Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Appendix Q-Mitigated Project Alternative Materials
APPENDIX Q Mitigated Project Alternative Materials • MPA Development Plan (7-20-2016) • Air Quality Emissions • Biological Impact Analysis • Post Development Flood Plain Map • Vesting Tract Map • Water Supply Assessment (WSA) Avila Ranch Development Project Final EIR This Page Intentionally Left Blank. AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A1Low Density Residential Medium Density ResidentialMedium-High Density ResidentialHigh Density ResidentialNeighborhood CommercialOpen SpaceParksRoadsOSOSOSOSM-1 BPM-1ServiceCommercialMedium Density ResidentialMedium Density ResidentialLow Density ResidentialHigh Density ResidentialLow Density ResidentialCOMMERCIALCOMMERCIALParkParkParkMedium-High Density ResidentialLow Density Residential (7 d.u./acre)Detached homes with private outdoor yard space Medium Density Residential (12 d.u./acre)Compact detached homes, or attached units, and smaller yards Medium-High Density Residential (20 d.u./acre)Primarily attached units, two- and three-story buildings, common outdoor High Density Residential (24 d.u./acre)Primarily attached units, two- and three-story buildings, common outdoor Neighborhood CommercialNeighborhood serving commercial usesService CommercialBusiness ParkR&D, light indistrial, and certain office typesServices and ManufacturingIndustry, commercial services, and certain office typesOpen SpaceMostly undeveloped land or bodies of waterParkPublic park-landAvila RanchProject BoundaryUrban Reserve LineResidential LandCommercial LandGreen SpaceLand Use DesignationsMap LegendArea Calculations Acres12.7727.2910.844.391.8651.9619.0821.71Land Use Plan0 75 150 300SCALE: 1”=150’ (24”x36” sheet) AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A2Reservation Area100’ x 1,200’EARTHWOOD LN.VENTURE DRIVE55 db BUCKLEY RD.JESPERSEN DR.VACHELL LN.HORIZON LN.Single Event Noise ContourLdn/CNEL Noise ContourPARKPARKOSOSOSPARKPARKPARKPARKPS-1CS-1BOpen SpaceMostly undeveloped land or bodies of waterParkPublic park-landGreen SpaceLand Use DesignationsMap LegendNeighborhood CommercialNeighborhood serving commercial usesCommercial LandLow Density Residential (7 d.u./acre)Detached homes with private outdoor yard space Medium Density Residential (12 d.u./acre)Compact detached homes, or attached units, and smaller yards Medium-High Density Residential (20 d.u./acre)Primarily attached units, two- and three-story buildings, common outdoor High Density Residential (24 d.u./acre)Primarily attached units, two- and three-story buildings, common outdoor Residential Land65 db PARKOverall Site Plan0 75 150 300SCALE: 1”=150’ (24”x36” sheet) AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A3Composite Site Plan0 75 150 300SCALE: 1”=150’ (24”x36” sheet)REFER TO A6 FORADDITIONAL DETAILREFER TO A9 FORADDITIONAL DETAILREFER TO A8 FORADDITIONAL DETAILREFER TO A7 FORADDITIONAL DETAILREFER TO A5 FORADDITIONAL DETAILREFER TO A4 FORADDITIONAL DETAIL AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A435’Traditional Lots Large Cluster Small ClusterMulti-FamilyCommercialOpen SpaceParkPrivate GreenPublic Street Private DrivePrivate YardResidential LandMap LegendLinear Courts - A17Linear Courts - A17Pocket Cottage - A17Riparian Setback(see A23, A24)Riparian EdgeConceptual Neighborhood Site Plan0 25 50 100SCALE: 1”=50’ (24”x36” sheet)A12A1219’-0” 35’REFER TO A11 FORADDITIONAL DETAILA24DA24E AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A5Conceptual Neighborhood Site PlanTraditional Lots Large Cluster Small ClusterMulti-FamilyCommercialOpen SpaceParkPrivate GreenPublic Street Private DrivePrivate YardResidential LandMap LegendA120 25 50 100SCALE: 1”=50’ (24”x36” sheet)REFER TO A15 FORADDITIONAL DETAILREFER TO A10 FORADDITIONAL DETAILA14A12A23CA24D AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A6Conceptual Neighborhood Site PlanTraditional Lots Large Cluster Small ClusterMulti-FamilyCommercialOpen SpaceParkPrivate GreenPublic Street Private DrivePrivate YardResidential LandMap LegendA14A12A14A12A140 25 50 100SCALE: 1”=50’ (24”x36” sheet)+/- 325’-0”20’-0” BUFFER & DRAINAGE EASEMENT+/- 85’-0” BUFFERAPPROXIMATELY 30 DWELLINGS UNITSAPPROXIMATELY 30 DWELLINGS UNITSTEMPORARY FIRE STATION & FUTURE PARKAPPROXIMATELY 65 DWELLINGS UNITS+/- 85’-0” BUFFER+/- 85’-0”BUFFER15’-0”SETBACK15’-0”SETBACKA23AA23BCARPORTSCARPORTS AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A7Conceptual Neighborhood Site PlanTraditional Lots Large Cluster Small ClusterMulti-FamilyCommercialOpen SpaceParkPrivate GreenPublic Street Private DrivePrivate YardResidential LandMap Legend0 25 50 100SCALE: 1”=50’ (24”x36” sheet)A13A14REFER TO A16A23C AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A8Conceptual Neighborhood Site PlanTraditional Lots Large Cluster Small ClusterMulti-FamilyCommercialOpen SpaceParkPrivate GreenPublic Street Private DrivePrivate YardResidential LandMap LegendA13A1401530 60SCALE: 1”=30’ (24”x36” sheet) AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A9Conceptual Neighborhood Site PlanTraditional Lots Large Cluster Small ClusterMulti-FamilyCommercialOpen SpaceParkPrivate GreenPublic Street Private DrivePrivate YardResidential LandMap LegendA120 25 50 100SCALE: 1”=50’ (24”x36” sheet) AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A10Typical Clustered Residential Street Scene04 8 16SCALE: 1”=8’ (24”x36” sheet)65’-0” TYP41’-0” TYP BUILDING WIDTH14’-0”10’-0”15’-0” SETBACK20’-0” TYP10’-0”SETBACK48’-0” RIGHT-OF-WAY AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A1165' - 0"15' - 0"14' - 0"222222CVVVKQ9' x 14')#4#)#))#)'11' x 18'7"$GF11'8" x 11'3".KXKPI16"5" x 12'2"(GZ10' x10'$CVJ5'6" x 11'3"2QTEJ8' - 0"10' - 0"41' - 9"40' - 9"40' - 9"51' - 9"14' - 0"22CCCCCCVVVVVKQQQQQ9' x 14')#4###)))#)'11' x 19'6"$GF11'2" x 10'8".KXKPI14'4" x 13'2"(GZ10' x 10'$CVJ5'6" x 9'9")WGUV2CTMKPI2QTEJ8' - 0"10' - 0";#;##4&9' x 14')WGUV2CTMKPI22CCCCCCVVVVVKQQQQ9' x 14')#4###)#))#)'11' x 20'$GF12' x 13'.KXKPI12'2" x 13'6"$CVJ5'6" x 12'4"/QVQVVQVQT%QWTVTVTV2QTEJ10' - 0")#4#)))#)'11' x 19'6"$GF11'2" x 13'5".KXKPI14'4" x 13'2"(GZ10' x 10'$CVJ5'6" x 9'9"2QTEJ13' - 6 1/8"-KVEJGP11'4" x 12'2"-KVEJGP11'4" x 12'2"-KVEJGP10'0" x 13'10"-KVEJGP10'0" x 13'10"/QVQVVQVQT%QWTVTVTV4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"5' - 0")WGUV2CTMKPI)WGUV2CTMKPI10' - 0"8' - 0"5' - 3 15/16"(TQPV;C;C;CTF(TQPV;C;C;CTF(TQPV;C;C;CTF$GF10'5" x 11'6"$CVJ10'1" x 5'6".QHV6'0" x10'5".QHV5'6" x 7'6"$CVJ5'2" x 8'9"$GF11'6" x 11'3" PLAN ONE A 1,047 SQ FT PLAN TWO 775 SQ FT PLAN ONE 765 SQ FT PLAN TWO A 1065 SQ FTSECOND FLOOR ELEVATIONSSECOND FLOOR Conceptual Small Lot Product (“Pocket Cottage” - see A17)02 4 8SCALE: 1”=4’ (24”x36” sheet) AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A12Typical 48’ Residential Street SectionSITE PLANSTREET SECTION 04 8 16SCALE: 1”=8’ (24”x36” sheet) AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A13Typical 58’ R-1 Residential Street Section04 8 16SCALE: 1”=8’ (24”x36” sheet)STREET SECTION SITE PLAN AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A14Typical 60’ Collector Street SectionSTREET SECTION SITE PLAN04 8 16SCALE: 1”=8’ (24”x36” sheet) AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A15Typical Speed Table, Parkette & Ped Crossing04 8 16SCALE: 1”=8’ (24”x36” sheet) AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A16Typical R1 Speed Table, Parkette & Ped Crossing04 8 16SCALE: 1”=8’ (24”x36” sheet) AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A1741' - 9" LOT WIDTH40' - 9" LOT WIDTH40' - 9" LOT WIDTH51' - 9" LOT WIDTH77' - 3" LOT DEPTH77' - 3" LOT DEPTHSIDE SETBACK4' - 0" TYPREAR SETBACK5' - 0" TYPTO THE HOUSE15' - 0" SETBACKTO THE HOUSE22' - 3" SETBACK175' - 0"T/R T/RT/R T/RT/R T/RT/R T/RT/RT/RT/RT/RT/RT/RT/RT/R214%*214%*214%*214%*TO THE PORCH20' - 3" SETBACKTOTHEPORCH9'-0"SETBACK65' - 0" LOT DEPTH65' - 0" LOT DEPTH41'-9"LOTWIDTH40'-9"LOTWIDTH40'-9"LOTWIDTH51'-9"LOTWIDTHTOTHEPORCH9'-0"SETBACKTOTHEHOUSE15'-0"SETBACK10' - 0"10' - 0"14' - 0"10' - 0"60'-0"LOTWIDTH55'-0"LOTWIDTH60'-0"LOTWIDTHSIDESETBACK5'-0"TYP8' - 0"10' - 0"T/R T/RT/R T/RT/R T/RT/R T/R24+8#6';#4&)7'562#4-+0)/1614%1746/1614%174624+8#6'2#6+124+8#6';#4&T/R T/R24+8#6'(4106;#4&214%*24+8#6'2#6+124+8#6'(4106;#4&T/R T/RT/R T/R)7'562#4-+0))7'562#4-+0))7'562#4-+0))7'562#4-+0)214%*214%*214%*214%*214%*214%*14' - 0"REARSETBACK5'-0"TYP175'-0"24+8#6'2#6+124+8#6'2#6+124+8#6'2#6+124+8#6'2#6+124+8#6';#4&24+8#6';#4&24+8#6';#4&214%*214%*214%*TO THE GARAGE20' - 0" SETBACKT/R T/RT/R T/RT/R T/RTOTHEPORCH10'-0"SETBACKTOTHEHOUSE15'-0"SETBACK71' - 6" LOT DEPTH55'-0"MINIMUMLOTWIDTH24+8#6';#4&24+8#6';#4&214%*214%*214%*)7'562#4-+0)60'-0"LOTWIDTH60'-0"LOTWIDTH69' - 0" LOT DEPTH107' - 6" LOT DEPTH15'-0"TOTHEHOUSE15'-0"SETBACK9'-0"24+8#6';#4&T/R T/RT/R T/RT/R T/RTOTHEPORCH10'-0"SETBACK24+8#6';#4&24+8#6';#4&POCKET COTTAGEPOCKET COTTAGEMOTORCOURTLINEAR COURTTRADITIONAL HOMESLINEAR COURT TRADITIONAL HOME MOTORCOURTTypical Land Use & Product Types01020 40SCALE: 1”=20’ (24”x36” sheet) AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A19LEGENDEntryBus Route 2, Alternative ABus Route 2, Alternative BProposed Bus Stop LocationExisting Roads60’ Collector Road (A14)58’ Residential Road (A13)48’ Residential Road (A12)Class I Bicycle PathClass II Bicycle Lane Proposed Buckley ExtensionRefer to Buckley Road Street Sections (A20)Refer to project Creek Sections (A23, A24)##Circulation PlanBUCKLEY ROADVACHELL LANEEARTHWOOD LANEHORIZON LANES. HIGUERA ST.L.O.V.R.SUBURBAN ST. B C24351 ADE AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A2034521BUCKLEY ROAD SECTION: 1BUCKLEY ROAD SECTION: 2Buckley Road Sections051015SCALE: 1”=8’ (24”x36” sheet)20BUCKLEY ROAD SECTION: 5BUCKLEY ROAD SECTION: 3BUCKLEY ROAD SECTION: 4 AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A21STREET SECTION SITE PLANAlternative Buckley Road Section 104 8 16SCALE: 1”=8’ (24”x36” sheet) AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A22STREET SECTION SITE PLANAlternative Buckley Road Section 204 8 16SCALE: 1”=8’ (24”x36” sheet) AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A23Project Creek SectionsPROJECT CREEK: APROJECT CREEK/BIKE PATH SECTION: BPROJECT CREEK/BIKE PATH SECTION: C051015SCALE: 1”=10’ (24”x36” sheet)20 AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A24PROJECT CREEK/BIKE PATH SECTION: DPROJECT CREEK/BIKE PATH SECTION: E051015SCALE: 1”=10’ (24”x36” sheet)Project Creek Sections AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A25Phasing PlanPhase 3Phase 4Phase 1Phase 6Phase 5Phase 20 75 150 300SCALE: 1”=150’ (24”x36” sheet)Ph 6 AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A26Recycled Water: ProposedDomestic Water: ProposedUTILITIES LEGENDWater Supply Plan AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A27Wastewater PlanSewer: Proposed Pump StationSewer: Proposed Force MainSewer: Proposed On Site GravitySewer: Proposed Off Site GravityUTILITIES LEGENDTO TANK FARM LIFT STATION AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A28Storm Drain PipingOutfallsBasinSwaleUTILITIES LEGENDStorm Drainage AVILA RANCH DEVELOPMENT PLANJuly 19, 2016#1011023A29Development StandardsAvila Ranch Specific PlanDevelopment StandardsLow Density Residential Lot and Building Standards (R-1)EXAMPLESThese sketches show basic lot layouts that would follow from the standards listed in the text, and in this table below. Not all features shown in the sketches are standards (for example, 2-car garages are not required).STANDARDS(minimums)STREET ACCESS (Alley Not Available)ALLEY ACCESS(Parking access from alley only)PARKING AT FRONT OF LOT PARKING AT FRONT OF LOT PARKING AT REAR OF LOTLot AreaLot WidthCorner Lot WidthLot DepthLot Coverage5,000 sf50 ft55 ft90 ft40% Max.5,000 sf50 ft55 ft90 ft40% Max.5,000 sf50 ft55 ft90 ft45% Max.4,500 sf45 ft50 ft80 ft50% Max.Front SetbackHouseGarage, carport (A)Front Porch15 ft20 ft10 ft15 ft15 ft10 ft15 ftDoes not Apply10 ft15 ftDoes not Apply ft10 ftRear SetbackHouseGarage, carport15 ft5 ft15 ft5 ft20 ft5 ft(from alley)15 ft3 ftSide SetbackHouseStreet (corner lot)Garage, carport5 ft10 ft5 ft5 ft10 ft5 ftdriveway side 12 ft5 ft10 ft5 ft5 ft10 ft5 ftPublic Street Public Street Public StreetPublic StreetAvila Ranch Specific PlanDevelopment StandardsMedium Density Residential Building Standards (R-2)EXAMPLESThese sketches show basic lot layouts that would follow from the standards. Not all features are shown in each layout.STANDARDSMinimums, unless noted otherwise.ALLEY ACCESS CLUSTER DEVELOPMENTDETACHED - ZERO LOT LINEATTACHED OR DETACHED(attached may include pairs of dwellings on adjacent lots)DETACHED(parking access from alley onlyLot Area Lot Coverage 3,575 sf Min.60% Max3,575 sf Min.60% Max3,575 sf Min.60% Max3,575 sf Min.60% Max3,575 sf Min.60% Max1- Street SetbackDwellingFront Porch15 ft10 ft15 ft10 ft15 ft10 ft15 ft10 ft15 ft10 ft2- Rear SetbackDwellingGarage20 ft13 ft20 ft13 ft20 ft13 ft5 ft5 ft5 ft5 ft3- Side Setback (A)0 (at lot line) or as provided in Zoning Regulations R-2 Zone0 (attached) or as provided in Zoning Regulations R-2 Zone5 ft 5 ft 5 ft4- Interior Setback4 ft 4 ft5- Garage Setback14’ Min. 14’ Min.6- Pedestrian Circ. Setback10’ Min. 10’ Min.7- Side Steet Setback10’ 10’ 10’ 10’ 10’A - Side setback applies to dwelling and covered parking.Where a building wall is located on a lot line, there shall be an easement at least 5 feet wide on the neighborhing lot for access to maintain the building wall.B - Reciprocal yard easements are allowed as an alternative.C - Minimum yard size of 150 sf with Minimum 10’ dimensionD - Second floor setbacks to match Ground floor setbacksPublic StreetPublic StreetPublic StreetPublic StreetYardYardYardYardCLUSTER DEVELOPMENT4 TO 6 LOTSCLUSTER DEVELOPMENT4 TO 6 LOTSPublic StreetPublic StreetYardYardYardYardYardYardYardYardYardYardYardYard11345612212713354Public StreetPrivate AlleyAlleyAlleyAvila Ranch Specific PlanDevelopment StandardsPublic StreetMedium - High Density Residential Lot and Building Standards (R-3)EXAMPLESThese sketches shows a site layouts that would follow from the standards. Not all features shown in the sketch are standards.STANDARDS (minimums)Lot AreaLot WidthLot DepthN/AN/AN/AFront SetbackDwellingFront Porch15 ft10 ftRear SetbackDwellingParking10 ft0 ftSide Setback (A) (applies to any structure, including covered parking)Street (corner lot)as provided in R-2 zone15 ft1,000 ft20 ft40 ftN/AN/AN/A15 ft10 ft15 ft10 ft10 ft0 ft10 ft0 ftas provided in R-2 zone15 ftas provided in R-2 zone15 ftHigh Density Residential Lot and Building Standards (R-3/R-4) San Luis Obispo County, Summer Avila Ranch Development Project Mitigated Project Alternative 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Parking Lot 1,590.00 Space 14.31 636,000.00 0 Other Asphalt Surfaces 21.71 Acre 21.71 945,687.60 0 City Park 19.08 Acre 19.08 831,124.80 0 Regional Shopping Center 15.00 1000sqft 1.86 15,000.00 0 Apartments Mid Rise 125.00 Dwelling Unit 4.40 125,000.00 286 Condo/Townhouse 197.00 Dwelling Unit 10.80 197,000.00 451 Single Family Housing 101.00 Dwelling Unit 12.80 181,800.00 232 Single Family Housing 297.00 Dwelling Unit 27.30 534,600.00 680 1.2 Other Project Characteristics Urbanization Climate Zone Urban 4 Wind Speed (m/s)Precipitation Freq (Days)3.2 44 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Pacific Gas & Electric Company 2030Operational Year CO2 Intensity (lb/MWhr) 641.35 0.029CH4 Intensity (lb/MWhr) 0.006N2O Intensity (lb/MWhr) CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 1 of 100 Project Characteristics - Land Use - Taken from MPA description Construction Phase - taken from updated construction schedule september 29 2016 Architectural Coating - using at least 50 EF paint from mitigation Woodstoves - no woodstoves or fireplaces Area Coating - EF is 50 from mitigation Water And Wastewater - based on city water use factors Solid Waste - from estimated solid waste production under the MPA table based on CalRecycle waste generation factors Sequestration - Construction Off-road Equipment Mitigation - based on mitigation Mobile Land Use Mitigation - Area Mitigation - 50 EF per mitigation Energy Mitigation - Water Mitigation - Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 2 of 100 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblAreaCoating Area_EF_Nonresidential_Exterior 250 50 tblAreaMitigation UseLowVOCPaintNonresidentialInteriorV alue 250 50 tblAreaMitigation UseLowVOCPaintResidentialExteriorValu e 250 50 tblAreaMitigation UseLowVOCPaintResidentialInteriorValu e 250 50 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 17.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 18.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 7.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 26.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 54.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation Tier No Change Tier 2 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 3 of 100 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstructionPhase NumDays 3,100.00 665.00 tblConstructionPhase NumDays 120.00 15.00 tblConstructionPhase NumDays 120.00 60.00 tblConstructionPhase NumDays 220.00 46.00 tblConstructionPhase NumDays 310.00 125.00 tblConstructionPhase NumDays 310.00 155.00 tblConstructionPhase NumDays 220.00 15.00 tblConstructionPhase NumDays 220.00 55.00 tblConstructionPhase NumDays 120.00 15.00 tblConstructionPhase NumDays 310.00 30.00 tblConstructionPhase NumDays 3,100.00 100.00 tblConstructionPhase NumDays 220.00 15.00 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 120.00 20.00 tblConstructionPhase NumDays 310.00 35.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 4 of 100 tblConstructionPhase NumDays 3,100.00 340.00 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 120.00 40.00 tblConstructionPhase NumDays 310.00 135.00 tblConstructionPhase NumDays 3,100.00 625.00 tblConstructionPhase NumDays 220.00 35.00 tblConstructionPhase NumDays 220.00 30.00 tblConstructionPhase NumDays 120.00 5.00 tblConstructionPhase NumDays 310.00 15.00 tblConstructionPhase NumDays 3,100.00 150.00 tblConstructionPhase NumDays 220.00 18.00 tblConstructionPhase NumDays 220.00 5.00 tblConstructionPhase PhaseStartDate 9/29/2029 9/30/2029 tblGrading AcresOfGrading 387.50 0.00 tblLandUse LotAcreage 0.34 1.86 tblLandUse LotAcreage 3.29 4.40 tblLandUse LotAcreage 12.31 10.80 tblLandUse LotAcreage 32.79 12.80 tblLandUse LotAcreage 96.43 27.30 tblLandUse Population 358.00 286.00 tblLandUse Population 563.00 451.00 tblLandUse Population 289.00 232.00 tblLandUse Population 849.00 680.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 3.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 4.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 3.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 5 of 100 tblOffRoadEquipment UsageHours 8.00 7.00 tblProjectCharacteristics OperationalYear 2014 2030 tblSequestration NumberOfNewTrees 0.00 525.00 tblSolidWaste SolidWasteGenerationRate 57.50 121.13 tblSolidWaste SolidWasteGenerationRate 1.64 0.00 tblSolidWaste SolidWasteGenerationRate 90.62 190.91 tblSolidWaste SolidWasteGenerationRate 15.75 6.84 tblSolidWaste SolidWasteGenerationRate 373.92 711.82 tblTripsAndVMT VendorTripNumber 0.00 475.00 tblTripsAndVMT VendorTripNumber 475.00 0.00 tblTripsAndVMT WorkerTripNumber 25.00 15.00 tblTripsAndVMT WorkerTripNumber 30.00 18.00 tblTripsAndVMT WorkerTripNumber 35.00 20.00 tblTripsAndVMT WorkerTripNumber 30.00 1,393.00 tblTripsAndVMT WorkerTripNumber 35.00 15.00 tblTripsAndVMT WorkerTripNumber 1,393.00 279.00 tblWater IndoorWaterUseRate 8,144,253.20 4,472,304.06 tblWater IndoorWaterUseRate 12,835,343.05 7,048,351.14 tblWater IndoorWaterUseRate 1,111,087.82 909,125.22 tblWater IndoorWaterUseRate 25,931,302.20 17,829,611.92 tblWater OutdoorWaterUseRate 5,134,420.50 2,859,341.94 tblWater OutdoorWaterUseRate 22,733,464.15 12,434,472.00 tblWater OutdoorWaterUseRate 8,091,846.70 4,506,322.86 tblWater OutdoorWaterUseRate 680,989.31 557,205.78 tblWater OutdoorWaterUseRate 16,347,994.86 11,399,260.08 tblWoodstoves WoodstoveDayYear 60.00 0.00 tblWoodstoves WoodstoveDayYear 60.00 0.00 tblWoodstoves WoodstoveDayYear 60.00 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 6 of 100 2.0 Emissions Summary tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 7 of 100 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2019 8.4258 81.0550 62.7219 0.0877 18.2442 3.8357 22.0799 9.9779 3.5289 13.5067 0.0000 8,641.801 9 8,641.801 9 2.6936 0.0000 8,698.366 6 2020 12.9107 79.5673 138.0535 0.2906 34.0005 3.0020 36.9426 14.2006 2.7618 16.9305 0.0000 23,852.26 14 23,852.26 14 2.6377 0.0000 23,907.65 31 2021 2.7864 19.8969 28.2473 0.0612 2.7582 1.0668 3.8251 0.7315 1.0085 1.7400 0.0000 5,032.429 1 5,032.429 1 0.7296 0.0000 5,047.750 6 2022 2.5381 17.9049 27.3723 0.0612 2.7582 0.9053 3.6635 0.7315 0.8564 1.5879 0.0000 4,998.288 8 4,998.288 8 0.7199 0.0000 5,013.405 8 2023 745.3390 35.0018 97.0922 0.2632 18.2442 1.5556 19.6361 9.9779 1.4311 11.2584 0.0000 20,696.44 19 20,696.44 19 1.9422 0.0000 20,737.22 76 2024 745.2947 32.4240 93.7608 0.2632 18.2442 1.4247 19.4952 9.9779 1.3107 11.1288 0.0000 20,553.63 47 20,553.63 47 1.9415 0.0000 20,594.40 54 2025 745.2578 31.0940 91.1410 0.2631 18.2442 1.1880 19.2747 9.9779 1.0930 10.9259 0.0000 20,428.38 73 20,428.38 73 1.9407 0.0000 20,469.14 22 2026 7.6006 30.7221 88.7944 0.2631 15.9348 1.1880 16.8249 4.2701 1.0930 5.1006 0.0000 20,319.69 57 20,319.69 57 1.9405 0.0000 20,360.44 68 2027 7.2715 30.3913 85.4501 0.2631 15.9350 0.8911 16.8261 4.2702 0.8314 5.1016 0.0000 20,224.97 25 20,224.97 25 1.0402 0.0000 20,246.81 70 2028 426.0989 30.0935 82.3371 0.2630 15.9352 0.8914 16.8266 4.2703 0.8317 5.1020 0.0000 20,143.54 69 20,143.54 69 1.0300 0.0000 20,165.17 62 2029 827.8999 29.8919 80.8762 0.2630 18.2442 1.1880 19.2747 9.9779 1.0930 10.9259 0.0000 20,073.80 49 20,073.80 49 1.9401 0.0000 20,114.54 64 Total 3,531.423 5 418.0426 875.8467 2.3422 178.5429 17.1364 194.6692 78.3637 15.8393 93.3084 0.0000 184,965.2 649 184,965.2 649 18.5559 0.0000 185,354.9 377 Unmitigated Construction CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 8 of 100 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2019 4.9131 71.9704 55.7179 0.0877 8.3078 2.0338 10.2469 4.5160 2.0337 6.4550 0.0000 8,641.801 9 8,641.801 9 2.6936 0.0000 8,698.366 6 2020 9.6382 75.8987 129.2850 0.2906 24.0640 2.0335 25.8715 8.7387 2.0334 10.5122 0.0000 23,852.26 14 23,852.26 14 2.6377 0.0000 23,907.65 31 2021 1.8665 26.8438 29.5402 0.0612 2.7582 1.0145 3.7728 0.7315 1.0132 1.7448 0.0000 5,032.429 0 5,032.429 0 0.7296 0.0000 5,047.750 6 2022 1.8265 26.7740 28.8791 0.0612 2.7582 1.0145 3.7727 0.7315 1.0132 1.7447 0.0000 4,998.288 8 4,998.288 8 0.7199 0.0000 5,013.405 8 2023 745.2613 51.0108 98.6986 0.2632 15.9346 1.3795 17.1995 4.5160 1.3794 5.5066 0.0000 20,696.44 19 20,696.44 19 1.9422 0.0000 20,737.22 76 2024 745.2279 51.0068 95.4432 0.2632 15.9345 1.3795 17.2007 4.5160 1.3794 5.5077 0.0000 20,553.63 47 20,553.63 47 1.9415 0.0000 20,594.40 54 2025 745.2008 51.0036 92.9048 0.2631 15.9346 1.3795 17.2022 4.5160 1.3794 5.5090 0.0000 20,428.38 73 20,428.38 73 1.9407 0.0000 20,469.14 22 2026 7.3174 51.0009 90.5582 0.2631 15.9348 1.3796 17.2015 4.2701 1.3795 5.5083 0.0000 20,319.69 57 20,319.69 57 1.9405 0.0000 20,360.44 68 2027 6.9883 41.4432 87.2139 0.2631 15.9350 1.2676 17.2026 4.2702 1.2391 5.5093 0.0000 20,224.97 25 20,224.97 25 1.0402 0.0000 20,246.81 70 2028 426.0419 41.1453 84.1010 0.2630 15.9352 1.2679 17.2031 4.2703 1.2393 5.5096 0.0000 20,143.54 69 20,143.54 69 1.0300 0.0000 20,165.17 62 2029 827.8429 50.9939 82.6400 0.2630 15.9353 1.3796 17.2038 4.5160 1.3795 5.5102 0.0000 20,073.80 49 20,073.80 49 1.9401 0.0000 20,114.54 64 Total 3,522.124 7 539.0913 874.9817 2.3422 149.4323 15.5296 164.0771 45.5924 15.4692 59.0173 0.0000 184,965.2 649 184,965.2 649 18.5559 0.0000 185,354.9 377 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.26 -28.96 0.10 0.00 16.30 9.38 15.71 41.82 2.34 36.75 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 9 of 100 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 94.0633 0.6845 59.4111 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3178 107.3178 0.1028 0.0000 109.4773 Energy 0.5594 4.7808 2.0385 0.0305 0.3865 0.3865 0.3865 0.3865 6,102.310 6 6,102.310 6 0.1170 0.1119 6,139.448 3 Mobile 16.1134 30.1763 135.8730 0.5231 36.5186 0.6269 37.1455 9.7654 0.5786 10.3440 38,061.81 09 38,061.81 09 1.0265 38,083.36 77 Total 110.7361 35.6416 197.3226 0.5568 36.5186 1.3434 37.8620 9.7654 1.2951 11.0605 0.0000 44,271.43 94 44,271.43 94 1.2463 0.1119 44,332.29 33 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 74.4981 0.6845 59.4111 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3178 107.3178 0.1028 0.0000 109.4773 Energy 0.4427 3.7836 1.6132 0.0242 0.3059 0.3059 0.3059 0.3059 4,829.540 0 4,829.540 0 0.0926 0.0885 4,858.931 8 Mobile 15.2553 26.2431 119.5671 0.4373 30.3141 0.5330 30.8471 8.1063 0.4919 8.5982 31,817.91 22 31,817.91 22 0.8696 31,836.17 42 Total 90.1961 30.7111 180.5914 0.4646 30.3141 1.1688 31.4829 8.1063 1.1278 9.2341 0.0000 36,754.77 00 36,754.77 00 1.0650 0.0885 36,804.58 33 Mitigated Operational CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 10 of 100 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Offsite Construction – Site Preparation Site Preparation 1/1/2019 3/25/2019 5 60 2 Offsite Construction – Grading Grading 3/26/2019 10/28/2019 5 155 3 Offsite Construction – Paving Paving 10/29/2019 12/31/2019 5 46 4 Phase I – Site Preparation Site Preparation 1/1/2020 1/21/2020 5 15 5 Phase I, III, IV – Grading Grading 1/22/2020 7/14/2020 5 125 6 Phase I – Building Construction Building Construction 7/15/2020 1/31/2023 5 665 7 Phase I – Paving Paving 2/1/2023 2/21/2023 5 15 8 Phase I – Architectural Coating Architectural Coating 2/22/2023 5/9/2023 5 55 9 Phase II – Site Preparation Site Preparation 5/10/2023 5/30/2023 5 15 10 Phase II – Grading Grading 5/31/2023 7/11/2023 5 30 11 Phase II – Building Construction Building Construction 7/12/2023 11/28/2023 5 100 12 Phase II – Paving Paving 11/29/2023 12/19/2023 5 15 13 Phase II – Architectural Coating Architectural Coating 12/20/2023 1/16/2024 5 20 14 Phase III – Site Preparation Site Preparation 1/17/2024 2/13/2024 5 20 15 Phase III – Grading Grading 2/14/2024 4/2/2024 5 35 16 Phase III – Building Construction Building Construction 4/3/2024 7/22/2025 5 340 17 Phase III – Architectural Coating Architectural Coating 7/23/2025 8/19/2025 5 20 18 Phase III – Paving Paving 8/20/2025 9/16/2025 5 20 19 Phases IV & V – Site Preparation Site Preparation 9/17/2025 11/11/2025 5 40 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 18.55 13.83 8.48 16.55 16.99 12.99 16.85 16.99 12.91 16.51 0.00 16.98 16.98 14.55 20.86 16.98 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 11 of 100 20 Phases IV & V – Grading Grading 11/12/2025 5/19/2026 5 135 21 Phases IV & V – Building Construction Building Construction 5/20/2026 10/10/2028 5 625 22 Phases IV & V – Architectural Coating Architectural Coating 10/11/2028 11/28/2028 5 35 23 Phases IV & V – Paving Paving 11/29/2028 1/9/2029 5 30 24 Phase VI – Site Preparation Site Preparation 1/10/2029 1/16/2029 5 5 25 Phase VI – Grading Grading 1/17/2029 2/6/2029 5 15 26 Phase VI – Building Construction Building Construction 2/7/2029 9/4/2029 5 150 27 Phase VI – Architectural Coating Architectural Coating 9/5/2029 9/28/2029 5 18 28 Phase VI – Paving Paving 9/30/2029 10/5/2029 5 5 OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Phase I – Building Construction Air Compressors 1 6.00 78 0.48 Offsite Construction – Site Preparation Excavators 3 8.00 162 0.38 Offsite Construction – Site Preparation Concrete/Industrial Saws 1 8.00 81 0.73 Offsite Construction – Paving Excavators 2 8.00 162 0.38 Phase I – Site Preparation Cranes 1 7.00 226 0.29 Phase I – Site Preparation Forklifts 3 8.00 89 0.20 Phase I – Site Preparation Generator Sets 1 8.00 84 0.74 Phase I, III, IV – Grading Pavers 2 8.00 125 0.42 Phase I, III, IV – Grading Rollers 2 8.00 80 0.38 Residential Indoor: 2,102,760; Residential Outdoor: 700,920; Non-Residential Indoor: 2,716,339; Non-Residential Outdoor: 905,446 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 0 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 12 of 100 Offsite Construction – Site Preparation Rubber Tired Dozers 2 8.00 255 0.40 Offsite Construction – Paving Rubber Tired Dozers 1 8.00 255 0.40 Phase I – Site Preparation Tractors/Loaders/Backhoes 3 7.00 97 0.37 Offsite Construction – Paving Graders 1 8.00 174 0.41 Offsite Construction – Paving Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase I, III, IV – Grading Paving Equipment 2 8.00 130 0.36 Offsite Construction – Grading Tractors/Loaders/Backhoes 4 8.00 97 0.37 Offsite Construction – Grading Rubber Tired Dozers 3 8.00 255 0.40 Offsite Construction – Paving Scrapers 2 8.00 361 0.48 Phase I – Site Preparation Welders 1 8.00 46 0.45 Phase II – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase III – Architectural Coating Air Compressors 1 6.00 78 0.48 Phases IV & V – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase VI – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase I – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase II – Building Construction Cranes 1 7.00 226 0.29 Phase III – Building Construction Cranes 1 7.00 226 0.29 Phases IV & V – Building Construction Cranes 1 7.00 226 0.29 Phase VI – Building Construction Cranes 1 7.00 226 0.29 Phase I – Building Construction Cranes 1 7.00 226 0.29 Phase II – Grading Excavators 2 8.00 162 0.38 Phase III – Grading Excavators 2 8.00 162 0.38 Offsite Construction – Grading Excavators 2 8.00 162 0.38 Phases IV & V – Grading Excavators 2 8.00 162 0.38 Phase VI – Grading Excavators 2 8.00 162 0.38 Phase I, III, IV – Grading Excavators 2 8.00 162 0.38 Phase II – Building Construction Forklifts 3 8.00 89 0.20 Phase III – Building Construction Forklifts 3 8.00 89 0.20 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 13 of 100 Phases IV & V – Building Construction Forklifts 3 8.00 89 0.20 Phase VI – Building Construction Forklifts 3 8.00 89 0.20 Phase I – Building Construction Forklifts 3 8.00 89 0.20 Phase II – Building Construction Generator Sets 1 8.00 84 0.74 Phase III – Building Construction Generator Sets 1 8.00 84 0.74 Phases IV & V – Building Construction Generator Sets 1 8.00 84 0.74 Phase VI – Building Construction Generator Sets 1 8.00 84 0.74 Phase I – Building Construction Generator Sets 1 8.00 84 0.74 Phase II – Grading Graders 1 8.00 174 0.41 Phase III – Grading Graders 1 8.00 174 0.41 Offsite Construction – Grading Graders 1 8.00 174 0.41 Phases IV & V – Grading Graders 1 8.00 174 0.41 Phase VI – Grading Graders 1 8.00 174 0.41 Phase I, III, IV – Grading Graders 1 8.00 174 0.41 Phase II – Paving Pavers 2 8.00 125 0.42 Phase III – Paving Pavers 2 8.00 125 0.42 Phases IV & V – Paving Pavers 2 8.00 125 0.42 Phase VI – Paving Pavers 2 8.00 125 0.42 Offsite Construction – Paving Pavers 2 8.00 125 0.42 Phase I – Paving Pavers 2 8.00 125 0.42 Phase II – Paving Paving Equipment 2 8.00 130 0.36 Phase III – Paving Paving Equipment 2 8.00 130 0.36 Phases IV & V – Paving Paving Equipment 2 8.00 130 0.36 Phase VI – Paving Paving Equipment 2 8.00 130 0.36 Offsite Construction – Paving Paving Equipment 2 8.00 130 0.36 Phase I – Paving Paving Equipment 2 8.00 130 0.36 Phase II – Paving Rollers 2 8.00 80 0.38 Phase III – Paving Rollers 2 8.00 80 0.38 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 14 of 100 Phases IV & V – Paving Rollers 2 8.00 80 0.38 Phase VI – Paving Rollers 2 8.00 80 0.38 Offsite Construction – Paving Rollers 2 8.00 80 0.38 Phase I – Paving Rollers 2 8.00 80 0.38 Phase II – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase III – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phases IV & V – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase VI – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase I, III, IV – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase III – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phases IV & V – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase VI – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase I – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase II – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase II – Grading Scrapers 2 8.00 361 0.48 Phase III – Grading Scrapers 2 8.00 361 0.48 Offsite Construction – Grading Scrapers 2 8.00 361 0.48 Phases IV & V – Grading Scrapers 2 8.00 361 0.48 Phase VI – Grading Scrapers 2 8.00 361 0.48 Phase I, III, IV – Grading Scrapers 2 8.00 361 0.48 Phase II – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase III – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phases IV & V – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase VI – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase I – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase II – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase III – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phases IV & V – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 15 of 100 Phase VI – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase I, III, IV – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Offsite Construction – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase III – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phases IV & V – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase VI – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase II – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase II – Building Construction Welders 1 8.00 46 0.45 Phase III – Building Construction Welders 1 8.00 46 0.45 Phases IV & V – Building Construction Welders 1 8.00 46 0.45 Phase VI – Building Construction Welders 1 8.00 46 0.45 Phase I – Building Construction Welders 1 8.00 46 0.45 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Offsite Construction – Site Preparation 10 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Offsite Construction – Grading 12 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Offsite Construction – Paving 14 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Site Preparation 12 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I, III, IV – Grading 14 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Building Construction 10 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 16 of 100 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area Reduce Vehicle Speed on Unpaved Roads Clean Paved Roads Phase III – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 17 of 100 3.2 Offsite Construction – Site Preparation - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 12.0442 0.0000 12.0442 6.6205 0.0000 6.6205 0.0000 0.0000 Off-Road 4.2536 43.2907 40.0157 0.0524 2.2690 2.2690 2.1058 2.1058 5,159.400 1 5,159.400 1 1.4866 5,190.618 3 Total 4.2536 43.2907 40.0157 0.0524 12.0442 2.2690 14.3131 6.6205 2.1058 8.7262 5,159.400 1 5,159.400 1 1.4866 5,190.618 3 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0429 0.0659 0.6353 1.6900e- 003 0.1483 9.9000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 125.8629 125.8629 5.9700e- 003 125.9884 Total 0.0429 0.0659 0.6353 1.6900e- 003 0.1483 9.9000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 125.8629 125.8629 5.9700e- 003 125.9884 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 18 of 100 3.2 Offsite Construction – Site Preparation - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 5.4199 0.0000 5.4199 2.9792 0.0000 2.9792 0.0000 0.0000 Off-Road 1.8728 45.4945 34.6332 0.0524 1.4199 1.4199 1.4199 1.4199 0.0000 5,159.400 1 5,159.400 1 1.4866 5,190.618 3 Total 1.8728 45.4945 34.6332 0.0524 5.4199 1.4199 6.8398 2.9792 1.4199 4.3991 0.0000 5,159.400 1 5,159.400 1 1.4866 5,190.618 3 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0429 0.0659 0.6353 1.6900e- 003 0.1483 9.9000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 125.8629 125.8629 5.9700e- 003 125.9884 Total 0.0429 0.0659 0.6353 1.6900e- 003 0.1483 9.9000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 125.8629 125.8629 5.9700e- 003 125.9884 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 19 of 100 3.3 Offsite Construction – Grading - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 7.4152 80.9760 61.9596 0.0857 3.8345 3.8345 3.5278 3.5278 8,490.766 4 8,490.766 4 2.6864 8,547.180 6 Total 7.4152 80.9760 61.9596 0.0857 18.0663 3.8345 21.9008 9.9307 3.5278 13.4585 8,490.766 4 8,490.766 4 2.6864 8,547.180 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0515 0.0791 0.7623 2.0300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 151.0355 151.0355 7.1700e- 003 151.1860 Total 0.0515 0.0791 0.7623 2.0300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 151.0355 151.0355 7.1700e- 003 151.1860 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 20 of 100 3.3 Offsite Construction – Grading - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 2.6151 71.8913 51.9820 0.0857 1.9380 1.9380 1.9380 1.9380 0.0000 8,490.766 4 8,490.766 4 2.6864 8,547.180 5 Total 2.6151 71.8913 51.9820 0.0857 8.1298 1.9380 10.0678 4.4688 1.9380 6.4068 0.0000 8,490.766 4 8,490.766 4 2.6864 8,547.180 5 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0515 0.0791 0.7623 2.0300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 151.0355 151.0355 7.1700e- 003 151.1860 Total 0.0515 0.0791 0.7623 2.0300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 151.0355 151.0355 7.1700e- 003 151.1860 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 21 of 100 3.4 Offsite Construction – Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 6.3170 69.1331 54.6540 0.0840 3.3143 3.3143 3.0492 3.0492 8,320.285 2 8,320.285 2 2.6325 8,375.566 7 Paving 2.0516 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 8.3686 69.1331 54.6540 0.0840 3.3143 3.3143 3.0492 3.0492 8,320.285 2 8,320.285 2 2.6325 8,375.566 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0572 0.0879 0.8470 2.2500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 167.8172 167.8172 7.9600e- 003 167.9845 Total 0.0572 0.0879 0.8470 2.2500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 167.8172 167.8172 7.9600e- 003 167.9845 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 22 of 100 3.4 Offsite Construction – Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.8043 70.6463 54.8708 0.0840 2.0325 2.0325 2.0325 2.0325 0.0000 8,320.285 2 8,320.285 2 2.6325 8,375.566 7 Paving 2.0516 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.8559 70.6463 54.8708 0.0840 2.0325 2.0325 2.0325 2.0325 0.0000 8,320.285 2 8,320.285 2 2.6325 8,375.566 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0572 0.0879 0.8470 2.2500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 167.8172 167.8172 7.9600e- 003 167.9845 Total 0.0572 0.0879 0.8470 2.2500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 167.8172 167.8172 7.9600e- 003 167.9845 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 23 of 100 3.5 Phase I – Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 4.9983 49.5273 40.6161 0.0535 2.5112 2.5112 2.3330 2.3330 5,131.687 5 5,131.687 5 1.4568 5,162.281 1 Total 4.9983 49.5273 40.6161 0.0535 18.0663 2.5112 20.5775 9.9307 2.3330 12.2637 5,131.687 5 5,131.687 5 1.4568 5,162.281 1 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.3046 24.4786 44.1046 0.0803 2.1628 0.3412 2.5040 0.6175 0.3138 0.9312 7,501.887 7 7,501.887 7 0.0582 7,503.109 6 Worker 3.6079 5.5614 53.3328 0.1567 13.7714 0.0898 13.8612 3.6524 0.0832 3.7357 11,218.68 62 11,218.68 62 0.5159 11,229.52 04 Total 7.9124 30.0399 97.4374 0.2370 15.9342 0.4309 16.3651 4.2699 0.3970 4.6669 18,720.57 39 18,720.57 39 0.5741 18,732.62 99 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 24 of 100 3.5 Phase I – Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.7258 45.8587 31.8476 0.0535 1.3765 1.3765 1.3765 1.3765 0.0000 5,131.687 5 5,131.687 5 1.4568 5,162.281 1 Total 1.7258 45.8587 31.8476 0.0535 8.1298 1.3765 9.5063 4.4688 1.3765 5.8453 0.0000 5,131.687 5 5,131.687 5 1.4568 5,162.281 1 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.3046 24.4786 44.1046 0.0803 2.1628 0.3412 2.5040 0.6175 0.3138 0.9312 7,501.887 7 7,501.887 7 0.0582 7,503.109 6 Worker 3.6079 5.5614 53.3328 0.1567 13.7714 0.0898 13.8612 3.6524 0.0832 3.7357 11,218.68 62 11,218.68 62 0.5159 11,229.52 04 Total 7.9124 30.0399 97.4374 0.2370 15.9342 0.4309 16.3651 4.2699 0.3970 4.6669 18,720.57 39 18,720.57 39 0.5741 18,732.62 99 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 25 of 100 3.6 Phase I, III, IV – Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 5.8802 63.1684 52.7780 0.0840 3.0010 3.0010 2.7609 2.7609 8,138.465 9 8,138.465 9 2.6321 8,193.741 0 Total 5.8802 63.1684 52.7780 0.0840 8.6733 3.0010 11.6743 3.5965 2.7609 6.3574 8,138.465 9 8,138.465 9 2.6321 8,193.741 0 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0389 0.0599 0.5743 1.6900e- 003 0.1483 9.7000e- 004 0.1493 0.0393 9.0000e- 004 0.0402 120.8042 120.8042 5.5600e- 003 120.9209 Total 0.0389 0.0599 0.5743 1.6900e- 003 0.1483 9.7000e- 004 0.1493 0.0393 9.0000e- 004 0.0402 120.8042 120.8042 5.5600e- 003 120.9209 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 26 of 100 3.6 Phase I, III, IV – Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 2.8043 70.6463 54.8708 0.0840 2.0325 2.0325 2.0325 2.0325 0.0000 8,138.465 9 8,138.465 9 2.6321 8,193.741 0 Total 2.8043 70.6463 54.8708 0.0840 3.9030 2.0325 5.9355 1.6184 2.0325 3.6509 0.0000 8,138.465 9 8,138.465 9 2.6321 8,193.741 0 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0389 0.0599 0.5743 1.6900e- 003 0.1483 9.7000e- 004 0.1493 0.0393 9.0000e- 004 0.0402 120.8042 120.8042 5.5600e- 003 120.9209 Total 0.0389 0.0599 0.5743 1.6900e- 003 0.1483 9.7000e- 004 0.1493 0.0393 9.0000e- 004 0.0402 120.8042 120.8042 5.5600e- 003 120.9209 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 27 of 100 3.7 Phase I – Building Construction - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.3534 20.7678 18.6399 0.0298 1.2238 1.2238 1.1574 1.1574 2,823.928 0 2,823.928 0 0.6412 2,837.393 7 Total 2.3534 20.7678 18.6399 0.0298 1.2238 1.2238 1.1574 1.1574 2,823.928 0 2,823.928 0 0.6412 2,837.393 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.7226 1.1139 10.6819 0.0314 2.7582 0.0180 2.7762 0.7315 0.0167 0.7482 2,246.958 7 2,246.958 7 0.1033 2,249.128 6 Total 0.7226 1.1139 10.6819 0.0314 2.7582 0.0180 2.7762 0.7315 0.0167 0.7482 2,246.958 7 2,246.958 7 0.1033 2,249.128 6 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 28 of 100 3.7 Phase I – Building Construction - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,823.928 0 2,823.928 0 0.6412 2,837.393 7 Total 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,823.928 0 2,823.928 0 0.6412 2,837.393 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.7226 1.1139 10.6819 0.0314 2.7582 0.0180 2.7762 0.7315 0.0167 0.7482 2,246.958 7 2,246.958 7 0.1033 2,249.128 6 Total 0.7226 1.1139 10.6819 0.0314 2.7582 0.0180 2.7762 0.7315 0.0167 0.7482 2,246.958 7 2,246.958 7 0.1033 2,249.128 6 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 29 of 100 3.7 Phase I – Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.1120 18.8671 18.3552 0.0298 1.0490 1.0490 0.9919 0.9919 2,824.229 8 2,824.229 8 0.6319 2,837.499 8 Total 2.1120 18.8671 18.3552 0.0298 1.0490 1.0490 0.9919 0.9919 2,824.229 8 2,824.229 8 0.6319 2,837.499 8 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6744 1.0298 9.8922 0.0314 2.7582 0.0179 2.7761 0.7315 0.0166 0.7481 2,208.199 3 2,208.199 3 0.0977 2,210.250 8 Total 0.6744 1.0298 9.8922 0.0314 2.7582 0.0179 2.7761 0.7315 0.0166 0.7481 2,208.199 3 2,208.199 3 0.0977 2,210.250 8 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 30 of 100 3.7 Phase I – Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,824.229 8 2,824.229 8 0.6319 2,837.499 8 Total 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,824.229 8 2,824.229 8 0.6319 2,837.499 8 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6744 1.0298 9.8922 0.0314 2.7582 0.0179 2.7761 0.7315 0.0166 0.7481 2,208.199 3 2,208.199 3 0.0977 2,210.250 8 Total 0.6744 1.0298 9.8922 0.0314 2.7582 0.0179 2.7761 0.7315 0.0166 0.7481 2,208.199 3 2,208.199 3 0.0977 2,210.250 8 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 31 of 100 3.7 Phase I – Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.9037 16.9449 18.1412 0.0298 0.8874 0.8874 0.8398 0.8398 2,825.197 7 2,825.197 7 0.6269 2,838.361 5 Total 1.9037 16.9449 18.1412 0.0298 0.8874 0.8874 0.8398 0.8398 2,825.197 7 2,825.197 7 0.6269 2,838.361 5 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6344 0.9600 9.2311 0.0314 2.7582 0.0178 2.7761 0.7315 0.0165 0.7481 2,173.091 1 2,173.091 1 0.0930 2,175.044 4 Total 0.6344 0.9600 9.2311 0.0314 2.7582 0.0178 2.7761 0.7315 0.0165 0.7481 2,173.091 1 2,173.091 1 0.0930 2,175.044 4 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 32 of 100 3.7 Phase I – Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,825.197 7 2,825.197 7 0.6269 2,838.361 5 Total 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,825.197 7 2,825.197 7 0.6269 2,838.361 5 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6344 0.9600 9.2311 0.0314 2.7582 0.0178 2.7761 0.7315 0.0165 0.7481 2,173.091 1 2,173.091 1 0.0930 2,175.044 4 Total 0.6344 0.9600 9.2311 0.0314 2.7582 0.0178 2.7761 0.7315 0.0165 0.7481 2,173.091 1 2,173.091 1 0.0930 2,175.044 4 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 33 of 100 3.7 Phase I – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.7578 15.6156 18.0204 0.0298 0.7675 0.7675 0.7265 0.7265 2,826.074 3 2,826.074 3 0.6213 2,839.120 8 Total 1.7578 15.6156 18.0204 0.0298 0.7675 0.7675 0.7265 0.7265 2,826.074 3 2,826.074 3 0.6213 2,839.120 8 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Total 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 34 of 100 3.7 Phase I – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,826.074 3 2,826.074 3 0.6213 2,839.120 8 Total 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,826.074 3 2,826.074 3 0.6213 2,839.120 8 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Total 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 35 of 100 3.8 Phase I – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0128 9.9983 14.2850 0.0223 0.5010 0.5010 0.4609 0.4609 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Paving 6.2915 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 7.3043 9.9983 14.2850 0.0223 0.5010 0.5010 0.4609 0.4609 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0321 0.0482 0.4627 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 115.1144 115.1144 4.7800e- 003 115.2147 Total 0.0321 0.0482 0.4627 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 115.1144 115.1144 4.7800e- 003 115.2147 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 36 of 100 3.8 Phase I – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Paving 6.2915 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 7.2036 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0321 0.0482 0.4627 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 115.1144 115.1144 4.7800e- 003 115.2147 Total 0.0321 0.0482 0.4627 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 115.1144 115.1144 4.7800e- 003 115.2147 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 37 of 100 3.9 Phase I – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 270.7457 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1917 1.3030 1.8111 2.9700e- 003 0.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8017 Total 270.9374 1.3030 1.8111 2.9700e- 003 0.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8017 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Total 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 38 of 100 3.9 Phase I – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 270.7457 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0168 281.8017 Total 270.8596 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0168 281.8017 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Total 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 39 of 100 3.10 Phase II – Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 3.0157 29.9342 28.8193 0.0392 1.3907 1.3907 1.2795 1.2795 3,793.953 5 3,793.953 5 1.2270 3,819.721 4 Total 3.0157 29.9342 28.8193 0.0392 18.0663 1.3907 19.4570 9.9307 1.2795 11.2102 3,793.953 5 3,793.953 5 1.2270 3,819.721 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0385 0.0579 0.5552 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 138.1373 138.1373 5.7300e- 003 138.2576 Total 0.0385 0.0579 0.5552 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 138.1373 138.1373 5.7300e- 003 138.2576 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 40 of 100 3.10 Phase II – Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.2300 34.4240 23.4003 0.0392 0.9611 0.9611 0.9611 0.9611 0.0000 3,793.953 5 3,793.953 5 1.2270 3,819.721 4 Total 1.2300 34.4240 23.4003 0.0392 8.1298 0.9611 9.0909 4.4688 0.9611 5.4299 0.0000 3,793.953 5 3,793.953 5 1.2270 3,819.721 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0385 0.0579 0.5552 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 138.1373 138.1373 5.7300e- 003 138.2576 Total 0.0385 0.0579 0.5552 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 138.1373 138.1373 5.7300e- 003 138.2576 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 41 of 100 3.11 Phase II – Grading - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.5314 34.9375 34.1888 0.0618 1.5543 1.5543 1.4300 1.4300 5,985.435 9 5,985.435 9 1.9358 6,026.087 9 Total 3.5314 34.9375 34.1888 0.0618 8.6733 1.5543 10.2276 3.5965 1.4300 5.0265 5,985.435 9 5,985.435 9 1.9358 6,026.087 9 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0428 0.0643 0.6169 2.2500e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 153.4858 153.4858 6.3700e- 003 153.6196 Total 0.0428 0.0643 0.6169 2.2500e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 153.4858 153.4858 6.3700e- 003 153.6196 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 42 of 100 3.11 Phase II – Grading - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,985.435 9 5,985.435 9 1.9358 6,026.087 9 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,985.435 9 5,985.435 9 1.9358 6,026.087 9 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0428 0.0643 0.6169 2.2500e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 153.4858 153.4858 6.3700e- 003 153.6196 Total 0.0428 0.0643 0.6169 2.2500e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 153.4858 153.4858 6.3700e- 003 153.6196 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 43 of 100 3.12 Phase II – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.5661 14.3126 16.2093 0.0268 0.6967 0.6967 0.6557 0.6557 2,544.626 2 2,544.626 2 0.6044 2,557.319 1 Total 1.5661 14.3126 16.2093 0.0268 0.6967 0.6967 0.6557 0.6557 2,544.626 2 2,544.626 2 0.6044 2,557.319 1 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.7256 14.9946 37.9181 0.0798 2.1632 0.2746 2.4377 0.6176 0.2526 0.8702 7,461.527 5 7,461.527 5 0.0558 7,462.700 1 Worker 2.9788 4.4784 42.9648 0.1566 13.7714 0.0888 13.8602 3.6524 0.0824 3.7348 10,690.28 81 10,690.28 81 0.4436 10,699.60 33 Total 6.7044 19.4731 80.8830 0.2364 15.9346 0.3634 16.2979 4.2700 0.3350 4.6050 18,151.81 56 18,151.81 56 0.4994 18,162.30 34 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 44 of 100 3.12 Phase II – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0268 0.9016 0.9016 0.9016 0.9016 0.0000 2,544.626 2 2,544.626 2 0.6044 2,557.319 1 Total 1.0782 23.4615 17.8156 0.0268 0.9016 0.9016 0.9016 0.9016 0.0000 2,544.626 2 2,544.626 2 0.6044 2,557.319 1 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.7256 14.9946 37.9181 0.0798 2.1632 0.2746 2.4377 0.6176 0.2526 0.8702 7,461.527 5 7,461.527 5 0.0558 7,462.700 1 Worker 2.9788 4.4784 42.9648 0.1566 13.7714 0.0888 13.8602 3.6524 0.0824 3.7348 10,690.28 81 10,690.28 81 0.4436 10,699.60 33 Total 6.7044 19.4731 80.8830 0.2364 15.9346 0.3634 16.2979 4.2700 0.3350 4.6050 18,151.81 56 18,151.81 56 0.4994 18,162.30 34 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 45 of 100 3.13 Phase II – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0128 9.9983 14.2850 0.0223 0.5010 0.5010 0.4609 0.4609 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Paving 6.2915 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 7.3043 9.9983 14.2850 0.0223 0.5010 0.5010 0.4609 0.4609 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0321 0.0482 0.4627 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 115.1144 115.1144 4.7800e- 003 115.2147 Total 0.0321 0.0482 0.4627 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 115.1144 115.1144 4.7800e- 003 115.2147 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 46 of 100 3.13 Phase II – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Paving 6.2915 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 7.2036 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0321 0.0482 0.4627 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 115.1144 115.1144 4.7800e- 003 115.2147 Total 0.0321 0.0482 0.4627 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 115.1144 115.1144 4.7800e- 003 115.2147 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 47 of 100 3.14 Phase II – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1917 1.3030 1.8111 2.9700e- 003 0.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8017 Total 744.7424 1.3030 1.8111 2.9700e- 003 0.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8017 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Total 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 48 of 100 3.14 Phase II – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0168 281.8017 Total 744.6647 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0168 281.8017 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Total 0.5966 0.8970 8.6053 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,141.127 3 2,141.127 3 0.0888 2,142.993 1 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 49 of 100 3.14 Phase II – Architectural Coating - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e- 003 0.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.7809 Total 744.7315 1.2188 1.8101 2.9700e- 003 0.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.7809 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5632 0.8424 8.0966 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,112.362 0 2,112.362 0 0.0852 2,114.152 0 Total 0.5632 0.8424 8.0966 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,112.362 0 2,112.362 0 0.0852 2,114.152 0 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 50 of 100 3.14 Phase II – Architectural Coating - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0159 281.7809 Total 744.6647 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0159 281.7809 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5632 0.8424 8.0966 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,112.362 0 2,112.362 0 0.0852 2,114.152 0 Total 0.5632 0.8424 8.0966 0.0314 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,112.362 0 2,112.362 0 0.0852 2,114.152 0 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 51 of 100 3.15 Phase III – Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 2.8238 27.5450 27.6020 0.0392 1.2498 1.2498 1.1498 1.1498 3,794.314 9 3,794.314 9 1.2272 3,820.085 2 Total 2.8238 27.5450 27.6020 0.0392 18.0663 1.2498 19.3161 9.9307 1.1498 11.0805 3,794.314 9 3,794.314 9 1.2272 3,820.085 2 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0363 0.0544 0.5224 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 136.2814 136.2814 5.5000e- 003 136.3969 Total 0.0363 0.0544 0.5224 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 136.2814 136.2814 5.5000e- 003 136.3969 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 52 of 100 3.15 Phase III – Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.2300 34.4240 23.4003 0.0392 0.9611 0.9611 0.9611 0.9611 0.0000 3,794.314 9 3,794.314 9 1.2272 3,820.085 2 Total 1.2300 34.4240 23.4003 0.0392 8.1298 0.9611 9.0909 4.4688 0.9611 5.4299 0.0000 3,794.314 9 3,794.314 9 1.2272 3,820.085 2 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0363 0.0544 0.5224 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 136.2814 136.2814 5.5000e- 003 136.3969 Total 0.0363 0.0544 0.5224 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 136.2814 136.2814 5.5000e- 003 136.3969 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 53 of 100 3.16 Phase III – Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.3599 32.1927 33.4441 0.0618 1.4234 1.4234 1.3096 1.3096 5,984.025 2 5,984.025 2 1.9354 6,024.667 7 Total 3.3599 32.1927 33.4441 0.0618 8.6733 1.4234 10.0968 3.5965 1.3096 4.9061 5,984.025 2 5,984.025 2 1.9354 6,024.667 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0404 0.0604 0.5804 2.2500e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 151.4238 151.4238 6.1100e- 003 151.5521 Total 0.0404 0.0604 0.5804 2.2500e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 151.4238 151.4238 6.1100e- 003 151.5521 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 54 of 100 3.16 Phase III – Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,984.025 2 5,984.025 2 1.9354 6,024.667 7 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,984.025 2 5,984.025 2 1.9354 6,024.667 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0404 0.0604 0.5804 2.2500e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 151.4238 151.4238 6.1100e- 003 151.5521 Total 0.0404 0.0604 0.5804 2.2500e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 151.4238 151.4238 6.1100e- 003 151.5521 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 55 of 100 3.17 Phase III – Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.4653 13.3774 16.1332 0.0268 0.6106 0.6106 0.5744 0.5744 2,545.115 4 2,545.115 4 0.6009 2,557.734 9 Total 1.4653 13.3774 16.1332 0.0268 0.6106 0.6106 0.5744 0.5744 2,545.115 4 2,545.115 4 0.6009 2,557.734 9 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.7313 14.8407 37.2028 0.0798 2.1632 0.2758 2.4390 0.6176 0.2538 0.8714 7,461.851 5 7,461.851 5 0.0561 7,463.028 8 Worker 2.8119 4.2059 40.4248 0.1565 13.7714 0.0887 13.8601 3.6524 0.0823 3.7348 10,546.66 78 10,546.66 78 0.4256 10,555.60 46 Total 6.5431 19.0466 77.6276 0.2363 15.9345 0.3646 16.2991 4.2700 0.3361 4.6061 18,008.51 92 18,008.51 92 0.4816 18,018.63 34 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 56 of 100 3.17 Phase III – Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0268 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.115 4 2,545.115 4 0.6009 2,557.734 9 Total 1.0782 23.4615 17.8156 0.0268 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.115 4 2,545.115 4 0.6009 2,557.734 9 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.7313 14.8407 37.2028 0.0798 2.1632 0.2758 2.4390 0.6176 0.2538 0.8714 7,461.851 5 7,461.851 5 0.0561 7,463.028 8 Worker 2.8119 4.2059 40.4248 0.1565 13.7714 0.0887 13.8601 3.6524 0.0823 3.7348 10,546.66 78 10,546.66 78 0.4256 10,555.60 46 Total 6.5431 19.0466 77.6276 0.2363 15.9345 0.3646 16.2991 4.2700 0.3361 4.6061 18,008.51 92 18,008.51 92 0.4816 18,018.63 34 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 57 of 100 3.17 Phase III – Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.6445 14.7042 36.6943 0.0798 2.1632 0.2769 2.4401 0.6176 0.2547 0.8723 7,462.354 1 7,462.354 1 0.0563 7,463.535 4 Worker 2.6770 3.9801 38.3949 0.1565 13.7714 0.0891 13.8605 3.6524 0.0827 3.7351 10,420.14 27 10,420.14 27 0.4107 10,428.76 71 Total 6.3215 18.6843 75.0892 0.2363 15.9346 0.3660 16.3006 4.2701 0.3374 4.6074 17,882.49 68 17,882.49 68 0.4669 17,892.30 25 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 58 of 100 3.17 Phase III – Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.6445 14.7042 36.6943 0.0798 2.1632 0.2769 2.4401 0.6176 0.2547 0.8723 7,462.354 1 7,462.354 1 0.0563 7,463.535 4 Worker 2.6770 3.9801 38.3949 0.1565 13.7714 0.0891 13.8605 3.6524 0.0827 3.7351 10,420.14 27 10,420.14 27 0.4107 10,428.76 71 Total 6.3215 18.6843 75.0892 0.2363 15.9346 0.3660 16.3006 4.2701 0.3374 4.6074 17,882.49 68 17,882.49 68 0.4669 17,892.30 25 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 59 of 100 3.18 Phase III – Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Total 744.7216 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5362 0.7972 7.6900 0.0313 2.7582 0.0178 2.7761 0.7315 0.0166 0.7481 2,087.020 7 2,087.020 7 0.0823 2,088.748 1 Total 0.5362 0.7972 7.6900 0.0313 2.7582 0.0178 2.7761 0.7315 0.0166 0.7481 2,087.020 7 2,087.020 7 0.0823 2,088.748 1 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 60 of 100 3.18 Phase III – Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Total 744.6647 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5362 0.7972 7.6900 0.0313 2.7582 0.0178 2.7761 0.7315 0.0166 0.7481 2,087.020 7 2,087.020 7 0.0823 2,088.748 1 Total 0.5362 0.7972 7.6900 0.0313 2.7582 0.0178 2.7761 0.7315 0.0166 0.7481 2,087.020 7 2,087.020 7 0.0823 2,088.748 1 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 61 of 100 3.19 Phase III – Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.8973 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 4.7186 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 5.6160 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0288 0.0429 0.4134 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 112.2054 112.2054 4.4200e- 003 112.2983 Total 0.0288 0.0429 0.4134 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 112.2054 112.2054 4.4200e- 003 112.2983 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 62 of 100 3.19 Phase III – Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 4.7186 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 5.6308 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0288 0.0429 0.4134 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 112.2054 112.2054 4.4200e- 003 112.2983 Total 0.0288 0.0429 0.4134 1.6900e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 112.2054 112.2054 4.4200e- 003 112.2983 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 63 of 100 3.20 Phases IV & V – Site Preparation - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 2.5083 23.5257 24.8879 0.0392 1.0293 1.0293 0.9470 0.9470 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Total 2.5083 23.5257 24.8879 0.0392 18.0663 1.0293 19.0956 9.9307 0.9470 10.8776 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0346 0.0514 0.4961 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0700e- 003 0.0483 134.6465 134.6465 5.3100e- 003 134.7579 Total 0.0346 0.0514 0.4961 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0700e- 003 0.0483 134.6465 134.6465 5.3100e- 003 134.7579 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 64 of 100 3.20 Phases IV & V – Site Preparation - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.2300 34.4240 23.4003 0.0392 0.9611 0.9611 0.9611 0.9611 0.0000 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Total 1.2300 34.4240 23.4003 0.0392 8.1298 0.9611 9.0909 4.4688 0.9611 5.4299 0.0000 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0346 0.0514 0.4961 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0700e- 003 0.0483 134.6465 134.6465 5.3100e- 003 134.7579 Total 0.0346 0.0514 0.4961 2.0200e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0700e- 003 0.0483 134.6465 134.6465 5.3100e- 003 134.7579 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 65 of 100 3.21 Phases IV & V – Grading - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.0022 27.2606 31.3515 0.0618 1.1867 1.1867 1.0918 1.0918 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 3.0022 27.2606 31.3515 0.0618 8.6733 1.1867 9.8600 3.5965 1.0918 4.6883 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0384 0.0571 0.5513 2.2500e- 003 0.1977 1.2800e- 003 0.1990 0.0524 1.1900e- 003 0.0536 149.6072 149.6072 5.9000e- 003 149.7310 Total 0.0384 0.0571 0.5513 2.2500e- 003 0.1977 1.2800e- 003 0.1990 0.0524 1.1900e- 003 0.0536 149.6072 149.6072 5.9000e- 003 149.7310 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 66 of 100 3.21 Phases IV & V – Grading - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0384 0.0571 0.5513 2.2500e- 003 0.1977 1.2800e- 003 0.1990 0.0524 1.1900e- 003 0.0536 149.6072 149.6072 5.9000e- 003 149.7310 Total 0.0384 0.0571 0.5513 2.2500e- 003 0.1977 1.2800e- 003 0.1990 0.0524 1.1900e- 003 0.0536 149.6072 149.6072 5.9000e- 003 149.7310 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 67 of 100 3.21 Phases IV & V – Grading - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.0022 27.2606 31.3515 0.0618 1.1867 1.1867 1.0918 1.0918 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 3.0022 27.2606 31.3515 0.0618 8.6733 1.1867 9.8600 3.5965 1.0918 4.6883 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0367 0.0544 0.5266 2.2500e- 003 0.1977 1.2900e- 003 0.1990 0.0524 1.2000e- 003 0.0536 148.0336 148.0336 5.7100e- 003 148.1535 Total 0.0367 0.0544 0.5266 2.2500e- 003 0.1977 1.2900e- 003 0.1990 0.0524 1.2000e- 003 0.0536 148.0336 148.0336 5.7100e- 003 148.1535 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 68 of 100 3.21 Phases IV & V – Grading - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0367 0.0544 0.5266 2.2500e- 003 0.1977 1.2900e- 003 0.1990 0.0524 1.2000e- 003 0.0536 148.0336 148.0336 5.7100e- 003 148.1535 Total 0.0367 0.0544 0.5266 2.2500e- 003 0.1977 1.2900e- 003 0.1990 0.0524 1.2000e- 003 0.0536 148.0336 148.0336 5.7100e- 003 148.1535 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 69 of 100 3.22 Phases IV & V – Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.6813 14.5236 36.0679 0.0798 2.1634 0.2753 2.4387 0.6177 0.2532 0.8709 7,463.267 9 7,463.267 9 0.0561 7,464.445 4 Worker 2.5579 3.7888 36.6747 0.1565 13.7714 0.0898 13.8612 3.6524 0.0834 3.7358 10,310.53 72 10,310.53 72 0.3979 10,318.89 34 Total 6.2392 18.3124 72.7426 0.2363 15.9348 0.3651 16.2999 4.2701 0.3366 4.6067 17,773.80 52 17,773.80 52 0.4540 17,783.33 88 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 70 of 100 3.22 Phases IV & V – Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.6813 14.5236 36.0679 0.0798 2.1634 0.2753 2.4387 0.6177 0.2532 0.8709 7,463.267 9 7,463.267 9 0.0561 7,464.445 4 Worker 2.5579 3.7888 36.6747 0.1565 13.7714 0.0898 13.8612 3.6524 0.0834 3.7358 10,310.53 72 10,310.53 72 0.3979 10,318.89 34 Total 6.2392 18.3124 72.7426 0.2363 15.9348 0.3651 16.2999 4.2701 0.3366 4.6067 17,773.80 52 17,773.80 52 0.4540 17,783.33 88 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 71 of 100 3.22 Phases IV & V – Building Construction - 2027 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.4613 14.3655 34.2634 0.0798 2.1636 0.2756 2.4392 0.6178 0.2536 0.8713 7,463.886 1 7,463.886 1 0.0562 7,465.065 6 Worker 2.4487 3.6162 35.1349 0.1564 13.7714 0.0904 13.8618 3.6524 0.0839 3.7364 10,215.19 59 10,215.19 59 0.3865 10,223.31 28 Total 5.9101 17.9817 69.3983 0.2362 15.9350 0.3661 16.3011 4.2702 0.3375 4.6077 17,679.08 19 17,679.08 19 0.4427 17,688.37 84 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 72 of 100 3.22 Phases IV & V – Building Construction - 2027 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.4613 14.3655 34.2634 0.0798 2.1636 0.2756 2.4392 0.6178 0.2536 0.8713 7,463.886 1 7,463.886 1 0.0562 7,465.065 6 Worker 2.4487 3.6162 35.1349 0.1564 13.7714 0.0904 13.8618 3.6524 0.0839 3.7364 10,215.19 59 10,215.19 59 0.3865 10,223.31 28 Total 5.9101 17.9817 69.3983 0.2362 15.9350 0.3661 16.3011 4.2702 0.3375 4.6077 17,679.08 19 17,679.08 19 0.4427 17,688.37 84 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 73 of 100 3.22 Phases IV & V – Building Construction - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.3960 14.2250 32.5134 0.0797 2.1638 0.2754 2.4392 0.6178 0.2533 0.8712 7,464.584 3 7,464.584 3 0.0562 7,465.764 3 Worker 2.3489 3.4587 33.7719 0.1564 13.7714 0.0910 13.8624 3.6524 0.0844 3.7369 10,133.07 20 10,133.07 20 0.3763 10,140.97 33 Total 5.7449 17.6838 66.2854 0.2362 15.9352 0.3664 16.3015 4.2703 0.3378 4.6081 17,597.65 63 17,597.65 63 0.4324 17,606.73 76 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 74 of 100 3.22 Phases IV & V – Building Construction - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.3960 14.2250 32.5134 0.0797 2.1638 0.2754 2.4392 0.6178 0.2533 0.8712 7,464.584 3 7,464.584 3 0.0562 7,465.764 3 Worker 2.3489 3.4587 33.7719 0.1564 13.7714 0.0910 13.8624 3.6524 0.0844 3.7369 10,133.07 20 10,133.07 20 0.3763 10,140.97 33 Total 5.7449 17.6838 66.2854 0.2362 15.9352 0.3664 16.3015 4.2703 0.3378 4.6081 17,597.65 63 17,597.65 63 0.4324 17,606.73 76 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 75 of 100 3.23 Phases IV & V – Architectural Coating - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 425.4576 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Total 425.6284 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.4705 0.6927 6.7641 0.0313 2.7582 0.0182 2.7765 0.7315 0.0169 0.7485 2,029.524 1 2,029.524 1 0.0754 2,031.106 6 Total 0.4705 0.6927 6.7641 0.0313 2.7582 0.0182 2.7765 0.7315 0.0169 0.7485 2,029.524 1 2,029.524 1 0.0754 2,031.106 6 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 76 of 100 3.23 Phases IV & V – Architectural Coating - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 425.4576 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Total 425.5715 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.4705 0.6927 6.7641 0.0313 2.7582 0.0182 2.7765 0.7315 0.0169 0.7485 2,029.524 1 2,029.524 1 0.0754 2,031.106 6 Total 0.4705 0.6927 6.7641 0.0313 2.7582 0.0182 2.7765 0.7315 0.0169 0.7485 2,029.524 1 2,029.524 1 0.0754 2,031.106 6 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 77 of 100 3.24 Phases IV & V – Paving - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.8973 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 3.1458 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.0431 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0253 0.0372 0.3637 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 109.1142 109.1142 4.0500e- 003 109.1993 Total 0.0253 0.0372 0.3637 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 109.1142 109.1142 4.0500e- 003 109.1993 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 78 of 100 3.24 Phases IV & V – Paving - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 3.1458 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.0579 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0253 0.0372 0.3637 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 109.1142 109.1142 4.0500e- 003 109.1993 Total 0.0253 0.0372 0.3637 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 109.1142 109.1142 4.0500e- 003 109.1993 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 79 of 100 3.24 Phases IV & V – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.8973 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 3.1458 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.0431 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0242 0.0356 0.3493 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 108.3511 108.3511 3.9400e- 003 108.4339 Total 0.0242 0.0356 0.3493 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 108.3511 108.3511 3.9400e- 003 108.4339 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 80 of 100 3.24 Phases IV & V – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 3.1458 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.0579 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0242 0.0356 0.3493 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 108.3511 108.3511 3.9400e- 003 108.4339 Total 0.0242 0.0356 0.3493 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 108.3511 108.3511 3.9400e- 003 108.4339 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 81 of 100 3.25 Phase VI – Site Preparation - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 2.5083 23.5257 24.8879 0.0392 1.0293 1.0293 0.9470 0.9470 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Total 2.5083 23.5257 24.8879 0.0392 18.0663 1.0293 19.0956 9.9307 0.9470 10.8776 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0291 0.0427 0.4192 2.0200e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 130.0213 130.0213 4.7300e- 003 130.1207 Total 0.0291 0.0427 0.4192 2.0200e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 130.0213 130.0213 4.7300e- 003 130.1207 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 82 of 100 3.25 Phase VI – Site Preparation - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.2300 34.4240 23.4003 0.0392 0.9611 0.9611 0.9611 0.9611 0.0000 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Total 1.2300 34.4240 23.4003 0.0392 8.1298 0.9611 9.0909 4.4688 0.9611 5.4299 0.0000 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0291 0.0427 0.4192 2.0200e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 130.0213 130.0213 4.7300e- 003 130.1207 Total 0.0291 0.0427 0.4192 2.0200e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 130.0213 130.0213 4.7300e- 003 130.1207 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 83 of 100 3.26 Phase VI – Grading - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.0022 27.2606 31.3515 0.0618 1.1867 1.1867 1.0918 1.0918 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 3.0022 27.2606 31.3515 0.0618 8.6733 1.1867 9.8600 3.5965 1.0918 4.6883 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0323 0.0475 0.4657 2.2500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 144.4682 144.4682 5.2600e- 003 144.5786 Total 0.0323 0.0475 0.4657 2.2500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 144.4682 144.4682 5.2600e- 003 144.5786 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 84 of 100 3.26 Phase VI – Grading - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0323 0.0475 0.4657 2.2500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 144.4682 144.4682 5.2600e- 003 144.5786 Total 0.0323 0.0475 0.4657 2.2500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 144.4682 144.4682 5.2600e- 003 144.5786 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 85 of 100 3.27 Phase VI – Building Construction - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.3636 14.1752 32.3855 0.0798 2.1640 0.2754 2.4394 0.6179 0.2534 0.8713 7,465.707 6 7,465.707 6 0.0562 7,466.888 6 Worker 2.2487 3.3070 32.4389 0.1564 13.7714 0.0914 13.8628 3.6524 0.0848 3.7373 10,062.20 68 10,062.20 68 0.3662 10,069.89 77 Total 5.6123 17.4822 64.8244 0.2362 15.9353 0.3669 16.3022 4.2704 0.3382 4.6086 17,527.91 44 17,527.91 44 0.4225 17,536.78 63 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 86 of 100 3.27 Phase VI – Building Construction - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.3636 14.1752 32.3855 0.0798 2.1640 0.2754 2.4394 0.6179 0.2534 0.8713 7,465.707 6 7,465.707 6 0.0562 7,466.888 6 Worker 2.2487 3.3070 32.4389 0.1564 13.7714 0.0914 13.8628 3.6524 0.0848 3.7373 10,062.20 68 10,062.20 68 0.3662 10,069.89 77 Total 5.6123 17.4822 64.8244 0.2362 15.9353 0.3669 16.3022 4.2704 0.3382 4.6086 17,527.91 44 17,527.91 44 0.4225 17,536.78 63 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 87 of 100 3.28 Phase VI – Architectural Coating - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 827.2786 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Total 827.4495 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.4504 0.6624 6.4971 0.0313 2.7582 0.0183 2.7765 0.7315 0.0170 0.7485 2,015.330 7 2,015.330 7 0.0734 2,016.871 1 Total 0.4504 0.6624 6.4971 0.0313 2.7582 0.0183 2.7765 0.7315 0.0170 0.7485 2,015.330 7 2,015.330 7 0.0734 2,016.871 1 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 88 of 100 3.28 Phase VI – Architectural Coating - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 827.2786 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Total 827.3925 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.4504 0.6624 6.4971 0.0313 2.7582 0.0183 2.7765 0.7315 0.0170 0.7485 2,015.330 7 2,015.330 7 0.0734 2,016.871 1 Total 0.4504 0.6624 6.4971 0.0313 2.7582 0.0183 2.7765 0.7315 0.0170 0.7485 2,015.330 7 2,015.330 7 0.0734 2,016.871 1 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 89 of 100 3.29 Phase VI – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.8973 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 18.8745 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 19.7718 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0242 0.0356 0.3493 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 108.3511 108.3511 3.9400e- 003 108.4339 Total 0.0242 0.0356 0.3493 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 108.3511 108.3511 3.9400e- 003 108.4339 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 90 of 100 4.0 Operational Detail - Mobile 3.29 Phase VI – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 18.8745 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 19.7866 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0242 0.0356 0.3493 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 108.3511 108.3511 3.9400e- 003 108.4339 Total 0.0242 0.0356 0.3493 1.6800e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 108.3511 108.3511 3.9400e- 003 108.4339 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 91 of 100 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 15.2553 26.2431 119.5671 0.4373 30.3141 0.5330 30.8471 8.1063 0.4919 8.5982 31,817.91 22 31,817.91 22 0.8696 31,836.17 42 Unmitigated 16.1134 30.1763 135.8730 0.5231 36.5186 0.6269 37.1455 9.7654 0.5786 10.3440 38,061.81 09 38,061.81 09 1.0265 38,083.36 77 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Mid Rise 823.75 895.00 758.75 2,095,877 1,739,787 City Park 30.34 30.34 30.34 61,654 51,179 Condo/Townhouse 1,298.23 1,410.52 1195.79 3,303,102 2,741,904 Other Asphalt Surfaces 0.00 0.00 0.00 Parking Lot 0.00 0.00 0.00 Regional Shopping Center 644.10 749.55 378.60 897,003 744,602 Single Family Housing 966.57 1,018.08 885.77 2,445,958 2,030,389 Single Family Housing 2,842.29 2,993.76 2604.69 7,192,571 5,970,551 Total 6,605.28 7,097.25 5,853.94 15,996,165 13,278,411 Increase Density Improve Walkability Design Increase Transit Accessibility Improve Pedestrian Network Expand Transit Network CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 92 of 100 4.3 Trip Type Information Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Mid Rise 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 City Park 13.00 5.00 5.00 33.00 48.00 19.00 66 28 6 Condo/Townhouse 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 Other Asphalt Surfaces 13.00 5.00 5.00 0.00 0.00 0.00 0 0 0 Parking Lot 13.00 5.00 5.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 13.00 5.00 5.00 16.30 64.70 19.00 54 35 11 Single Family Housing 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 Single Family Housing 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 5.0 Energy Detail 5.1 Mitigation Measures Energy Exceed Title 24 Install High Efficiency Lighting Percent of Electricity Use Generated with Renewable Energy 4.4 Fleet Mix LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH 0.457871 0.042296 0.214250 0.146969 0.067525 0.009931 0.017760 0.024978 0.002423 0.001427 0.009102 0.000742 0.004726 Historical Energy Use: N CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 93 of 100 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.4427 3.7836 1.6132 0.0242 0.3059 0.3059 0.3059 0.3059 4,829.540 0 4,829.540 0 0.0926 0.0885 4,858.931 8 NaturalGas Unmitigated 0.5594 4.7808 2.0385 0.0305 0.3865 0.3865 0.3865 0.3865 6,102.310 6 6,102.310 6 0.1170 0.1119 6,139.448 3 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 94 of 100 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Mid Rise 2783.43 0.0300 0.2565 0.1092 1.6400e- 003 0.0207 0.0207 0.0207 0.0207 327.4625 327.4625 6.2800e- 003 6.0000e- 003 329.4554 City Park 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 10511 0.1134 0.9687 0.4122 6.1800e- 003 0.0783 0.0783 0.0783 0.0783 1,236.582 8 1,236.582 8 0.0237 0.0227 1,244.108 5 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 102.329 1.1000e- 003 0.0100 8.4300e- 003 6.0000e- 005 7.6000e- 004 7.6000e- 004 7.6000e- 004 7.6000e- 004 12.0387 12.0387 2.3000e- 004 2.2000e- 004 12.1119 Single Family Housing 28709.7 0.3096 2.6458 1.1259 0.0169 0.2139 0.2139 0.2139 0.2139 3,377.611 3 3,377.611 3 0.0647 0.0619 3,398.166 9 Single Family Housing 9763.23 0.1053 0.8998 0.3829 5.7400e- 003 0.0728 0.0728 0.0728 0.0728 1,148.615 3 1,148.615 3 0.0220 0.0211 1,155.605 6 Total 0.5594 4.7808 2.0385 0.0305 0.3865 0.3865 0.3865 0.3865 6,102.310 6 6,102.310 6 0.1170 0.1119 6,139.448 3 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 95 of 100 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day City Park 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 8.2814 0.0893 0.7632 0.3248 4.8700e- 003 0.0617 0.0617 0.0617 0.0617 974.2822 974.2822 0.0187 0.0179 980.2115 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0.0767466 8.3000e- 004 7.5200e- 003 6.3200e- 003 5.0000e- 005 5.7000e- 004 5.7000e- 004 5.7000e- 004 5.7000e- 004 9.0290 9.0290 1.7000e- 004 1.7000e- 004 9.0840 Single Family Housing 22.7278 0.2451 2.0945 0.8913 0.0134 0.1693 0.1693 0.1693 0.1693 2,673.855 3 2,673.855 3 0.0513 0.0490 2,690.128 0 Single Family Housing 7.72897 0.0834 0.7123 0.3031 4.5500e- 003 0.0576 0.0576 0.0576 0.0576 909.2909 909.2909 0.0174 0.0167 914.8247 Apartments Mid Rise 2.2362 0.0241 0.2061 0.0877 1.3200e- 003 0.0167 0.0167 0.0167 0.0167 263.0826 263.0826 5.0400e- 003 4.8200e- 003 264.6837 Total 0.4427 3.7836 1.6132 0.0242 0.3059 0.3059 0.3059 0.3059 4,829.540 0 4,829.540 0 0.0926 0.0885 4,858.931 8 Mitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 96 of 100 Use Low VOC Paint - Residential Interior Use Low VOC Paint - Residential Exterior Use Low VOC Paint - Non-Residential Interior Use Low VOC Paint - Non-Residential Exterior No Hearths Installed Use Low VOC Cleaning Supplies ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 74.4981 0.6845 59.4111 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3178 107.3178 0.1028 0.0000 109.4773 Unmitigated 94.0633 0.6845 59.4111 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3178 107.3178 0.1028 0.0000 109.4773 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 97 of 100 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 18.0991 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 74.1770 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.7873 0.6845 59.4111 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 107.3178 107.3178 0.1028 109.4773 Total 94.0634 0.6845 59.4111 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3178 107.3178 0.1028 0.0000 109.4773 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 98 of 100 8.1 Mitigation Measures Waste Use Reclaimed Water Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 4.0797 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 68.6310 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.7873 0.6845 59.4111 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 107.3178 107.3178 0.1028 109.4773 Total 74.4981 0.6845 59.4111 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3178 107.3178 0.1028 0.0000 109.4773 Mitigated 9.0 Operational Offroad CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 99 of 100 10.0 Vegetation 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:47 PMPage 100 of 100 San Luis Obispo County, Winter Avila Ranch Development Project Mitigated Project Alternative 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Parking Lot 1,590.00 Space 14.31 636,000.00 0 Other Asphalt Surfaces 21.71 Acre 21.71 945,687.60 0 City Park 19.08 Acre 19.08 831,124.80 0 Regional Shopping Center 15.00 1000sqft 1.86 15,000.00 0 Apartments Mid Rise 125.00 Dwelling Unit 4.40 125,000.00 286 Condo/Townhouse 197.00 Dwelling Unit 10.80 197,000.00 451 Single Family Housing 101.00 Dwelling Unit 12.80 181,800.00 232 Single Family Housing 297.00 Dwelling Unit 27.30 534,600.00 680 1.2 Other Project Characteristics Urbanization Climate Zone Urban 4 Wind Speed (m/s)Precipitation Freq (Days)3.2 44 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Pacific Gas & Electric Company 2030Operational Year CO2 Intensity (lb/MWhr) 641.35 0.029CH4 Intensity (lb/MWhr) 0.006N2O Intensity (lb/MWhr) CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 1 of 100 Project Characteristics - Land Use - Taken from MPA description Construction Phase - taken from updated construction schedule september 29 2016 Architectural Coating - using at least 50 EF paint from mitigation Woodstoves - no woodstoves or fireplaces Area Coating - EF is 50 from mitigation Water And Wastewater - based on city water use factors Solid Waste - from estimated solid waste production under the MPA table based on CalRecycle waste generation factors Sequestration - Construction Off-road Equipment Mitigation - based on mitigation Mobile Land Use Mitigation - Area Mitigation - 50 EF per mitigation Energy Mitigation - Water Mitigation - Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 2 of 100 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblAreaCoating Area_EF_Nonresidential_Exterior 250 50 tblAreaMitigation UseLowVOCPaintNonresidentialInteriorV alue 250 50 tblAreaMitigation UseLowVOCPaintResidentialExteriorValu e 250 50 tblAreaMitigation UseLowVOCPaintResidentialInteriorValu e 250 50 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 17.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 18.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 7.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 26.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 54.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation Tier No Change Tier 2 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 3 of 100 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstructionPhase NumDays 3,100.00 665.00 tblConstructionPhase NumDays 120.00 15.00 tblConstructionPhase NumDays 120.00 60.00 tblConstructionPhase NumDays 220.00 46.00 tblConstructionPhase NumDays 310.00 125.00 tblConstructionPhase NumDays 310.00 155.00 tblConstructionPhase NumDays 220.00 15.00 tblConstructionPhase NumDays 220.00 55.00 tblConstructionPhase NumDays 120.00 15.00 tblConstructionPhase NumDays 310.00 30.00 tblConstructionPhase NumDays 3,100.00 100.00 tblConstructionPhase NumDays 220.00 15.00 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 120.00 20.00 tblConstructionPhase NumDays 310.00 35.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 4 of 100 tblConstructionPhase NumDays 3,100.00 340.00 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 120.00 40.00 tblConstructionPhase NumDays 310.00 135.00 tblConstructionPhase NumDays 3,100.00 625.00 tblConstructionPhase NumDays 220.00 35.00 tblConstructionPhase NumDays 220.00 30.00 tblConstructionPhase NumDays 120.00 5.00 tblConstructionPhase NumDays 310.00 15.00 tblConstructionPhase NumDays 3,100.00 150.00 tblConstructionPhase NumDays 220.00 18.00 tblConstructionPhase NumDays 220.00 5.00 tblConstructionPhase PhaseStartDate 9/29/2029 9/30/2029 tblGrading AcresOfGrading 387.50 0.00 tblLandUse LotAcreage 0.34 1.86 tblLandUse LotAcreage 3.29 4.40 tblLandUse LotAcreage 12.31 10.80 tblLandUse LotAcreage 32.79 12.80 tblLandUse LotAcreage 96.43 27.30 tblLandUse Population 358.00 286.00 tblLandUse Population 563.00 451.00 tblLandUse Population 289.00 232.00 tblLandUse Population 849.00 680.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 3.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 4.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 3.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 5 of 100 tblOffRoadEquipment UsageHours 8.00 7.00 tblProjectCharacteristics OperationalYear 2014 2030 tblSequestration NumberOfNewTrees 0.00 525.00 tblSolidWaste SolidWasteGenerationRate 57.50 121.13 tblSolidWaste SolidWasteGenerationRate 1.64 0.00 tblSolidWaste SolidWasteGenerationRate 90.62 190.91 tblSolidWaste SolidWasteGenerationRate 15.75 6.84 tblSolidWaste SolidWasteGenerationRate 373.92 711.82 tblTripsAndVMT VendorTripNumber 0.00 475.00 tblTripsAndVMT VendorTripNumber 475.00 0.00 tblTripsAndVMT WorkerTripNumber 25.00 15.00 tblTripsAndVMT WorkerTripNumber 30.00 18.00 tblTripsAndVMT WorkerTripNumber 35.00 20.00 tblTripsAndVMT WorkerTripNumber 30.00 1,393.00 tblTripsAndVMT WorkerTripNumber 35.00 15.00 tblTripsAndVMT WorkerTripNumber 1,393.00 279.00 tblWater IndoorWaterUseRate 8,144,253.20 4,472,304.06 tblWater IndoorWaterUseRate 12,835,343.05 7,048,351.14 tblWater IndoorWaterUseRate 1,111,087.82 909,125.22 tblWater IndoorWaterUseRate 25,931,302.20 17,829,611.92 tblWater OutdoorWaterUseRate 5,134,420.50 2,859,341.94 tblWater OutdoorWaterUseRate 22,733,464.15 12,434,472.00 tblWater OutdoorWaterUseRate 8,091,846.70 4,506,322.86 tblWater OutdoorWaterUseRate 680,989.31 557,205.78 tblWater OutdoorWaterUseRate 16,347,994.86 11,399,260.08 tblWoodstoves WoodstoveDayYear 60.00 0.00 tblWoodstoves WoodstoveDayYear 60.00 0.00 tblWoodstoves WoodstoveDayYear 60.00 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 6 of 100 2.0 Emissions Summary tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 7 of 100 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2019 8.4292 81.0657 62.7117 0.0877 18.2442 3.8357 22.0799 9.9779 3.5289 13.5067 0.0000 8,634.756 9 8,634.756 9 2.6936 0.0000 8,691.321 6 2020 14.0520 80.6805 160.2496 0.2827 34.0005 3.0020 36.9480 14.2006 2.7618 16.9355 0.0000 23,246.92 95 23,246.92 95 2.6377 0.0000 23,302.32 12 2021 2.8233 20.0344 28.0410 0.0597 2.7582 1.0668 3.8251 0.7315 1.0085 1.7400 0.0000 4,929.222 1 4,929.222 1 0.7296 0.0000 4,944.543 7 2022 2.5727 18.0325 27.1572 0.0597 2.7582 0.9053 3.6635 0.7315 0.8564 1.5879 0.0000 4,896.639 5 4,896.639 5 0.7199 0.0000 4,911.756 6 2023 745.3715 35.0103 116.3297 0.2553 18.2442 1.5556 19.6361 9.9779 1.4311 11.2584 0.0000 20,114.38 30 20,114.38 30 1.9422 0.0000 20,155.16 88 2024 745.3255 33.2116 112.5360 0.2552 18.2442 1.4247 19.4952 9.9779 1.3107 11.1288 0.0000 19,977.72 89 19,977.72 89 1.9415 0.0000 20,018.49 97 2025 745.2873 31.8432 109.5793 0.2552 18.2442 1.1880 19.2747 9.9779 1.0930 10.9259 0.0000 19,857.89 93 19,857.89 93 1.9407 0.0000 19,898.65 43 2026 8.4323 31.4375 106.8521 0.2552 15.9348 1.1880 16.8282 4.2701 1.0930 5.1036 0.0000 19,753.90 78 19,753.90 78 1.9405 0.0000 19,794.65 88 2027 8.0069 31.0739 101.6962 0.2551 15.9350 0.8943 16.8293 4.2702 0.8344 5.1046 0.0000 19,663.19 85 19,663.19 85 1.0428 0.0000 19,685.09 82 2028 426.1259 30.7470 96.8181 0.2550 15.9352 0.8946 16.8298 4.2703 0.8347 5.1050 0.0000 19,585.17 25 19,585.17 25 1.0326 0.0000 19,606.85 71 2029 827.9264 30.5245 95.3237 0.2550 18.2442 1.1880 19.2747 9.9779 1.0930 10.9259 0.0000 19,518.28 11 19,518.28 11 1.9401 0.0000 19,559.02 26 Total 3,534.353 0 423.6611 1,017.294 5 2.2756 178.5429 17.1430 194.6844 78.3637 15.8453 93.3224 0.0000 180,178.1 191 180,178.1 191 18.5611 0.0000 180,567.9 025 Unmitigated Construction CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 8 of 100 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2019 4.9164 71.9811 55.7066 0.0877 8.3078 2.0338 10.2469 4.5160 2.0337 6.4550 0.0000 8,634.756 9 8,634.756 9 2.6936 0.0000 8,691.321 6 2020 10.7795 77.0120 151.4811 0.2827 24.0640 2.0335 25.8769 8.7387 2.0334 10.5172 0.0000 23,246.92 95 23,246.92 95 2.6377 0.0000 23,302.32 12 2021 1.9034 26.9813 29.3338 0.0597 2.7582 1.0145 3.7728 0.7315 1.0132 1.7448 0.0000 4,929.222 1 4,929.222 1 0.7296 0.0000 4,944.543 7 2022 1.8611 26.9016 28.6641 0.0597 2.7582 1.0145 3.7727 0.7315 1.0132 1.7447 0.0000 4,896.639 5 4,896.639 5 0.7199 0.0000 4,911.756 6 2023 745.2938 51.0193 117.9361 0.2553 15.9346 1.3795 17.2028 4.5160 1.3794 5.5096 0.0000 20,114.38 30 20,114.38 30 1.9422 0.0000 20,155.16 88 2024 745.2587 51.0148 114.2184 0.2552 15.9345 1.3795 17.2040 4.5160 1.3794 5.5107 0.0000 19,977.72 89 19,977.72 89 1.9415 0.0000 20,018.49 97 2025 745.2303 51.0111 111.3431 0.2552 15.9346 1.3795 17.2054 4.5160 1.3794 5.5120 0.0000 19,857.89 93 19,857.89 93 1.9407 0.0000 19,898.65 43 2026 8.1491 51.0080 108.6159 0.2552 15.9348 1.3796 17.2047 4.2701 1.3795 5.5113 0.0000 19,753.90 78 19,753.90 78 1.9405 0.0000 19,794.65 88 2027 7.7236 42.1257 103.4600 0.2551 15.9350 1.2709 17.2059 4.2702 1.2421 5.5123 0.0000 19,663.19 85 19,663.19 85 1.0428 0.0000 19,685.09 82 2028 426.0689 41.7989 98.5819 0.2550 15.9352 1.2712 17.2064 4.2703 1.2423 5.5126 0.0000 19,585.17 25 19,585.17 25 1.0326 0.0000 19,606.85 71 2029 827.8695 51.0001 97.0875 0.2550 15.9353 1.3796 17.2070 4.5160 1.3795 5.5131 0.0000 19,518.28 11 19,518.28 11 1.9401 0.0000 19,559.02 26 Total 3,525.054 2 541.8537 1,016.428 3 2.2756 149.4323 15.5361 164.1054 45.5924 15.4752 59.0434 0.0000 180,178.1 191 180,178.1 191 18.5611 0.0000 180,567.9 025 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.26 -27.90 0.09 0.00 16.30 9.37 15.71 41.82 2.34 36.73 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 9 of 100 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 94.0633 0.6845 59.4111 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3178 107.3178 0.1028 0.0000 109.4773 Energy 0.5594 4.7808 2.0385 0.0305 0.3865 0.3865 0.3865 0.3865 6,102.310 6 6,102.310 6 0.1170 0.1119 6,139.448 3 Mobile 17.3256 31.9380 152.0907 0.5050 36.5186 0.6292 37.1478 9.7654 0.5807 10.3461 36,837.07 43 36,837.07 43 1.0285 36,858.67 28 Total 111.9483 37.4032 213.5403 0.5386 36.5186 1.3456 37.8643 9.7654 1.2972 11.0626 0.0000 43,046.70 28 43,046.70 28 1.2483 0.1119 43,107.59 84 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 74.4981 0.6845 59.4111 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3178 107.3178 0.1028 0.0000 109.4773 Energy 0.4427 3.7836 1.6132 0.0242 0.3059 0.3059 0.3059 0.3059 4,829.540 0 4,829.540 0 0.0926 0.0885 4,858.931 8 Mobile 16.4658 27.7553 136.4651 0.4222 30.3141 0.5352 30.8493 8.1063 0.4940 8.6003 30,791.83 18 30,791.83 18 0.8716 30,810.13 54 Total 91.4065 32.2233 197.4894 0.4495 30.3141 1.1711 31.4852 8.1063 1.1299 9.2362 0.0000 35,728.68 96 35,728.68 96 1.0670 0.0885 35,778.54 45 Mitigated Operational CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 10 of 100 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Offsite Construction – Site Preparation Site Preparation 1/1/2019 3/25/2019 5 60 2 Offsite Construction – Grading Grading 3/26/2019 10/28/2019 5 155 3 Offsite Construction – Paving Paving 10/29/2019 12/31/2019 5 46 4 Phase I – Site Preparation Site Preparation 1/1/2020 1/21/2020 5 15 5 Phase I, III, IV – Grading Grading 1/22/2020 7/14/2020 5 125 6 Phase I – Building Construction Building Construction 7/15/2020 1/31/2023 5 665 7 Phase I – Paving Paving 2/1/2023 2/21/2023 5 15 8 Phase I – Architectural Coating Architectural Coating 2/22/2023 5/9/2023 5 55 9 Phase II – Site Preparation Site Preparation 5/10/2023 5/30/2023 5 15 10 Phase II – Grading Grading 5/31/2023 7/11/2023 5 30 11 Phase II – Building Construction Building Construction 7/12/2023 11/28/2023 5 100 12 Phase II – Paving Paving 11/29/2023 12/19/2023 5 15 13 Phase II – Architectural Coating Architectural Coating 12/20/2023 1/16/2024 5 20 14 Phase III – Site Preparation Site Preparation 1/17/2024 2/13/2024 5 20 15 Phase III – Grading Grading 2/14/2024 4/2/2024 5 35 16 Phase III – Building Construction Building Construction 4/3/2024 7/22/2025 5 340 17 Phase III – Architectural Coating Architectural Coating 7/23/2025 8/19/2025 5 20 18 Phase III – Paving Paving 8/20/2025 9/16/2025 5 20 19 Phases IV & V – Site Preparation Site Preparation 9/17/2025 11/11/2025 5 40 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 18.35 13.85 7.52 16.54 16.99 12.97 16.85 16.99 12.89 16.51 0.00 17.00 17.00 14.52 20.86 17.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 11 of 100 20 Phases IV & V – Grading Grading 11/12/2025 5/19/2026 5 135 21 Phases IV & V – Building Construction Building Construction 5/20/2026 10/10/2028 5 625 22 Phases IV & V – Architectural Coating Architectural Coating 10/11/2028 11/28/2028 5 35 23 Phases IV & V – Paving Paving 11/29/2028 1/9/2029 5 30 24 Phase VI – Site Preparation Site Preparation 1/10/2029 1/16/2029 5 5 25 Phase VI – Grading Grading 1/17/2029 2/6/2029 5 15 26 Phase VI – Building Construction Building Construction 2/7/2029 9/4/2029 5 150 27 Phase VI – Architectural Coating Architectural Coating 9/5/2029 9/28/2029 5 18 28 Phase VI – Paving Paving 9/30/2029 10/5/2029 5 5 OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Phase I – Building Construction Air Compressors 1 6.00 78 0.48 Offsite Construction – Site Preparation Excavators 3 8.00 162 0.38 Offsite Construction – Site Preparation Concrete/Industrial Saws 1 8.00 81 0.73 Offsite Construction – Paving Excavators 2 8.00 162 0.38 Phase I – Site Preparation Cranes 1 7.00 226 0.29 Phase I – Site Preparation Forklifts 3 8.00 89 0.20 Phase I – Site Preparation Generator Sets 1 8.00 84 0.74 Phase I, III, IV – Grading Pavers 2 8.00 125 0.42 Phase I, III, IV – Grading Rollers 2 8.00 80 0.38 Residential Indoor: 2,102,760; Residential Outdoor: 700,920; Non-Residential Indoor: 2,716,339; Non-Residential Outdoor: 905,446 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 0 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 12 of 100 Offsite Construction – Site Preparation Rubber Tired Dozers 2 8.00 255 0.40 Offsite Construction – Paving Rubber Tired Dozers 1 8.00 255 0.40 Phase I – Site Preparation Tractors/Loaders/Backhoes 3 7.00 97 0.37 Offsite Construction – Paving Graders 1 8.00 174 0.41 Offsite Construction – Paving Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase I, III, IV – Grading Paving Equipment 2 8.00 130 0.36 Offsite Construction – Grading Tractors/Loaders/Backhoes 4 8.00 97 0.37 Offsite Construction – Grading Rubber Tired Dozers 3 8.00 255 0.40 Offsite Construction – Paving Scrapers 2 8.00 361 0.48 Phase I – Site Preparation Welders 1 8.00 46 0.45 Phase II – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase III – Architectural Coating Air Compressors 1 6.00 78 0.48 Phases IV & V – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase VI – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase I – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase II – Building Construction Cranes 1 7.00 226 0.29 Phase III – Building Construction Cranes 1 7.00 226 0.29 Phases IV & V – Building Construction Cranes 1 7.00 226 0.29 Phase VI – Building Construction Cranes 1 7.00 226 0.29 Phase I – Building Construction Cranes 1 7.00 226 0.29 Phase II – Grading Excavators 2 8.00 162 0.38 Phase III – Grading Excavators 2 8.00 162 0.38 Offsite Construction – Grading Excavators 2 8.00 162 0.38 Phases IV & V – Grading Excavators 2 8.00 162 0.38 Phase VI – Grading Excavators 2 8.00 162 0.38 Phase I, III, IV – Grading Excavators 2 8.00 162 0.38 Phase II – Building Construction Forklifts 3 8.00 89 0.20 Phase III – Building Construction Forklifts 3 8.00 89 0.20 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 13 of 100 Phases IV & V – Building Construction Forklifts 3 8.00 89 0.20 Phase VI – Building Construction Forklifts 3 8.00 89 0.20 Phase I – Building Construction Forklifts 3 8.00 89 0.20 Phase II – Building Construction Generator Sets 1 8.00 84 0.74 Phase III – Building Construction Generator Sets 1 8.00 84 0.74 Phases IV & V – Building Construction Generator Sets 1 8.00 84 0.74 Phase VI – Building Construction Generator Sets 1 8.00 84 0.74 Phase I – Building Construction Generator Sets 1 8.00 84 0.74 Phase II – Grading Graders 1 8.00 174 0.41 Phase III – Grading Graders 1 8.00 174 0.41 Offsite Construction – Grading Graders 1 8.00 174 0.41 Phases IV & V – Grading Graders 1 8.00 174 0.41 Phase VI – Grading Graders 1 8.00 174 0.41 Phase I, III, IV – Grading Graders 1 8.00 174 0.41 Phase II – Paving Pavers 2 8.00 125 0.42 Phase III – Paving Pavers 2 8.00 125 0.42 Phases IV & V – Paving Pavers 2 8.00 125 0.42 Phase VI – Paving Pavers 2 8.00 125 0.42 Offsite Construction – Paving Pavers 2 8.00 125 0.42 Phase I – Paving Pavers 2 8.00 125 0.42 Phase II – Paving Paving Equipment 2 8.00 130 0.36 Phase III – Paving Paving Equipment 2 8.00 130 0.36 Phases IV & V – Paving Paving Equipment 2 8.00 130 0.36 Phase VI – Paving Paving Equipment 2 8.00 130 0.36 Offsite Construction – Paving Paving Equipment 2 8.00 130 0.36 Phase I – Paving Paving Equipment 2 8.00 130 0.36 Phase II – Paving Rollers 2 8.00 80 0.38 Phase III – Paving Rollers 2 8.00 80 0.38 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 14 of 100 Phases IV & V – Paving Rollers 2 8.00 80 0.38 Phase VI – Paving Rollers 2 8.00 80 0.38 Offsite Construction – Paving Rollers 2 8.00 80 0.38 Phase I – Paving Rollers 2 8.00 80 0.38 Phase II – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase III – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phases IV & V – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase VI – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase I, III, IV – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase III – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phases IV & V – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase VI – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase I – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase II – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase II – Grading Scrapers 2 8.00 361 0.48 Phase III – Grading Scrapers 2 8.00 361 0.48 Offsite Construction – Grading Scrapers 2 8.00 361 0.48 Phases IV & V – Grading Scrapers 2 8.00 361 0.48 Phase VI – Grading Scrapers 2 8.00 361 0.48 Phase I, III, IV – Grading Scrapers 2 8.00 361 0.48 Phase II – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase III – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phases IV & V – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase VI – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase I – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase II – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase III – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phases IV & V – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 15 of 100 Phase VI – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase I, III, IV – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Offsite Construction – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase III – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phases IV & V – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase VI – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase II – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase II – Building Construction Welders 1 8.00 46 0.45 Phase III – Building Construction Welders 1 8.00 46 0.45 Phases IV & V – Building Construction Welders 1 8.00 46 0.45 Phase VI – Building Construction Welders 1 8.00 46 0.45 Phase I – Building Construction Welders 1 8.00 46 0.45 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Offsite Construction – Site Preparation 10 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Offsite Construction – Grading 12 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Offsite Construction – Paving 14 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Site Preparation 12 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I, III, IV – Grading 14 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Building Construction 10 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 16 of 100 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area Reduce Vehicle Speed on Unpaved Roads Clean Paved Roads Phase III – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 17 of 100 3.2 Offsite Construction – Site Preparation - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 12.0442 0.0000 12.0442 6.6205 0.0000 6.6205 0.0000 0.0000 Off-Road 4.2536 43.2907 40.0157 0.0524 2.2690 2.2690 2.1058 2.1058 5,159.400 1 5,159.400 1 1.4866 5,190.618 3 Total 4.2536 43.2907 40.0157 0.0524 12.0442 2.2690 14.3131 6.6205 2.1058 8.7262 5,159.400 1 5,159.400 1 1.4866 5,190.618 3 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0454 0.0748 0.6268 1.6100e- 003 0.1483 9.9000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 119.9921 119.9921 5.9700e- 003 120.1175 Total 0.0454 0.0748 0.6268 1.6100e- 003 0.1483 9.9000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 119.9921 119.9921 5.9700e- 003 120.1175 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 18 of 100 3.2 Offsite Construction – Site Preparation - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 5.4199 0.0000 5.4199 2.9792 0.0000 2.9792 0.0000 0.0000 Off-Road 1.8728 45.4945 34.6332 0.0524 1.4199 1.4199 1.4199 1.4199 0.0000 5,159.400 1 5,159.400 1 1.4866 5,190.618 3 Total 1.8728 45.4945 34.6332 0.0524 5.4199 1.4199 6.8398 2.9792 1.4199 4.3991 0.0000 5,159.400 1 5,159.400 1 1.4866 5,190.618 3 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0454 0.0748 0.6268 1.6100e- 003 0.1483 9.9000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 119.9921 119.9921 5.9700e- 003 120.1175 Total 0.0454 0.0748 0.6268 1.6100e- 003 0.1483 9.9000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 119.9921 119.9921 5.9700e- 003 120.1175 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 19 of 100 3.3 Offsite Construction – Grading - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 7.4152 80.9760 61.9596 0.0857 3.8345 3.8345 3.5278 3.5278 8,490.766 4 8,490.766 4 2.6864 8,547.180 6 Total 7.4152 80.9760 61.9596 0.0857 18.0663 3.8345 21.9008 9.9307 3.5278 13.4585 8,490.766 4 8,490.766 4 2.6864 8,547.180 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0545 0.0897 0.7522 1.9300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 143.9905 143.9905 7.1700e- 003 144.1410 Total 0.0545 0.0897 0.7522 1.9300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 143.9905 143.9905 7.1700e- 003 144.1410 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 20 of 100 3.3 Offsite Construction – Grading - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 2.6151 71.8913 51.9820 0.0857 1.9380 1.9380 1.9380 1.9380 0.0000 8,490.766 4 8,490.766 4 2.6864 8,547.180 5 Total 2.6151 71.8913 51.9820 0.0857 8.1298 1.9380 10.0678 4.4688 1.9380 6.4068 0.0000 8,490.766 4 8,490.766 4 2.6864 8,547.180 5 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0545 0.0897 0.7522 1.9300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 143.9905 143.9905 7.1700e- 003 144.1410 Total 0.0545 0.0897 0.7522 1.9300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 143.9905 143.9905 7.1700e- 003 144.1410 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 21 of 100 3.4 Offsite Construction – Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 6.3170 69.1331 54.6540 0.0840 3.3143 3.3143 3.0492 3.0492 8,320.285 2 8,320.285 2 2.6325 8,375.566 7 Paving 2.0516 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 8.3686 69.1331 54.6540 0.0840 3.3143 3.3143 3.0492 3.0492 8,320.285 2 8,320.285 2 2.6325 8,375.566 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0605 0.0997 0.8357 2.1500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 159.9895 159.9895 7.9600e- 003 160.1567 Total 0.0605 0.0997 0.8357 2.1500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 159.9895 159.9895 7.9600e- 003 160.1567 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 22 of 100 3.4 Offsite Construction – Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.8043 70.6463 54.8708 0.0840 2.0325 2.0325 2.0325 2.0325 0.0000 8,320.285 2 8,320.285 2 2.6325 8,375.566 7 Paving 2.0516 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.8559 70.6463 54.8708 0.0840 2.0325 2.0325 2.0325 2.0325 0.0000 8,320.285 2 8,320.285 2 2.6325 8,375.566 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0605 0.0997 0.8357 2.1500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 159.9895 159.9895 7.9600e- 003 160.1567 Total 0.0605 0.0997 0.8357 2.1500e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 159.9895 159.9895 7.9600e- 003 160.1567 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 23 of 100 3.5 Phase I – Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 4.9983 49.5273 40.6161 0.0535 2.5112 2.5112 2.3330 2.3330 5,131.687 5 5,131.687 5 1.4568 5,162.281 1 Total 4.9983 49.5273 40.6161 0.0535 18.0663 2.5112 20.5775 9.9307 2.3330 12.2637 5,131.687 5 5,131.687 5 1.4568 5,162.281 1 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 5.2455 24.8458 67.2689 0.0798 2.1628 0.3466 2.5094 0.6175 0.3188 0.9362 7,420.474 6 7,420.474 6 0.0606 7,421.746 9 Worker 3.8082 6.3074 52.3646 0.1494 13.7714 0.0898 13.8612 3.6524 0.0832 3.7357 10,694.76 74 10,694.76 74 0.5159 10,705.60 16 Total 9.0537 31.1532 119.6335 0.2292 15.9342 0.4364 16.3706 4.2699 0.4020 4.6719 18,115.24 20 18,115.24 20 0.5765 18,127.34 85 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 24 of 100 3.5 Phase I – Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.7258 45.8587 31.8476 0.0535 1.3765 1.3765 1.3765 1.3765 0.0000 5,131.687 5 5,131.687 5 1.4568 5,162.281 1 Total 1.7258 45.8587 31.8476 0.0535 8.1298 1.3765 9.5063 4.4688 1.3765 5.8453 0.0000 5,131.687 5 5,131.687 5 1.4568 5,162.281 1 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 5.2455 24.8458 67.2689 0.0798 2.1628 0.3466 2.5094 0.6175 0.3188 0.9362 7,420.474 6 7,420.474 6 0.0606 7,421.746 9 Worker 3.8082 6.3074 52.3646 0.1494 13.7714 0.0898 13.8612 3.6524 0.0832 3.7357 10,694.76 74 10,694.76 74 0.5159 10,705.60 16 Total 9.0537 31.1532 119.6335 0.2292 15.9342 0.4364 16.3706 4.2699 0.4020 4.6719 18,115.24 20 18,115.24 20 0.5765 18,127.34 85 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 25 of 100 3.6 Phase I, III, IV – Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 5.8802 63.1684 52.7780 0.0840 3.0010 3.0010 2.7609 2.7609 8,138.465 9 8,138.465 9 2.6321 8,193.741 0 Total 5.8802 63.1684 52.7780 0.0840 8.6733 3.0010 11.6743 3.5965 2.7609 6.3574 8,138.465 9 8,138.465 9 2.6321 8,193.741 0 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0410 0.0679 0.5639 1.6100e- 003 0.1483 9.7000e- 004 0.1493 0.0393 9.0000e- 004 0.0402 115.1626 115.1626 5.5600e- 003 115.2793 Total 0.0410 0.0679 0.5639 1.6100e- 003 0.1483 9.7000e- 004 0.1493 0.0393 9.0000e- 004 0.0402 115.1626 115.1626 5.5600e- 003 115.2793 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 26 of 100 3.6 Phase I, III, IV – Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 2.8043 70.6463 54.8708 0.0840 2.0325 2.0325 2.0325 2.0325 0.0000 8,138.465 9 8,138.465 9 2.6321 8,193.741 0 Total 2.8043 70.6463 54.8708 0.0840 3.9030 2.0325 5.9355 1.6184 2.0325 3.6509 0.0000 8,138.465 9 8,138.465 9 2.6321 8,193.741 0 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0410 0.0679 0.5639 1.6100e- 003 0.1483 9.7000e- 004 0.1493 0.0393 9.0000e- 004 0.0402 115.1626 115.1626 5.5600e- 003 115.2793 Total 0.0410 0.0679 0.5639 1.6100e- 003 0.1483 9.7000e- 004 0.1493 0.0393 9.0000e- 004 0.0402 115.1626 115.1626 5.5600e- 003 115.2793 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 27 of 100 3.7 Phase I – Building Construction - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.3534 20.7678 18.6399 0.0298 1.2238 1.2238 1.1574 1.1574 2,823.928 0 2,823.928 0 0.6412 2,837.393 7 Total 2.3534 20.7678 18.6399 0.0298 1.2238 1.2238 1.1574 1.1574 2,823.928 0 2,823.928 0 0.6412 2,837.393 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.7627 1.2633 10.4880 0.0299 2.7582 0.0180 2.7762 0.7315 0.0167 0.7482 2,142.024 5 2,142.024 5 0.1033 2,144.194 4 Total 0.7627 1.2633 10.4880 0.0299 2.7582 0.0180 2.7762 0.7315 0.0167 0.7482 2,142.024 5 2,142.024 5 0.1033 2,144.194 4 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 28 of 100 3.7 Phase I – Building Construction - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,823.928 0 2,823.928 0 0.6412 2,837.393 7 Total 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,823.928 0 2,823.928 0 0.6412 2,837.393 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.7627 1.2633 10.4880 0.0299 2.7582 0.0180 2.7762 0.7315 0.0167 0.7482 2,142.024 5 2,142.024 5 0.1033 2,144.194 4 Total 0.7627 1.2633 10.4880 0.0299 2.7582 0.0180 2.7762 0.7315 0.0167 0.7482 2,142.024 5 2,142.024 5 0.1033 2,144.194 4 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 29 of 100 3.7 Phase I – Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.1120 18.8671 18.3552 0.0298 1.0490 1.0490 0.9919 0.9919 2,824.229 8 2,824.229 8 0.6319 2,837.499 8 Total 2.1120 18.8671 18.3552 0.0298 1.0490 1.0490 0.9919 0.9919 2,824.229 8 2,824.229 8 0.6319 2,837.499 8 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.7113 1.1673 9.6858 0.0299 2.7582 0.0179 2.7761 0.7315 0.0166 0.7481 2,104.992 3 2,104.992 3 0.0977 2,107.043 9 Total 0.7113 1.1673 9.6858 0.0299 2.7582 0.0179 2.7761 0.7315 0.0166 0.7481 2,104.992 3 2,104.992 3 0.0977 2,107.043 9 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 30 of 100 3.7 Phase I – Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,824.229 8 2,824.229 8 0.6319 2,837.499 8 Total 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,824.229 8 2,824.229 8 0.6319 2,837.499 8 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.7113 1.1673 9.6858 0.0299 2.7582 0.0179 2.7761 0.7315 0.0166 0.7481 2,104.992 3 2,104.992 3 0.0977 2,107.043 9 Total 0.7113 1.1673 9.6858 0.0299 2.7582 0.0179 2.7761 0.7315 0.0166 0.7481 2,104.992 3 2,104.992 3 0.0977 2,107.043 9 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 31 of 100 3.7 Phase I – Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.9037 16.9449 18.1412 0.0298 0.8874 0.8874 0.8398 0.8398 2,825.197 7 2,825.197 7 0.6269 2,838.361 5 Total 1.9037 16.9449 18.1412 0.0298 0.8874 0.8874 0.8398 0.8398 2,825.197 7 2,825.197 7 0.6269 2,838.361 5 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6690 1.0877 9.0161 0.0299 2.7582 0.0178 2.7761 0.7315 0.0165 0.7481 2,071.441 8 2,071.441 8 0.0930 2,073.395 1 Total 0.6690 1.0877 9.0161 0.0299 2.7582 0.0178 2.7761 0.7315 0.0165 0.7481 2,071.441 8 2,071.441 8 0.0930 2,073.395 1 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 32 of 100 3.7 Phase I – Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,825.197 7 2,825.197 7 0.6269 2,838.361 5 Total 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,825.197 7 2,825.197 7 0.6269 2,838.361 5 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6690 1.0877 9.0161 0.0299 2.7582 0.0178 2.7761 0.7315 0.0165 0.7481 2,071.441 8 2,071.441 8 0.0930 2,073.395 1 Total 0.6690 1.0877 9.0161 0.0299 2.7582 0.0178 2.7761 0.7315 0.0165 0.7481 2,071.441 8 2,071.441 8 0.0930 2,073.395 1 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 33 of 100 3.7 Phase I – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.7578 15.6156 18.0204 0.0298 0.7675 0.7675 0.7265 0.7265 2,826.074 3 2,826.074 3 0.6213 2,839.120 8 Total 1.7578 15.6156 18.0204 0.0298 0.7675 0.7675 0.7265 0.7265 2,826.074 3 2,826.074 3 0.6213 2,839.120 8 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Total 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 34 of 100 3.7 Phase I – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,826.074 3 2,826.074 3 0.6213 2,839.120 8 Total 1.1921 25.8140 19.6480 0.0298 0.9967 0.9967 0.9967 0.9967 0.0000 2,826.074 3 2,826.074 3 0.6213 2,839.120 8 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Total 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 35 of 100 3.8 Phase I – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0128 9.9983 14.2850 0.0223 0.5010 0.5010 0.4609 0.4609 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Paving 6.2915 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 7.3043 9.9983 14.2850 0.0223 0.5010 0.5010 0.4609 0.4609 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0338 0.0546 0.4506 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 109.7242 109.7242 4.7800e- 003 109.8245 Total 0.0338 0.0546 0.4506 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 109.7242 109.7242 4.7800e- 003 109.8245 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 36 of 100 3.8 Phase I – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Paving 6.2915 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 7.2036 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0338 0.0546 0.4506 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 109.7242 109.7242 4.7800e- 003 109.8245 Total 0.0338 0.0546 0.4506 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 109.7242 109.7242 4.7800e- 003 109.8245 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 37 of 100 3.9 Phase I – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 270.7457 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1917 1.3030 1.8111 2.9700e- 003 0.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8017 Total 270.9374 1.3030 1.8111 2.9700e- 003 0.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8017 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Total 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 38 of 100 3.9 Phase I – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 270.7457 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0168 281.8017 Total 270.8596 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0168 281.8017 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Total 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 39 of 100 3.10 Phase II – Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 3.0157 29.9342 28.8193 0.0392 1.3907 1.3907 1.2795 1.2795 3,793.953 5 3,793.953 5 1.2270 3,819.721 4 Total 3.0157 29.9342 28.8193 0.0392 18.0663 1.3907 19.4570 9.9307 1.2795 11.2102 3,793.953 5 3,793.953 5 1.2270 3,819.721 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0406 0.0655 0.5408 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 131.6690 131.6690 5.7300e- 003 131.7894 Total 0.0406 0.0655 0.5408 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 131.6690 131.6690 5.7300e- 003 131.7894 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 40 of 100 3.10 Phase II – Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.2300 34.4240 23.4003 0.0392 0.9611 0.9611 0.9611 0.9611 0.0000 3,793.953 5 3,793.953 5 1.2270 3,819.721 4 Total 1.2300 34.4240 23.4003 0.0392 8.1298 0.9611 9.0909 4.4688 0.9611 5.4299 0.0000 3,793.953 5 3,793.953 5 1.2270 3,819.721 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0406 0.0655 0.5408 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 131.6690 131.6690 5.7300e- 003 131.7894 Total 0.0406 0.0655 0.5408 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 131.6690 131.6690 5.7300e- 003 131.7894 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 41 of 100 3.11 Phase II – Grading - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.5314 34.9375 34.1888 0.0618 1.5543 1.5543 1.4300 1.4300 5,985.435 9 5,985.435 9 1.9358 6,026.087 9 Total 3.5314 34.9375 34.1888 0.0618 8.6733 1.5543 10.2276 3.5965 1.4300 5.0265 5,985.435 9 5,985.435 9 1.9358 6,026.087 9 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0451 0.0728 0.6008 2.1400e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 146.2989 146.2989 6.3700e- 003 146.4326 Total 0.0451 0.0728 0.6008 2.1400e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 146.2989 146.2989 6.3700e- 003 146.4326 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 42 of 100 3.11 Phase II – Grading - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,985.435 9 5,985.435 9 1.9358 6,026.087 9 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,985.435 9 5,985.435 9 1.9358 6,026.087 9 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0451 0.0728 0.6008 2.1400e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 146.2989 146.2989 6.3700e- 003 146.4326 Total 0.0451 0.0728 0.6008 2.1400e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 146.2989 146.2989 6.3700e- 003 146.4326 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 43 of 100 3.12 Phase II – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.5661 14.3126 16.2093 0.0268 0.6967 0.6967 0.6557 0.6557 2,544.626 2 2,544.626 2 0.6044 2,557.319 1 Total 1.5661 14.3126 16.2093 0.0268 0.6967 0.6967 0.6557 0.6557 2,544.626 2 2,544.626 2 0.6044 2,557.319 1 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.4520 15.2368 58.2727 0.0793 2.1632 0.2779 2.4410 0.6176 0.2556 0.8732 7,380.039 0 7,380.039 0 0.0585 7,381.266 4 Worker 3.1409 5.0708 41.8478 0.1492 13.7714 0.0888 13.8602 3.6524 0.0824 3.7348 10,189.71 78 10,189.71 78 0.4436 10,199.03 30 Total 7.5930 20.3076 100.1205 0.2284 15.9346 0.3666 16.3012 4.2700 0.3380 4.6080 17,569.75 68 17,569.75 68 0.5020 17,580.29 94 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 44 of 100 3.12 Phase II – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0268 0.9016 0.9016 0.9016 0.9016 0.0000 2,544.626 2 2,544.626 2 0.6044 2,557.319 1 Total 1.0782 23.4615 17.8156 0.0268 0.9016 0.9016 0.9016 0.9016 0.0000 2,544.626 2 2,544.626 2 0.6044 2,557.319 1 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.4520 15.2368 58.2727 0.0793 2.1632 0.2779 2.4410 0.6176 0.2556 0.8732 7,380.039 0 7,380.039 0 0.0585 7,381.266 4 Worker 3.1409 5.0708 41.8478 0.1492 13.7714 0.0888 13.8602 3.6524 0.0824 3.7348 10,189.71 78 10,189.71 78 0.4436 10,199.03 30 Total 7.5930 20.3076 100.1205 0.2284 15.9346 0.3666 16.3012 4.2700 0.3380 4.6080 17,569.75 68 17,569.75 68 0.5020 17,580.29 94 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 45 of 100 3.13 Phase II – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0128 9.9983 14.2850 0.0223 0.5010 0.5010 0.4609 0.4609 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Paving 6.2915 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 7.3043 9.9983 14.2850 0.0223 0.5010 0.5010 0.4609 0.4609 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0338 0.0546 0.4506 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 109.7242 109.7242 4.7800e- 003 109.8245 Total 0.0338 0.0546 0.4506 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 109.7242 109.7242 4.7800e- 003 109.8245 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 46 of 100 3.13 Phase II – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Paving 6.2915 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 7.2036 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,160.613 9 2,160.613 9 0.6988 2,175.288 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0338 0.0546 0.4506 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 109.7242 109.7242 4.7800e- 003 109.8245 Total 0.0338 0.0546 0.4506 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 109.7242 109.7242 4.7800e- 003 109.8245 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 47 of 100 3.14 Phase II – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1917 1.3030 1.8111 2.9700e- 003 0.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8017 Total 744.7424 1.3030 1.8111 2.9700e- 003 0.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8017 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Total 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 48 of 100 3.14 Phase II – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0168 281.8017 Total 744.6647 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0168 281.8017 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Total 0.6291 1.0156 8.3816 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,040.869 5 2,040.869 5 0.0888 2,042.735 3 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 49 of 100 3.14 Phase II – Architectural Coating - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e- 003 0.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.7809 Total 744.7315 1.2188 1.8101 2.9700e- 003 0.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.7809 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5940 0.9533 7.8679 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,013.337 4 2,013.337 4 0.0852 2,015.127 4 Total 0.5940 0.9533 7.8679 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,013.337 4 2,013.337 4 0.0852 2,015.127 4 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 50 of 100 3.14 Phase II – Architectural Coating - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0159 281.7809 Total 744.6647 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0159 281.7809 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5940 0.9533 7.8679 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,013.337 4 2,013.337 4 0.0852 2,015.127 4 Total 0.5940 0.9533 7.8679 0.0299 2.7582 0.0178 2.7760 0.7315 0.0165 0.7480 2,013.337 4 2,013.337 4 0.0852 2,015.127 4 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 51 of 100 3.15 Phase III – Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 2.8238 27.5450 27.6020 0.0392 1.2498 1.2498 1.1498 1.1498 3,794.314 9 3,794.314 9 1.2272 3,820.085 2 Total 2.8238 27.5450 27.6020 0.0392 18.0663 1.2498 19.3161 9.9307 1.1498 11.0805 3,794.314 9 3,794.314 9 1.2272 3,820.085 2 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0383 0.0615 0.5076 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 129.8927 129.8927 5.5000e- 003 130.0082 Total 0.0383 0.0615 0.5076 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 129.8927 129.8927 5.5000e- 003 130.0082 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 52 of 100 3.15 Phase III – Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.2300 34.4240 23.4003 0.0392 0.9611 0.9611 0.9611 0.9611 0.0000 3,794.314 9 3,794.314 9 1.2272 3,820.085 2 Total 1.2300 34.4240 23.4003 0.0392 8.1298 0.9611 9.0909 4.4688 0.9611 5.4299 0.0000 3,794.314 9 3,794.314 9 1.2272 3,820.085 2 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0383 0.0615 0.5076 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 129.8927 129.8927 5.5000e- 003 130.0082 Total 0.0383 0.0615 0.5076 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0600e- 003 0.0483 129.8927 129.8927 5.5000e- 003 130.0082 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 53 of 100 3.16 Phase III – Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.3599 32.1927 33.4441 0.0618 1.4234 1.4234 1.3096 1.3096 5,984.025 2 5,984.025 2 1.9354 6,024.667 7 Total 3.3599 32.1927 33.4441 0.0618 8.6733 1.4234 10.0968 3.5965 1.3096 4.9061 5,984.025 2 5,984.025 2 1.9354 6,024.667 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0426 0.0683 0.5640 2.1400e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 144.3253 144.3253 6.1100e- 003 144.4536 Total 0.0426 0.0683 0.5640 2.1400e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 144.3253 144.3253 6.1100e- 003 144.4536 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 54 of 100 3.16 Phase III – Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,984.025 2 5,984.025 2 1.9354 6,024.667 7 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,984.025 2 5,984.025 2 1.9354 6,024.667 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0426 0.0683 0.5640 2.1400e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 144.3253 144.3253 6.1100e- 003 144.4536 Total 0.0426 0.0683 0.5640 2.1400e- 003 0.1977 1.2700e- 003 0.1990 0.0524 1.1800e- 003 0.0536 144.3253 144.3253 6.1100e- 003 144.4536 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 55 of 100 3.17 Phase III – Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.4653 13.3774 16.1332 0.0268 0.6106 0.6106 0.5744 0.5744 2,545.115 4 2,545.115 4 0.6009 2,557.734 9 Total 1.4653 13.3774 16.1332 0.0268 0.6106 0.6106 0.5744 0.5744 2,545.115 4 2,545.115 4 0.6009 2,557.734 9 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.4478 15.0748 57.1198 0.0792 2.1632 0.2791 2.4423 0.6176 0.2568 0.8744 7,380.358 9 7,380.358 9 0.0587 7,381.591 2 Worker 2.9658 4.7595 39.2830 0.1491 13.7714 0.0887 13.8601 3.6524 0.0823 3.7348 10,052.25 46 10,052.25 46 0.4256 10,061.19 15 Total 7.4136 19.8342 96.4028 0.2284 15.9345 0.3678 16.3024 4.2700 0.3391 4.6091 17,432.61 35 17,432.61 35 0.4843 17,442.78 26 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 56 of 100 3.17 Phase III – Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0268 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.115 4 2,545.115 4 0.6009 2,557.734 9 Total 1.0782 23.4615 17.8156 0.0268 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.115 4 2,545.115 4 0.6009 2,557.734 9 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.4478 15.0748 57.1198 0.0792 2.1632 0.2791 2.4423 0.6176 0.2568 0.8744 7,380.358 9 7,380.358 9 0.0587 7,381.591 2 Worker 2.9658 4.7595 39.2830 0.1491 13.7714 0.0887 13.8601 3.6524 0.0823 3.7348 10,052.25 46 10,052.25 46 0.4256 10,061.19 15 Total 7.4136 19.8342 96.4028 0.2284 15.9345 0.3678 16.3024 4.2700 0.3391 4.6091 17,432.61 35 17,432.61 35 0.4843 17,442.78 26 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 57 of 100 3.17 Phase III – Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.3343 14.9316 56.2838 0.0792 2.1632 0.2801 2.4434 0.6176 0.2577 0.8754 7,380.858 5 7,380.858 5 0.0589 7,382.094 8 Worker 2.8243 4.5019 37.2437 0.1491 13.7714 0.0891 13.8605 3.6524 0.0827 3.7351 9,931.150 3 9,931.150 3 0.4107 9,939.774 8 Total 7.1587 19.4335 93.5275 0.2283 15.9346 0.3692 16.3039 4.2701 0.3404 4.6104 17,312.00 88 17,312.00 88 0.4696 17,321.86 96 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 58 of 100 3.17 Phase III – Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.3343 14.9316 56.2838 0.0792 2.1632 0.2801 2.4434 0.6176 0.2577 0.8754 7,380.858 5 7,380.858 5 0.0589 7,382.094 8 Worker 2.8243 4.5019 37.2437 0.1491 13.7714 0.0891 13.8605 3.6524 0.0827 3.7351 9,931.150 3 9,931.150 3 0.4107 9,939.774 8 Total 7.1587 19.4335 93.5275 0.2283 15.9346 0.3692 16.3039 4.2701 0.3404 4.6104 17,312.00 88 17,312.00 88 0.4696 17,321.86 96 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 59 of 100 3.18 Phase III – Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Total 744.7216 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5657 0.9017 7.4594 0.0299 2.7582 0.0178 2.7761 0.7315 0.0166 0.7481 1,989.081 8 1,989.081 8 0.0823 1,990.809 2 Total 0.5657 0.9017 7.4594 0.0299 2.7582 0.0178 2.7761 0.7315 0.0166 0.7481 1,989.081 8 1,989.081 8 0.0823 1,990.809 2 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 60 of 100 3.18 Phase III – Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 744.5508 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Total 744.6647 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.5657 0.9017 7.4594 0.0299 2.7582 0.0178 2.7761 0.7315 0.0166 0.7481 1,989.081 8 1,989.081 8 0.0823 1,990.809 2 Total 0.5657 0.9017 7.4594 0.0299 2.7582 0.0178 2.7761 0.7315 0.0166 0.7481 1,989.081 8 1,989.081 8 0.0823 1,990.809 2 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 61 of 100 3.19 Phase III – Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.8973 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 4.7186 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 5.6160 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0304 0.0485 0.4010 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 106.9399 106.9399 4.4200e- 003 107.0328 Total 0.0304 0.0485 0.4010 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 106.9399 106.9399 4.4200e- 003 107.0328 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 62 of 100 3.19 Phase III – Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 4.7186 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 5.6308 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0304 0.0485 0.4010 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 106.9399 106.9399 4.4200e- 003 107.0328 Total 0.0304 0.0485 0.4010 1.6100e- 003 0.1483 9.6000e- 004 0.1493 0.0393 8.9000e- 004 0.0402 106.9399 106.9399 4.4200e- 003 107.0328 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 63 of 100 3.20 Phases IV & V – Site Preparation - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 2.5083 23.5257 24.8879 0.0392 1.0293 1.0293 0.9470 0.9470 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Total 2.5083 23.5257 24.8879 0.0392 18.0663 1.0293 19.0956 9.9307 0.9470 10.8776 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0365 0.0582 0.4813 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0700e- 003 0.0483 128.3279 128.3279 5.3100e- 003 128.4393 Total 0.0365 0.0582 0.4813 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0700e- 003 0.0483 128.3279 128.3279 5.3100e- 003 128.4393 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 64 of 100 3.20 Phases IV & V – Site Preparation - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.2300 34.4240 23.4003 0.0392 0.9611 0.9611 0.9611 0.9611 0.0000 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Total 1.2300 34.4240 23.4003 0.0392 8.1298 0.9611 9.0909 4.4688 0.9611 5.4299 0.0000 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0365 0.0582 0.4813 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0700e- 003 0.0483 128.3279 128.3279 5.3100e- 003 128.4393 Total 0.0365 0.0582 0.4813 1.9300e- 003 0.1780 1.1500e- 003 0.1791 0.0472 1.0700e- 003 0.0483 128.3279 128.3279 5.3100e- 003 128.4393 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 65 of 100 3.21 Phases IV & V – Grading - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.0022 27.2606 31.3515 0.0618 1.1867 1.1867 1.0918 1.0918 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 3.0022 27.2606 31.3515 0.0618 8.6733 1.1867 9.8600 3.5965 1.0918 4.6883 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0406 0.0646 0.5347 2.1400e- 003 0.1977 1.2800e- 003 0.1990 0.0524 1.1900e- 003 0.0536 142.5865 142.5865 5.9000e- 003 142.7103 Total 0.0406 0.0646 0.5347 2.1400e- 003 0.1977 1.2800e- 003 0.1990 0.0524 1.1900e- 003 0.0536 142.5865 142.5865 5.9000e- 003 142.7103 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 66 of 100 3.21 Phases IV & V – Grading - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0406 0.0646 0.5347 2.1400e- 003 0.1977 1.2800e- 003 0.1990 0.0524 1.1900e- 003 0.0536 142.5865 142.5865 5.9000e- 003 142.7103 Total 0.0406 0.0646 0.5347 2.1400e- 003 0.1977 1.2800e- 003 0.1990 0.0524 1.1900e- 003 0.0536 142.5865 142.5865 5.9000e- 003 142.7103 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 67 of 100 3.21 Phases IV & V – Grading - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.0022 27.2606 31.3515 0.0618 1.1867 1.1867 1.0918 1.0918 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 3.0022 27.2606 31.3515 0.0618 8.6733 1.1867 9.8600 3.5965 1.0918 4.6883 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0388 0.0615 0.5100 2.1400e- 003 0.1977 1.2900e- 003 0.1990 0.0524 1.2000e- 003 0.0536 141.0804 141.0804 5.7100e- 003 141.2003 Total 0.0388 0.0615 0.5100 2.1400e- 003 0.1977 1.2900e- 003 0.1990 0.0524 1.2000e- 003 0.0536 141.0804 141.0804 5.7100e- 003 141.2003 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 68 of 100 3.21 Phases IV & V – Grading - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0388 0.0615 0.5100 2.1400e- 003 0.1977 1.2900e- 003 0.1990 0.0524 1.2000e- 003 0.0536 141.0804 141.0804 5.7100e- 003 141.2003 Total 0.0388 0.0615 0.5100 2.1400e- 003 0.1977 1.2900e- 003 0.1990 0.0524 1.2000e- 003 0.0536 141.0804 141.0804 5.7100e- 003 141.2003 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 69 of 100 3.22 Phases IV & V – Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.3708 14.7439 55.2786 0.0792 2.1634 0.2785 2.4419 0.6177 0.2563 0.8739 7,381.769 9 7,381.769 9 0.0587 7,383.002 6 Worker 2.7001 4.2840 35.5218 0.1491 13.7714 0.0898 13.8612 3.6524 0.0834 3.7358 9,826.247 3 9,826.247 3 0.3979 9,834.603 5 Total 7.0709 19.0278 90.8003 0.2283 15.9348 0.3684 16.3031 4.2701 0.3396 4.6097 17,208.01 72 17,208.01 72 0.4566 17,217.60 60 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 70 of 100 3.22 Phases IV & V – Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.3708 14.7439 55.2786 0.0792 2.1634 0.2785 2.4419 0.6177 0.2563 0.8739 7,381.769 9 7,381.769 9 0.0587 7,383.002 6 Worker 2.7001 4.2840 35.5218 0.1491 13.7714 0.0898 13.8612 3.6524 0.0834 3.7358 9,826.247 3 9,826.247 3 0.3979 9,834.603 5 Total 7.0709 19.0278 90.8003 0.2283 15.9348 0.3684 16.3031 4.2701 0.3396 4.6097 17,208.01 72 17,208.01 72 0.4566 17,217.60 60 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 71 of 100 3.22 Phases IV & V – Building Construction - 2027 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.0589 14.5768 51.6618 0.0792 2.1636 0.2789 2.4425 0.6178 0.2566 0.8743 7,382.385 5 7,382.385 5 0.0588 7,383.620 3 Worker 2.5865 4.0874 33.9826 0.1491 13.7714 0.0904 13.8618 3.6524 0.0839 3.7364 9,734.922 4 9,734.922 4 0.3865 9,743.039 3 Total 6.6454 18.6642 85.6444 0.2282 15.9350 0.3693 16.3043 4.2702 0.3405 4.6107 17,117.30 79 17,117.30 79 0.4453 17,126.65 96 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 72 of 100 3.22 Phases IV & V – Building Construction - 2027 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.0589 14.5768 51.6618 0.0792 2.1636 0.2789 2.4425 0.6178 0.2566 0.8743 7,382.385 5 7,382.385 5 0.0588 7,383.620 3 Worker 2.5865 4.0874 33.9826 0.1491 13.7714 0.0904 13.8618 3.6524 0.0839 3.7364 9,734.922 4 9,734.922 4 0.3865 9,743.039 3 Total 6.6454 18.6642 85.6444 0.2282 15.9350 0.3693 16.3043 4.2702 0.3405 4.6107 17,117.30 79 17,117.30 79 0.4453 17,126.65 96 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 73 of 100 3.22 Phases IV & V – Building Construction - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.9301 14.4292 48.1410 0.0791 2.1638 0.2786 2.4424 0.6178 0.2563 0.8742 7,383.081 5 7,383.081 5 0.0588 7,384.316 8 Worker 2.4836 3.9081 32.6253 0.1490 13.7714 0.0910 13.8624 3.6524 0.0844 3.7369 9,656.200 5 9,656.200 5 0.3763 9,664.101 8 Total 6.4138 18.3373 80.7663 0.2281 15.9352 0.3696 16.3048 4.2703 0.3408 4.6111 17,039.28 20 17,039.28 20 0.4351 17,048.41 86 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 74 of 100 3.22 Phases IV & V – Building Construction - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.9301 14.4292 48.1410 0.0791 2.1638 0.2786 2.4424 0.6178 0.2563 0.8742 7,383.081 5 7,383.081 5 0.0588 7,384.316 8 Worker 2.4836 3.9081 32.6253 0.1490 13.7714 0.0910 13.8624 3.6524 0.0844 3.7369 9,656.200 5 9,656.200 5 0.3763 9,664.101 8 Total 6.4138 18.3373 80.7663 0.2281 15.9352 0.3696 16.3048 4.2703 0.3408 4.6111 17,039.28 20 17,039.28 20 0.4351 17,048.41 86 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 75 of 100 3.23 Phases IV & V – Architectural Coating - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 425.4576 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Total 425.6284 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.4974 0.7828 6.5344 0.0299 2.7582 0.0182 2.7765 0.7315 0.0169 0.7485 1,934.012 9 1,934.012 9 0.0754 1,935.595 4 Total 0.4974 0.7828 6.5344 0.0299 2.7582 0.0182 2.7765 0.7315 0.0169 0.7485 1,934.012 9 1,934.012 9 0.0754 1,935.595 4 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 76 of 100 3.23 Phases IV & V – Architectural Coating - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 425.4576 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Total 425.5715 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.4974 0.7828 6.5344 0.0299 2.7582 0.0182 2.7765 0.7315 0.0169 0.7485 1,934.012 9 1,934.012 9 0.0754 1,935.595 4 Total 0.4974 0.7828 6.5344 0.0299 2.7582 0.0182 2.7765 0.7315 0.0169 0.7485 1,934.012 9 1,934.012 9 0.0754 1,935.595 4 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 77 of 100 3.24 Phases IV & V – Paving - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.8973 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 3.1458 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.0431 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0267 0.0421 0.3513 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.9792 103.9792 4.0500e- 003 104.0643 Total 0.0267 0.0421 0.3513 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.9792 103.9792 4.0500e- 003 104.0643 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 78 of 100 3.24 Phases IV & V – Paving - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 3.1458 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.0579 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0267 0.0421 0.3513 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.9792 103.9792 4.0500e- 003 104.0643 Total 0.0267 0.0421 0.3513 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.9792 103.9792 4.0500e- 003 104.0643 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 79 of 100 3.24 Phases IV & V – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.8973 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 3.1458 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.0431 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0256 0.0402 0.3371 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.2468 103.2468 3.9400e- 003 103.3296 Total 0.0256 0.0402 0.3371 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.2468 103.2468 3.9400e- 003 103.3296 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 80 of 100 3.24 Phases IV & V – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 3.1458 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.0579 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0256 0.0402 0.3371 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.2468 103.2468 3.9400e- 003 103.3296 Total 0.0256 0.0402 0.3371 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.2468 103.2468 3.9400e- 003 103.3296 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 81 of 100 3.25 Phase VI – Site Preparation - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 2.5083 23.5257 24.8879 0.0392 1.0293 1.0293 0.9470 0.9470 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Total 2.5083 23.5257 24.8879 0.0392 18.0663 1.0293 19.0956 9.9307 0.9470 10.8776 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0308 0.0483 0.4045 1.9300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 123.8962 123.8962 4.7300e- 003 123.9956 Total 0.0308 0.0483 0.4045 1.9300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 123.8962 123.8962 4.7300e- 003 123.9956 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 82 of 100 3.25 Phase VI – Site Preparation - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 1.2300 34.4240 23.4003 0.0392 0.9611 0.9611 0.9611 0.9611 0.0000 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Total 1.2300 34.4240 23.4003 0.0392 8.1298 0.9611 9.0909 4.4688 0.9611 5.4299 0.0000 3,793.840 3 3,793.840 3 1.2270 3,819.607 4 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0308 0.0483 0.4045 1.9300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 123.8962 123.8962 4.7300e- 003 123.9956 Total 0.0308 0.0483 0.4045 1.9300e- 003 0.1780 1.1800e- 003 0.1791 0.0472 1.1000e- 003 0.0483 123.8962 123.8962 4.7300e- 003 123.9956 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 83 of 100 3.26 Phase VI – Grading - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.6733 0.0000 8.6733 3.5965 0.0000 3.5965 0.0000 0.0000 Off-Road 3.0022 27.2606 31.3515 0.0618 1.1867 1.1867 1.0918 1.0918 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 3.0022 27.2606 31.3515 0.0618 8.6733 1.1867 9.8600 3.5965 1.0918 4.6883 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0342 0.0536 0.4494 2.1400e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 137.6624 137.6624 5.2600e- 003 137.7729 Total 0.0342 0.0536 0.4494 2.1400e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 137.6624 137.6624 5.2600e- 003 137.7729 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 84 of 100 3.26 Phase VI – Grading - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 3.9030 0.0000 3.9030 1.6184 0.0000 1.6184 0.0000 0.0000 Off-Road 1.8922 50.9465 37.9432 0.0618 1.3783 1.3783 1.3783 1.3783 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Total 1.8922 50.9465 37.9432 0.0618 3.9030 1.3783 5.2813 1.6184 1.3783 2.9967 0.0000 5,982.352 6 5,982.352 6 1.9348 6,022.983 7 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0342 0.0536 0.4494 2.1400e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 137.6624 137.6624 5.2600e- 003 137.7729 Total 0.0342 0.0536 0.4494 2.1400e- 003 0.1977 1.3100e- 003 0.1990 0.0524 1.2200e- 003 0.0537 137.6624 137.6624 5.2600e- 003 137.7729 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 85 of 100 3.27 Phase VI – Building Construction - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.8923 14.3794 47.9703 0.0791 2.1640 0.2787 2.4427 0.6179 0.2564 0.8743 7,384.202 4 7,384.202 4 0.0589 7,385.438 8 Worker 2.3813 3.7354 31.3016 0.1490 13.7714 0.0914 13.8628 3.6524 0.0848 3.7373 9,588.188 2 9,588.188 2 0.3662 9,595.879 0 Total 6.2735 18.1148 79.2719 0.2281 15.9353 0.3701 16.3054 4.2704 0.3412 4.6116 16,972.39 06 16,972.39 06 0.4251 16,981.31 78 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 86 of 100 3.27 Phase VI – Building Construction - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Total 1.0782 23.4615 17.8156 0.0269 0.9016 0.9016 0.9016 0.9016 0.0000 2,545.890 5 2,545.890 5 0.5975 2,558.438 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.8923 14.3794 47.9703 0.0791 2.1640 0.2787 2.4427 0.6179 0.2564 0.8743 7,384.202 4 7,384.202 4 0.0589 7,385.438 8 Worker 2.3813 3.7354 31.3016 0.1490 13.7714 0.0914 13.8628 3.6524 0.0848 3.7373 9,588.188 2 9,588.188 2 0.3662 9,595.879 0 Total 6.2735 18.1148 79.2719 0.2281 15.9353 0.3701 16.3054 4.2704 0.3412 4.6116 16,972.39 06 16,972.39 06 0.4251 16,981.31 78 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 87 of 100 3.28 Phase VI – Architectural Coating - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 827.2786 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Total 827.4495 1.1455 1.8091 2.9700e- 003 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.4769 0.7482 6.2693 0.0299 2.7582 0.0183 2.7765 0.7315 0.0170 0.7485 1,920.390 9 1,920.390 9 0.0734 1,921.931 3 Total 0.4769 0.7482 6.2693 0.0299 2.7582 0.0183 2.7765 0.7315 0.0170 0.7485 1,920.390 9 1,920.390 9 0.0734 1,921.931 3 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 88 of 100 3.28 Phase VI – Architectural Coating - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 827.2786 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1139 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Total 827.3925 2.3524 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0154 281.7705 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.4769 0.7482 6.2693 0.0299 2.7582 0.0183 2.7765 0.7315 0.0170 0.7485 1,920.390 9 1,920.390 9 0.0734 1,921.931 3 Total 0.4769 0.7482 6.2693 0.0299 2.7582 0.0183 2.7765 0.7315 0.0170 0.7485 1,920.390 9 1,920.390 9 0.0734 1,921.931 3 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 89 of 100 3.29 Phase VI – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.8973 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 18.8745 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 19.7718 8.4215 14.2781 0.0223 0.4109 0.4109 0.3781 0.3781 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0256 0.0402 0.3371 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.2468 103.2468 3.9400e- 003 103.3296 Total 0.0256 0.0402 0.3371 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.2468 103.2468 3.9400e- 003 103.3296 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 90 of 100 4.0 Operational Detail - Mobile 3.29 Phase VI – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9122 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Paving 18.8745 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 19.7866 19.6998 16.9276 0.0223 0.6542 0.6542 0.6542 0.6542 0.0000 2,159.796 7 2,159.796 7 0.6985 2,174.465 6 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0256 0.0402 0.3371 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.2468 103.2468 3.9400e- 003 103.3296 Total 0.0256 0.0402 0.3371 1.6000e- 003 0.1483 9.8000e- 004 0.1493 0.0393 9.1000e- 004 0.0402 103.2468 103.2468 3.9400e- 003 103.3296 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 91 of 100 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 16.4658 27.7553 136.4651 0.4222 30.3141 0.5352 30.8493 8.1063 0.4940 8.6003 30,791.83 18 30,791.83 18 0.8716 30,810.13 54 Unmitigated 17.3256 31.9380 152.0907 0.5050 36.5186 0.6292 37.1478 9.7654 0.5807 10.3461 36,837.07 43 36,837.07 43 1.0285 36,858.67 28 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Mid Rise 823.75 895.00 758.75 2,095,877 1,739,787 City Park 30.34 30.34 30.34 61,654 51,179 Condo/Townhouse 1,298.23 1,410.52 1195.79 3,303,102 2,741,904 Other Asphalt Surfaces 0.00 0.00 0.00 Parking Lot 0.00 0.00 0.00 Regional Shopping Center 644.10 749.55 378.60 897,003 744,602 Single Family Housing 966.57 1,018.08 885.77 2,445,958 2,030,389 Single Family Housing 2,842.29 2,993.76 2604.69 7,192,571 5,970,551 Total 6,605.28 7,097.25 5,853.94 15,996,165 13,278,411 Increase Density Improve Walkability Design Increase Transit Accessibility Improve Pedestrian Network Expand Transit Network CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 92 of 100 4.3 Trip Type Information Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Mid Rise 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 City Park 13.00 5.00 5.00 33.00 48.00 19.00 66 28 6 Condo/Townhouse 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 Other Asphalt Surfaces 13.00 5.00 5.00 0.00 0.00 0.00 0 0 0 Parking Lot 13.00 5.00 5.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 13.00 5.00 5.00 16.30 64.70 19.00 54 35 11 Single Family Housing 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 Single Family Housing 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 5.0 Energy Detail 5.1 Mitigation Measures Energy Exceed Title 24 Install High Efficiency Lighting Percent of Electricity Use Generated with Renewable Energy 4.4 Fleet Mix LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH 0.457871 0.042296 0.214250 0.146969 0.067525 0.009931 0.017760 0.024978 0.002423 0.001427 0.009102 0.000742 0.004726 Historical Energy Use: N CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 93 of 100 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.4427 3.7836 1.6132 0.0242 0.3059 0.3059 0.3059 0.3059 4,829.540 0 4,829.540 0 0.0926 0.0885 4,858.931 8 NaturalGas Unmitigated 0.5594 4.7808 2.0385 0.0305 0.3865 0.3865 0.3865 0.3865 6,102.310 6 6,102.310 6 0.1170 0.1119 6,139.448 3 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 94 of 100 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Mid Rise 2783.43 0.0300 0.2565 0.1092 1.6400e- 003 0.0207 0.0207 0.0207 0.0207 327.4625 327.4625 6.2800e- 003 6.0000e- 003 329.4554 City Park 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 10511 0.1134 0.9687 0.4122 6.1800e- 003 0.0783 0.0783 0.0783 0.0783 1,236.582 8 1,236.582 8 0.0237 0.0227 1,244.108 5 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 102.329 1.1000e- 003 0.0100 8.4300e- 003 6.0000e- 005 7.6000e- 004 7.6000e- 004 7.6000e- 004 7.6000e- 004 12.0387 12.0387 2.3000e- 004 2.2000e- 004 12.1119 Single Family Housing 28709.7 0.3096 2.6458 1.1259 0.0169 0.2139 0.2139 0.2139 0.2139 3,377.611 3 3,377.611 3 0.0647 0.0619 3,398.166 9 Single Family Housing 9763.23 0.1053 0.8998 0.3829 5.7400e- 003 0.0728 0.0728 0.0728 0.0728 1,148.615 3 1,148.615 3 0.0220 0.0211 1,155.605 6 Total 0.5594 4.7808 2.0385 0.0305 0.3865 0.3865 0.3865 0.3865 6,102.310 6 6,102.310 6 0.1170 0.1119 6,139.448 3 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 95 of 100 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day City Park 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 8.2814 0.0893 0.7632 0.3248 4.8700e- 003 0.0617 0.0617 0.0617 0.0617 974.2822 974.2822 0.0187 0.0179 980.2115 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0.0767466 8.3000e- 004 7.5200e- 003 6.3200e- 003 5.0000e- 005 5.7000e- 004 5.7000e- 004 5.7000e- 004 5.7000e- 004 9.0290 9.0290 1.7000e- 004 1.7000e- 004 9.0840 Single Family Housing 22.7278 0.2451 2.0945 0.8913 0.0134 0.1693 0.1693 0.1693 0.1693 2,673.855 3 2,673.855 3 0.0513 0.0490 2,690.128 0 Single Family Housing 7.72897 0.0834 0.7123 0.3031 4.5500e- 003 0.0576 0.0576 0.0576 0.0576 909.2909 909.2909 0.0174 0.0167 914.8247 Apartments Mid Rise 2.2362 0.0241 0.2061 0.0877 1.3200e- 003 0.0167 0.0167 0.0167 0.0167 263.0826 263.0826 5.0400e- 003 4.8200e- 003 264.6837 Total 0.4427 3.7836 1.6132 0.0242 0.3059 0.3059 0.3059 0.3059 4,829.540 0 4,829.540 0 0.0926 0.0885 4,858.931 8 Mitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 96 of 100 Use Low VOC Paint - Residential Interior Use Low VOC Paint - Residential Exterior Use Low VOC Paint - Non-Residential Interior Use Low VOC Paint - Non-Residential Exterior No Hearths Installed Use Low VOC Cleaning Supplies ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 74.4981 0.6845 59.4111 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3178 107.3178 0.1028 0.0000 109.4773 Unmitigated 94.0633 0.6845 59.4111 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3178 107.3178 0.1028 0.0000 109.4773 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 97 of 100 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 18.0991 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 74.1770 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.7873 0.6845 59.4111 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 107.3178 107.3178 0.1028 109.4773 Total 94.0634 0.6845 59.4111 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3178 107.3178 0.1028 0.0000 109.4773 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 98 of 100 8.1 Mitigation Measures Waste Use Reclaimed Water Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 4.0797 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 68.6310 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.7873 0.6845 59.4111 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 107.3178 107.3178 0.1028 109.4773 Total 74.4981 0.6845 59.4111 3.1500e- 003 0.3300 0.3300 0.3300 0.3300 0.0000 107.3178 107.3178 0.1028 0.0000 109.4773 Mitigated 9.0 Operational Offroad CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 99 of 100 10.0 Vegetation 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:50 PMPage 100 of 100 San Luis Obispo County, Annual Avila Ranch Development Project Mitigated Project Alternative 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Parking Lot 1,590.00 Space 14.31 636,000.00 0 Other Asphalt Surfaces 21.71 Acre 21.71 945,687.60 0 City Park 19.08 Acre 19.08 831,124.80 0 Regional Shopping Center 15.00 1000sqft 1.86 15,000.00 0 Apartments Mid Rise 125.00 Dwelling Unit 4.40 125,000.00 286 Condo/Townhouse 197.00 Dwelling Unit 10.80 197,000.00 451 Single Family Housing 101.00 Dwelling Unit 12.80 181,800.00 232 Single Family Housing 297.00 Dwelling Unit 27.30 534,600.00 680 1.2 Other Project Characteristics Urbanization Climate Zone Urban 4 Wind Speed (m/s)Precipitation Freq (Days)3.2 44 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Pacific Gas & Electric Company 2030Operational Year CO2 Intensity (lb/MWhr) 641.35 0.029CH4 Intensity (lb/MWhr) 0.006N2O Intensity (lb/MWhr) CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 1 of 109 Project Characteristics - Land Use - Taken from MPA description Construction Phase - taken from updated construction schedule september 29 2016 Architectural Coating - using at least 50 EF paint from mitigation Woodstoves - no woodstoves or fireplaces Area Coating - EF is 50 from mitigation Water And Wastewater - based on city water use factors Solid Waste - from estimated solid waste production under the MPA table based on CalRecycle waste generation factors Sequestration - Construction Off-road Equipment Mitigation - based on mitigation Mobile Land Use Mitigation - Area Mitigation - 50 EF per mitigation Energy Mitigation - Water Mitigation - Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 2 of 109 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblAreaCoating Area_EF_Nonresidential_Exterior 250 50 tblAreaMitigation UseLowVOCPaintNonresidentialInteriorV alue 250 50 tblAreaMitigation UseLowVOCPaintResidentialExteriorValu e 250 50 tblAreaMitigation UseLowVOCPaintResidentialInteriorValu e 250 50 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 17.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 18.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 7.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 26.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 54.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 14.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation Tier No Change Tier 2 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 3 of 109 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstEquipMitigation Tier No Change Tier 2 tblConstructionPhase NumDays 3,100.00 665.00 tblConstructionPhase NumDays 120.00 15.00 tblConstructionPhase NumDays 120.00 60.00 tblConstructionPhase NumDays 220.00 46.00 tblConstructionPhase NumDays 310.00 125.00 tblConstructionPhase NumDays 310.00 155.00 tblConstructionPhase NumDays 220.00 15.00 tblConstructionPhase NumDays 220.00 55.00 tblConstructionPhase NumDays 120.00 15.00 tblConstructionPhase NumDays 310.00 30.00 tblConstructionPhase NumDays 3,100.00 100.00 tblConstructionPhase NumDays 220.00 15.00 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 120.00 20.00 tblConstructionPhase NumDays 310.00 35.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 4 of 109 tblConstructionPhase NumDays 3,100.00 340.00 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 220.00 20.00 tblConstructionPhase NumDays 120.00 40.00 tblConstructionPhase NumDays 310.00 135.00 tblConstructionPhase NumDays 3,100.00 625.00 tblConstructionPhase NumDays 220.00 35.00 tblConstructionPhase NumDays 220.00 30.00 tblConstructionPhase NumDays 120.00 5.00 tblConstructionPhase NumDays 310.00 15.00 tblConstructionPhase NumDays 3,100.00 150.00 tblConstructionPhase NumDays 220.00 18.00 tblConstructionPhase NumDays 220.00 5.00 tblConstructionPhase PhaseStartDate 9/29/2029 9/30/2029 tblGrading AcresOfGrading 387.50 0.00 tblLandUse LotAcreage 0.34 1.86 tblLandUse LotAcreage 3.29 4.40 tblLandUse LotAcreage 12.31 10.80 tblLandUse LotAcreage 32.79 12.80 tblLandUse LotAcreage 96.43 27.30 tblLandUse Population 358.00 286.00 tblLandUse Population 563.00 451.00 tblLandUse Population 289.00 232.00 tblLandUse Population 849.00 680.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 3.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 4.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 3.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 5 of 109 tblOffRoadEquipment UsageHours 8.00 7.00 tblProjectCharacteristics OperationalYear 2014 2030 tblSequestration NumberOfNewTrees 0.00 525.00 tblSolidWaste SolidWasteGenerationRate 57.50 121.13 tblSolidWaste SolidWasteGenerationRate 1.64 0.00 tblSolidWaste SolidWasteGenerationRate 90.62 190.91 tblSolidWaste SolidWasteGenerationRate 15.75 6.84 tblSolidWaste SolidWasteGenerationRate 373.92 711.82 tblTripsAndVMT VendorTripNumber 0.00 475.00 tblTripsAndVMT VendorTripNumber 475.00 0.00 tblTripsAndVMT WorkerTripNumber 25.00 15.00 tblTripsAndVMT WorkerTripNumber 30.00 18.00 tblTripsAndVMT WorkerTripNumber 35.00 20.00 tblTripsAndVMT WorkerTripNumber 30.00 1,393.00 tblTripsAndVMT WorkerTripNumber 35.00 15.00 tblTripsAndVMT WorkerTripNumber 1,393.00 279.00 tblWater IndoorWaterUseRate 8,144,253.20 4,472,304.06 tblWater IndoorWaterUseRate 12,835,343.05 7,048,351.14 tblWater IndoorWaterUseRate 1,111,087.82 909,125.22 tblWater IndoorWaterUseRate 25,931,302.20 17,829,611.92 tblWater OutdoorWaterUseRate 5,134,420.50 2,859,341.94 tblWater OutdoorWaterUseRate 22,733,464.15 12,434,472.00 tblWater OutdoorWaterUseRate 8,091,846.70 4,506,322.86 tblWater OutdoorWaterUseRate 680,989.31 557,205.78 tblWater OutdoorWaterUseRate 16,347,994.86 11,399,260.08 tblWoodstoves WoodstoveDayYear 60.00 0.00 tblWoodstoves WoodstoveDayYear 60.00 0.00 tblWoodstoves WoodstoveDayYear 60.00 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 6 of 109 2.0 Emissions Summary tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 tblWoodstoves WoodstoveWoodMass 2,016.50 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 7 of 109 2.1 Overall Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2019 0.9013 9.1757 7.3548 0.0104 1.7837 0.4416 2.2253 0.9741 0.4069 1.3810 0.0000 927.8427 927.8427 0.2851 0.0000 933.8296 2020 0.6575 5.9008 6.2384 0.0111 0.9669 0.2855 1.2524 0.3765 0.2647 0.6412 0.0000 902.8801 902.8801 0.2046 0.0000 907.1763 2021 0.3625 2.6119 3.6510 7.8200e- 003 0.3505 0.1392 0.4897 0.0932 0.1316 0.2248 0.0000 585.5877 585.5877 0.0864 0.0000 587.4016 2022 0.3288 2.3418 3.5235 7.7900e- 003 0.3492 0.1177 0.4669 0.0928 0.1113 0.2041 0.0000 579.4709 579.4709 0.0849 0.0000 581.2538 2023 11.0919 2.8888 6.9873 0.0162 1.1624 0.1058 1.2682 0.3690 0.0985 0.4675 0.0000 1,174.938 3 1,174.938 3 0.1046 0.0000 1,177.135 3 2024 5.3746 4.0956 11.1419 0.0268 1.8675 0.1331 2.0006 0.5745 0.1238 0.6983 0.0000 1,923.983 0 1,923.983 0 0.1384 0.0000 1,926.889 5 2025 8.1958 3.3805 8.7070 0.0212 2.1077 0.1115 2.2192 0.7531 0.1035 0.8565 0.0000 1,527.054 6 1,527.054 6 0.1314 0.0000 1,529.813 9 2026 0.7929 3.9029 9.6215 0.0240 1.8526 0.1310 1.9837 0.5831 0.1215 0.7045 0.0000 1,735.967 0 1,735.967 0 0.1645 0.0000 1,739.421 3 2027 0.9858 4.0623 12.3758 0.0335 2.0263 0.1165 2.1427 0.5442 0.1087 0.6529 0.0000 2,342.916 5 2,342.916 5 0.1233 0.0000 2,345.505 4 2028 8.2457 3.2422 9.4658 0.0268 1.6169 0.0961 1.7130 0.4341 0.0897 0.5238 0.0000 1,865.140 8 1,865.140 8 0.1032 0.0000 1,867.308 9 2029 8.0852 2.6254 7.1479 0.0203 1.3017 0.0816 1.3833 0.3717 0.0760 0.4477 0.0000 1,417.537 0 1,417.537 0 0.0900 0.0000 1,419.427 4 Total 45.0218 44.2279 86.2149 0.2058 15.3853 1.7596 17.1449 5.1661 1.6361 6.8022 0.0000 14,983.31 87 14,983.31 87 1.5164 0.0000 15,015.16 28 Unmitigated Construction CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 8 of 109 2.1 Overall Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2019 0.3771 8.5726 6.4251 0.0104 0.8149 0.2397 1.0545 0.4416 0.2397 0.6813 0.0000 927.8417 927.8417 0.2851 0.0000 933.8285 2020 0.3698 6.6485 6.3650 0.0111 0.5942 0.2026 0.7968 0.2119 0.2022 0.4141 0.0000 902.8793 902.8793 0.2046 0.0000 907.1755 2021 0.2424 3.5185 3.8197 7.8200e- 003 0.3505 0.1324 0.4829 0.0932 0.1322 0.2254 0.0000 585.5873 585.5873 0.0864 0.0000 587.4012 2022 0.2363 3.4948 3.7194 7.7900e- 003 0.3492 0.1319 0.4811 0.0928 0.1317 0.2245 0.0000 579.4706 579.4706 0.0849 0.0000 581.2534 2023 11.0194 3.9109 7.1415 0.0162 1.0164 0.1158 1.1321 0.2983 0.1143 0.4126 0.0000 1,174.938 0 1,174.938 0 0.1046 0.0000 1,177.134 9 2024 5.2948 5.4826 11.3427 0.0268 1.6847 0.1580 1.8427 0.4852 0.1552 0.6404 0.0000 1,923.982 6 1,923.982 6 0.1384 0.0000 1,926.889 1 2025 8.1293 4.9509 8.9505 0.0212 1.5870 0.1438 1.7307 0.5103 0.1417 0.6520 0.0000 1,527.054 2 1,527.054 2 0.1314 0.0000 1,529.813 5 2026 0.7150 5.9705 10.0907 0.0240 1.5307 0.1710 1.7016 0.4495 0.1687 0.6182 0.0000 1,735.966 5 1,735.966 5 0.1645 0.0000 1,739.420 7 2027 0.9488 5.5046 12.6060 0.0335 2.0263 0.1656 2.1919 0.5442 0.1619 0.7061 0.0000 2,342.916 2 2,342.916 2 0.1233 0.0000 2,345.505 0 2028 8.2162 4.5093 9.6748 0.0268 1.6169 0.1377 1.7546 0.4341 0.1348 0.5689 0.0000 1,865.140 5 1,865.140 5 0.1032 0.0000 1,867.308 6 2029 8.0520 3.7377 7.3420 0.0203 1.2411 0.1129 1.3540 0.3432 0.1108 0.4540 0.0000 1,417.536 7 1,417.536 7 0.0900 0.0000 1,419.427 1 Total 43.6011 56.3006 87.4773 0.2058 12.8116 1.7113 14.5229 3.9043 1.6931 5.5975 0.0000 14,983.31 34 14,983.31 34 1.5164 0.0000 15,015.15 74 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 3.16 -27.30 -1.46 0.00 16.73 2.74 15.29 24.42 -3.49 17.71 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 9 of 109 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 17.1353 0.1129 9.8028 5.2000e- 004 0.0545 0.0545 0.0545 0.0545 0.0000 16.0639 16.0639 0.0154 0.0000 16.3872 Energy 0.1021 0.8725 0.3720 5.5700e- 003 0.0705 0.0705 0.0705 0.0705 0.0000 2,418.371 7 2,418.371 7 0.0830 0.0317 2,429.940 9 Mobile 2.7440 5.3839 24.4339 0.0859 6.0219 0.1061 6.1280 1.6138 0.0979 1.7117 0.0000 5,683.456 0 5,683.456 0 0.1575 0.0000 5,686.763 2 Waste 0.0000 0.0000 0.0000 0.0000 209.2228 0.0000 209.2228 12.3647 0.0000 468.8818 Water 0.0000 0.0000 0.0000 0.0000 9.5999 79.9662 89.5661 0.9896 0.0240 117.7974 Total 19.9814 6.3693 34.6088 0.0920 6.0219 0.2311 6.2530 1.6138 0.2229 1.8367 218.8227 8,197.857 8 8,416.680 5 13.6102 0.0557 8,719.770 4 Unmitigated Operational CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 10 of 109 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 13.5646 0.1129 9.8028 5.2000e- 004 0.0545 0.0545 0.0545 0.0545 0.0000 16.0639 16.0639 0.0154 0.0000 16.3872 Energy 0.0808 0.6905 0.2944 4.4100e- 003 0.0558 0.0558 0.0558 0.0558 0.0000 1,755.467 4 1,755.467 4 0.0586 0.0236 1,764.013 4 Mobile 2.5989 4.6767 21.7900 0.0718 4.9988 0.0902 5.0890 1.3396 0.0833 1.4229 0.0000 4,751.236 5 4,751.236 5 0.1334 0.0000 4,754.038 4 Waste 0.0000 0.0000 0.0000 0.0000 209.2228 0.0000 209.2228 12.3647 0.0000 468.8818 Water 0.0000 0.0000 0.0000 0.0000 7.6799 64.6904 72.3703 0.7916 0.0192 94.9458 Total 16.2444 5.4801 31.8873 0.0768 4.9988 0.2005 5.1993 1.3396 0.1935 1.5332 216.9027 6,587.458 1 6,804.360 8 13.3637 0.0428 7,098.266 4 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 18.70 13.96 7.86 16.57 16.99 13.24 16.85 16.99 13.17 16.53 0.88 19.64 19.16 1.81 23.20 18.60 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 11 of 109 3.0 Construction Detail 2.3 Vegetation CO2e Category MT New Trees 371.7000 Total 371.7000 Vegetation Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Offsite Construction – Site Preparation Site Preparation 1/1/2019 3/25/2019 5 60 2 Offsite Construction – Grading Grading 3/26/2019 10/28/2019 5 155 3 Offsite Construction – Paving Paving 10/29/2019 12/31/2019 5 46 4 Phase I – Site Preparation Site Preparation 1/1/2020 1/21/2020 5 15 5 Phase I, III, IV – Grading Grading 1/22/2020 7/14/2020 5 125 6 Phase I – Building Construction Building Construction 7/15/2020 1/31/2023 5 665 7 Phase I – Paving Paving 2/1/2023 2/21/2023 5 15 8 Phase I – Architectural Coating Architectural Coating 2/22/2023 5/9/2023 5 55 9 Phase II – Site Preparation Site Preparation 5/10/2023 5/30/2023 5 15 10 Phase II – Grading Grading 5/31/2023 7/11/2023 5 30 11 Phase II – Building Construction Building Construction 7/12/2023 11/28/2023 5 100 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 12 of 109 12 Phase II – Paving Paving 11/29/2023 12/19/2023 5 15 13 Phase II – Architectural Coating Architectural Coating 12/20/2023 1/16/2024 5 20 14 Phase III – Site Preparation Site Preparation 1/17/2024 2/13/2024 5 20 15 Phase III – Grading Grading 2/14/2024 4/2/2024 5 35 16 Phase III – Building Construction Building Construction 4/3/2024 7/22/2025 5 340 17 Phase III – Architectural Coating Architectural Coating 7/23/2025 8/19/2025 5 20 18 Phase III – Paving Paving 8/20/2025 9/16/2025 5 20 19 Phases IV & V – Site Preparation Site Preparation 9/17/2025 11/11/2025 5 40 20 Phases IV & V – Grading Grading 11/12/2025 5/19/2026 5 135 21 Phases IV & V – Building Construction Building Construction 5/20/2026 10/10/2028 5 625 22 Phases IV & V – Architectural Coating Architectural Coating 10/11/2028 11/28/2028 5 35 23 Phases IV & V – Paving Paving 11/29/2028 1/9/2029 5 30 24 Phase VI – Site Preparation Site Preparation 1/10/2029 1/16/2029 5 5 25 Phase VI – Grading Grading 1/17/2029 2/6/2029 5 15 26 Phase VI – Building Construction Building Construction 2/7/2029 9/4/2029 5 150 27 Phase VI – Architectural Coating Architectural Coating 9/5/2029 9/28/2029 5 18 28 Phase VI – Paving Paving 9/30/2029 10/5/2029 5 5 OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Phase I – Building Construction Air Compressors 1 6.00 78 0.48 Residential Indoor: 2,102,760; Residential Outdoor: 700,920; Non-Residential Indoor: 2,716,339; Non-Residential Outdoor: 905,446 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 0 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 13 of 109 Offsite Construction – Site Preparation Excavators 3 8.00 162 0.38 Offsite Construction – Site Preparation Concrete/Industrial Saws 1 8.00 81 0.73 Offsite Construction – Paving Excavators 2 8.00 162 0.38 Phase I – Site Preparation Cranes 1 7.00 226 0.29 Phase I – Site Preparation Forklifts 3 8.00 89 0.20 Phase I – Site Preparation Generator Sets 1 8.00 84 0.74 Phase I, III, IV – Grading Pavers 2 8.00 125 0.42 Phase I, III, IV – Grading Rollers 2 8.00 80 0.38 Offsite Construction – Site Preparation Rubber Tired Dozers 2 8.00 255 0.40 Offsite Construction – Paving Rubber Tired Dozers 1 8.00 255 0.40 Phase I – Site Preparation Tractors/Loaders/Backhoes 3 7.00 97 0.37 Offsite Construction – Paving Graders 1 8.00 174 0.41 Offsite Construction – Paving Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase I, III, IV – Grading Paving Equipment 2 8.00 130 0.36 Offsite Construction – Grading Tractors/Loaders/Backhoes 4 8.00 97 0.37 Offsite Construction – Grading Rubber Tired Dozers 3 8.00 255 0.40 Offsite Construction – Paving Scrapers 2 8.00 361 0.48 Phase I – Site Preparation Welders 1 8.00 46 0.45 Phase II – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase III – Architectural Coating Air Compressors 1 6.00 78 0.48 Phases IV & V – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase VI – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase I – Architectural Coating Air Compressors 1 6.00 78 0.48 Phase II – Building Construction Cranes 1 7.00 226 0.29 Phase III – Building Construction Cranes 1 7.00 226 0.29 Phases IV & V – Building Construction Cranes 1 7.00 226 0.29 Phase VI – Building Construction Cranes 1 7.00 226 0.29 Phase I – Building Construction Cranes 1 7.00 226 0.29 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 14 of 109 Phase II – Grading Excavators 2 8.00 162 0.38 Phase III – Grading Excavators 2 8.00 162 0.38 Offsite Construction – Grading Excavators 2 8.00 162 0.38 Phases IV & V – Grading Excavators 2 8.00 162 0.38 Phase VI – Grading Excavators 2 8.00 162 0.38 Phase I, III, IV – Grading Excavators 2 8.00 162 0.38 Phase II – Building Construction Forklifts 3 8.00 89 0.20 Phase III – Building Construction Forklifts 3 8.00 89 0.20 Phases IV & V – Building Construction Forklifts 3 8.00 89 0.20 Phase VI – Building Construction Forklifts 3 8.00 89 0.20 Phase I – Building Construction Forklifts 3 8.00 89 0.20 Phase II – Building Construction Generator Sets 1 8.00 84 0.74 Phase III – Building Construction Generator Sets 1 8.00 84 0.74 Phases IV & V – Building Construction Generator Sets 1 8.00 84 0.74 Phase VI – Building Construction Generator Sets 1 8.00 84 0.74 Phase I – Building Construction Generator Sets 1 8.00 84 0.74 Phase II – Grading Graders 1 8.00 174 0.41 Phase III – Grading Graders 1 8.00 174 0.41 Offsite Construction – Grading Graders 1 8.00 174 0.41 Phases IV & V – Grading Graders 1 8.00 174 0.41 Phase VI – Grading Graders 1 8.00 174 0.41 Phase I, III, IV – Grading Graders 1 8.00 174 0.41 Phase II – Paving Pavers 2 8.00 125 0.42 Phase III – Paving Pavers 2 8.00 125 0.42 Phases IV & V – Paving Pavers 2 8.00 125 0.42 Phase VI – Paving Pavers 2 8.00 125 0.42 Offsite Construction – Paving Pavers 2 8.00 125 0.42 Phase I – Paving Pavers 2 8.00 125 0.42 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 15 of 109 Phase II – Paving Paving Equipment 2 8.00 130 0.36 Phase III – Paving Paving Equipment 2 8.00 130 0.36 Phases IV & V – Paving Paving Equipment 2 8.00 130 0.36 Phase VI – Paving Paving Equipment 2 8.00 130 0.36 Offsite Construction – Paving Paving Equipment 2 8.00 130 0.36 Phase I – Paving Paving Equipment 2 8.00 130 0.36 Phase II – Paving Rollers 2 8.00 80 0.38 Phase III – Paving Rollers 2 8.00 80 0.38 Phases IV & V – Paving Rollers 2 8.00 80 0.38 Phase VI – Paving Rollers 2 8.00 80 0.38 Offsite Construction – Paving Rollers 2 8.00 80 0.38 Phase I – Paving Rollers 2 8.00 80 0.38 Phase II – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase III – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phases IV & V – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase VI – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase I, III, IV – Grading Rubber Tired Dozers 1 8.00 255 0.40 Phase III – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phases IV & V – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase VI – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase I – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase II – Site Preparation Rubber Tired Dozers 3 8.00 255 0.40 Phase II – Grading Scrapers 2 8.00 361 0.48 Phase III – Grading Scrapers 2 8.00 361 0.48 Offsite Construction – Grading Scrapers 2 8.00 361 0.48 Phases IV & V – Grading Scrapers 2 8.00 361 0.48 Phase VI – Grading Scrapers 2 8.00 361 0.48 Phase I, III, IV – Grading Scrapers 2 8.00 361 0.48 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 16 of 109 Phase II – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase III – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phases IV & V – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase VI – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase I – Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase II – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase III – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phases IV & V – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase VI – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Phase I, III, IV – Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Offsite Construction – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase III – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phases IV & V – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase VI – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase II – Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase II – Building Construction Welders 1 8.00 46 0.45 Phase III – Building Construction Welders 1 8.00 46 0.45 Phases IV & V – Building Construction Welders 1 8.00 46 0.45 Phase VI – Building Construction Welders 1 8.00 46 0.45 Phase I – Building Construction Welders 1 8.00 46 0.45 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Offsite Construction – Site Preparation 10 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Offsite Construction – Grading 12 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Offsite Construction – Paving 14 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Site Preparation 12 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 17 of 109 3.1 Mitigation Measures Construction Phase I, III, IV – Grading 14 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Building Construction 10 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Architectural Coating 1 279.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Building Construction 9 1,393.00 475.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Grading 8 20.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase I – Paving 6 15.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase III – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phases IV & V – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase VI – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT Phase II – Site Preparation 7 18.00 0.00 0.00 13.00 5.00 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 18 of 109 3.2 Offsite Construction – Site Preparation - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.3613 0.0000 0.3613 0.1986 0.0000 0.1986 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1276 1.2987 1.2005 1.5700e- 003 0.0681 0.0681 0.0632 0.0632 0.0000 140.4159 140.4159 0.0405 0.0000 141.2655 Total 0.1276 1.2987 1.2005 1.5700e- 003 0.3613 0.0681 0.4294 0.1986 0.0632 0.2618 0.0000 140.4159 140.4159 0.0405 0.0000 141.2655 Unmitigated Construction On-Site Use Cleaner Engines for Construction Equipment Water Exposed Area Reduce Vehicle Speed on Unpaved Roads Clean Paved Roads CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 19 of 109 3.2 Offsite Construction – Site Preparation - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2800e- 003 2.2000e- 003 0.0186 5.0000e- 005 4.3300e- 003 3.0000e- 005 4.3600e- 003 1.1500e- 003 3.0000e- 005 1.1800e- 003 0.0000 3.2922 3.2922 1.6000e- 004 0.0000 3.2956 Total 1.2800e- 003 2.2000e- 003 0.0186 5.0000e- 005 4.3300e- 003 3.0000e- 005 4.3600e- 003 1.1500e- 003 3.0000e- 005 1.1800e- 003 0.0000 3.2922 3.2922 1.6000e- 004 0.0000 3.2956 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1626 0.0000 0.1626 0.0894 0.0000 0.0894 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0562 1.3648 1.0390 1.5700e- 003 0.0426 0.0426 0.0426 0.0426 0.0000 140.4157 140.4157 0.0405 0.0000 141.2653 Total 0.0562 1.3648 1.0390 1.5700e- 003 0.1626 0.0426 0.2052 0.0894 0.0426 0.1320 0.0000 140.4157 140.4157 0.0405 0.0000 141.2653 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 20 of 109 3.2 Offsite Construction – Site Preparation - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2800e- 003 2.2000e- 003 0.0186 5.0000e- 005 4.3300e- 003 3.0000e- 005 4.3600e- 003 1.1500e- 003 3.0000e- 005 1.1800e- 003 0.0000 3.2922 3.2922 1.6000e- 004 0.0000 3.2956 Total 1.2800e- 003 2.2000e- 003 0.0186 5.0000e- 005 4.3300e- 003 3.0000e- 005 4.3600e- 003 1.1500e- 003 3.0000e- 005 1.1800e- 003 0.0000 3.2922 3.2922 1.6000e- 004 0.0000 3.2956 Mitigated Construction Off-Site 3.3 Offsite Construction – Grading - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 1.4001 0.0000 1.4001 0.7696 0.0000 0.7696 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.5747 6.2756 4.8019 6.6400e- 003 0.2972 0.2972 0.2734 0.2734 0.0000 596.9588 596.9588 0.1889 0.0000 600.9251 Total 0.5747 6.2756 4.8019 6.6400e- 003 1.4001 0.2972 1.6973 0.7696 0.2734 1.0430 0.0000 596.9588 596.9588 0.1889 0.0000 600.9251 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 21 of 109 3.3 Offsite Construction – Grading - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.9500e- 003 6.8300e- 003 0.0578 1.5000e- 004 0.0134 9.0000e- 005 0.0135 3.5700e- 003 8.0000e- 005 3.6500e- 003 0.0000 10.2058 10.2058 5.0000e- 004 0.0000 10.2163 Total 3.9500e- 003 6.8300e- 003 0.0578 1.5000e- 004 0.0134 9.0000e- 005 0.0135 3.5700e- 003 8.0000e- 005 3.6500e- 003 0.0000 10.2058 10.2058 5.0000e- 004 0.0000 10.2163 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.6301 0.0000 0.6301 0.3463 0.0000 0.3463 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2027 5.5716 4.0286 6.6400e- 003 0.1502 0.1502 0.1502 0.1502 0.0000 596.9581 596.9581 0.1889 0.0000 600.9244 Total 0.2027 5.5716 4.0286 6.6400e- 003 0.6301 0.1502 0.7803 0.3463 0.1502 0.4965 0.0000 596.9581 596.9581 0.1889 0.0000 600.9244 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 22 of 109 3.3 Offsite Construction – Grading - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.9500e- 003 6.8300e- 003 0.0578 1.5000e- 004 0.0134 9.0000e- 005 0.0135 3.5700e- 003 8.0000e- 005 3.6500e- 003 0.0000 10.2058 10.2058 5.0000e- 004 0.0000 10.2163 Total 3.9500e- 003 6.8300e- 003 0.0578 1.5000e- 004 0.0134 9.0000e- 005 0.0135 3.5700e- 003 8.0000e- 005 3.6500e- 003 0.0000 10.2058 10.2058 5.0000e- 004 0.0000 10.2163 Mitigated Construction Off-Site 3.4 Offsite Construction – Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1453 1.5901 1.2570 1.9300e- 003 0.0762 0.0762 0.0701 0.0701 0.0000 173.6048 173.6048 0.0549 0.0000 174.7583 Paving 0.0472 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.1925 1.5901 1.2570 1.9300e- 003 0.0762 0.0762 0.0701 0.0701 0.0000 173.6048 173.6048 0.0549 0.0000 174.7583 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 23 of 109 3.4 Offsite Construction – Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.3000e- 003 2.2500e- 003 0.0191 5.0000e- 005 4.4300e- 003 3.0000e- 005 4.4600e- 003 1.1800e- 003 3.0000e- 005 1.2000e- 003 0.0000 3.3653 3.3653 1.7000e- 004 0.0000 3.3688 Total 1.3000e- 003 2.2500e- 003 0.0191 5.0000e- 005 4.4300e- 003 3.0000e- 005 4.4600e- 003 1.1800e- 003 3.0000e- 005 1.2000e- 003 0.0000 3.3653 3.3653 1.7000e- 004 0.0000 3.3688 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0645 1.6249 1.2620 1.9300e- 003 0.0468 0.0468 0.0468 0.0468 0.0000 173.6046 173.6046 0.0549 0.0000 174.7581 Paving 0.0472 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.1117 1.6249 1.2620 1.9300e- 003 0.0468 0.0468 0.0468 0.0468 0.0000 173.6046 173.6046 0.0549 0.0000 174.7581 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 24 of 109 3.4 Offsite Construction – Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.3000e- 003 2.2500e- 003 0.0191 5.0000e- 005 4.4300e- 003 3.0000e- 005 4.4600e- 003 1.1800e- 003 3.0000e- 005 1.2000e- 003 0.0000 3.3653 3.3653 1.7000e- 004 0.0000 3.3688 Total 1.3000e- 003 2.2500e- 003 0.0191 5.0000e- 005 4.4300e- 003 3.0000e- 005 4.4600e- 003 1.1800e- 003 3.0000e- 005 1.2000e- 003 0.0000 3.3653 3.3653 1.7000e- 004 0.0000 3.3688 Mitigated Construction Off-Site 3.5 Phase I – Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1355 0.0000 0.1355 0.0745 0.0000 0.0745 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0375 0.3715 0.3046 4.0000e- 004 0.0188 0.0188 0.0175 0.0175 0.0000 34.9154 34.9154 9.9100e- 003 0.0000 35.1236 Total 0.0375 0.3715 0.3046 4.0000e- 004 0.1355 0.0188 0.1543 0.0745 0.0175 0.0920 0.0000 34.9154 34.9154 9.9100e- 003 0.0000 35.1236 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 25 of 109 3.5 Phase I – Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0362 0.1881 0.4383 6.0000e- 004 0.0159 2.5800e- 003 0.0184 4.5400e- 003 2.3700e- 003 6.9100e- 003 0.0000 50.8093 50.8093 4.0000e- 004 0.0000 50.8178 Worker 0.0267 0.0465 0.3898 1.1300e- 003 0.1006 6.7000e- 004 0.1013 0.0267 6.2000e- 004 0.0274 0.0000 73.3579 73.3579 3.5100e- 003 0.0000 73.4316 Total 0.0630 0.2346 0.8281 1.7300e- 003 0.1165 3.2500e- 003 0.1197 0.0313 2.9900e- 003 0.0343 0.0000 124.1672 124.1672 3.9100e- 003 0.0000 124.2494 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0610 0.0000 0.0610 0.0335 0.0000 0.0335 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0129 0.3439 0.2389 4.0000e- 004 0.0103 0.0103 0.0103 0.0103 0.0000 34.9154 34.9154 9.9100e- 003 0.0000 35.1235 Total 0.0129 0.3439 0.2389 4.0000e- 004 0.0610 0.0103 0.0713 0.0335 0.0103 0.0438 0.0000 34.9154 34.9154 9.9100e- 003 0.0000 35.1235 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 26 of 109 3.5 Phase I – Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0362 0.1881 0.4383 6.0000e- 004 0.0159 2.5800e- 003 0.0184 4.5400e- 003 2.3700e- 003 6.9100e- 003 0.0000 50.8093 50.8093 4.0000e- 004 0.0000 50.8178 Worker 0.0267 0.0465 0.3898 1.1300e- 003 0.1006 6.7000e- 004 0.1013 0.0267 6.2000e- 004 0.0274 0.0000 73.3579 73.3579 3.5100e- 003 0.0000 73.4316 Total 0.0630 0.2346 0.8281 1.7300e- 003 0.1165 3.2500e- 003 0.1197 0.0313 2.9900e- 003 0.0343 0.0000 124.1672 124.1672 3.9100e- 003 0.0000 124.2494 Mitigated Construction Off-Site 3.6 Phase I, III, IV – Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.5421 0.0000 0.5421 0.2248 0.0000 0.2248 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.3675 3.9480 3.2986 5.2500e- 003 0.1876 0.1876 0.1726 0.1726 0.0000 461.4433 461.4433 0.1492 0.0000 464.5773 Total 0.3675 3.9480 3.2986 5.2500e- 003 0.5421 0.1876 0.7296 0.2248 0.1726 0.3973 0.0000 461.4433 461.4433 0.1492 0.0000 464.5773 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 27 of 109 3.6 Phase I, III, IV – Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e- 003 4.1700e- 003 0.0350 1.0000e- 004 9.0300e- 003 6.0000e- 005 9.0900e- 003 2.4000e- 003 6.0000e- 005 2.4500e- 003 0.0000 6.5827 6.5827 3.1000e- 004 0.0000 6.5893 Total 2.4000e- 003 4.1700e- 003 0.0350 1.0000e- 004 9.0300e- 003 6.0000e- 005 9.0900e- 003 2.4000e- 003 6.0000e- 005 2.4500e- 003 0.0000 6.5827 6.5827 3.1000e- 004 0.0000 6.5893 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.2439 0.0000 0.2439 0.1012 0.0000 0.1012 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1753 4.4154 3.4294 5.2500e- 003 0.1270 0.1270 0.1270 0.1270 0.0000 461.4427 461.4427 0.1492 0.0000 464.5768 Total 0.1753 4.4154 3.4294 5.2500e- 003 0.2439 0.1270 0.3710 0.1012 0.1270 0.2282 0.0000 461.4427 461.4427 0.1492 0.0000 464.5768 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 28 of 109 3.6 Phase I, III, IV – Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e- 003 4.1700e- 003 0.0350 1.0000e- 004 9.0300e- 003 6.0000e- 005 9.0900e- 003 2.4000e- 003 6.0000e- 005 2.4500e- 003 0.0000 6.5827 6.5827 3.1000e- 004 0.0000 6.5893 Total 2.4000e- 003 4.1700e- 003 0.0350 1.0000e- 004 9.0300e- 003 6.0000e- 005 9.0900e- 003 2.4000e- 003 6.0000e- 005 2.4500e- 003 0.0000 6.5827 6.5827 3.1000e- 004 0.0000 6.5893 Mitigated Construction Off-Site 3.7 Phase I – Building Construction - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1436 1.2668 1.1370 1.8200e- 003 0.0747 0.0747 0.0706 0.0706 0.0000 156.2713 156.2713 0.0355 0.0000 157.0165 Total 0.1436 1.2668 1.1370 1.8200e- 003 0.0747 0.0747 0.0706 0.0706 0.0000 156.2713 156.2713 0.0355 0.0000 157.0165 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 29 of 109 3.7 Phase I – Building Construction - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0435 0.0757 0.6350 1.8400e- 003 0.1638 1.1000e- 003 0.1649 0.0435 1.0200e- 003 0.0446 0.0000 119.5002 119.5002 5.7200e- 003 0.0000 119.6202 Total 0.0435 0.0757 0.6350 1.8400e- 003 0.1638 1.1000e- 003 0.1649 0.0435 1.0200e- 003 0.0446 0.0000 119.5002 119.5002 5.7200e- 003 0.0000 119.6202 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0727 1.5747 1.1985 1.8200e- 003 0.0608 0.0608 0.0608 0.0608 0.0000 156.2711 156.2711 0.0355 0.0000 157.0163 Total 0.0727 1.5747 1.1985 1.8200e- 003 0.0608 0.0608 0.0608 0.0608 0.0000 156.2711 156.2711 0.0355 0.0000 157.0163 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 30 of 109 3.7 Phase I – Building Construction - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0435 0.0757 0.6350 1.8400e- 003 0.1638 1.1000e- 003 0.1649 0.0435 1.0200e- 003 0.0446 0.0000 119.5002 119.5002 5.7200e- 003 0.0000 119.6202 Total 0.0435 0.0757 0.6350 1.8400e- 003 0.1638 1.1000e- 003 0.1649 0.0435 1.0200e- 003 0.0446 0.0000 119.5002 119.5002 5.7200e- 003 0.0000 119.6202 Mitigated Construction Off-Site 3.7 Phase I – Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.2756 2.4622 2.3954 3.8900e- 003 0.1369 0.1369 0.1295 0.1295 0.0000 334.3538 334.3538 0.0748 0.0000 335.9248 Total 0.2756 2.4622 2.3954 3.8900e- 003 0.1369 0.1369 0.1295 0.1295 0.0000 334.3538 334.3538 0.0748 0.0000 335.9248 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 31 of 109 3.7 Phase I – Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0868 0.1497 1.2556 3.9300e- 003 0.3505 2.3300e- 003 0.3529 0.0932 2.1600e- 003 0.0953 0.0000 251.2339 251.2339 0.0116 0.0000 251.4767 Total 0.0868 0.1497 1.2556 3.9300e- 003 0.3505 2.3300e- 003 0.3529 0.0932 2.1600e- 003 0.0953 0.0000 251.2339 251.2339 0.0116 0.0000 251.4767 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1556 3.3687 2.5641 3.8900e- 003 0.1301 0.1301 0.1301 0.1301 0.0000 334.3534 334.3534 0.0748 0.0000 335.9244 Total 0.1556 3.3687 2.5641 3.8900e- 003 0.1301 0.1301 0.1301 0.1301 0.0000 334.3534 334.3534 0.0748 0.0000 335.9244 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 32 of 109 3.7 Phase I – Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0868 0.1497 1.2556 3.9300e- 003 0.3505 2.3300e- 003 0.3529 0.0932 2.1600e- 003 0.0953 0.0000 251.2339 251.2339 0.0116 0.0000 251.4767 Total 0.0868 0.1497 1.2556 3.9300e- 003 0.3505 2.3300e- 003 0.3529 0.0932 2.1600e- 003 0.0953 0.0000 251.2339 251.2339 0.0116 0.0000 251.4767 Mitigated Construction Off-Site 3.7 Phase I – Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.2475 2.2028 2.3584 3.8700e- 003 0.1154 0.1154 0.1092 0.1092 0.0000 333.1869 333.1869 0.0739 0.0000 334.7394 Total 0.2475 2.2028 2.3584 3.8700e- 003 0.1154 0.1154 0.1092 0.1092 0.0000 333.1869 333.1869 0.0739 0.0000 334.7394 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 33 of 109 3.7 Phase I – Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0813 0.1390 1.1652 3.9200e- 003 0.3492 2.3200e- 003 0.3515 0.0928 2.1500e- 003 0.0949 0.0000 246.2840 246.2840 0.0110 0.0000 246.5144 Total 0.0813 0.1390 1.1652 3.9200e- 003 0.3492 2.3200e- 003 0.3515 0.0928 2.1500e- 003 0.0949 0.0000 246.2840 246.2840 0.0110 0.0000 246.5144 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1550 3.3558 2.5542 3.8700e- 003 0.1296 0.1296 0.1296 0.1296 0.0000 333.1865 333.1865 0.0739 0.0000 334.7390 Total 0.1550 3.3558 2.5542 3.8700e- 003 0.1296 0.1296 0.1296 0.1296 0.0000 333.1865 333.1865 0.0739 0.0000 334.7390 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 34 of 109 3.7 Phase I – Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0813 0.1390 1.1652 3.9200e- 003 0.3492 2.3200e- 003 0.3515 0.0928 2.1500e- 003 0.0949 0.0000 246.2840 246.2840 0.0110 0.0000 246.5144 Total 0.0813 0.1390 1.1652 3.9200e- 003 0.3492 2.3200e- 003 0.3515 0.0928 2.1500e- 003 0.0949 0.0000 246.2840 246.2840 0.0110 0.0000 246.5144 Mitigated Construction Off-Site 3.7 Phase I – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0193 0.1718 0.1982 3.3000e- 004 8.4400e- 003 8.4400e- 003 7.9900e- 003 7.9900e- 003 0.0000 28.2015 28.2015 6.2000e- 003 0.0000 28.3317 Total 0.0193 0.1718 0.1982 3.3000e- 004 8.4400e- 003 8.4400e- 003 7.9900e- 003 7.9900e- 003 0.0000 28.2015 28.2015 6.2000e- 003 0.0000 28.3317 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 35 of 109 3.7 Phase I – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.4700e- 003 0.0110 0.0917 3.3000e- 004 0.0296 2.0000e- 004 0.0297 7.8500e- 003 1.8000e- 004 8.0300e- 003 0.0000 20.5320 20.5320 8.9000e- 004 0.0000 20.5507 Total 6.4700e- 003 0.0110 0.0917 3.3000e- 004 0.0296 2.0000e- 004 0.0297 7.8500e- 003 1.8000e- 004 8.0300e- 003 0.0000 20.5320 20.5320 8.9000e- 004 0.0000 20.5507 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0131 0.2840 0.2161 3.3000e- 004 0.0110 0.0110 0.0110 0.0110 0.0000 28.2015 28.2015 6.2000e- 003 0.0000 28.3316 Total 0.0131 0.2840 0.2161 3.3000e- 004 0.0110 0.0110 0.0110 0.0110 0.0000 28.2015 28.2015 6.2000e- 003 0.0000 28.3316 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 36 of 109 3.7 Phase I – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.4700e- 003 0.0110 0.0917 3.3000e- 004 0.0296 2.0000e- 004 0.0297 7.8500e- 003 1.8000e- 004 8.0300e- 003 0.0000 20.5320 20.5320 8.9000e- 004 0.0000 20.5507 Total 6.4700e- 003 0.0110 0.0917 3.3000e- 004 0.0296 2.0000e- 004 0.0297 7.8500e- 003 1.8000e- 004 8.0300e- 003 0.0000 20.5320 20.5320 8.9000e- 004 0.0000 20.5507 Mitigated Construction Off-Site 3.8 Phase I – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 7.6000e- 003 0.0750 0.1071 1.7000e- 004 3.7600e- 003 3.7600e- 003 3.4600e- 003 3.4600e- 003 0.0000 14.7006 14.7006 4.7500e- 003 0.0000 14.8004 Paving 0.0472 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0548 0.0750 0.1071 1.7000e- 004 3.7600e- 003 3.7600e- 003 3.4600e- 003 3.4600e- 003 0.0000 14.7006 14.7006 4.7500e- 003 0.0000 14.8004 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 37 of 109 3.8 Phase I – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e- 004 4.0000e- 004 3.3600e- 003 1.0000e- 005 1.0800e- 003 1.0000e- 005 1.0900e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.7526 0.7526 3.0000e- 005 0.0000 0.7533 Total 2.4000e- 004 4.0000e- 004 3.3600e- 003 1.0000e- 005 1.0800e- 003 1.0000e- 005 1.0900e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.7526 0.7526 3.0000e- 005 0.0000 0.7533 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 6.8400e- 003 0.1478 0.1270 1.7000e- 004 4.9100e- 003 4.9100e- 003 4.9100e- 003 4.9100e- 003 0.0000 14.7006 14.7006 4.7500e- 003 0.0000 14.8004 Paving 0.0472 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0540 0.1478 0.1270 1.7000e- 004 4.9100e- 003 4.9100e- 003 4.9100e- 003 4.9100e- 003 0.0000 14.7006 14.7006 4.7500e- 003 0.0000 14.8004 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 38 of 109 3.8 Phase I – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e- 004 4.0000e- 004 3.3600e- 003 1.0000e- 005 1.0800e- 003 1.0000e- 005 1.0900e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.7526 0.7526 3.0000e- 005 0.0000 0.7533 Total 2.4000e- 004 4.0000e- 004 3.3600e- 003 1.0000e- 005 1.0800e- 003 1.0000e- 005 1.0900e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.7526 0.7526 3.0000e- 005 0.0000 0.7533 Mitigated Construction Off-Site 3.9 Phase I – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 7.4455 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 5.2700e- 003 0.0358 0.0498 8.0000e- 005 1.9500e- 003 1.9500e- 003 1.9500e- 003 1.9500e- 003 0.0000 7.0215 7.0215 4.2000e- 004 0.0000 7.0303 Total 7.4508 0.0358 0.0498 8.0000e- 005 1.9500e- 003 1.9500e- 003 1.9500e- 003 1.9500e- 003 0.0000 7.0215 7.0215 4.2000e- 004 0.0000 7.0303 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 39 of 109 3.9 Phase I – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0162 0.0275 0.2293 8.3000e- 004 0.0739 4.9000e- 004 0.0744 0.0196 4.5000e- 004 0.0201 0.0000 51.3301 51.3301 2.2200e- 003 0.0000 51.3766 Total 0.0162 0.0275 0.2293 8.3000e- 004 0.0739 4.9000e- 004 0.0744 0.0196 4.5000e- 004 0.0201 0.0000 51.3301 51.3301 2.2200e- 003 0.0000 51.3766 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 7.4455 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 3.1300e- 003 0.0647 0.0504 8.0000e- 005 2.6100e- 003 2.6100e- 003 2.6100e- 003 2.6100e- 003 0.0000 7.0214 7.0214 4.2000e- 004 0.0000 7.0303 Total 7.4486 0.0647 0.0504 8.0000e- 005 2.6100e- 003 2.6100e- 003 2.6100e- 003 2.6100e- 003 0.0000 7.0214 7.0214 4.2000e- 004 0.0000 7.0303 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 40 of 109 3.9 Phase I – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0162 0.0275 0.2293 8.3000e- 004 0.0739 4.9000e- 004 0.0744 0.0196 4.5000e- 004 0.0201 0.0000 51.3301 51.3301 2.2200e- 003 0.0000 51.3766 Total 0.0162 0.0275 0.2293 8.3000e- 004 0.0739 4.9000e- 004 0.0744 0.0196 4.5000e- 004 0.0201 0.0000 51.3301 51.3301 2.2200e- 003 0.0000 51.3766 Mitigated Construction Off-Site 3.10 Phase II – Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1355 0.0000 0.1355 0.0745 0.0000 0.0745 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0226 0.2245 0.2161 2.9000e- 004 0.0104 0.0104 9.6000e- 003 9.6000e- 003 0.0000 25.8136 25.8136 8.3500e- 003 0.0000 25.9890 Total 0.0226 0.2245 0.2161 2.9000e- 004 0.1355 0.0104 0.1459 0.0745 9.6000e- 003 0.0841 0.0000 25.8136 25.8136 8.3500e- 003 0.0000 25.9890 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 41 of 109 3.10 Phase II – Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.8000e- 004 4.8000e- 004 4.0300e- 003 1.0000e- 005 1.3000e- 003 1.0000e- 005 1.3100e- 003 3.5000e- 004 1.0000e- 005 3.5000e- 004 0.0000 0.9032 0.9032 4.0000e- 005 0.0000 0.9040 Total 2.8000e- 004 4.8000e- 004 4.0300e- 003 1.0000e- 005 1.3000e- 003 1.0000e- 005 1.3100e- 003 3.5000e- 004 1.0000e- 005 3.5000e- 004 0.0000 0.9032 0.9032 4.0000e- 005 0.0000 0.9040 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0610 0.0000 0.0610 0.0335 0.0000 0.0335 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 9.2200e- 003 0.2582 0.1755 2.9000e- 004 7.2100e- 003 7.2100e- 003 7.2100e- 003 7.2100e- 003 0.0000 25.8136 25.8136 8.3500e- 003 0.0000 25.9889 Total 9.2200e- 003 0.2582 0.1755 2.9000e- 004 0.0610 7.2100e- 003 0.0682 0.0335 7.2100e- 003 0.0407 0.0000 25.8136 25.8136 8.3500e- 003 0.0000 25.9889 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 42 of 109 3.10 Phase II – Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.8000e- 004 4.8000e- 004 4.0300e- 003 1.0000e- 005 1.3000e- 003 1.0000e- 005 1.3100e- 003 3.5000e- 004 1.0000e- 005 3.5000e- 004 0.0000 0.9032 0.9032 4.0000e- 005 0.0000 0.9040 Total 2.8000e- 004 4.8000e- 004 4.0300e- 003 1.0000e- 005 1.3000e- 003 1.0000e- 005 1.3100e- 003 3.5000e- 004 1.0000e- 005 3.5000e- 004 0.0000 0.9032 0.9032 4.0000e- 005 0.0000 0.9040 Mitigated Construction Off-Site 3.11 Phase II – Grading - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1301 0.0000 0.1301 0.0540 0.0000 0.0540 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0530 0.5241 0.5128 9.3000e- 004 0.0233 0.0233 0.0215 0.0215 0.0000 81.4484 81.4484 0.0263 0.0000 82.0016 Total 0.0530 0.5241 0.5128 9.3000e- 004 0.1301 0.0233 0.1534 0.0540 0.0215 0.0754 0.0000 81.4484 81.4484 0.0263 0.0000 82.0016 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 43 of 109 3.11 Phase II – Grading - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.3000e- 004 1.0700e- 003 8.9700e- 003 3.0000e- 005 2.8900e- 003 2.0000e- 005 2.9100e- 003 7.7000e- 004 2.0000e- 005 7.9000e- 004 0.0000 2.0070 2.0070 9.0000e- 005 0.0000 2.0089 Total 6.3000e- 004 1.0700e- 003 8.9700e- 003 3.0000e- 005 2.8900e- 003 2.0000e- 005 2.9100e- 003 7.7000e- 004 2.0000e- 005 7.9000e- 004 0.0000 2.0070 2.0070 9.0000e- 005 0.0000 2.0089 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0586 0.0000 0.0586 0.0243 0.0000 0.0243 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0284 0.7642 0.5692 9.3000e- 004 0.0207 0.0207 0.0207 0.0207 0.0000 81.4483 81.4483 0.0263 0.0000 82.0015 Total 0.0284 0.7642 0.5692 9.3000e- 004 0.0586 0.0207 0.0792 0.0243 0.0207 0.0450 0.0000 81.4483 81.4483 0.0263 0.0000 82.0015 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 44 of 109 3.11 Phase II – Grading - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.3000e- 004 1.0700e- 003 8.9700e- 003 3.0000e- 005 2.8900e- 003 2.0000e- 005 2.9100e- 003 7.7000e- 004 2.0000e- 005 7.9000e- 004 0.0000 2.0070 2.0070 9.0000e- 005 0.0000 2.0089 Total 6.3000e- 004 1.0700e- 003 8.9700e- 003 3.0000e- 005 2.8900e- 003 2.0000e- 005 2.9100e- 003 7.7000e- 004 2.0000e- 005 7.9000e- 004 0.0000 2.0070 2.0070 9.0000e- 005 0.0000 2.0089 Mitigated Construction Off-Site 3.12 Phase II – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0783 0.7156 0.8105 1.3400e- 003 0.0348 0.0348 0.0328 0.0328 0.0000 115.4223 115.4223 0.0274 0.0000 115.9980 Total 0.0783 0.7156 0.8105 1.3400e- 003 0.0348 0.0348 0.0328 0.0328 0.0000 115.4223 115.4223 0.0274 0.0000 115.9980 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 45 of 109 3.12 Phase II – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2063 0.7678 2.5225 3.9800e- 003 0.1058 0.0138 0.1196 0.0303 0.0127 0.0430 0.0000 336.8968 336.8968 2.5800e- 003 0.0000 336.9510 Worker 0.1467 0.2493 2.0817 7.5200e- 003 0.6705 4.4400e- 003 0.6750 0.1782 4.1200e- 003 0.1823 0.0000 465.9680 465.9680 0.0201 0.0000 466.3906 Total 0.3530 1.0170 4.6041 0.0115 0.7763 0.0182 0.7946 0.2085 0.0168 0.2253 0.0000 802.8648 802.8648 0.0227 0.0000 803.3416 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0539 1.1731 0.8908 1.3400e- 003 0.0451 0.0451 0.0451 0.0451 0.0000 115.4222 115.4222 0.0274 0.0000 115.9979 Total 0.0539 1.1731 0.8908 1.3400e- 003 0.0451 0.0451 0.0451 0.0451 0.0000 115.4222 115.4222 0.0274 0.0000 115.9979 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 46 of 109 3.12 Phase II – Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2063 0.7678 2.5225 3.9800e- 003 0.1058 0.0138 0.1196 0.0303 0.0127 0.0430 0.0000 336.8968 336.8968 2.5800e- 003 0.0000 336.9510 Worker 0.1467 0.2493 2.0817 7.5200e- 003 0.6705 4.4400e- 003 0.6750 0.1782 4.1200e- 003 0.1823 0.0000 465.9680 465.9680 0.0201 0.0000 466.3906 Total 0.3530 1.0170 4.6041 0.0115 0.7763 0.0182 0.7946 0.2085 0.0168 0.2253 0.0000 802.8648 802.8648 0.0227 0.0000 803.3416 Mitigated Construction Off-Site 3.13 Phase II – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 7.6000e- 003 0.0750 0.1071 1.7000e- 004 3.7600e- 003 3.7600e- 003 3.4600e- 003 3.4600e- 003 0.0000 14.7006 14.7006 4.7500e- 003 0.0000 14.8004 Paving 0.0472 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0548 0.0750 0.1071 1.7000e- 004 3.7600e- 003 3.7600e- 003 3.4600e- 003 3.4600e- 003 0.0000 14.7006 14.7006 4.7500e- 003 0.0000 14.8004 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 47 of 109 3.13 Phase II – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e- 004 4.0000e- 004 3.3600e- 003 1.0000e- 005 1.0800e- 003 1.0000e- 005 1.0900e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.7526 0.7526 3.0000e- 005 0.0000 0.7533 Total 2.4000e- 004 4.0000e- 004 3.3600e- 003 1.0000e- 005 1.0800e- 003 1.0000e- 005 1.0900e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.7526 0.7526 3.0000e- 005 0.0000 0.7533 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 6.8400e- 003 0.1478 0.1270 1.7000e- 004 4.9100e- 003 4.9100e- 003 4.9100e- 003 4.9100e- 003 0.0000 14.7006 14.7006 4.7500e- 003 0.0000 14.8004 Paving 0.0472 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0540 0.1478 0.1270 1.7000e- 004 4.9100e- 003 4.9100e- 003 4.9100e- 003 4.9100e- 003 0.0000 14.7006 14.7006 4.7500e- 003 0.0000 14.8004 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 48 of 109 3.13 Phase II – Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e- 004 4.0000e- 004 3.3600e- 003 1.0000e- 005 1.0800e- 003 1.0000e- 005 1.0900e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.7526 0.7526 3.0000e- 005 0.0000 0.7533 Total 2.4000e- 004 4.0000e- 004 3.3600e- 003 1.0000e- 005 1.0800e- 003 1.0000e- 005 1.0900e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.7526 0.7526 3.0000e- 005 0.0000 0.7533 Mitigated Construction Off-Site 3.14 Phase II – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 2.9782 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 7.7000e- 004 5.2100e- 003 7.2400e- 003 1.0000e- 005 2.8000e- 004 2.8000e- 004 2.8000e- 004 2.8000e- 004 0.0000 1.0213 1.0213 6.0000e- 005 0.0000 1.0226 Total 2.9790 5.2100e- 003 7.2400e- 003 1.0000e- 005 2.8000e- 004 2.8000e- 004 2.8000e- 004 2.8000e- 004 0.0000 1.0213 1.0213 6.0000e- 005 0.0000 1.0226 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 49 of 109 3.14 Phase II – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.3500e- 003 3.9900e- 003 0.0334 1.2000e- 004 0.0107 7.0000e- 005 0.0108 2.8600e- 003 7.0000e- 005 2.9200e- 003 0.0000 7.4662 7.4662 3.2000e- 004 0.0000 7.4730 Total 2.3500e- 003 3.9900e- 003 0.0334 1.2000e- 004 0.0107 7.0000e- 005 0.0108 2.8600e- 003 7.0000e- 005 2.9200e- 003 0.0000 7.4662 7.4662 3.2000e- 004 0.0000 7.4730 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 2.9782 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 4.6000e- 004 9.4100e- 003 7.3300e- 003 1.0000e- 005 3.8000e- 004 3.8000e- 004 3.8000e- 004 3.8000e- 004 0.0000 1.0213 1.0213 6.0000e- 005 0.0000 1.0226 Total 2.9787 9.4100e- 003 7.3300e- 003 1.0000e- 005 3.8000e- 004 3.8000e- 004 3.8000e- 004 3.8000e- 004 0.0000 1.0213 1.0213 6.0000e- 005 0.0000 1.0226 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 50 of 109 3.14 Phase II – Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.3500e- 003 3.9900e- 003 0.0334 1.2000e- 004 0.0107 7.0000e- 005 0.0108 2.8600e- 003 7.0000e- 005 2.9200e- 003 0.0000 7.4662 7.4662 3.2000e- 004 0.0000 7.4730 Total 2.3500e- 003 3.9900e- 003 0.0334 1.2000e- 004 0.0107 7.0000e- 005 0.0108 2.8600e- 003 7.0000e- 005 2.9200e- 003 0.0000 7.4662 7.4662 3.2000e- 004 0.0000 7.4730 Mitigated Construction Off-Site 3.14 Phase II – Architectural Coating - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 4.4673 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.0800e- 003 7.3100e- 003 0.0109 2.0000e- 005 3.7000e- 004 3.7000e- 004 3.7000e- 004 3.7000e- 004 0.0000 1.5320 1.5320 9.0000e- 005 0.0000 1.5338 Total 4.4684 7.3100e- 003 0.0109 2.0000e- 005 3.7000e- 004 3.7000e- 004 3.7000e- 004 3.7000e- 004 0.0000 1.5320 1.5320 9.0000e- 005 0.0000 1.5338 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 51 of 109 3.14 Phase II – Architectural Coating - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.3300e- 003 5.6200e- 003 0.0470 1.8000e- 004 0.0161 1.1000e- 004 0.0162 4.2800e- 003 1.0000e- 004 4.3800e- 003 0.0000 11.0483 11.0483 4.6000e- 004 0.0000 11.0581 Total 3.3300e- 003 5.6200e- 003 0.0470 1.8000e- 004 0.0161 1.1000e- 004 0.0162 4.2800e- 003 1.0000e- 004 4.3800e- 003 0.0000 11.0483 11.0483 4.6000e- 004 0.0000 11.0581 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 4.4673 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 6.8000e- 004 0.0141 0.0110 2.0000e- 005 5.7000e- 004 5.7000e- 004 5.7000e- 004 5.7000e- 004 0.0000 1.5320 1.5320 9.0000e- 005 0.0000 1.5338 Total 4.4680 0.0141 0.0110 2.0000e- 005 5.7000e- 004 5.7000e- 004 5.7000e- 004 5.7000e- 004 0.0000 1.5320 1.5320 9.0000e- 005 0.0000 1.5338 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 52 of 109 3.14 Phase II – Architectural Coating - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.3300e- 003 5.6200e- 003 0.0470 1.8000e- 004 0.0161 1.1000e- 004 0.0162 4.2800e- 003 1.0000e- 004 4.3800e- 003 0.0000 11.0483 11.0483 4.6000e- 004 0.0000 11.0581 Total 3.3300e- 003 5.6200e- 003 0.0470 1.8000e- 004 0.0161 1.1000e- 004 0.0162 4.2800e- 003 1.0000e- 004 4.3800e- 003 0.0000 11.0483 11.0483 4.6000e- 004 0.0000 11.0581 Mitigated Construction Off-Site 3.15 Phase III – Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1807 0.0000 0.1807 0.0993 0.0000 0.0993 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0282 0.2755 0.2760 3.9000e- 004 0.0125 0.0125 0.0115 0.0115 0.0000 34.4215 34.4215 0.0111 0.0000 34.6552 Total 0.0282 0.2755 0.2760 3.9000e- 004 0.1807 0.0125 0.1932 0.0993 0.0115 0.1108 0.0000 34.4215 34.4215 0.0111 0.0000 34.6552 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 53 of 109 3.15 Phase III – Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.6000e- 004 6.0000e- 004 5.0500e- 003 2.0000e- 005 1.7300e- 003 1.0000e- 005 1.7400e- 003 4.6000e- 004 1.0000e- 005 4.7000e- 004 0.0000 1.1880 1.1880 5.0000e- 005 0.0000 1.1890 Total 3.6000e- 004 6.0000e- 004 5.0500e- 003 2.0000e- 005 1.7300e- 003 1.0000e- 005 1.7400e- 003 4.6000e- 004 1.0000e- 005 4.7000e- 004 0.0000 1.1880 1.1880 5.0000e- 005 0.0000 1.1890 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0813 0.0000 0.0813 0.0447 0.0000 0.0447 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0123 0.3442 0.2340 3.9000e- 004 9.6100e- 003 9.6100e- 003 9.6100e- 003 9.6100e- 003 0.0000 34.4214 34.4214 0.0111 0.0000 34.6552 Total 0.0123 0.3442 0.2340 3.9000e- 004 0.0813 9.6100e- 003 0.0909 0.0447 9.6100e- 003 0.0543 0.0000 34.4214 34.4214 0.0111 0.0000 34.6552 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 54 of 109 3.15 Phase III – Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.6000e- 004 6.0000e- 004 5.0500e- 003 2.0000e- 005 1.7300e- 003 1.0000e- 005 1.7400e- 003 4.6000e- 004 1.0000e- 005 4.7000e- 004 0.0000 1.1880 1.1880 5.0000e- 005 0.0000 1.1890 Total 3.6000e- 004 6.0000e- 004 5.0500e- 003 2.0000e- 005 1.7300e- 003 1.0000e- 005 1.7400e- 003 4.6000e- 004 1.0000e- 005 4.7000e- 004 0.0000 1.1880 1.1880 5.0000e- 005 0.0000 1.1890 Mitigated Construction Off-Site 3.16 Phase III – Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1518 0.0000 0.1518 0.0629 0.0000 0.0629 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0588 0.5634 0.5853 1.0800e- 003 0.0249 0.0249 0.0229 0.0229 0.0000 95.0008 95.0008 0.0307 0.0000 95.6460 Total 0.0588 0.5634 0.5853 1.0800e- 003 0.1518 0.0249 0.1767 0.0629 0.0229 0.0859 0.0000 95.0008 95.0008 0.0307 0.0000 95.6460 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 55 of 109 3.16 Phase III – Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.0000e- 004 1.1800e- 003 9.8300e- 003 4.0000e- 005 3.3700e- 003 2.0000e- 005 3.3900e- 003 9.0000e- 004 2.0000e- 005 9.2000e- 004 0.0000 2.3100 2.3100 1.0000e- 004 0.0000 2.3120 Total 7.0000e- 004 1.1800e- 003 9.8300e- 003 4.0000e- 005 3.3700e- 003 2.0000e- 005 3.3900e- 003 9.0000e- 004 2.0000e- 005 9.2000e- 004 0.0000 2.3100 2.3100 1.0000e- 004 0.0000 2.3120 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0683 0.0000 0.0683 0.0283 0.0000 0.0283 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0331 0.8916 0.6640 1.0800e- 003 0.0241 0.0241 0.0241 0.0241 0.0000 95.0007 95.0007 0.0307 0.0000 95.6459 Total 0.0331 0.8916 0.6640 1.0800e- 003 0.0683 0.0241 0.0924 0.0283 0.0241 0.0524 0.0000 95.0007 95.0007 0.0307 0.0000 95.6459 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 56 of 109 3.16 Phase III – Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.0000e- 004 1.1800e- 003 9.8300e- 003 4.0000e- 005 3.3700e- 003 2.0000e- 005 3.3900e- 003 9.0000e- 004 2.0000e- 005 9.2000e- 004 0.0000 2.3100 2.3100 1.0000e- 004 0.0000 2.3120 Total 7.0000e- 004 1.1800e- 003 9.8300e- 003 4.0000e- 005 3.3700e- 003 2.0000e- 005 3.3900e- 003 9.0000e- 004 2.0000e- 005 9.2000e- 004 0.0000 2.3100 2.3100 1.0000e- 004 0.0000 2.3120 Mitigated Construction Off-Site 3.17 Phase III – Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1429 1.3043 1.5730 2.6200e- 003 0.0595 0.0595 0.0560 0.0560 0.0000 225.1168 225.1168 0.0532 0.0000 226.2330 Total 0.1429 1.3043 1.5730 2.6200e- 003 0.0595 0.0595 0.0560 0.0560 0.0000 225.1168 225.1168 0.0532 0.0000 226.2330 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 57 of 109 3.17 Phase III – Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.4019 1.4814 4.8218 7.7600e- 003 0.2063 0.0270 0.2333 0.0591 0.0249 0.0840 0.0000 656.9772 656.9772 5.0600e- 003 0.0000 657.0834 Worker 0.2700 0.4563 3.8130 0.0147 1.3075 8.6500e- 003 1.3162 0.3475 8.0300e- 003 0.3555 0.0000 896.3886 896.3886 0.0376 0.0000 897.1790 Total 0.6719 1.9378 8.6348 0.0224 1.5138 0.0357 1.5495 0.4066 0.0329 0.4395 0.0000 1,553.365 8 1,553.365 8 0.0427 0.0000 1,554.262 4 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1051 2.2875 1.7370 2.6200e- 003 0.0879 0.0879 0.0879 0.0879 0.0000 225.1165 225.1165 0.0532 0.0000 226.2327 Total 0.1051 2.2875 1.7370 2.6200e- 003 0.0879 0.0879 0.0879 0.0879 0.0000 225.1165 225.1165 0.0532 0.0000 226.2327 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 58 of 109 3.17 Phase III – Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.4019 1.4814 4.8218 7.7600e- 003 0.2063 0.0270 0.2333 0.0591 0.0249 0.0840 0.0000 656.9772 656.9772 5.0600e- 003 0.0000 657.0834 Worker 0.2700 0.4563 3.8130 0.0147 1.3075 8.6500e- 003 1.3162 0.3475 8.0300e- 003 0.3555 0.0000 896.3886 896.3886 0.0376 0.0000 897.1790 Total 0.6719 1.9378 8.6348 0.0224 1.5138 0.0357 1.5495 0.4066 0.0329 0.4395 0.0000 1,553.365 8 1,553.365 8 0.0427 0.0000 1,554.262 4 Mitigated Construction Off-Site 3.17 Phase III – Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0987 0.8997 1.1638 1.9500e- 003 0.0381 0.0381 0.0358 0.0358 0.0000 167.4455 167.4455 0.0393 0.0000 168.2708 Total 0.0987 0.8997 1.1638 1.9500e- 003 0.0381 0.0381 0.0358 0.0358 0.0000 167.4455 167.4455 0.0393 0.0000 168.2708 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 59 of 109 3.17 Phase III – Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2915 1.0913 3.5334 5.7700e- 003 0.1534 0.0202 0.1736 0.0439 0.0186 0.0625 0.0000 488.5545 488.5545 3.7700e- 003 0.0000 488.6337 Worker 0.1911 0.3210 2.6894 0.0109 0.9723 6.4600e- 003 0.9787 0.2584 5.9900e- 003 0.2644 0.0000 658.5210 658.5210 0.0270 0.0000 659.0882 Total 0.4826 1.4122 6.2228 0.0167 1.1257 0.0266 1.1523 0.3023 0.0246 0.3269 0.0000 1,147.075 5 1,147.075 5 0.0308 0.0000 1,147.721 9 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0782 1.7010 1.2916 1.9500e- 003 0.0654 0.0654 0.0654 0.0654 0.0000 167.4453 167.4453 0.0393 0.0000 168.2706 Total 0.0782 1.7010 1.2916 1.9500e- 003 0.0654 0.0654 0.0654 0.0654 0.0000 167.4453 167.4453 0.0393 0.0000 168.2706 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 60 of 109 3.17 Phase III – Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2915 1.0913 3.5334 5.7700e- 003 0.1534 0.0202 0.1736 0.0439 0.0186 0.0625 0.0000 488.5545 488.5545 3.7700e- 003 0.0000 488.6337 Worker 0.1911 0.3210 2.6894 0.0109 0.9723 6.4600e- 003 0.9787 0.2584 5.9900e- 003 0.2644 0.0000 658.5210 658.5210 0.0270 0.0000 659.0882 Total 0.4826 1.4122 6.2228 0.0167 1.1257 0.0266 1.1523 0.3023 0.0246 0.3269 0.0000 1,147.075 5 1,147.075 5 0.0308 0.0000 1,147.721 9 Mitigated Construction Off-Site 3.18 Phase III – Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 7.4455 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.7100e- 003 0.0115 0.0181 3.0000e- 005 5.2000e- 004 5.2000e- 004 5.2000e- 004 5.2000e- 004 0.0000 2.5533 2.5533 1.4000e- 004 0.0000 2.5562 Total 7.4472 0.0115 0.0181 3.0000e- 005 5.2000e- 004 5.2000e- 004 5.2000e- 004 5.2000e- 004 0.0000 2.5533 2.5533 1.4000e- 004 0.0000 2.5562 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 61 of 109 3.18 Phase III – Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 5.2800e- 003 8.8700e- 003 0.0743 3.0000e- 004 0.0269 1.8000e- 004 0.0270 7.1400e- 003 1.7000e- 004 7.3000e- 003 0.0000 18.1922 18.1922 7.5000e- 004 0.0000 18.2079 Total 5.2800e- 003 8.8700e- 003 0.0743 3.0000e- 004 0.0269 1.8000e- 004 0.0270 7.1400e- 003 1.7000e- 004 7.3000e- 003 0.0000 18.1922 18.1922 7.5000e- 004 0.0000 18.2079 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 7.4455 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.1400e- 003 0.0235 0.0183 3.0000e- 005 9.5000e- 004 9.5000e- 004 9.5000e- 004 9.5000e- 004 0.0000 2.5533 2.5533 1.4000e- 004 0.0000 2.5562 Total 7.4467 0.0235 0.0183 3.0000e- 005 9.5000e- 004 9.5000e- 004 9.5000e- 004 9.5000e- 004 0.0000 2.5533 2.5533 1.4000e- 004 0.0000 2.5562 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 62 of 109 3.18 Phase III – Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 5.2800e- 003 8.8700e- 003 0.0743 3.0000e- 004 0.0269 1.8000e- 004 0.0270 7.1400e- 003 1.7000e- 004 7.3000e- 003 0.0000 18.1922 18.1922 7.5000e- 004 0.0000 18.2079 Total 5.2800e- 003 8.8700e- 003 0.0743 3.0000e- 004 0.0269 1.8000e- 004 0.0270 7.1400e- 003 1.7000e- 004 7.3000e- 003 0.0000 18.1922 18.1922 7.5000e- 004 0.0000 18.2079 Mitigated Construction Off-Site 3.19 Phase III – Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 8.9700e- 003 0.0842 0.1428 2.2000e- 004 4.1100e- 003 4.1100e- 003 3.7800e- 003 3.7800e- 003 0.0000 19.5934 19.5934 6.3400e- 003 0.0000 19.7264 Paving 0.0472 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0562 0.0842 0.1428 2.2000e- 004 4.1100e- 003 4.1100e- 003 3.7800e- 003 3.7800e- 003 0.0000 19.5934 19.5934 6.3400e- 003 0.0000 19.7264 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 63 of 109 3.19 Phase III – Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.8000e- 004 4.8000e- 004 3.9900e- 003 2.0000e- 005 1.4400e- 003 1.0000e- 005 1.4500e- 003 3.8000e- 004 1.0000e- 005 3.9000e- 004 0.0000 0.9781 0.9781 4.0000e- 005 0.0000 0.9789 Total 2.8000e- 004 4.8000e- 004 3.9900e- 003 2.0000e- 005 1.4400e- 003 1.0000e- 005 1.4500e- 003 3.8000e- 004 1.0000e- 005 3.9000e- 004 0.0000 0.9781 0.9781 4.0000e- 005 0.0000 0.9789 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 9.1200e- 003 0.1970 0.1693 2.2000e- 004 6.5400e- 003 6.5400e- 003 6.5400e- 003 6.5400e- 003 0.0000 19.5933 19.5933 6.3400e- 003 0.0000 19.7264 Paving 0.0472 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0563 0.1970 0.1693 2.2000e- 004 6.5400e- 003 6.5400e- 003 6.5400e- 003 6.5400e- 003 0.0000 19.5933 19.5933 6.3400e- 003 0.0000 19.7264 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 64 of 109 3.19 Phase III – Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.8000e- 004 4.8000e- 004 3.9900e- 003 2.0000e- 005 1.4400e- 003 1.0000e- 005 1.4500e- 003 3.8000e- 004 1.0000e- 005 3.9000e- 004 0.0000 0.9781 0.9781 4.0000e- 005 0.0000 0.9789 Total 2.8000e- 004 4.8000e- 004 3.9900e- 003 2.0000e- 005 1.4400e- 003 1.0000e- 005 1.4500e- 003 3.8000e- 004 1.0000e- 005 3.9000e- 004 0.0000 0.9781 0.9781 4.0000e- 005 0.0000 0.9789 Mitigated Construction Off-Site 3.20 Phases IV & V – Site Preparation - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.3613 0.0000 0.3613 0.1986 0.0000 0.1986 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0502 0.4705 0.4978 7.8000e- 004 0.0206 0.0206 0.0189 0.0189 0.0000 68.8343 68.8343 0.0223 0.0000 69.3018 Total 0.0502 0.4705 0.4978 7.8000e- 004 0.3613 0.0206 0.3819 0.1986 0.0189 0.2176 0.0000 68.8343 68.8343 0.0223 0.0000 69.3018 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 65 of 109 3.20 Phases IV & V – Site Preparation - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.8000e- 004 1.1400e- 003 9.5900e- 003 4.0000e- 005 3.4700e- 003 2.0000e- 005 3.4900e- 003 9.2000e- 004 2.0000e- 005 9.4000e- 004 0.0000 2.3474 2.3474 1.0000e- 004 0.0000 2.3494 Total 6.8000e- 004 1.1400e- 003 9.5900e- 003 4.0000e- 005 3.4700e- 003 2.0000e- 005 3.4900e- 003 9.2000e- 004 2.0000e- 005 9.4000e- 004 0.0000 2.3474 2.3474 1.0000e- 004 0.0000 2.3494 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1626 0.0000 0.1626 0.0894 0.0000 0.0894 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0246 0.6885 0.4680 7.8000e- 004 0.0192 0.0192 0.0192 0.0192 0.0000 68.8342 68.8342 0.0223 0.0000 69.3017 Total 0.0246 0.6885 0.4680 7.8000e- 004 0.1626 0.0192 0.1818 0.0894 0.0192 0.1086 0.0000 68.8342 68.8342 0.0223 0.0000 69.3017 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 66 of 109 3.20 Phases IV & V – Site Preparation - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.8000e- 004 1.1400e- 003 9.5900e- 003 4.0000e- 005 3.4700e- 003 2.0000e- 005 3.4900e- 003 9.2000e- 004 2.0000e- 005 9.4000e- 004 0.0000 2.3474 2.3474 1.0000e- 004 0.0000 2.3494 Total 6.8000e- 004 1.1400e- 003 9.5900e- 003 4.0000e- 005 3.4700e- 003 2.0000e- 005 3.4900e- 003 9.2000e- 004 2.0000e- 005 9.4000e- 004 0.0000 2.3474 2.3474 1.0000e- 004 0.0000 2.3494 Mitigated Construction Off-Site 3.21 Phases IV & V – Grading - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.5855 0.0000 0.5855 0.2428 0.0000 0.2428 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0540 0.4907 0.5643 1.1100e- 003 0.0214 0.0214 0.0197 0.0197 0.0000 97.6878 97.6878 0.0316 0.0000 98.3513 Total 0.0540 0.4907 0.5643 1.1100e- 003 0.5855 0.0214 0.6068 0.2428 0.0197 0.2624 0.0000 97.6878 97.6878 0.0316 0.0000 98.3513 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 67 of 109 3.21 Phases IV & V – Grading - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.8000e- 004 1.1400e- 003 9.5900e- 003 4.0000e- 005 3.4700e- 003 2.0000e- 005 3.4900e- 003 9.2000e- 004 2.0000e- 005 9.4000e- 004 0.0000 2.3474 2.3474 1.0000e- 004 0.0000 2.3494 Total 6.8000e- 004 1.1400e- 003 9.5900e- 003 4.0000e- 005 3.4700e- 003 2.0000e- 005 3.4900e- 003 9.2000e- 004 2.0000e- 005 9.4000e- 004 0.0000 2.3474 2.3474 1.0000e- 004 0.0000 2.3494 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.2635 0.0000 0.2635 0.1092 0.0000 0.1092 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0341 0.9170 0.6830 1.1100e- 003 0.0248 0.0248 0.0248 0.0248 0.0000 97.6877 97.6877 0.0316 0.0000 98.3511 Total 0.0341 0.9170 0.6830 1.1100e- 003 0.2635 0.0248 0.2883 0.1092 0.0248 0.1341 0.0000 97.6877 97.6877 0.0316 0.0000 98.3511 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 68 of 109 3.21 Phases IV & V – Grading - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.8000e- 004 1.1400e- 003 9.5900e- 003 4.0000e- 005 3.4700e- 003 2.0000e- 005 3.4900e- 003 9.2000e- 004 2.0000e- 005 9.4000e- 004 0.0000 2.3474 2.3474 1.0000e- 004 0.0000 2.3494 Total 6.8000e- 004 1.1400e- 003 9.5900e- 003 4.0000e- 005 3.4700e- 003 2.0000e- 005 3.4900e- 003 9.2000e- 004 2.0000e- 005 9.4000e- 004 0.0000 2.3474 2.3474 1.0000e- 004 0.0000 2.3494 Mitigated Construction Off-Site 3.21 Phases IV & V – Grading - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.5855 0.0000 0.5855 0.2428 0.0000 0.2428 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1486 1.3494 1.5519 3.0600e- 003 0.0587 0.0587 0.0540 0.0540 0.0000 268.6414 268.6414 0.0869 0.0000 270.4660 Total 0.1486 1.3494 1.5519 3.0600e- 003 0.5855 0.0587 0.6442 0.2428 0.0540 0.2968 0.0000 268.6414 268.6414 0.0869 0.0000 270.4660 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 69 of 109 3.21 Phases IV & V – Grading - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.7900e- 003 2.9900e- 003 0.0252 1.1000e- 004 9.5300e- 003 6.0000e- 005 9.5900e- 003 2.5300e- 003 6.0000e- 005 2.5900e- 003 0.0000 6.3872 6.3872 2.6000e- 004 0.0000 6.3925 Total 1.7900e- 003 2.9900e- 003 0.0252 1.1000e- 004 9.5300e- 003 6.0000e- 005 9.5900e- 003 2.5300e- 003 6.0000e- 005 2.5900e- 003 0.0000 6.3872 6.3872 2.6000e- 004 0.0000 6.3925 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.2635 0.0000 0.2635 0.1092 0.0000 0.1092 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0937 2.5219 1.8782 3.0600e- 003 0.0682 0.0682 0.0682 0.0682 0.0000 268.6411 268.6411 0.0869 0.0000 270.4656 Total 0.0937 2.5219 1.8782 3.0600e- 003 0.2635 0.0682 0.3317 0.1092 0.0682 0.1775 0.0000 268.6411 268.6411 0.0869 0.0000 270.4656 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 70 of 109 3.21 Phases IV & V – Grading - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.7900e- 003 2.9900e- 003 0.0252 1.1000e- 004 9.5300e- 003 6.0000e- 005 9.5900e- 003 2.5300e- 003 6.0000e- 005 2.5900e- 003 0.0000 6.3872 6.3872 2.6000e- 004 0.0000 6.3925 Total 1.7900e- 003 2.9900e- 003 0.0252 1.1000e- 004 9.5300e- 003 6.0000e- 005 9.5900e- 003 2.5300e- 003 6.0000e- 005 2.5900e- 003 0.0000 6.3872 6.3872 2.6000e- 004 0.0000 6.3925 Mitigated Construction Off-Site 3.22 Phases IV & V – Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1103 1.0052 1.3002 2.1700e- 003 0.0425 0.0425 0.0400 0.0400 0.0000 187.0770 187.0770 0.0439 0.0000 187.9991 Total 0.1103 1.0052 1.3002 2.1700e- 003 0.0425 0.0425 0.0400 0.0400 0.0000 187.0770 187.0770 0.0439 0.0000 187.9991 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 71 of 109 3.22 Phases IV & V – Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.3283 1.2040 3.8774 6.4500e- 003 0.1714 0.0224 0.1938 0.0491 0.0206 0.0697 0.0000 545.9004 545.9004 4.2000e- 003 0.0000 545.9886 Worker 0.2039 0.3413 2.8669 0.0122 1.0863 7.2800e- 003 1.0935 0.2887 6.7500e- 003 0.2954 0.0000 727.9611 727.9611 0.0292 0.0000 728.5751 Total 0.5323 1.5453 6.7443 0.0186 1.2577 0.0297 1.2874 0.3378 0.0274 0.3651 0.0000 1,273.861 4 1,273.861 4 0.0334 0.0000 1,274.563 7 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0873 1.9004 1.4431 2.1700e- 003 0.0730 0.0730 0.0730 0.0730 0.0000 187.0768 187.0768 0.0439 0.0000 187.9989 Total 0.0873 1.9004 1.4431 2.1700e- 003 0.0730 0.0730 0.0730 0.0730 0.0000 187.0768 187.0768 0.0439 0.0000 187.9989 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 72 of 109 3.22 Phases IV & V – Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.3283 1.2040 3.8774 6.4500e- 003 0.1714 0.0224 0.1938 0.0491 0.0206 0.0697 0.0000 545.9004 545.9004 4.2000e- 003 0.0000 545.9886 Worker 0.2039 0.3413 2.8669 0.0122 1.0863 7.2800e- 003 1.0935 0.2887 6.7500e- 003 0.2954 0.0000 727.9611 727.9611 0.0292 0.0000 728.5751 Total 0.5323 1.5453 6.7443 0.0186 1.2577 0.0297 1.2874 0.3378 0.0274 0.3651 0.0000 1,273.861 4 1,273.861 4 0.0334 0.0000 1,274.563 7 Mitigated Construction Off-Site 3.22 Phases IV & V – Building Construction - 2027 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1777 1.6195 2.0948 3.5000e- 003 0.0685 0.0685 0.0645 0.0645 0.0000 301.4019 301.4019 0.0707 0.0000 302.8874 Total 0.1777 1.6195 2.0948 3.5000e- 003 0.0685 0.0685 0.0645 0.0645 0.0000 301.4019 301.4019 0.0707 0.0000 302.8874 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 73 of 109 3.22 Phases IV & V – Building Construction - 2027 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.4935 1.9182 5.8608 0.0104 0.2762 0.0362 0.3123 0.0791 0.0333 0.1124 0.0000 879.5792 879.5792 6.7800e- 003 0.0000 879.7216 Worker 0.3146 0.5247 4.4203 0.0196 1.7501 0.0118 1.7619 0.4651 0.0110 0.4760 0.0000 1,161.935 5 1,161.935 5 0.0458 0.0000 1,162.896 4 Total 0.8081 2.4428 10.2811 0.0300 2.0263 0.0480 2.0742 0.5442 0.0442 0.5884 0.0000 2,041.514 6 2,041.514 6 0.0525 0.0000 2,042.618 0 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1407 3.0617 2.3249 3.5000e- 003 0.1177 0.1177 0.1177 0.1177 0.0000 301.4015 301.4015 0.0707 0.0000 302.8871 Total 0.1407 3.0617 2.3249 3.5000e- 003 0.1177 0.1177 0.1177 0.1177 0.0000 301.4015 301.4015 0.0707 0.0000 302.8871 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 74 of 109 3.22 Phases IV & V – Building Construction - 2027 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.4935 1.9182 5.8608 0.0104 0.2762 0.0362 0.3123 0.0791 0.0333 0.1124 0.0000 879.5792 879.5792 6.7800e- 003 0.0000 879.7216 Worker 0.3146 0.5247 4.4203 0.0196 1.7501 0.0118 1.7619 0.4651 0.0110 0.4760 0.0000 1,161.935 5 1,161.935 5 0.0458 0.0000 1,162.896 4 Total 0.8081 2.4428 10.2811 0.0300 2.0263 0.0480 2.0742 0.5442 0.0442 0.5884 0.0000 2,041.514 6 2,041.514 6 0.0525 0.0000 2,042.618 0 Mitigated Construction Off-Site 3.22 Phases IV & V – Building Construction - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1375 1.2534 1.6212 2.7100e- 003 0.0530 0.0530 0.0499 0.0499 0.0000 233.2689 233.2689 0.0548 0.0000 234.4186 Total 0.1375 1.2534 1.6212 2.7100e- 003 0.0530 0.0530 0.0499 0.0499 0.0000 233.2689 233.2689 0.0548 0.0000 234.4186 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 75 of 109 3.22 Phases IV & V – Building Construction - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.3712 1.4697 4.2453 8.0300e- 003 0.2138 0.0280 0.2417 0.0612 0.0257 0.0869 0.0000 680.8110 680.8110 5.2500e- 003 0.0000 680.9213 Worker 0.2336 0.3883 3.2854 0.0152 1.3545 9.1900e- 003 1.3637 0.3600 8.5300e- 003 0.3685 0.0000 892.0110 892.0110 0.0345 0.0000 892.7350 Total 0.6048 1.8580 7.5306 0.0232 1.5682 0.0371 1.6054 0.4212 0.0342 0.4554 0.0000 1,572.822 0 1,572.822 0 0.0397 0.0000 1,573.656 2 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1089 2.3696 1.7994 2.7100e- 003 0.0911 0.0911 0.0911 0.0911 0.0000 233.2686 233.2686 0.0548 0.0000 234.4183 Total 0.1089 2.3696 1.7994 2.7100e- 003 0.0911 0.0911 0.0911 0.0911 0.0000 233.2686 233.2686 0.0548 0.0000 234.4183 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 76 of 109 3.22 Phases IV & V – Building Construction - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.3712 1.4697 4.2453 8.0300e- 003 0.2138 0.0280 0.2417 0.0612 0.0257 0.0869 0.0000 680.8110 680.8110 5.2500e- 003 0.0000 680.9213 Worker 0.2336 0.3883 3.2854 0.0152 1.3545 9.1900e- 003 1.3637 0.3600 8.5300e- 003 0.3685 0.0000 892.0110 892.0110 0.0345 0.0000 892.7350 Total 0.6048 1.8580 7.5306 0.0232 1.5682 0.0371 1.6054 0.4212 0.0342 0.4554 0.0000 1,572.822 0 1,572.822 0 0.0397 0.0000 1,573.656 2 Mitigated Construction Off-Site 3.23 Phases IV & V – Architectural Coating - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 7.4455 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 2.9900e- 003 0.0201 0.0317 5.0000e- 005 9.0000e- 004 9.0000e- 004 9.0000e- 004 9.0000e- 004 0.0000 4.4682 4.4682 2.4000e- 004 0.0000 4.4733 Total 7.4485 0.0201 0.0317 5.0000e- 005 9.0000e- 004 9.0000e- 004 9.0000e- 004 9.0000e- 004 0.0000 4.4682 4.4682 2.4000e- 004 0.0000 4.4733 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 77 of 109 3.23 Phases IV & V – Architectural Coating - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 8.1100e- 003 0.0135 0.1140 5.3000e- 004 0.0470 3.2000e- 004 0.0473 0.0125 3.0000e- 004 0.0128 0.0000 30.9557 30.9557 1.2000e- 003 0.0000 30.9808 Total 8.1100e- 003 0.0135 0.1140 5.3000e- 004 0.0470 3.2000e- 004 0.0473 0.0125 3.0000e- 004 0.0128 0.0000 30.9557 30.9557 1.2000e- 003 0.0000 30.9808 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 7.4455 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.9900e- 003 0.0412 0.0321 5.0000e- 005 1.6600e- 003 1.6600e- 003 1.6600e- 003 1.6600e- 003 0.0000 4.4682 4.4682 2.4000e- 004 0.0000 4.4733 Total 7.4475 0.0412 0.0321 5.0000e- 005 1.6600e- 003 1.6600e- 003 1.6600e- 003 1.6600e- 003 0.0000 4.4682 4.4682 2.4000e- 004 0.0000 4.4733 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 78 of 109 3.23 Phases IV & V – Architectural Coating - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 8.1100e- 003 0.0135 0.1140 5.3000e- 004 0.0470 3.2000e- 004 0.0473 0.0125 3.0000e- 004 0.0128 0.0000 30.9557 30.9557 1.2000e- 003 0.0000 30.9808 Total 8.1100e- 003 0.0135 0.1140 5.3000e- 004 0.0470 3.2000e- 004 0.0473 0.0125 3.0000e- 004 0.0128 0.0000 30.9557 30.9557 1.2000e- 003 0.0000 30.9808 Mitigated Construction Off-Site 3.24 Phases IV & V – Paving - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0103 0.0969 0.1642 2.6000e- 004 4.7300e- 003 4.7300e- 003 4.3500e- 003 4.3500e- 003 0.0000 22.5324 22.5324 7.2900e- 003 0.0000 22.6854 Paving 0.0362 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0465 0.0969 0.1642 2.6000e- 004 4.7300e- 003 4.7300e- 003 4.3500e- 003 4.3500e- 003 0.0000 22.5324 22.5324 7.2900e- 003 0.0000 22.6854 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 79 of 109 3.24 Phases IV & V – Paving - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.9000e- 004 4.8000e- 004 4.0300e- 003 2.0000e- 005 1.6600e- 003 1.0000e- 005 1.6700e- 003 4.4000e- 004 1.0000e- 005 4.5000e- 004 0.0000 1.0937 1.0937 4.0000e- 005 0.0000 1.0946 Total 2.9000e- 004 4.8000e- 004 4.0300e- 003 2.0000e- 005 1.6600e- 003 1.0000e- 005 1.6700e- 003 4.4000e- 004 1.0000e- 005 4.5000e- 004 0.0000 1.0937 1.0937 4.0000e- 005 0.0000 1.0946 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0105 0.2266 0.1947 2.6000e- 004 7.5200e- 003 7.5200e- 003 7.5200e- 003 7.5200e- 003 0.0000 22.5323 22.5323 7.2900e- 003 0.0000 22.6854 Paving 0.0362 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0467 0.2266 0.1947 2.6000e- 004 7.5200e- 003 7.5200e- 003 7.5200e- 003 7.5200e- 003 0.0000 22.5323 22.5323 7.2900e- 003 0.0000 22.6854 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 80 of 109 3.24 Phases IV & V – Paving - 2028 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.9000e- 004 4.8000e- 004 4.0300e- 003 2.0000e- 005 1.6600e- 003 1.0000e- 005 1.6700e- 003 4.4000e- 004 1.0000e- 005 4.5000e- 004 0.0000 1.0937 1.0937 4.0000e- 005 0.0000 1.0946 Total 2.9000e- 004 4.8000e- 004 4.0300e- 003 2.0000e- 005 1.6600e- 003 1.0000e- 005 1.6700e- 003 4.4000e- 004 1.0000e- 005 4.5000e- 004 0.0000 1.0937 1.0937 4.0000e- 005 0.0000 1.0946 Mitigated Construction Off-Site 3.24 Phases IV & V – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 3.1400e- 003 0.0295 0.0500 8.0000e- 005 1.4400e- 003 1.4400e- 003 1.3200e- 003 1.3200e- 003 0.0000 6.8577 6.8577 2.2200e- 003 0.0000 6.9043 Paving 0.0110 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0142 0.0295 0.0500 8.0000e- 005 1.4400e- 003 1.4400e- 003 1.3200e- 003 1.3200e- 003 0.0000 6.8577 6.8577 2.2200e- 003 0.0000 6.9043 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 81 of 109 3.24 Phases IV & V – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 8.0000e- 005 1.4000e- 004 1.1800e- 003 1.0000e- 005 5.1000e- 004 0.0000 5.1000e- 004 1.3000e- 004 0.0000 1.4000e- 004 0.0000 0.3305 0.3305 1.0000e- 005 0.0000 0.3308 Total 8.0000e- 005 1.4000e- 004 1.1800e- 003 1.0000e- 005 5.1000e- 004 0.0000 5.1000e- 004 1.3000e- 004 0.0000 1.4000e- 004 0.0000 0.3305 0.3305 1.0000e- 005 0.0000 0.3308 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 3.1900e- 003 0.0690 0.0593 8.0000e- 005 2.2900e- 003 2.2900e- 003 2.2900e- 003 2.2900e- 003 0.0000 6.8577 6.8577 2.2200e- 003 0.0000 6.9042 Paving 0.0110 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0142 0.0690 0.0593 8.0000e- 005 2.2900e- 003 2.2900e- 003 2.2900e- 003 2.2900e- 003 0.0000 6.8577 6.8577 2.2200e- 003 0.0000 6.9042 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 82 of 109 3.24 Phases IV & V – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 8.0000e- 005 1.4000e- 004 1.1800e- 003 1.0000e- 005 5.1000e- 004 0.0000 5.1000e- 004 1.3000e- 004 0.0000 1.4000e- 004 0.0000 0.3305 0.3305 1.0000e- 005 0.0000 0.3308 Total 8.0000e- 005 1.4000e- 004 1.1800e- 003 1.0000e- 005 5.1000e- 004 0.0000 5.1000e- 004 1.3000e- 004 0.0000 1.4000e- 004 0.0000 0.3305 0.3305 1.0000e- 005 0.0000 0.3308 Mitigated Construction Off-Site 3.25 Phase VI – Site Preparation - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0452 0.0000 0.0452 0.0248 0.0000 0.0248 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 6.2700e- 003 0.0588 0.0622 1.0000e- 004 2.5700e- 003 2.5700e- 003 2.3700e- 003 2.3700e- 003 0.0000 8.6043 8.6043 2.7800e- 003 0.0000 8.6627 Total 6.2700e- 003 0.0588 0.0622 1.0000e- 004 0.0452 2.5700e- 003 0.0477 0.0248 2.3700e- 003 0.0272 0.0000 8.6043 8.6043 2.7800e- 003 0.0000 8.6627 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 83 of 109 3.25 Phase VI – Site Preparation - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.0000e- 005 1.2000e- 004 1.0100e- 003 0.0000 4.3000e- 004 0.0000 4.4000e- 004 1.2000e- 004 0.0000 1.2000e- 004 0.0000 0.2833 0.2833 1.0000e- 005 0.0000 0.2835 Total 7.0000e- 005 1.2000e- 004 1.0100e- 003 0.0000 4.3000e- 004 0.0000 4.4000e- 004 1.2000e- 004 0.0000 1.2000e- 004 0.0000 0.2833 0.2833 1.0000e- 005 0.0000 0.2835 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0203 0.0000 0.0203 0.0112 0.0000 0.0112 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 3.0700e- 003 0.0861 0.0585 1.0000e- 004 2.4000e- 003 2.4000e- 003 2.4000e- 003 2.4000e- 003 0.0000 8.6043 8.6043 2.7800e- 003 0.0000 8.6627 Total 3.0700e- 003 0.0861 0.0585 1.0000e- 004 0.0203 2.4000e- 003 0.0227 0.0112 2.4000e- 003 0.0136 0.0000 8.6043 8.6043 2.7800e- 003 0.0000 8.6627 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 84 of 109 3.25 Phase VI – Site Preparation - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.0000e- 005 1.2000e- 004 1.0100e- 003 0.0000 4.3000e- 004 0.0000 4.4000e- 004 1.2000e- 004 0.0000 1.2000e- 004 0.0000 0.2833 0.2833 1.0000e- 005 0.0000 0.2835 Total 7.0000e- 005 1.2000e- 004 1.0100e- 003 0.0000 4.3000e- 004 0.0000 4.4000e- 004 1.2000e- 004 0.0000 1.2000e- 004 0.0000 0.2833 0.2833 1.0000e- 005 0.0000 0.2835 Mitigated Construction Off-Site 3.26 Phase VI – Grading - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0651 0.0000 0.0651 0.0270 0.0000 0.0270 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0225 0.2045 0.2351 4.6000e- 004 8.9000e- 003 8.9000e- 003 8.1900e- 003 8.1900e- 003 0.0000 40.7032 40.7032 0.0132 0.0000 40.9797 Total 0.0225 0.2045 0.2351 4.6000e- 004 0.0651 8.9000e- 003 0.0740 0.0270 8.1900e- 003 0.0352 0.0000 40.7032 40.7032 0.0132 0.0000 40.9797 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 85 of 109 3.26 Phase VI – Grading - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e- 004 4.0000e- 004 3.3600e- 003 2.0000e- 005 1.4400e- 003 1.0000e- 005 1.4500e- 003 3.8000e- 004 1.0000e- 005 3.9000e- 004 0.0000 0.9443 0.9443 4.0000e- 005 0.0000 0.9451 Total 2.4000e- 004 4.0000e- 004 3.3600e- 003 2.0000e- 005 1.4400e- 003 1.0000e- 005 1.4500e- 003 3.8000e- 004 1.0000e- 005 3.9000e- 004 0.0000 0.9443 0.9443 4.0000e- 005 0.0000 0.9451 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0293 0.0000 0.0293 0.0121 0.0000 0.0121 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0142 0.3821 0.2846 4.6000e- 004 0.0103 0.0103 0.0103 0.0103 0.0000 40.7032 40.7032 0.0132 0.0000 40.9796 Total 0.0142 0.3821 0.2846 4.6000e- 004 0.0293 0.0103 0.0396 0.0121 0.0103 0.0225 0.0000 40.7032 40.7032 0.0132 0.0000 40.9796 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 86 of 109 3.26 Phase VI – Grading - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e- 004 4.0000e- 004 3.3600e- 003 2.0000e- 005 1.4400e- 003 1.0000e- 005 1.4500e- 003 3.8000e- 004 1.0000e- 005 3.9000e- 004 0.0000 0.9443 0.9443 4.0000e- 005 0.0000 0.9451 Total 2.4000e- 004 4.0000e- 004 3.3600e- 003 2.0000e- 005 1.4400e- 003 1.0000e- 005 1.4500e- 003 3.8000e- 004 1.0000e- 005 3.9000e- 004 0.0000 0.9443 0.9443 4.0000e- 005 0.0000 0.9451 Mitigated Construction Off-Site 3.27 Phase VI – Building Construction - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1021 0.9307 1.2039 2.0100e- 003 0.0394 0.0394 0.0370 0.0370 0.0000 173.2195 173.2195 0.0407 0.0000 174.0732 Total 0.1021 0.9307 1.2039 2.0100e- 003 0.0394 0.0394 0.0370 0.0370 0.0000 173.2195 173.2195 0.0407 0.0000 174.0732 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 87 of 109 3.27 Phase VI – Building Construction - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2731 1.0876 3.1408 5.9600e- 003 0.1588 0.0208 0.1795 0.0455 0.0191 0.0646 0.0000 505.6291 505.6291 3.9000e- 003 0.0000 505.7110 Worker 0.1662 0.2756 2.3413 0.0113 1.0058 6.8600e- 003 1.0127 0.2673 6.3600e- 003 0.2737 0.0000 657.7247 657.7247 0.0249 0.0000 658.2480 Total 0.4392 1.3632 5.4820 0.0172 1.1646 0.0276 1.1922 0.3128 0.0255 0.3382 0.0000 1,163.353 8 1,163.353 8 0.0288 0.0000 1,163.959 0 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0809 1.7596 1.3362 2.0100e- 003 0.0676 0.0676 0.0676 0.0676 0.0000 173.2193 173.2193 0.0407 0.0000 174.0730 Total 0.0809 1.7596 1.3362 2.0100e- 003 0.0676 0.0676 0.0676 0.0676 0.0000 173.2193 173.2193 0.0407 0.0000 174.0730 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 88 of 109 3.27 Phase VI – Building Construction - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2731 1.0876 3.1408 5.9600e- 003 0.1588 0.0208 0.1795 0.0455 0.0191 0.0646 0.0000 505.6291 505.6291 3.9000e- 003 0.0000 505.7110 Worker 0.1662 0.2756 2.3413 0.0113 1.0058 6.8600e- 003 1.0127 0.2673 6.3600e- 003 0.2737 0.0000 657.7247 657.7247 0.0249 0.0000 658.2480 Total 0.4392 1.3632 5.4820 0.0172 1.1646 0.0276 1.1922 0.3128 0.0255 0.3382 0.0000 1,163.353 8 1,163.353 8 0.0288 0.0000 1,163.959 0 Mitigated Construction Off-Site 3.28 Phase VI – Architectural Coating - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 7.4455 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.5400e- 003 0.0103 0.0163 3.0000e- 005 4.6000e- 004 4.6000e- 004 4.6000e- 004 4.6000e- 004 0.0000 2.2979 2.2979 1.3000e- 004 0.0000 2.3006 Total 7.4471 0.0103 0.0163 3.0000e- 005 4.6000e- 004 4.6000e- 004 4.6000e- 004 4.6000e- 004 0.0000 2.2979 2.2979 1.3000e- 004 0.0000 2.3006 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 89 of 109 3.28 Phase VI – Architectural Coating - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.9900e- 003 6.6200e- 003 0.0563 2.7000e- 004 0.0242 1.6000e- 004 0.0243 6.4200e- 003 1.5000e- 004 6.5800e- 003 0.0000 15.8081 15.8081 6.0000e- 004 0.0000 15.8206 Total 3.9900e- 003 6.6200e- 003 0.0563 2.7000e- 004 0.0242 1.6000e- 004 0.0243 6.4200e- 003 1.5000e- 004 6.5800e- 003 0.0000 15.8081 15.8081 6.0000e- 004 0.0000 15.8206 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 7.4455 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.0300e- 003 0.0212 0.0165 3.0000e- 005 8.6000e- 004 8.6000e- 004 8.6000e- 004 8.6000e- 004 0.0000 2.2979 2.2979 1.3000e- 004 0.0000 2.3006 Total 7.4465 0.0212 0.0165 3.0000e- 005 8.6000e- 004 8.6000e- 004 8.6000e- 004 8.6000e- 004 0.0000 2.2979 2.2979 1.3000e- 004 0.0000 2.3006 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 90 of 109 3.28 Phase VI – Architectural Coating - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.9900e- 003 6.6200e- 003 0.0563 2.7000e- 004 0.0242 1.6000e- 004 0.0243 6.4200e- 003 1.5000e- 004 6.5800e- 003 0.0000 15.8081 15.8081 6.0000e- 004 0.0000 15.8206 Total 3.9900e- 003 6.6200e- 003 0.0563 2.7000e- 004 0.0242 1.6000e- 004 0.0243 6.4200e- 003 1.5000e- 004 6.5800e- 003 0.0000 15.8081 15.8081 6.0000e- 004 0.0000 15.8206 Mitigated Construction Off-Site 3.29 Phase VI – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 2.2400e- 003 0.0211 0.0357 6.0000e- 005 1.0300e- 003 1.0300e- 003 9.5000e- 004 9.5000e- 004 0.0000 4.8983 4.8983 1.5800e- 003 0.0000 4.9316 Paving 0.0472 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0494 0.0211 0.0357 6.0000e- 005 1.0300e- 003 1.0300e- 003 9.5000e- 004 9.5000e- 004 0.0000 4.8983 4.8983 1.5800e- 003 0.0000 4.9316 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 91 of 109 3.29 Phase VI – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.0000e- 005 1.0000e- 004 8.4000e- 004 0.0000 3.6000e- 004 0.0000 3.6000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.2361 0.2361 1.0000e- 005 0.0000 0.2363 Total 6.0000e- 005 1.0000e- 004 8.4000e- 004 0.0000 3.6000e- 004 0.0000 3.6000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.2361 0.2361 1.0000e- 005 0.0000 0.2363 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 2.2800e- 003 0.0493 0.0423 6.0000e- 005 1.6400e- 003 1.6400e- 003 1.6400e- 003 1.6400e- 003 0.0000 4.8983 4.8983 1.5800e- 003 0.0000 4.9316 Paving 0.0472 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0495 0.0493 0.0423 6.0000e- 005 1.6400e- 003 1.6400e- 003 1.6400e- 003 1.6400e- 003 0.0000 4.8983 4.8983 1.5800e- 003 0.0000 4.9316 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 92 of 109 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile Increase Density Improve Walkability Design Increase Transit Accessibility Improve Pedestrian Network Expand Transit Network 3.29 Phase VI – Paving - 2029 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.0000e- 005 1.0000e- 004 8.4000e- 004 0.0000 3.6000e- 004 0.0000 3.6000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.2361 0.2361 1.0000e- 005 0.0000 0.2363 Total 6.0000e- 005 1.0000e- 004 8.4000e- 004 0.0000 3.6000e- 004 0.0000 3.6000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.2361 0.2361 1.0000e- 005 0.0000 0.2363 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 93 of 109 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 2.5989 4.6767 21.7900 0.0718 4.9988 0.0902 5.0890 1.3396 0.0833 1.4229 0.0000 4,751.236 5 4,751.236 5 0.1334 0.0000 4,754.038 4 Unmitigated 2.7440 5.3839 24.4339 0.0859 6.0219 0.1061 6.1280 1.6138 0.0979 1.7117 0.0000 5,683.456 0 5,683.456 0 0.1575 0.0000 5,686.763 2 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Mid Rise 823.75 895.00 758.75 2,095,877 1,739,787 City Park 30.34 30.34 30.34 61,654 51,179 Condo/Townhouse 1,298.23 1,410.52 1195.79 3,303,102 2,741,904 Other Asphalt Surfaces 0.00 0.00 0.00 Parking Lot 0.00 0.00 0.00 Regional Shopping Center 644.10 749.55 378.60 897,003 744,602 Single Family Housing 966.57 1,018.08 885.77 2,445,958 2,030,389 Single Family Housing 2,842.29 2,993.76 2604.69 7,192,571 5,970,551 Total 6,605.28 7,097.25 5,853.94 15,996,165 13,278,411 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 94 of 109 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Mid Rise 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 City Park 13.00 5.00 5.00 33.00 48.00 19.00 66 28 6 Condo/Townhouse 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 Other Asphalt Surfaces 13.00 5.00 5.00 0.00 0.00 0.00 0 0 0 Parking Lot 13.00 5.00 5.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 13.00 5.00 5.00 16.30 64.70 19.00 54 35 11 Single Family Housing 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 Single Family Housing 13.00 5.00 5.00 35.80 21.00 43.20 86 11 3 5.0 Energy Detail 5.1 Mitigation Measures Energy Exceed Title 24 Install High Efficiency Lighting Percent of Electricity Use Generated with Renewable Energy 4.4 Fleet Mix LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH 0.457871 0.042296 0.214250 0.146969 0.067525 0.009931 0.017760 0.024978 0.002423 0.001427 0.009102 0.000742 0.004726 Historical Energy Use: N CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 95 of 109 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Electricity Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 955.8829 955.8829 0.0432 8.9400e- 003 959.5627 Electricity Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 1,408.065 8 1,408.065 8 0.0637 0.0132 1,413.486 4 NaturalGas Mitigated 0.0808 0.6905 0.2944 4.4100e- 003 0.0558 0.0558 0.0558 0.0558 0.0000 799.5845 799.5845 0.0153 0.0147 804.4506 NaturalGas Unmitigated 0.1021 0.8725 0.3720 5.5700e- 003 0.0705 0.0705 0.0705 0.0705 0.0000 1,010.306 0 1,010.306 0 0.0194 0.0185 1,016.454 5 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 96 of 109 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Mid Rise 1.01595e +006 5.4800e- 003 0.0468 0.0199 3.0000e- 004 3.7800e- 003 3.7800e- 003 3.7800e- 003 3.7800e- 003 0.0000 54.2151 54.2151 1.0400e- 003 9.9000e- 004 54.5450 City Park 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 3.8365e +006 0.0207 0.1768 0.0752 1.1300e- 003 0.0143 0.0143 0.0143 0.0143 0.0000 204.7302 204.7302 3.9200e- 003 3.7500e- 003 205.9761 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 37350 2.0000e- 004 1.8300e- 003 1.5400e- 003 1.0000e- 005 1.4000e- 004 1.4000e- 004 1.4000e- 004 1.4000e- 004 0.0000 1.9931 1.9931 4.0000e- 005 4.0000e- 005 2.0053 Single Family Housing 1.0479e +007 0.0565 0.4829 0.2055 3.0800e- 003 0.0390 0.0390 0.0390 0.0390 0.0000 559.2014 559.2014 0.0107 0.0103 562.6046 Single Family Housing 3.56358e +006 0.0192 0.1642 0.0699 1.0500e- 003 0.0133 0.0133 0.0133 0.0133 0.0000 190.1661 190.1661 3.6400e- 003 3.4900e- 003 191.3235 Total 0.1021 0.8725 0.3720 5.5700e- 003 0.0705 0.0705 0.0705 0.0705 0.0000 1,010.306 0 1,010.306 0 0.0194 0.0185 1,016.454 5 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 97 of 109 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Mid Rise 816214 4.4000e- 003 0.0376 0.0160 2.4000e- 004 3.0400e- 003 3.0400e- 003 3.0400e- 003 3.0400e- 003 0.0000 43.5563 43.5563 8.3000e- 004 8.0000e- 004 43.8214 City Park 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 3.02271e +006 0.0163 0.1393 0.0593 8.9000e- 004 0.0113 0.0113 0.0113 0.0113 0.0000 161.3033 161.3033 3.0900e- 003 2.9600e- 003 162.2850 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 28012.5 1.5000e- 004 1.3700e- 003 1.1500e- 003 1.0000e- 005 1.0000e- 004 1.0000e- 004 1.0000e- 004 1.0000e- 004 0.0000 1.4949 1.4949 3.0000e- 005 3.0000e- 005 1.5040 Single Family Housing 2.82107e +006 0.0152 0.1300 0.0553 8.3000e- 004 0.0105 0.0105 0.0105 0.0105 0.0000 150.5433 150.5433 2.8900e- 003 2.7600e- 003 151.4595 Single Family Housing 8.29564e +006 0.0447 0.3823 0.1627 2.4400e- 003 0.0309 0.0309 0.0309 0.0309 0.0000 442.6867 442.6867 8.4800e- 003 8.1200e- 003 445.3809 Total 0.0808 0.6905 0.2944 4.4100e- 003 0.0558 0.0558 0.0558 0.0558 0.0000 799.5845 799.5845 0.0153 0.0147 804.4506 Mitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 98 of 109 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr Apartments Mid Rise 440820 128.2396 5.8000e- 003 1.2000e- 003 128.7333 City Park 0 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 849306 247.0730 0.0112 2.3100e- 003 248.0241 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 Parking Lot 559680 162.8173 7.3600e- 003 1.5200e- 003 163.4441 Regional Shopping Center 175350 51.0113 2.3100e- 003 4.8000e- 004 51.2077 Single Family Housing 2.10066e +006 611.1070 0.0276 5.7200e- 003 613.4596 Single Family Housing 714367 207.8175 9.4000e- 003 1.9400e- 003 208.6176 Total 1,408.065 8 0.0637 0.0132 1,413.486 4 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 99 of 109 6.1 Mitigation Measures Area 6.0 Area Detail 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr Apartments Mid Rise 307927 89.5796 4.0500e- 003 8.4000e- 004 89.9244 City Park 0 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 593196 172.5675 7.8000e- 003 1.6100e- 003 173.2318 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 Parking Lot 314820 91.5848 4.1400e- 003 8.6000e- 004 91.9373 Regional Shopping Center 106172 30.8866 1.4000e- 003 2.9000e- 004 31.0055 Single Family Housing 1.46538e +006 426.2953 0.0193 3.9900e- 003 427.9364 Single Family Housing 498327 144.9691 6.5600e- 003 1.3600e- 003 145.5272 Total 955.8829 0.0432 8.9500e- 003 959.5627 Mitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 100 of 109 Use Low VOC Paint - Residential Interior Use Low VOC Paint - Residential Exterior Use Low VOC Paint - Non-Residential Interior Use Low VOC Paint - Non-Residential Exterior No Hearths Installed Use Low VOC Cleaning Supplies ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 13.5646 0.1129 9.8028 5.2000e- 004 0.0545 0.0545 0.0545 0.0545 0.0000 16.0639 16.0639 0.0154 0.0000 16.3872 Unmitigated 17.1353 0.1129 9.8028 5.2000e- 004 0.0545 0.0545 0.0545 0.0545 0.0000 16.0639 16.0639 0.0154 0.0000 16.3872 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 101 of 109 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 3.3031 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 13.5373 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.2949 0.1129 9.8028 5.2000e- 004 0.0545 0.0545 0.0545 0.0545 0.0000 16.0639 16.0639 0.0154 0.0000 16.3872 Total 17.1353 0.1129 9.8028 5.2000e- 004 0.0545 0.0545 0.0545 0.0545 0.0000 16.0639 16.0639 0.0154 0.0000 16.3872 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 102 of 109 Use Reclaimed Water Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 7.1 Mitigation Measures Water 7.0 Water Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.7446 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 12.5252 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.2949 0.1129 9.8028 5.2000e- 004 0.0545 0.0545 0.0545 0.0545 0.0000 16.0639 16.0639 0.0154 0.0000 16.3872 Total 13.5646 0.1129 9.8028 5.2000e- 004 0.0545 0.0545 0.0545 0.0545 0.0000 16.0639 16.0639 0.0154 0.0000 16.3872 Mitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 103 of 109 Total CO2 CH4 N2O CO2e Category MT/yr Mitigated 72.3703 0.7916 0.0192 94.9458 Unmitigated 89.5661 0.9896 0.0240 117.7974 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr Apartments Mid Rise 4.4723 / 2.85934 11.3702 0.1462 3.5300e- 003 15.5355 City Park 0 / 12.4345 12.6607 5.7000e- 004 1.2000e- 004 12.7094 Condo/Townhous e 7.04835 / 4.50632 17.9194 0.2304 5.5700e- 003 24.4840 Other Asphalt Surfaces 0 / 0 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 / 0 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0.909125 / 0.557206 2.2868 0.0297 7.2000e- 004 3.1335 Single Family Housing 17.8296 / 11.3993 45.3291 0.5828 0.0141 61.9350 Total 89.5661 0.9896 0.0240 117.7974 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 104 of 109 8.1 Mitigation Measures Waste 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr Apartments Mid Rise 3.57784 / 2.35091 9.1607 0.1169 2.8200e- 003 12.4914 City Park 0 / 10.2234 10.4094 4.7000e- 004 1.0000e- 004 10.4495 Condo/Townhous e 5.63868 / 3.70503 14.4373 0.1843 4.4500e- 003 19.6865 Other Asphalt Surfaces 0 / 0 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 / 0 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0.7273 / 0.458127 1.8421 0.0238 5.7000e- 004 2.5191 Single Family Housing 14.2637 / 9.37231 36.5208 0.4661 0.0113 49.7993 Total 72.3703 0.7916 0.0192 94.9458 Mitigated 8.0 Waste Detail CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 105 of 109 Total CO2 CH4 N2O CO2e MT/yr Mitigated 209.2228 12.3647 0.0000 468.8818 Unmitigated 209.2228 12.3647 0.0000 468.8818 Category/Year CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 106 of 109 8.2 Waste by Land Use Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr Apartments Mid Rise 121.13 24.5883 1.4531 0.0000 55.1040 City Park 0 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 190.91 38.7530 2.2902 0.0000 86.8480 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 6.84 1.3885 0.0821 0.0000 3.1116 Single Family Housing 711.82 144.4930 8.5393 0.0000 323.8182 Total 209.2228 12.3647 0.0000 468.8817 Unmitigated CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 107 of 109 10.0 Vegetation 8.2 Waste by Land Use Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr Apartments Mid Rise 121.13 24.5883 1.4531 0.0000 55.1040 City Park 0 0.0000 0.0000 0.0000 0.0000 Condo/Townhous e 190.91 38.7530 2.2902 0.0000 86.8480 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 6.84 1.3885 0.0821 0.0000 3.1116 Single Family Housing 711.82 144.4930 8.5393 0.0000 323.8182 Total 209.2228 12.3647 0.0000 468.8817 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 108 of 109 Total CO2 CH4 N2O CO2e Category MT Unmitigated 371.7000 0.0000 0.0000 371.7000 10.2 Net New Trees Number of Trees Total CO2 CH4 N2O CO2e MT Miscellaneous 525 371.7000 0.0000 0.0000 371.7000 Total 371.7000 0.0000 0.0000 371.7000 Species Class CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:43 PMPage 109 of 109 San Luis Obispo County, Mitigation Report Avila Ranch Development Project Mitigated Project Alternative Construction Mitigation Summary Phase ROG NOx CO SO2 Exhaust PM10 Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Percent Reduction Offsite Construction – Grading 0.64 0.11 0.16 0.00 0.49 0.45 0.00 0.00 0.00 0.00 0.00 0.00 Offsite Construction – Paving 0.42 -0.02 0.00 0.00 0.39 0.33 0.00 0.00 0.00 0.00 0.00 0.00 Offsite Construction – Site Preparation 0.55 -0.05 0.13 0.00 0.37 0.33 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Architectural Coating 0.00 -0.46 0.00 0.00 -0.27 -0.28 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Building Construction 0.32 -0.38 -0.05 0.00 0.01 -0.04 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Paving 0.01 -0.97 -0.18 0.00 -0.31 -0.42 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Site Preparation 0.24 0.05 0.06 0.00 0.39 0.35 0.00 0.00 0.00 0.00 0.00 0.00 Phase I, III, IV – Grading 0.52 -0.12 -0.04 0.00 0.32 0.26 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Architectural Coating 0.00 -0.50 0.00 0.00 -0.36 -0.37 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Building Construction 0.06 -0.26 -0.01 0.00 -0.19 -0.25 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Grading 0.46 -0.46 -0.11 0.00 0.11 0.04 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Paving 0.01 -0.97 -0.18 0.00 -0.31 -0.42 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Site Preparation 0.59 -0.15 0.18 0.00 0.31 0.25 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Architectural Coating 0.00 -0.59 0.00 0.00 -0.61 -0.62 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Building Construction 0.04 -0.32 -0.02 0.00 -0.35 -0.41 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Grading 0.43 -0.58 -0.13 0.00 0.03 -0.05 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Paving 0.00 -1.33 -0.18 0.00 -0.59 -0.73 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:54 PMPage 1 of 13 Phase III – Site Preparation 0.56 -0.25 0.15 0.00 0.23 0.16 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Architectural Coating 0.00 -0.64 0.00 0.00 -0.65 -0.66 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Building Construction 0.04 -0.36 -0.02 0.00 -0.42 -0.49 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Grading 0.37 -0.87 -0.21 0.00 -0.16 -0.26 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Paving 0.00 -1.33 -0.18 0.00 -0.59 -0.73 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Site Preparation 0.50 -0.46 0.06 0.00 0.07 -0.01 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Architectural Coating 0.00 -0.63 0.00 0.00 -0.62 -0.63 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Building Construction 0.04 -0.36 -0.02 0.00 -0.42 -0.49 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Grading 0.37 -0.87 -0.21 0.00 -0.16 -0.26 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Paving 0.00 -1.33 -0.18 0.00 -0.59 -0.73 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Site Preparation 0.50 -0.46 0.06 0.00 0.07 -0.01 0.00 0.00 0.00 0.00 0.00 0.00 OFFROAD Equipment Mitigation CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:54 PMPage 2 of 13 Equipment Type Fuel Type Tier Number Mitigated Total Number of Equipment DPF Oxidation Catalyst Air Compressors Diesel Tier 2 6 6 No Change 0.00 Excavators Diesel Tier 2 17 17 No Change 0.00 Concrete/Industrial Saws Diesel Tier 2 1 1 No Change 0.00 Cranes Diesel Tier 2 6 6 No Change 0.00 Forklifts Diesel Tier 2 18 18 No Change 0.00 Graders Diesel Tier 2 7 7 No Change 0.00 Pavers Diesel Tier 2 14 14 No Change 0.00 Rollers Diesel Tier 2 14 14 No Change 0.00 Rubber Tired Dozers Diesel Tier 2 26 26 No Change 0.00 Tractors/Loaders/Backhoes Diesel Tier 2 54 54 No Change 0.00 Generator Sets Diesel Tier 2 6 6 No Change 0.00 Paving Equipment Diesel Tier 2 14 14 No Change 0.00 Scrapers Diesel Tier 2 14 14 No Change 0.00 Welders Diesel Tier 2 6 6 No Change 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:54 PMPage 3 of 13 Equipment Type ROG NOx CO SO2 Exhaust PM10 Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Unmitigated tons/yr Unmitigated mt/yr Air Compressors 8.54000E-002 5.89570E-001 7.38540E-001 1.21000E-003 3.49300E-002 3.49300E-002 0.00000E+000 1.03790E+002 1.03790E+002 6.90000E-003 0.00000E+000 1.03935E+002 Concrete/Industria l Saws 1.38600E-002 1.07660E-001 1.11070E-001 1.90000E-004 6.88000E-003 6.88000E-003 0.00000E+000 1.61297E+001 1.61297E+001 1.14000E-003 0.00000E+000 1.61536E+001 Cranes 2.83440E-001 3.06280E+000 1.48387E+000 4.68000E-003 1.27880E-001 1.17650E-001 0.00000E+000 4.11191E+002 4.11191E+002 1.32990E-001 0.00000E+000 4.13984E+002 Excavators 1.47160E-001 1.39526E+000 2.11111E+000 3.34000E-003 6.75900E-002 6.21800E-002 0.00000E+000 2.96547E+002 2.96547E+002 9.49400E-002 0.00000E+000 2.98540E+002 Forklifts 2.90750E-001 2.70331E+000 3.25704E+000 4.34000E-003 1.66130E-001 1.52840E-001 0.00000E+000 3.81723E+002 3.81723E+002 1.23460E-001 0.00000E+000 3.84316E+002 Generator Sets 2.85870E-001 2.54779E+000 3.47699E+000 6.23000E-003 1.16920E-001 1.16920E-001 0.00000E+000 5.35534E+002 5.35534E+002 2.27900E-002 0.00000E+000 5.36013E+002 Graders 1.67950E-001 1.59457E+000 1.21024E+000 1.68000E-003 8.87500E-002 8.16500E-002 0.00000E+000 1.48918E+002 1.48918E+002 4.77700E-002 0.00000E+000 1.49921E+002 Pavers 5.90300E-002 6.14010E-001 7.13000E-001 1.16000E-003 2.96600E-002 2.72900E-002 0.00000E+000 1.02061E+002 1.02061E+002 3.28800E-002 0.00000E+000 1.02751E+002 Paving Equipment 4.81800E-002 4.81710E-001 6.39790E-001 1.03000E-003 2.39500E-002 2.20300E-002 0.00000E+000 9.05860E+001 9.05860E+001 2.91800E-002 0.00000E+000 9.11988E+001 Rollers 4.85800E-002 4.90890E-001 4.81540E-001 6.70000E-004 3.00100E-002 2.76100E-002 0.00000E+000 5.92395E+001 5.92395E+001 1.90800E-002 0.00000E+000 5.96403E+001 Rubber Tired Dozers 5.66270E-001 5.85498E+000 4.66927E+000 5.59000E-003 2.67920E-001 2.46490E-001 0.00000E+000 4.96972E+002 4.96972E+002 1.58960E-001 0.00000E+000 5.00310E+002 Scrapers 4.81210E-001 5.44762E+000 3.69136E+000 8.07000E-003 2.13460E-001 1.96380E-001 0.00000E+000 7.14404E+002 7.14404E+002 2.29160E-001 0.00000E+000 7.19216E+002 Tractors/Loaders/ Backhoes 5.67240E-001 5.72538E+000 7.78738E+000 1.07900E-002 3.00880E-001 2.76810E-001 0.00000E+000 9.50203E+002 9.50203E+002 3.06380E-001 0.00000E+000 9.56637E+002 Welders 2.38520E-001 1.33335E+000 1.59013E+000 2.42000E-003 5.07300E-002 5.07300E-002 0.00000E+000 1.78339E+002 1.78339E+002 1.93800E-002 0.00000E+000 1.78746E+002 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:54 PMPage 4 of 13 Equipment Type ROG NOx CO SO2 Exhaust PM10 Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Mitigated tons/yr Mitigated mt/yr Air Compressors 4.63000E-002 9.56260E-001 7.44870E-001 1.21000E-003 3.86500E-002 3.86500E-002 0.00000E+000 1.03790E+002 1.03790E+002 6.90000E-003 0.00000E+000 1.03934E+002 Concrete/Industrial Saws 7.20000E-003 1.48610E-001 1.15760E-001 1.90000E-004 6.01000E-003 6.01000E-003 0.00000E+000 1.61297E+001 1.61297E+001 1.14000E-003 0.00000E+000 1.61535E+001 Cranes 1.15000E-001 3.97709E+000 2.49167E+000 4.68000E-003 8.43300E-002 8.43300E-002 0.00000E+000 4.11190E+002 4.11190E+002 1.32990E-001 0.00000E+000 4.13983E+002 Excavators 1.30170E-001 2.85685E+000 2.53486E+000 3.34000E-003 8.76900E-002 8.76900E-002 0.00000E+000 2.96546E+002 2.96546E+002 9.49400E-002 0.00000E+000 2.98540E+002 Forklifts 2.05240E-001 4.23875E+000 3.30176E+000 4.34000E-003 1.71330E-001 1.71330E-001 0.00000E+000 3.81723E+002 3.81723E+002 1.23460E-001 0.00000E+000 3.84315E+002 Generator Sets 2.38910E-001 4.93410E+000 3.84340E+000 6.23000E-003 1.99440E-001 1.99440E-001 0.00000E+000 5.35533E+002 5.35533E+002 2.27900E-002 0.00000E+000 5.36012E+002 Graders 6.46700E-002 1.41925E+000 1.25929E+000 1.68000E-003 4.35600E-002 4.35600E-002 0.00000E+000 1.48918E+002 1.48918E+002 4.77700E-002 0.00000E+000 1.49921E+002 Pavers 4.50400E-002 9.88460E-001 8.77050E-001 1.16000E-003 3.03400E-002 3.03400E-002 0.00000E+000 1.02061E+002 1.02061E+002 3.28800E-002 0.00000E+000 1.02751E+002 Paving Equipment 4.01500E-002 8.81140E-001 7.81830E-001 1.03000E-003 2.70500E-002 2.70500E-002 0.00000E+000 9.05859E+001 9.05859E+001 2.91800E-002 0.00000E+000 9.11987E+001 Rollers 3.15700E-002 6.51970E-001 5.07850E-001 6.70000E-004 2.63500E-002 2.63500E-002 0.00000E+000 5.92395E+001 5.92395E+001 1.90800E-002 0.00000E+000 5.96402E+001 Rubber Tired Dozers 1.35570E-001 4.68848E+000 2.93736E+000 5.59000E-003 9.94200E-002 9.94200E-002 0.00000E+000 4.96971E+002 4.96971E+002 1.58960E-001 0.00000E+000 5.00309E+002 Scrapers 1.98400E-001 6.26626E+000 4.29876E+000 8.07000E-003 1.45500E-001 1.45500E-001 0.00000E+000 7.14403E+002 7.14403E+002 2.29160E-001 0.00000E+000 7.19215E+002 Tractors/Loaders/Ba ckhoes 5.04200E-001 1.04128E+001 8.11101E+000 1.07900E-002 4.20900E-001 4.20900E-001 0.00000E+000 9.50202E+002 9.50202E+002 3.06380E-001 0.00000E+000 9.56635E+002 Welders 1.00320E-001 1.60160E+000 1.41826E+000 2.42000E-003 9.68600E-002 9.68600E-002 0.00000E+000 1.78339E+002 1.78339E+002 1.93800E-002 0.00000E+000 1.78746E+002 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:54 PMPage 5 of 13 Fugitive Dust Mitigation No Soil Stabilizer for unpaved Roads PM10 Reduction 0.00 PM2.5 Reduction 0.00 No Replace Ground Cover of Area Disturbed PM10 Reduction 0.00 PM2.5 Reduction 0.00 Yes Water Exposed Area PM10 Reduction 55.00 PM2.5 Reduction 55.00 Frequency (per day) 2.00 Equipment Type ROG NOx CO SO2 Exhaust PM10 Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Percent Reduction Air Compressors 4.57845E-001 -6.21962E-001 -8.57096E-003 0.00000E+000 -1.06499E-001 -1.06499E-001 0.00000E+000 1.15618E-006 1.15618E-006 0.00000E+000 0.00000E+000 1.15457E-006 Concrete/Industrial Saws 4.80519E-001 -3.80364E-001 -4.22256E-002 0.00000E+000 1.26453E-001 1.26453E-001 0.00000E+000 1.23995E-006 1.23995E-006 0.00000E+000 0.00000E+000 1.23812E-006 Cranes 5.94270E-001 -2.98514E-001 -6.79170E-001 0.00000E+000 3.40554E-001 2.83213E-001 0.00000E+000 1.19166E-006 1.19166E-006 0.00000E+000 0.00000E+000 1.18362E-006 Excavators 1.15453E-001 -1.04754E+000 -2.00724E-001 0.00000E+000 -2.97381E-001 -4.10261E-001 0.00000E+000 1.18025E-006 1.18025E-006 0.00000E+000 0.00000E+000 1.20587E-006 Forklifts 2.94101E-001 -5.67985E-001 -1.37303E-002 0.00000E+000 -3.13008E-002 -1.20976E-001 0.00000E+000 1.17887E-006 1.17887E-006 0.00000E+000 0.00000E+000 1.19693E-006 Generator Sets 1.64270E-001 -9.36620E-001 -1.05381E-001 0.00000E+000 -7.05782E-001 -7.05782E-001 0.00000E+000 1.17640E-006 1.17640E-006 0.00000E+000 0.00000E+000 1.19400E-006 Graders 6.14945E-001 1.09948E-001 -4.05292E-002 0.00000E+000 5.09183E-001 4.66503E-001 0.00000E+000 1.20872E-006 1.20872E-006 0.00000E+000 0.00000E+000 1.20063E-006 Pavers 2.36998E-001 -6.09843E-001 -2.30084E-001 0.00000E+000 -2.29265E-002 -1.11763E-001 0.00000E+000 1.17577E-006 1.17577E-006 0.00000E+000 0.00000E+000 1.16787E-006 Paving Equipment 1.66667E-001 -8.29192E-001 -2.22010E-001 0.00000E+000 -1.29436E-001 -2.27871E-001 0.00000E+000 1.21432E-006 1.21432E-006 0.00000E+000 0.00000E+000 1.20616E-006 Rollers 3.50144E-001 -3.28139E-001 -5.46372E-002 0.00000E+000 1.21959E-001 4.56356E-002 0.00000E+000 1.18164E-006 1.18164E-006 0.00000E+000 0.00000E+000 1.34138E-006 Rubber Tired Dozers 7.60591E-001 1.99232E-001 3.70917E-001 0.00000E+000 6.28919E-001 5.96657E-001 0.00000E+000 1.18719E-006 1.18719E-006 0.00000E+000 0.00000E+000 1.19926E-006 Scrapers 5.87706E-001 -1.50275E-001 -1.64546E-001 0.00000E+000 3.18373E-001 2.59090E-001 0.00000E+000 1.18980E-006 1.18980E-006 0.00000E+000 0.00000E+000 1.18184E-006 Tractors/Loaders/Ba ckhoes 1.11135E-001 -8.18705E-001 -4.15583E-002 0.00000E+000 -3.98897E-001 -5.20538E-001 0.00000E+000 1.18922E-006 1.18922E-006 0.00000E+000 0.00000E+000 1.19168E-006 Welders 5.79406E-001 -2.01185E-001 1.08086E-001 0.00000E+000 -9.09324E-001 -9.09324E-001 0.00000E+000 1.23361E-006 1.23361E-006 0.00000E+000 0.00000E+000 1.17485E-006 Yes/No Mitigation InputMitigation InputMitigation InputMitigation Measure CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:54 PMPage 6 of 13 No Unpaved Road Mitigation Moisture Content % 0.00 Vehicle Speed (mph) 15.00 Yes Clean Paved Road % PM Reduction 0.00 Unmitigated Mitigated Percent Reduction Phase Source PM10 PM2.5 PM10 PM2.5 PM10 PM2.5 Offsite Construction – Grading Fugitive Dust 1.40 0.77 0.63 0.35 0.55 0.55 Offsite Construction – Grading Roads 0.01 0.00 0.01 0.00 0.00 0.00 Offsite Construction – Paving Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Offsite Construction – Paving Roads 0.00 0.00 0.00 0.00 0.00 0.00 Offsite Construction – Site Preparation Fugitive Dust 0.36 0.20 0.16 0.09 0.55 0.55 Offsite Construction – Site Preparation Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Architectural Coating Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Architectural Coating Roads 0.07 0.02 0.07 0.02 0.00 0.00 Phase I – Building Construction Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Building Construction Roads 0.89 0.24 0.89 0.24 0.00 0.00 Phase I – Paving Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Paving Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase I – Site Preparation Fugitive Dust 0.14 0.07 0.06 0.03 0.55 0.55 Phase I – Site Preparation Roads 0.12 0.03 0.12 0.03 0.00 0.00 Phase I, III, IV – Grading Fugitive Dust 0.54 0.22 0.24 0.10 0.55 0.55 Phase I, III, IV – Grading Roads 0.01 0.00 0.01 0.00 0.00 0.00 Phase II – Architectural Coating Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Architectural Coating Roads 0.03 0.01 0.03 0.01 0.00 0.00 Phase II – Building Construction Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:54 PMPage 7 of 13 Phase II – Building Construction Roads 0.78 0.21 0.78 0.21 0.00 0.00 Phase II – Grading Fugitive Dust 0.13 0.05 0.06 0.02 0.55 0.55 Phase II – Grading Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Paving Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Paving Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase II – Site Preparation Fugitive Dust 0.14 0.07 0.06 0.03 0.55 0.55 Phase II – Site Preparation Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Architectural Coating Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Architectural Coating Roads 0.03 0.01 0.03 0.01 0.00 0.00 Phase III – Building Construction Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Building Construction Roads 2.64 0.71 2.64 0.71 0.00 0.00 Phase III – Grading Fugitive Dust 0.15 0.06 0.07 0.03 0.55 0.55 Phase III – Grading Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Paving Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Paving Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase III – Site Preparation Fugitive Dust 0.18 0.10 0.08 0.04 0.55 0.55 Phase III – Site Preparation Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Architectural Coating Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Architectural Coating Roads 0.02 0.01 0.02 0.01 0.00 0.00 Phase VI – Building Construction Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Building Construction Roads 1.16 0.31 1.16 0.31 0.00 0.00 Phase VI – Grading Fugitive Dust 0.07 0.03 0.03 0.01 0.55 0.55 Phase VI – Grading Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Paving Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:54 PMPage 8 of 13 Operational Percent Reduction Summary Phase VI – Paving Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phase VI – Site Preparation Fugitive Dust 0.05 0.02 0.02 0.01 0.55 0.55 Phase VI – Site Preparation Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Architectural Coating Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Architectural Coating Roads 0.05 0.01 0.05 0.01 0.00 0.00 Phases IV & V – Building Construction Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Building Construction Roads 4.85 1.30 4.85 1.30 0.00 0.00 Phases IV & V – Grading Fugitive Dust 1.17 0.49 0.53 0.22 0.55 0.55 Phases IV & V – Grading Roads 0.01 0.00 0.01 0.00 0.00 0.00 Phases IV & V – Paving Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Paving Roads 0.00 0.00 0.00 0.00 0.00 0.00 Phases IV & V – Site Preparation Fugitive Dust 0.36 0.20 0.16 0.09 0.55 0.55 Phases IV & V – Site Preparation Roads 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:54 PMPage 9 of 13 Category ROG NOx CO SO2 Exhaust PM10 Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Percent Reduction Architectural Coating 77.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Consumer Products 7.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Electricity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.11 32.11 32.10 32.04 32.11 Hearth 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Landscaping 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Mobile 5.29 13.14 10.82 16.39 14.97 14.96 0.00 16.40 16.40 15.28 0.00 16.40 Natural Gas 20.86 20.86 20.87 20.83 20.86 20.86 0.00 20.86 20.86 20.87 20.79 20.86 Water Indoor 0.00 0.00 0.00 0.00 0.00 0.00 20.00 19.10 19.20 20.01 20.10 19.40 Water Outdoor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Operational Mobile Mitigation Mitigation Selected No Yes No Yes No Yes Category Land Use Land Use Land Use Land Use Land Use Land Use Land Use % Reduction 0.02 0.16 0.00 0.16 0.00 -0.10 0.25 Input Value 1 7.00 0.56 10.00 0.25 Input Value 2 Input Value 3 Measure Increase Diversity Land Use SubTotal Integrate Below Market Rate Housing Increase Transit Accessibility Improve Destination Accessibility Improve Walkability Design Increase Density Project Setting:Urban CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:54 PMPage 10 of 13 Yes No No Neighborhood Enhancements Neighborhood Enhancements Neighborhood Enhancements 0.01 1.00 Project Site Implement NEV Network Provide Traffic Calming Measures Improve Pedestrian Network No No No No Yes No Parking Policy Pricing Transit Improvements Transit Improvements Transit Improvements Transit Improvements Parking Policy Pricing Parking Policy Pricing Parking Policy Pricing Neighborhood Enhancements 0.01 0.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Limit Parking Supply Land Use and Site Enhancement Subtotal Transit Improvements Subtotal Increase Transit Frequency Expand Transit Network Provide BRT System Parking Policy Pricing Subtotal On-street Market Pricing Unbundle Parking Costs Neighborhood Enhancements Subtotal No No No No No No No No Commute Commute Commute Commute Commute Commute Commute Commute Commute 0.00 15.00 0.00 0.00 0.00 7.70 2.00 Transit Subsidy Commute Subtotal Provide Ride Sharing Program Employee Vanpool/Shuttle Market Commute Trip Reduction Option Encourage Telecommuting and Alternative Work Schedules Workplace Parking Charge Implement Employee Parking "Cash Out" Implement Trip Reduction Program CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:54 PMPage 11 of 13 Area Mitigation Measure Implemented Yes Yes Yes No Yes Yes No No Yes No Mitigation Measure No Hearth % Electric Chainsaw % Electric Leafblower % Electric Lawnmower Use Low VOC Paint (Non-residential Exterior) Use Low VOC Paint (Non-residential Interior) Use Low VOC Paint (Residential Exterior) Use Low VOC Paint (Residential Interior) Use Low VOC Cleaning Supplies Only Natural Gas Hearth Input Value 0.00 0.00 0.00 50.00 50.00 50.00 50.00 Energy Mitigation Measures Measure Implemented Yes Yes Yes Mitigation Measure Install High Efficiency Lighting On-site Renewable Exceed Title 24 Input Value 1 25.00 25.00 25.00 Input Value 2 Appliance Type Land Use Subtype % Improvement ClothWasher 30.00 No School Trip 0.00Implement School Bus Program 0.17Total VMT Reduction CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:54 PMPage 12 of 13 DishWasher 15.00 Fan 50.00 Refrigerator 15.00 Water Mitigation Measures Measure Implemented No Yes No Mitigation Measure Use Reclaimed Water Use Grey Water Apply Water Conservation on Strategy Input Value 1 0.00 0.00 0.00 0.00 45.00 Input Value 2 Yes Yes Yes Yes Install low-flow bathroom faucet Install low-flow Toilet Install low-flow Shower Install low-flow Kitchen faucet 32.00 18.00 20.00 20.00 No No No Turf Reduction Water Efficient Landscape Use Water Efficient Irrigation Systems 0.00 6.10 0.00 0.00 Solid Waste Mitigation Mitigation Measures Institute Recycling and Composting Services Percent Reduction in Waste Disposed Input Value CalEEMod Version: CalEEMod.2013.2.2 Date: 10/9/2016 3:54 PMPage 13 of 13 1602 Spring Street, Paso Robles, CA 93446 (805) 237-9626 • Fax (805) 237-9181 • www.althouseandmeade.com LynneDee Althouse, M.S. • Cell: (805) 459-1660 • lynnedee@althouseandmeade.com Avila Ranch Updated Impact Analysis 1 June 13, 2016 June 13, 2016 Project 838.03 Avila Ranch, LLC c/o Mangano Homes, Inc. 740 Tank Farm Road Suite 240 San Luis Obispo, CA 93401 Attention: Stephen Peck Re: Avila Ranch Updated Biological Impact Analysis Dear Steve: We evaluated effects of various changes made to the Avila Ranch Site Plan. Overall, these appear to improve the project from a biological standpoint. Changes include: 1) retain existing northern reach of Tank Farm Creek (North-South Creek section, a federal wetland) in place rather than filling and relocating it as previously proposed; 2) avoid removal/relocation of the East-West drainage (a federal wetland); 3) improve and expand the capacity and riparian habitat within a reach of the North-South Creek to accommodate flood flows; 4) improve and expand wetland habitat and the capacity of a 400-foot reach near the confluence of the East-West and the North-South drainage; and, 5) increase the riparian buffer width to a minimum of 20 feet along approximately 750 lineal feet and the Tank Farm Creek frontage (approximately 10 percent of the total frontage), and to a minimum of 35 feet of riparian setback in all other locations. The site plan was adjusted to avoid impacts to the east-west drainage, with a minimum of 35-foot setback from the top of bank. Tank Farm Creek will be temporarily impacted in the vicinity of the intersection of the east-west drainage and the north-south drainage to allow for a more natural confluence (increased sinuosity) and additional flood capacity at that intersection. The proposed modifications will provide a larger wetland/riparian area where it is currently farmed and used as an access road along the farm field. The revised site plan changes increased buffer width for the riparian areas and associated wetland in Tank Farm Creek to a minimum of 20 feet, with most of the riparian buffer at a minimum of 35 feet (6600 linear feet on both sides of Tank Farm Creek). The proposed buffers are adequate for wildlife movement. The minimum buffer recommended by the California Rapid Assessment Method (CRAM) for riverine systems is 16.4 feet (5 meters)i. It should also be noted that CRAM considers vegetated levees as part of a Creek buffer, and that there are significant areas along the Althouse and Meade, Inc. – 838.03 Avila Ranch Updated Impact Analysis 2 June 13, 2016 creek that have vegetated 3:1 fill slopes that would qualify as part of the buffer. However, these areas were not included in the buffer width measurements for this analysis. The proposed buffer (setback) for the east-west drainage is 40 feet on the north side and 35 feet on the south side. The proposed setbacks, even at their minimum points exceed the CRAM minima and the City Municipal Code minima. The planned wetland mitigation is on-site replacement (wetland creation) at a ratio of 1.5 to 1 acre for state wetland (1- or 2-factor wetland), and 3 to 1 ratio for federal wetland (3-factor wetland)ii. The proposed mitigation area is in appropriate soil (heavy serpentinite clay) where moisture from an adjacent Tank Farm ponded habitat provides high soil moisture conditions on an annual basis. The revised impacted wetland areas include 0.97 acre of state wetlands that are currently farmland (an increase of 0.11 acre from the previous project design), 0.07 acre of riparian 1-factor wetland vegetation adjacent to Tank Farm Creek (no change), and 0.17 acre of federal 3-factor wetland (a 0.71 acre reduction from the previous project design). The total proposed wetland impacts would be 1.21 acre: state wetland 1.04 acre, and federal wetland 0.17 acre. Proposed mitigation is a total of 3.47 acres mostly 3-factor wetland (federal wetland, also considered state wetland), that is more than the 2.06 mitigation acres needed. An attached figure shows wetland impact and mitigation areas. Jesperson Road access from Buckley Road impacts state farmed wetland and a federal wetland at the east-west drainage. Venture Lane and two multi-use paths will bridge Tank Farm Creek. Multi-use paths will be canted a minimum of five percent toward a bioswale located away from the riparian buffer. Where Venture Lane turns toward the south, a culvert will be placed to cross the east-west drainage. Other wetland/riparian impacts include approximately 8 culvert outlets in Tank Farm Creek. All water from the site will be filtered prior to discharge. TABLE 1. AVILA RANCH WETLAND IMPACT AND MITIGATION AREAS. The mitigation ratio for state wetland (1- or 2-factor wetland) is calculated at 1.5 acre mitigation to 1 acre of impact. The mitigation ratio for federal wetland (3-factor) is calculated at 3 acre mitigation to 1 acre of impact. The total mitigation proposed in bold. State Wetlands (1-and 2-factor farmed wetland) Riparian (adjacent to Tank Farm Creek) Federal Wetlands (3-factor wetland) Totals: Wetland Plus Adjacent Riparian Existing 2.83 1.86 3.03 7.72 Permanently Impacted 0.97 0.07 0.17 1.21 Mitigation Ratio 1.5:1 1.5:1 3:01 n/a Mitigation Needed 1.45 0.10 0.51 2.06 Mitigation (Creation) Shown 1.46 0.10 1.91 3.47 New Total 3.31 1.89 4.77 9.97 Actual Mitigation Ratio 1.51 1.58 11.24 n/a Althouse and Meade, Inc. – 838.03 Avila Ranch Updated Impact Analysis 3 June 13, 2016 We are pleased with the revised plan for Avila Ranch provided by your design and engineering team. Sincerely, LynneDee Althouse Copy: John Rogers (Cannon Associates) Attachments: Wetland Impacts and Mitigation Areas Riparian setbacks i CRAM Buffer Definition: The buffer is the area adjoining the AA that is in a natural or semi-natural state and currently not dedicated to anthropogenic uses that would severely detract from its ability to entrap contaminants, discourage forays into the AA by people and non-native predators, or otherwise protect the AA from stress and disturbance. To be considered as buffer, a suitable land cover type must be at least 5 m wide starting at the edge of the AA extending perpendicular to the channel and extend along the perimeter of the AA (measured parallel to the channel) for at least 5 m. ii Wetlands are represented by hydric soil, wetland hydrology (e.g. depression, swale, stream channel), and/or dominated by wetland vegetation. 1-factor wetland may only be represented by one of the wetland indicators (e.g. wetland vegetation as represented by willows on Avila Ranch) adjacent to a stream; 2-factor wetland contains two of the three wetland indicators; 3-factor wetland contains all three wetland indicators. 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 TANK FARM ROAD SOUTH HIGUERA STREETBUCKLEY ROADVACHELL LANESUBURBAN ROAD HORIZON LANE6+81 102.80 02+90 13+83 14+82 16+8417+83 21+84 22+79 30+32 31+81 33+82 39+76 35+77 40+20 53+94 49+18 53+2853+0852+8850+7450+65 41+50 43+68 45+4346+61 05+96 06+84 04+86 06+54 03+84 44+37 51+40 50+1550+07 41+85 42+67 02+67 02+38 02+12 37+86 39+42 29+29 28+91 32+82 09+86 28+63 00+89 28+31 10+86 53+82 20+81 52+30 11+84 26+82 12+82 19+84 25+74 34+82 23+79 07+86 08+87 15+83 24+82 18+83 41+20 Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CN ES/Airbus D S, USDA, USGS, AEX,Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User CommunityS:\GIS\1428_Avila_Ranch\ArcDocuments\011_1428.003_Proposed_Floodplain_100Year.mxd\6/10/2016FIGURE 2 PROPOSED CON DITIO NS F LOOD PLAI N AVILA RANCHHYDROLOGY STUDY PREPARED FORCANNONSAN LUIS OBISPO, CALIFORNIA APPROXIMATESCALE 0 500 1,000250Feet PROJECT SITE LEGE ND FLOOD PLAIN SECTION STATION CREEKS AVILA RANCH PR OJECT BOU NDARY PROPOSED CONDITIONS 100-YEAR FLOODPLAIN FEMA FLOODPLAIN TANKFARMCREEK EASTBRANC H S ANL U I S OBISPOC R EEK DRAF T 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood Drive San Luis Obispo, CA 93401 P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood Drive San Luis Obispo, CA 93401 P 805.544.7407 F 805.544.3863 1050 Southwood Drive San Luis Obispo, CA 93401 P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood Drive San Luis Obispo, CA 93401 P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 Prepared for Avila Ranch LLC Prepared by Cannon 1050 Southwood Drive San Luis Obispo, CA 93401 805.544.7407 Date October 26, 2016 SB610 Water Supply Assessment Avila Ranch Final Avila Ranch WSA Avila Ranch, LLC 10/26/2016 i WATER SUPPLY ASSESSMENT Water Code §10910 et seq. To: City of San Luis Obispo 990 Palm Street San Luis Obispo, CA 93401 Project Title: Avila Ranch Water Supply Assessment The following determination has been made regarding the above‐described project: The projected water demand for the project was included in the City's most recently adopted urban water management plan. Based on additional sources of information, a sufficient water supply is available for the project. The total water supplies available to the City during normal, single‐dry, and multiple‐dry years within a 20‐year projection will meet the projected water demand under the project in addition to the demand of existing and other planned future uses, including, but not limited to, agricultural uses. A sufficient water supply is not available for the project. [Plan for acquiring and developing sufficient supply attached. Water Code§ 10911 (a)]. The foregoing determination is based on the following Water Supply Assessment (WSA) Information and supporting information in the San Luis Obispo General Plan Update Background Report Section 5.1, Water and 5.3 Wastewater, as well as the records of the City of San Luis Obispo. The Land Use Circulation Plan (LUCE) WSA covers the cumulative water supply impacts, and this WSA will cover the project specific impacts. Signature Date Title X Avila Ranch WSA Avila Ranch, LLC 10/26/2016 ii Table of Contents Table of Contents ........................................................................................................................................ ii Tables ........................................................................................................................................................ iii Appendices ................................................................................................................................................. iii 1. INTRODUCTION .............................................................................................................................. 1 1.1 Background ...................................................................................................................................... 1 1.2 Project Location and Description ..................................................................................................... 2 2. WATER SUPPLY ............................................................................................................................. 2 2.1 Surface Water Supply: ..................................................................................................................... 2 2.2 Recycled Water Supply: ................................................................................................................... 3 2.3 Groundwater Supply: ....................................................................................................................... 3 3. URBAN WATER MANAGEMENT PLAN APPLICABILITY ........................................................... 3 4. WATER RESOURCE AVAILABILITY ............................................................................................. 4 5. WATER SUPPLY RELIABILITY ..................................................................................................... 4 6. WATER USAGE .............................................................................................................................. 5 6.1 Water Conservation Program: ......................................................................................................... 5 7. ENTITLEMENTS/REGULATORY APPROVALS ............................................................................ 7 8. AVILA RANCH PROJECT .............................................................................................................. 7 9. CONCLUSION ............................................................................................................................... 10 REFERENCES ............................................................................................................................................ 11 TECHNICAL APPENDICES ....................................................................................................................... 12 Avila Ranch WSA Avila Ranch, LLC 10/26/2016 iii Tables Table 4-1. City Water Resource Availability ............................................................................................. 4 Table 5-1. Water Supply Reliability ........................................................................................................... 5 Table 5-2. 2015 City Potable Water Supply Availability .......................................................................... 5 Table 8-1. Avila Ranch Project Water Demand by Use Factors ............................................................. 7 Table 8-2. Avila Ranch Water Demand – Project Specific ...................................................................... 8 Table 8-3. City Water Supply Availability and Avila Ranch Water Usage ............................................. 8 Appendices Appendix A: Preliminary Irrigation Water-Use Estimate Appendix B: Avila Ranch Recycled Water Use Areas Appendix C: Airport Area Specific Plan: Water Conservation Policy 7.2.2 Avila Ranch WSA Avila Ranch, LLC 10/26/2016 1 1. INTRODUCTION This Water Supply Assessment was prepared for the proposed Avila Ranch project (Tract 3089) for the City of San Luis Obispo, pursuant to the requirements of Section 10910 of the State Water Code, as amended by Senate Bill No. 610, Chapter 643 (2001). 1.1 Background Senate Bill No. 610, effective January 1, 2002, requires a city or county, which determines that a “project” (as defined in Water Code§ 10912) is subject to the California Environmental Quality Act (CEQA), to identify any public water system that may supply water for the project and to request those public water systems to prepare a specified water supply assessment. The assessment is required to include an identification of existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project and water received in prior years pursuant to those entitlements, rights, and contracts. The assessment must be approved by the governing body of the public water system supplying water to the project. If the projected water demand associated with the project was included as part of the most recently adopted urban water management plan, the public water system may incorporate the requested information from the urban water management plan in the water supply assessment. The bill requires the city or county, if it is not able to identify any public water system that may supply water for the project, to prepare the water supply assessment after a prescribed consultation. If the public water system concludes that water supplies are, or will be, insufficient, plans for acquiring additional water supplies are required to be submitted to the city or county. The city or county must include the water supply assessment in any environmental document prepared for the project pursuant to the act. It also requires the city or county to determine whether project water supplies will be sufficient to satisfy the demands of the project, in addition to existing and planned future uses. A “project” under Section 10912 includes the following: a. A proposed residential development of more than 500 dwelling units. b. A proposed shopping center or business establishment employing more than 1,000 persons or having more than 500,000 square feet of floor space. c. A proposed commercial office building employing more than 1,000 persons or having more than 250,000 square feet of floor space. d. A proposed hotel or motel, or both, having more than 500 rooms. e. A proposed industrial, manufacturing, or processing plant, or industrial park planned to house more than 1,000 persons, occupying more than 40 acres of land, or having more than 650,000 square feet of floor area. f. A mixed-use project that includes one or more of the projects specified in this subdivision. g. A project that would demand an amount of water equivalent to, or greater than, the amount of water required by a 500 dwelling unit project. The Avila Ranch project includes at least 500 units and 15,000 square feet of shopping center area, and the SB610 requirements apply to the project. Avila Ranch WSA Avila Ranch, LLC 10/26/2016 2 1.2 Project Location and Description The proposed Avila Ranch project (Tract 3089) is located in the City of San Luis Obispo along the north side of Buckley Road, extending from Vachell Lane to approximately 4,000 feet to the east, and approximately 2,000 feet to the north. The site consists of over 150 acres of property zoned for Business Park uses. The proposed project includes over 700 dwelling units and several land use categories; therefore, the requirements of Section 10910 of the California Water Code apply to the proposed project. The property was annexed to the City in 2008 and is covered by the City’s UWMP and Water and Wastewater Element. 2. WATER SUPPLY Water Code Section 10910(b) requires the identification of the public water system that may serve the project. The City is the sole water purveyor within the city limits and will provide water to the proposed Avila Ranch. The City’s water is supplied from multiple surface water sources, in addition, to recycled water and groundwater to supplement irrigation demands. The Water and Wastewater Management Element of the General Plan, first adopted in 1987 and most recently updated in 2016, specifies that the City utilize multiple water resources to meet its water supply needs. Having several sources of water avoids dependence on any one source that may not be available during a drought or other water supply reduction or emergency. With the update of the Water and Wastewater Management Element, the City Council reaffirmed the policy for a multi-source water supply. Consistent with the multi-source water supply concept, the City obtains water from five sources: • Salinas Reservoir (Santa Margarita Lake) and Whale Rock Reservoir: Combined Safe Annual Yield 6,940 acre-feet (AF)/year • Nacimiento Reservoir: 5,482 AF/year dependable yield/ contractual limit • Recycled water from the City’s Wastewater Resource Recovery Facility (WRRF): 187 AF/year 2015 Annual Usage • Groundwater: Supplemental usage, 43 AF/year in 2015 2.1 Surface Water Supply: The Salinas Dam was built in 1942 by the War Department to supply water to Camp San Luis Obispo and secondarily, to meet the water needs of the City of San Luis Obispo. The Salinas Reservoir (Santa Margarita Lake) captures water from an 112‐square mile watershed and can store up to 23,843 AF. Since the late 1940s, the San Luis Obispo County Flood Control and Water Conservation District has operated the Salinas Reservoir under a lease from the U.S. Army Corps of Engineers. Water from the reservoir is pumped through the one‐mile long Cuesta Tunnel, and then flows by gravity to the City’s Water Treatment Plant on Stenner Creek Road. The Whale Rock Reservoir is a 40,662 AF reservoir created by the construction of an earthen dam on Old Creek near the town of Cayucos. The Whale Rock Dam captures water from a 20.3 square mile watershed and water is delivered through 17.6 miles of 30‐inch pipeline and by two pumping stations. The City of San Luis Obispo owns 55.05 percent of the water storage rights at the reservoir. The remaining water storage rights are divided between the two State agencies with Cal Poly owning 33.71 percent and the California Men’s Colony owning 11.24 percent. Avila Ranch WSA Avila Ranch, LLC 10/26/2016 3 The Nacimiento Reservoir provides flood protection and is a source of supply for groundwater recharge for the Salinas Valley. It is owned and operated by the Monterey County Water Resources Agency. Since 1959, the San Luis Obispo County Flood Control and Water Conservation District has had an entitlement to 17,500 AF/year of water from the reservoir for use in San Luis Obispo County. Approximately 1,750 AF/year have been designated for uses around the lake, leaving 15,750 AF/year for allocation to other areas within the County of San Luis Obispo. The City’s contractual supply is 5,482 AF. 2.2 Recycled Water Supply: Recycled water was envisioned as part of the City’s overall water supply strategy since the 1980s. In 1994, the City began a major capital improvement project at the WRRF that included addition of tertiary treatment and other unit processes required to meet stringent effluent quality limits, set forth by the Regional Water Quality Control Board, intended to protect and enhance the receiving waters of San Luis Obispo Creek. The City completed construction of the project in 2006 and recycled water deliveries began in May that year. The main non-potable water source is the City’s WRRF which has a design flow rate of 5,700 AF/year (5.1 mgd). The City is required to release 1,807 AF/year of flow to San Luis Creek for environmental enhancement. The recycled water usage for 2014 and 2015 totaled 185 AF/year and 187 AF/year, respectively. 2.3 Groundwater Supply: The City stopped the supply of groundwater to its drinking water system in April 2015 due to new regulatory requirements that would require additional costly treatment of the wells before the water could be used. The groundwater wells remain in operable standby condition should use of groundwater be required in the future. The City no longer relies on groundwater for long‐term community water demands because of water quality and reliability issues and does not consider this source of supply as part of its water resources planning. 3. URBAN WATER MANAGEMENT PLAN APPLICABILITY Water Code Section 10910(c)(1) requires a determination of whether or not the project was included in the City’s most recently adopted Urban Water Management Plan (UWMP), adopted on June 14, 2016. The UWMP provides a description of the City’s service area, demographics, multi-source water supply, treatment, and conveyance/distribution facilities. The UWMP also includes historical and future water demand to serve the buildout of the City consistent with the General Plan which includes the Avila Ranch Project. Since 1987, the City’s General Plan has included a Water and Wastewater Management Element. The water section of the Element includes policies related to present water demand and overall projected water demand. The Element also addresses water conservation, water resource availability, accounting for siltation, multi-source water supply, and recycled water. The 2014 LUCE update included a Water Supply Assessment for the areas within the City’s Urban Reserve Line (URL). This WSA was for undeveloped and developed lands to be developed pursuant to the LUCE. Avila Ranch WSA Avila Ranch, LLC 10/26/2016 4 4. WATER RESOURCE AVAILABILITY As described in the Water Supply Section 2, the City has five water resources to meet current and future City water demands: Salinas Reservoir (Santa Margarita Lake), Whale Rock Reservoir, Nacimiento Reservoir, recycled water from the City’s WRRF, and groundwater. In order to ensure water supply reliability, the City determined the amount of water available from these water resources on an annual basis. The method to determine the available yield from each resource varies based on water right, contractual agreement, or the amount of water actually supplied. For Salinas and Whale Rock Reservoirs the term “safe annual yield” is used to define the annual amount of water available from these two resources. The two reservoirs are operated in a coordinated manner to increase the available water. In contrast, the “dependable yield” from Nacimiento Reservoir is the contractual amount of water to which the City has rights. Since Nacimiento Reservoir is operated as a water supply project for Monterey County, the concept of safe annual yield is not used for the City’s contractual water supply from this source. For recycled water, the annual amount delivered is counted in the water availability calculation. Though groundwater is part of the City’s water portfolio, due to the limitations on its use, the City will not consider this supply in estimating available water resources to meet community needs. Table 4-1 is a summary of the City’s available water resources. Table 4-1. City Water Resource Availability Water Resource 2014 Annual Availability Salinas Reservoir and Whale Rock Reservoir 6,940 AF Safe Annual Yield Nacimiento Reservoir 5,482 AF Contractual Limit Siltation to 2060 (500 AF) Policy A 4.2.2 Recycled Water Use 187 AF 2015 Annual Usage TOTAL 12,109 AF Source: 2015 Urban Water Management Plan 5. WATER SUPPLY RELIABILITY The water supply and reliability analysis provided by the 2015 UWMP uses historical information since 1941 for evaluation of water supply availability and safe annual yield for the Salinas and Whale Rock Reservoirs. The analysis of water supply availability is based on the controlled drought period of the two reservoirs, which occurred between 1987 and 1991. Table 5-1 below summarizes the results of that analysis and indicates the City’s water resources are reliable during extended drought periods. Through the coordinated operation of Salinas and Whale Rock Reservoirs and the ability to use other available water supplies (Nacimiento, recycled water, and groundwater), climatic conditions such as prolonged drought are not anticipated to impact the City’s water supply. As required by Section 5 of the City’s Water and Wastewater Management Element, the City accounts for water supplies necessary to meet three specific community needs, including primary water supply, secondary water supply, and reliability reserve, see Table 5-2. The primary water supply is defined as the amount of water needed to serve the build-out population of the city as identified in the Land Use Element of the General Plan. The quantity of water needed for the primary water supply is calculated using the maximum allowed per capita water Avila Ranch WSA Avila Ranch, LLC 10/26/2016 5 use under Senate Bill X7-7 and the city’s build-out population. The maximum allowed per capita water use is 117 gallons per capita per day (gpcd). The proposed Land Use Element build-out population is estimated to be 57,200, and the primary water supply is estimated to be 7,496 AF. The reliability reserve provides a buffer for future unforeseen or unpredicted long-term impacts to the City’s available water supply. The quantity of water for the reliability reserve is established using twenty percent of the ten-year average of current per capita water use and the City’s current population (45,802 in 2015). The reliability reserve provides as reserve above and beyond the existing needs of the community and may not be used for future development. In 2015, the reliability reserve is 1,201 AF. The secondary water supply is the amount of water remaining from the City’s available water resources above those needed to meet the primary water supply and reliability reserve. The secondary supply identified to meet peak water demand periods or short-term loss of City water supply sources. Table 5-1. Water Supply Reliability Average/Normal Water Year (acre feet) Single Dry Water Year (acre feet) Multiple Dry Water Years Year 1 Year 2 Year 3 12,622 12,622 12,622 12,622 12,622 Percent of Average/Normal Year 100% 100% 100% 100% Source: 2015 Urban Water Management Plan Table 5-2. 2015 City Potable Water Supply Availability Total 2015 Actual Usage Primary Water Supply Reliability Reserve Secondary Water Supply 12,109 4,908 7,496 1,201 3,412 6. WATER USAGE Water use in the city includes single-family, multi-family, commercial (including institutional and industrial), and irrigation customers. No agricultural uses are supplied by City water and the City does not sell water to other agencies. The City does not have additional water demands such as water use for saline barriers, groundwater recharge, etc. In 2014, the total water demand for the city was 5,524 AF, and total demand in 2015 was 4,908 AF (during drought conditions). The City’s water use factors for each land use category are provided below. Single-family residences (R-1) 0.3 AF/year/unit Single Family (R-2) 0.21 AF/year/unit Apartment (R-3/R-4) 0.18 AF/year/unit Neighborhood Commercial 0.3 AF/year/1,000 SF Parkland 2 AF/year/acre Avila Ranch WSA Avila Ranch, LLC 10/26/2016 6 6.1 Water Conservation Program: Water conservation was first referenced as a part of the City's water management policy in 1973. In 1985, the City adopted the Annual Water Operational Plan policy, establishing water conservation as a means of extending water supplies during projected water shortages. Since 1985, many technological and philosophical changes have occurred which are proving water conservation to be both a short‐term corrective measure for immediate water supply shortages and a long‐term solution to water supply reliability. The City developed a Water Shortage Contingency Plan to deal with water shortage conditions that could occur due to drought, earthquake, infrastructure failure, or other emergency. The Plan provides the foundation for a staged response to worsening water shortage conditions. The City uses a water projection model to analyze current water storage at the reservoirs and to predict how long the water supplies are available to determine the necessary level of response. There are six stages of the Plan: Monitor, Watch, Warning, Severe, Extreme, and Critical. Each stage provides different levels of response for a water shortage event ranging from a ten percent supply deficiency up to a 50 percent or greater deficiency. The Plan is also a required component of the City’s UWMP which is updated every five years per State Water Code. The City also recognizes the importance of long‐term water efficiency by supporting programs that will enhance water supply reliability and comply with any current and/or future state mandates in water use reductions. In 2009, Senate Bill X7‐7 was passed requiring water agencies to reduce per capita water use by 25 percent by the year 2020. The City’s target per capita water use would be 117 gpcd. In 2013, the City already met that target with a use of 116 gpcd. In 2014, the City’s use was 105 gpcd. In terms of water supply reliability the City was one of the original signatories to the Memorandum of Understanding (MOU) Regarding Urban W ater Conservation and has actively pursued the implementation of the water efficiency best management practices (BMPs) prescribed in the MOU. The MOU was a negotiated agreement between water purveyors statewide and environmental organizations on how best to utilize the State’s water resources by incorporating conservation into their water management practices. The BMPs have been developed over the years by water purveyors, environmental groups, and industry stakeholders. They represent the best available water conservation practices based on research and experience and include: • Water conservation pricing and rate structures, • Technical assistance for water customers, • Incentives for indoor and outdoor water saving technologies, • Public information and outreach, and • Water audits. On July 15, 2014, the California State Water Resources Control Board adopted emergency drought regulations that were to be implemented by all urban water suppliers who have over 3,000 water connections regardless of that community’s water supply situation. Water purveyors who do not implement the mandatory requirements face up to $10,000 per day in fines and other penalties. The Emergency Regulations are in effect for 270 days but can be rescinded, extended or amended based on drought conditions. Notwithstanding the city’s stable water supply position, the Emergency Regulations specifically mandate that the City implement mandatory outdoor water restrictions and water waste Avila Ranch WSA Avila Ranch, LLC 10/26/2016 7 prohibitions or face fines up to $10,000 a day and no access to state grants and loans. Accordingly, city council adopted an ordinance limiting the outdoor irrigation of ornamental landscape and turf with potable water to three days a week, and allocated funding for education and public outreach effects. In response to the continued drought conditions, the State Water Board extended the 2014 emergency regulations and added new measures on March 17, 2015. As a result of these new measures, the City is required to reduce its water use by an average of 12 percent from June 2015 to February 2016. To achieve this reduction, the City Council adopted a drought response strategy in June 2015. This strategy includes: • Adoption of a resolution declaring a drought emergency. • Adoption of a resolution to defer new landscape installation or the use of modified landscape plans during the drought emergency. • Introduction of an ordinance amending Chapter 13.07 of the City’s Municipal Code to include two-day-a-week and time-of-day restrictions for outdoor watering. • Approval of an incentive program for high efficiency toilets and washing machines. • Adoption of a resolution establishing a permit fee for the use of the Corporation Yard groundwater well. 7. ENTITLEMENTS/REGULATORY APPROVALS Water Code Section 10910(d)(2) requires the identification of existing water supply entitlements, water rights, or water service contracts, federal, state, and local permits for construction of necessary infrastructure, and any regulatory approvals required in order to be able to deliver the water supply. The City's entitlements are described above in the section describing water supply. 8. AVILA RANCH PROJECT The Avila Ranch site is proposed to be developed into single-family and multi-family dwelling units, commercial, parks, and open space. Table 8-1 was developed to project Avila Ranch’s water demand using the City’s water use factors. Using these water demand factors shows that the total water use of Avila Ranch would be 189 AF/year. Table 8-1. Avila Ranch Project Water Demand by Use Factors AREAS Water Use Factor Quantity Water Demand Single-Family Residences (R-1) 0.3 AF/year/unit 101 30.3 Single Family (R-2) 0.21 AF/year/unit 297 62.4 Apartment (R-3/R-4) 0.18 AF/year/unit 322 58 Neighborhood Commercial 0.3 AF/year/1,000 SF 7,793 2.3 Parkland 2 AF/year/acre 18 36 Total (acre-feet/year): 189 Note: R-1 zoning = Single-family residence R-2 zoning = Single family R-3 & R-4 zoning = Apartments Avila Ranch WSA Avila Ranch, LLC 10/26/2016 8 For comparison, Table 8-2 shows a summary of the project water demands under each land use area of the proposed site. These demands were calculated and presented in the Preliminary Irrigation Water-Use Estimate, see Appendix A. The estimated total water demand for the Avila Ranch Project is shown in Table 8-2. Table 8-2. Avila Ranch Water Demand – Project Specific AREAS Person Per Unit Irrigation Demand potable Irrigation demand non-potable Indoor Domestic Demand Total R-1 2.29 1,223,830 2,861,867 4,085,697 R-2 2.29 2,184,446 8,415,589 10,600,035 R-3 2.29 885,204 5,582,057 6,467,261 R-4 2.29 339,106 3,541,914 3,881,020 Commercial 70,542 70,542 Community Garden Beds 274,997 274,997 Riparian Open Space 2,655,191 2,655,191 Drought Tolerant Open Space 2,516,699 2,516,699 Turf (Park Area) 7,003,362 7,003,362 Drought Tolerant Park 3,611,368 3,611,368 Drought Tolerant Parkways 457,624 457,624 Total (gallons/year): 3,408,276 17,814,093 20,401,427 41,623,796 Total (acre- feet/year): 10.4 54.7 62.6 127.7 Table 8-3 compares the City’s available water with Avila’s projected usage. Avila Ranch’s potable water use was included in the buildout population and associated water demands of the City’s available water (Table 5-2). Table 8-3. City Water Supply Availability and Avila Ranch Water Usage City Primary Water Supply City Water Usage City Water Available Avila Ranch Use (project specific) Avila Ranch Use (calculated by use factors) 7,496 4,908 2,588 127.7 189 As shown in Table 8-2 above, 54.7 AF/year is planned to come from non-potable sources with the use of recycled water lines to the site. Appendix B shows the recycled water use area’s within Avila Ranch. The project also has an existing well that is located on the north-west corner of the site. The well is being tested for water quality, as well as production capabilities. Avila Ranch WSA Avila Ranch, LLC 10/26/2016 9 If production rates are high enough, this well could potentially be used for non-potable water at the proposed parks. Potential water-saving programs will be implemented for the project in an attempt to reduce the water demand use even further as part of the Water Conservation Policy 7.2.2 in the Airport Area Specific Plan, see Appendix C. This involves using recycled water for all planter areas except the residential lots, water saving devices and features in the design of the homes and lots, and potential for using the existing onsite well for onsite irrigation. All plant species selected for the parkways, and drought tolerant open space areas of the site meet the Very Low Water Needs categories under the California Water Use Classification of Landscape Species (WUCOLS) list. All of the planter areas except the turf play areas and portions of the community garden beds are intended to be irrigated using drip and/or low-volume irrigation equipment. In addition, it is anticipated that the native plantings in the drought tolerant and riparian open space areas will receive temporary establishment irrigation that will be reduced over time and eventually activated only during periods of extended drought or prolonged periods of high temperatures. The irrigation design will implement all appropriate and available tools and techniques towards achieving maximum water application uniformity (distribution uniformity). Such measures will include utilizing dedicated landscape water meters, soil moisture sensors, central irrigation controllers and master valves combined with flow sensors. Weather based irrigation controllers that are tied to CIMIS (California Irrigation Management Information System) weather data will be used for the larger landscape areas. This type of controller communicates with a nearby CIMIS weather station and adjusts irrigation application based on real-time weather conditions. Other smaller landscape areas or POC’s (Points of Connection) may utilize basic weather based ‘smart’ irrigation controllers, that adjust water application based on historic Eto data pre- programed into the controller, as opposed to actual real-time weather data. Irrigation zones will be determined by means of defining hydrozones, whereby all irrigation circuits will be spatially defined by virtue of grouping plants with the same water needs and similar climatic and soil conditions (and/or other factors that impact watering needs). Per Appendix A, all planter areas, except Turf (Park Areas) are using ETAF (Evapotranspiration adjustment factor) of 0.50. Avila Ranch WSA Avila Ranch, LLC 10/26/2016 10 9. CONCLUSION The water supply demand for the Avila Ranch project was included in the City’s Land Use and Circulation Element Update Water Supply Assessment. A sufficient water supply is available to serve the project no matter which method is used to calculate the demand. Using the City’s land use water factors, the Avila Ranch project’s total water demand is 189 AF/year. The Applicant project’s the Avila Ranch project will demand 127.7 AF/year of the City’s available supply. Based on these water demand projections, there is a sufficient supply of water to meet the project’s needs. Using project-specific water demand information, 73 AF/year of the City’s available supply is required, and 54.7 AF/year of the available recycled water would be utilized. Both of these water needs are within the water demand calculated as part of the primary water supply. This conclusion was determined based on this Water Supply Assessment and supporting information in the records of the City of San Luis Obispo. Avila Ranch WSA Avila Ranch, LLC 10/26/2016 11 REFERENCES San Luis Obispo, City of. General Plan – Chapter 8 Water and Wastewater Management Element. Adopted February 24, 1987, Revised June 15, 2016 San Luis Obispo, City of. 2015 Urban Water Management Plan. Adopted June 14, 2016 San Luis Obispo, City of. Land Use and Circulation Element Update Water Supply Assessment. Adopted June 2014 San Luis Obispo, City of. Orcutt Area Specific Plan – Water Supply Assessment. Approved March 5, 2008 San Luis Obispo, City of. 2015 Water Resources Status Report Memorandum of Understanding Regarding Urban Water Conservation in California. Amended September 17, 2014 Avila Ranch Avila Ranch, LLC 10/26/2016 12 TECHNICAL APPENDICES The following technical appendices are included: • Appendix A: Preliminary Irrigation Water-Use Estimate • Appendix B: Avila Ranch Recycled Water Use Areas • Appendix C: Airport Area Specific Plan: Water Conservation Policy 7.2.2 APPENDIX A: PRELIMINARY IRRIGATION WATER-USE ESTIMATE AVILA RANCH Preliminary Irrigation Water‐Use Estimate10/25/2016 NOTES:SUMMARY OF ESTIMATED WATER USE (Refer to Detailed Preliminary Calculations on the following page)MAWA (Gallons)PRE‐EMERGENCY REGULATIONSAREASHYDROZONES (SF) MAWA (Gallons)ETWU (Gallons) ETAF Used43.8 x 0.62 x ([0.7 x LA) / (0.3 x SLA) RIPARIAN OPEN SPACE195,551 2,752,967 2,655,1910.5 3,775,933DROUGHT TOLERANT OPEN SPACE*247,135 3,479,167 2,516,6990.5 4,771,979DROUGHT TOLERANT PARKS265,972 3,744,354 3,611,3680.5 5,135,707TURF at Parks ‐ Hybrid Bermuda 300,876 8,170,589 7,003,3621.0 5,809,675COMMUNITY GARDEN BEDS *22,785 320,764 274,9970.5 439,956DROUGHT TOLERANT PARKWAYS50,555 711,713 457,6240.5 976,177COMMERCIAL (10% of Total SF)7,793 109,710 70,5420.5 150,477R‐3 RESIDENTIAL (20% of Total SF)97,791 1,376,702 885,2040.5 1,888,266R‐4 RESIDENTIAL (20% of Total SF)37,462 527,390 339,1060.5 723,361R‐2 / 4‐PACK RESIDENTIAL107,026 1,506,712 968,7990.5 2,034,479R‐2 / 6‐PACK RESIDENTIAL134,296 1,890,619 1,215,6470.5 2,552,860R‐1 / SINGLE FAMILY RESIDENTIAL135,200 1,903,346 1,223,8300.5 2,570,044TOTAL IRRIGATED LANDSCAPE1,602,442 26,494,032 21,222,37130,828,913TOTAL IRRIGATED LANDSCAPE IN ACRES: 36.8‐14.06%ACRE FEET WATER: 81.31 65.13 MAWA ‐ Maximum Applied Water Allowance ETWU ‐ Estimated Total Water UseNote: All Residential planter areas are using ETAF of 0.50The following landscape irrigation calculations are based on the current TTM and preliminary site plans to date. This Preliminary Irrigation Water‐Use Estimate is only considered an approximation of the final landscape irrigation needs and is based on City of SLO Resolution: R‐10628 and direction provided by Ron Munns. Irrigation calculations may change as the project progresses, and calculations are subject to revisions as required on subsequent submittals. Acutal water use may be lower than as indicated in these calculations since planting density is likley to be less than average in the Native Riparian and Native Open Space catagories. ETo Rate of 43.80 used (Per California Dept. of Water Resources. The Agricultral Parcel and Orchard areas are not included in these calculations. PERCENTAGE THAT PROPOSED MAWA IS UNDER PRE‐EMERGENCY REGULATIONSAvila Ranch VTM ‐ Preliminary Landscape Water Calculations Oct. 25, 2016 AVILA RANCH Preliminary Irrigation Water‐Use Estimate10/25/2016PROPOSED LAND USETOTAL LANDSCAPE AREA (SF)WATER USE PER (WUCOLS)PLANT FACTOR (WUCOLS)REFERENCE EtoEto ADJUSTMENT FACTORESTIMATED HYDROZONE (SF)IRRIGATION EFFICIENCYMAWA (Gal/Yr.)ETWU (Gal/Yr.)POTABLE OR RECLAIMED WATER NOTESRIPARIAN OPEN SPACE 195,551 MODERATE 0.4 43.8 0.5 195,551 0.8 2,752,967 2,655,191 ReclaimedETAF of 0.5 used as directed by Ron Munns of City of SLODROUGHT TOLERANT OPEN SPACE* 494,270 LOW 0.3 43.8 0.5 247,135 0.8 3,479,167 2,516,699 ReclaimedETAF of 0.5 used as directed by Ron Munns of City of SLODROUGHT TOLERANT PARKS 265,972 MODERATE 0.4 43.8 0.5 265,972 0.8 3,744,354 3,611,368 ReclaimedETAF of 0.5 used as directed by Ron Munns of City of SLOTURF at Parks ‐ Hybrid Bermuda 300,876 MODERATE 0.6 43.8 1.0 300,876 0.7 8,170,589 7,003,362 ReclaimedETAF of 1.0 used as directed by Ron Munns of City of SLO ‐ 60% of EtoCOMMUNITY GARDEN BEDS *28,481 MODERATE 0.4 43.8 0.5 22,785 0.9 320,764 274,997 PotableETAF of 0.5 used as directed by Ron Munns of City of SLODROUGHT TOLERANT PARKWAYS 50,555 LOW 0.3 43.8 0.5 50,555 0.9 711,713 457,624 ReclaimedETAF of 0.5 used as directed by Ron Munns of City of SLOCOMMERCIAL (10% of Total SF) 7,793 LOW 0.3 43.8 0.5 7,793 0.9 109,710 70,542 ReclaimedETAF of 0.5 used as directed by Ron Munns of City of SLOR‐3 RESIDENTIAL (20% of Total SF) 97,791 LOW 0.3 43.8 0.5 97,791 0.9 1,376,702 885,204 ReclaimedETAF of 0.5 used as directed by Ron Munns of City of SLOR‐4 RESIDENTIAL (20% of Total SF) 37,462 LOW 0.3 43.8 0.5 37,462 0.9 527,390 339,106 ReclaimedETAF of 0.5 used as directed by Ron Munns of City of SLOR‐2 / 4‐PACK RESIDENTIAL 107,026 LOW 0.3 43.8 0.5 107,026 0.9 1,506,712 968,799 PotableETAF of 0.5 used as directed by Ron Munns of City of SLOR‐2 / 6‐PACK RESIDENTIAL 134,296 LOW 0.3 43.8 0.5 134,296 0.9 1,890,619 1,215,647 PotableETAF of 0.5 used as directed by Ron Munns of City of SLOR‐1 / SINGLE FAMILY RESIDENTIAL 135,200 LOW 0.3 43.8 0.5 135,200 0.9 1,903,346 1,223,830 PotableETAF of 0.5 used as directed by Ron Munns of City of SLOTOTAL PROJECT : 1,855,27326,494,032 21,222,371NOTES:*HYDROZONE AREA FOR DROUGHT TOLERANT OPEN SPACE IS BASED ON 50% OF TOTAL CATEGORY LANDSCAPE AREA DUE TO LOWER DENSITY SPACING*HYDROZONE AREA FOR COMMUNITY GARDEN IS BASED ON 80% OF TOTAL CATEGORY LANDSCAPE AREA DUE TONON‐IRRIGATED SPACES OF OTHER USE‐AREA WITHIN CREEK SETBACK TO BE MITIGATED PER BIOLOGIST'S RECOMMENDATION. ANY IRRIGATION WILL BE TEMPORARY AND USE RECYCLED WATER.‐PEDESTRIAN ACCESS EASEMENTS ARE INCLUDED IN RESIDENTIAL LANDSCAPE AREA TOTALS.‐UPDATED FIGURES REFER TO MITIGATED PROJECT ANALYSIS.IRRIGATION DESIGN APPROACH:ALL PLANTER AREAS (EXCEPT THE LAWN, BIO‐RETENTION AREAS, & SOME OPEN SPACE AREAS) ARE INTENDED TO BE IRRIGATED USING DRIP AND/OR LOW‐VOLUME IRRIGATION EQUIPMENT.LAWN PLANTERS WILL LIKELY BE IRRIGATED WITH ROTOR OR ROTARY SPRAY POP‐UP NOZZLES. BIORETENTION AREAS WILL BE IRRIGATED WITH ROTOR OR ROTARY SPRAY POP‐UP NOZZLES, DUE TO POSSIBLE SOIL MAINTENANCE DAMAGE TO A DRIP SYSTEM.SMALL LAWN AREAS MAY BE IRRIGATED WITH SUB‐SURFACE, IN‐LINE DRIP EMITTERS WITH AIR RELIEF AND FLUSH VALVES.Avila Ranch VTM ‐ Preliminary Landscape Water Calculations Oct. 25, 2016 APPENDIX B: AVILA RANCH RECYCLED WATER USE AREAS 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863 APPENDIX C: AIRPORT AREA SPECIFIC PLAN: WATER CONSERVATION POLICY 7.2.2