.0186 0.0625 0.0000 488.5545 488.5545 3.7700e- 003 0.0000 488.6337 Worker 0.1911 0.3210 2.6894 0.0109 0.9723 6.4600e- 003 0.9787 0.2584 5.9900e- 003 0.2644 0.0000 658.5210 658.5210 0.0270 0.0000 659.0882 Total 0.4826 1.4122 6.2228 0.0167 1.1257 0.0266 1.1523 0.3023 0.0246 0.3269 0.0000 1,147.075 5 1,147.075 5 0.0308 0.0000 1,147.721 9 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0782 1.7010 1.2916 1.9500e- 003 0.0654 0.0654 0.0654 0.0654 0.0000 167.4453 167.4453 0.0393 0.0000 168.2706 Total 0.0782 1.7010 1.2916 1.9500e- 003 0.0654 0.0654 0.0654 0.0654 0.0000 167.4453 167.4453 0.0393 0.0000 168.2706 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 60 of 109 3.17 Phase III – Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2915 1.0913 3.5334 5.7700e- 003 0.1534 0.0202 0.1736 0.0439 0.0186 0.0625 0.0000 488.5545 488.5545 3.7700e- 003 0.0000 488.6337 Worker 0.1911 0.3210 2.6894 0.0109 0.9723 6.4600e- 003 0.9787 0.2584 5.9900e- 003 0.2644 0.0000 658.5210 658.5210 0.0270 0.0000 659.0882 Total 0.4826 1.4122 6.2228 0.0167 1.1257 0.0266 1.1523 0.3023 0.0246 0.3269 0.0000 1,147.075 5 1,147.075 5 0.0308 0.0000 1,147.721 9 Mitigated Construction Off-Site 3.18 Phase III – Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 7.4455 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.7100e- 003 0.0115 0.0181 3.0000e- 005 5.2000e- 004 5.2000e- 004 5.2000e- 004 5.2000e- 004 0.0000 2.5533 2.5533 1.4000e- 004 0.0000 2.5562 Total 7.4472 0.0115 0.0181 3.0000e- 005 5.2000e- 004 5.2000e- 004 5.2000e- 004 5.2000e- 004 0.0000 2.5533 2.5533 1.4000e- 004 0.0000 2.5562 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 61 of 109 3.18 Phase III – Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 5.2800e- 003 8.8700e- 003 0.0743 3.0000e- 004 0.0269 1.8000e- 004 0.0270 7.1400e- 003 1.7000e- 004 7.3000e- 003 0.0000 18.1922 18.1922 7.5000e- 004 0.0000 18.2079 Total 5.2800e- 003 8.8700e- 003 0.0743 3.0000e- 004 0.0269 1.8000e- 004 0.0270 7.1400e- 003 1.7000e- 004 7.3000e- 003 0.0000 18.1922 18.1922 7.5000e- 004 0.0000 18.2079 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 7.4455 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.1400e- 003 0.0235 0.0183 3.0000e- 005 9.5000e- 004 9.5000e- 004 9.5000e- 004 9.5000e- 004 0.0000 2.5533 2.5533 1.4000e- 004 0.0000 2.5562 Total 7.4467 0.0235 0.0183 3.0000e- 005 9.5000e- 004 9.5000e- 004 9.5000e- 004 9.5000e- 004 0.0000 2.5533 2.5533 1.4000e- 004 0.0000 2.5562 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 62 of 109 3.18 Phase III – Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 5.2800e- 003 8.8700e- 003 0.0743 3.0000e- 004 0.0269 1.8000e- 004 0.0270 7.1400e- 003 1.7000e- 004 7.3000e- 003 0.0000 18.1922 18.1922 7.5000e- 004 0.0000 18.2079 Total 5.2800e- 003 8.8700e- 003 0.0743 3.0000e- 004 0.0269 1.8000e- 004 0.0270 7.1400e- 003 1.7000e- 004 7.3000e- 003 0.0000 18.1922 18.1922 7.5000e- 004 0.0000 18.2079 Mitigated Construction Off-Site 3.19 Phase III – Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 8.9700e- 003 0.0842 0.1428 2.2000e- 004 4.1100e- 003 4.1100e- 003 3.7800e- 003 3.7800e- 003 0.0000 19.5934 19.5934 6.3400e- 003 0.0000 19.7264 Paving 0.0287 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0377 0.0842 0.1428 2.2000e- 004 4.1100e- 003 4.1100e- 003 3.7800e- 003 3.7800e- 003 0.0000 19.5934 19.5934 6.3400e- 003 0.0000 19.7264 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 63 of 109 3.19 Phase III – Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.8000e- 004 4.8000e- 004 3.9900e- 003 2.0000e- 005 1.4400e- 003 1.0000e- 005 1.4500e- 003 3.8000e- 004 1.0000e- 005 3.9000e- 004 0.0000 0.9781 0.9781 4.0000e- 005 0.0000 0.9789 Total 2.8000e- 004 4.8000e- 004 3.9900e- 003 2.0000e- 005 1.4400e- 003 1.0000e- 005 1.4500e- 003 3.8000e- 004 1.0000e- 005 3.9000e- 004 0.0000 0.9781 0.9781 4.0000e- 005 0.0000 0.9789 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 9.1200e- 003 0.1970 0.1693 2.2000e- 004 6.5400e- 003 6.5400e- 003 6.5400e- 003 6.5400e- 003 0.0000 19.5933 19.5933 6.3400e- 003 0.0000 19.7264 Paving 0.0287 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0378 0.1970 0.1693 2.2000e- 004 6.5400e- 003 6.5400e- 003 6.5400e- 003 6.5400e- 003 0.0000 19.5933 19.5933 6.3400e- 003 0.0000 19.7264 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 64 of 109 3.19 Phase III – Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.8000e- 004 4.8000e- 004 3.9900e- 003 2.0000e- 005 1.4400e- 003 1.0000e- 005 1.4500e- 003 3.8000e- 004 1.0000e- 005 3.9000e- 004 0.0000 0.9781 0.9781 4.0000e- 005 0.0000 0.9789 Total 2.8000e- 004 4.8000e- 004 3.9900e- 003 2.0000e- 005 1.4400e- 003 1.0000e- 005 1.4500e- 003 3.8000e- 004 1.0000e- 005 3.9000e- 004 0.0000 0.9781 0.9781 4.0000e- 005 0.0000 0.9789 Mitigated Construction Off-Site 3.20 Phases IV & V – Site Preparation - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.3613 0.0000 0.3613 0.1986 0.0000 0.1986 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0502 0.4705 0.4978 7.8000e- 004 0.0206 0.0206 0.0189 0.0189 0.0000 68.8343 68.8343 0.0223 0.0000 69.3018 Total 0.0502 0.4705 0.4978 7.8000e- 004 0.3613 0.0206 0.3819 0.1986 0.0189 0.2176 0.0000 68.8343 68.8343 0.0223 0.0000 69.3018 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 65 of 109 3.20 Phases IV & V – Site Preparation - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.8000e- 004 1.1400e- 003 9.5900e- 003 4.0000e- 005 3.4700e- 003 2.0000e- 005 3.4900e- 003 9.2000e- 004 2.0000e- 005 9.4000e- 004 0.0000 2.3474 2.3474 1.0000e- 004 0.0000 2.3494 Total 6.8000e- 004 1.1400e- 003 9.5900e- 003 4.0000e- 005 3.4700e- 003 2.0000e- 005 3.4900e- 003 9.2000e- 004 2.0000e- 005 9.4000e- 004 0.0000 2.3474 2.3474 1.0000e- 004 0.0000 2.3494 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1626 0.0000 0.1626 0.0894 0.0000 0.0894 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0246 0.6885 0.4680 7.8000e- 004 0.0192 0.0192 0.0192 0.0192 0.0000 68.8342 68.8342 0.0223 0.0000 69.3017 Total 0.0246 0.6885 0.4680 7.8000e- 004 0.1626 0.0192 0.1818 0.0894 0.0192 0.1086 0.0000 68.8342 68.8342 0.0223 0.0000 69.3017 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 66 of 109 3.20 Phases IV & V – Site Preparation - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.8000e- 004 1.1400e- 003 9.5900e- 003 4.0000e- 005 3.4700e- 003 2.0000e- 005 3.4900e- 003 9.2000e- 004 2.0000e- 005 9.4000e- 004 0.0000 2.3474 2.3474 1.0000e- 004 0.0000 2.3494 Total 6.8000e- 004 1.1400e- 003 9.5900e- 003 4.0000e- 005 3.4700e- 003 2.0000e- 005 3.4900e- 003 9.2000e- 004 2.0000e- 005 9.4000e- 004 0.0000 2.3474 2.3474 1.0000e- 004 0.0000 2.3494 Mitigated Construction Off-Site 3.21 Phases IV & V – Grading - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.5855 0.0000 0.5855 0.2428 0.0000 0.2428 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0540 0.4907 0.5643 1.1100e- 003 0.0214 0.0214 0.0197 0.0197 0.0000 97.6878 97.6878 0.0316 0.0000 98.3513 Total 0.0540 0.4907 0.5643 1.1100e- 003 0.5855 0.0214 0.6068 0.2428 0.0197 0.2624 0.0000 97.6878 97.6878 0.0316 0.0000 98.3513 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 67 of 109 3.21 Phases IV & V – Grading - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.8000e- 004 1.1400e- 003 9.5900e- 003 4.0000e- 005 3.4700e- 003 2.0000e- 005 3.4900e- 003 9.2000e- 004 2.0000e- 005 9.4000e- 004 0.0000 2.3474 2.3474 1.0000e- 004 0.0000 2.3494 Total 6.8000e- 004 1.1400e- 003 9.5900e- 003 4.0000e- 005 3.4700e- 003 2.0000e- 005 3.4900e- 003 9.2000e- 004 2.0000e- 005 9.4000e- 004 0.0000 2.3474 2.3474 1.0000e- 004 0.0000 2.3494 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.2635 0.0000 0.2635 0.1092 0.0000 0.1092 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0341 0.9170 0.6830 1.1100e- 003 0.0248 0.0248 0.0248 0.0248 0.0000 97.6877 97.6877 0.0316 0.0000 98.3511 Total 0.0341 0.9170 0.6830 1.1100e- 003 0.2635 0.0248 0.2883 0.1092 0.0248 0.1341 0.0000 97.6877 97.6877 0.0316 0.0000 98.3511 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 68 of 109 3.21 Phases IV & V – Grading - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.8000e- 004 1.1400e- 003 9.5900e- 003 4.0000e- 005 3.4700e- 003 2.0000e- 005 3.4900e- 003 9.2000e- 004 2.0000e- 005 9.4000e- 004 0.0000 2.3474 2.3474 1.0000e- 004 0.0000 2.3494 Total 6.8000e- 004 1.1400e- 003 9.5900e- 003 4.0000e- 005 3.4700e- 003 2.0000e- 005 3.4900e- 003 9.2000e- 004 2.0000e- 005 9.4000e- 004 0.0000 2.3474 2.3474 1.0000e- 004 0.0000 2.3494 Mitigated Construction Off-Site 3.21 Phases IV & V – Grading - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.5855 0.0000 0.5855 0.2428 0.0000 0.2428 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1486 1.3494 1.5519 3.0600e- 003 0.0587 0.0587 0.0540 0.0540 0.0000 268.6414 268.6414 0.0869 0.0000 270.4660 Total 0.1486 1.3494 1.5519 3.0600e- 003 0.5855 0.0587 0.6442 0.2428 0.0540 0.2968 0.0000 268.6414 268.6414 0.0869 0.0000 270.4660 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 69 of 109 3.21 Phases IV & V – Grading - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.7900e- 003 2.9900e- 003 0.0252 1.1000e- 004 9.5300e- 003 6.0000e- 005 9.5900e- 003 2.5300e- 003 6.0000e- 005 2.5900e- 003 0.0000 6.3872 6.3872 2.6000e- 004 0.0000 6.3925 Total 1.7900e- 003 2.9900e- 003 0.0252 1.1000e- 004 9.5300e- 003 6.0000e- 005 9.5900e- 003 2.5300e- 003 6.0000e- 005 2.5900e- 003 0.0000 6.3872 6.3872 2.6000e- 004 0.0000 6.3925 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.2635 0.0000 0.2635 0.1092 0.0000 0.1092 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0937 2.5219 1.8782 3.0600e- 003 0.0682 0.0682 0.0682 0.0682 0.0000 268.6411 268.6411 0.0869 0.0000 270.4656 Total 0.0937 2.5219 1.8782 3.0600e- 003 0.2635 0.0682 0.3317 0.1092 0.0682 0.1775 0.0000 268.6411 268.6411 0.0869 0.0000 270.4656 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 70 of 109 3.21 Phases IV & V – Grading - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.7900e- 003 2.9900e- 003 0.0252 1.1000e- 004 9.5300e- 003 6.0000e- 005 9.5900e- 003 2.5300e- 003 6.0000e- 005 2.5900e- 003 0.0000 6.3872 6.3872 2.6000e- 004 0.0000 6.3925 Total 1.7900e- 003 2.9900e- 003 0.0252 1.1000e- 004 9.5300e- 003 6.0000e- 005 9.5900e- 003 2.5300e- 003 6.0000e- 005 2.5900e- 003 0.0000 6.3872 6.3872 2.6000e- 004 0.0000 6.3925 Mitigated Construction Off-Site 3.22 Phases IV & V – Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1103 1.0052 1.3002 2.1700e- 003 0.0425 0.0425 0.0400 0.0400 0.0000 187.0770 187.0770 0.0439 0.0000 187.9991 Total 0.1103 1.0052 1.3002 2.1700e- 003 0.0425 0.0425 0.0400 0.0400 0.0000 187.0770 187.0770 0.0439 0.0000 187.9991 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 71 of 109 3.22 Phases IV & V – Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.3283 1.2040 3.8774 6.4500e- 003 0.1714 0.0224 0.1938 0.0491 0.0206 0.0697 0.0000 545.9004 545.9004 4.2000e- 003 0.0000 545.9886 Worker 0.2039 0.3413 2.8669 0.0122 1.0863 7.2800e- 003 1.0935 0.2887 6.7500e- 003 0.2954 0.0000 727.9611 727.9611 0.0292 0.0000 728.5751 Total 0.5323 1.5453 6.7443 0.0186 1.2577 0.0297 1.2874 0.3378 0.0274 0.3651 0.0000 1,273.861 4 1,273.861 4 0.0334 0.0000 1,274.563 7 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0873 1.9004 1.4431 2.1700e- 003 0.0730 0.0730 0.0730 0.0730 0.0000 187.0768 187.0768 0.0439 0.0000 187.9989 Total 0.0873 1.9004 1.4431 2.1700e- 003 0.0730 0.0730 0.0730 0.0730 0.0000 187.0768 187.0768 0.0439 0.0000 187.9989 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 72 of 109 3.22 Phases IV & V – Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.3283 1.2040 3.8774 6.4500e- 003 0.1714 0.0224 0.1938 0.0491 0.0206 0.0697 0.0000 545.9004 545.9004 4.2000e- 003 0.0000 545.9886 Worker 0.2039 0.3413 2.8669 0.0122 1.0863 7.2800e- 003 1.0935 0.2887 6.7500e- 003 0.2954 0.0000 727.9611 727.9611 0.0292 0.0000 728.5751 Total 0.5323 1.5453 6.7443 0.0186 1.2577 0.0297 1.2874 0.3378 0.0274 0.3651 0.0000 1,273.861 4 1,273.861 4 0.0334 0.0000 1,274.563 7 Mitigated Construction Off-Site 3.22 Phases IV & V – Building Construction - 2027 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1777 1.6195 2.0948 3.5000e- 003 0.0685 0.0685 0.0645 0.0645 0.0000 301.4019 301.4019 0.0707 0.0000 302.8874 Total 0.1777 1.6195 2.0948 3.5000e- 003 0.0685 0.0685 0.0645 0.0645 0.0000 301.4019 301.4019 0.0707 0.0000 302.8874 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 73 of 109 3.22 Phases IV & V – Building Construction - 2027 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.4935 1.9182 5.8608 0.0104 0.2762 0.0362 0.3123 0.0791 0.0333 0.1124 0.0000 879.5792 879.5792 6.7800e- 003 0.0000 879.7216 Worker 0.3146 0.5247 4.4203 0.0196 1.7501 0.0118 1.7619 0.4651 0.0110 0.4760 0.0000 1,161.935 5 1,161.935 5 0.0458 0.0000 1,162.896 4 Total 0.8081 2.4428 10.2811 0.0300 2.0263 0.0480 2.0742 0.5442 0.0442 0.5884 0.0000 2,041.514 6 2,041.514 6 0.0525 0.0000 2,042.618 0 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1407 3.0617 2.3249 3.5000e- 003 0.1177 0.1177 0.1177 0.1177 0.0000 301.4015 301.4015 0.0707 0.0000 302.8871 Total 0.1407 3.0617 2.3249 3.5000e- 003 0.1177 0.1177 0.1177 0.1177 0.0000 301.4015 301.4015 0.0707 0.0000 302.8871 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 74 of 109 3.22 Phases IV & V – Building Construction - 2027 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.4935 1.9182 5.8608 0.0104 0.2762 0.0362 0.3123 0.0791 0.0333 0.1124 0.0000 879.5792 879.5792 6.7800e- 003 0.0000 879.7216 Worker 0.3146 0.5247 4.4203 0.0196 1.7501 0.0118 1.7619 0.4651 0.0110 0.4760 0.0000 1,161.935 5 1,161.935 5 0.0458 0.0000 1,162.896 4 Total 0.8081 2.4428 10.2811 0.0300 2.0263 0.0480 2.0742 0.5442 0.0442 0.5884 0.0000 2,041.514 6 2,041.514 6 0.0525 0.0000 2,042.618 0 Mitigated Construction Off-Site 3.22 Phases IV & V – Building Construction - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1375 1.2534 1.6212 2.7100e- 003 0.0530 0.0530 0.0499 0.0499 0.0000 233.2689 233.2689 0.0548 0.0000 234.4186 Total 0.1375 1.2534 1.6212 2.7100e- 003 0.0530 0.0530 0.0499 0.0499 0.0000 233.2689 233.2689 0.0548 0.0000 234.4186 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 75 of 109 3.22 Phases IV & V – Building Construction - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.3712 1.4697 4.2453 8.0300e- 003 0.2138 0.0280 0.2417 0.0612 0.0257 0.0869 0.0000 680.8110 680.8110 5.2500e- 003 0.0000 680.9213 Worker 0.2336 0.3883 3.2854 0.0152 1.3545 9.1900e- 003 1.3637 0.3600 8.5300e- 003 0.3685 0.0000 892.0110 892.0110 0.0345 0.0000 892.7350 Total 0.6048 1.8580 7.5306 0.0232 1.5682 0.0371 1.6054 0.4212 0.0342 0.4554 0.0000 1,572.822 0 1,572.822 0 0.0397 0.0000 1,573.656 2 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1089 2.3696 1.7994 2.7100e- 003 0.0911 0.0911 0.0911 0.0911 0.0000 233.2686 233.2686 0.0548 0.0000 234.4183 Total 0.1089 2.3696 1.7994 2.7100e- 003 0.0911 0.0911 0.0911 0.0911 0.0000 233.2686 233.2686 0.0548 0.0000 234.4183 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 76 of 109 3.22 Phases IV & V – Building Construction - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.3712 1.4697 4.2453 8.0300e- 003 0.2138 0.0280 0.2417 0.0612 0.0257 0.0869 0.0000 680.8110 680.8110 5.2500e- 003 0.0000 680.9213 Worker 0.2336 0.3883 3.2854 0.0152 1.3545 9.1900e- 003 1.3637 0.3600 8.5300e- 003 0.3685 0.0000 892.0110 892.0110 0.0345 0.0000 892.7350 Total 0.6048 1.8580 7.5306 0.0232 1.5682 0.0371 1.6054 0.4212 0.0342 0.4554 0.0000 1,572.822 0 1,572.822 0 0.0397 0.0000 1,573.656 2 Mitigated Construction Off-Site 3.23 Phases IV & V – Architectural Coating - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 7.4455 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 2.9900e- 003 0.0201 0.0317 5.0000e- 005 9.0000e- 004 9.0000e- 004 9.0000e- 004 9.0000e- 004 0.0000 4.4682 4.4682 2.4000e- 004 0.0000 4.4733 Total 7.4485 0.0201 0.0317 5.0000e- 005 9.0000e- 004 9.0000e- 004 9.0000e- 004 9.0000e- 004 0.0000 4.4682 4.4682 2.4000e- 004 0.0000 4.4733 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 77 of 109 3.23 Phases IV & V – Architectural Coating - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 8.1100e- 003 0.0135 0.1140 5.3000e- 004 0.0470 3.2000e- 004 0.0473 0.0125 3.0000e- 004 0.0128 0.0000 30.9557 30.9557 1.2000e- 003 0.0000 30.9808 Total 8.1100e- 003 0.0135 0.1140 5.3000e- 004 0.0470 3.2000e- 004 0.0473 0.0125 3.0000e- 004 0.0128 0.0000 30.9557 30.9557 1.2000e- 003 0.0000 30.9808 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 7.4455 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.9900e- 003 0.0412 0.0321 5.0000e- 005 1.6600e- 003 1.6600e- 003 1.6600e- 003 1.6600e- 003 0.0000 4.4682 4.4682 2.4000e- 004 0.0000 4.4733 Total 7.4475 0.0412 0.0321 5.0000e- 005 1.6600e- 003 1.6600e- 003 1.6600e- 003 1.6600e- 003 0.0000 4.4682 4.4682 2.4000e- 004 0.0000 4.4733 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 78 of 109 3.23 Phases IV & V – Architectural Coating - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 8.1100e- 003 0.0135 0.1140 5.3000e- 004 0.0470 3.2000e- 004 0.0473 0.0125 3.0000e- 004 0.0128 0.0000 30.9557 30.9557 1.2000e- 003 0.0000 30.9808 Total 8.1100e- 003 0.0135 0.1140 5.3000e- 004 0.0470 3.2000e- 004 0.0473 0.0125 3.0000e- 004 0.0128 0.0000 30.9557 30.9557 1.2000e- 003 0.0000 30.9808 Mitigated Construction Off-Site 3.24 Phases IV & V – Paving - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0103 0.0969 0.1642 2.6000e- 004 4.7300e- 003 4.7300e- 003 4.3500e- 003 4.3500e- 003 0.0000 22.5324 22.5324 7.2900e- 003 0.0000 22.6854 Paving 0.0220 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0323 0.0969 0.1642 2.6000e- 004 4.7300e- 003 4.7300e- 003 4.3500e- 003 4.3500e- 003 0.0000 22.5324 22.5324 7.2900e- 003 0.0000 22.6854 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 79 of 109 3.24 Phases IV & V – Paving - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.9000e- 004 4.8000e- 004 4.0300e- 003 2.0000e- 005 1.6600e- 003 1.0000e- 005 1.6700e- 003 4.4000e- 004 1.0000e- 005 4.5000e- 004 0.0000 1.0937 1.0937 4.0000e- 005 0.0000 1.0946 Total 2.9000e- 004 4.8000e- 004 4.0300e- 003 2.0000e- 005 1.6600e- 003 1.0000e- 005 1.6700e- 003 4.4000e- 004 1.0000e- 005 4.5000e- 004 0.0000 1.0937 1.0937 4.0000e- 005 0.0000 1.0946 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0105 0.2266 0.1947 2.6000e- 004 7.5200e- 003 7.5200e- 003 7.5200e- 003 7.5200e- 003 0.0000 22.5323 22.5323 7.2900e- 003 0.0000 22.6854 Paving 0.0220 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0325 0.2266 0.1947 2.6000e- 004 7.5200e- 003 7.5200e- 003 7.5200e- 003 7.5200e- 003 0.0000 22.5323 22.5323 7.2900e- 003 0.0000 22.6854 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 80 of 109 3.24 Phases IV & V – Paving - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.9000e- 004 4.8000e- 004 4.0300e- 003 2.0000e- 005 1.6600e- 003 1.0000e- 005 1.6700e- 003 4.4000e- 004 1.0000e- 005 4.5000e- 004 0.0000 1.0937 1.0937 4.0000e- 005 0.0000 1.0946 Total 2.9000e- 004 4.8000e- 004 4.0300e- 003 2.0000e- 005 1.6600e- 003 1.0000e- 005 1.6700e- 003 4.4000e- 004 1.0000e- 005 4.5000e- 004 0.0000 1.0937 1.0937 4.0000e- 005 0.0000 1.0946 Mitigated Construction Off-Site 3.24 Phases IV & V – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 3.1400e- 003 0.0295 0.0500 8.0000e- 005 1.4400e- 003 1.4400e- 003 1.3200e- 003 1.3200e- 003 0.0000 6.8577 6.8577 2.2200e- 003 0.0000 6.9043 Paving 6.6900e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 9.8300e- 003 0.0295 0.0500 8.0000e- 005 1.4400e- 003 1.4400e- 003 1.3200e- 003 1.3200e- 003 0.0000 6.8577 6.8577 2.2200e- 003 0.0000 6.9043 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 81 of 109 3.24 Phases IV & V – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 8.0000e- 005 1.4000e- 004 1.1800e- 003 1.0000e- 005 5.1000e- 004 0.0000 5.1000e- 004 1.3000e- 004 0.0000 1.4000e- 004 0.0000 0.3305 0.3305 1.0000e- 005 0.0000 0.3308 Total 8.0000e- 005 1.4000e- 004 1.1800e- 003 1.0000e- 005 5.1000e- 004 0.0000 5.1000e- 004 1.3000e- 004 0.0000 1.4000e- 004 0.0000 0.3305 0.3305 1.0000e- 005 0.0000 0.3308 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 3.1900e- 003 0.0690 0.0593 8.0000e- 005 2.2900e- 003 2.2900e- 003 2.2900e- 003 2.2900e- 003 0.0000 6.8577 6.8577 2.2200e- 003 0.0000 6.9042 Paving 6.6900e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 9.8800e- 003 0.0690 0.0593 8.0000e- 005 2.2900e- 003 2.2900e- 003 2.2900e- 003 2.2900e- 003 0.0000 6.8577 6.8577 2.2200e- 003 0.0000 6.9042 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 82 of 109 3.24 Phases IV & V – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 8.0000e- 005 1.4000e- 004 1.1800e- 003 1.0000e- 005 5.1000e- 004 0.0000 5.1000e- 004 1.3000e- 004 0.0000 1.4000e- 004 0.0000 0.3305 0.3305 1.0000e- 005 0.0000 0.3308 Total 8.0000e- 005 1.4000e- 004 1.1800e- 003 1.0000e- 005 5.1000e- 004 0.0000 5.1000e- 004 1.3000e- 004 0.0000 1.4000e- 004 0.0000 0.3305 0.3305 1.0000e- 005 0.0000 0.3308 Mitigated Construction Off-Site 3.25 Phase VI – Site Preparation - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0452 0.0000 0.0452 0.0248 0.0000 0.0248 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 6.2700e- 003 0.0588 0.0622 1.0000e- 004 2.5700e- 003 2.5700e- 003 2.3700e- 003 2.3700e- 003 0.0000 8.6043 8.6043 2.7800e- 003 0.0000 8.6627 Total 6.2700e- 003 0.0588 0.0622 1.0000e- 004 0.0452 2.5700e- 003 0.0477 0.0248 2.3700e- 003 0.0272 0.0000 8.6043 8.6043 2.7800e- 003 0.0000 8.6627 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 83 of 109 3.25 Phase VI – Site Preparation - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.0000e- 005 1.2000e- 004 1.0100e- 003 0.0000 4.3000e- 004 0.0000 4.4000e- 004 1.2000e- 004 0.0000 1.2000e- 004 0.0000 0.2833 0.2833 1.0000e- 005 0.0000 0.2835 Total 7.0000e- 005 1.2000e- 004 1.0100e- 003 0.0000 4.3000e- 004 0.0000 4.4000e- 004 1.2000e- 004 0.0000 1.2000e- 004 0.0000 0.2833 0.2833 1.0000e- 005 0.0000 0.2835 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0203 0.0000 0.0203 0.0112 0.0000 0.0112 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 3.0700e- 003 0.0861 0.0585 1.0000e- 004 2.4000e- 003 2.4000e- 003 2.4000e- 003 2.4000e- 003 0.0000 8.6043 8.6043 2.7800e- 003 0.0000 8.6627 Total 3.0700e- 003 0.0861 0.0585 1.0000e- 004 0.0203 2.4000e- 003 0.0227 0.0112 2.4000e- 003 0.0136 0.0000 8.6043 8.6043 2.7800e- 003 0.0000 8.6627 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 84 of 109 3.25 Phase VI – Site Preparation - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.0000e- 005 1.2000e- 004 1.0100e- 003 0.0000 4.3000e- 004 0.0000 4.4000e- 004 1.2000e- 004 0.0000 1.2000e- 004 0.0000 0.2833 0.2833 1.0000e- 005 0.0000 0.2835 Total 7.0000e- 005 1.2000e- 004 1.0100e- 003 0.0000 4.3000e- 004 0.0000 4.4000e- 004 1.2000e- 004 0.0000 1.2000e- 004 0.0000 0.2833 0.2833 1.0000e- 005 0.0000 0.2835 Mitigated Construction Off-Site 3.26 Phase VI – Grading - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0651 0.0000 0.0651 0.0270 0.0000 0.0270 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0225 0.2045 0.2351 4.6000e- 004 8.9000e- 003 8.9000e- 003 8.1900e- 003 8.1900e- 003 0.0000 40.7032 40.7032 0.0132 0.0000 40.9797 Total 0.0225 0.2045 0.2351 4.6000e- 004 0.0651 8.9000e- 003 0.0740 0.0270 8.1900e- 003 0.0352 0.0000 40.7032 40.7032 0.0132 0.0000 40.9797 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 85 of 109 3.26 Phase VI – Grading - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e- 004 4.0000e- 004 3.3600e- 003 2.0000e- 005 1.4400e- 003 1.0000e- 005 1.4500e- 003 3.8000e- 004 1.0000e- 005 3.9000e- 004 0.0000 0.9443 0.9443 4.0000e- 005 0.0000 0.9451 Total 2.4000e- 004 4.0000e- 004 3.3600e- 003 2.0000e- 005 1.4400e- 003 1.0000e- 005 1.4500e- 003 3.8000e- 004 1.0000e- 005 3.9000e- 004 0.0000 0.9443 0.9443 4.0000e- 005 0.0000 0.9451 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0293 0.0000 0.0293 0.0121 0.0000 0.0121 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0142 0.3821 0.2846 4.6000e- 004 0.0103 0.0103 0.0103 0.0103 0.0000 40.7032 40.7032 0.0132 0.0000 40.9796 Total 0.0142 0.3821 0.2846 4.6000e- 004 0.0293 0.0103 0.0396 0.0121 0.0103 0.0225 0.0000 40.7032 40.7032 0.0132 0.0000 40.9796 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 86 of 109 3.26 Phase VI – Grading - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e- 004 4.0000e- 004 3.3600e- 003 2.0000e- 005 1.4400e- 003 1.0000e- 005 1.4500e- 003 3.8000e- 004 1.0000e- 005 3.9000e- 004 0.0000 0.9443 0.9443 4.0000e- 005 0.0000 0.9451 Total 2.4000e- 004 4.0000e- 004 3.3600e- 003 2.0000e- 005 1.4400e- 003 1.0000e- 005 1.4500e- 003 3.8000e- 004 1.0000e- 005 3.9000e- 004 0.0000 0.9443 0.9443 4.0000e- 005 0.0000 0.9451 Mitigated Construction Off-Site 3.27 Phase VI – Building Construction - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1021 0.9307 1.2039 2.0100e- 003 0.0394 0.0394 0.0370 0.0370 0.0000 173.2195 173.2195 0.0407 0.0000 174.0732 Total 0.1021 0.9307 1.2039 2.0100e- 003 0.0394 0.0394 0.0370 0.0370 0.0000 173.2195 173.2195 0.0407 0.0000 174.0732 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 87 of 109 3.27 Phase VI – Building Construction - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2731 1.0876 3.1408 5.9600e- 003 0.1588 0.0208 0.1795 0.0455 0.0191 0.0646 0.0000 505.6291 505.6291 3.9000e- 003 0.0000 505.7110 Worker 0.1662 0.2756 2.3413 0.0113 1.0058 6.8600e- 003 1.0127 0.2673 6.3600e- 003 0.2737 0.0000 657.7247 657.7247 0.0249 0.0000 658.2480 Total 0.4392 1.3632 5.4820 0.0172 1.1646 0.0276 1.1922 0.3128 0.0255 0.3382 0.0000 1,163.353 8 1,163.353 8 0.0288 0.0000 1,163.959 0 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0809 1.7596 1.3362 2.0100e- 003 0.0676 0.0676 0.0676 0.0676 0.0000 173.2193 173.2193 0.0407 0.0000 174.0730 Total 0.0809 1.7596 1.3362 2.0100e- 003 0.0676 0.0676 0.0676 0.0676 0.0000 173.2193 173.2193 0.0407 0.0000 174.0730 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 88 of 109 3.27 Phase VI – Building Construction - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2731 1.0876 3.1408 5.9600e- 003 0.1588 0.0208 0.1795 0.0455 0.0191 0.0646 0.0000 505.6291 505.6291 3.9000e- 003 0.0000 505.7110 Worker 0.1662 0.2756 2.3413 0.0113 1.0058 6.8600e- 003 1.0127 0.2673 6.3600e- 003 0.2737 0.0000 657.7247 657.7247 0.0249 0.0000 658.2480 Total 0.4392 1.3632 5.4820 0.0172 1.1646 0.0276 1.1922 0.3128 0.0255 0.3382 0.0000 1,163.353 8 1,163.353 8 0.0288 0.0000 1,163.959 0 Mitigated Construction Off-Site 3.28 Phase VI – Architectural Coating - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 7.4455 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.5400e- 003 0.0103 0.0163 3.0000e- 005 4.6000e- 004 4.6000e- 004 4.6000e- 004 4.6000e- 004 0.0000 2.2979 2.2979 1.3000e- 004 0.0000 2.3006 Total 7.4471 0.0103 0.0163 3.0000e- 005 4.6000e- 004 4.6000e- 004 4.6000e- 004 4.6000e- 004 0.0000 2.2979 2.2979 1.3000e- 004 0.0000 2.3006 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 89 of 109 3.28 Phase VI – Architectural Coating - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.9900e- 003 6.6200e- 003 0.0563 2.7000e- 004 0.0242 1.6000e- 004 0.0243 6.4200e- 003 1.5000e- 004 6.5800e- 003 0.0000 15.8081 15.8081 6.0000e- 004 0.0000 15.8206 Total 3.9900e- 003 6.6200e- 003 0.0563 2.7000e- 004 0.0242 1.6000e- 004 0.0243 6.4200e- 003 1.5000e- 004 6.5800e- 003 0.0000 15.8081 15.8081 6.0000e- 004 0.0000 15.8206 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 7.4455 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.0300e- 003 0.0212 0.0165 3.0000e- 005 8.6000e- 004 8.6000e- 004 8.6000e- 004 8.6000e- 004 0.0000 2.2979 2.2979 1.3000e- 004 0.0000 2.3006 Total 7.4465 0.0212 0.0165 3.0000e- 005 8.6000e- 004 8.6000e- 004 8.6000e- 004 8.6000e- 004 0.0000 2.2979 2.2979 1.3000e- 004 0.0000 2.3006 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 90 of 109 3.28 Phase VI – Architectural Coating - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.9900e- 003 6.6200e- 003 0.0563 2.7000e- 004 0.0242 1.6000e- 004 0.0243 6.4200e- 003 1.5000e- 004 6.5800e- 003 0.0000 15.8081 15.8081 6.0000e- 004 0.0000 15.8206 Total 3.9900e- 003 6.6200e- 003 0.0563 2.7000e- 004 0.0242 1.6000e- 004 0.0243 6.4200e- 003 1.5000e- 004 6.5800e- 003 0.0000 15.8081 15.8081 6.0000e- 004 0.0000 15.8206 Mitigated Construction Off-Site 3.29 Phase VI – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 2.2400e- 003 0.0211 0.0357 6.0000e- 005 1.0300e- 003 1.0300e- 003 9.5000e- 004 9.5000e- 004 0.0000 4.8983 4.8983 1.5800e- 003 0.0000 4.9316 Paving 0.0287 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0309 0.0211 0.0357 6.0000e- 005 1.0300e- 003 1.0300e- 003 9.5000e- 004 9.5000e- 004 0.0000 4.8983 4.8983 1.5800e- 003 0.0000 4.9316 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 91 of 109 3.29 Phase VI – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.0000e- 005 1.0000e- 004 8.4000e- 004 0.0000 3.6000e- 004 0.0000 3.6000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.2361 0.2361 1.0000e- 005 0.0000 0.2363 Total 6.0000e- 005 1.0000e- 004 8.4000e- 004 0.0000 3.6000e- 004 0.0000 3.6000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.2361 0.2361 1.0000e- 005 0.0000 0.2363 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 2.2800e- 003 0.0493 0.0423 6.0000e- 005 1.6400e- 003 1.6400e- 003 1.6400e- 003 1.6400e- 003 0.0000 4.8983 4.8983 1.5800e- 003 0.0000 4.9316 Paving 0.0287 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0310 0.0493 0.0423 6.0000e- 005 1.6400e- 003 1.6400e- 003 1.6400e- 003 1.6400e- 003 0.0000 4.8983 4.8983 1.5800e- 003 0.0000 4.9316 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 92 of 109 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile Increase Density Improve Walkability Design Increase Transit Accessibility Improve Pedestrian Network Expand Transit Network 3.29 Phase VI – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.0000e- 005 1.0000e- 004 8.4000e- 004 0.0000 3.6000e- 004 0.0000 3.6000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.2361 0.2361 1.0000e- 005 0.0000 0.2363 Total 6.0000e- 005 1.0000e- 004 8.4000e- 004 0.0000 3.6000e- 004 0.0000 3.6000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.2361 0.2361 1.0000e- 005 0.0000 0.2363 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 93 of 109 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 2.6112 4.6995 21.8951 0.0722 5.0236 0.0906 5.1143 1.3463 0.0837 1.4300 0.0000 4,774.765 5 4,774.765 5 0.1341 0.0000 4,777.581 2 Unmitigated 2.7570 5.4102 24.5521 0.0863 6.0518 0.1066 6.1584 1.6218 0.0984 1.7202 0.0000 5,711.615 3 5,711.615 3 0.1583 0.0000 5,714.938 8 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Mid Rise 823.75 895.00 758.75 2,095,877 1,739,787 City Park 25.44 25.44 25.44 51,701 42,917 Condo/Townhouse 1,219.15 1,324.60 1122.95 3,101,898 2,574,885 Other Asphalt Surfaces 0.00 0.00 0.00 Parking Lot 0.00 0.00 0.00 Regional Shopping Center 644.10 749.55 378.60 897,003 744,602 Single Family Housing 1,004.85 1,058.40 920.85 2,542,828 2,110,801 Single Family Housing 2,918.85 3,074.40 2674.85 7,386,310 6,131,374 Total 6,636.14 7,127.39 5,881.44 16,075,617 13,344,365 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 94 of 109 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Mid Rise 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 City Park 13.00 5.00 5.00 33.00 48.00 19.00 66 28 6 Condo/Townhouse 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 Other Asphalt Surfaces 13.00 5.00 5.00 0.00 0.00 0.00 0 0 0 Parking Lot 13.00 5.00 5.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 13.00 5.00 5.00 16.30 64.70 19.00 54 35 11 Single Family Housing 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 Single Family Housing 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 5.0 Energy Detail 5.1 Mitigation Measures Energy Exceed Title 24 Install High Efficiency Lighting Percent of Electricity Use Generated with Renewable Energy LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH 0.457871 0.042296 0.214250 0.146969 0.067525 0.009931 0.017760 0.024978 0.002423 0.001427 0.009102 0.000742 0.004726 Historical Energy Use: N CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 95 of 109 4.4 Fleet Mix ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Electricity Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 966.1664 966.1664 0.0437 9.0400e- 003 969.8859 Electricity Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 1,424.055 7 1,424.055 7 0.0644 0.0133 1,429.537 9 NaturalGas Mitigated 0.0816 0.6975 0.2974 4.4500e- 003 0.0564 0.0564 0.0564 0.0564 0.0000 807.6453 807.6453 0.0155 0.0148 812.5605 NaturalGas Unmitigated 0.1031 0.8812 0.3758 5.6200e- 003 0.0712 0.0712 0.0712 0.0712 0.0000 1,020.429 1 1,020.429 1 0.0196 0.0187 1,026.639 3 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 96 of 109 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Mid Rise 1.01595e +006 5.4800e- 003 0.0468 0.0199 3.0000e- 004 3.7800e- 003 3.7800e- 003 3.7800e- 003 3.7800e- 003 0.0000 54.2151 54.2151 1.0400e- 003 9.9000e- 004 54.5450 City Park 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 3.6028e +006 0.0194 0.1660 0.0706 1.0600e- 003 0.0134 0.0134 0.0134 0.0134 0.0000 192.2593 192.2593 3.6800e- 003 3.5200e- 003 193.4293 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 37350 2.0000e- 004 1.8300e- 003 1.5400e- 003 1.0000e- 005 1.4000e- 004 1.4000e- 004 1.4000e- 004 1.4000e- 004 0.0000 1.9931 1.9931 4.0000e- 005 4.0000e- 005 2.0053 Single Family Housing 1.07613e +007 0.0580 0.4959 0.2110 3.1700e- 003 0.0401 0.0401 0.0401 0.0401 0.0000 574.2641 574.2641 0.0110 0.0105 577.7590 Single Family Housing 3.70471e +006 0.0200 0.1707 0.0726 1.0900e- 003 0.0138 0.0138 0.0138 0.0138 0.0000 197.6975 197.6975 3.7900e- 003 3.6200e- 003 198.9006 Total 0.1031 0.8812 0.3758 5.6300e- 003 0.0712 0.0712 0.0712 0.0712 0.0000 1,020.429 1 1,020.429 1 0.0196 0.0187 1,026.639 3 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 97 of 109 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Mid Rise 816214 4.4000e- 003 0.0376 0.0160 2.4000e- 004 3.0400e- 003 3.0400e- 003 3.0400e- 003 3.0400e- 003 0.0000 43.5563 43.5563 8.3000e- 004 8.0000e- 004 43.8214 City Park 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 2.83859e +006 0.0153 0.1308 0.0557 8.3000e- 004 0.0106 0.0106 0.0106 0.0106 0.0000 151.4778 151.4778 2.9000e- 003 2.7800e- 003 152.3996 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 28012.5 1.5000e- 004 1.3700e- 003 1.1500e- 003 1.0000e- 005 1.0000e- 004 1.0000e- 004 1.0000e- 004 1.0000e- 004 0.0000 1.4949 1.4949 3.0000e- 005 3.0000e- 005 1.5040 Single Family Housing 2.9328e +006 0.0158 0.1351 0.0575 8.6000e- 004 0.0109 0.0109 0.0109 0.0109 0.0000 156.5054 156.5054 3.0000e- 003 2.8700e- 003 157.4579 Single Family Housing 8.51909e +006 0.0459 0.3926 0.1670 2.5100e- 003 0.0317 0.0317 0.0317 0.0317 0.0000 454.6110 454.6110 8.7100e- 003 8.3300e- 003 457.3777 Total 0.0816 0.6975 0.2974 4.4500e- 003 0.0564 0.0564 0.0564 0.0564 0.0000 807.6452 807.6452 0.0155 0.0148 812.5605 Mitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 98 of 109 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr Apartments Mid Rise 440820 128.2396 5.8000e- 003 1.2000e- 003 128.7333 City Park 0 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 797572 232.0228 0.0105 2.1700e- 003 232.9161 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 Parking Lot 581504 169.1662 7.6500e- 003 1.5800e- 003 169.8174 Regional Shopping Center 175350 51.0113 2.3100e- 003 4.8000e- 004 51.2077 Single Family Housing 2.15725e +006 627.5678 0.0284 5.8700e- 003 629.9837 Single Family Housing 742659 216.0479 9.7700e- 003 2.0200e- 003 216.8797 Total 1,424.055 7 0.0644 0.0133 1,429.537 9 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 99 of 109 6.1 Mitigation Measures Area 6.0 Area Detail 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr Apartments Mid Rise 307927 89.5796 4.0500e- 003 8.4000e- 004 89.9244 City Park 0 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 557062 162.0558 7.3300e- 003 1.5200e- 003 162.6796 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 Parking Lot 327096 95.1560 4.3000e- 003 8.9000e- 004 95.5223 Regional Shopping Center 106172 30.8866 1.4000e- 003 2.9000e- 004 31.0055 Single Family Housing 1.50485e +006 437.7780 0.0198 4.1000e- 003 439.4633 Single Family Housing 518063 150.7105 6.8100e- 003 1.4100e- 003 151.2907 Total 966.1664 0.0437 9.0500e- 003 969.8859 Mitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 100 of 109 Use Low VOC Paint - Residential Interior Use Low VOC Paint - Residential Exterior Use Low VOC Paint - Non-Residential Interior Use Low VOC Paint - Non-Residential Exterior No Hearths Installed Use Low VOC Cleaning Supplies ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 10.8935 0.1130 9.8036 5.2000e- 004 0.0545 0.0545 0.0545 0.0545 0.0000 16.0654 16.0654 0.0154 0.0000 16.3887 Unmitigated 11.6898 0.1130 9.8036 5.2000e- 004 0.0545 0.0545 0.0545 0.0545 0.0000 16.0654 16.0654 0.0154 0.0000 16.3887 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 101 of 109 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.7446 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 10.6503 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.2950 0.1130 9.8036 5.2000e- 004 0.0545 0.0545 0.0545 0.0545 0.0000 16.0654 16.0654 0.0154 0.0000 16.3887 Total 11.6898 0.1130 9.8036 5.2000e- 004 0.0545 0.0545 0.0545 0.0545 0.0000 16.0654 16.0654 0.0154 0.0000 16.3887 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 102 of 109 Use Reclaimed Water Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 7.1 Mitigation Measures Water 7.0 Water Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.7446 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 9.8540 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.2950 0.1130 9.8036 5.2000e- 004 0.0545 0.0545 0.0545 0.0545 0.0000 16.0654 16.0654 0.0154 0.0000 16.3887 Total 10.8935 0.1130 9.8036 5.2000e- 004 0.0545 0.0545 0.0545 0.0545 0.0000 16.0654 16.0654 0.0154 0.0000 16.3887 Mitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 103 of 109 Total CO2 CH4 N2O CO2e Category MT/yr Mitigated 72.1923 0.8107 0.0197 95.3076 Unmitigated 89.3871 1.0135 0.0246 118.2936 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr Apartments Mid Rise 4.4723 / 2.85934 11.3702 0.1462 3.5300e- 003 15.5355 City Park 0 / 10.4272 10.6169 4.8000e- 004 1.0000e- 004 10.6578 Condo/Townhous e 6.61902 / 4.23183 16.8279 0.2164 5.2300e- 003 22.9926 Other Asphalt Surfaces 0 / 0 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 / 0 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0.909125 / 0.557206 2.2868 0.0297 7.2000e- 004 3.1335 Single Family Housing 18.9924 / 12.1427 48.2854 0.6208 0.0150 65.9742 Total 89.3871 1.0135 0.0246 118.2936 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 104 of 109 8.1 Mitigation Measures Waste 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr Apartments Mid Rise 3.57784 / 2.35091 9.1607 0.1169 2.8200e- 003 12.4914 City Park 0 / 8.57313 8.7291 3.9000e- 004 8.0000e- 005 8.7627 Condo/Townhous e 5.29522 / 3.47935 13.5579 0.1731 4.1800e- 003 18.4874 Other Asphalt Surfaces 0 / 0 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 / 0 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0.7273 / 0.458127 1.8421 0.0238 5.7000e- 004 2.5191 Single Family Housing 15.1939 / 9.98355 38.9026 0.4966 0.0120 53.0471 Total 72.1923 0.8107 0.0196 95.3076 Mitigated 8.0 Waste Detail CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 105 of 109 Total CO2 CH4 N2O CO2e MT/yr Mitigated 211.2202 12.4828 0.0000 473.3581 Unmitigated 211.2202 12.4828 0.0000 473.3581 Category/Year CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 106 of 109 8.2 Waste by Land Use Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr Apartments Mid Rise 121.13 24.5883 1.4531 0.0000 55.1040 City Park 0 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 179.28 36.3922 2.1507 0.0000 81.5573 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 6.84 1.3885 0.0821 0.0000 3.1116 Single Family Housing 733.29 148.8512 8.7969 0.0000 333.5852 Total 211.2202 12.4828 0.0000 473.3581 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 107 of 109 10.0 Vegetation 8.2 Waste by Land Use Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr Apartments Mid Rise 121.13 24.5883 1.4531 0.0000 55.1040 City Park 0 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 179.28 36.3922 2.1507 0.0000 81.5573 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 6.84 1.3885 0.0821 0.0000 3.1116 Single Family Housing 733.29 148.8512 8.7969 0.0000 333.5852 Total 211.2202 12.4828 0.0000 473.3581 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 108 of 109 Total CO2 CH4 N2O CO2e Category MT Unmitigated 371.7000 0.0000 0.0000 371.7000 10.2 Net New Trees Number of Trees Total CO2 CH4 N2O CO2e MT Miscellaneous 525 371.7000 0.0000 0.0000 371.7000 Total 371.7000 0.0000 0.0000 371.7000 Species Class CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:31 PMPage 109 of 109 San Luis Obispo County, Mitigation Report Avila Ranch Development Project Construction Mitigation Summary Phase ROG NOx CO SO2 Exhaust PM10 Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Percent Reduction Offsite Construction – Grading 0.64 0.11 0.16 0.00 0.49 0.45 0.00 0.00 0.00 0.00 0.00 0.00 Offsite Construction – Paving 0.46 -0.02 0.00 0.00 0.39 0.33 0.00 0.00 0.00 0.00 0.00 0.00 Offsite Construction – Site Preparation 0.55 -0.05 0.13 0.00 0.37 0.33 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Architectural Coating 0.00 -0.46 0.00 0.00 -0.27 -0.28 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Building Construction 0.32 -0.38 -0.05 0.00 0.01 -0.04 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Paving 0.02 -0.97 -0.18 0.00 -0.31 -0.42 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Site Preparation 0.24 0.05 0.06 0.00 0.39 0.35 0.00 0.00 0.00 0.00 0.00 0.00 Phase I, III, IV – Grading 0.52 -0.12 -0.04 0.00 0.32 0.26 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Architectural Coating 0.00 -0.50 0.00 0.00 -0.36 -0.37 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Building Construction 0.06 -0.26 -0.01 0.00 -0.19 -0.25 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Grading 0.46 -0.46 -0.11 0.00 0.11 0.04 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Paving 0.02 -0.97 -0.18 0.00 -0.31 -0.42 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Site Preparation 0.59 -0.15 0.18 0.00 0.31 0.25 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Architectural Coating 0.00 -0.59 0.00 0.00 -0.61 -0.62 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Building Construction 0.04 -0.32 -0.02 0.00 -0.35 -0.41 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Grading 0.43 -0.58 -0.13 0.00 0.03 -0.05 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Paving 0.00 -1.33 -0.18 0.00 -0.59 -0.73 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:36 PMPage 1 of 13 Phase III – Site Preparation 0.56 -0.25 0.15 0.00 0.23 0.16 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Architectural Coating 0.00 -0.64 0.00 0.00 -0.65 -0.66 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Building Construction 0.04 -0.36 -0.02 0.00 -0.42 -0.49 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Grading 0.37 -0.87 -0.21 0.00 -0.16 -0.26 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Paving 0.00 -1.33 -0.18 0.00 -0.59 -0.73 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Site Preparation 0.50 -0.46 0.06 0.00 0.07 -0.01 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Architectural Coating 0.00 -0.63 0.00 0.00 -0.62 -0.63 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Building Construction 0.04 -0.36 -0.02 0.00 -0.42 -0.49 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Grading 0.37 -0.87 -0.21 0.00 -0.16 -0.26 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Paving -0.01 -1.33 -0.18 0.00 -0.59 -0.73 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Site Preparation 0.50 -0.46 0.06 0.00 0.07 -0.01 0.00 0.00 0.00 0.00 0.00 0.00 OFFROAD Equipment Mitigation CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:36 PMPage 2 of 13 Equipment Type Fuel Type Tier Number Mitigated Total Number of Equipment DPF Oxidation Catalyst Air Compressors Diesel Tier 2 6 6 No Change 0.00 Excavators Diesel Tier 2 17 17 No Change 0.00 Concrete/Industrial Saws Diesel Tier 2 1 1 No Change 0.00 Cranes Diesel Tier 2 6 6 No Change 0.00 Forklifts Diesel Tier 2 18 18 No Change 0.00 Graders Diesel Tier 2 7 7 No Change 0.00 Pavers Diesel Tier 2 14 14 No Change 0.00 Rollers Diesel Tier 2 14 14 No Change 0.00 Rubber Tired Dozers Diesel Tier 2 26 26 No Change 0.00 Tractors/Loaders/Backhoes Diesel Tier 2 54 54 No Change 0.00 Generator Sets Diesel Tier 2 6 6 No Change 0.00 Paving Equipment Diesel Tier 2 14 14 No Change 0.00 Scrapers Diesel Tier 2 14 14 No Change 0.00 Welders Diesel Tier 2 6 6 No Change 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:36 PMPage 3 of 13 Equipment Type ROG NOx CO SO2 Exhaust PM10 Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Unmitigated tons/yr Unmitigated mt/yr Air Compressors 8.54000E-002 5.89570E-001 7.38540E-001 1.21000E-003 3.49300E-002 3.49300E-002 0.00000E+000 1.03790E+002 1.03790E+002 6.90000E-003 0.00000E+000 1.03935E+002 Concrete/Industria l Saws 1.38600E-002 1.07660E-001 1.11070E-001 1.90000E-004 6.88000E-003 6.88000E-003 0.00000E+000 1.61297E+001 1.61297E+001 1.14000E-003 0.00000E+000 1.61536E+001 Cranes 2.83440E-001 3.06280E+000 1.48387E+000 4.68000E-003 1.27880E-001 1.17650E-001 0.00000E+000 4.11191E+002 4.11191E+002 1.32990E-001 0.00000E+000 4.13984E+002 Excavators 1.47160E-001 1.39526E+000 2.11111E+000 3.34000E-003 6.75900E-002 6.21800E-002 0.00000E+000 2.96547E+002 2.96547E+002 9.49400E-002 0.00000E+000 2.98540E+002 Forklifts 2.90750E-001 2.70331E+000 3.25704E+000 4.34000E-003 1.66130E-001 1.52840E-001 0.00000E+000 3.81723E+002 3.81723E+002 1.23460E-001 0.00000E+000 3.84316E+002 Generator Sets 2.85870E-001 2.54779E+000 3.47699E+000 6.23000E-003 1.16920E-001 1.16920E-001 0.00000E+000 5.35534E+002 5.35534E+002 2.27900E-002 0.00000E+000 5.36013E+002 Graders 1.67950E-001 1.59457E+000 1.21024E+000 1.68000E-003 8.87500E-002 8.16500E-002 0.00000E+000 1.48918E+002 1.48918E+002 4.77700E-002 0.00000E+000 1.49921E+002 Pavers 5.90300E-002 6.14010E-001 7.13000E-001 1.16000E-003 2.96600E-002 2.72900E-002 0.00000E+000 1.02061E+002 1.02061E+002 3.28800E-002 0.00000E+000 1.02751E+002 Paving Equipment 4.81800E-002 4.81710E-001 6.39790E-001 1.03000E-003 2.39500E-002 2.20300E-002 0.00000E+000 9.05860E+001 9.05860E+001 2.91800E-002 0.00000E+000 9.11988E+001 Rollers 4.85800E-002 4.90890E-001 4.81540E-001 6.70000E-004 3.00100E-002 2.76100E-002 0.00000E+000 5.92395E+001 5.92395E+001 1.90800E-002 0.00000E+000 5.96403E+001 Rubber Tired Dozers 5.66270E-001 5.85498E+000 4.66927E+000 5.59000E-003 2.67920E-001 2.46490E-001 0.00000E+000 4.96972E+002 4.96972E+002 1.58960E-001 0.00000E+000 5.00310E+002 Scrapers 4.81210E-001 5.44762E+000 3.69136E+000 8.07000E-003 2.13460E-001 1.96380E-001 0.00000E+000 7.14404E+002 7.14404E+002 2.29160E-001 0.00000E+000 7.19216E+002 Tractors/Loaders/ Backhoes 5.67240E-001 5.72538E+000 7.78738E+000 1.07900E-002 3.00880E-001 2.76810E-001 0.00000E+000 9.50203E+002 9.50203E+002 3.06380E-001 0.00000E+000 9.56637E+002 Welders 2.38520E-001 1.33335E+000 1.59013E+000 2.42000E-003 5.07300E-002 5.07300E-002 0.00000E+000 1.78339E+002 1.78339E+002 1.93800E-002 0.00000E+000 1.78746E+002 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:36 PMPage 4 of 13 Equipment Type ROG NOx CO SO2 Exhaust PM10 Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Mitigated tons/yr Mitigated mt/yr Air Compressors 4.63000E-002 9.56260E-001 7.44870E-001 1.21000E-003 3.86500E-002 3.86500E-002 0.00000E+000 1.03790E+002 1.03790E+002 6.90000E-003 0.00000E+000 1.03934E+002 Concrete/Industrial Saws 7.20000E-003 1.48610E-001 1.15760E-001 1.90000E-004 6.01000E-003 6.01000E-003 0.00000E+000 1.61297E+001 1.61297E+001 1.14000E-003 0.00000E+000 1.61535E+001 Cranes 1.15000E-001 3.97709E+000 2.49167E+000 4.68000E-003 8.43300E-002 8.43300E-002 0.00000E+000 4.11190E+002 4.11190E+002 1.32990E-001 0.00000E+000 4.13983E+002 Excavators 1.30170E-001 2.85685E+000 2.53486E+000 3.34000E-003 8.76900E-002 8.76900E-002 0.00000E+000 2.96546E+002 2.96546E+002 9.49400E-002 0.00000E+000 2.98540E+002 Forklifts 2.05240E-001 4.23875E+000 3.30176E+000 4.34000E-003 1.71330E-001 1.71330E-001 0.00000E+000 3.81723E+002 3.81723E+002 1.23460E-001 0.00000E+000 3.84315E+002 Generator Sets 2.38910E-001 4.93410E+000 3.84340E+000 6.23000E-003 1.99440E-001 1.99440E-001 0.00000E+000 5.35533E+002 5.35533E+002 2.27900E-002 0.00000E+000 5.36012E+002 Graders 6.46700E-002 1.41925E+000 1.25929E+000 1.68000E-003 4.35600E-002 4.35600E-002 0.00000E+000 1.48918E+002 1.48918E+002 4.77700E-002 0.00000E+000 1.49921E+002 Pavers 4.50400E-002 9.88460E-001 8.77050E-001 1.16000E-003 3.03400E-002 3.03400E-002 0.00000E+000 1.02061E+002 1.02061E+002 3.28800E-002 0.00000E+000 1.02751E+002 Paving Equipment 4.01500E-002 8.81140E-001 7.81830E-001 1.03000E-003 2.70500E-002 2.70500E-002 0.00000E+000 9.05859E+001 9.05859E+001 2.91800E-002 0.00000E+000 9.11987E+001 Rollers 3.15700E-002 6.51970E-001 5.07850E-001 6.70000E-004 2.63500E-002 2.63500E-002 0.00000E+000 5.92395E+001 5.92395E+001 1.90800E-002 0.00000E+000 5.96402E+001 Rubber Tired Dozers 1.35570E-001 4.68848E+000 2.93736E+000 5.59000E-003 9.94200E-002 9.94200E-002 0.00000E+000 4.96971E+002 4.96971E+002 1.58960E-001 0.00000E+000 5.00309E+002 Scrapers 1.98400E-001 6.26626E+000 4.29876E+000 8.07000E-003 1.45500E-001 1.45500E-001 0.00000E+000 7.14403E+002 7.14403E+002 2.29160E-001 0.00000E+000 7.19215E+002 Tractors/Loaders/Ba ckhoes 5.04200E-001 1.04128E+001 8.11101E+000 1.07900E-002 4.20900E-001 4.20900E-001 0.00000E+000 9.50202E+002 9.50202E+002 3.06380E-001 0.00000E+000 9.56635E+002 Welders 1.00320E-001 1.60160E+000 1.41826E+000 2.42000E-003 9.68600E-002 9.68600E-002 0.00000E+000 1.78339E+002 1.78339E+002 1.93800E-002 0.00000E+000 1.78746E+002 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:36 PMPage 5 of 13 Fugitive Dust Mitigation No Soil Stabilizer for unpaved Roads PM10 Reduction 0.00 PM2.5 Reduction 0.00 No Replace Ground Cover of Area Disturbed PM10 Reduction 0.00 PM2.5 Reduction 0.00 Yes Water Exposed Area PM10 Reduction 55.00 PM2.5 Reduction 55.00 Frequency (per day) 2.00 Equipment Type ROG NOx CO SO2 Exhaust PM10 Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Percent Reduction Air Compressors 4.57845E-001 -6.21962E-001 -8.57096E-003 0.00000E+000 -1.06499E-001 -1.06499E-001 0.00000E+000 1.15618E-006 1.15618E-006 0.00000E+000 0.00000E+000 1.15457E-006 Concrete/Industrial Saws 4.80519E-001 -3.80364E-001 -4.22256E-002 0.00000E+000 1.26453E-001 1.26453E-001 0.00000E+000 1.23995E-006 1.23995E-006 0.00000E+000 0.00000E+000 1.23812E-006 Cranes 5.94270E-001 -2.98514E-001 -6.79170E-001 0.00000E+000 3.40554E-001 2.83213E-001 0.00000E+000 1.19166E-006 1.19166E-006 0.00000E+000 0.00000E+000 1.18362E-006 Excavators 1.15453E-001 -1.04754E+000 -2.00724E-001 0.00000E+000 -2.97381E-001 -4.10261E-001 0.00000E+000 1.18025E-006 1.18025E-006 0.00000E+000 0.00000E+000 1.20587E-006 Forklifts 2.94101E-001 -5.67985E-001 -1.37303E-002 0.00000E+000 -3.13008E-002 -1.20976E-001 0.00000E+000 1.17887E-006 1.17887E-006 0.00000E+000 0.00000E+000 1.19693E-006 Generator Sets 1.64270E-001 -9.36620E-001 -1.05381E-001 0.00000E+000 -7.05782E-001 -7.05782E-001 0.00000E+000 1.17640E-006 1.17640E-006 0.00000E+000 0.00000E+000 1.19400E-006 Graders 6.14945E-001 1.09948E-001 -4.05292E-002 0.00000E+000 5.09183E-001 4.66503E-001 0.00000E+000 1.20872E-006 1.20872E-006 0.00000E+000 0.00000E+000 1.20063E-006 Pavers 2.36998E-001 -6.09843E-001 -2.30084E-001 0.00000E+000 -2.29265E-002 -1.11763E-001 0.00000E+000 1.17577E-006 1.17577E-006 0.00000E+000 0.00000E+000 1.16787E-006 Paving Equipment 1.66667E-001 -8.29192E-001 -2.22010E-001 0.00000E+000 -1.29436E-001 -2.27871E-001 0.00000E+000 1.21432E-006 1.21432E-006 0.00000E+000 0.00000E+000 1.20616E-006 Rollers 3.50144E-001 -3.28139E-001 -5.46372E-002 0.00000E+000 1.21959E-001 4.56356E-002 0.00000E+000 1.18164E-006 1.18164E-006 0.00000E+000 0.00000E+000 1.34138E-006 Rubber Tired Dozers 7.60591E-001 1.99232E-001 3.70917E-001 0.00000E+000 6.28919E-001 5.96657E-001 0.00000E+000 1.18719E-006 1.18719E-006 0.00000E+000 0.00000E+000 1.19926E-006 Scrapers 5.87706E-001 -1.50275E-001 -1.64546E-001 0.00000E+000 3.18373E-001 2.59090E-001 0.00000E+000 1.18980E-006 1.18980E-006 0.00000E+000 0.00000E+000 1.18184E-006 Tractors/Loaders/Ba ckhoes 1.11135E-001 -8.18705E-001 -4.15583E-002 0.00000E+000 -3.98897E-001 -5.20538E-001 0.00000E+000 1.18922E-006 1.18922E-006 0.00000E+000 0.00000E+000 1.19168E-006 Welders 5.79406E-001 -2.01185E-001 1.08086E-001 0.00000E+000 -9.09324E-001 -9.09324E-001 0.00000E+000 1.23361E-006 1.23361E-006 0.00000E+000 0.00000E+000 1.17485E-006 Yes/No Mitigation InputMitigation InputMitigation InputMitigation Measure CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:36 PMPage 6 of 13 No Unpaved Road Mitigation Moisture Content % 0.00 Vehicle Speed (mph) 15.00 Yes Clean Paved Road % PM Reduction 0.00 Unmitigated Mitigated Percent Reduction Phase Source PM10 PM2.5 PM10 PM2.5 PM10 PM2.5 Offsite Construction – Grading Fugitive Dust 1.40 0.77 0.63 0.35 0.55 0.55 Offsite Construction – Grading Roads 0.01 0.00 0.01 0.00 0.00 0.00 Offsite Construction – Paving Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Offsite Construction – Paving Roads 0.00 0.00 0.00 0.00 0.00 0.00 Offsite Construction – Site Preparation Fugitive Dust 0.36 0.20 0.16 0.09 0.55 0.55 Offsite Construction – Site Preparation Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Architectural Coating Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Architectural Coating Roads 0.07 0.02 0.07 0.02 0.00 0.00 Phase I – Building Construction Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Building Construction Roads 0.89 0.24 0.89 0.24 0.00 0.00 Phase I – Paving Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Paving Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Site Preparation Fugitive Dust 0.14 0.07 0.06 0.03 0.55 0.55 Phase I – Site Preparation Roads 0.12 0.03 0.12 0.03 0.00 0.00 Phase I, III, IV – Grading Fugitive Dust 0.54 0.22 0.24 0.10 0.55 0.55 Phase I, III, IV – Grading Roads 0.01 0.00 0.01 0.00 0.00 0.00 Phase II – Architectural Coating Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Architectural Coating Roads 0.03 0.01 0.03 0.01 0.00 0.00 Phase II – Building Construction Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:36 PMPage 7 of 13 Phase II – Building Construction Roads 0.78 0.21 0.78 0.21 0.00 0.00 Phase II – Grading Fugitive Dust 0.13 0.05 0.06 0.02 0.55 0.55 Phase II – Grading Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Paving Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Paving Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Site Preparation Fugitive Dust 0.14 0.07 0.06 0.03 0.55 0.55 Phase II – Site Preparation Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Architectural Coating Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Architectural Coating Roads 0.03 0.01 0.03 0.01 0.00 0.00 Phase III – Building Construction Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Building Construction Roads 2.64 0.71 2.64 0.71 0.00 0.00 Phase III – Grading Fugitive Dust 0.15 0.06 0.07 0.03 0.55 0.55 Phase III – Grading Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Paving Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Paving Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Site Preparation Fugitive Dust 0.18 0.10 0.08 0.04 0.55 0.55 Phase III – Site Preparation Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Architectural Coating Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Architectural Coating Roads 0.02 0.01 0.02 0.01 0.00 0.00 Phase VI – Building Construction Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Building Construction Roads 1.16 0.31 1.16 0.31 0.00 0.00 Phase VI – Grading Fugitive Dust 0.07 0.03 0.03 0.01 0.55 0.55 Phase VI – Grading Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Paving Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:36 PMPage 8 of 13 Operational Percent Reduction Summary Phase VI – Paving Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Site Preparation Fugitive Dust 0.05 0.02 0.02 0.01 0.55 0.55 Phase VI – Site Preparation Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Architectural Coating Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Architectural Coating Roads 0.05 0.01 0.05 0.01 0.00 0.00 Phases IV & V – Building Construction Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Building Construction Roads 4.85 1.30 4.85 1.30 0.00 0.00 Phases IV & V – Grading Fugitive Dust 1.17 0.49 0.53 0.22 0.55 0.55 Phases IV & V – Grading Roads 0.01 0.00 0.01 0.00 0.00 0.00 Phases IV & V – Paving Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Paving Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Site Preparation Fugitive Dust 0.36 0.20 0.16 0.09 0.55 0.55 Phases IV & V – Site Preparation Roads 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:36 PMPage 9 of 13 Category ROG NOx CO SO2 Exhaust PM10 Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Percent Reduction Architectural Coating 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Consumer Products 7.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Electricity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.15 32.15 32.16 32.06 32.15 Hearth 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Landscaping 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Mobile 5.29 13.14 10.82 16.38 14.97 14.96 0.00 16.40 16.40 15.28 0.00 16.40 Natural Gas 20.86 20.85 20.86 20.96 20.83 20.83 0.00 20.85 20.85 20.91 20.80 20.85 Water Indoor 0.00 0.00 0.00 0.00 0.00 0.00 20.00 19.14 19.24 20.01 20.13 19.43 Water Outdoor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Operational Mobile Mitigation Mitigation Selected No Yes No Yes No Yes Category Land Use Land Use Land Use Land Use Land Use Land Use Land Use % Reduction 0.02 0.16 0.00 0.16 0.00 -0.10 0.27 Input Value 1 7.00 0.60 10.00 0.25 Input Value 2 Input Value 3 Measure Increase Diversity Land Use SubTotal Integrate Below Market Rate Housing Increase Transit Accessibility Improve Destination Accessibility Improve Walkability Design Increase Density Project Setting:Urban CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:36 PMPage 10 of 13 Yes No No Neighborhood Enhancements Neighborhood Enhancements Neighborhood Enhancements 0.01 1.00 Project Site Implement NEV Network Provide Traffic Calming Measures Improve Pedestrian Network No No No No Yes No Parking Policy Pricing Transit Improvements Transit Improvements Transit Improvements Transit Improvements Parking Policy Pricing Parking Policy Pricing Parking Policy Pricing Neighborhood Enhancements 0.01 0.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Limit Parking Supply Land Use and Site Enhancement Subtotal Transit Improvements Subtotal Increase Transit Frequency Expand Transit Network Provide BRT System Parking Policy Pricing Subtotal On-street Market Pricing Unbundle Parking Costs Neighborhood Enhancements Subtotal No No No No No No No No Commute Commute Commute Commute Commute Commute Commute Commute Commute 0.00 15.00 0.00 0.00 0.00 7.70 2.00 Transit Subsidy Commute Subtotal Provide Ride Sharing Program Employee Vanpool/Shuttle Market Commute Trip Reduction Option Encourage Telecommuting and Alternative Work Schedules Workplace Parking Charge Implement Employee Parking "Cash Out" Implement Trip Reduction Program CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:36 PMPage 11 of 13 Area Mitigation Measure Implemented Yes Yes Yes No Yes Yes No No Yes No Mitigation Measure No Hearth % Electric Chainsaw % Electric Leafblower % Electric Lawnmower Use Low VOC Paint (Non-residential Exterior) Use Low VOC Paint (Non-residential Interior) Use Low VOC Paint (Residential Exterior) Use Low VOC Paint (Residential Interior) Use Low VOC Cleaning Supplies Only Natural Gas Hearth Input Value 0.00 0.00 0.00 50.00 50.00 50.00 50.00 Energy Mitigation Measures Measure Implemented Yes Yes Yes Mitigation Measure Install High Efficiency Lighting On-site Renewable Exceed Title 24 Input Value 1 25.00 25.00 25.00 Input Value 2 Appliance Type Land Use Subtype % Improvement ClothWasher 30.00 No School Trip 0.00Implement School Bus Program 0.17Total VMT Reduction CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:36 PMPage 12 of 13 DishWasher 15.00 Fan 50.00 Refrigerator 15.00 Water Mitigation Measures Measure Implemented No Yes No Mitigation Measure Use Reclaimed Water Use Grey Water Apply Water Conservation on Strategy Input Value 1 0.00 0.00 0.00 0.00 45.00 Input Value 2 Yes Yes Yes Yes Install low-flow bathroom faucet Install low-flow Toilet Install low-flow Shower Install low-flow Kitchen faucet 32.00 18.00 20.00 20.00 No No No Turf Reduction Water Efficient Landscape Use Water Efficient Irrigation Systems 0.00 6.10 0.00 0.00 Solid Waste Mitigation Mitigation Measures Institute Recycling and Composting Services Percent Reduction in Waste Disposed Input Value CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:36 PMPage 13 of 13 San Luis Obispo County, Summer Avila Ranch Development Project 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Parking Lot 1,652.00 Space 14.87 660,800.00 0 Other Asphalt Surfaces 7.03 Acre 7.03 306,226.80 0 City Park 16.00 Acre 16.00 696,960.00 0 Regional Shopping Center 15.00 1000sqft 3.34 15,000.00 0 Apartments Mid Rise 125.00 Dwelling Unit 4.71 125,000.00 287 Condo/Townhouse 185.00 Dwelling Unit 11.05 185,000.00 424 Single Family Housing 105.00 Dwelling Unit 17.45 189,000.00 240 Single Family Housing 305.00 Dwelling Unit 35.03 549,000.00 698 1.2 Other Project Characteristics Urbanization Climate Zone Urban 4 Wind Speed (m/s)Precipitation Freq (Days)3.2 44 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Pacific Gas & Electric Company 2030Operational Year CO2 Intensity (lb/MWhr) 641.35 0.029CH4 Intensity (lb/MWhr) 0.006N2O Intensity (lb/MWhr) CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 1 of 100 Project Characteristics - Land Use - Taken from project description Construction Phase - taken from updated construction schedule september 29 2016 Architectural Coating - using at least 50 EF paint from mitigation Woodstoves - no woodstoves or fireplaces Area Coating - EF is 50 from mitigation Water And Wastewater - based on city water use factors Solid Waste - from estimated solid waste production under the table based on CalRecycle waste generation factors Sequestration - Construction Off-road Equipment Mitigation - based on mitigation Mobile Land Use Mitigation - Area Mitigation - 50 EF per mitigation Energy Mitigation - Water Mitigation - Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 2 of 100 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblAreaCoating Area_EF_Nonresidential_Exterior 250 50 tblAreaCoating Area_EF_Nonresidential_Interior 250 50 tblAreaCoating Area_EF_Residential_Exterior 250 50 tblAreaCoating Area_EF_Residential_Interior 250 50 tblAreaMitigation UseLowVOCPaintNonresidentialInteriorV alue 250 50 tblAreaMitigation UseLowVOCPaintResidentialExteriorValu e 250 50 tblAreaMitigation UseLowVOCPaintResidentialInteriorValu e 250 50 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 17.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 18.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 7.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 26.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 54.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 3 of 100 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstructionPhase NumDays 3,100.00 665.00 tblConstructionPhase NumDays 120.00 15.00 tblConstructionPhase NumDays 120.00 60.00 tblConstructionPhase NumDays 220.00 46.00 tblConstructionPhase NumDays 310.00 125.00 tblConstructionPhase NumDays 310.00 155.00 tblConstructionPhase NumDays 220.00 15.00 tblConstructionPhase NumDays 220.00 55.00 tblConstructionPhase NumDays 120.00 15.00 tblConstructionPhase NumDays 310.00 30.00 tblConstructionPhase NumDays 3,100.00 100.00 tblConstructionPhase NumDays 220.00 15.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 4 of 100 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 120.00 20.00 tblConstructionPhase NumDays 310.00 35.00 tblConstructionPhase NumDays 3,100.00 340.00 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 120.00 40.00 tblConstructionPhase NumDays 310.00 135.00 tblConstructionPhase NumDays 3,100.00 625.00 tblConstructionPhase NumDays 220.00 35.00 tblConstructionPhase NumDays 220.00 30.00 tblConstructionPhase NumDays 120.00 5.00 tblConstructionPhase NumDays 310.00 15.00 tblConstructionPhase NumDays 3,100.00 150.00 tblConstructionPhase NumDays 220.00 18.00 tblConstructionPhase NumDays 220.00 5.00 tblConstructionPhase PhaseStartDate 9/29/2029 9/30/2029 tblGrading AcresOfGrading 387.50 0.00 tblLandUse LotAcreage 0.34 3.34 tblLandUse LotAcreage 3.29 4.71 tblLandUse LotAcreage 11.56 11.05 tblLandUse LotAcreage 34.09 17.45 tblLandUse LotAcreage 99.03 35.03 tblLandUse Population 358.00 287.00 tblLandUse Population 529.00 424.00 tblLandUse Population 300.00 240.00 tblLandUse Population 872.00 698.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 5 of 100 tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 3.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 4.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 3.00 tblOffRoadEquipment UsageHours 8.00 7.00 tblProjectCharacteristics OperationalYear 2014 2030 tblSequestration NumberOfNewTrees 0.00 525.00 tblSolidWaste SolidWasteGenerationRate 57.50 121.13 tblSolidWaste SolidWasteGenerationRate 1.64 0.00 tblSolidWaste SolidWasteGenerationRate 90.62 179.28 tblSolidWaste SolidWasteGenerationRate 15.75 6.84 tblSolidWaste SolidWasteGenerationRate 373.92 733.29 tblTripsAndVMT VendorTripNumber 0.00 475.00 tblTripsAndVMT VendorTripNumber 475.00 0.00 tblTripsAndVMT WorkerTripNumber 25.00 15.00 tblTripsAndVMT WorkerTripNumber 30.00 18.00 tblTripsAndVMT WorkerTripNumber 35.00 20.00 tblTripsAndVMT WorkerTripNumber 30.00 1,393.00 tblTripsAndVMT WorkerTripNumber 35.00 15.00 tblTripsAndVMT WorkerTripNumber 1,393.00 279.00 tblWater IndoorWaterUseRate 8,144,253.20 4,472,304.06 tblWater IndoorWaterUseRate 12,835,343.05 6,619,019.72 tblWater IndoorWaterUseRate 1,111,087.82 909,125.22 tblWater IndoorWaterUseRate 25,931,302.20 18,992,412.22 tblWater OutdoorWaterUseRate 5,134,420.50 2,859,341.94 tblWater OutdoorWaterUseRate 22,733,464.15 10,427,245.00 tblWater OutdoorWaterUseRate 8,091,846.70 4,231,832.28 tblWater OutdoorWaterUseRate 680,989.31 557,205.78 tblWater OutdoorWaterUseRate 16,347,994.86 12,142,689.78 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 6 of 100 2.0 Emissions Summary tblWoodstoves WoodstoveDayYear 60.00 0.00 tblWoodstoves WoodstoveDayYear 60.00 0.00 tblWoodstoves WoodstoveDayYear 60.00 0.00 tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 7 of 100 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2019 7.6216 81.0550 62.7219 0.0877 18.2442 3.8357 22.0799 9.9779 3.5289 13.5067 0.0000 8,641.801 9 8,641.801 9 2.6936 0.0000 8,698.366 6 2020 12.9107 79.5673 138.0535 0.2906 34.0005 3.0020 36.9426 14.2006 2.7618 16.9305 0.0000 23,852.26 14 23,852.26 14 2.6377 0.0000 23,907.65 31 2021 2.7864 19.8969 28.2473 0.0612 2.7582 1.0668 3.8251 0.7315 1.0085 1.7400 0.0000 5,032.429 1 5,032.429 1 0.7296 0.0000 5,047.750 6 2022 2.5381 17.9049 27.3723 0.0612 2.7582 0.9053 3.6635 0.7315 0.8564 1.5879 0.0000 4,998.288 8 4,998.288 8 0.7199 0.0000 5,013.405 8 2023 745.3390 35.0018 97.0922 0.2632 18.2442 1.5556 19.6361 9.9779 1.4311 11.2584 0.0000 20,696.44 19 20,696.44 19 1.9422 0.0000 20,737.22 76 2024 745.2947 32.4240 93.7608 0.2632 18.2442 1.4247 19.4952 9.9779 1.3107 11.1288 0.0000 20,553.63 47 20,553.63 47 1.9415 0.0000 20,594.40 54 2025 745.2578 31.0940 91.1410 0.2631 18.2442 1.1880 19.2747 9.9779 1.0930 10.9259 0.0000 20,428.38 73 20,428.38 73 1.9407 0.0000 20,469.14 22 2026 7.6006 30.7221 88.7944 0.2631 15.9348 1.1880 16.8249 4.2701 1.0930 5.1006 0.0000 20,319.69 57 20,319.69 57 1.9405 0.0000 20,360.44 68 2027 7.2715 30.3913 85.4501 0.2631 15.9350 0.8911 16.8261 4.2702 0.8314 5.1016 0.0000 20,224.97 25 20,224.97 25 1.0402 0.0000 20,246.81 70 2028 426.0989 30.0935 82.3371 0.2630 15.9352 0.8914 16.8266 4.2703 0.8317 5.1020 0.0000 20,143.54 69 20,143.54 69 1.0300 0.0000 20,165.17 62 2029 827.8999 29.8919 80.8762 0.2630 18.2442 1.1880 19.2747 9.9779 1.0930 10.9259 0.0000 20,073.80 49 20,073.80 49 1.9401 0.0000 20,114.54 64 Total 3,530.619 2 418.0426 875.8467 2.3422 178.5429 17.1364 194.6692 78.3637 15.8393 93.3084 0.0000 184,965.2 649 184,965.2 649 18.5559 0.0000 185,354.9 377 Unmitigated Construction CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 8 of 100 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2019 4.1089 71.9704 55.7179 0.0877 8.3078 2.0338 10.2469 4.5160 2.0337 6.4550 0.0000 8,641.801 9 8,641.801 9 2.6936 0.0000 8,698.366 6 2020 9.6382 75.8987 129.2850 0.2906 24.0640 2.0335 25.8715 8.7387 2.0334 10.5122 0.0000 23,852.26 14 23,852.26 14 2.6377 0.0000 23,907.65 31 2021 1.8665 26.8438 29.5402 0.0612 2.7582 1.0145 3.7728 0.7315 1.0132 1.7448 0.0000 5,032.429 0 5,032.429 0 0.7296 0.0000 5,047.750 6 2022 1.8265 26.7740 28.8791 0.0612 2.7582 1.0145 3.7727 0.7315 1.0132 1.7447 0.0000 4,998.288 8 4,998.288 8 0.7199 0.0000 5,013.405 8 2023 745.2613 51.0108 98.6986 0.2632 15.9346 1.3795 17.1995 4.5160 1.3794 5.5066 0.0000 20,696.44 19 20,696.44 19 1.9422 0.0000 20,737.22 76 2024 745.2279 51.0068 95.4432 0.2632 15.9345 1.3795 17.2007 4.5160 1.3794 5.5077 0.0000 20,553.63 47 20,553.63 47 1.9415 0.0000 20,594.40 54 2025 745.2008 51.0036 92.9048 0.2631 15.9346 1.3795 17.2022 4.5160 1.3794 5.5090 0.0000 20,428.38 73 20,428.38 73 1.9407 0.0000 20,469.14 22 2026 7.3174 51.0009 90.5582 0.2631 15.9348 1.3796 17.2015 4.2701 1.3795 5.5083 0.0000 20,319.69 57 20,319.69 57 1.9405 0.0000 20,360.44 68 2027 6.9883 41.4432 87.2139 0.2631 15.9350 1.2676 17.2026 4.2702 1.2391 5.5093 0.0000 20,224.97 25 20,224.97 25 1.0402 0.0000 20,246.81 70 2028 426.0419 41.1453 84.1010 0.2630 15.9352 1.2679 17.2031 4.2703 1.2393 5.5096 0.0000 20,143.54 69 20,143.54 69 1.0300 0.0000 20,165.17 62 2029 827.8429 50.9939 82.6400 0.2630 15.9353 1.3796 17.2038 4.5160 1.3795 5.5102 0.0000 20,073.80 49 20,073.80 49 1.9401 0.0000 20,114.54 64 Total 3,521.320 5 539.0913 874.9817 2.3422 149.4323 15.5296 164.0771 45.5924 15.4692 59.0173 0.0000 184,965.2 649 184,965.2 649 18.5559 0.0000 185,354.9 377 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.26 -28.96 0.10 0.00 16.30 9.38 15.71 41.82 2.34 36.75 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 9 of 100 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 64.2250 0.6845 59.4156 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3275 107.3275 0.1029 0.0000 109.4875 Energy 0.5650 4.8286 2.0589 0.0308 0.3904 0.3904 0.3904 0.3904 6,163.454 9 6,163.454 9 0.1181 0.1130 6,200.964 7 Mobile 16.1836 30.3126 136.4838 0.5255 36.6866 0.6297 37.3163 9.8103 0.5812 10.3916 38,236.39 89 38,236.39 89 1.0312 38,258.05 41 Total 80.9736 35.8258 197.9583 0.5595 36.6866 1.3501 38.0367 9.8103 1.3016 11.1119 0.0000 44,507.18 14 44,507.18 14 1.2522 0.1130 44,568.50 63 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 59.8618 0.6845 59.4156 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3275 107.3275 0.1029 0.0000 109.4875 Energy 0.4472 3.8217 1.6294 0.0244 0.3090 0.3090 0.3090 0.3090 4,878.227 4 4,878.227 4 0.0935 0.0894 4,907.915 5 Mobile 15.3216 26.3613 120.1030 0.4393 30.4535 0.5354 30.9889 8.1436 0.4942 8.6377 31,963.78 40 31,963.78 40 0.8736 31,982.12 92 Total 75.6306 30.8675 181.1480 0.4669 30.4535 1.1744 31.6279 8.1436 1.1332 9.2767 0.0000 36,949.33 89 36,949.33 89 1.0699 0.0894 36,999.53 22 Mitigated Operational CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 10 of 100 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Offsite Construction – Site Preparation Site Preparation 1/1/2019 3/25/2019 5 60 2 Offsite Construction – Grading Grading 3/26/2019 10/28/2019 5 155 3 Offsite Construction – Paving Paving 10/29/2019 12/31/2019 5 46 4 Phase I – Site Preparation Site Preparation 1/1/2020 1/21/2020 5 15 5 Phase I, III, IV – Grading Grading 1/22/2020 7/14/2020 5 125 6 Phase I – Building Construction Building Construction 7/15/2020 1/31/2023 5 665 7 Phase I – Paving Paving 2/1/2023 2/21/2023 5 15 8 Phase I – Architectural Coating Architectural Coating 2/22/2023 5/9/2023 5 55 9 Phase II – Site Preparation Site Preparation 5/10/2023 5/30/2023 5 15 10 Phase II – Grading Grading 5/31/2023 7/11/2023 5 30 11 Phase II – Building Construction Building Construction 7/12/2023 11/28/2023 5 100 12 Phase II – Paving Paving 11/29/2023 12/19/2023 5 15 13 Phase II – Architectural Coating Architectural Coating 12/20/2023 1/16/2024 5 20 14 Phase III – Site Preparation Site Preparation 1/17/2024 2/13/2024 5 20 15 Phase III – Grading Grading 2/14/2024 4/2/2024 5 35 16 Phase III – Building Construction Building Construction 4/3/2024 7/22/2025 5 340 17 Phase III – Architectural Coating Architectural Coating 7/23/2025 8/19/2025 5 20 18 Phase III – Paving Paving 8/20/2025 9/16/2025 5 20 19 Phases IV & V – Site Preparation Site Preparation 9/17/2025 11/11/2025 5 40 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 6.60 13.84 8.49 16.55 16.99 13.02 16.85 16.99 12.94 16.52 0.00 16.98 16.98 14.55 20.86 16.98 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 11 of 100 20 Phases IV & V – Grading Grading 11/12/2025 5/19/2026 5 135 21 Phases IV & V – Building Construction Building Construction 5/20/2026 10/10/2028 5 625 22 Phases IV & V – Architectural Coating Architectural Coating 10/11/2028 11/28/2028 5 35 23 Phases IV & V – Paving Paving 11/29/2028 1/9/2029 5 30 24 Phase VI – Site Preparation Site Preparation 1/10/2029 1/16/2029 5 5 25 Phase VI – Grading Grading 1/17/2029 2/6/2029 5 15 26 Phase VI – Building Construction Building Construction 2/7/2029 9/4/2029 5 150 27 Phase VI – Architectural Coating Architectural Coating 9/5/2029 9/28/2029 5 18 28 Phase VI – Paving Paving 9/30/2029 10/5/2029 5 5 OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Phase I – Building Construction Air Compressors 1 6.00 78 0.48 Offsite Construction – Site Preparation Excavators 3 8.00 162 0.38 Offsite Construction – Site Preparation Concrete/Industrial Saws 1 8.00 81 0.73 Offsite Construction – Paving Excavators 2 8.00 162 0.38 Phase I – Site Preparation Cranes 1 7.00 226 0.29 Phase I – Site Preparation Forklifts 3 8.00 89 0.20 Phase I – Site Preparation Generator Sets 1 8.00 84 0.74 Phase I, III, IV – Grading Pavers 2 8.00 125 0.42 Phase I, III, IV – Grading Rollers 2 8.00 80 0.38 Residential Indoor: 2,102,760; Residential Outdoor: 700,920; Non-Residential Indoor: 2,716,339; Non-Residential Outdoor: 905,446 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 0 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 12 of 100 Offsite Construction – Site Preparation Rubber Tired Dozers 2 8.00 255 0.40 Offsite Construction – Paving Rubber Tired Dozers 1 8.00 255 0.40 Phase I – Site Preparation Tractors/Loaders/Backhoes 3 7.00 97 0.37 Offsite Construction – Paving Graders 1 8.00 174 0.41 Offsite Construction – Paving Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase I, III, IV – Grading Paving Equipment 2 8.00 130 0.36 Offsite Construction – Grading Tractors/Loaders/Backhoes 4 8.00 97 0.37 Offsite Construction – Grading Rubber Tired Dozers 3 8.00 255 0.40 Offsite Construction – Paving Scrapers 2 8.00 361 0.48 Phase I – Site Preparation Welders 1 8.00 46 0.45 Phase II – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase III – Architectural Coating Air Compressors 1 6.00 78 0.48 Phases IV & V – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase VI – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase I – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase II – Building Construction Cranes 1 7.00 226 0.29 Phase III – Building Construction Cranes 1 7.00 226 0.29 Phases IV & V – Building Construction Cranes 1 7.00 226 0.29 Phase VI – Building Construction Cranes 1 7.00 226 0.29 Phase I – Building Construction Cranes 1 7.00 226 0.29 Phase II – Grading Excavators 2 8.00 162 0.38 Phase III – Grading Excavators 2 8.00 162 0.38 Offsite Construction – Grading Excavators 2 8.00 162 0.38 Phases IV & V – Grading Excavators 2 8.00 162 0.38 Phase VI – Grading Excavators 2 8.00 162 0.38 Phase I, III, IV – Grading Excavators 2 8.00 162 0.38 Phase II – Building Construction Forklifts 3 8.00 89 0.20 Phase III – Building Construction Forklifts 3 8.00 89 0.20 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 13 of 100 Phases IV & V – Building Construction Forklifts 3 8.00 89 0.20 Phase VI – Building Construction Forklifts 3 8.00 89 0.20 Phase I – Building Construction Forklifts 3 8.00 89 0.20 Phase II – Building Construction Generator Sets 1 8.00 84 0.74 Phase III – Building Construction Generator Sets 1 8.00 84 0.74 Phases IV & V – Building Construction Generator Sets 1 8.00 84 0.74 Phase VI – Building Construction Generator Sets 1 8.00 84 0.74 Phase I – Building Construction Generator Sets 1 8.00 84 0.74 Phase II – Grading Graders 1 8.00 174 0.41 Phase III – Grading Graders 1 8.00 174 0.41 Offsite Construction – Grading Graders 1 8.00 174 0.41 Phases IV & V – Grading Graders 1 8.00 174 0.41 Phase VI – Grading Graders 1 8.00 174 0.41 Phase I, III, IV – Grading Graders 1 8.00 174 0.41 Phase II – Paving Pavers 2 8.00 125 0.42 Phase III – Paving Pavers 2 8.00 125 0.42 Phases IV & V – Paving Pavers 2 8.00 125 0.42 Phase VI – Paving Pavers 2 8.00 125 0.42 Offsite Construction – Paving Pavers 2 8.00 125 0.42 Phase I – Paving Pavers 2 8.00 125 0.42 Phase II – Paving Paving Equipment 2 8.00 130 0.36 Phase III – Paving Paving Equipment 2 8.00 130 0.36 Phases IV & V – Paving Paving Equipment 2 8.00 130 0.36 Phase VI – Paving Paving Equipment 2 8.00 130 0.36 Offsite Construction – Paving Paving Equipment 2 8.00 130 0.36 Phase I – Paving Paving Equipment 2 8.00 130 0.36 Phase II – Paving Rollers 2 8.00 80 0.38 Phase III – Paving Rollers 2 8.00 80 0.38 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 14 of 100 Phases IV & V – Paving Rollers 2 8.00 80 0.38 Phase VI – Paving Rollers 2 8.00 80 0.38 Offsite Construction – Paving Rollers 2 8.00 80 0.38 Phase I – Paving Rollers 2 8.00 80 0.38 Phase II – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase III – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phases IV & V – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase VI – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase I, III, IV – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase III – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phases IV & V – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase VI – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase I – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase II – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase II – Grading Scrapers 2 8.00 361 0.48 Phase III – Grading Scrapers 2 8.00 361 0.48 Offsite Construction – Grading Scrapers 2 8.00 361 0.48 Phases IV & V – Grading Scrapers 2 8.00 361 0.48 Phase VI – Grading Scrapers 2 8.00 361 0.48 Phase I, III, IV – Grading Scrapers 2 8.00 361 0.48 Phase II – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase III – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phases IV & V – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase VI – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase I – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase II – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase III – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phases IV & V – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 15 of 100 Phase VI – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase I, III, IV – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Offsite Construction – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase III – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phases IV & V – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase VI – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase II – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase II – Building Construction Welders 1 8.00 46 0.45 Phase III – Building Construction Welders 1 8.00 46 0.45 Phases IV & V – Building Construction Welders 1 8.00 46 0.45 Phase VI – Building Construction Welders 1 8.00 46 0.45 Phase I – Building Construction Welders 1 8.00 46 0.45 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Offsite Construction – Site Preparation 10 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Offsite Construction – Grading 12 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Offsite Construction – Paving 14 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Site Preparation 12 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I, III, IV – Grading 14 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Building Construction 10 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 16 of 100 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area Reduce Vehicle Speed on Unpaved Roads Clean Paved Roads Phase III – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 17 of 100 3.2 Offsite Construction – Site Preparation - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 12.0442 0.0000 12.0442 6.6205 0.0000 6.6205 0.0000 0.0000 Off-Road 4.2536 43.2907 40.0157 0.0524 2.2690 2.2690 2.1058 2.1058 5,159.400 1 5,159.400 1 1.4866 5,190.618 3 Total 4.2536 43.2907 40.0157 0.0524 12.0442 2.2690 14.3131 6.6205 2.1058 8.7262 5,159.400 1 5,159.400 1 1.4866 5,190.618 3 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0429 0.0659 0.6353 1.6900e- 003 0.1483 9.9000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 125.8629 125.8629 5.9700e- 003 125.9884 Total 0.0429 0.0659 0.6353 1.6900e- 003 0.1483 9.9000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 125.8629 125.8629 5.9700e- 003 125.9884 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 18 of 100 3.2 Offsite Construction – Site Preparation - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 5.4199 0.0000 5.4199 2.9792 0.0000 2.9792 0.0000 0.0000 Off-Road 1.8728 45.4945 34.6332 0.0524 1.4199 1.4199 1.4199 1.4199 0.0000 5,159.400 1 5,159.400 1 1.4866 5,190.618 3 Total 1.8728 45.4945 34.6332 0.0524 5.4199 1.4199 6.8398 2.9792 1.4199 4.3991 0.0000 5,159.400 1 5,159.400 1 1.4866 5,190.618 3 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0429 0.0659 0.6353 1.6900e- 003 0.1483 9.9000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 125.8629 125.8629 5.9700e- 003 125.9884 Total 0.0429 0.0659 0.6353 1.6900e- 003 0.1483 9.9000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 125.8629 125.8629 5.9700e- 003 125.9884 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 19 of 100 3.3 Offsite Construction – Grading - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 7.4152 80.9760 61.9596 0.0857 3.8345 3.8345 3.5278 3.5278 8,490.766 4 8,490.766 4 2.6864 8,547.180 6 Total 7.4152 80.9760 61.9596 0.0857 18.0663 3.8345 21.9008 9.9307 3.5278 13.4585 8,490.766 4 8,490.766 4 2.6864 8,547.180 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0515 0.0791 0.7623 2.0300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 151.0355 151.0355 7.1700e- 003 151.1860 Total 0.0515 0.0791 0.7623 2.0300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 151.0355 151.0355 7.1700e- 003 151.1860 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 20 of 100 3.3 Offsite Construction – Grading - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 2.6151 71.8913 51.9820 0.0857 1.9380 1.9380 1.9380 1.9380 0.0000 8,490.766 4 8,490.766 4 2.6864 8,547.180 5 Total 2.6151 71.8913 51.9820 0.0857 8.1298 1.9380 10.0678 4.4688 1.9380 6.4068 0.0000 8,490.766 4 8,490.766 4 2.6864 8,547.180 5 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0515 0.0791 0.7623 2.0300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 151.0355 151.0355 7.1700e- 003 151.1860 Total 0.0515 0.0791 0.7623 2.0300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 151.0355 151.0355 7.1700e- 003 151.1860 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 21 of 100 3.4 Offsite Construction – Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 6.3170 69.1331 54.6540 0.0840 3.3143 3.3143 3.0492 3.0492 8,320.285 2 8,320.285 2 2.6325 8,375.566 7 Paving 1.2474 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 7.5644 69.1331 54.6540 0.0840 3.3143 3.3143 3.0492 3.0492 8,320.285 2 8,320.285 2 2.6325 8,375.566 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0572 0.0879 0.8470 2.2500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 167.8172 167.8172 7.9600e- 003 167.9845 Total 0.0572 0.0879 0.8470 2.2500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 167.8172 167.8172 7.9600e- 003 167.9845 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 22 of 100 3.4 Offsite Construction – Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.8043 70.6463 54.8708 0.0840 2.0325 2.0325 2.0325 2.0325 0.0000 8,320.285 2 8,320.285 2 2.6325 8,375.566 7 Paving 1.2474 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.0517 70.6463 54.8708 0.0840 2.0325 2.0325 2.0325 2.0325 0.0000 8,320.285 2 8,320.285 2 2.6325 8,375.566 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0572 0.0879 0.8470 2.2500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 167.8172 167.8172 7.9600e- 003 167.9845 Total 0.0572 0.0879 0.8470 2.2500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 167.8172 167.8172 7.9600e- 003 167.9845 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 23 of 100 3.5 Phase I – Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 4.9983 49.5273 40.6161 0.0535 2.5112 2.5112 2.3330 2.3330 5,131.687 5 5,131.687 5 1.4568 5,162.281 1 Total 4.9983 49.5273 40.6161 0.0535 18.0663 2.5112 20.5775 9.9307 2.3330 12.2637 5,131.687 5 5,131.687 5 1.4568 5,162.281 1 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.3046 24.4786 44.1046 0.0803 2.1628 0.3412 2.5040 0.6175 0.3138 0.9312 7,501.887 7 7,501.887 7 0.0582 7,503.109 6 Worker 3.6079 5.5614 53.3328 0.1567 13.7714 0.0898 13.8612 3.6524 0.0832 3.7357 11,218.68 62 11,218.68 62 0.5159 11,229.52 04 Total 7.9124 30.0399 97.4374 0.2370 15.9342 0.4309 16.3651 4.2699 0.3970 4.6669 18,720.57 39 18,720.57 39 0.5741 18,732.62 99 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 24 of 100 3.5 Phase I – Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.7258 45.8587 31.8476 0.0535 1.3765 1.3765 1.3765 1.3765 0.0000 5,131.687 5 5,131.687 5 1.4568 5,162.281 1 Total 1.7258 45.8587 31.8476 0.0535 8.1298 1.3765 9.5063 4.4688 1.3765 5.8453 0.0000 5,131.687 5 5,131.687 5 1.4568 5,162.281 1 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.3046 24.4786 44.1046 0.0803 2.1628 0.3412 2.5040 0.6175 0.3138 0.9312 7,501.887 7 7,501.887 7 0.0582 7,503.109 6 Worker 3.6079 5.5614 53.3328 0.1567 13.7714 0.0898 13.8612 3.6524 0.0832 3.7357 11,218.68 62 11,218.68 62 0.5159 11,229.52 04 Total 7.9124 30.0399 97.4374 0.2370 15.9342 0.4309 16.3651 4.2699 0.3970 4.6669 18,720.57 39 18,720.57 39 0.5741 18,732.62 99 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 25 of 100 3.6 Phase I, III, IV – Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 5.8802 63.1684 52.7780 0.0840 3.0010 3.0010 2.7609 2.7609 8,138.465 9 8,138.465 9 2.6321 8,193.741 0 Total 5.8802 63.1684 52.7780 0.0840 8.6733 3.0010 11.6743 3.5965 2.7609 6.3574 8,138.465 9 8,138.465 9 2.6321 8,193.741 0 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0389 0.0599 0.5743 1.6900e- 003 0.1483 9.7000e- 004 0.1493 0.0393 9.0000e- 004 0.0402 120.8042 120.8042 5.5600e- 003 120.9209 Total 0.0389 0.0599 0.5743 1.6900e- 003 0.1483 9.7000e- 004 0.1493 0.0393 9.0000e- 004 0.0402 120.8042 120.8042 5.5600e- 003 120.9209 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 26 of 100 3.6 Phase I, III, IV – Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 2.8043 70.6463 54.8708 0.0840 2.0325 2.0325 2.0325 2.0325 0.0000 8,138.465 9 8,138.465 9 2.6321 8,193.741 0 Total 2.8043 70.6463 54.8708 0.0840 3.9030 2.0325 5.9355 1.6184 2.0325 3.6509 0.0000 8,138.465 9 8,138.465 9 2.6321 8,193.741 0 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0389 0.0599 0.5743 1.6900e- 003 0.1483 9.7000e- 004 0.1493 0.0393 9.0000e- 004 0.0402 120.8042 120.8042 5.5600e- 003 120.9209 Total 0.0389 0.0599 0.5743 1.6900e- 003 0.1483 9.7000e- 004 0.1493 0.0393 9.0000e- 004 0.0402 120.8042 120.8042 5.5600e- 003 120.9209 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 27 of 100 3.7 Phase I – Building Construction - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.3534 20.7678 18.6399 0.0298 1.2238 1.2238 1.1574 1.1574 2,823.928 0 2,823.928 0 0.6412 2,837.393 7 Total 2.3534 20.7678 18.6399 0.0298 1.2238 1.2238 1.1574 1.1574 2,823.928 0 2,823.928 0 0.6412 2,837.393 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.7226 1.1139 10.6819 0.0314 2.7582 0.0180 2.7762 0.7315 0.0167 0.7482 2,246.958 7 2,246.958 7 0.1033 2,249.128 6 Total 0.7226 1.1139 10.6819 0.0314 2.7582 0.0180 2.7762 0.7315 0.0167 0.7482 2,246.958 7 2,246.958 7 0.1033 2,249.128 6 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 28 of 100 3.7 Phase I – Building Construction - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,823.928 0 2,823.928 0 0.6412 2,837.393 7 Total 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,823.928 0 2,823.928 0 0.6412 2,837.393 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.7226 1.1139 10.6819 0.0314 2.7582 0.0180 2.7762 0.7315 0.0167 0.7482 2,246.958 7 2,246.958 7 0.1033 2,249.128 6 Total 0.7226 1.1139 10.6819 0.0314 2.7582 0.0180 2.7762 0.7315 0.0167 0.7482 2,246.958 7 2,246.958 7 0.1033 2,249.128 6 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 29 of 100 3.7 Phase I – Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.1120 18.8671 18.3552 0.0298 1.0490 1.0490 0.9919 0.9919 2,824.229 8 2,824.229 8 0.6319 2,837.499 8 Total 2.1120 18.8671 18.3552 0.0298 1.0490 1.0490 0.9919 0.9919 2,824.229 8 2,824.229 8 0.6319 2,837.499 8 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6744 1.0298 9.8922 0.0314 2.7582 0.0179 2.7761 0.7315 0.0166 0.7481 2,208.199 3 2,208.199 3 0.0977 2,210.250 8 Total 0.6744 1.0298 9.8922 0.0314 2.7582 0.0179 2.7761 0.7315 0.0166 0.7481 2,208.199 3 2,208.199 3 0.0977 2,210.250 8 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 30 of 100 3.7 Phase I – Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,824.229 8 2,824.229 8 0.6319 2,837.499 8 Total 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,824.229 8 2,824.229 8 0.6319 2,837.499 8 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6744 1.0298 9.8922 0.0314 2.7582 0.0179 2.7761 0.7315 0.0166 0.7481 2,208.199 3 2,208.199 3 0.0977 2,210.250 8 Total 0.6744 1.0298 9.8922 0.0314 2.7582 0.0179 2.7761 0.7315 0.0166 0.7481 2,208.199 3 2,208.199 3 0.0977 2,210.250 8 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 31 of 100 3.7 Phase I – Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.9037 16.9449 18.1412 0.0298 0.8874 0.8874 0.8398 0.8398 2,825.197 7 2,825.197 7 0.6269 2,838.361 5 Total 1.9037 16.9449 18.1412 0.0298 0.8874 0.8874 0.8398 0.8398 2,825.197 7 2,825.197 7 0.6269 2,838.361 5 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6344 0.9600 9.2311 0.0314 2.7582 0.0178 2.7761 0.7315 0.0165 0.7481 2,173.091 1 2,173.091 1 0.0930 2,175.044 4 Total 0.6344 0.9600 9.2311 0.0314 2.7582 0.0178 2.7761 0.7315 0.0165 0.7481 2,173.091 1 2,173.091 1 0.0930 2,175.044 4 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 32 of 100 3.7 Phase I – Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,825.197 7 2,825.197 7 0.6269 2,838.361 5 Total 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,825.197 7 2,825.197 7 0.6269 2,838.361 5 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6344 0.9600 9.2311 0.0314 2.7582 0.0178 2.7761 0.7315 0.0165 0.7481 2,173.091 1 2,173.091 1 0.0930 2,175.044 4 Total 0.6344 0.9600 9.2311 0.0314 2.7582 0.0178 2.7761 0.7315 0.0165 0.7481 2,173.091 1 2,173.091 1 0.0930 2,175.044 4 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 33 of 100 3.7 Phase I – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.7578 15.6156 18.0204 0.0298 0.7675 0.7675 0.7265 0.7265 2,826.074 3 2,826.074 3 0.6213 2,839.120 8 Total 1.7578 15.6156 18.0204 0.0298 0.7675 0.7675 0.7265 0.7265 2,826.074 3 2,826.074 3 0.6213 2,839.120 8 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Total 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 34 of 100 3.7 Phase I – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,826.074 3 2,826.074 3 0.6213 2,839.120 8 Total 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,826.074 3 2,826.074 3 0.6213 2,839.120 8 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Total 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 35 of 100 3.8 Phase I – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0128 9.9983 14.2850 0.0223 0.5010 0.5010 0.4609 0.4609 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Paving 3.8252 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.8380 9.9983 14.2850 0.0223 0.5010 0.5010 0.4609 0.4609 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0321 0.0482 0.4627 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 115.1144 115.1144 4.7800e- 003 115.2147 Total 0.0321 0.0482 0.4627 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 115.1144 115.1144 4.7800e- 003 115.2147 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 36 of 100 3.8 Phase I – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Paving 3.8252 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.7374 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0321 0.0482 0.4627 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 115.1144 115.1144 4.7800e- 003 115.2147 Total 0.0321 0.0482 0.4627 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 115.1144 115.1144 4.7800e- 003 115.2147 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 37 of 100 3.9 Phase I – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 270.7457 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1917 1.3030 1.8111 2.9700e- 003 0.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8017 Total 270.9374 1.3030 1.8111 2.9700e- 003 0.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8017 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Total 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 38 of 100 3.9 Phase I – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 270.7457 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0168 281.8017 Total 270.8596 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0168 281.8017 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Total 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 39 of 100 3.10 Phase II – Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 3.0157 29.9342 28.8193 0.0392 1.3907 1.3907 1.2795 1.2795 3,793.953 5 3,793.953 5 1.2270 3,819.721 4 Total 3.0157 29.9342 28.8193 0.0392 18.0663 1.3907 19.4570 9.9307 1.2795 11.2102 3,793.953 5 3,793.953 5 1.2270 3,819.721 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0385 0.0579 0.5552 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 138.1373 138.1373 5.7300e- 003 138.2576 Total 0.0385 0.0579 0.5552 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 138.1373 138.1373 5.7300e- 003 138.2576 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 40 of 100 3.10 Phase II – Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.2300 34.4240 23.4003 0.0392 0.9611 0.9611 0.9611 0.9611 0.0000 3,793.953 5 3,793.953 5 1.2270 3,819.721 4 Total 1.2300 34.4240 23.4003 0.0392 8.1298 0.9611 9.0909 4.4688 0.9611 5.4299 0.0000 3,793.953 5 3,793.953 5 1.2270 3,819.721 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0385 0.0579 0.5552 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 138.1373 138.1373 5.7300e- 003 138.2576 Total 0.0385 0.0579 0.5552 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 138.1373 138.1373 5.7300e- 003 138.2576 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 41 of 100 3.11 Phase II – Grading - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.5314 34.9375 34.1888 0.0618 1.5543 1.5543 1.4300 1.4300 5,985.435 9 5,985.435 9 1.9358 6,026.087 9 Total 3.5314 34.9375 34.1888 0.0618 8.6733 1.5543 10.2276 3.5965 1.4300 5.0265 5,985.435 9 5,985.435 9 1.9358 6,026.087 9 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0428 0.0643 0.6169 2.2500e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 153.4858 153.4858 6.3700e- 003 153.6196 Total 0.0428 0.0643 0.6169 2.2500e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 153.4858 153.4858 6.3700e- 003 153.6196 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 42 of 100 3.11 Phase II – Grading - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,985.435 9 5,985.435 9 1.9358 6,026.087 9 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,985.435 9 5,985.435 9 1.9358 6,026.087 9 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0428 0.0643 0.6169 2.2500e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 153.4858 153.4858 6.3700e- 003 153.6196 Total 0.0428 0.0643 0.6169 2.2500e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 153.4858 153.4858 6.3700e- 003 153.6196 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 43 of 100 3.12 Phase II – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.5661 14.3126 16.2093 0.0268 0.6967 0.6967 0.6557 0.6557 2,544.626 2 2,544.626 2 0.6044 2,557.319 1 Total 1.5661 14.3126 16.2093 0.0268 0.6967 0.6967 0.6557 0.6557 2,544.626 2 2,544.626 2 0.6044 2,557.319 1 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.7256 14.9946 37.9181 0.0798 2.1632 0.2746 2.4377 0.6176 0.2526 0.8702 7,461.527 5 7,461.527 5 0.0558 7,462.700 1 Worker 2.9788 4.4784 42.9648 0.1566 13.7714 0.0888 13.8602 3.6524 0.0824 3.7348 10,690.28 81 10,690.28 81 0.4436 10,699.60 33 Total 6.7044 19.4731 80.8830 0.2364 15.9346 0.3634 16.2979 4.2700 0.3350 4.6050 18,151.81 56 18,151.81 56 0.4994 18,162.30 34 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 44 of 100 3.12 Phase II – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0268 0.9016 0.9016 0.9016 0.9016 0.0000 2,544.626 2 2,544.626 2 0.6044 2,557.319 1 Total 1.0782 23.4615 17.8156 0.0268 0.9016 0.9016 0.9016 0.9016 0.0000 2,544.626 2 2,544.626 2 0.6044 2,557.319 1 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.7256 14.9946 37.9181 0.0798 2.1632 0.2746 2.4377 0.6176 0.2526 0.8702 7,461.527 5 7,461.527 5 0.0558 7,462.700 1 Worker 2.9788 4.4784 42.9648 0.1566 13.7714 0.0888 13.8602 3.6524 0.0824 3.7348 10,690.28 81 10,690.28 81 0.4436 10,699.60 33 Total 6.7044 19.4731 80.8830 0.2364 15.9346 0.3634 16.2979 4.2700 0.3350 4.6050 18,151.81 56 18,151.81 56 0.4994 18,162.30 34 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 45 of 100 3.13 Phase II – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0128 9.9983 14.2850 0.0223 0.5010 0.5010 0.4609 0.4609 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Paving 3.8252 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.8380 9.9983 14.2850 0.0223 0.5010 0.5010 0.4609 0.4609 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0321 0.0482 0.4627 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 115.1144 115.1144 4.7800e- 003 115.2147 Total 0.0321 0.0482 0.4627 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 115.1144 115.1144 4.7800e- 003 115.2147 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 46 of 100 3.13 Phase II – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Paving 3.8252 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.7374 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0321 0.0482 0.4627 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 115.1144 115.1144 4.7800e- 003 115.2147 Total 0.0321 0.0482 0.4627 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 115.1144 115.1144 4.7800e- 003 115.2147 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 47 of 100 3.14 Phase II – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1917 1.3030 1.8111 2.9700e- 003 0.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8017 Total 744.7424 1.3030 1.8111 2.9700e- 003 0.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8017 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Total 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 48 of 100 3.14 Phase II – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0168 281.8017 Total 744.6647 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0168 281.8017 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Total 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 49 of 100 3.14 Phase II – Architectural Coating - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e- 003 0.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.7809 Total 744.7315 1.2188 1.8101 2.9700e- 003 0.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.7809 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5632 0.8424 8.0966 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,112.362 0 2,112.362 0 0.0852 2,114.152 0 Total 0.5632 0.8424 8.0966 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,112.362 0 2,112.362 0 0.0852 2,114.152 0 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 50 of 100 3.14 Phase II – Architectural Coating - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0159 281.7809 Total 744.6647 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0159 281.7809 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5632 0.8424 8.0966 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,112.362 0 2,112.362 0 0.0852 2,114.152 0 Total 0.5632 0.8424 8.0966 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,112.362 0 2,112.362 0 0.0852 2,114.152 0 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 51 of 100 3.15 Phase III – Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 2.8238 27.5450 27.6020 0.0392 1.2498 1.2498 1.1498 1.1498 3,794.314 9 3,794.314 9 1.2272 3,820.085 2 Total 2.8238 27.5450 27.6020 0.0392 18.0663 1.2498 19.3161 9.9307 1.1498 11.0805 3,794.314 9 3,794.314 9 1.2272 3,820.085 2 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0363 0.0544 0.5224 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 136.2814 136.2814 5.5000e- 003 136.3969 Total 0.0363 0.0544 0.5224 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 136.2814 136.2814 5.5000e- 003 136.3969 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 52 of 100 3.15 Phase III – Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.2300 34.4240 23.4003 0.0392 0.9611 0.9611 0.9611 0.9611 0.0000 3,794.314 9 3,794.314 9 1.2272 3,820.085 2 Total 1.2300 34.4240 23.4003 0.0392 8.1298 0.9611 9.0909 4.4688 0.9611 5.4299 0.0000 3,794.314 9 3,794.314 9 1.2272 3,820.085 2 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0363 0.0544 0.5224 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 136.2814 136.2814 5.5000e- 003 136.3969 Total 0.0363 0.0544 0.5224 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 136.2814 136.2814 5.5000e- 003 136.3969 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 53 of 100 3.16 Phase III – Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.3599 32.1927 33.4441 0.0618 1.4234 1.4234 1.3096 1.3096 5,984.025 2 5,984.025 2 1.9354 6,024.667 7 Total 3.3599 32.1927 33.4441 0.0618 8.6733 1.4234 10.0968 3.5965 1.3096 4.9061 5,984.025 2 5,984.025 2 1.9354 6,024.667 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0404 0.0604 0.5804 2.2500e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 151.4238 151.4238 6.1100e- 003 151.5521 Total 0.0404 0.0604 0.5804 2.2500e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 151.4238 151.4238 6.1100e- 003 151.5521 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 54 of 100 3.16 Phase III – Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,984.025 2 5,984.025 2 1.9354 6,024.667 7 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,984.025 2 5,984.025 2 1.9354 6,024.667 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0404 0.0604 0.5804 2.2500e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 151.4238 151.4238 6.1100e- 003 151.5521 Total 0.0404 0.0604 0.5804 2.2500e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 151.4238 151.4238 6.1100e- 003 151.5521 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 55 of 100 3.17 Phase III – Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.4653 13.3774 16.1332 0.0268 0.6106 0.6106 0.5744 0.5744 2,545.115 4 2,545.115 4 0.6009 2,557.734 9 Total 1.4653 13.3774 16.1332 0.0268 0.6106 0.6106 0.5744 0.5744 2,545.115 4 2,545.115 4 0.6009 2,557.734 9 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.7313 14.8407 37.2028 0.0798 2.1632 0.2758 2.4390 0.6176 0.2538 0.8714 7,461.851 5 7,461.851 5 0.0561 7,463.028 8 Worker 2.8119 4.2059 40.4248 0.1565 13.7714 0.0887 13.8601 3.6524 0.0823 3.7348 10,546.66 78 10,546.66 78 0.4256 10,555.60 46 Total 6.5431 19.0466 77.6276 0.2363 15.9345 0.3646 16.2991 4.2700 0.3361 4.6061 18,008.51 92 18,008.51 92 0.4816 18,018.63 34 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 56 of 100 3.17 Phase III – Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0268 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.115 4 2,545.115 4 0.6009 2,557.734 9 Total 1.0782 23.4615 17.8156 0.0268 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.115 4 2,545.115 4 0.6009 2,557.734 9 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.7313 14.8407 37.2028 0.0798 2.1632 0.2758 2.4390 0.6176 0.2538 0.8714 7,461.851 5 7,461.851 5 0.0561 7,463.028 8 Worker 2.8119 4.2059 40.4248 0.1565 13.7714 0.0887 13.8601 3.6524 0.0823 3.7348 10,546.66 78 10,546.66 78 0.4256 10,555.60 46 Total 6.5431 19.0466 77.6276 0.2363 15.9345 0.3646 16.2991 4.2700 0.3361 4.6061 18,008.51 92 18,008.51 92 0.4816 18,018.63 34 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 57 of 100 3.17 Phase III – Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.6445 14.7042 36.6943 0.0798 2.1632 0.2769 2.4401 0.6176 0.2547 0.8723 7,462.354 1 7,462.354 1 0.0563 7,463.535 4 Worker 2.6770 3.9801 38.3949 0.1565 13.7714 0.0891 13.8605 3.6524 0.0827 3.7351 10,420.14 27 10,420.14 27 0.4107 10,428.76 71 Total 6.3215 18.6843 75.0892 0.2363 15.9346 0.3660 16.3006 4.2701 0.3374 4.6074 17,882.49 68 17,882.49 68 0.4669 17,892.30 25 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 58 of 100 3.17 Phase III – Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.6445 14.7042 36.6943 0.0798 2.1632 0.2769 2.4401 0.6176 0.2547 0.8723 7,462.354 1 7,462.354 1 0.0563 7,463.535 4 Worker 2.6770 3.9801 38.3949 0.1565 13.7714 0.0891 13.8605 3.6524 0.0827 3.7351 10,420.14 27 10,420.14 27 0.4107 10,428.76 71 Total 6.3215 18.6843 75.0892 0.2363 15.9346 0.3660 16.3006 4.2701 0.3374 4.6074 17,882.49 68 17,882.49 68 0.4669 17,892.30 25 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 59 of 100 3.18 Phase III – Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Total 744.7216 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5362 0.7972 7.6900 0.0313 2.7582 0.0178 2.7761 0.7315 0.0166 0.7481 2,087.020 7 2,087.020 7 0.0823 2,088.748 1 Total 0.5362 0.7972 7.6900 0.0313 2.7582 0.0178 2.7761 0.7315 0.0166 0.7481 2,087.020 7 2,087.020 7 0.0823 2,088.748 1 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 60 of 100 3.18 Phase III – Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Total 744.6647 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5362 0.7972 7.6900 0.0313 2.7582 0.0178 2.7761 0.7315 0.0166 0.7481 2,087.020 7 2,087.020 7 0.0823 2,088.748 1 Total 0.5362 0.7972 7.6900 0.0313 2.7582 0.0178 2.7761 0.7315 0.0166 0.7481 2,087.020 7 2,087.020 7 0.0823 2,088.748 1 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 61 of 100 3.19 Phase III – Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.8973 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 2.8689 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 3.7662 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0288 0.0429 0.4134 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 112.2054 112.2054 4.4200e- 003 112.2983 Total 0.0288 0.0429 0.4134 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 112.2054 112.2054 4.4200e- 003 112.2983 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 62 of 100 3.19 Phase III – Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 2.8689 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 3.7811 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0288 0.0429 0.4134 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 112.2054 112.2054 4.4200e- 003 112.2983 Total 0.0288 0.0429 0.4134 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 112.2054 112.2054 4.4200e- 003 112.2983 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 63 of 100 3.20 Phases IV & V – Site Preparation - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 2.5083 23.5257 24.8879 0.0392 1.0293 1.0293 0.9470 0.9470 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Total 2.5083 23.5257 24.8879 0.0392 18.0663 1.0293 19.0956 9.9307 0.9470 10.8776 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0346 0.0514 0.4961 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0700e- 003 0.0483 134.6465 134.6465 5.3100e- 003 134.7579 Total 0.0346 0.0514 0.4961 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0700e- 003 0.0483 134.6465 134.6465 5.3100e- 003 134.7579 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 64 of 100 3.20 Phases IV & V – Site Preparation - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.2300 34.4240 23.4003 0.0392 0.9611 0.9611 0.9611 0.9611 0.0000 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Total 1.2300 34.4240 23.4003 0.0392 8.1298 0.9611 9.0909 4.4688 0.9611 5.4299 0.0000 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0346 0.0514 0.4961 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0700e- 003 0.0483 134.6465 134.6465 5.3100e- 003 134.7579 Total 0.0346 0.0514 0.4961 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0700e- 003 0.0483 134.6465 134.6465 5.3100e- 003 134.7579 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 65 of 100 3.21 Phases IV & V – Grading - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.0022 27.2606 31.3515 0.0618 1.1867 1.1867 1.0918 1.0918 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 3.0022 27.2606 31.3515 0.0618 8.6733 1.1867 9.8600 3.5965 1.0918 4.6883 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0384 0.0571 0.5513 2.2500e- 003 0.1977 1.2800e- 003 0.1990 0.0524 1.1900e- 003 0.0536 149.6072 149.6072 5.9000e- 003 149.7310 Total 0.0384 0.0571 0.5513 2.2500e- 003 0.1977 1.2800e- 003 0.1990 0.0524 1.1900e- 003 0.0536 149.6072 149.6072 5.9000e- 003 149.7310 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 66 of 100 3.21 Phases IV & V – Grading - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0384 0.0571 0.5513 2.2500e- 003 0.1977 1.2800e- 003 0.1990 0.0524 1.1900e- 003 0.0536 149.6072 149.6072 5.9000e- 003 149.7310 Total 0.0384 0.0571 0.5513 2.2500e- 003 0.1977 1.2800e- 003 0.1990 0.0524 1.1900e- 003 0.0536 149.6072 149.6072 5.9000e- 003 149.7310 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 67 of 100 3.21 Phases IV & V – Grading - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.0022 27.2606 31.3515 0.0618 1.1867 1.1867 1.0918 1.0918 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 3.0022 27.2606 31.3515 0.0618 8.6733 1.1867 9.8600 3.5965 1.0918 4.6883 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0367 0.0544 0.5266 2.2500e- 003 0.1977 1.2900e- 003 0.1990 0.0524 1.2000e- 003 0.0536 148.0336 148.0336 5.7100e- 003 148.1535 Total 0.0367 0.0544 0.5266 2.2500e- 003 0.1977 1.2900e- 003 0.1990 0.0524 1.2000e- 003 0.0536 148.0336 148.0336 5.7100e- 003 148.1535 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 68 of 100 3.21 Phases IV & V – Grading - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0367 0.0544 0.5266 2.2500e- 003 0.1977 1.2900e- 003 0.1990 0.0524 1.2000e- 003 0.0536 148.0336 148.0336 5.7100e- 003 148.1535 Total 0.0367 0.0544 0.5266 2.2500e- 003 0.1977 1.2900e- 003 0.1990 0.0524 1.2000e- 003 0.0536 148.0336 148.0336 5.7100e- 003 148.1535 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 69 of 100 3.22 Phases IV & V – Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.6813 14.5236 36.0679 0.0798 2.1634 0.2753 2.4387 0.6177 0.2532 0.8709 7,463.267 9 7,463.267 9 0.0561 7,464.445 4 Worker 2.5579 3.7888 36.6747 0.1565 13.7714 0.0898 13.8612 3.6524 0.0834 3.7358 10,310.53 72 10,310.53 72 0.3979 10,318.89 34 Total 6.2392 18.3124 72.7426 0.2363 15.9348 0.3651 16.2999 4.2701 0.3366 4.6067 17,773.80 52 17,773.80 52 0.4540 17,783.33 88 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 70 of 100 3.22 Phases IV & V – Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.6813 14.5236 36.0679 0.0798 2.1634 0.2753 2.4387 0.6177 0.2532 0.8709 7,463.267 9 7,463.267 9 0.0561 7,464.445 4 Worker 2.5579 3.7888 36.6747 0.1565 13.7714 0.0898 13.8612 3.6524 0.0834 3.7358 10,310.53 72 10,310.53 72 0.3979 10,318.89 34 Total 6.2392 18.3124 72.7426 0.2363 15.9348 0.3651 16.2999 4.2701 0.3366 4.6067 17,773.80 52 17,773.80 52 0.4540 17,783.33 88 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 71 of 100 3.22 Phases IV & V – Building Construction - 2027 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.4613 14.3655 34.2634 0.0798 2.1636 0.2756 2.4392 0.6178 0.2536 0.8713 7,463.886 1 7,463.886 1 0.0562 7,465.065 6 Worker 2.4487 3.6162 35.1349 0.1564 13.7714 0.0904 13.8618 3.6524 0.0839 3.7364 10,215.19 59 10,215.19 59 0.3865 10,223.31 28 Total 5.9101 17.9817 69.3983 0.2362 15.9350 0.3661 16.3011 4.2702 0.3375 4.6077 17,679.08 19 17,679.08 19 0.4427 17,688.37 84 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 72 of 100 3.22 Phases IV & V – Building Construction - 2027 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.4613 14.3655 34.2634 0.0798 2.1636 0.2756 2.4392 0.6178 0.2536 0.8713 7,463.886 1 7,463.886 1 0.0562 7,465.065 6 Worker 2.4487 3.6162 35.1349 0.1564 13.7714 0.0904 13.8618 3.6524 0.0839 3.7364 10,215.19 59 10,215.19 59 0.3865 10,223.31 28 Total 5.9101 17.9817 69.3983 0.2362 15.9350 0.3661 16.3011 4.2702 0.3375 4.6077 17,679.08 19 17,679.08 19 0.4427 17,688.37 84 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 73 of 100 3.22 Phases IV & V – Building Construction - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.3960 14.2250 32.5134 0.0797 2.1638 0.2754 2.4392 0.6178 0.2533 0.8712 7,464.584 3 7,464.584 3 0.0562 7,465.764 3 Worker 2.3489 3.4587 33.7719 0.1564 13.7714 0.0910 13.8624 3.6524 0.0844 3.7369 10,133.07 20 10,133.07 20 0.3763 10,140.97 33 Total 5.7449 17.6838 66.2854 0.2362 15.9352 0.3664 16.3015 4.2703 0.3378 4.6081 17,597.65 63 17,597.65 63 0.4324 17,606.73 76 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 74 of 100 3.22 Phases IV & V – Building Construction - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.3960 14.2250 32.5134 0.0797 2.1638 0.2754 2.4392 0.6178 0.2533 0.8712 7,464.584 3 7,464.584 3 0.0562 7,465.764 3 Worker 2.3489 3.4587 33.7719 0.1564 13.7714 0.0910 13.8624 3.6524 0.0844 3.7369 10,133.07 20 10,133.07 20 0.3763 10,140.97 33 Total 5.7449 17.6838 66.2854 0.2362 15.9352 0.3664 16.3015 4.2703 0.3378 4.6081 17,597.65 63 17,597.65 63 0.4324 17,606.73 76 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 75 of 100 3.23 Phases IV & V – Architectural Coating - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 425.4576 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Total 425.6284 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.4705 0.6927 6.7641 0.0313 2.7582 0.0182 2.7765 0.7315 0.0169 0.7485 2,029.524 1 2,029.524 1 0.0754 2,031.106 6 Total 0.4705 0.6927 6.7641 0.0313 2.7582 0.0182 2.7765 0.7315 0.0169 0.7485 2,029.524 1 2,029.524 1 0.0754 2,031.106 6 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 76 of 100 3.23 Phases IV & V – Architectural Coating - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 425.4576 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Total 425.5715 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.4705 0.6927 6.7641 0.0313 2.7582 0.0182 2.7765 0.7315 0.0169 0.7485 2,029.524 1 2,029.524 1 0.0754 2,031.106 6 Total 0.4705 0.6927 6.7641 0.0313 2.7582 0.0182 2.7765 0.7315 0.0169 0.7485 2,029.524 1 2,029.524 1 0.0754 2,031.106 6 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 77 of 100 3.24 Phases IV & V – Paving - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.8973 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 1.9126 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.8099 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0253 0.0372 0.3637 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 109.1142 109.1142 4.0500e- 003 109.1993 Total 0.0253 0.0372 0.3637 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 109.1142 109.1142 4.0500e- 003 109.1993 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 78 of 100 3.24 Phases IV & V – Paving - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 1.9126 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.8248 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0253 0.0372 0.3637 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 109.1142 109.1142 4.0500e- 003 109.1993 Total 0.0253 0.0372 0.3637 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 109.1142 109.1142 4.0500e- 003 109.1993 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 79 of 100 3.24 Phases IV & V – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.8973 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 1.9126 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.8099 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0242 0.0356 0.3493 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 108.3511 108.3511 3.9400e- 003 108.4339 Total 0.0242 0.0356 0.3493 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 108.3511 108.3511 3.9400e- 003 108.4339 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 80 of 100 3.24 Phases IV & V – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 1.9126 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.8248 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0242 0.0356 0.3493 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 108.3511 108.3511 3.9400e- 003 108.4339 Total 0.0242 0.0356 0.3493 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 108.3511 108.3511 3.9400e- 003 108.4339 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 81 of 100 3.25 Phase VI – Site Preparation - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 2.5083 23.5257 24.8879 0.0392 1.0293 1.0293 0.9470 0.9470 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Total 2.5083 23.5257 24.8879 0.0392 18.0663 1.0293 19.0956 9.9307 0.9470 10.8776 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0291 0.0427 0.4192 2.0200e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 130.0213 130.0213 4.7300e- 003 130.1207 Total 0.0291 0.0427 0.4192 2.0200e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 130.0213 130.0213 4.7300e- 003 130.1207 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 82 of 100 3.25 Phase VI – Site Preparation - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.2300 34.4240 23.4003 0.0392 0.9611 0.9611 0.9611 0.9611 0.0000 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Total 1.2300 34.4240 23.4003 0.0392 8.1298 0.9611 9.0909 4.4688 0.9611 5.4299 0.0000 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0291 0.0427 0.4192 2.0200e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 130.0213 130.0213 4.7300e- 003 130.1207 Total 0.0291 0.0427 0.4192 2.0200e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 130.0213 130.0213 4.7300e- 003 130.1207 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 83 of 100 3.26 Phase VI – Grading - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.0022 27.2606 31.3515 0.0618 1.1867 1.1867 1.0918 1.0918 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 3.0022 27.2606 31.3515 0.0618 8.6733 1.1867 9.8600 3.5965 1.0918 4.6883 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0323 0.0475 0.4657 2.2500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 144.4682 144.4682 5.2600e- 003 144.5786 Total 0.0323 0.0475 0.4657 2.2500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 144.4682 144.4682 5.2600e- 003 144.5786 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 84 of 100 3.26 Phase VI – Grading - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0323 0.0475 0.4657 2.2500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 144.4682 144.4682 5.2600e- 003 144.5786 Total 0.0323 0.0475 0.4657 2.2500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 144.4682 144.4682 5.2600e- 003 144.5786 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 85 of 100 3.27 Phase VI – Building Construction - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.3636 14.1752 32.3855 0.0798 2.1640 0.2754 2.4394 0.6179 0.2534 0.8713 7,465.707 6 7,465.707 6 0.0562 7,466.888 6 Worker 2.2487 3.3070 32.4389 0.1564 13.7714 0.0914 13.8628 3.6524 0.0848 3.7373 10,062.20 68 10,062.20 68 0.3662 10,069.89 77 Total 5.6123 17.4822 64.8244 0.2362 15.9353 0.3669 16.3022 4.2704 0.3382 4.6086 17,527.91 44 17,527.91 44 0.4225 17,536.78 63 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 86 of 100 3.27 Phase VI – Building Construction - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.3636 14.1752 32.3855 0.0798 2.1640 0.2754 2.4394 0.6179 0.2534 0.8713 7,465.707 6 7,465.707 6 0.0562 7,466.888 6 Worker 2.2487 3.3070 32.4389 0.1564 13.7714 0.0914 13.8628 3.6524 0.0848 3.7373 10,062.20 68 10,062.20 68 0.3662 10,069.89 77 Total 5.6123 17.4822 64.8244 0.2362 15.9353 0.3669 16.3022 4.2704 0.3382 4.6086 17,527.91 44 17,527.91 44 0.4225 17,536.78 63 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 87 of 100 3.28 Phase VI – Architectural Coating - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 827.2786 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Total 827.4495 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.4504 0.6624 6.4971 0.0313 2.7582 0.0183 2.7765 0.7315 0.0170 0.7485 2,015.330 7 2,015.330 7 0.0734 2,016.871 1 Total 0.4504 0.6624 6.4971 0.0313 2.7582 0.0183 2.7765 0.7315 0.0170 0.7485 2,015.330 7 2,015.330 7 0.0734 2,016.871 1 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 88 of 100 3.28 Phase VI – Architectural Coating - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 827.2786 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Total 827.3925 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.4504 0.6624 6.4971 0.0313 2.7582 0.0183 2.7765 0.7315 0.0170 0.7485 2,015.330 7 2,015.330 7 0.0734 2,016.871 1 Total 0.4504 0.6624 6.4971 0.0313 2.7582 0.0183 2.7765 0.7315 0.0170 0.7485 2,015.330 7 2,015.330 7 0.0734 2,016.871 1 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 89 of 100 3.29 Phase VI – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.8973 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 11.4756 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 12.3729 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0242 0.0356 0.3493 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 108.3511 108.3511 3.9400e- 003 108.4339 Total 0.0242 0.0356 0.3493 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 108.3511 108.3511 3.9400e- 003 108.4339 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 90 of 100 4.0 Operational Detail - Mobile 3.29 Phase VI – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 11.4756 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 12.3878 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0242 0.0356 0.3493 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 108.3511 108.3511 3.9400e- 003 108.4339 Total 0.0242 0.0356 0.3493 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 108.3511 108.3511 3.9400e- 003 108.4339 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 91 of 100 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 15.3216 26.3613 120.1030 0.4393 30.4535 0.5354 30.9889 8.1436 0.4942 8.6377 31,963.78 40 31,963.78 40 0.8736 31,982.12 92 Unmitigated 16.1836 30.3126 136.4838 0.5255 36.6866 0.6297 37.3163 9.8103 0.5812 10.3916 38,236.39 89 38,236.39 89 1.0312 38,258.05 41 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Mid Rise 823.75 895.00 758.75 2,095,877 1,739,787 City Park 25.44 25.44 25.44 51,701 42,917 Condo/Townhouse 1,219.15 1,324.60 1122.95 3,101,898 2,574,885 Other Asphalt Surfaces 0.00 0.00 0.00 Parking Lot 0.00 0.00 0.00 Regional Shopping Center 644.10 749.55 378.60 897,003 744,602 Single Family Housing 1,004.85 1,058.40 920.85 2,542,828 2,110,801 Single Family Housing 2,918.85 3,074.40 2674.85 7,386,310 6,131,374 Total 6,636.14 7,127.39 5,881.44 16,075,617 13,344,365 Increase Density Improve Walkability Design Increase Transit Accessibility Improve Pedestrian Network Expand Transit Network CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 92 of 100 4.3 Trip Type Information Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Mid Rise 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 City Park 13.00 5.00 5.00 33.00 48.00 19.00 66 28 6 Condo/Townhouse 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 Other Asphalt Surfaces 13.00 5.00 5.00 0.00 0.00 0.00 0 0 0 Parking Lot 13.00 5.00 5.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 13.00 5.00 5.00 16.30 64.70 19.00 54 35 11 Single Family Housing 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 Single Family Housing 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 5.0 Energy Detail 5.1 Mitigation Measures Energy Exceed Title 24 Install High Efficiency Lighting Percent of Electricity Use Generated with Renewable Energy LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH 0.457871 0.042296 0.214250 0.146969 0.067525 0.009931 0.017760 0.024978 0.002423 0.001427 0.009102 0.000742 0.004726 Historical Energy Use: N CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 93 of 100 4.4 Fleet Mix ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.4472 3.8217 1.6294 0.0244 0.3090 0.3090 0.3090 0.3090 4,878.227 4 4,878.227 4 0.0935 0.0894 4,907.915 5 NaturalGas Unmitigated 0.5650 4.8286 2.0589 0.0308 0.3904 0.3904 0.3904 0.3904 6,163.454 9 6,163.454 9 0.1181 0.1130 6,200.964 7 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 94 of 100 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Mid Rise 2783.43 0.0300 0.2565 0.1092 1.6400e- 003 0.0207 0.0207 0.0207 0.0207 327.4625 327.4625 6.2800e- 003 6.0000e- 003 329.4554 City Park 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 9870.69 0.1065 0.9097 0.3871 5.8100e- 003 0.0736 0.0736 0.0736 0.0736 1,161.258 0 1,161.258 0 0.0223 0.0213 1,168.325 2 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 102.329 1.1000e- 003 0.0100 8.4300e- 003 6.0000e- 005 7.6000e- 004 7.6000e- 004 7.6000e- 004 7.6000e- 004 12.0387 12.0387 2.3000e- 004 2.2000e- 004 12.1119 Single Family Housing 10149.9 0.1095 0.9354 0.3980 5.9700e- 003 0.0756 0.0756 0.0756 0.0756 1,194.105 0 1,194.105 0 0.0229 0.0219 1,201.372 1 Single Family Housing 29483 0.3180 2.7171 1.1562 0.0173 0.2197 0.2197 0.2197 0.2197 3,468.590 8 3,468.590 8 0.0665 0.0636 3,489.700 0 Total 0.5650 4.8286 2.0589 0.0308 0.3904 0.3904 0.3904 0.3904 6,163.454 9 6,163.454 9 0.1181 0.1130 6,200.964 7 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 95 of 100 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day City Park 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 7.77695 0.0839 0.7167 0.3050 4.5700e- 003 0.0580 0.0580 0.0580 0.0580 914.9350 914.9350 0.0175 0.0168 920.5032 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0.0767466 8.3000e- 004 7.5200e- 003 6.3200e- 003 5.0000e- 005 5.7000e- 004 5.7000e- 004 5.7000e- 004 5.7000e- 004 9.0290 9.0290 1.7000e- 004 1.7000e- 004 9.0840 Single Family Housing 23.34 0.2517 2.1509 0.9153 0.0137 0.1739 0.1739 0.1739 0.1739 2,745.878 4 2,745.878 4 0.0526 0.0503 2,762.589 3 Single Family Housing 8.03507 0.0867 0.7405 0.3151 4.7300e- 003 0.0599 0.0599 0.0599 0.0599 945.3024 945.3024 0.0181 0.0173 951.0554 Apartments Mid Rise 2.2362 0.0241 0.2061 0.0877 1.3200e- 003 0.0167 0.0167 0.0167 0.0167 263.0826 263.0826 5.0400e- 003 4.8200e- 003 264.6837 Total 0.4472 3.8217 1.6294 0.0244 0.3090 0.3090 0.3090 0.3090 4,878.227 4 4,878.227 4 0.0935 0.0894 4,907.915 5 Mitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 96 of 100 Use Low VOC Paint - Residential Interior Use Low VOC Paint - Residential Exterior Use Low VOC Paint - Non-Residential Interior Use Low VOC Paint - Non-Residential Exterior No Hearths Installed Use Low VOC Cleaning Supplies ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 59.8618 0.6845 59.4156 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3275 107.3275 0.1029 0.0000 109.4875 Unmitigated 64.2250 0.6845 59.4156 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3275 107.3275 0.1029 0.0000 109.4875 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 97 of 100 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 4.0797 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 58.3575 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.7877 0.6845 59.4156 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 107.3275 107.3275 0.1029 109.4875 Total 64.2250 0.6845 59.4156 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3275 107.3275 0.1029 0.0000 109.4875 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 98 of 100 8.1 Mitigation Measures Waste Use Reclaimed Water Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 4.0797 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 53.9943 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.7877 0.6845 59.4156 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 107.3275 107.3275 0.1029 109.4875 Total 59.8618 0.6845 59.4156 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3275 107.3275 0.1029 0.0000 109.4875 Mitigated 9.0 Operational Offroad CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 99 of 100 10.0 Vegetation 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:32 PMPage 100 of 100 San Luis Obispo County, Winter Avila Ranch Development Project 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Parking Lot 1,652.00 Space 14.87 660,800.00 0 Other Asphalt Surfaces 7.03 Acre 7.03 306,226.80 0 City Park 16.00 Acre 16.00 696,960.00 0 Regional Shopping Center 15.00 1000sqft 3.34 15,000.00 0 Apartments Mid Rise 125.00 Dwelling Unit 4.71 125,000.00 287 Condo/Townhouse 185.00 Dwelling Unit 11.05 185,000.00 424 Single Family Housing 105.00 Dwelling Unit 17.45 189,000.00 240 Single Family Housing 305.00 Dwelling Unit 35.03 549,000.00 698 1.2 Other Project Characteristics Urbanization Climate Zone Urban 4 Wind Speed (m/s)Precipitation Freq (Days)3.2 44 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Pacific Gas & Electric Company 2030Operational Year CO2 Intensity (lb/MWhr) 641.35 0.029CH4 Intensity (lb/MWhr) 0.006N2O Intensity (lb/MWhr) CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 1 of 100 Project Characteristics - Land Use - Taken from project description Construction Phase - taken from updated construction schedule september 29 2016 Architectural Coating - using at least 50 EF paint from mitigation Woodstoves - no woodstoves or fireplaces Area Coating - EF is 50 from mitigation Water And Wastewater - based on city water use factors Solid Waste - from estimated solid waste production under the table based on CalRecycle waste generation factors Sequestration - Construction Off-road Equipment Mitigation - based on mitigation Mobile Land Use Mitigation - Area Mitigation - 50 EF per mitigation Energy Mitigation - Water Mitigation - Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 2 of 100 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblAreaCoating Area_EF_Nonresidential_Exterior 250 50 tblAreaCoating Area_EF_Nonresidential_Interior 250 50 tblAreaCoating Area_EF_Residential_Exterior 250 50 tblAreaCoating Area_EF_Residential_Interior 250 50 tblAreaMitigation UseLowVOCPaintNonresidentialInteriorV alue 250 50 tblAreaMitigation UseLowVOCPaintResidentialExteriorValu e 250 50 tblAreaMitigation UseLowVOCPaintResidentialInteriorValu e 250 50 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 17.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 18.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 7.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 26.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 54.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 3 of 100 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstructionPhase NumDays 3,100.00 665.00 tblConstructionPhase NumDays 120.00 15.00 tblConstructionPhase NumDays 120.00 60.00 tblConstructionPhase NumDays 220.00 46.00 tblConstructionPhase NumDays 310.00 125.00 tblConstructionPhase NumDays 310.00 155.00 tblConstructionPhase NumDays 220.00 15.00 tblConstructionPhase NumDays 220.00 55.00 tblConstructionPhase NumDays 120.00 15.00 tblConstructionPhase NumDays 310.00 30.00 tblConstructionPhase NumDays 3,100.00 100.00 tblConstructionPhase NumDays 220.00 15.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 4 of 100 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 120.00 20.00 tblConstructionPhase NumDays 310.00 35.00 tblConstructionPhase NumDays 3,100.00 340.00 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 120.00 40.00 tblConstructionPhase NumDays 310.00 135.00 tblConstructionPhase NumDays 3,100.00 625.00 tblConstructionPhase NumDays 220.00 35.00 tblConstructionPhase NumDays 220.00 30.00 tblConstructionPhase NumDays 120.00 5.00 tblConstructionPhase NumDays 310.00 15.00 tblConstructionPhase NumDays 3,100.00 150.00 tblConstructionPhase NumDays 220.00 18.00 tblConstructionPhase NumDays 220.00 5.00 tblConstructionPhase PhaseStartDate 9/29/2029 9/30/2029 tblGrading AcresOfGrading 387.50 0.00 tblLandUse LotAcreage 0.34 3.34 tblLandUse LotAcreage 3.29 4.71 tblLandUse LotAcreage 11.56 11.05 tblLandUse LotAcreage 34.09 17.45 tblLandUse LotAcreage 99.03 35.03 tblLandUse Population 358.00 287.00 tblLandUse Population 529.00 424.00 tblLandUse Population 300.00 240.00 tblLandUse Population 872.00 698.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 5 of 100 tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 3.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 4.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 3.00 tblOffRoadEquipment UsageHours 8.00 7.00 tblProjectCharacteristics OperationalYear 2014 2030 tblSequestration NumberOfNewTrees 0.00 525.00 tblSolidWaste SolidWasteGenerationRate 57.50 121.13 tblSolidWaste SolidWasteGenerationRate 1.64 0.00 tblSolidWaste SolidWasteGenerationRate 90.62 179.28 tblSolidWaste SolidWasteGenerationRate 15.75 6.84 tblSolidWaste SolidWasteGenerationRate 373.92 733.29 tblTripsAndVMT VendorTripNumber 0.00 475.00 tblTripsAndVMT VendorTripNumber 475.00 0.00 tblTripsAndVMT WorkerTripNumber 25.00 15.00 tblTripsAndVMT WorkerTripNumber 30.00 18.00 tblTripsAndVMT WorkerTripNumber 35.00 20.00 tblTripsAndVMT WorkerTripNumber 30.00 1,393.00 tblTripsAndVMT WorkerTripNumber 35.00 15.00 tblTripsAndVMT WorkerTripNumber 1,393.00 279.00 tblWater IndoorWaterUseRate 8,144,253.20 4,472,304.06 tblWater IndoorWaterUseRate 12,835,343.05 6,619,019.72 tblWater IndoorWaterUseRate 1,111,087.82 909,125.22 tblWater IndoorWaterUseRate 25,931,302.20 18,992,412.22 tblWater OutdoorWaterUseRate 5,134,420.50 2,859,341.94 tblWater OutdoorWaterUseRate 22,733,464.15 10,427,245.00 tblWater OutdoorWaterUseRate 8,091,846.70 4,231,832.28 tblWater OutdoorWaterUseRate 680,989.31 557,205.78 tblWater OutdoorWaterUseRate 16,347,994.86 12,142,689.78 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 6 of 100 2.0 Emissions Summary tblWoodstoves WoodstoveDayYear 60.00 0.00 tblWoodstoves WoodstoveDayYear 60.00 0.00 tblWoodstoves WoodstoveDayYear 60.00 0.00 tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 7 of 100 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2019 7.6249 81.0657 62.7117 0.0877 18.2442 3.8357 22.0799 9.9779 3.5289 13.5067 0.0000 8,634.756 9 8,634.756 9 2.6936 0.0000 8,691.321 6 2020 14.0520 80.6805 160.2496 0.2827 34.0005 3.0020 36.9480 14.2006 2.7618 16.9355 0.0000 23,246.92 95 23,246.92 95 2.6377 0.0000 23,302.32 12 2021 2.8233 20.0344 28.0410 0.0597 2.7582 1.0668 3.8251 0.7315 1.0085 1.7400 0.0000 4,929.222 1 4,929.222 1 0.7296 0.0000 4,944.543 7 2022 2.5727 18.0325 27.1572 0.0597 2.7582 0.9053 3.6635 0.7315 0.8564 1.5879 0.0000 4,896.639 5 4,896.639 5 0.7199 0.0000 4,911.756 6 2023 745.3715 35.0103 116.3297 0.2553 18.2442 1.5556 19.6361 9.9779 1.4311 11.2584 0.0000 20,114.38 30 20,114.38 30 1.9422 0.0000 20,155.16 88 2024 745.3255 33.2116 112.5360 0.2552 18.2442 1.4247 19.4952 9.9779 1.3107 11.1288 0.0000 19,977.72 89 19,977.72 89 1.9415 0.0000 20,018.49 97 2025 745.2873 31.8432 109.5793 0.2552 18.2442 1.1880 19.2747 9.9779 1.0930 10.9259 0.0000 19,857.89 93 19,857.89 93 1.9407 0.0000 19,898.65 43 2026 8.4323 31.4375 106.8521 0.2552 15.9348 1.1880 16.8282 4.2701 1.0930 5.1036 0.0000 19,753.90 78 19,753.90 78 1.9405 0.0000 19,794.65 88 2027 8.0069 31.0739 101.6962 0.2551 15.9350 0.8943 16.8293 4.2702 0.8344 5.1046 0.0000 19,663.19 85 19,663.19 85 1.0428 0.0000 19,685.09 82 2028 426.1259 30.7470 96.8181 0.2550 15.9352 0.8946 16.8298 4.2703 0.8347 5.1050 0.0000 19,585.17 25 19,585.17 25 1.0326 0.0000 19,606.85 71 2029 827.9264 30.5245 95.3237 0.2550 18.2442 1.1880 19.2747 9.9779 1.0930 10.9259 0.0000 19,518.28 11 19,518.28 11 1.9401 0.0000 19,559.02 26 Total 3,533.548 7 423.6611 1,017.294 5 2.2756 178.5429 17.1430 194.6844 78.3637 15.8453 93.3224 0.0000 180,178.1 191 180,178.1 191 18.5611 0.0000 180,567.9 025 Unmitigated Construction CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 8 of 100 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2019 4.1122 71.9811 55.7066 0.0877 8.3078 2.0338 10.2469 4.5160 2.0337 6.4550 0.0000 8,634.756 9 8,634.756 9 2.6936 0.0000 8,691.321 6 2020 10.7795 77.0120 151.4811 0.2827 24.0640 2.0335 25.8769 8.7387 2.0334 10.5172 0.0000 23,246.92 95 23,246.92 95 2.6377 0.0000 23,302.32 12 2021 1.9034 26.9813 29.3338 0.0597 2.7582 1.0145 3.7728 0.7315 1.0132 1.7448 0.0000 4,929.222 1 4,929.222 1 0.7296 0.0000 4,944.543 7 2022 1.8611 26.9016 28.6641 0.0597 2.7582 1.0145 3.7727 0.7315 1.0132 1.7447 0.0000 4,896.639 5 4,896.639 5 0.7199 0.0000 4,911.756 6 2023 745.2938 51.0193 117.9361 0.2553 15.9346 1.3795 17.2028 4.5160 1.3794 5.5096 0.0000 20,114.38 30 20,114.38 30 1.9422 0.0000 20,155.16 88 2024 745.2587 51.0148 114.2184 0.2552 15.9345 1.3795 17.2040 4.5160 1.3794 5.5107 0.0000 19,977.72 89 19,977.72 89 1.9415 0.0000 20,018.49 97 2025 745.2303 51.0111 111.3431 0.2552 15.9346 1.3795 17.2054 4.5160 1.3794 5.5120 0.0000 19,857.89 93 19,857.89 93 1.9407 0.0000 19,898.65 43 2026 8.1491 51.0080 108.6159 0.2552 15.9348 1.3796 17.2047 4.2701 1.3795 5.5113 0.0000 19,753.90 78 19,753.90 78 1.9405 0.0000 19,794.65 88 2027 7.7236 42.1257 103.4600 0.2551 15.9350 1.2709 17.2059 4.2702 1.2421 5.5123 0.0000 19,663.19 85 19,663.19 85 1.0428 0.0000 19,685.09 82 2028 426.0689 41.7989 98.5819 0.2550 15.9352 1.2712 17.2064 4.2703 1.2423 5.5126 0.0000 19,585.17 25 19,585.17 25 1.0326 0.0000 19,606.85 71 2029 827.8695 51.0001 97.0875 0.2550 15.9353 1.3796 17.2070 4.5160 1.3795 5.5131 0.0000 19,518.28 11 19,518.28 11 1.9401 0.0000 19,559.02 26 Total 3,524.250 0 541.8537 1,016.428 3 2.2756 149.4323 15.5361 164.1054 45.5924 15.4752 59.0434 0.0000 180,178.1 191 180,178.1 191 18.5611 0.0000 180,567.9 025 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.26 -27.90 0.09 0.00 16.30 9.37 15.71 41.82 2.34 36.73 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 9 of 100 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 64.2250 0.6845 59.4156 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3275 107.3275 0.1029 0.0000 109.4875 Energy 0.5650 4.8286 2.0589 0.0308 0.3904 0.3904 0.3904 0.3904 6,163.454 9 6,163.454 9 0.1181 0.1130 6,200.964 7 Mobile 17.4010 32.0823 152.7690 0.5073 36.6866 0.6320 37.3186 9.8103 0.5833 10.3937 37,006.04 91 37,006.04 91 1.0332 37,027.74 62 Total 82.1909 37.5954 214.2435 0.5413 36.6866 1.3524 38.0390 9.8103 1.3037 11.1140 0.0000 43,276.83 16 43,276.83 16 1.2542 0.1130 43,338.19 84 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 59.8618 0.6845 59.4156 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3275 107.3275 0.1029 0.0000 109.4875 Energy 0.4472 3.8217 1.6294 0.0244 0.3090 0.3090 0.3090 0.3090 4,878.227 4 4,878.227 4 0.0935 0.0894 4,907.915 5 Mobile 16.5372 27.8803 137.0716 0.4242 30.4535 0.5377 30.9912 8.1436 0.4963 8.6398 30,933.00 40 30,933.00 40 0.8756 30,951.39 11 Total 76.8462 32.3866 198.1166 0.4517 30.4535 1.1766 31.6301 8.1436 1.1352 9.2788 0.0000 35,918.55 89 35,918.55 89 1.0719 0.0894 35,968.79 41 Mitigated Operational CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 10 of 100 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Offsite Construction – Site Preparation Site Preparation 1/1/2019 3/25/2019 5 60 2 Offsite Construction – Grading Grading 3/26/2019 10/28/2019 5 155 3 Offsite Construction – Paving Paving 10/29/2019 12/31/2019 5 46 4 Phase I – Site Preparation Site Preparation 1/1/2020 1/21/2020 5 15 5 Phase I, III, IV – Grading Grading 1/22/2020 7/14/2020 5 125 6 Phase I – Building Construction Building Construction 7/15/2020 1/31/2023 5 665 7 Phase I – Paving Paving 2/1/2023 2/21/2023 5 15 8 Phase I – Architectural Coating Architectural Coating 2/22/2023 5/9/2023 5 55 9 Phase II – Site Preparation Site Preparation 5/10/2023 5/30/2023 5 15 10 Phase II – Grading Grading 5/31/2023 7/11/2023 5 30 11 Phase II – Building Construction Building Construction 7/12/2023 11/28/2023 5 100 12 Phase II – Paving Paving 11/29/2023 12/19/2023 5 15 13 Phase II – Architectural Coating Architectural Coating 12/20/2023 1/16/2024 5 20 14 Phase III – Site Preparation Site Preparation 1/17/2024 2/13/2024 5 20 15 Phase III – Grading Grading 2/14/2024 4/2/2024 5 35 16 Phase III – Building Construction Building Construction 4/3/2024 7/22/2025 5 340 17 Phase III – Architectural Coating Architectural Coating 7/23/2025 8/19/2025 5 20 18 Phase III – Paving Paving 8/20/2025 9/16/2025 5 20 19 Phases IV & V – Site Preparation Site Preparation 9/17/2025 11/11/2025 5 40 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 6.50 13.85 7.53 16.54 16.99 13.00 16.85 16.99 12.92 16.51 0.00 17.00 17.00 14.53 20.86 17.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 11 of 100 20 Phases IV & V – Grading Grading 11/12/2025 5/19/2026 5 135 21 Phases IV & V – Building Construction Building Construction 5/20/2026 10/10/2028 5 625 22 Phases IV & V – Architectural Coating Architectural Coating 10/11/2028 11/28/2028 5 35 23 Phases IV & V – Paving Paving 11/29/2028 1/9/2029 5 30 24 Phase VI – Site Preparation Site Preparation 1/10/2029 1/16/2029 5 5 25 Phase VI – Grading Grading 1/17/2029 2/6/2029 5 15 26 Phase VI – Building Construction Building Construction 2/7/2029 9/4/2029 5 150 27 Phase VI – Architectural Coating Architectural Coating 9/5/2029 9/28/2029 5 18 28 Phase VI – Paving Paving 9/30/2029 10/5/2029 5 5 OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Phase I – Building Construction Air Compressors 1 6.00 78 0.48 Offsite Construction – Site Preparation Excavators 3 8.00 162 0.38 Offsite Construction – Site Preparation Concrete/Industrial Saws 1 8.00 81 0.73 Offsite Construction – Paving Excavators 2 8.00 162 0.38 Phase I – Site Preparation Cranes 1 7.00 226 0.29 Phase I – Site Preparation Forklifts 3 8.00 89 0.20 Phase I – Site Preparation Generator Sets 1 8.00 84 0.74 Phase I, III, IV – Grading Pavers 2 8.00 125 0.42 Phase I, III, IV – Grading Rollers 2 8.00 80 0.38 Residential Indoor: 2,102,760; Residential Outdoor: 700,920; Non-Residential Indoor: 2,716,339; Non-Residential Outdoor: 905,446 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 0 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 12 of 100 Offsite Construction – Site Preparation Rubber Tired Dozers 2 8.00 255 0.40 Offsite Construction – Paving Rubber Tired Dozers 1 8.00 255 0.40 Phase I – Site Preparation Tractors/Loaders/Backhoes 3 7.00 97 0.37 Offsite Construction – Paving Graders 1 8.00 174 0.41 Offsite Construction – Paving Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase I, III, IV – Grading Paving Equipment 2 8.00 130 0.36 Offsite Construction – Grading Tractors/Loaders/Backhoes 4 8.00 97 0.37 Offsite Construction – Grading Rubber Tired Dozers 3 8.00 255 0.40 Offsite Construction – Paving Scrapers 2 8.00 361 0.48 Phase I – Site Preparation Welders 1 8.00 46 0.45 Phase II – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase III – Architectural Coating Air Compressors 1 6.00 78 0.48 Phases IV & V – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase VI – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase I – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase II – Building Construction Cranes 1 7.00 226 0.29 Phase III – Building Construction Cranes 1 7.00 226 0.29 Phases IV & V – Building Construction Cranes 1 7.00 226 0.29 Phase VI – Building Construction Cranes 1 7.00 226 0.29 Phase I – Building Construction Cranes 1 7.00 226 0.29 Phase II – Grading Excavators 2 8.00 162 0.38 Phase III – Grading Excavators 2 8.00 162 0.38 Offsite Construction – Grading Excavators 2 8.00 162 0.38 Phases IV & V – Grading Excavators 2 8.00 162 0.38 Phase VI – Grading Excavators 2 8.00 162 0.38 Phase I, III, IV – Grading Excavators 2 8.00 162 0.38 Phase II – Building Construction Forklifts 3 8.00 89 0.20 Phase III – Building Construction Forklifts 3 8.00 89 0.20 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 13 of 100 Phases IV & V – Building Construction Forklifts 3 8.00 89 0.20 Phase VI – Building Construction Forklifts 3 8.00 89 0.20 Phase I – Building Construction Forklifts 3 8.00 89 0.20 Phase II – Building Construction Generator Sets 1 8.00 84 0.74 Phase III – Building Construction Generator Sets 1 8.00 84 0.74 Phases IV & V – Building Construction Generator Sets 1 8.00 84 0.74 Phase VI – Building Construction Generator Sets 1 8.00 84 0.74 Phase I – Building Construction Generator Sets 1 8.00 84 0.74 Phase II – Grading Graders 1 8.00 174 0.41 Phase III – Grading Graders 1 8.00 174 0.41 Offsite Construction – Grading Graders 1 8.00 174 0.41 Phases IV & V – Grading Graders 1 8.00 174 0.41 Phase VI – Grading Graders 1 8.00 174 0.41 Phase I, III, IV – Grading Graders 1 8.00 174 0.41 Phase II – Paving Pavers 2 8.00 125 0.42 Phase III – Paving Pavers 2 8.00 125 0.42 Phases IV & V – Paving Pavers 2 8.00 125 0.42 Phase VI – Paving Pavers 2 8.00 125 0.42 Offsite Construction – Paving Pavers 2 8.00 125 0.42 Phase I – Paving Pavers 2 8.00 125 0.42 Phase II – Paving Paving Equipment 2 8.00 130 0.36 Phase III – Paving Paving Equipment 2 8.00 130 0.36 Phases IV & V – Paving Paving Equipment 2 8.00 130 0.36 Phase VI – Paving Paving Equipment 2 8.00 130 0.36 Offsite Construction – Paving Paving Equipment 2 8.00 130 0.36 Phase I – Paving Paving Equipment 2 8.00 130 0.36 Phase II – Paving Rollers 2 8.00 80 0.38 Phase III – Paving Rollers 2 8.00 80 0.38 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 14 of 100 Phases IV & V – Paving Rollers 2 8.00 80 0.38 Phase VI – Paving Rollers 2 8.00 80 0.38 Offsite Construction – Paving Rollers 2 8.00 80 0.38 Phase I – Paving Rollers 2 8.00 80 0.38 Phase II – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase III – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phases IV & V – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase VI – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase I, III, IV – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase III – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phases IV & V – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase VI – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase I – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase II – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase II – Grading Scrapers 2 8.00 361 0.48 Phase III – Grading Scrapers 2 8.00 361 0.48 Offsite Construction – Grading Scrapers 2 8.00 361 0.48 Phases IV & V – Grading Scrapers 2 8.00 361 0.48 Phase VI – Grading Scrapers 2 8.00 361 0.48 Phase I, III, IV – Grading Scrapers 2 8.00 361 0.48 Phase II – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase III – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phases IV & V – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase VI – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase I – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase II – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase III – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phases IV & V – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 15 of 100 Phase VI – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase I, III, IV – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Offsite Construction – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase III – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phases IV & V – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase VI – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase II – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase II – Building Construction Welders 1 8.00 46 0.45 Phase III – Building Construction Welders 1 8.00 46 0.45 Phases IV & V – Building Construction Welders 1 8.00 46 0.45 Phase VI – Building Construction Welders 1 8.00 46 0.45 Phase I – Building Construction Welders 1 8.00 46 0.45 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Offsite Construction – Site Preparation 10 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Offsite Construction – Grading 12 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Offsite Construction – Paving 14 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Site Preparation 12 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I, III, IV – Grading 14 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Building Construction 10 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 16 of 100 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area Reduce Vehicle Speed on Unpaved Roads Clean Paved Roads Phase III – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 17 of 100 3.2 Offsite Construction – Site Preparation - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 12.0442 0.0000 12.0442 6.6205 0.0000 6.6205 0.0000 0.0000 Off-Road 4.2536 43.2907 40.0157 0.0524 2.2690 2.2690 2.1058 2.1058 5,159.400 1 5,159.400 1 1.4866 5,190.618 3 Total 4.2536 43.2907 40.0157 0.0524 12.0442 2.2690 14.3131 6.6205 2.1058 8.7262 5,159.400 1 5,159.400 1 1.4866 5,190.618 3 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0454 0.0748 0.6268 1.6100e- 003 0.1483 9.9000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 119.9921 119.9921 5.9700e- 003 120.1175 Total 0.0454 0.0748 0.6268 1.6100e- 003 0.1483 9.9000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 119.9921 119.9921 5.9700e- 003 120.1175 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 18 of 100 3.2 Offsite Construction – Site Preparation - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 5.4199 0.0000 5.4199 2.9792 0.0000 2.9792 0.0000 0.0000 Off-Road 1.8728 45.4945 34.6332 0.0524 1.4199 1.4199 1.4199 1.4199 0.0000 5,159.400 1 5,159.400 1 1.4866 5,190.618 3 Total 1.8728 45.4945 34.6332 0.0524 5.4199 1.4199 6.8398 2.9792 1.4199 4.3991 0.0000 5,159.400 1 5,159.400 1 1.4866 5,190.618 3 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0454 0.0748 0.6268 1.6100e- 003 0.1483 9.9000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 119.9921 119.9921 5.9700e- 003 120.1175 Total 0.0454 0.0748 0.6268 1.6100e- 003 0.1483 9.9000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 119.9921 119.9921 5.9700e- 003 120.1175 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 19 of 100 3.3 Offsite Construction – Grading - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 7.4152 80.9760 61.9596 0.0857 3.8345 3.8345 3.5278 3.5278 8,490.766 4 8,490.766 4 2.6864 8,547.180 6 Total 7.4152 80.9760 61.9596 0.0857 18.0663 3.8345 21.9008 9.9307 3.5278 13.4585 8,490.766 4 8,490.766 4 2.6864 8,547.180 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0545 0.0897 0.7522 1.9300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 143.9905 143.9905 7.1700e- 003 144.1410 Total 0.0545 0.0897 0.7522 1.9300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 143.9905 143.9905 7.1700e- 003 144.1410 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 20 of 100 3.3 Offsite Construction – Grading - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 2.6151 71.8913 51.9820 0.0857 1.9380 1.9380 1.9380 1.9380 0.0000 8,490.766 4 8,490.766 4 2.6864 8,547.180 5 Total 2.6151 71.8913 51.9820 0.0857 8.1298 1.9380 10.0678 4.4688 1.9380 6.4068 0.0000 8,490.766 4 8,490.766 4 2.6864 8,547.180 5 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0545 0.0897 0.7522 1.9300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 143.9905 143.9905 7.1700e- 003 144.1410 Total 0.0545 0.0897 0.7522 1.9300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 143.9905 143.9905 7.1700e- 003 144.1410 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 21 of 100 3.4 Offsite Construction – Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 6.3170 69.1331 54.6540 0.0840 3.3143 3.3143 3.0492 3.0492 8,320.285 2 8,320.285 2 2.6325 8,375.566 7 Paving 1.2474 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 7.5644 69.1331 54.6540 0.0840 3.3143 3.3143 3.0492 3.0492 8,320.285 2 8,320.285 2 2.6325 8,375.566 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0605 0.0997 0.8357 2.1500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 159.9895 159.9895 7.9600e- 003 160.1567 Total 0.0605 0.0997 0.8357 2.1500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 159.9895 159.9895 7.9600e- 003 160.1567 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 22 of 100 3.4 Offsite Construction – Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.8043 70.6463 54.8708 0.0840 2.0325 2.0325 2.0325 2.0325 0.0000 8,320.285 2 8,320.285 2 2.6325 8,375.566 7 Paving 1.2474 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.0517 70.6463 54.8708 0.0840 2.0325 2.0325 2.0325 2.0325 0.0000 8,320.285 2 8,320.285 2 2.6325 8,375.566 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0605 0.0997 0.8357 2.1500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 159.9895 159.9895 7.9600e- 003 160.1567 Total 0.0605 0.0997 0.8357 2.1500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 159.9895 159.9895 7.9600e- 003 160.1567 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 23 of 100 3.5 Phase I – Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 4.9983 49.5273 40.6161 0.0535 2.5112 2.5112 2.3330 2.3330 5,131.687 5 5,131.687 5 1.4568 5,162.281 1 Total 4.9983 49.5273 40.6161 0.0535 18.0663 2.5112 20.5775 9.9307 2.3330 12.2637 5,131.687 5 5,131.687 5 1.4568 5,162.281 1 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 5.2455 24.8458 67.2689 0.0798 2.1628 0.3466 2.5094 0.6175 0.3188 0.9362 7,420.474 6 7,420.474 6 0.0606 7,421.746 9 Worker 3.8082 6.3074 52.3646 0.1494 13.7714 0.0898 13.8612 3.6524 0.0832 3.7357 10,694.76 74 10,694.76 74 0.5159 10,705.60 16 Total 9.0537 31.1532 119.6335 0.2292 15.9342 0.4364 16.3706 4.2699 0.4020 4.6719 18,115.24 20 18,115.24 20 0.5765 18,127.34 85 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 24 of 100 3.5 Phase I – Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.7258 45.8587 31.8476 0.0535 1.3765 1.3765 1.3765 1.3765 0.0000 5,131.687 5 5,131.687 5 1.4568 5,162.281 1 Total 1.7258 45.8587 31.8476 0.0535 8.1298 1.3765 9.5063 4.4688 1.3765 5.8453 0.0000 5,131.687 5 5,131.687 5 1.4568 5,162.281 1 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 5.2455 24.8458 67.2689 0.0798 2.1628 0.3466 2.5094 0.6175 0.3188 0.9362 7,420.474 6 7,420.474 6 0.0606 7,421.746 9 Worker 3.8082 6.3074 52.3646 0.1494 13.7714 0.0898 13.8612 3.6524 0.0832 3.7357 10,694.76 74 10,694.76 74 0.5159 10,705.60 16 Total 9.0537 31.1532 119.6335 0.2292 15.9342 0.4364 16.3706 4.2699 0.4020 4.6719 18,115.24 20 18,115.24 20 0.5765 18,127.34 85 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 25 of 100 3.6 Phase I, III, IV – Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 5.8802 63.1684 52.7780 0.0840 3.0010 3.0010 2.7609 2.7609 8,138.465 9 8,138.465 9 2.6321 8,193.741 0 Total 5.8802 63.1684 52.7780 0.0840 8.6733 3.0010 11.6743 3.5965 2.7609 6.3574 8,138.465 9 8,138.465 9 2.6321 8,193.741 0 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0410 0.0679 0.5639 1.6100e- 003 0.1483 9.7000e- 004 0.1493 0.0393 9.0000e- 004 0.0402 115.1626 115.1626 5.5600e- 003 115.2793 Total 0.0410 0.0679 0.5639 1.6100e- 003 0.1483 9.7000e- 004 0.1493 0.0393 9.0000e- 004 0.0402 115.1626 115.1626 5.5600e- 003 115.2793 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 26 of 100 3.6 Phase I, III, IV – Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 2.8043 70.6463 54.8708 0.0840 2.0325 2.0325 2.0325 2.0325 0.0000 8,138.465 9 8,138.465 9 2.6321 8,193.741 0 Total 2.8043 70.6463 54.8708 0.0840 3.9030 2.0325 5.9355 1.6184 2.0325 3.6509 0.0000 8,138.465 9 8,138.465 9 2.6321 8,193.741 0 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0410 0.0679 0.5639 1.6100e- 003 0.1483 9.7000e- 004 0.1493 0.0393 9.0000e- 004 0.0402 115.1626 115.1626 5.5600e- 003 115.2793 Total 0.0410 0.0679 0.5639 1.6100e- 003 0.1483 9.7000e- 004 0.1493 0.0393 9.0000e- 004 0.0402 115.1626 115.1626 5.5600e- 003 115.2793 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 27 of 100 3.7 Phase I – Building Construction - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.3534 20.7678 18.6399 0.0298 1.2238 1.2238 1.1574 1.1574 2,823.928 0 2,823.928 0 0.6412 2,837.393 7 Total 2.3534 20.7678 18.6399 0.0298 1.2238 1.2238 1.1574 1.1574 2,823.928 0 2,823.928 0 0.6412 2,837.393 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.7627 1.2633 10.4880 0.0299 2.7582 0.0180 2.7762 0.7315 0.0167 0.7482 2,142.024 5 2,142.024 5 0.1033 2,144.194 4 Total 0.7627 1.2633 10.4880 0.0299 2.7582 0.0180 2.7762 0.7315 0.0167 0.7482 2,142.024 5 2,142.024 5 0.1033 2,144.194 4 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 28 of 100 3.7 Phase I – Building Construction - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,823.928 0 2,823.928 0 0.6412 2,837.393 7 Total 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,823.928 0 2,823.928 0 0.6412 2,837.393 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.7627 1.2633 10.4880 0.0299 2.7582 0.0180 2.7762 0.7315 0.0167 0.7482 2,142.024 5 2,142.024 5 0.1033 2,144.194 4 Total 0.7627 1.2633 10.4880 0.0299 2.7582 0.0180 2.7762 0.7315 0.0167 0.7482 2,142.024 5 2,142.024 5 0.1033 2,144.194 4 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 29 of 100 3.7 Phase I – Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.1120 18.8671 18.3552 0.0298 1.0490 1.0490 0.9919 0.9919 2,824.229 8 2,824.229 8 0.6319 2,837.499 8 Total 2.1120 18.8671 18.3552 0.0298 1.0490 1.0490 0.9919 0.9919 2,824.229 8 2,824.229 8 0.6319 2,837.499 8 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.7113 1.1673 9.6858 0.0299 2.7582 0.0179 2.7761 0.7315 0.0166 0.7481 2,104.992 3 2,104.992 3 0.0977 2,107.043 9 Total 0.7113 1.1673 9.6858 0.0299 2.7582 0.0179 2.7761 0.7315 0.0166 0.7481 2,104.992 3 2,104.992 3 0.0977 2,107.043 9 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 30 of 100 3.7 Phase I – Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,824.229 8 2,824.229 8 0.6319 2,837.499 8 Total 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,824.229 8 2,824.229 8 0.6319 2,837.499 8 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.7113 1.1673 9.6858 0.0299 2.7582 0.0179 2.7761 0.7315 0.0166 0.7481 2,104.992 3 2,104.992 3 0.0977 2,107.043 9 Total 0.7113 1.1673 9.6858 0.0299 2.7582 0.0179 2.7761 0.7315 0.0166 0.7481 2,104.992 3 2,104.992 3 0.0977 2,107.043 9 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 31 of 100 3.7 Phase I – Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.9037 16.9449 18.1412 0.0298 0.8874 0.8874 0.8398 0.8398 2,825.197 7 2,825.197 7 0.6269 2,838.361 5 Total 1.9037 16.9449 18.1412 0.0298 0.8874 0.8874 0.8398 0.8398 2,825.197 7 2,825.197 7 0.6269 2,838.361 5 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6690 1.0877 9.0161 0.0299 2.7582 0.0178 2.7761 0.7315 0.0165 0.7481 2,071.441 8 2,071.441 8 0.0930 2,073.395 1 Total 0.6690 1.0877 9.0161 0.0299 2.7582 0.0178 2.7761 0.7315 0.0165 0.7481 2,071.441 8 2,071.441 8 0.0930 2,073.395 1 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 32 of 100 3.7 Phase I – Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,825.197 7 2,825.197 7 0.6269 2,838.361 5 Total 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,825.197 7 2,825.197 7 0.6269 2,838.361 5 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6690 1.0877 9.0161 0.0299 2.7582 0.0178 2.7761 0.7315 0.0165 0.7481 2,071.441 8 2,071.441 8 0.0930 2,073.395 1 Total 0.6690 1.0877 9.0161 0.0299 2.7582 0.0178 2.7761 0.7315 0.0165 0.7481 2,071.441 8 2,071.441 8 0.0930 2,073.395 1 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 33 of 100 3.7 Phase I – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.7578 15.6156 18.0204 0.0298 0.7675 0.7675 0.7265 0.7265 2,826.074 3 2,826.074 3 0.6213 2,839.120 8 Total 1.7578 15.6156 18.0204 0.0298 0.7675 0.7675 0.7265 0.7265 2,826.074 3 2,826.074 3 0.6213 2,839.120 8 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Total 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 34 of 100 3.7 Phase I – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,826.074 3 2,826.074 3 0.6213 2,839.120 8 Total 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,826.074 3 2,826.074 3 0.6213 2,839.120 8 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Total 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 35 of 100 3.8 Phase I – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0128 9.9983 14.2850 0.0223 0.5010 0.5010 0.4609 0.4609 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Paving 3.8252 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.8380 9.9983 14.2850 0.0223 0.5010 0.5010 0.4609 0.4609 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0338 0.0546 0.4506 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 109.7242 109.7242 4.7800e- 003 109.8245 Total 0.0338 0.0546 0.4506 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 109.7242 109.7242 4.7800e- 003 109.8245 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 36 of 100 3.8 Phase I – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Paving 3.8252 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.7374 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0338 0.0546 0.4506 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 109.7242 109.7242 4.7800e- 003 109.8245 Total 0.0338 0.0546 0.4506 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 109.7242 109.7242 4.7800e- 003 109.8245 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 37 of 100 3.9 Phase I – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 270.7457 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1917 1.3030 1.8111 2.9700e- 003 0.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8017 Total 270.9374 1.3030 1.8111 2.9700e- 003 0.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8017 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Total 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 38 of 100 3.9 Phase I – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 270.7457 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0168 281.8017 Total 270.8596 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0168 281.8017 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Total 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 39 of 100 3.10 Phase II – Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 3.0157 29.9342 28.8193 0.0392 1.3907 1.3907 1.2795 1.2795 3,793.953 5 3,793.953 5 1.2270 3,819.721 4 Total 3.0157 29.9342 28.8193 0.0392 18.0663 1.3907 19.4570 9.9307 1.2795 11.2102 3,793.953 5 3,793.953 5 1.2270 3,819.721 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0406 0.0655 0.5408 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 131.6690 131.6690 5.7300e- 003 131.7894 Total 0.0406 0.0655 0.5408 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 131.6690 131.6690 5.7300e- 003 131.7894 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 40 of 100 3.10 Phase II – Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.2300 34.4240 23.4003 0.0392 0.9611 0.9611 0.9611 0.9611 0.0000 3,793.953 5 3,793.953 5 1.2270 3,819.721 4 Total 1.2300 34.4240 23.4003 0.0392 8.1298 0.9611 9.0909 4.4688 0.9611 5.4299 0.0000 3,793.953 5 3,793.953 5 1.2270 3,819.721 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0406 0.0655 0.5408 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 131.6690 131.6690 5.7300e- 003 131.7894 Total 0.0406 0.0655 0.5408 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 131.6690 131.6690 5.7300e- 003 131.7894 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 41 of 100 3.11 Phase II – Grading - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.5314 34.9375 34.1888 0.0618 1.5543 1.5543 1.4300 1.4300 5,985.435 9 5,985.435 9 1.9358 6,026.087 9 Total 3.5314 34.9375 34.1888 0.0618 8.6733 1.5543 10.2276 3.5965 1.4300 5.0265 5,985.435 9 5,985.435 9 1.9358 6,026.087 9 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0451 0.0728 0.6008 2.1400e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 146.2989 146.2989 6.3700e- 003 146.4326 Total 0.0451 0.0728 0.6008 2.1400e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 146.2989 146.2989 6.3700e- 003 146.4326 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 42 of 100 3.11 Phase II – Grading - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,985.435 9 5,985.435 9 1.9358 6,026.087 9 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,985.435 9 5,985.435 9 1.9358 6,026.087 9 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0451 0.0728 0.6008 2.1400e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 146.2989 146.2989 6.3700e- 003 146.4326 Total 0.0451 0.0728 0.6008 2.1400e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 146.2989 146.2989 6.3700e- 003 146.4326 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 43 of 100 3.12 Phase II – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.5661 14.3126 16.2093 0.0268 0.6967 0.6967 0.6557 0.6557 2,544.626 2 2,544.626 2 0.6044 2,557.319 1 Total 1.5661 14.3126 16.2093 0.0268 0.6967 0.6967 0.6557 0.6557 2,544.626 2 2,544.626 2 0.6044 2,557.319 1 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.4520 15.2368 58.2727 0.0793 2.1632 0.2779 2.4410 0.6176 0.2556 0.8732 7,380.039 0 7,380.039 0 0.0585 7,381.266 4 Worker 3.1409 5.0708 41.8478 0.1492 13.7714 0.0888 13.8602 3.6524 0.0824 3.7348 10,189.71 78 10,189.71 78 0.4436 10,199.03 30 Total 7.5930 20.3076 100.1205 0.2284 15.9346 0.3666 16.3012 4.2700 0.3380 4.6080 17,569.75 68 17,569.75 68 0.5020 17,580.29 94 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 44 of 100 3.12 Phase II – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0268 0.9016 0.9016 0.9016 0.9016 0.0000 2,544.626 2 2,544.626 2 0.6044 2,557.319 1 Total 1.0782 23.4615 17.8156 0.0268 0.9016 0.9016 0.9016 0.9016 0.0000 2,544.626 2 2,544.626 2 0.6044 2,557.319 1 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.4520 15.2368 58.2727 0.0793 2.1632 0.2779 2.4410 0.6176 0.2556 0.8732 7,380.039 0 7,380.039 0 0.0585 7,381.266 4 Worker 3.1409 5.0708 41.8478 0.1492 13.7714 0.0888 13.8602 3.6524 0.0824 3.7348 10,189.71 78 10,189.71 78 0.4436 10,199.03 30 Total 7.5930 20.3076 100.1205 0.2284 15.9346 0.3666 16.3012 4.2700 0.3380 4.6080 17,569.75 68 17,569.75 68 0.5020 17,580.29 94 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 45 of 100 3.13 Phase II – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0128 9.9983 14.2850 0.0223 0.5010 0.5010 0.4609 0.4609 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Paving 3.8252 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.8380 9.9983 14.2850 0.0223 0.5010 0.5010 0.4609 0.4609 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0338 0.0546 0.4506 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 109.7242 109.7242 4.7800e- 003 109.8245 Total 0.0338 0.0546 0.4506 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 109.7242 109.7242 4.7800e- 003 109.8245 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 46 of 100 3.13 Phase II – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Paving 3.8252 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.7374 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0338 0.0546 0.4506 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 109.7242 109.7242 4.7800e- 003 109.8245 Total 0.0338 0.0546 0.4506 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 109.7242 109.7242 4.7800e- 003 109.8245 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 47 of 100 3.14 Phase II – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1917 1.3030 1.8111 2.9700e- 003 0.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8017 Total 744.7424 1.3030 1.8111 2.9700e- 003 0.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8017 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Total 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 48 of 100 3.14 Phase II – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0168 281.8017 Total 744.6647 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0168 281.8017 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Total 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 49 of 100 3.14 Phase II – Architectural Coating - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e- 003 0.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.7809 Total 744.7315 1.2188 1.8101 2.9700e- 003 0.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.7809 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5940 0.9533 7.8679 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,013.337 4 2,013.337 4 0.0852 2,015.127 4 Total 0.5940 0.9533 7.8679 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,013.337 4 2,013.337 4 0.0852 2,015.127 4 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 50 of 100 3.14 Phase II – Architectural Coating - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0159 281.7809 Total 744.6647 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0159 281.7809 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5940 0.9533 7.8679 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,013.337 4 2,013.337 4 0.0852 2,015.127 4 Total 0.5940 0.9533 7.8679 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,013.337 4 2,013.337 4 0.0852 2,015.127 4 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 51 of 100 3.15 Phase III – Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 2.8238 27.5450 27.6020 0.0392 1.2498 1.2498 1.1498 1.1498 3,794.314 9 3,794.314 9 1.2272 3,820.085 2 Total 2.8238 27.5450 27.6020 0.0392 18.0663 1.2498 19.3161 9.9307 1.1498 11.0805 3,794.314 9 3,794.314 9 1.2272 3,820.085 2 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0383 0.0615 0.5076 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 129.8927 129.8927 5.5000e- 003 130.0082 Total 0.0383 0.0615 0.5076 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 129.8927 129.8927 5.5000e- 003 130.0082 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 52 of 100 3.15 Phase III – Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.2300 34.4240 23.4003 0.0392 0.9611 0.9611 0.9611 0.9611 0.0000 3,794.314 9 3,794.314 9 1.2272 3,820.085 2 Total 1.2300 34.4240 23.4003 0.0392 8.1298 0.9611 9.0909 4.4688 0.9611 5.4299 0.0000 3,794.314 9 3,794.314 9 1.2272 3,820.085 2 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0383 0.0615 0.5076 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 129.8927 129.8927 5.5000e- 003 130.0082 Total 0.0383 0.0615 0.5076 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 129.8927 129.8927 5.5000e- 003 130.0082 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 53 of 100 3.16 Phase III – Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.3599 32.1927 33.4441 0.0618 1.4234 1.4234 1.3096 1.3096 5,984.025 2 5,984.025 2 1.9354 6,024.667 7 Total 3.3599 32.1927 33.4441 0.0618 8.6733 1.4234 10.0968 3.5965 1.3096 4.9061 5,984.025 2 5,984.025 2 1.9354 6,024.667 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0426 0.0683 0.5640 2.1400e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 144.3253 144.3253 6.1100e- 003 144.4536 Total 0.0426 0.0683 0.5640 2.1400e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 144.3253 144.3253 6.1100e- 003 144.4536 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 54 of 100 3.16 Phase III – Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,984.025 2 5,984.025 2 1.9354 6,024.667 7 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,984.025 2 5,984.025 2 1.9354 6,024.667 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0426 0.0683 0.5640 2.1400e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 144.3253 144.3253 6.1100e- 003 144.4536 Total 0.0426 0.0683 0.5640 2.1400e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 144.3253 144.3253 6.1100e- 003 144.4536 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 55 of 100 3.17 Phase III – Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.4653 13.3774 16.1332 0.0268 0.6106 0.6106 0.5744 0.5744 2,545.115 4 2,545.115 4 0.6009 2,557.734 9 Total 1.4653 13.3774 16.1332 0.0268 0.6106 0.6106 0.5744 0.5744 2,545.115 4 2,545.115 4 0.6009 2,557.734 9 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.4478 15.0748 57.1198 0.0792 2.1632 0.2791 2.4423 0.6176 0.2568 0.8744 7,380.358 9 7,380.358 9 0.0587 7,381.591 2 Worker 2.9658 4.7595 39.2830 0.1491 13.7714 0.0887 13.8601 3.6524 0.0823 3.7348 10,052.25 46 10,052.25 46 0.4256 10,061.19 15 Total 7.4136 19.8342 96.4028 0.2284 15.9345 0.3678 16.3024 4.2700 0.3391 4.6091 17,432.61 35 17,432.61 35 0.4843 17,442.78 26 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 56 of 100 3.17 Phase III – Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0268 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.115 4 2,545.115 4 0.6009 2,557.734 9 Total 1.0782 23.4615 17.8156 0.0268 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.115 4 2,545.115 4 0.6009 2,557.734 9 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.4478 15.0748 57.1198 0.0792 2.1632 0.2791 2.4423 0.6176 0.2568 0.8744 7,380.358 9 7,380.358 9 0.0587 7,381.591 2 Worker 2.9658 4.7595 39.2830 0.1491 13.7714 0.0887 13.8601 3.6524 0.0823 3.7348 10,052.25 46 10,052.25 46 0.4256 10,061.19 15 Total 7.4136 19.8342 96.4028 0.2284 15.9345 0.3678 16.3024 4.2700 0.3391 4.6091 17,432.61 35 17,432.61 35 0.4843 17,442.78 26 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 57 of 100 3.17 Phase III – Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.3343 14.9316 56.2838 0.0792 2.1632 0.2801 2.4434 0.6176 0.2577 0.8754 7,380.858 5 7,380.858 5 0.0589 7,382.094 8 Worker 2.8243 4.5019 37.2437 0.1491 13.7714 0.0891 13.8605 3.6524 0.0827 3.7351 9,931.150 3 9,931.150 3 0.4107 9,939.774 8 Total 7.1587 19.4335 93.5275 0.2283 15.9346 0.3692 16.3039 4.2701 0.3404 4.6104 17,312.00 88 17,312.00 88 0.4696 17,321.86 96 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 58 of 100 3.17 Phase III – Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.3343 14.9316 56.2838 0.0792 2.1632 0.2801 2.4434 0.6176 0.2577 0.8754 7,380.858 5 7,380.858 5 0.0589 7,382.094 8 Worker 2.8243 4.5019 37.2437 0.1491 13.7714 0.0891 13.8605 3.6524 0.0827 3.7351 9,931.150 3 9,931.150 3 0.4107 9,939.774 8 Total 7.1587 19.4335 93.5275 0.2283 15.9346 0.3692 16.3039 4.2701 0.3404 4.6104 17,312.00 88 17,312.00 88 0.4696 17,321.86 96 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 59 of 100 3.18 Phase III – Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Total 744.7216 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5657 0.9017 7.4594 0.0299 2.7582 0.0178 2.7761 0.7315 0.0166 0.7481 1,989.081 8 1,989.081 8 0.0823 1,990.809 2 Total 0.5657 0.9017 7.4594 0.0299 2.7582 0.0178 2.7761 0.7315 0.0166 0.7481 1,989.081 8 1,989.081 8 0.0823 1,990.809 2 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 60 of 100 3.18 Phase III – Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Total 744.6647 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5657 0.9017 7.4594 0.0299 2.7582 0.0178 2.7761 0.7315 0.0166 0.7481 1,989.081 8 1,989.081 8 0.0823 1,990.809 2 Total 0.5657 0.9017 7.4594 0.0299 2.7582 0.0178 2.7761 0.7315 0.0166 0.7481 1,989.081 8 1,989.081 8 0.0823 1,990.809 2 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 61 of 100 3.19 Phase III – Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.8973 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 2.8689 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 3.7662 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0304 0.0485 0.4010 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 106.9399 106.9399 4.4200e- 003 107.0328 Total 0.0304 0.0485 0.4010 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 106.9399 106.9399 4.4200e- 003 107.0328 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 62 of 100 3.19 Phase III – Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 2.8689 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 3.7811 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0304 0.0485 0.4010 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 106.9399 106.9399 4.4200e- 003 107.0328 Total 0.0304 0.0485 0.4010 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 106.9399 106.9399 4.4200e- 003 107.0328 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 63 of 100 3.20 Phases IV & V – Site Preparation - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 2.5083 23.5257 24.8879 0.0392 1.0293 1.0293 0.9470 0.9470 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Total 2.5083 23.5257 24.8879 0.0392 18.0663 1.0293 19.0956 9.9307 0.9470 10.8776 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0365 0.0582 0.4813 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0700e- 003 0.0483 128.3279 128.3279 5.3100e- 003 128.4393 Total 0.0365 0.0582 0.4813 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0700e- 003 0.0483 128.3279 128.3279 5.3100e- 003 128.4393 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 64 of 100 3.20 Phases IV & V – Site Preparation - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.2300 34.4240 23.4003 0.0392 0.9611 0.9611 0.9611 0.9611 0.0000 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Total 1.2300 34.4240 23.4003 0.0392 8.1298 0.9611 9.0909 4.4688 0.9611 5.4299 0.0000 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0365 0.0582 0.4813 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0700e- 003 0.0483 128.3279 128.3279 5.3100e- 003 128.4393 Total 0.0365 0.0582 0.4813 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0700e- 003 0.0483 128.3279 128.3279 5.3100e- 003 128.4393 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 65 of 100 3.21 Phases IV & V – Grading - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.0022 27.2606 31.3515 0.0618 1.1867 1.1867 1.0918 1.0918 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 3.0022 27.2606 31.3515 0.0618 8.6733 1.1867 9.8600 3.5965 1.0918 4.6883 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0406 0.0646 0.5347 2.1400e- 003 0.1977 1.2800e- 003 0.1990 0.0524 1.1900e- 003 0.0536 142.5865 142.5865 5.9000e- 003 142.7103 Total 0.0406 0.0646 0.5347 2.1400e- 003 0.1977 1.2800e- 003 0.1990 0.0524 1.1900e- 003 0.0536 142.5865 142.5865 5.9000e- 003 142.7103 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 66 of 100 3.21 Phases IV & V – Grading - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0406 0.0646 0.5347 2.1400e- 003 0.1977 1.2800e- 003 0.1990 0.0524 1.1900e- 003 0.0536 142.5865 142.5865 5.9000e- 003 142.7103 Total 0.0406 0.0646 0.5347 2.1400e- 003 0.1977 1.2800e- 003 0.1990 0.0524 1.1900e- 003 0.0536 142.5865 142.5865 5.9000e- 003 142.7103 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 67 of 100 3.21 Phases IV & V – Grading - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.0022 27.2606 31.3515 0.0618 1.1867 1.1867 1.0918 1.0918 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 3.0022 27.2606 31.3515 0.0618 8.6733 1.1867 9.8600 3.5965 1.0918 4.6883 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0388 0.0615 0.5100 2.1400e- 003 0.1977 1.2900e- 003 0.1990 0.0524 1.2000e- 003 0.0536 141.0804 141.0804 5.7100e- 003 141.2003 Total 0.0388 0.0615 0.5100 2.1400e- 003 0.1977 1.2900e- 003 0.1990 0.0524 1.2000e- 003 0.0536 141.0804 141.0804 5.7100e- 003 141.2003 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 68 of 100 3.21 Phases IV & V – Grading - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0388 0.0615 0.5100 2.1400e- 003 0.1977 1.2900e- 003 0.1990 0.0524 1.2000e- 003 0.0536 141.0804 141.0804 5.7100e- 003 141.2003 Total 0.0388 0.0615 0.5100 2.1400e- 003 0.1977 1.2900e- 003 0.1990 0.0524 1.2000e- 003 0.0536 141.0804 141.0804 5.7100e- 003 141.2003 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 69 of 100 3.22 Phases IV & V – Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.3708 14.7439 55.2786 0.0792 2.1634 0.2785 2.4419 0.6177 0.2563 0.8739 7,381.769 9 7,381.769 9 0.0587 7,383.002 6 Worker 2.7001 4.2840 35.5218 0.1491 13.7714 0.0898 13.8612 3.6524 0.0834 3.7358 9,826.247 3 9,826.247 3 0.3979 9,834.603 5 Total 7.0709 19.0278 90.8003 0.2283 15.9348 0.3684 16.3031 4.2701 0.3396 4.6097 17,208.01 72 17,208.01 72 0.4566 17,217.60 60 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 70 of 100 3.22 Phases IV & V – Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.3708 14.7439 55.2786 0.0792 2.1634 0.2785 2.4419 0.6177 0.2563 0.8739 7,381.769 9 7,381.769 9 0.0587 7,383.002 6 Worker 2.7001 4.2840 35.5218 0.1491 13.7714 0.0898 13.8612 3.6524 0.0834 3.7358 9,826.247 3 9,826.247 3 0.3979 9,834.603 5 Total 7.0709 19.0278 90.8003 0.2283 15.9348 0.3684 16.3031 4.2701 0.3396 4.6097 17,208.01 72 17,208.01 72 0.4566 17,217.60 60 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 71 of 100 3.22 Phases IV & V – Building Construction - 2027 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.0589 14.5768 51.6618 0.0792 2.1636 0.2789 2.4425 0.6178 0.2566 0.8743 7,382.385 5 7,382.385 5 0.0588 7,383.620 3 Worker 2.5865 4.0874 33.9826 0.1491 13.7714 0.0904 13.8618 3.6524 0.0839 3.7364 9,734.922 4 9,734.922 4 0.3865 9,743.039 3 Total 6.6454 18.6642 85.6444 0.2282 15.9350 0.3693 16.3043 4.2702 0.3405 4.6107 17,117.30 79 17,117.30 79 0.4453 17,126.65 96 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 72 of 100 3.22 Phases IV & V – Building Construction - 2027 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.0589 14.5768 51.6618 0.0792 2.1636 0.2789 2.4425 0.6178 0.2566 0.8743 7,382.385 5 7,382.385 5 0.0588 7,383.620 3 Worker 2.5865 4.0874 33.9826 0.1491 13.7714 0.0904 13.8618 3.6524 0.0839 3.7364 9,734.922 4 9,734.922 4 0.3865 9,743.039 3 Total 6.6454 18.6642 85.6444 0.2282 15.9350 0.3693 16.3043 4.2702 0.3405 4.6107 17,117.30 79 17,117.30 79 0.4453 17,126.65 96 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 73 of 100 3.22 Phases IV & V – Building Construction - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.9301 14.4292 48.1410 0.0791 2.1638 0.2786 2.4424 0.6178 0.2563 0.8742 7,383.081 5 7,383.081 5 0.0588 7,384.316 8 Worker 2.4836 3.9081 32.6253 0.1490 13.7714 0.0910 13.8624 3.6524 0.0844 3.7369 9,656.200 5 9,656.200 5 0.3763 9,664.101 8 Total 6.4138 18.3373 80.7663 0.2281 15.9352 0.3696 16.3048 4.2703 0.3408 4.6111 17,039.28 20 17,039.28 20 0.4351 17,048.41 86 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 74 of 100 3.22 Phases IV & V – Building Construction - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.9301 14.4292 48.1410 0.0791 2.1638 0.2786 2.4424 0.6178 0.2563 0.8742 7,383.081 5 7,383.081 5 0.0588 7,384.316 8 Worker 2.4836 3.9081 32.6253 0.1490 13.7714 0.0910 13.8624 3.6524 0.0844 3.7369 9,656.200 5 9,656.200 5 0.3763 9,664.101 8 Total 6.4138 18.3373 80.7663 0.2281 15.9352 0.3696 16.3048 4.2703 0.3408 4.6111 17,039.28 20 17,039.28 20 0.4351 17,048.41 86 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 75 of 100 3.23 Phases IV & V – Architectural Coating - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 425.4576 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Total 425.6284 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.4974 0.7828 6.5344 0.0299 2.7582 0.0182 2.7765 0.7315 0.0169 0.7485 1,934.012 9 1,934.012 9 0.0754 1,935.595 4 Total 0.4974 0.7828 6.5344 0.0299 2.7582 0.0182 2.7765 0.7315 0.0169 0.7485 1,934.012 9 1,934.012 9 0.0754 1,935.595 4 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 76 of 100 3.23 Phases IV & V – Architectural Coating - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 425.4576 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Total 425.5715 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.4974 0.7828 6.5344 0.0299 2.7582 0.0182 2.7765 0.7315 0.0169 0.7485 1,934.012 9 1,934.012 9 0.0754 1,935.595 4 Total 0.4974 0.7828 6.5344 0.0299 2.7582 0.0182 2.7765 0.7315 0.0169 0.7485 1,934.012 9 1,934.012 9 0.0754 1,935.595 4 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 77 of 100 3.24 Phases IV & V – Paving - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.8973 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 1.9126 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.8099 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0267 0.0421 0.3513 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.9792 103.9792 4.0500e- 003 104.0643 Total 0.0267 0.0421 0.3513 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.9792 103.9792 4.0500e- 003 104.0643 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 78 of 100 3.24 Phases IV & V – Paving - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 1.9126 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.8248 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0267 0.0421 0.3513 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.9792 103.9792 4.0500e- 003 104.0643 Total 0.0267 0.0421 0.3513 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.9792 103.9792 4.0500e- 003 104.0643 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 79 of 100 3.24 Phases IV & V – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.8973 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 1.9126 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.8099 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0256 0.0402 0.3371 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.2468 103.2468 3.9400e- 003 103.3296 Total 0.0256 0.0402 0.3371 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.2468 103.2468 3.9400e- 003 103.3296 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 80 of 100 3.24 Phases IV & V – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 1.9126 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.8248 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0256 0.0402 0.3371 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.2468 103.2468 3.9400e- 003 103.3296 Total 0.0256 0.0402 0.3371 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.2468 103.2468 3.9400e- 003 103.3296 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 81 of 100 3.25 Phase VI – Site Preparation - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 2.5083 23.5257 24.8879 0.0392 1.0293 1.0293 0.9470 0.9470 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Total 2.5083 23.5257 24.8879 0.0392 18.0663 1.0293 19.0956 9.9307 0.9470 10.8776 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0308 0.0483 0.4045 1.9300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 123.8962 123.8962 4.7300e- 003 123.9956 Total 0.0308 0.0483 0.4045 1.9300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 123.8962 123.8962 4.7300e- 003 123.9956 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 82 of 100 3.25 Phase VI – Site Preparation - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.2300 34.4240 23.4003 0.0392 0.9611 0.9611 0.9611 0.9611 0.0000 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Total 1.2300 34.4240 23.4003 0.0392 8.1298 0.9611 9.0909 4.4688 0.9611 5.4299 0.0000 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0308 0.0483 0.4045 1.9300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 123.8962 123.8962 4.7300e- 003 123.9956 Total 0.0308 0.0483 0.4045 1.9300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 123.8962 123.8962 4.7300e- 003 123.9956 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 83 of 100 3.26 Phase VI – Grading - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.0022 27.2606 31.3515 0.0618 1.1867 1.1867 1.0918 1.0918 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 3.0022 27.2606 31.3515 0.0618 8.6733 1.1867 9.8600 3.5965 1.0918 4.6883 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0342 0.0536 0.4494 2.1400e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 137.6624 137.6624 5.2600e- 003 137.7729 Total 0.0342 0.0536 0.4494 2.1400e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 137.6624 137.6624 5.2600e- 003 137.7729 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 84 of 100 3.26 Phase VI – Grading - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0342 0.0536 0.4494 2.1400e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 137.6624 137.6624 5.2600e- 003 137.7729 Total 0.0342 0.0536 0.4494 2.1400e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 137.6624 137.6624 5.2600e- 003 137.7729 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 85 of 100 3.27 Phase VI – Building Construction - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.8923 14.3794 47.9703 0.0791 2.1640 0.2787 2.4427 0.6179 0.2564 0.8743 7,384.202 4 7,384.202 4 0.0589 7,385.438 8 Worker 2.3813 3.7354 31.3016 0.1490 13.7714 0.0914 13.8628 3.6524 0.0848 3.7373 9,588.188 2 9,588.188 2 0.3662 9,595.879 0 Total 6.2735 18.1148 79.2719 0.2281 15.9353 0.3701 16.3054 4.2704 0.3412 4.6116 16,972.39 06 16,972.39 06 0.4251 16,981.31 78 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 86 of 100 3.27 Phase VI – Building Construction - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.8923 14.3794 47.9703 0.0791 2.1640 0.2787 2.4427 0.6179 0.2564 0.8743 7,384.202 4 7,384.202 4 0.0589 7,385.438 8 Worker 2.3813 3.7354 31.3016 0.1490 13.7714 0.0914 13.8628 3.6524 0.0848 3.7373 9,588.188 2 9,588.188 2 0.3662 9,595.879 0 Total 6.2735 18.1148 79.2719 0.2281 15.9353 0.3701 16.3054 4.2704 0.3412 4.6116 16,972.39 06 16,972.39 06 0.4251 16,981.31 78 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 87 of 100 3.28 Phase VI – Architectural Coating - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 827.2786 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Total 827.4495 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.4769 0.7482 6.2693 0.0299 2.7582 0.0183 2.7765 0.7315 0.0170 0.7485 1,920.390 9 1,920.390 9 0.0734 1,921.931 3 Total 0.4769 0.7482 6.2693 0.0299 2.7582 0.0183 2.7765 0.7315 0.0170 0.7485 1,920.390 9 1,920.390 9 0.0734 1,921.931 3 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 88 of 100 3.28 Phase VI – Architectural Coating - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 827.2786 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Total 827.3925 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.4769 0.7482 6.2693 0.0299 2.7582 0.0183 2.7765 0.7315 0.0170 0.7485 1,920.390 9 1,920.390 9 0.0734 1,921.931 3 Total 0.4769 0.7482 6.2693 0.0299 2.7582 0.0183 2.7765 0.7315 0.0170 0.7485 1,920.390 9 1,920.390 9 0.0734 1,921.931 3 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 89 of 100 3.29 Phase VI – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.8973 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 11.4756 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 12.3729 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0256 0.0402 0.3371 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.2468 103.2468 3.9400e- 003 103.3296 Total 0.0256 0.0402 0.3371 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.2468 103.2468 3.9400e- 003 103.3296 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 90 of 100 4.0 Operational Detail - Mobile 3.29 Phase VI – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 11.4756 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 12.3878 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0256 0.0402 0.3371 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.2468 103.2468 3.9400e- 003 103.3296 Total 0.0256 0.0402 0.3371 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.2468 103.2468 3.9400e- 003 103.3296 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 91 of 100 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 16.5372 27.8803 137.0716 0.4242 30.4535 0.5377 30.9912 8.1436 0.4963 8.6398 30,933.00 40 30,933.00 40 0.8756 30,951.39 11 Unmitigated 17.4010 32.0823 152.7690 0.5073 36.6866 0.6320 37.3186 9.8103 0.5833 10.3937 37,006.04 91 37,006.04 91 1.0332 37,027.74 62 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Mid Rise 823.75 895.00 758.75 2,095,877 1,739,787 City Park 25.44 25.44 25.44 51,701 42,917 Condo/Townhouse 1,219.15 1,324.60 1122.95 3,101,898 2,574,885 Other Asphalt Surfaces 0.00 0.00 0.00 Parking Lot 0.00 0.00 0.00 Regional Shopping Center 644.10 749.55 378.60 897,003 744,602 Single Family Housing 1,004.85 1,058.40 920.85 2,542,828 2,110,801 Single Family Housing 2,918.85 3,074.40 2674.85 7,386,310 6,131,374 Total 6,636.14 7,127.39 5,881.44 16,075,617 13,344,365 Increase Density Improve Walkability Design Increase Transit Accessibility Improve Pedestrian Network Expand Transit Network CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 92 of 100 4.3 Trip Type Information Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Mid Rise 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 City Park 13.00 5.00 5.00 33.00 48.00 19.00 66 28 6 Condo/Townhouse 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 Other Asphalt Surfaces 13.00 5.00 5.00 0.00 0.00 0.00 0 0 0 Parking Lot 13.00 5.00 5.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 13.00 5.00 5.00 16.30 64.70 19.00 54 35 11 Single Family Housing 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 Single Family Housing 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 5.0 Energy Detail 5.1 Mitigation Measures Energy Exceed Title 24 Install High Efficiency Lighting Percent of Electricity Use Generated with Renewable Energy LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH 0.457871 0.042296 0.214250 0.146969 0.067525 0.009931 0.017760 0.024978 0.002423 0.001427 0.009102 0.000742 0.004726 Historical Energy Use: N CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 93 of 100 4.4 Fleet Mix ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.4472 3.8217 1.6294 0.0244 0.3090 0.3090 0.3090 0.3090 4,878.227 4 4,878.227 4 0.0935 0.0894 4,907.915 5 NaturalGas Unmitigated 0.5650 4.8286 2.0589 0.0308 0.3904 0.3904 0.3904 0.3904 6,163.454 9 6,163.454 9 0.1181 0.1130 6,200.964 7 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 94 of 100 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Mid Rise 2783.43 0.0300 0.2565 0.1092 1.6400e- 003 0.0207 0.0207 0.0207 0.0207 327.4625 327.4625 6.2800e- 003 6.0000e- 003 329.4554 City Park 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 9870.69 0.1065 0.9097 0.3871 5.8100e- 003 0.0736 0.0736 0.0736 0.0736 1,161.258 0 1,161.258 0 0.0223 0.0213 1,168.325 2 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 102.329 1.1000e- 003 0.0100 8.4300e- 003 6.0000e- 005 7.6000e- 004 7.6000e- 004 7.6000e- 004 7.6000e- 004 12.0387 12.0387 2.3000e- 004 2.2000e- 004 12.1119 Single Family Housing 10149.9 0.1095 0.9354 0.3980 5.9700e- 003 0.0756 0.0756 0.0756 0.0756 1,194.105 0 1,194.105 0 0.0229 0.0219 1,201.372 1 Single Family Housing 29483 0.3180 2.7171 1.1562 0.0173 0.2197 0.2197 0.2197 0.2197 3,468.590 8 3,468.590 8 0.0665 0.0636 3,489.700 0 Total 0.5650 4.8286 2.0589 0.0308 0.3904 0.3904 0.3904 0.3904 6,163.454 9 6,163.454 9 0.1181 0.1130 6,200.964 7 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 95 of 100 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day City Park 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 7.77695 0.0839 0.7167 0.3050 4.5700e- 003 0.0580 0.0580 0.0580 0.0580 914.9350 914.9350 0.0175 0.0168 920.5032 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0.0767466 8.3000e- 004 7.5200e- 003 6.3200e- 003 5.0000e- 005 5.7000e- 004 5.7000e- 004 5.7000e- 004 5.7000e- 004 9.0290 9.0290 1.7000e- 004 1.7000e- 004 9.0840 Single Family Housing 23.34 0.2517 2.1509 0.9153 0.0137 0.1739 0.1739 0.1739 0.1739 2,745.878 4 2,745.878 4 0.0526 0.0503 2,762.589 3 Single Family Housing 8.03507 0.0867 0.7405 0.3151 4.7300e- 003 0.0599 0.0599 0.0599 0.0599 945.3024 945.3024 0.0181 0.0173 951.0554 Apartments Mid Rise 2.2362 0.0241 0.2061 0.0877 1.3200e- 003 0.0167 0.0167 0.0167 0.0167 263.0826 263.0826 5.0400e- 003 4.8200e- 003 264.6837 Total 0.4472 3.8217 1.6294 0.0244 0.3090 0.3090 0.3090 0.3090 4,878.227 4 4,878.227 4 0.0935 0.0894 4,907.915 5 Mitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 96 of 100 Use Low VOC Paint - Residential Interior Use Low VOC Paint - Residential Exterior Use Low VOC Paint - Non-Residential Interior Use Low VOC Paint - Non-Residential Exterior No Hearths Installed Use Low VOC Cleaning Supplies ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 59.8618 0.6845 59.4156 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3275 107.3275 0.1029 0.0000 109.4875 Unmitigated 64.2250 0.6845 59.4156 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3275 107.3275 0.1029 0.0000 109.4875 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 97 of 100 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 4.0797 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 58.3575 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.7877 0.6845 59.4156 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 107.3275 107.3275 0.1029 109.4875 Total 64.2250 0.6845 59.4156 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3275 107.3275 0.1029 0.0000 109.4875 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 98 of 100 8.1 Mitigation Measures Waste Use Reclaimed Water Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 4.0797 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 53.9943 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.7877 0.6845 59.4156 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 107.3275 107.3275 0.1029 109.4875 Total 59.8618 0.6845 59.4156 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3275 107.3275 0.1029 0.0000 109.4875 Mitigated 9.0 Operational Offroad CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 99 of 100 10.0 Vegetation 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 8:35 PMPage 100 of 100 Phase Equipment Quantity Hours Each Day Total Number of Days Worked Horse Power Load Factor Fuel Consumption Rate (Gallons per Hour) Duration (Total Hours) Total Fuel Consumption (Gallons) Offsite Construction Site Preparation Excavators 3 8 60 162 0.38 3.078 1440 4432.32 Concrete/Industrial Saws 1 8 60 81 0.73 2.9565 480 1419.12 Rubber Tired Dozers 2 8 60 255 0.4 5.1 960 4896 Tractors/Loaders/B ackhoes 4 8 60 97 0.37 1.7945 1920 3445.44 Grading Tractors/Loaders/B ackhoes 4 8 155 97 0.37 1.7945 4960 8900.72 Rubber Tired Dozers 3 8 155 255 0.4 5.1 3720 18972 Excavators 2 8 155 162 0.38 3.078 2480 7633.44 Graders 1 8 155 174 0.41 3.567 1240 4423.08 Scrapers 2 8 155 361 0.48 8.664 2480 21486.72 Paving Excavators 2 8 46 162 0.38 3.078 736 2265.408 Rubber Tired Dozers 1 8 46 255 0.4 5.1 368 1876.8 Graders 1 8 46 174 0.41 3.567 368 1312.656 Tractors/Loaders/B ackhoes 2 8 46 97 0.37 1.7945 736 1320.752 Scrapers 2 8 46 361 0.48 8.664 736 6376.704 Pavers 2 8 46 125 0.42 2.625 736 1932 Paving Equipment 2 8 46 130 0.36 2.34 736 1722.24 Rollers 2 8 46 80 0.38 1.52 736 1118.72 Notes:Refer to Appendix H for construction equipment quantities, horse power, load factors, and hours of use per phase Fuel consumption factor for diesel engine is assumed to be 0.05 gallons per horsepower per hour (gal/hp/hr) based on SCAQMD CEQA Handbook Table A9-3E Phase Equipment Quantity Hours Each Day Total Number of Days Worked Horse Power Load Factor Fuel Consumption Rate (Gallons per Hour) Duration (Total Hours) Total Fuel Consumption (Gallons) Phase I Site Preparation Cranes 1 7 15 226 0.29 3.277 105 344.085 Forklifts 3 8 15 89 0.2 0.89 360 320.4 Generator Sets 1 8 15 84 0.74 3.108 120 372.96 Tractors/Loaders/B ackhoes 3 7 15 97 0.37 1.7945 315 565.2675 Welders 1 8 15 46 0.45 1.035 120 124.2 Rubber Tired Dozers 3 8 15 255 0.4 5.1 360 1836 Grading Pavers 2 8 125 125 0.42 2.625 2000 5250 Rollers 2 8 125 80 0.38 1.52 2000 3040 Paving Equipment 2 8 125 130 0.36 2.34 2000 4680 Excavators 2 8 125 162 0.38 3.078 2000 6156 Graders 1 8 125 174 0.41 3.567 1000 3567 Rubber Tired Dozers 1 8 125 255 0.4 5.1 1000 5100 Scrapers 2 8 125 361 0.48 8.664 2000 17328 Tractors/Loaders/B ackhoes 2 8 125 97 0.37 1.7945 2000 3589 Paving Pavers 2 8 15 125 0.42 2.625 240 630 Paving Equipment 2 8 15 130 0.36 2.34 240 561.6 Rollers 2 8 15 80 0.38 1.52 240 364.8 Building Construction Air Compressors 1 6 665 78 0.48 1.872 3990 7469.28 Cranes 1 7 665 226 0.29 3.277 4655 15254.435 Forklifts 3 8 665 89 0.2 0.89 15960 14204.4 Generator Sets 1 8 665 84 0.74 3.108 5320 16534.56 Tractors/Loaders/B ackhoes 3 7 665 97 0.37 1.7945 13965 25060.1925 Welders 1 8 665 46 0.45 1.035 5320 5506.2 Architectural Coating Air Compressors 1 6 55 78 0.48 1.872 330 617.76 Notes:Refer to Appendix H for construction equipment quantities, horse power, load factors, and hours of use per phase Fuel consumption factor for diesel engine is assumed to be 0.05 gallons per horsepower per hour (gal/hp/hr) based on SCAQMD C EQA Handbook Table A9-3E Phase Equipment Quantity Hours Each Day Total Number of Days Worked Horse Power Load Factor Fuel Consumption Rate (Gallons per Hour) Duration (Total Hours) Total Fuel Consumption (Gallons) Phase II Site Preparation Rubber Tired Dozers 3 8 15 255 0.4 5.1 360 1836 Tractors/Loaders/B ackhoes 4 8 15 97 0.37 1.7945 480 861.36 Grading Excavators 2 8 30 162 0.38 3.078 480 1477.44 Graders 1 8 30 174 0.41 3.567 240 856.08 Rubber Tired Dozers 1 8 30 255 0.4 5.1 240 1224 Scrapers 2 8 30 361 0.48 8.664 480 4158.72 Tractors/Loaders/B ackhoes 2 8 30 97 0.37 1.7945 480 861.36 Paving Pavers 2 8 15 125 0.42 2.625 240 630 Paving Equipment 2 8 15 130 0.36 2.34 240 561.6 Rollers 2 8 15 80 0.38 1.52 240 364.8 Building Construction Cranes 1 7 100 226 0.29 3.277 700 2293.9 Forklifts 3 8 100 89 0.2 0.89 2400 2136 Generator Sets 1 8 100 84 0.74 3.108 800 2486.4 Tractors/Loaders/B ackhoes 3 7 100 97 0.37 1.7945 2100 3768.45 Welders 1 8 100 46 0.45 1.035 800 828 Architectural Coating Air Compressors 1 6 20 78 0.48 1.872 120 224.64 Notes:Refer to Appendix H for construction equipment quantities, horse power, load factors, and hours of use per phase Fuel consumption factor for diesel engine is assumed to be 0.05 gallons per horsepower per hour (gal/hp/hr) based on SCAQMD CEQA Handbook Table A9-3E Phase Equipment Quantity Hours Each Day Total Number of Days Worked Horse Power Load Factor Fuel Consumption Rate (Gallons per Hour) Duration (Total Hours) Total Fuel Consumption (Gallons) Phase III Site Preparation Rubber Tired Dozers 3 8 20 255 0.4 5.1 480 2448 Tractors/Loaders/B ackhoes 4 8 20 97 0.37 1.7945 640 1148.48 Grading Pavers 2 8 35 125 0.42 2.625 560 1470 Rollers 2 8 35 80 0.38 1.52 560 851.2 Paving Equipment 2 8 35 130 0.36 2.34 560 1310.4 Excavators 2 8 35 162 0.38 3.078 560 1723.68 Graders 1 8 35 174 0.41 3.567 280 998.76 Rubber Tired Dozers 1 8 35 255 0.4 5.1 280 1428 Scrapers 2 8 35 361 0.48 8.664 560 4851.84 Tractors/Loaders/B ackhoes 2 8 35 97 0.37 1.7945 560 1004.92 Paving Pavers 2 8 20 125 0.42 2.625 320 840 Paving Equipment 2 8 20 130 0.36 2.34 320 748.8 Rollers 2 8 20 80 0.38 1.52 320 486.4 Building Construction Cranes 1 7 340 226 0.29 3.277 2380 7799.26 Forklifts 3 8 340 89 0.2 0.89 8160 7262.4 Generator Sets 1 8 340 84 0.74 3.108 2720 8453.76 Tractors/Loaders/B ackhoes 3 7 340 97 0.37 1.7945 7140 12812.73 Welders 1 8 340 46 0.45 1.035 2720 2815.2 Architectural Coating Air Compressors 1 6 20 78 0.48 1.872 120 224.64 Notes:Refer to Appendix H for construction equipment quantities, horse power, load factors, and hours of use per phase Phase Equipment Quantity Hours Each Day Total Number of Days Worked Horse Power Load Factor Fuel Consumption Rate (Gallons per Hour) Duration (Total Hours) Total Fuel Consumption (Gallons) Phase IV and V Site Preparation Rubber Tired Dozers 3 8 40 255 0.4 5.1 960 4896 Tractors/Loaders/B ackhoes 4 8 40 97 0.37 1.7945 1280 2296.96 Grading Excavators 2 8 135 162 0.38 3.078 2160 6648.48 Graders 1 8 135 174 0.41 3.567 1080 3852.36 Rubber Tired Dozers 1 8 135 255 0.4 5.1 1080 5508 Scrapers 2 8 135 361 0.48 8.664 2160 18714.24 Tractors/Loaders/B ackhoes 2 8 135 97 0.37 1.7945 2160 3876.12 Pavers 2 8 135 125 0.42 2.625 2160 5670 Rollers 2 8 135 80 0.38 1.52 2160 3283.2 Paving Equipment 2 8 135 130 0.36 2.34 2160 5054.4 Paving Pavers 2 8 30 125 0.42 2.625 480 1260 Paving Equipment 2 8 30 130 0.36 2.34 480 1123.2 Rollers 2 8 30 80 0.38 1.52 480 729.6 Building Construction Cranes 1 7 625 226 0.29 3.277 4375 14336.875 Forklifts 3 8 625 89 0.2 0.89 15000 13350 Generator Sets 1 8 625 84 0.74 3.108 5000 15540 Tractors/Loaders/B ackhoes 3 7 625 97 0.37 1.7945 13125 23552.8125 Fuel consumption factor for diesel engine is assumed to be 0.05 gallons per horsepower per hour (gal/hp/hr) based on SCAQMD C EQA Handbook Table A9-3E Welders 1 8 625 46 0.45 1.035 5000 5175 Architectural Coating Air Compressors 1 6 35 78 0.48 1.872 210 393.12 Notes:Refer to Appendix H for construction equipment quantities, horse power, load factors, and hours of use per phase Fuel consumption factor for diesel engine is assumed to be 0.05 gallons per horsepower per hour (gal/hp/hr) based on SCAQMD C EQA Handbook Table A9-3E Phase Equipment Quantity Hours Each Day Total Number of Days Worked Horse Power Load Factor Fuel Consumption Rate (Gallons per Hour) Duration (Total Hours) Total Fuel Consumption (Gallons) Phase VI Site Preparation Rubber Tired Dozers 3 8 5 255 0.4 5.1 120 612 Tractors/Loaders/B ackhoes 4 8 5 97 0.37 1.7945 160 287.12 Grading Excavators 2 8 15 162 0.38 3.078 240 738.72 Graders 1 8 15 174 0.41 3.567 120 428.04 Rubber Tired Dozers 1 8 15 255 0.4 5.1 120 612 Scrapers 2 8 15 361 0.48 8.664 240 2079.36 Tractors/Loaders/B ackhoes 2 8 15 97 0.37 1.7945 240 430.68 Paving Pavers 2 8 5 125 0.42 2.625 80 210 Paving Equipment 2 8 5 130 0.36 2.34 80 187.2 Rollers 2 8 5 80 0.38 1.52 80 121.6 Building Construction Cranes 1 7 150 226 0.29 3.277 1050 3440.85 Forklifts 3 8 150 89 0.2 0.89 3600 3204 Generator Sets 1 8 150 84 0.74 3.108 1200 3729.6 Tractors/Loaders/B ackhoes 3 7 150 97 0.37 1.7945 3150 5652.675 Welders 1 8 150 46 0.45 1.035 1200 1242 Architectural Coating Air Compressors 1 6 18 78 0.48 1.872 108 202.176 Notes:Refer to Appendix H for construction equipment quantities, horse power, load factors, and hours of use per phase Fuel consumption factor for diesel engine is assumed to be 0.05 gallons per horsepower per hour (gal/hp/hr) based on SCAQMD C EQA Handbook Table A9-3E Total Fuel Consumption By Phase Phase Fuel Consumption (Gallons) Offsite Construction 93534.12 Phase I 138476.14 Phase II 24568.75 Phase III 58678.47 Phase IV and V 135260.3675 Phase VI 23178.021 Total 473695.8685