Loading...
HomeMy WebLinkAbout01-09-2018 Item 12 Preliminary Results of the Capital Facilities Fee Program Nexus StudyMeeting Date: 1/9/2018 FROM: Michael Codron, Community Development Director Prepared By:Xzandrea Fowler, Deputy Director - Long Range Planning SUBJECT:PRELIMINARY RESULTS OF THE CAPITAL FACILITIES FEE PROGRAM NEXUS STUDY: STUDY SESSION #2 RECOMMENDATION 1. Participate in a study session and receive a presentation on the revised preliminary results of the Capital Facilities Fee Program Nexus Study and the Water and Wastewater Capacity and Connection Fee Program Study; and 2. Receive public input and provide guidance to staff regarding fee options and policy considerations for implementation; and 3. Direct staff to return on March 6, 2018, with applicable ordinances and resolutions to implement the updated Capital Facilities Fee Program based on the options endorsed by City Council. REPORT-IN-BRIEF On October 17, 2017, the City Council participated in a study session on the preliminary results of the Capital Facilities Fee Program Nexus Study and the Water and Wastewater Capacity and Connection Fee Program Nexus Study. The preliminary results presented at that hearing represented the maximum fees that could be charged to development based on the improvements identified or the service level desired, consistent with legal nexus requirements and fair-share analysis applied on a project by project basis. The Council considered the effect of implementing a maximum fee program and provided staff with guidance regarding policy considerations. The Council then directed staff to return with more analysis of the fee burden with respect to project feasibility for specific development prototypes, impacts to affordable housing objectives, identification of alternative infrastructure funding sources, refinement of the project transportation improvement lists, development of an anticipated park and recreation project list, implementation phasing, and to engage additional community outreach. In response to Council direction, staff and the consultant team completed the following tasks: 1. Re-evaluated Development Feasibility for development prototypes and active development projects 2. Re-evaluated and Recalculated the Transportation Impact Fee 3. Re-evaluated the Parkland, Fire and General Government Impact Fees 4. Developed Fee Level Recommendations 5. Conducted Additional Community Outreach A summary of these items is further discussed in this report and in Attachment A. The consideration of the Final Capacity and Connection Fee Study and the Final Capital Facilities Fee Program Study is on the Council Agenda for March 6, 2018. Implementation of the new fee programs is planned for March/April 2018. Packet Pg 305 12 BACKGROUND General Plan Policies City of San Luis Obispo General Plan, Land Use Element Policy 1.13.9., Costs of Growth, states the following: The City shall require the costs of public facilities and services needed for new development be borne by the new development, unless the community chooses to help pay the costs for a certain development to obtain community-wide benefits. The City shall consider a range of options for financing measures so that new development pays its fair share of costs of new services and facilities which are required to serve the project, and which are reasonably related to the new growth attributable to the development. Mitigation Fee Act The Mitigation Fee Act (Assembly Bill 1600) is contained in California Government Code Section 66000 et.seq., and established constitutional limits and “ground rules” for the imposition and administration of impact fee programs. The Act became law in January 1988 and requires local governments to document the following when adopting an impact fee: 1. Identify the purpose of the fee; 2. Identify the use of the fee revenues; 3. Determine a reasonable relationship between the use of the fee and the type of development paying the fee; 4. Determine a reasonable relationship between the need for the fee and the type of development paying the fee; and 5. Determine a reasonable relationship between the amount of the fee and the cost of the facility attributable to development paying the fee. In summary, a fee cannot be more than the cost of the public facility needed to accommodate the new development paying the fee, there needs to be a nexus between the project and fee, and the fee revenues can only be used for their intended purpose. Development Impact Fee Program Policy Considerations A well-planned fee program can generate sufficient funds to allow the city to adequately mitigate capital need impacts created by new development. Conversely, a poorly planned fee can result in the city either collecting too little money and being forced to close the funding gap through alternative funding sources, collecting too much money based on an unsupported fee program, thus exposing the city to a fee challenge, or discouraging development that is consistent with City policies and goals. Prior Council Direction The following is a summary of Council’s discussion points and direction during City Council Study Session #1: Packet Pg 306 12 1. Development Feasibility.Feasibility is a concern. The Council expressed support for the development projects in the pipeline and wants to avoid the creation of major feasibility hurdles through the adoption of updated development impact fee programs. Council expressly supports the development of affordable workforce housing and does not want the fee program to discourage the provision of this type of housing, nor the type of commercial development that supports residential uses. Council requested to see additional development feasibility analysis of smaller homes and industrial prototypes among others, as well as project-specific analysis whereby project-specific infrastructure burdens can also be incorporated into the analysis of the total fee burden. 2. Parkland Investment. Council requested more information about how the parks fee revenue would be spent (e.g., identification of priority projects/expenditures) to determine whether the whole fee should be changed at this time or if any changes to the fee program should wait for the completion of the pending Parks and Recreation Master Plan. 3. Fee Reduction Options.Council directed staff and the consultant team to look for strategies to reduce fees and test the effects of implementing those strategies, consistent with the options presented by the consultant team: a) Reduce fees by reducing infrastructure investments. Council provided direction to review the transportation project list and identify those projects that are not high priorities or not likely to be built by the year 2035-time horizon. Council also indicated that the fee for General Government may not be appropriate at this time. b) Reduce fees and identify alternative funding sources. Council indicated that to achieve certain policy objectives (e.g., infill development and affordable workforce housing), the City may need to consider discounting or other reductions that would require identification of other funding sources. There was also discussion of the possibility of grouping together a range of improvements that could be packaged into an initiative for voter approval associated with non-fee funding sources. c) Adjust transportation cost allocations. Council provided direction to consider a single citywide fee for transportation, which will spread the fee, resulting in an increase to the fee in the North Area and a decrease in the fee in the South Area. d) Adjust how the fee is implemented. Council indicated a willingness to consider implementation adjustments, such as phasing in fees. 4. Outreach.Council indicated that there needs to be more outreach with developers of active projects and the general public. 5. Existing vs. New Fees.Council requested to see a clearer presentation of current fees compared with maximum (and, eventually, recommended) fee levels. Packet Pg 307 12 6. Additional Council Study Session.Staff and the consultant team were directed to return to Council in the form of a second study session to describe additional technical analysis, revised maximum fees, and fee implementation options and tradeoffs. DISCUSSION Capital Facilities Fee Program Update 1. General Government Facilities Impact Fee This fee is intended to address the need for public building facilities to accommodate new development in the City of San Luis Obispo. These public buildings include city hall and the public works/community development administrative office facilities. The fee schedule presented is based on the cost of these facilities to ensure that new development provides adequate funding to expand these facilities to meet its needs. Specifically, the fee reflects the project costs associated with the conversion of the Little Theater, located adjacent to City Hall, into additional administrative office and conference space. This fee was not updated, the fee summary table is provided in Attachment F. 2. Public Safety Fee This fee is intended to address the need for public safety facilities to accommodate new development in the City of San Luis Obispo. The fee schedule presented is based on the cost of these facilities to ensure that new development provides adequate funding to meet its needs. The fee presented is broken down into the following components: a. Fire Facilities b. Police Facilities The Fire Facilities fee component reflects the project costs associated with a variety of fire safety related capital improvements that include existing fire station repairs and the construction of Fire Station 5. This fee component also includes the cost associated with the replacement or purchase of fire vehicles and apparatus. This fee was updated to reflect additional input from Fire Chief Olson. An updated fee summary table is provided in Attachment E. The Police Facilities fee component reflects the project costs associated with the construction of a new police headquarters, as well as the cost associated with the purchase and replacement of police vehicle fleet that are necessary to serve new development. This fee was not updated, the fee summary table is provided in Attachment D. 3. Parkland Fee This fee is intended to address the need for parks and recreational facilities to meet the new Packet Pg 308 12 demands on City parks and facilities arising from new development in the City of San Luis Obispo. The fee schedule presented is based on the cost of acquiring land for parks and recreational facilities and/or adding amenities and/or facilities to existing parks to meet the new park and recreational needs of new residents, employees, and visitors. In response to Council direction, a list of potential/illustrative park improvement projects was developed to demonstrate how revenue from this fee could be used. It is incomplete and only represents a portion of need. Further refinement of this list will occur with the update of the City’s Parks and Recreation Element and Master Plan Update. This fee was not updated, the fee summary table is provided in Attachment C. 4. Transportation Fee This fee is intended to address the need for transportation facilities to accommodate new development in the City of San Luis Obispo. These include multimodal projects such as intersection & corridor improvements, protected bikeways, buses and transit facilities. The fee schedule presented is based on the cost of these facilities to ensure that new development provides adequate funding to meet its needs.In response to Council direction the transportation improvement project list and associated costs were re-evaluated with the objective of removing those projects that a) are not required for new development to proceeded, b) are not likely to be built prior to the build out of the General Plan, c) have a low chance of securing other needed funding, or d) have a high chance of securing other funding. In the context of this review, a system of prioritization was created. This revised project list was incorporated into the analysis to develop revised fee level calculations. To the extent possible, any project that was removed from the list that was presented at the October 17th study session was re-allocated to applicable specific developments, and it was assumed that the associated project costs would become part of the project-specific costs that were evaluated in the updated feasibility analysis. Trip rates and/or cost allocations were also revised as appropriate. A single or “one happy family” Citywide transportation fee was also developed for comparison with the updated North Area/South Area fee calculations, so that Council can have a better understanding of the relative tradeoffs associated with the different approaches. An updated fee summary table is provided in Attachment B. Water and Wastewater Capacity and Connection Fee Program On October 17, 2017 the Utilities Department and its Capacity and Connection Fee Study consultant from HDR Engineering, Inc. presented fee options consistent with Council direction provided at the February 7, 2017 study session. Staff recommended fee options that equitably distribute infrastructure costs to ensure both new and existing water and wastewater ratepayers pay their fair share of infrastructure-related investments. Council took no action on the fees at the meeting, but provided feedback and directed staff to return with its recommended fees with the City’s AB 1600 fee study so that the feasibility of the City’s fee program could be considered comprehensively. At the October 17 meeting, Council supported fee study options that eliminated the wastewater catchment area fees in favor of a citywide wastewater fee and the tiering of residential fees where reduced fees were available for smaller residential units. The recommended residential fees are shown below. Packet Pg 309 12 Table 1: Recommended Residential Fees Water Wastewater Total % Reduction* > 1,200 SF $ 15,780 $ 12,602 $ 28,382 - 801-1,200 SF $ 12,624 $ 10,082 $ 22,706 -20% 451-800 SF $ 11,046 $ 8,821 $ 19,867 -30% Mobile Homes $ 9,468 $ 7,561 $ 17,029 -40% 450 SF or less $ 4,734 $ 3,781 $ 8,515 -70% NOTE: The percent reduction shown above is from the fee for one residential unit greater than 1,200 square feet, which is based on existing water consumption data for similarly sized residential units. Council was interested in whether or not the project list used in the Capacity and Connection Fee Study could be further refined, or “fine-tuned.”Staff reviewed the projects included in the Capacity and Connection Fee Study to see whether reductions could be made. However, the recommended fees include a prioritized list of capital projects from water and wastewater master plans prepared following the update of the General Plan Land Use Element in 2014. The Fee Study includes only the highest priority water and wastewater projects necessary to provide the required capacity for the General Plan that could be feasibly delivered over the next ten years. The projects are also equitably distributed between existing customers through rates (84% of project costs) and new development through the recommended Capacity and Connection Fees (16% of project costs). Council was interested in whether or not alternative funding sources could be utilized, such as assigning a greater portion of the burden to water and wastewater rates. Staff provided two alternatives including the “status quo” alternative and the Water Option 1/Wastewater Option 3 alternative. These alternatives were not recommended as they both place a greater than “fair share” portion of capital improvement costs on existing water and wastewater ratepayers.The rate increases shown below, do not include any escalation due to other cost impacts carried in the rates, so the actual impact may be greater than presented in Table 2. Table 2: Estimated Water and Wastewater Customer Rate Impacts Annual Impact to Water Rate (Per Customer) Annual Impact to Wastewater Rate (Per Customer) No Action/Status Quo $68 $133 Water Option 1/ Wastewater Option 3 $59 $29 NOTE: Assumes revenue burden would be applied equally to all customers for 25 years. Realistically, impact will vary by water consumption and customer class (residential, multi- family residential, non-residential, and irrigation). Water Option 1 –This option includes only debt-financed water infrastructure. Option 1 does not include a buy-in component to existing water infrastructure. Packet Pg 310 12 Wastewater Option 3 –This option includes only debt financed wastewater infrastructure, and includes the cost of all catchment area improvements, for a single fee for all customers connecting to the City’s system. This option does not include buy-in to the sewer mainline portion of the existing wastewater infrastructure. Impact Fee Program Implementation The facility and infrastructure impact fees for general government, public safety, parks and recreation, transportation, and water and wastewater capacity and connection, would typically be collected at the time of building permit issuance. However, in response to Council direction recommendations for implementation approaches, such as phasing, and the timing of fee collection, as well as the tradeoffs associated with a range of options intended to reduce, re- calibrate, or delay fee changes, are presented below for Council consideration. A. Reduce Fees by Reducing Infrastructure Investments These options reduce fee levels without creating off-setting demands on other revenue sources. These options are primarily focused on reducing required infrastructure expectations/investments/standards and do not create a need to secure other sources of funding. 1. For transportation, prioritize and reduce the project list. For example, consider removal of a set of lower priority projects, projects that are not likely to be built, projects with a very low chance of securing other funding (e.g., grants, direct developer contributions, or regional funding), and/or projects with a very high chance of securing total funding from other sources (e.g., grants for multi-modal improvements). 2. For transportation, evaluate other ways to finance the improvements so that financing costs can be removed for those projects for which financing costs are included. 3. For General Government and Parks Fees on Commercial Development, consider charging less than the maximum fee. Because these fees are based on a service standard rather than a capital program, while investment in these facilities will be reduced, there is no need to identify other funding. 4. For Police, consider switching the approach to a service standard approach, rather than tying the fee to a plan for the headquarters facility. Note that this option perpetuates the existing space deficiency on a per service population basis. 5. Do not adopt fees for General Government, Police, and/or Fire. While this would lower the overall fee burden, it would mean deciding not to move forward with certain General Government, Police, or Fire facilities or identifying other funding. B. Reduce Fees and Identify Alternative Funding Sources The following approaches require other funding sources to “back-fill” the reduction in fee revenues. 1. Consider transportation impact fee discounts for certain land use categories (e.g., commercial and industrial development or affordable workforce/missing middle housing) Packet Pg 311 12 2.Reconsider the City’s affordable housing fee program. C. Change Transportation Cost Allocations and Fees These options will lower the transportation fees for some and increase it for others relative to the estimated maximum transportation development impact fee schedule. Some of these options would require additional technical analysis. 1. Consider blending the North Area and South Area into one Citywide fee. 2. Merge the LOVR fee program into the Citywide fee program. 3. Merge some (or all) commercial/non-residential land use categories. 4. For the Transportation fee on retail, consider a pass-through trip adjustment. This will reduce retail transportation fees but increase other transportation fees. 5. Consider a policy-based trip rate reduction, (e.g., reduce retail trips by 30% because 30% of retail development is “local-serving” and hence is only present due to residential development). 6. Integrate average Vehicle Miles Travelled (VMT) into transportation fee calculations such that fees are based on both trip rates and average miles travelled; in other fee studies, this has resulted in a reduction in transportation fees on retail development. D. Fee Timing/ Implementation Options 1. Transportation fees could be phased in (e.g., 20% in first year, 40% in second year, 60% in the third year, 80% in the forth year, and 100% in fifth year). This option has implications for needing to identify other funding sources to back-fill uncollected fee revenue. 2. Fees can be deferred. Rather than charging fees at the time of building permit issuance, fees can be charged at the later certificate of occupancy date. The implementation options mentioned above for reducing fee levels to address remaining feasibility concerns will increase the likely hood that the Capital Facilities Fee Program will be underfunded, which will shift the pressure to non-development impact funding sources to bridge the funding gap for the infrastructure and facilities projects that are identified in the Capital Facilities Fee Program Update section of this staff report. Other Funding Considerations In response to Council direction regarding updated fee level calculations, development feasibility, and the implementation options, staff and the consultant team will re-evaluate the availability of alternative funding sources to provide Council with a recommended list. One strategy that staff would like Council direction on involves “bundling” the community’s infrastructure and facilities priorities into a parcel tax. Community Outreach In response to Council direction, on November 21, 2017 staff brought forth for Council consideration a Resolution of Intent to apply the pending Capital Facilities Fee Program and Water and Wastewater Capacity and Connection Fee Program to new development. The premises behind this effort was that greater certainty up front as to the impact fee amount and Packet Pg 312 12 any other requirements can be of substantial benefit to a developer in saving time and costs as opposed to the situation with little clarity and ad hoc negotiations. Since development impact fees offer a mechanism for paying a development’s fair share of costs it can be of benefit to a developer compared to a situation where the largest project or the first project in an area must pay the full cost of improvements serving the larger surrounding area while subsequent projects pay less. Council adopted Resolution No. 10849 (2017 Series), see Attachment G. Staff also held another Developer’s Roundtable meeting on December 11, 2017, that was well attended by a variety of representatives from the development community. Staff provided an overview of the tasks that were underway to address the Council direction that was received during the October 17th study session, provided an updated project schedule, and requested feedback and submittal of approved or in process retail, industrial, office and residential projects that could be used as case studies for the feasibility analysis. Several developers submitted projects for consideration, that have been incorporated into the updated prototypes and feasibility analysis. Impact Fee Program Feasibility Considerations In response to Council direction, the feasibility analysis was refined and updated to show current fee levels as a basis for total fee burden comparison, to the extent possible. There are certain geographic areas, such as the Airport Area Specific Plan (AASP), for which there is no existing residential impact fee established, so staff and the consultant team made assumptions about the geographic location of each prototype. The revised total fee burden charts have been expanded to reflect current fees and revised fee levels to illustrate the magnitude of the change, see Attachment A. City staff and the consultant team, with the assistance of the development community, created new prototypes for evaluation that reflect current development projects in the City, including a small-lot, single-family detached residential unit that is “affordable by design” and an industrial development. The consultant team conducted market research to estimate appropriate values and coordinated with relevant developers as needed to obtain project-specific information. Provided below is a summary of the analysis methodology, the specific case studies that were used, and the total fee burden factors that were evaluated. The feasibility analysis charts, provided in Attachment A, illustrate existing fee levels compared with the revised fee levels for a series of development prototypes against the back-drop of industry standard infrastructure burden feasibility norms. Throughout the charts, cross-hatching indicates that the consultant team has made certain assumptions and used some judgement about which fees to show and/or the best way to illustrate the cost of a fee that is otherwise not straight-forward to calculate. Notes are included throughout to explain any assumptions that were used. In all cases, the water and wastewater fees reflect the recommended connection charges as provided by the Utilities Department. In addition, because affordable housing fees, public art-in-lieu fees and school district fees are Packet Pg 313 12 not part of this update, they are shown in aggregate, though the detail of each fee is shown on the data table, following each chart. Consistent with Council direction, case studies that specifically evaluate three different single- family product types as though they were being developed in the recently approved Avila Ranch Specific Plan area. Since the Avila Ranch development will introduce residential development to the Airport Area Specific Plan, where residential uses had not been contemplated before, the consultant team used the existing Los Osos Valley Road (LOVR) base fee and subarea fee and the Margarita Area Specific Plan (MASP subarea fee as a proxy for existing transportation fee levels in the AASP. In addition, to quantify a proxy cost for the parkland fees for single family development in the Avila Ranch series of prototypes, the consultant team used the Avila Ranch Development Agreement to quantify it on a per unit basis, and applying that cost as a proxy for the park fee requirement. Since the new development typically faces other infrastructure costs outside of a formal fee program that contributes to a development’s overall infrastructure burden, the consultant team included a proxy for these costs based on conversations with the Avila Ranch team. These too are cross-hatched. For the Avila ranch series, the existing “other infrastructure” costs are not known; however, they are shown (with a “?”) to reflect that this fee update is formalizing certain “other infrastructure” cost and incorporating them into the fee program. CONCURRENCES The proposed update to the City’s development impact fee programs combined sound technical analysis with a collaborative, iterative, and informed decision-making process. The technical analysis was grounded in legally defensible nexus arguments, with ongoing policy direction from various stakeholders, including City staff, advisory bodies, the local public, and the development community. To help achieve politically and economically acceptable fees, the ultimate objective was the establishment of a revised set of development impact fees that strike a mutually enforcing balance between infrastructure and parks and new residential and economic development in the City. ENVIRONMENTAL REVIEW This is a study session, so staff is not recommending Council take any action on the Capital Facilities Fee Program Nexus Study or the Water and Wastewater Capacity and Connection Fee Study now. Modification of rates and charges by public agencies is statutorily exempt from the California Environmental Quality Act (CEQA) under Section 15273 of the Public Resources Code because changes in fees is not intended to fund expansion of capital projects not otherwise evaluated under CEQA. FISCAL IMPACT This is a study session, therefore there is no direct fiscal impact associated with it. However, there will be fiscal impacts associated with any action the City Council takes when it considers the Final Water and Wastewater Capacity and Connection Fee Study and the Final Capital Packet Pg 314 12 Facilities Fee Program Nexus Study on March 6, 2018. The following is a summary of the alternative funding sources that could be used to fund the infrastructure and facilities that will be impacted because of new development: x Existing or new General Fund revenues x Existing or new general-purpose taxes x New special purpose taxes (any new special purpose tax would require two-thirds voter approval) x Existing or new assessments (any new assessments or property-related charge would require majority property owner approval) x Grants where the use of the funds are restricted for eligible capital facilities improvement projects However, the City has specific policies in place that discourage earmarking general-purpose revenues, whether in the General Fund or Enterprise Funds. It is also the City’s policy that new development should pay its fair share of the cost of constructing the community facilities needed to serve it. For this reason, the City has established development impact fees for water, wastewater, and transportation improvements. The City has also adopted in-lieu fees for parking, parkland dedication (consistent with the Quimby Act), and “inclusionary moderate and low- income housing” requirements. This allows developers to pay in-lieu fees instead of providing the required asset. NEXT STEPS The following objectives are the most important factors in establishing new development impact fees for transportation, water and wastewater capacity and connection, park land acquisition and improvement, general government administration, and public safety: 1.The fees must be legally defensible.The fee should be developed and implemented in a fashion that unambiguously complies with applicable State law. The fees should be based on explicit growth and cost assumptions and sound nexus arguments that ensure the types of improvements and facilities and the costs of the improvements and facilities are directly attributable to benefiting land uses. 2.The fees must be financially effective. The fees developed should provide sufficient means for successfully funding the new improvements and required capital facilities targeted by the program. Given that fee revenues are likely to represent only one, albeit important, funding source for transportation, capital facilities and parks improvements, the development impact fee program must be effectively integrated with other programs and resources to ensure stakeholders (and developers who pay the fees) that the facilities will ultimately be built. 3.The fees must be politically and economically viable.The fees developed in this process should reflect input from key stakeholders in the community to ensure that they receive broad support. Although the technical steps provide the basis for completing the impact fee study, it is recognized that ultimate approval will require compromise and Packet Pg 315 12 policy choices. To this end, it will be important to work closely with stakeholders. In addition, it will be important to understand and monitor the economic implications of the fee program to ensure that financial burdens on development are reasonable and do not hinder growth. The consideration of the Final Capacity and Connection Fee Study and the Final Capital Facilities Fee Program Study is on the Council Agenda for March 6, 2018. Implementation of the new fee programs is planned for March/April 2018. Attachments: a - Total Fee Burden Feasibility Analysis Update (December 2017) b - Updated Transportation Fee Summary Table c - Parkland Fee Summary Table and Project List d - Police Fee Summary Table e - Fire Fee Summary Table f - General Government Fee Summary Table g - Resolution of Intent-10849 (2017 Series) Packet Pg 316 12 0San Luis Obispo Capital Facilities Fee UpdateCAPITAL FACILITIES FEE UPDATE:FEASIBILITY POLICY CONSIDERATIONSPacket Pg 31712 1San Luis Obispo Capital Facilities Fee UpdateGeneral Notes for City StaffThese charts illustrate existing fee levels compared with the revised maximum fee levels for a series of development prototypesagainst the back-drop of industry standard infrastructure burden feasibility norms. Throughout these charts, cross-hatching indicates that EPS has made certain assumptions and used some judgement about which fees to show and/or the best way to illustrate the cost of a fee that is otherwise not straight-forward to calculate. We have tried to include notes throughout to explain our assumptions.In all cases, the water and wastewater fees reflect the recommended connection charges as provided by the Utilities Department.In addition, because affordable housing fees, public art in-lieu fees and school district fees are not part of this update, theyareshown in aggregate, though the detail of each fee is shown on the data table, following each chart.Consistent with Council direction, we have looked specifically at three different single-family product types as though they arebeing developed in the Avila Ranch project area. Because the Avila Ranch development will develop residential units in the AASP,where residential uses had not been contemplated, we have used the existing LOVR base fee and subarea fee and the MASP subarea fee as a proxy for existing transportation fee levels in the AASP. In addition, to quantify a proxy cost for the park fees forsingle family development in the Avila Ranch series of prototypes, we are using the deal agreed to by the City and Avila Ranch,quantifying it on a per unit basis, and applying that cost as a proxy for the park fee requirement. And finally, because new development typically faces other infrastructure costs outside of a formal fee program that contributeto a development’s overall infrastructure burden, we have included a proxy for these costs based on conversations with the Avila Ranchteam. These too are cross-hatched. For the Avila Ranch series, the existing “other infrastructure” costs are not known; however,they are shown (with a “?”) to reflect that this fee update is formalizing certain “other infrastructure” costs and incorporating them into the fee program. WWeare not showing options for reducing fee levels to address feasibility concerns at this time but will do so at the City’sdirection for those prototypes engendering concern. Packet Pg 31812 2San Luis Obispo Capital Facilities Fee UpdateSINGLE FAMILYPROTOTYPES(OUTSIDE OF EXPANSION AREAS AND SPECIFIC PLAN AREAS)Packet Pg 31912 3San Luis Obispo Capital Facilities Fee UpdateSingle Family Prototype 1Square Feet: 2,250Price/Unit: $750,00010% of Avg. Sale Price15% of Avg. Sale Price20% of Avg. Sale PriceOther fee obligations include school district fees, public art in-lieu fee, andthe affordable housing fee where applicable. These fees are not part of this current fee update.Outside of the expansion area, the “proxy” affordable housing fee iscalculated at 5% of the building permit valuation, estimated at 50% of sales price.The South Area fee is shown for information only. This prototype outside of the expansion area would not pay this fee.(Outside of Expansion Areas and Specific Plan Areas)KeyWastewater and water fees are based on the Staff recommended options for a 2,250 sq.ft unit. Packet Pg 32012 4San Luis Obispo Capital Facilities Fee UpdateChart Data% Change from Existing FeeSingle Family Prototype 1(Outside of Expansion Areas and Specific Plan Areas)FeasibilityCategoryExisting Fee Citywide North Area South AreaAffordable Housing $18,750 $18,750 $18,750 $18,750Wastewater $3,830 $12,602 $12,602 $12,602Water $11,322 $15,780 $15,780 $15,780Transportation $3,694 $9,651 $6,136 $10,896LOVR Interchange $0 $0 $0 $0Other Project Specific Infrastructure Costs $0 $0 $0 $0Parks $5,668 $6,030 $6,030 $6,030School District $7,830 $7,830 $7,830 $7,830Public Safety $0 $1,237 $1,237 $1,237General Government $0$690$690$690Total $51,094 $72,570 $69,055 $73,815CategoryCitywide North Area South AreaAffordable Housing 0.0% 0.0% 0.0%Wastewater 229.0% 229.0% 229.0%Water 39.4% 39.4% 39.4%Transportation 161.3% 66.1% 195.0%LOVR Interchange n/a n/a n/aOther Project Specific Infrastructure Costs n/a n/a n/aParks 6.4% 6.4% 6.4%School District 0.0% 0.0% 0.0%Public Safety n/a n/a n/aGeneral Government n/a n/a n/aTotal 42.0% 35.2% 44.5%Packet Pg 32112 5San Luis Obispo Capital Facilities Fee UpdateSingle Family Prototype 2Square Feet: 1,675Price/Unit: $650,00010% of Avg. Sale Price15% of Avg. Sale Price20% of Avg. Sale Price(Outside of Expansion Areas and Specific Plan Areas)KeyOther fee obligations include school district fees, public art in-lieu fee, andthe affordable housing fee where applicable. These fees are not part of this current fee update.Outside of the expansion area, the “proxy” affordable housing fee iscalculated at 5% of the building permit valuation, estimated at 50% of sales price.The South Area fee is shown for information only. This prototype outside of the expansion area would not pay this fee.Wastewater and water fees are based on the Staff recommended options for a 1,675 sq.ft. unit.Packet Pg 32212 6San Luis Obispo Capital Facilities Fee UpdateChart Data% Change from Existing FeeSingle Family Prototype 2(Outside of Expansion Areas and Specific Plan Areas)CategoryExisting Fee Citywide North Area South AreaAffordable Housing $16,250 $16,250 $16,250 $16,250Wastewater $3,830 $12,602 $12,602 $12,602Water $11,322 $15,780 $15,780 $15,780Transportation $3,694 $9,651 $6,136 $10,896LOVR Interchange $0 $0 $0 $0Other Project Specific Infrastructure Costs $0 $0 $0 $0Parks $5,668 $6,030 $6,030 $6,030School District $5,829 $5,829 $5,829 $5,829Public Safety $0 $1,237 $1,237 $1,237General Government $0$690$690$690Total $46,593 $68,069 $64,554 $69,314CategoryCitywide North Area South AreaAffordable Housing 0.0% 0.0% 0.0%Wastewater 229.0% 229.0% 229.0%Water 39.4% 39.4% 39.4%Transportation 161.3% 66.1% 195.0%LOVR Interchange n/a n/a n/aOther Project Specific Infrastructure Costs n/a n/a n/aParks 6.4% 6.4% 6.4%School District 0.0% 0.0% 0.0%Public Safety n/a n/a n/aGeneral Government n/a n/a n/aTotal 46.1% 38.5% 48.8%Packet Pg 32312 7San Luis Obispo Capital Facilities Fee UpdateSingle Family Prototype 3Square Feet: 1,100Price/Unit: $525,00010% of Avg. Sale Price15% of Avg. Sale Price20% of Avg. Sale Price(Outside of Expansion Areas and Specific Plan Areas)KeyOther fee obligations include school district fees, public art in-lieu fee, andthe affordable housing fee where applicable. These fees are not part of this current fee update.Outside of the expansion area, the “proxy” affordable housing fee iscalculated at 5% of the building permit valuation, estimated at 50% of sales price.The South Area fee is shown for information only. This prototype outside of the expansion area would not pay this fee.Wastewater and water fees are based on the Staff recommended options for a 1,100 sq.ft. unit.Packet Pg 32412 8San Luis Obispo Capital Facilities Fee UpdateChart Data% Change from Existing FeeSingle Family Prototype 3(Outside of Expansion Areas and Specific Plan Areas)CategoryCitywideNorth AreaSouth AreaAffordable Housing 0.0% 0.0% 0.0%Wastewater 163.2% 163.2% 163.2%Water 11.5% 11.5% 11.5%Transportation 161.3% 66.1% 195.0%LOVR Interchange n/a n/a n/aOther Project Specific Infrastructure Costs n/a n/a n/aParks 6.4% 6.4% 6.4%School District 0.0% 0.0% 0.0%Public Safety n/a n/a n/aGeneral Government n/a n/a n/aTotal 38.1% 29.6% 41.1%CategoryExisting Fee CitywideNorth AreaSouth AreaAffordable Housing $13,125 $13,125 $13,125 $13,125Wastewater $3,830 $10,082 $10,082 $10,082Water $11,322 $12,624 $12,624 $12,624Transportation $3,694 $9,651 $6,136 $10,896LOVR Interchange $0 $0 $0 $0Other Project Specific Infrastructure Costs $0 $0 $0 $0Parks $5,668 $6,030 $6,030 $6,030School District $3,828 $3,828 $3,828 $3,828Public Safety $0 $1,237 $1,237 $1,237General Government $0$690$690$690Total $41,467 $57,267 $53,752 $58,512Packet Pg 32512 9San Luis Obispo Capital Facilities Fee UpdateSINGLE FAMILY PROTOTYPES(AVILA RANCH EXAMPLES)Packet Pg 32612 10San Luis Obispo Capital Facilities Fee UpdateSingle Family Prototype 1Square Feet: 2,250Price/Unit: $750,00010% of Avg. Sale Price15% of Avg. Sale Price20% of Avg. Sale PriceThe existing parks fee is based on 2012 MASP subarea fee.Existing Wastewater cost includes costs for the Tank Farm catchment area.The existing transportation fee reflects the LOVR Base fee, MASP Sub-area fee, MASPArea Plan Prep fee.Yellow cross-hatching is shown as visual reminder of other infrastructure costs outside of the fee program that new development is required to pay. This amount is lower in the revised maximum calculations, reflecting that some of these infrastructure costs are being incorporated and formalized in the fee program as part of this update.LOVR Interchange cost reflects the LOVR Sub-area fee.(Avila Ranch Example)Key?Other fee obligations includeschool district fees, public art in-lieu fee, and the affordable housing fee where applicable. These fees are not part of this current fee update.Outside of the expansion area,the “proxy” affordable housing fee is calculated at 10% of the building permit valuation, estimated at 50% of sales price.Maximum wastewater and water fees are based on the Staff recommended options for a 2,250 sq.ft. unit.Packet Pg 32712 11San Luis Obispo Capital Facilities Fee UpdateChart Data% Change from Existing FeeSingle Family Prototype 1(Avila Ranch Example)CategoryExisting Fee/Proxy Costs Revised Maximum (Citywide TIF)Revised Maximum (South Area TIF)Affordable Housing $37,500 $37,500 $37,500Wastewater $7,559 $12,602 $12,602Water $11,322 $15,780 $15,780Transportation $13,463 $8,683 $9,662LOVR Interchange $6,293 $6,293 $6,293Other Project Specific Infrastructure Costs $24,391 $12,500 $12,500Parks $8,247 $13,000 $13,000School District $7,830 $7,830 $7,830Public Safety $0 $1,237 $1,237General Government $0$690$690Total $116,605 $116,115 $117,094CategoryNew Maximum (Citywide TIF)New Maximum (South Area TIF)Affordable Housing 0.0% 0.0%Wastewater 66.7% 66.7%Water 39.4% 39.4%Transportation -35.5% -28.2%LOVR Interchange 0.0% 0.0%Other Project Specific Infrastructure Costs -48.8% -48.8%Parks 57.6% 57.6%School District 0.0% 0.0%Public Safety n/a n/aGeneral Government n/a n/aTotal 0.0% 0.0%Packet Pg 32812 12San Luis Obispo Capital Facilities Fee UpdateSingle Family Prototype 2Square Feet: 1,675Price/Unit: $650,00010% of Avg. Sale Price15% of Avg. Sale Price20% of Avg. Sale Price(Avila Ranch Example)Key?The existing parks fee is based on 2012 MASP subarea fee.Existing Wastewater cost includes costs for the Tank Farm catchment area.The existing transportation fee reflects the LOVR Base fee, MASP Sub-area fee, MASPArea Plan Prep fee.LOVR Interchange cost reflects the LOVR Sub-area fee.Other fee obligations includeschool district fees, public art in-lieu fee, and the affordable housing fee where applicable. These fees are not part of this current fee update.Outside of the expansion area,the “proxy” affordable housing fee is calculated at 10% of the building permit valuation, estimated at 50% of sales price.Wastewater and water fees are based on the Staff recommended options for a 1,675 sq.ft. unit.Yellow cross-hatching is shown as visual reminder of other infrastructure costs outside of the fee program that new development is required to pay. This amount is lower in the revised maximum calculations, reflecting that some of these infrastructure costs are being incorporated and formalized in the fee program as part of this update.Packet Pg 32912 13San Luis Obispo Capital Facilities Fee UpdateChart Data% Change from Existing FeeSingle Family Prototype 2(Avila Ranch Example)CategoryExisting Fee/Proxy Costs Revised Maximum (Citywide TIF)Revised Maximum (South Area TIF)Affordable Housing $32,500 $32,500 $32,500Wastewater $7,559 $12,602 $12,602Water $11,322 $15,780 $15,780Transportation $13,463 $8,683 $9,662LOVR Interchange $6,293 $6,293 $6,293Other Project Specific Infrastructure Costs $24,391 $12,500 $12,500Parks $8,247 $13,000 $13,000School District $5,829 $5,829 $5,829Public Safety $0 $1,237 $1,237General Government $0$690$690Total $109,604 $109,114 $110,093CategoryNew Maximum (Citywide TIF)New Maximum (South Area TIF)Affordable Housing 0.0% 0.0%Wastewater 66.7% 66.7%Water 39.4% 39.4%Transportation -35.5% -28.2%LOVR Interchange 0.0% 0.0%Other Project Specific Infrastructure Costs n/a n/aParks 57.6% 57.6%School District 0.0% 0.0%Public Safety n/a n/aGeneral Government n/a n/aTotal 0.0% 0.0%Packet Pg 33012 14San Luis Obispo Capital Facilities Fee UpdateSingle Family Prototype 3Square Feet: 1,100Price/Unit: $525,00010% of Avg. Sale Price15% of Avg. Sale Price20% of Avg. Sale Price(Avila Ranch Example)Key?The existing parks fee is based on 2012 MASP subarea fee.Existing Wastewater cost includes costs for the Tank Farm catchment area.The existing transportation fee reflects the LOVR Base fee, MASP Sub-area fee, MASPArea Plan Prep fee.LOVR Interchange cost reflects the LOVR Sub-area fee.Other fee obligations includeschool district fees, public art in-lieu fee, and the affordable housing fee where applicable. These fees are not part of this current fee update.Outside of the expansion area,the “proxy” affordable housing fee is calculated at 10% of the building permit valuation, estimated at 50% of sales price.Wastewater and water fees are based on the Staff recommended options for a 1,100 sq.ft. unit. Yellow cross-hatching is shown as visual reminder of other infrastructure costs outside of the fee program that new development is required to pay. This amount is lower in the revised maximum calculations, reflecting that some of these infrastructure costs are being incorporated and formalized in the fee program as part of this update.Packet Pg 33112 15San Luis Obispo Capital Facilities Fee UpdateChart Data% Change from Existing FeeSingle Family Prototype 3(Avila Ranch Example)CategoryExisting Fee/Proxy Costs Revised Maximum (Citywide TIF)Revised Maximum (South Area TIF)Affordable Housing $26,250 $26,250 $26,250Wastewater $7,558 $10,082 $10,082Water $11,322 $12,624 $12,624Transportation $13,463 $8,683 $9,662LOVR Interchange $6,293 $6,293 $6,293Other Project Specific Infrastructure Costs $18,715 $12,500 $12,500Parks $8,247 $13,000 $13,000School District $3,828 $3,828 $3,828Public Safety $0 $1,237 $1,237General Government $0$690$690Total $95,677 $95,187 $96,166CategoryNew Maximum (Citywide TIF)New Maximum (South Area TIF)Affordable Housing 0.0% 0.0%Wastewater 33.4% 33.4%Water 11.5% 11.5%Transportation -35.5% -28.2%LOVR Interchange 0.0% 0.0%Other Project Specific Infrastructure Costs n/a n/aParks 57.6% 57.6%School District 0.0% 0.0%Public Safety n/a n/aGeneral Government n/a n/aTotal 0.0% 0.0%Packet Pg 33212 16San Luis Obispo Capital Facilities Fee UpdateNON-SINGLE FAMILY PROTOTYPES(OUTSIDE OF SPECIFIC PLAN AREAS)Packet Pg 33312 17San Luis Obispo Capital Facilities Fee UpdateMultifamily PrototypeSquare Feet/ Unit: 800Price/Unit: $400,000Key5% of Avg. Sale Price10% of Avg. Sale Price15% of Avg. Sale Price(Outside of Specific Plan Areas)Other fee obligations include school district fees, public art in-lieufee, and the affordable housing fee whereapplicable. These fees are not part of this current fee update.Wastewater and water fees are based on the Staff recommended options for a 800 sq.ft. unit.Packet Pg 33412 18San Luis Obispo Capital Facilities Fee UpdateChart Data% Change from Existing FeeMultifamily Prototype(Outside of Specific Plan Areas)CategoryExisting Fee Citywide North Area South AreaAffordable Housing $0 $0 $0 $0Wastewater $2,681 $8,821 $8,821 $8,821Water $7,925 $11,046 $11,046 $11,046Transportation $3,694 $7,498 $4,767 $8,465Parks $0 $3,530 $3,530 $3,530School District $2,784 $2,784 $2,784 $2,784Public Safety $0 $891 $891 $891General Government $0$497$497$497Total $17,084 $35,067 $32,336 $36,034CategoryCitywide North Area South AreaAffordable Housing n/a n/a n/aWastewater 229.0% 229.0% 229.0%Water 39.4% 39.4% 39.4%Transportation 103.0% 29.1% 129.2%Parks n/a n/a n/aSchool District 0.0% 0.0% 0.0%Public Safety n/a n/a n/aGeneral Government n/a n/a n/aTotal 105.3% 89.3% 110.9%Packet Pg 33512 19San Luis Obispo Capital Facilities Fee UpdateOffice/Business Park PrototypeSquare Feet: 10,000Price/Square Foot: $4255% of Avg. Sale Price7.5% of Avg. Sale Price10% of Avg. Sale Price(Outside of Specific Plan Areas)KeyOther fee obligations include school district fees, public art in-lieu fee, andthe affordable housing fee where applicable. These fees are not part of this current fee update.Outside of the expansion area, the “proxy” affordable housing fee is calculated at 5% of the building permit valuation, estimated at 50% of per square foot sales price.Wastewater and water fees are based on the Staff recommended options for a 10,000 sq.ft. building.Packet Pg 33612 20San Luis Obispo Capital Facilities Fee UpdateChart Data% Change from Existing FeeOffice/Business Park Prototype(Outside of Specific Plan Areas)CategoryExisting Fee CitywideNorth AreaSouth AreaAffordable Housing $10.63 $10.63 $10.63 $10.63Wastewater $0.38 $1.26 $1.26 $1.26Water $1.13 $1.58 $1.58 $1.58Transportation $7.41 $10.96 $6.97 $12.38Parks $0.00 $3.25 $3.25 $3.25School District $0.56 $0.56 $0.56 $0.56Public Safety $0.00 $0.45 $0.45 $0.45General Government $0.00 $0.46 $0.46 $0.46Public Art $1.06$1.06$1.06$1.06Total $21.17 $30.21 $26.21 $31.62CategoryCitywideNorth AreaSouth AreaAffordable Housing 0.0% 0.0% 0.0%Wastewater 229.0% 229.0% 229.0%Water 39.4% 39.4% 39.4%Transportation 48.0% -5.9% 67.0%Parks n/a n/a n/aSchool District 0.0% 0.0% 0.0%Public Safety n/a n/a n/aGeneral Government n/a n/a n/aPublic Art 0.0% 0.0% 0.0%Total 42.7% 23.8% 49.4%Packet Pg 33712 21San Luis Obispo Capital Facilities Fee UpdateOffice/Service PrototypeSquare Feet: 10,000Price/Square Foot: $3005% of Avg. Sale Price7.5% of Avg. Sale Price10% of Avg. Sale Price(Outside of Specific Plan Areas)KeyOther fee obligations include school district fees, public art in-lieu fee, andthe affordable housing fee where applicable. These fees are not part of this current fee update.Outside of the expansion area, the “proxy” affordable housing fee is calculated at 5% of the building permit valuation, estimated at 50% of per square foot sales price.Wastewater and water fees are based on the Staff recommended options for a 10,000 sq.ft. building.Packet Pg 33812 22San Luis Obispo Capital Facilities Fee UpdateChart Data% Change from Existing FeeOffice/Service Prototype(Outside of Specific Plan Areas)CategoryCitywideNorth AreaSouth AreaAffordable Housing 0.0% 0.0% 0.0%Wastewater 229.0% 229.0% 229.0%Water 39.4% 39.4% 39.4%Transportation 48.0% -5.9% 67.0%Parks n/a n/a n/aSchool District 0.0% 0.0% 0.0%Public Safety n/a n/a n/aGeneral Government n/a n/a n/aPublic Art 0.0% 0.0% 0.0%Total 50.9% 28.4% 58.9%CategoryExisting Fee CitywideNorth AreaSouth AreaAffordable Housing $7.50 $7.50 $7.50 $7.50Wastewater $0.38 $1.26 $1.26 $1.26Water $1.13 $1.58 $1.58 $1.58Transportation $7.41 $10.96 $6.97 $12.38Parks $0.00 $3.25 $3.25 $3.25School District $0.56 $0.56 $0.56 $0.56Public Safety $0.00 $0.45 $0.45 $0.45General Government $0.00 $0.46 $0.46 $0.46Public Art $0.75$0.75$0.75$0.75Total $17.73 $26.77 $22.78 $28.18Packet Pg 33912 23San Luis Obispo Capital Facilities Fee UpdateIndustrial PrototypeSquare Feet: 17,424Price/Square Foot: $2005% of Avg. Sale Price7.5% of Avg. Sale Price10% of Avg. Sale Price(Outside of Specific Plan Areas)KeyOther fee obligations include school district fees, public art in-lieu fee, andthe affordable housing fee where applicable. These fees are not part of this current fee update.Outside of the expansion area, the “proxy” affordable housing fee is calculated at 5% of the building permit valuation, estimated at 50% of per square foot sales price.Wastewater and water fees are based on the Staff recommended options for a 17,424 sq.ft. building.Packet Pg 34012 24San Luis Obispo Capital Facilities Fee UpdateChart Data% Change from Existing FeeIndustrial Prototype(Outside of Specific Plan Areas)CategoryExisting Fee CitywideNorth AreaSouth AreaAffordable Housing $5.00 $5.00 $5.00 $5.00Wastewater $0.22 $0.72 $0.72 $0.72Water $1.30 $1.81 $1.81 $1.81Transportation $2.14 $6.73 $4.28 $7.60Parks $0.00 $1.30 $1.30 $1.30School District $0.56 $0.56 $0.56 $0.56Public Safety $0.00 $0.45 $0.45 $0.45General Government $0.00 $0.46 $0.46 $0.46Public Art $0.50$0.50$0.50$0.50Total $9.72 $17.53 $15.08 $18.40CategoryCitywideNorth AreaSouth AreaAffordable Housing 0.0% 0.0% 0.0%Wastewater 229.0% 229.0% 229.0%Water 39.4% 39.4% 39.4%Transportation 214.6% 100.0% 255.2%Parks n/a n/a n/aSchool District 0.0% 0.0% 0.0%Public Safety n/a n/a n/aGeneral Government n/a n/a n/aPublic Art 0.0% 0.0% 0.0%Total 80.4% 55.2% 89.3%Packet Pg 34112 25San Luis Obispo Capital Facilities Fee UpdateRetail Prototype (w/ 50 percent Discount)Square Feet: 10,000Price/Square Foot: $3005% of Avg. Sale Price7.5% of Avg. Sale Price10% of Avg. Sale PriceThe existing transportation fee represents a 50% discount to the maximum allowable fee. Thisdiscount is shown as continuing in the updated fee calculation and still suggest feasibility concerns.(Outside of Specific Plan Areas)KeyOther fee obligations include school district fees, public art in-lieu fee, andthe affordable housing fee where applicable. These fees are not part of this current fee update.Outside of the expansion area, the “proxy” affordable housing fee iscalculated at 5% of the building permit valuation, estimated at 50% of per square foot sales price.Wastewater and water fees are based on the Staff recommended options for a 10,000 sq.ft. building.Packet Pg 34212 26San Luis Obispo Capital Facilities Fee UpdateChart Data% Change from Existing FeeRetail Prototype (w/ 50 percent Discount)(Outside of Specific Plan Areas)CategoryExisting Fee CitywideNorth AreaSouth AreaAffordable Housing $7.50 $7.50 $7.50 $7.50Wastewater $0.38 $1.26 $1.26 $1.26Water $1.13 $1.58 $1.58 $1.58Transportation $7.78 $16.91 $10.75 $19.09Parks $0.00 $1.77 $1.77 $1.77School District $0.56 $0.56 $0.56 $0.56Public Safety $0.00 $0.45 $0.45 $0.45General Government $0.00 $0.25 $0.25 $0.25Public Art $0.75$0.75$0.75$0.75Total $18.11 $31.03 $24.87 $33.21CategoryCitywideNorth AreaSouth AreaAffordable Housing 0.0% 0.0% 0.0%Wastewater 229.0% 229.0% 229.0%Water 39.5% 39.5% 39.4%Transportation 117.3% 38.2% 145.4%Parks n/a n/a n/aSchool District 0.0% 0.0% 0.0%Public Safety n/a n/a n/aGeneral Government n/a n/a n/aPublic Art 0.0% 0.0% 0.0%Total 71.4% 37.4% 83.4%Packet Pg 34312 Summary Table 1Maximum Transportation Development Impact Fees, Shown by Citywide or North/South AreasSan Luis Obispo Capital Facilities Fee Nexus Analysis; EPS #161187Citywide Fees (1)San Luis Ranch Area (2)Los Osos Valley Road Area (3)Land UseCitywideNorth AreaSouth AreaCitywideSouth AreaCitywideSouth AreaResidential Single Family (per Unit)$9,650.85$6,136.09$10,895.81$7,445.15$8,176.88$8,683.45$9,662.43Multifamily (per Unit)$7,498.15$4,767.38$8,465.41$5,784.44$6,352.96$6,746.53$7,507.14Non-Residential Office/Service (per Sq.Ft.)$10.96$6.97$12.38$8.46$9.29$9.86$10.97Retail (per Sq.Ft.)$33.82$21.51$38.19$26.09$28.66$30.43$33.87Industrial (per Sq.Ft.)$6.73$4.28$7.60$5.19$5.70$6.06$6.74Institutional (per Sq.Ft.) $10.96$6.97$12.38$8.46$9.29$9.86$10.97Hotel (per Room) $9,734.23$6,189.10$10,989.94$7,509.47$8,247.52$8,758.47$9,745.90(1) Schedule of fees to be paid by new development outside of the San Luis Ranch project area and the Los Osos Valley Road subarea.(2) Schedule of fees to be paid by the San Luis Ranch development.(3) Schedule of fees to be paid by new development in the Los Osos Valley Road subarea. In addition, development in this subarea will pay the LOVR subarea fee as well. Sources: City of San Luis Obispo; Economic & Planning Systems, Inc.Packet Pg 34412 Summary Table 1 Maximum Parkland Development Impact Fees, All Areas San Luis Obispo Capital Facilities Fee Nexus Analysis; EPS #161187 Quimby Act & Mitigation Fee Act - Land Use Citywide/ North Area/ South Area Residential Single Family (per Unit)$6,030.38 Multifamily - Condominiums (per Unit)$4,342.44 Multifamily - Apartments (per Unit)$3,530.35 Non-Residential Office/Service (per Sq.Ft.)$3.25 Retail (per Sq.Ft.)$1.77 Industrial (per Sq.Ft.)$1.30 Institutional (per Sq.Ft.) $0.00 Hotel (per Room) $976.00 Sources: City of San Luis Obispo; and Economic & Planning Systems, Inc. Packet Pg 345 12 Table 2 Existing Parkland and Recreational Facilities San Luis Obispo Capital Facilities Fee Nexus Analysis; EPS #161187 Existing Park and Recreation Land Acreage Existing Parklands Damon Garcia Sports Field, Broad @Tank Farm 22 Chinese Garden, Santa Rosa @ Marsh 0.3 DeVaul Park, west end of Madonna 0.9 Emerson Park, Nipomo @ Pacific 3.3 French Park, Poinsettia @ Fuller 10 Laguna Hills Park, San Andriano Ct. 3.2 Demonstration Garden, South @ Broad 0.1 Vista Lago Park, Vista del Lago 0.2 Stoneridge Park, 535 Bluerock Dr 1 Buena Vista Park, Buena Vista Ave. 0.5 Sinsheimer Park/ Sports Complex, 900 Southwood 21.7 Mitchell Park, Osos @ Bucheon 3 Anholm Park, Mission St 0.1 Throop Park, Cuesta @ Cerro Romauldo 3 Santa Rosa Park, Santa Rosa @Oak 11 Johnson Park, Augusta 5 Meadow Park, South @ Meadow 16 Ellsford Park, San Luis Drive near California 1 Osos Triangle Park, Osos @ Church 0.2 Las Praderas Park, Las Praderas and Mariposa 0.4 Packet Pg 346 12 Priolo-Martin Park, Vista del Collados & Vista del Arroyo 0.5 Laguna Lake Park, 500 Madonna Rd 40 Jack House Gardens, Marsh @ Beach 0.8 Laguna Lake Golf Course, 11175 LOVR 27 Railroad Bike Path, Orcutt to Jennifer 10 Poinsettia Creek Walk, Poinsettia @ Rosemary 2 Total Existing Parklands 183.2 Existing Recreational Facilities Rodriguez Adobe, Purple Sage Lane 1.4 Islay Hills Park, Tank Farm @ Orcutt 6 Canet Adobe, 464 Dana St. 0.5 Mission Plaza, Broad @ Monterey 3 Ludwick Center, Santa Rosa @ Mill 1 Jack House, 536 Marsh St 0.1 Senior Center, 1445 Santa Rosa St 0.1 Meadow Park Center, 2333 Meadow St 0.1 Total Existing Recreational Facilities 12.2 Total Existing Parklands and Recreational Facilities 195.4 Source: City of San Luis Obispo Packet Pg 347 12 Table 3 Anticipated and Approved New Parkland and Recreational Facilities San Luis Obispo Capital Facilities Fee Nexus Analysis; EPS #161187 New Parkland and Recreation Facilities Acreage Anticipated - New Parkland Froom Ranch Specific Plan - Neighborhood Park 2.9 Mission Plaza Park, Broad @ Monterey (DTCP/MPCP)0.5 Pocket Park, Toro @ Marsh (DTCP)0.3 Cheng Park Expansion, Santa Rosa @ Marsh (DTCP)0.3 Total Anticipated - New Parkland 4 Approved - New Parkland Avila Ranch Specific Plan - Neighborhood Park 9.5 Avila Ranch Specific Plan - Pocket Parks 8.5 San Luis Ranch Specific Plan - Neighborhood Park 1.42 San Luis Ranch Specific Plan - Pocket Parks 1.29 Orcutt area Specific Plan - Neighborhood Park 12 Orcutt Area Specific Plan - Pocket Park 0.25 Margarita Area Specific Plan - Neighborhood Park 9.9 Total Approved - New Parkland 42.86 Anticipated - New Recreational Facilities Rosa Butron Adobe and Grounds 0.5 Monterey Street Pocket Plaza, Between Toro & Johnson (DTCP)0.3 Creek Plaza, Higuera @ Nipomo (DTCP)0.5 Public Restrooms - Emerson Park 0 Packet Pg 348 12 Ludwick Center Expansion (DTCP)0 Murray Adobe Reuse As An Interpretive Center (MPCP)0.1 Mission Plaza Performance Platform (DTCP/MPCP)0 Total Anticipated - New Recreational Facilities 1.4 Approved - New Recreational Facilities Margarita Area Specific Plan - Sports Fields 16 Total Approved - New Recreational Facilities 16 Total Anticipated and Approved - New Parkland and Recreational Facilities 64.26 DTCP - Downtown Concept Plan Implementation MPCP - Mission Plaza Concept Plan Implementation Source: City of San Luis Obispo Packet Pg 349 12 Summary Table 1Maximum Police Development Impact Fees, All AreasSan Luis Obispo Capital Facilities Fee Nexus Analysis; EPS #161187Land UseCitywide/ North Area/ South AreaResidential Single Family (per Unit)$667.67Multifamily (per Unit)$480.79Non-Residential Office/Service (per Sq.Ft.)$0.44Retail (per Sq.Ft.)$0.24Industrial (per Sq.Ft.)$0.18 Institutional (per Sq.Ft.) $0.24Hotel (per Room) $132.92Sources: City of San Luis Obispo; and Economic & Planning Systems, Inc. Packet Pg 35012 Summary Table 1 Maximum Fire Development Impact Fees, All Areas San Luis Obispo Capital Facilities Fee Nexus Analysis; EPS #161187 Land Use Citywide/ North Area/ South Area Residential Single Family (per Unit)$569.33 Multifamily (per Unit)$410.21 Non-Residential Office/Service (per Sq.Ft.)$0.38 Retail (per Sq.Ft.)$0.20 Industrial (per Sq.Ft.)$0.15 Institutional (per Sq.Ft.) $0.20 Service (per Sq.Ft)$0.20 Hotel (per Room) $113.26 Sources: City of San Luis Obispo; and Economic & Planning Systems, Inc. Packet Pg 351 12 Summary Table 1Maximum General Government Development Impact Fees, All AreasSan Luis Obispo Capital Facilities Fee Nexus Analysis; EPS #161187Land UseCitywide/ North Area/ South AreaResidential Single Family (per Unit)$689.77 Multifamily (per Unit)$496.70 Non-Residential Office/Service (per Sq.Ft.)$0.46 Retail (per Sq.Ft.)$0.25 Industrial (per Sq.Ft.)$0.18 Institutional (per Sq.Ft.) $0.25 Hotel (per Room) $137.32 Sources: City of San Luis Obispo; and Economic & Planning Systems, Inc. Packet Pg 35212 Packet Pg 353 12 Packet Pg 354 12 Packet Pg 355 12 Packet Pg 356 12 Packet Pg 357 12 Page intentionally left blank. Packet Pg 358 12 Water and Wastewater Capacity and Connection FeesJanuary 9, 201801-09-2018 Item 12, Staff Presentation Presentation by:Shawn KoornAssociate Vice President, HDR Engineering, Inc.Water and Wastewater Capacity and Connection Fees01-09-2018 Item 12, Staff Presentation February 7, 2017 Study Session - Questions for City Council DirectionYes No1. Is the name change from Water and SewerDevelopmentImpact Feesto Water and SewerCapacity and ConnectionFeeshelpful to more clearly communicate the serviceprovided?2. Should the City’s Water Capacity and Connection Feeinclude:a. The water assets identified in the prior water developmentimpact fee study?b. All existing and future water assets that provide capacity toserve new development?3. Should the City’s Sewer Capacity and Connection Feeinclude:a.The wastewater assets identified in the prior sewerdevelopment impact fee study?b.All existing and future wastewater assets that providecapacity to serve new development in the Sewer Capacityand Connection Fees?4. Should the City eliminate area‐specific sewer CatchmentArea fees in favor of one citywide Sewer Capacity andConnection Fee?Option #1Option #2Option #1 & #3 Option#2 &  #4Option #3 & 4Water and Wastewater Capacity and Connection FeesIndicates City Council Direction provided at Study Session01-09-2018 Item 12, Staff Presentation October 17, 2017 RecommendationCitywide FeeExisting 2017‐18 Impact FeeOption 1 Option 2 Option 3 Option 4Water$11,322.16 $11,872 $15,780 N/A N/AWastewater$ 3,830.212$ 8,1652$9,5222$10,721 $12,602NOTES:1. All fees are per equivalent dwelling unit (or EDU).2. Additional catchment area fees, where applicable.WastewaterCatchment Area2017‐18 Development Impact FeesNew Catchment Area Fees Calle Joaquin$1,878.64 $2,898Laguna$503.30 $434Margarita$2,819.50 $3,830Silver City$1,392.80 $2,429Tank Farm$3,728.52 $3,192AirportN/A $6,372BuckleyN/A $643FoothillN/A $22,319Water and Wastewater Capacity and Connection Fees01-09-2018 Item 12, Staff Presentation $15,780 $12,624 $11,046 $9,468 $4,734 $12,602 $10,082 $8,821 $7,561 $3,781  $‐ $5,000 $10,000 $15,000 $20,000 $25,000 $30,000100%>1,200 SF<20%>801‐1,200 SF<30%>451‐800 SF<40%>Mobile Homes<70%>450 SF or lessRecommended Residential Water and Wastewater Capacity and Connection Fees WaterWastewater01-09-2018 Item 12, Staff Presentation Water Capacity and Connection Fees(cost per equivalent dwelling unit) Land Use TypeEquivalent Dwelling Unit (EDU)Existing (Replacement Cost Less Depreciation) plus Future plus Financing CostRESIDENTIAL (per unit)Residential (greater than 1,200 s.f.) 1.0 $15,780 Residential (801 s.f.1,200 s.f.) 0.8 $12,624 Residential (451 s.f. to 800 s.f.) 0.7 11,046 Mobile Home 0.6 9,468 Studio Unit (450 s.f. or less) 0.3 4,734 NON-RESIDENTIAL (Meter Size)3/4"-inch 1.0 $15,780 1-inch 1.7 26,826 1-1/2 inch 3.4 53,652 2-inch 5.4 85,212 3-inch 10.7 168,846 4-inch 16.7 263,526 6-inch 33.4 527,052 A single family home and 3/4" non-residential water meter equals oneequivalent dwelling unit.01-09-2018 Item 12, Staff Presentation EquivalentDwelling Full CostLand Use Type Unit (EDU) Capacity and Connection FeeRESIDENTIAL (per unit)Residential (greater than 1,200 s.f.) 1.0 $12,602 Residential (801 s.f. to 1,200 s.f.) 0.8 $10,082 Residential (451 s.f. to 800 s.f.) 0.7 8,821 Mobile Home 0.6 7,561 Studio Unit (450 s.f. or less) 0.3 3,781 NON-RESIDENTIAL (Meter Size)Meter Size3/4"-inch 1.0 $12,602 1-inch 1.7 21,423 1-1/2 inch 3.4 42,847 2-inch 5.4 68,051 3-inch 10.7 134,841 4-inch 16.7 210,453 6-inch 33.4 420,907 A single family home and 3/4" non-residential water meterequals one equivalent dwelling unit.Wastewater Capacity and Connection Fees(cost per equivalent dwelling unit) 01-09-2018 Item 12, Staff Presentation 01-09-2018 Item 12, Staff Presentation AlternativesNo Action/Status Quo-Maintain current fees with annual adjustments-Places a greater than fair share portion of capital improvement cost on existing ratepayers-The increase would equal approximately $68 per water customer and $133 per wastewater customer annually for 25 yearsWater Option 1 / Wastewater Option 3-Include only debt-financed infrastructure and eliminate wastewater catchment area fees-Places a greater than fair share portion of capital improvement cost on existing ratepayers-The increase would equal approximately $59 per water customer and $29 per wastewater customer annually for 25 years01-09-2018 Item 12, Staff Presentation AlternativesEstimated Water and Wastewater Customer Rate ImpactAnnual Impact to Water Rate(Per Customer)Annual Impact to Wastewater Rate (Per Customer)No Action/Status Quo$68 $133Water Option 1/ Wastewater Option 3$59$29NOTE:Assumes revenue burden would be applied equally to all customers. Realistically,impact will vary by water consumption and customer class (residential, multi‐familyresidential, non‐residential, and irrigation).01-09-2018 Item 12, Staff Presentation Current Water Development Impact Fees (cost per equivalent dwelling unit) EquivalentExisting WaterDwelling Development Impact FeeLand Use TypeUnit (EDU)$/EDURESIDENTIAL (per unit)Single Family Residential1.0$11,322.16Multi-Family Residential0.77,925.51Mobile Home0.66,793.30Studio Unit (450 s.f. or less)0.33,396.65NON-RESIDENTIAL (Meter Size)3/4"-inch1.0$11,322.161-inch1.719,247.681-1/2 inch3.438,495.362-inch5.461,138.453-inch10.7121,145.004-inch16.7185,076.966-inch33.4378,153.92A single family home and 3/4" non-residential water meter equals oneequivalent dwelling unit.Fees shown are as of 7/1/201701-09-2018 Item 12, Staff Presentation Current Water Development Impact Fees (cost per equivalent dwelling unit) Fee includes project cost plus financing:Nacimiento Pipeline and Water Reuse Project 2006 Water Treatment Plant Improvements2006 Water Treatment Plant Sedimentation Process2007 Bishop Tank 1994 Water Treatment UpgradeFee has been updated annually by CPI* Fee does not include the cost/benefit of the existing backbone infrastructure01-09-2018 Item 12, Staff Presentation Option 1 – Current Fee plus future growth related improvements Current FeeIncludes specific future supply and treatment plantIncludes interest cost on future improvementsDivided by future EDUs at the timeFuture AssetsUse current capital improvement plan; no water distribution systemInclude only capacity fee eligible projectsDivided by future equivalent dwelling units* This option does not include buy-in to existing backbone system Water Capacity and Connection Fee Options01-09-2018 Item 12, Staff Presentation Option 2 - “Combined Methodology” Buy-In (Existing assets)Use system asset inventory recordsReplacement cost new less depreciationUse only those costs that are capacity fee eligibleDivided by build-out equivalent unitsIncremental (Future assets)Use current capital improvement plan (adopted potable water and recycled water master plans)Include only capacity fee eligible projectsDivided by future equivalent dwelling unitsWater Capacity and Connection Fee Options01-09-2018 Item 12, Staff Presentation Water Fee Summary - Options 1 and 2 Fee includes backbone infrastructureComponentBuy-in + Upgrade [2]Future [3] Debt ServiceTotal ($/EDU)Option 1 - (Current Fee + Future)Current Fee - Future Treatment [1] $0 $10,773 $0 $10,773Supply 0 254 0 254Treatment 0 845 0 845Distribution 0 0 0 0Debt Service 0 0 0 0Cash Reserves 0000------------ ------------ ------------ ------------Maximum Allowable Fee $0 $11,872 $0 $11,872Option 2- Existing + Future Supply $10,348 $243 $0 $10,591Treatment 1,999 809 0 2,808Distribution 2,932 471 0 3,403Debt Service 0 0 (1,459) (1,459)Cash Reserves 437 0 0 437------------ ------------ ------------ ------------Maximum Allowable Fee $15,716 $1,523 ($1,459) $15,780[1] Current Fee divided by 6,921 EDUs, Future divided by 5,821 EDUs.[2] Buy-in + Upgrade divided by existing and future EDUs of 36,791.[3] Future divided by future EDUs of 5,821.01-09-2018 Item 12, Staff Presentation Water Capacity and Connection Fees(cost per equivalent dwelling unit) Option #1Option #2Land Use TypeEquivalent Dwelling Unit (EDU)Current Fee plus Future Portion of Project plus Financing CostExisting (Replacement Cost Less Depreciation) plus Future plus Financing CostRESIDENTIAL (per unit)Residential (greater than 800 s.f.) 1.0 $11,872 $15,780Residential (451 s.f. to 800 s.f.) 0.7 8,310 11,046Mobile Home 0.6 7,123 9,468Studio Unit (450 s.f. or less) 0.3 3,562 4,734NON-RESIDENTIAL (Meter Size)3/4"-inch 1.0 $11,872 $15,7801-inch 1.7 20,182 26,8261-1/2 inch 3.4 40,365 53,6522-inch 5.4 64,109 85,2123-inch 10.7 127,030 168,8464-inch 16.7 198,262 263,5266-inch 33.4 396,525 527,052A single family home and 3/4" non-residential water meter equals oneequivalent dwelling unit.01-09-2018 Item 12, Staff Presentation Current Wastewater Development Impact Fees (cost per equivalent dwelling unit) Area Specific FeesEquivalentDwellingLand Use Type Unit (EDU) Citywide Margarita Tank Farm Silver Cityalle Joaquin LagunaRESIDENTIAL (per unit)Single Family Residential 1.0 $3,830.21 $2,819.50 $3,728.52 $1,392.80 $1,878.64 $503.30Multi-Family Residential 0.7 2,681.14 1,973.65 2,609.96 974.96 1,315.05 352.31Mobile Home 0.6 2,298.12 1,691.70 2,237.11 835.68 1,127.18 301.98Studio Unit (450 s.f. or less) 0.3 1,149.06 845.85 1,118.56 417.84 563.59 150.99NON-RESIDENTIAL (Meter Size)5/8" to 3/4"-inch 1.0 $3,830.21 $2,819.50 $3,728.52 $1,392.80 $1,878.64 $503.301-inch 1.7 6,511.35 4,793.15 6,338.48 2,367.76 3,193.69 855.611-1/2 inch 3.4 13,022.70 9,586.30 12,676.96 4,735.53 6,387.37 1,711.222-inch 5.4 20,683.11 15,225.30 20,134.00 7,521.13 10,144.65 2,717.813-inch 10.7 40,983.19 30,168.64 39,895.14 14,902.98 20,101.44 5,385.304-inch 16.7 63,964.42 47,085.64 62,266.25 23,259.79 31,373.27 8,405.096-inch 33.4 127,928.85 94,171.28 124,532.51 46,519.58 62,746.54 16,810.17A single family home and 3/4" non-residential water meter equals one equivalent dwelling unit.Fees shown are as of 7/1/2017Impact FeeAdditional Catchment Area Charges01-09-2018 Item 12, Staff Presentation Current Wastewater Development Impact Fees (cost per equivalent dwelling unit) Fee includes project cost plus financing:1994 Upgrade included 1.039 MGD future of 5.079 MGD total plant Prior estimated construction cost for WRRF upgrade that expands capacity to 5.4 MGDFee has been updated annually by CPI*Fee does not include the cost/benefit of the existing backbone infrastructure01-09-2018 Item 12, Staff Presentation Option 1 –Current Fee plus future growth related improvements Current FeeIncludes specific future treatment plantIncludes interest cost on future plantDivided by future EDUs at the timeFuture AssetsUse current capital improvement plan; no wastewater collection systemInclude only capacity fee eligible projectsDivided by future equivalent dwelling unitsSeparate Catchment Area Fees, where applicableWastewater Capacity and Connection Fee Options01-09-2018 Item 12, Staff Presentation Option 2 - “Combined Methodology” for Determining Fees Buy-In (Existing assets)Use system asset inventory recordsReplacement cost new less depreciationUse only those costs that are capacity fee eligibleDivided by build-out equivalent unitsIncremental (Future assets)Use current capital improvement plan (adopted collection system master plan and WRRF Facilities Plan)Include only capacity fee eligible projectsDivided by future equivalent dwelling unitsSeparate Catchment Area Fees, where applicableWastewater Capacity and Connection Fee Options01-09-2018 Item 12, Staff Presentation Option 3 – Current Fee plus future growth related improvements Option 1 plus catchment area costsCity wide fee; no separate catchment area feeOption 4 - “Combined Methodology” for Determining Fees Option 2 plus catchment area costsCity wide fee; no separate catchment area feeWastewater Capacity and Connection Fee Options01-09-2018 Item 12, Staff Presentation Wastewater Fee Summary - Options 1, 2, 3, & 4Includes backbone infrastructure; One Citywide Wastewater FeeComponentBuy-in + Upgrade [2]Future [3] Debt ServiceTotal ($/EDU)Option 1 - Current Fee + Future (Catchment separate fee)Current Fee - Future Treatment [1]$0 $3,729 $0 $3,729Treatment0 4,436 0 4,436------------ ------------ ------------ ------------Maximum Allowable Fee$0 $8,165 $0 $8,165Option 2 - Existing + Future (Catchment separate fee)Treatment$1,145 $4,246 $0 $5,391Collection2,906 4,002 0 6,908Less: Catchment(523) (2,557) 0 (3,080)Debt Service00 (465) (465)Cash Reserves7680 0 768------------ ------------ ------------ ------------Maximum Allowable Fee$4,296 $5,691 ($465) $9,522Option 3- Current Fee + Future (includes Catchment)Current Fee - Future Treatment [1]$0 $3,729 $0 $3,729Treatment0 6,993 0 6,993------------ ------------ ------------ ------------Maximum Allowable Fee$0 $10,721 $0 $10,721Option 4- Existing + Future (includes Catchment)Treatment$1,145 $4,246 $0 $5,391Collection2,906 4,002 0 6,908Debt Service00 (465) (465)Cash Reserves7680 0 768------------ ------------ ------------ ------------Maximum Allowable Fee$4,819 $8,248 ($465) $12,602[1] Current Fee divided by 6,921 EDUs, Future divided by 5,821 EDUs.[2] Buy-in + Upgrade divided by existing and future EDUs of 36,791.[3] Future divided by future EDUs of 5,821.01-09-2018 Item 12, Staff Presentation Wastewater Capacity and Connection Fees Option 1(cost per equivalent dwelling unit) Area Specific FeesEquivalentCapacity and Connection FeeDwellingAdditional Catchment Area ChargesLand Use TypeUnit (EDU)Citywide Margarita Tank Farm Silver CityCalle JoaquinLaguna Airport Foothill BuckleyRESIDENTIAL (per unit)Residential (greater than 800 s.f.) 1.0 $8,165 $3,830 $3,192 $2,429 $2,898 $434 $6,372 $22,319 $643 Residential (451 s.f. to 800 s.f.) 0.7 5,715 2,681 2,234 1,700 2,029 304 4,460 15,623 450 Mobile Home 0.6 4,899 2,298 1,915 1,457 1,739 261 3,823 13,391 386 Studio Unit (450 s.f. or less) 0.3 2,449 1,149 958 729 870 130 1,912 6,696 193 NON-RESIDENTIAL (Meter Size)3/4"-inch 1.0 $8,165 $3,830 $3,192 $2,429 $2,898 $434 $6,372 $22,319 $643 1-inch 1.7 13,880 6,511 5,426 4,129 4,927 738 10,833 37,943 1,093 1-1/2 inch 3.4 27,759 13,022 10,852 8,259 9,855 1,477 21,665 75,885 2,187 2-inch 5.4 44,088 20,683 17,236 13,117 15,651 2,345 34,409 120,523 3,473 3-inch 10.7 87,360 40,982 34,153 25,990 31,013 4,647 68,181 238,815 6,882 4-inch 16.7 136,347 63,963 53,304 40,565 48,403 7,253 106,414 372,730 10,741 6-inch 33.4 272,695 127,925 106,608 81,129 96,807 14,506 212,828 745,460 21,483 A single family home and 3/4" non-residential water meter equals one equivalent dwelling unit.01-09-2018 Item 12, Staff Presentation Wastewater Capacity and Connection Fees Option 2(cost per equivalent dwelling unit) Area Specific FeesEquivalentCapacity and Connection FeeDwellingAdditional Catchment Area ChargesLand Use TypeUnit (EDU)Citywide Margarita Tank Farm Silver CityCalle JoaquinLaguna Airport Foothill BuckleyRESIDENTIAL (per unit)Residential (greater than 800 s.f.)1.0 $9,522 $3,830 $3,192 $2,429 $2,898 $434 $6,372 $22,319 $643 Residential (451 s.f. to 800 s.f.)0.7 6,666 2,681 2,234 1,700 2,029 304 4,460 15,623 450 Mobile Home0.6 5,713 2,298 1,915 1,457 1,739 261 3,823 13,391 386 Studio Unit (450 s.f. or less)0.3 2,857 1,149 958 729 870 130 1,912 6,696 193 NON-RESIDENTIAL (Meter Size)3/4"-inch1.0 $9,522 $3,830 $3,192 $2,429 $2,898 $434 $6,372 $22,319 $643 1-inch1.7 16,188 6,511 5,426 4,129 4,927 738 10,833 37,943 1,093 1-1/2 inch3.4 32,375 13,022 10,852 8,259 9,855 1,477 21,665 75,885 2,187 2-inch5.4 51,420 20,683 17,236 13,117 15,651 2,345 34,409 120,523 3,473 3-inch10.7 101,887 40,982 34,153 25,990 31,013 4,647 68,181 238,815 6,882 4-inch16.7 159,021 63,963 53,304 40,565 48,403 7,253 106,414 372,730 10,741 6-inch33.4 318,041 127,925 106,608 81,129 96,807 14,506 212,828 745,460 21,483 A single family home and 3/4" non-residential water meter equals one equivalent dwelling unit.01-09-2018 Item 12, Staff Presentation Wastewater Capacity and Connection Fees Option 3(cost per equivalent dwelling unit) No Area Specific FeesEquivalentDwelling Full CostLand Use Type Unit (EDU) Capacity and Connection FeeRESIDENTIAL (per unit)Residential (greater than 800 s.f.) 1.0 $10,721 Residential (451 s.f. to 800 s.f.) 0.7 7,505 Mobile Home 0.6 6,433 Studio Unit (450 s.f. or less) 0.3 3,216 NON-RESIDENTIAL (Meter Size)Meter Size3/4"-inch 1.0 $10,721 1-inch 1.7 18,226 1-1/2 inch 3.4 36,452 2-inch 5.4 57,895 3-inch 10.7 114,718 4-inch 16.7 179,046 6-inch 33.4 358,092 A single family home and 3/4" non-residential water meterequals one equivalent dwelling unit.01-09-2018 Item 12, Staff Presentation SummaryCitywide FeeExisting 2017‐18 Impact FeeOption 1 Option 2 Option 3 Option 4Water$11,322.16 $11,872 $15,780 N/A N/AWastewater$ 3,830.212$ 8,1652$9,5222$10,721 $12,602NOTES:1. All fees are per equivalent dwelling unit (or EDU).2. Additional catchment area fees, where applicable.WastewaterCatchment Area2017‐18 Development Impact FeesNew Catchment Area Fees Calle Joaquin$1,878.64 $2,898Laguna$503.30 $434Margarita$2,819.50 $3,830Silver City$1,392.80 $2,429Tank Farm$3,728.52 $3,192AirportN/A $6,372BuckleyN/A $643FoothillN/A $22,319Water and Wastewater Capacity and Connection Fees01-09-2018 Item 12, Staff Presentation Comparison to 12-22-17 Draft AB 1600 Fee calculations CityWide These Amounts are from Draft Table that came in on 12-22-17 from EPS Base Also, has already reduced for 50% Retail and TOT policy TIF Gets rid of North/South fee areas from prior study Citywide TIF New Fee Diff % Change Single Family Residential Dwelling Unit 3,694$ 9,650.85$ 5,956$ 161% Multi-family Residential Dwelling Unit 3,278$ 7,498.15$ 4,220$ 129% Retail Square Feet 7.78$ 16.91$ 9.13$ 117%Note: Adjusted for 50% Discount for comparitive purposes Office Square Feet 7.41$ 10.96$ 3.55$ 48%Dicount: 50% Service Commercial Square Feet 4.02$ 10.96$ 6.94$ 173% Business Park Square Feet ADT Trips Industrial Square Feet 2.14$ 6.73$ 4.59$ 215% Hospital Square Feet 6.28$ Motel/Hotel Room 1,716$ 4,867.12$ 3,151$ 184%Note: Adjusted for 50% Discount for comparitive purposes Service Station (includes 1,000 sq. ft.) Pump 8,726$ Dicount: 50% Other Average Daily Trip (PM for LOVR ) or Acreage 344$ LOVR Sub Area Base Traffic Fee Total Fees Citywide TIF TIF New Fee Diff % Change Sub Area (Same) Current Fees Proposed Diff % Change Single Family Residential Dwelling Unit 3,046$ 6,293$ 8,683.00$ 5,637$ 185% 9,339$ 14,976$ 5,637$ 60% Multi-family Residential Dwelling Unit 2,703$ 4,134$ 6,746.53$ 4,044$ 150% 6,837$ 10,881$ 4,044$ 59% Retail Square Feet 6.410$ 15.190$ 15.22$ 8.81$ 137% 21.60$ 30$ 8.81$ 41% Office Square Feet 6.108$ PM Trips 9.86$ 3.75$ 61% Service Commercial Square Feet 3.313$ 9.253$ 9.86$ 6.55$ 198% 12.57$ 19$ 6.55$ 52% Business Park Square Feet ADT Trips 7.974$ Industrial Square Feet 1.764$ 4.569$ 6.06$ 4.30$ 244% 6.33$ 11$ 4.30$ 68% Hospital Square Feet 5.178$ PM Trips Motel/Hotel Room 1,414$ 3,430$ 4,379.24$ 2,965$ 210% 4,844$ 7,809$ 2,965$ 61% Service Station (includes 1,000 sq. ft.) Pump 7,196$ PM Trips Other Average Daily Trip (PM for LOVR ) or Acreage 284$ 6,169$ MASP Sub Area Base Traffic Fee Total Fees Citywide TIF TIF New Fee Diff % Change Sub Area Current Fees Proposed Diff % Change Single Family Residential Dwelling Unit 2,722$ 10,206$ 9,650.85$ 6,928$ 254% 12,929$ 9,651$ (3,278)$ -25% Multi-family Residential Dwelling Unit 2,414$ 6,297$ 7,498.15$ 5,084$ 211% 8,711$ 7,498$ (1,213)$ -14% Retail Square Feet 5.72$ 46.01$ 16.91$ 11.19$ 196% 51.73$ 16.91$ (34.82)$ -67% Office Square Feet 5.46$ 19.31$ 10.96$ 5.50$ 101% 24.77$ 10.96$ (13.81)$ -56% Service Commercial Square Feet 2.96$ ADT Trips 10.96$ 8.00$ 270% Business Park Square Feet ADT Trips 19.31$ Industrial Square Feet 1.58$ 19.31$ 6.73$ 5.15$ 327% 20.88$ 6.73$ (14.15)$ -68% Hospital Square Feet 4.54$ ADT Trips Motel/Hotel Room 1,263$ ADT Trips 4,867.12$ 3,604$ 285% Service Station (includes 1,000 sq. ft.) Pump 6,428$ ADT Trips Other Average Daily Trip (PM for LOVR ) or Acreage 255$ 1,713$ AASP Sub Area Base Traffic Fee Total Fees Citywide TIF TIF New Fee Diff % Change Sub Area Current Fees Proposed Diff % Change Single Family Residential Dwelling Unit 3,694$ ADT Trips 9,650.85$ 5,956$ 161% Multi-family Residential Dwelling Unit 3,278$ ADT Trips 7,498.15$ 4,220$ 129% Retail Square Feet 7.78$ ADT Trips 16.91$ 9.13$ 117% Office Square Feet 7.41$ ADT Trips 10.96$ 3.55$ 48% Service Commercial Square Feet 4.02$ 3.64$ 10.96$ 6.94$ 173% 7.66$ 10.96$ 3.30$ 43% Business Park Square Feet ADT Trips 4.83$ Industrial Square Feet 2.14$ 0.73$ 6.73$ 4.59$ 215% 2.87$ 6.73$ 3.86$ 135% Hospital Square Feet 6.28$ ADT Trips Motel/Hotel Room 1,716$ ADT Trips 4,867.12$ 3,151$ 184% Service Station (includes 1,000 sq. ft.) Pump 8,726$ ADT Trips Other Average Daily Trip (PM for LOVR ) or Acreage 344$ 358$ NEW AREA - San Luis Ranch SLO R Base Total Fees Citywide TIF TIF New Fee Diff % Change Current Fees Proposed Diff % Change Single Family Residential Dwelling Unit 3,694$ -$ 7,445.15$ 3,751$ 102% 3,694$ 7,445.15$ 3,751$ 102% Multi-family Residential Dwelling Unit 3,278$ -$ 5,784.44$ 2,506$ 76% 3,278$ 5,784.44$ 2,506$ 76% Retail Square Feet 7.78$ -$ 13.03$ 5.25$ 67% 7.78$ 13.03$ 5.25$ 67% Office Square Feet 7.41$ -$ 8.46$ 1.05$ 14% 7.41$ 8.46$ 1.05$ 14% Service Commercial Square Feet 4.02$ -$ 8.46$ 4.44$ 111% 4.02$ 8.46$ 4.44$ 111% Business Park Square Feet ADT Trips -$ Industrial Square Feet 2.14$ -$ 5.19$ 3.05$ 143% 2.14$ 5.19$ 3.05$ 143% Hospital Square Feet 6.28$ -$ -$ -$ Motel/Hotel Room 1,716$ -$ 3,754.50$ 2,039$ 119% 1,716$ 3,754.50$ 2,039$ 119% Service Station (includes 1,000 sq. ft.) Pump 8,726$ -$ -$ -$ Other Average Daily Trip (PM for LOVR ) or Acreage 344$ -$ Orcutt Area - Note: These would only apply if projects participate in the new fee structure OASP Sub Area Base Traffic Fee Total Fees Citywide TIF TIF New Fee Diff % Change New Sub Area Diff % Change Current Fees Proposed Diff % Change Single Family Residential Dwelling Unit 3,694$ 12,394$ 9,650.85$ 5,956$ 161% 9,871.00$ (2,523)$ -20% 16,088$ 19,522$ 3,433$ 21% Multi-family Residential Dwelling Unit 3,278$ 8,658$ 7,498.15$ 4,220$ 129% 6,896.00$ (1,762)$ -20% 11,936$ 14,394$ 2,458$ 21% Retail Square Feet 7.78$ -$ Office Square Feet 7.41$ -$ Service Commercial Square Feet 4.02$ -$ Business Park Square Feet ADT Trips -$ Industrial Square Feet 2.14$ -$ Hospital Square Feet 6.28$ -$ Motel/Hotel Room 1,716$ -$ Service Station (includes 1,000 sq. ft.) Pump 8,726$ -$ Other Average Daily Trip (PM for LOVR ) or Acreage 344$ 1,364$ LOVR Sub Area MASP Sub Area AASP Sub Area San Luis Ranch OASP Sub Area Disbanded Disbanded Same