Loading...
HomeMy WebLinkAboutItem #3 - ARCH-1233-2017 (207 Higuera) Mixed Use-signedMeeting Date: March 5, 2018 Item Number: #3 ARCHITECTURAL REVIEW COMMISSION AGENDA REPORT SUBJECT: Review of a three-story mixed-use project consisting of three buildings including 1,097 square feet of commercial space and eight residential units. The project includes a 28 percent density bonus with a request for an incentive to reduce the street yard setback to 1.5 feet, where 15 feet is normally required, including a categorical exemption from environmental review. PROJECT ADDRESS: 207 Higuera Street BY: Kyle Bell, Associate Planner Phone Number: 781-7524 E-mail: kbell@slocity.org FILE NUMBER: ARCH-1233-2017 FROM: Doug Davidson, Deputy Director RECOMMENDATION: Adopt the Draft Resolution (Attachment 1) which approves the project, based on findings and subject to conditions. SITE DATA Applicant 207 Higuera, LLC Representative Ten Over Studio Complete Date February 6, 2018 Zoning C-S-MU (Commercial Service with a Mixed-Use Overlay) General Plan Service Commercial Site Area ~0.23 acres Environmental Status Categorically exempt from environmental review under CEQA Guidelines section 15332 (In-Fill Development Projects) SUMMARY The applicant, 207 Higuera, LLC, is proposing to construct a mixed-use project with commercial/retail at the ground level (1,097 sq. ft.) and two upper level apartments, as well as six townhomes to be subdivided for individual sale under a separate application (SBDV-1237-2017). The project site is located in the Commercial Services (C-S-MU) zone within a Mixed-Use Overlay near the corner of Higuera & South Streets as part of the Mid Higuera Street Enhancement Plan (MHEP). The project has been designed to be consistent with the MHEP and the Community Design Guidelines (CDG), no exceptions have been requested as part of this application. The applicant has applied for a 28% density bonus through the Affordable Housing Incentive program (§17.90.040) including a request for reduction in site development standards for the front yard setback in the C-S zone, subject to review by the City Council under a separate application (AFFH-1335-2018). ARC3 - 1 DD ARCH-1233-2017 207 Higuera Street Page 2 1.0 COMMISSION’S PURVIEW The ARC’s role is to review the project in terms of its consistency with the CDG, MHEP and applicable City policies and standards. As noted above, the reduction to the site development standards for the front yard setback in the C-S zone and the 28% density bonus will be reviewed by the City Council at a subsequent hearing under a separate application (AFFH-1335-2018). 2.0 PROJECT INFORMATION Site Information/Setting: Site Size 10,019 square feet Present Use & Development The Pond Place (Building and Landscape Materials Sales – Outdoor) Land Use Designation Commercial Services (C-S-MU) Mixed Use Overlay zone Topography Flat Access Higuera Street Surrounding Use/Zoning North: C-S-MU (Vehicle Service – Repair and maintenance) South: C-S-MU (Building Materials Sales - Indoor) East: C-S-MU (Furniture Store) West: C-R-MU (Dry Cleaning & Restaurant) Project Description: Project includes the following details (Attachment 3, Project Plans): 1.Site Plan: New mixed-use project consisting of three buildings •Demolish existing one-story structure •Site improvements, landscaping & tree replacements •Two-story mixed-use building with ground floor retail facing Higuera Street (524 & 567 sf.) with two residential units on the upper floor. •Two three-story residential structures encompassing a total of six residential units with garage parking on the ground floor through a shared driveway. 2.Design: Contemporary Industrial architectural style consisting of; •Two new commercial entrances oriented toward Higuera Street •Design features; upper level balconies, vertical and horizontal offsets, recessed windows and wall planes, awnings, wood fencing, wood facia, and shed roofs •Materials; Corrugated metal, horizontal lap siding, stucco, black vinyl windows, and aluminum clad storefront systems Project Statistics Item Proposed 1 Ordinance Standard 2 Street Yard setback 0 feet 3 15 feet Side Yard Setbacks 0 feet 0 feet Max. Height of Structure(s) 31 feet 35 feet Coverage (buildings & paving) 60% 75% Density 6.98 DU (28% Bonus) 3 5.52 DU Floor Area Ratio (FAR) 1.1 1.5 Parking Spaces 17 17 Notes: 1. Applicant’s project plans 2. City Zoning Regulations 3. Separate application (AFFH-1335-2018) ARC3 - 2 ARCH-1233-2017 207 Higuera Street Page 3 3.0 PROJECT ANALYSIS The proposed improvements must conform to the standards and limitations of the Zoning Regulations and Engineering Standards and be consistent with the MHEP and applicable CDG. Staff has evaluated the project against relevant standards and guidelines and found it to be in substantial compliance, as discussed in this analysis. Consistency with the Community Design Guidelines and Mid Higuera Enhancement Plan The CDG establish the intent of the development objectives for commercial projects that consider San Luis Obispo’s small-town scale and demonstrate sensitivity to the design context of the surrounding area. The CDG also establish the intent of the development standards for infill development projects to be compatible in scale, siting, detailing, and overall character with adjacent buildings and those in the immediate neighborhood. Site Plan: The objective of the MHEP design guidelines is to create a “main street” architectural character along Higuera Street which reflects some aspects of Downtown San Luis Obispo but does not duplicate it. Downtown elements such as pedestrian-oriented building scale & location, various storefronts and displays, street trees and other amenities to create a pedestrian-friendly environment are encouraged. The MHEP includes regulations that address site planning, architectural treatments, pedestrian and auto access, parking areas, signs, lighting, and landscaping (MHEP Design Guidelines I). The MHEP encourages parking areas along Higuera Street to be located to the rear or between buildings to be accessible from adjacent streets or common driveways. Buildings should be sited close to, and oriented toward the street with pedestrian linkages to provide safe vehicle and pedestrian circulation within the project site to adjacent neighborhoods. The project orients the commercial uses along Higuera Street and provides residential units on the upper levels. The applicant has proposed to provide majority of the residential parking within the individual garages and parking for the commercial uses on the ground level, accessed from Higuera Street. The project’s parking area is not a dominant visual element of the site and is screened by a structure that is oriented toward the major street frontage. Building Design: A building’s design should provide a sense of human scale and proportion. Horizontal and vertical wall articulation should be expressed through the use of wall offsets, recessed windows and entries, awnings, full roofs with overhangs, second floor setbacks, or covered arcades (CDG 3.2). The MHEP is designed to promote the existing eclectic mix of building styles which does not require any particular architectural style but encourages well designed forms and treatments of building walls, windows, doors, architectural details, colors and materials. New development should emphasize historic architectural forms and materials, not corporate architectural styles (MHEP Design Guidelines I.B). The applicant has designed the project close to the street to provide as many parking spaces in terior to the property as possible. The MHEP Design Guidelines state that buildings along Higuera Street should generally not exceed two-stories at the street and be designed so that upper floors are “stepped” or otherwise designed to preserve views of Cerro San Luis and maintain pedestrian scale at the street. Views toward Cerro San Luis are preserved from the project site as the building is located on the East side of Higuera Street designed with a shed style roofs that range between one and two stories below the maximum height allowed, which also provide a visual transition of views from adjacent properties toward Cerro San Luis. ARC3 - 3 ARCH-1233-2017 207 Higuera Street Page 4 The project demonstrates consistent use of colors, materials, and detailing throughout all elevations of the building. The design utilizes vertical wall articulation, offsets, and recessed windows to relieve the form and mass of the building. The project includes pedestrian-scale features including storefront windows, planter boxes, light fixtures, and balconies. All elevations are visually interesting and receive interesting architectural treatments that enhance views of the structures from all views on and off site. Consistency with the Zoning Regulations The Zoning Regulations Table 9 (Uses allowed per zone) requires a Planning Commission Use Permit for a mixed-use project within the C-S zone. The MHEP authorized the rezoning of the property from C-S to C-S-MU; the Mixed-Use Overlay was included through the Mid Higuera corridor to encourage compatible and appropriate mixed-uses, including dwellings within commercial areas. The MU overlay zone requires new development to include a mix of residential and nonresidential uses on the same site where ground floor street frontages are occupied by retail or commercial uses with residential uses above or to the rear of a site (Zoning Regulations Chapter 17.55). This designation allows the Director to waive the use permit requirement for projects that are consistent with the MHEP (MHEP: Implementing the Plan). The Zoning Regulations 17.08.72 Mixed-Use Projects state that the design of mixed use projects shall consider potential impacts on adjacent properties and designed compatible with the adjacent and surrounding residential neighborhood. The building heights of the project are consistent with MU Overlay regulations1, in order to accommodate the residential component of a mixed-use project and are below the maximum height allowed within the C-S zone. The project design complies with side yard setbacks, lot coverage, building height, and parking requirements for the Commercial Service (C-S) zone (see Section 2.0 Project Statistics). However, the property development standards for the C-S zone require a street yard setback of 15 feet for buildings greater than 20 feet in height2. The applicant has requested a density bonus incentive for a street yard setback of 1.5 feet where 15 feet is normally required. This setback reduction request will be reviewed by the City Council under a separate application as an affordable housing incentive (AFFH-1335-2018). 4.0 ENVIRONMENTAL REVIEW The project is categorically exempt under Class 32, In -Fill Development Projects; Section 15332 of the CEQA Guidelines, because the project is consistent with General Plan policies for the land use designation and is consistent with the applicable zoning designation and regulations. The project site occurs on a property of no more than five acres substantially surrounded by urban uses that has no value as habitat for endangered, rare or threatened species as the site is located on an existing developed property. 1 Zoning Regulations Chapter 17.55.030; Property Development Standards: Property development standards shall be those of the underlying zone, except that the application of the MU overlay to properties may include establishing a higher height limit than the underlying zone, to more effectively accommodate the residential component of a mixed-use project. 2 Zoning Regulations Chapter 17.46.020; Property Development Standards: Minimum street yards shall be: for buildings 20 feet and less in height, 10 feet; and for buildings more than 20 feet in height, 15 feet. ARC3 - 4 ARCH-1233-2017 207 Higuera Street Page 5 5.0 ALTERNATIVES 5.1 Continue the project with direction to the applicant and staff on pertinent issues. 5.2 Deny the project. An action denying the application should include findings that cite the basis for denial and should reference inconsistency with the General Plan, MHEP, CDG, Zoning Regulations or other policy documents. 6.0 ATTACHMENTS 1.Draft Resolution 2.Reduced Project Plans Available at ARC Hearing: Colors and Materials Board Website Link to MHEP: http://www.slocity.org/home/showdocument?id=4300 ARC3 - 5 RESOLUTION NO. ARC-XXXX-18 A RESOLUTION OF THE SAN LUIS OBISPO ARCHITECTURAL REVIEW COMMISSION APPROVING THE DEVELOPMENT OF A MIXED-USE PROJECT THAT INCLUDES EIGHT RESIDENTIAL UNITS AND APPROXIMATELY 1,097 SQUARE FEET OF COMMERCIAL SPACE. THE PROJECT IS CATEGORICAL EXEMPT FROM ENVIRONMENTAL REVIEW. AS REPRESENTED IN THE STAFF REPORT AND ATTACHMENTS DATED MARCH 5, 2018 (207 HIGUERA STREET, ARCH-1233-2017) WHEREAS, the Architectural Review Commission of the City of San Luis Obispo conducted a public hearing in the Council Hearing Room of City Hall, 990 Palm Street, San Luis Obispo, California, on March 5, 2018, pursuant to a proceeding instituted under ARCH-1233- 2016, 207 Higuera, LLC, applicant; and WHEREAS, the Architectural Review Commission of the City of San Luis Obispo has duly considered all evidence, including the testimony of the applicant, interested parties, and evaluation and recommendations by staff, presented at said hearing. WHEREAS, notices of said public hearing were made at the time and in the manner required by law; and NOW, THEREFORE, BE IT RESOLVED by the Architectural Review Commission of the City of San Luis Obispo as follows: SECTION 1. Findings. The Architectural Review Commission hereby grants final approval to the project (ARCH-1233-2017), based on the following findings: 1.As conditioned, the project will not be detrimental to the health, safety, and welfare of persons living or working at the site or in the vicinity because the project will be compatible with site constraints and the scale and character of the neighborhood. 2.The proposed project is consistent with the General Plan for this location since the project proposes to construct a mixed-use building that includes commercial, and residential uses that can be utilized for such uses envisioned by the Services and Manufacturing District within the Mixed Use Overlay zone. 3.The proposed project is consistent with Land Use Element policies 2.3.6 (Housing & Businesses) and 3.8.5 (Mixed Uses), because the project provides residential dwellings within a commercial district that are appropriate and compatible with the existing neighborhood. 4.The project is consistent with the Conservation and Open Space Element policy 4.4.3 because the project promotes higher-density, compact housing to achieve more efficient use Attachment 1 ARC3 - 6 Resolution No. ARC-XXXX-18 207 Higuera Street, ARCH-1233-2017 Page 2 of public facilities and services and to improve the City’s jobs/housing balance. 5.As conditioned, the project is consistent with the Zoning Regulations for Mixed-Use Projects (Section 17.08.072), since the proposed building design complies with design and performance standards for mixed-use development and is consistent with property development standards including height, coverage, and parking for the Commercial Services (C-S) zone. 6.As conditioned, the project design is consistent with the Community Design Guidelines by providing a variety of architectural treatments that add visual interest and articulation to the building design that complements the design and scale of the existing structures in the surrounding neighborhood (CDG, Chapter 5.4). 7.The design of the project is consistent with the Mid Higuera Enhancement Plan design guidelines since the building incorporates articulation, massing, and a mix of color/finish materials that are compatible with the neighborhood and complementary to other development within the immediate vicinity. SECTION 2. Environmental Review. The project is categorically exempt under Class 32, In-Fill Development Projects; Section 15332 of the CEQA Guidelines, because the project is consistent with General Plan policies for the land use designation and is consistent with the applicable zoning designation and regulations. The project site occurs on a property of no more than five acres substantially surrounded by urban uses that has no value as habitat for endangered, rare or threatened species as the site is located on an existing developed property. SECTION 3. Action. The project conditions of approval do not include mandatory code requirements. Code compliance will be verified during the plan check process, which may include additional requirements applicable to the project. The Architectural Review Commission (ARC) hereby grants final approval to the project with incorporation of the following conditions: Planning Division 1.Final project design and construction drawings submitted for a building permit shall be in substantial compliance with the project plans approved by the ARC (ARCH-1233-2017). A separate, full-size sheet shall be included in working drawings submitted for a building permit that lists all conditions and code requirements of project approval listed as sheet number 2. Reference shall be made in the margin of listed items as to where in plans requirements are addressed. Any change to approved design, colors, materials, landscaping, or other conditions of approval must be approved by the Director or Architectural Review Commission, as deemed appropriate. 2.The Architectural Review Commission’s determination regarding the project is contingent upon the approval of the City Council in regards to the 28% density bonus that includes a request for an incentive to reduce the street yard setback to 1.5 feet, where 15 feet is normally required, subject to review by the City Council under a separate application Attachment 1 ARC3 - 7 Resolution No. ARC-XXXX-18 207 Higuera Street, ARCH-1233-2017 Page 3 (AFFH-1335-2018). 3.Demolition of the existing building shall not commence until a permit has been issued by the building official. The applicant shall comply with Municipal Code Chapter 15.04 Construction and Fire Prevention Regulations, Appendix Chapter A2 Demolition and Moving of Buildings, including but not limited to, the following: for structures older than 50 years, the applicant shall provide evidence that for a period of not less than 90 days from date of permit application, the building was advertised in a local newspaper on at least 3 separate occasions not less than 15 days apart, as available to any interested person to be moved, and submit historic documentation for the structure. 4.Plans submitted for a building permit shall call out the colors and materials of all proposed building surfaces and other improvements. Colors and materials shall be consistent with the color and material board submitted with Architectural Review application. 5.Plans submitted for a building permit shall include window details and all other details including but not limited to awnings, and railings. Plans shall indicate the type of materials for the window frames and mullions, their dimensions, and colors. Plans shall include the materials and dimensions of all lintels, sills, surrounds recesses and other related window features. Plans shall demonstrate the use of high quality materials for all design features that reflect the architectural style of the project and are compatible with the neighborhood character, to the approval of the Community Development Director. 6.Final plans shall clearly depict the location of all required short and long-term bicycle parking required for commercial uses, plans submitted for construction permits shall include bicycle lockers or interior space within each residential unit or parking area for the storage of at least two bicycles per unit. Sufficient detail shall be provided about the placement and design of bike racks and lockers to demonstrate compliance with relevant Engineering Standards and Community Design Guidelines, to the satisfaction of the Public Works and Community Development Directors. 7.Noise reduction – Interior noise levels: Plans submitted for construction permits to complete the project will clearly indicate and describe the noise reduction measures, techniques, and materials used to reduce noise levels for the portion of the project along Higuera Street that is exposed to elevated noise levels, as indicated in Figures 4 and 5 of the Noise Element of the General Plan, to acceptable levels, as described in Figure 1 of the Noise Element. Measures, techniques, and materials used to reduce noise levels shall be as described in the Standard Noise Package for achieving a noise level reduction of 25 dB, from the City’s Noise Guidebook, or equivalent alternative measures, techniques, and materials. 8.The trash enclosure located shall be design with high quality materials to match the architecture of the project and screened with large shrubs and/or trees, subject to the approval of the Community Development Director. The applicant shall incorporate a trellis over the trash enclosure in order to screen from overlook; design of the trellis is subject to Attachment 1 ARC3 - 8 Resolution No. ARC-XXXX-18 207 Higuera Street, ARCH-1233-2017 Page 4 the Community Design Guidelines and to the satisfaction of the Community Development Director. 9.The storage area for trash and recycling cans shall be screened from the public right -of-way. The subject property shall be maintained in a clean and orderly manner at all times; free of excessive leaves, branches, and other landscape material. The applicant shall be responsible for the clean-up of any landscape material in the public right-of-way. 10.The locations of all lighting, including bollard style landscaping or path lighting, shall be included in plans submitted for a building permit. All wall-mounted lighting fixtures shall be clearly called out on building elevations included as part of working drawings. All wall- mounted lighting shall complement building architecture. The lighting schedule for the building shall include a graphic representation of the proposed lighting fixtures and cut- sheets on the submitted building plans. The selected fixture(s) shall be shielded to ensure that light is directed downward consistent with the requirements of the City’s Night Sky Preservation standards contained in Chapter 17.23 of the Zoning Regulations. 11.Mechanical and electrical equipment shall be located internally to the building. With submittal of working drawings, the applicant shall include sectional views of the building, which clearly show the sizes of any proposed condensers and other mechanical equipment. If any condensers or other mechanical equipment is to be placed on the roof, plans submitted for a building permit shall confirm that parapets and other roof features will provide adequate screening. A line-of-sight diagram shall be included to confirm that proposed screening will be adequate. This condition applies to both initial project construction and later building modifications and improvements. 12.A final landscaping plan, including irrigation details and plans, shall be submitted to the Community Development Department along with working drawings. The legend for the landscaping plan shall include the sizes and species of all groundcovers, shrubs, and trees with corresponding symbols for each plant material showing their specific locations on plans. 13.The location of any required backflow preventer and double-check assembly shall be shown on all site plans submitted for a building permit, including the landscaping plan. Construction plans shall also include a scaled diagram of the equipment proposed. Where possible, as determined by the Utilities Director, equipment shall be located inside the building within 20 feet of the front property line. Where this is not possible, as determined by the Utilities Director, the back flow preventer and double-check assembly shall be located in the street yard and screened using a combination of paint color, landscaping and, if deemed appropriate by the Community Development Director, a low wall. The size and configuration of such equipment shall be subject to review and approval by the Utilities and Community Development Directors. 14.Any proposed signs are subject to review and approval of the Community Development Department and subject to a sign permit. The Community Development Director shall refer Attachment 1 ARC3 - 9 Resolution No. ARC-XXXX-18 207 Higuera Street, ARCH-1233-2017 Page 5 signage to the ARC if signs need an exception or appear to be excessive in size or out of character with the project. Housing Division – Community Development Department 15.To satisfy the City’s Inclusionary Housing Requirements and qualify for the Affordable Housing Incentives associated with the project the applicant shall dedicate affordable housing unit(s) consistent with Table 2A of the General Plan Housing Element, subject to approval by the City Council through the application AFFH-1335-2018. Public Works – Engineering Division 16.The building plan submittal shall show compliance with the Parking and Driveway Standards. Standard size vehicles shall be able to access all parking spaces in one motion and exit to the adjoining street in a forward motion in not more than two maneuvers. The final plans may require that all garage doors be widened to 18’ to improve maneuverability. 17.The building plan submittal shall show a widened driveway approach to the maximum extent practical to better align with the on-site driveway width and to improvement maneuverability into and out of the site. A centerline stripe, decorative paving delineation, or other method shall be provided on-site to help with the alignment of vehicles entering and exiting the site to help minimize vehicle queuing within Higuera Street. 18.The building plans shall show full compliance with the City’s Floodplain Management Regulations. All buildings and building service equipment shall be protected or elevated to a minimum of 1’ above the Base Flood Elevation (BFE). Additional freeboard to 2’ above the BFE is recommended to better protect the building and to provide for reductions in Flood Insurance premiums. This project is located in a FEMA identified Repetitive Loss area. 19.The building plan submittal shall include a final drainage report showing and noting compliance with the Floodplain Management Regulations, Drainage Design Manual, Mid- Higuera Plan, and the Post Construction Stormwater Regulations. The Mid -Higuera flood impact anal ysis strategy has been endorsed. The final Drainage Design Manual compliance strategy and analysis for re-development shall include a comparative analysis of displaced flood volumes between this project and the previously entitled project. The analysis shall also include the pre. vs. post City HEC-RAS model outputs for the existing developed site and proposed development to show compliance with the elevation and velocity limits of the Drainage Design Manual. 20.The building plans shall show all required flood-resistant construction and venting for the residential “wet floodproofed” garages. Prescriptive cross-ventilation for equalizing pressure from floodwater may not be possible because of property line locations and Building Code limitations. Therefore, depending upon the depth of the BFE and structural design, a custom analysis and proposal for venting within the garage doors may be required. Attachment 1 ARC3 - 10 Resolution No. ARC-XXXX-18 207 Higuera Street, ARCH-1233-2017 Page 6 21.The Post Construction Stormwater Regulation compliance documentation shall include an Operation and Maintenance Manual and the recordation of a Private Stormwater Conveyance Agreement. Transportation Division - Public Works Department 22.The final landscape plan for the building front/driveway entry planters and street trees shall consider a line-of-site analysis for vehicles exiting the driveway. The plantings at the entry shall have a mature height of less than 30” above grade. The final street tree species, size, planting location, and approval of the specific nursery stock shall be approved to the satisfaction of the City Arborist and Transportation Division. Utilities Department 23.The project’s commercial and residential uses shall be metered separately. All residential units are to be individually metered. Privately owned sub-meters may be provided for residential apartments upon approval of the Utilities Director. The CCR’s for the property/homeowner association shall require that the sub-meters be read by the association (or P/HOA contracted service) and each apartment billed according to water use. 24.The proposed utility infrastructure shall comply with the latest engineering design standards in effect during the time a building permit is obtained, and shall have reasonable alignments and clearances needed for maintenance. 25.Any sewer lateral that crosses one proposed parcel for the benefit of another shall provide evidence that a private utility easement appropriate for those facilities has been recorded prior to final Building Permit. 26.A new HDPE sewer lateral shall be installed per the engine ering design standards, and connect into the existing 18” sewer main. 27.All water service(s) zoned for manufacturing shall provide a reduced pressure backflow preventer downstream of the meter. 28.Trash enclosure(s) shall conform the requirements by the San Luis Garbage Company and refuse bins shall be sized to provide a reasonable level of service. Separate refuse bins shall be accommodated within the site for waste, recycling, and organics. 29.Driveways and access routes to all refuse receptacles shall be designed to accommodate the size and weight of the garbage trucks; a written confirmation from the San Luis Garbage Company shall be included in the building permit plans for the proposed project. 30.If the proposed use includes food preparation, or any type of process discharge, a pre- treatment design shall be provided with the site plan, and a pre-treatment application shall Attachment 1 ARC3 - 11 Resolution No. ARC-XXXX-18 207 Higuera Street, ARCH-1233-2017 Page 7 be completed. The pre-treatment application will need to be coordinated with the building department, and the City’s Industrial Waste Program Manager. Fire Department 31.Plans submitted for a building permit shall include the location of the fire riser room within the building footprint, that provides access from Higuera Street to the satisfaction of the Fire Marshal and the Community Development Director. Backflow device shall be located no more than 20 feet from property line, FDC shall face the Fire Access Roadway (Higuera Street). 32.Buildings over 30 feet in height shall be provided with Ladder Truck Access as specified in Appendix ‘d’ of the Fire Code. The 14 feet between buildings ‘B’ and ‘C’ is insufficient to operate the City’s Ladder Truck to achieve roof access. An increase in fire sprinkler density to a minimum 0.1 gpm/sf and attic coverage will be acceptable in lieu of full access , to the satisfaction of the Fire Marshal. Indemnification 33.The applicant shall defend, indemnify and hold harmless the City and/or its agents, officers and employees from any claim, action or proceeding against the City and/or its agents, officers or employees to attack, set aside, void or annul, the approval by the City of this project, and all actions relating thereto, including but not limited to environmental review (“Indemnified Claims”). The City shall promptly notify the applicant of any Indemnified Claim upon being presented with the Indemnified Claim and the City shall fully cooperate in the defense against an Indemnified Claim. On motion by Commissioner ___________, seconded by Commissioner _____________, and on the following roll call vote: AYES: NOES: REFRAIN: ABSENT: The foregoing resolution was passed and adopted this 5th day of March, 2018. _____________________________ Doug Davidson, Secretary Architectural Review Commission Attachment 1 ARC3 - 12 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/18/2018CLIENT207 HIGUERA, LLC 207 HIGUERA ST., SAN LUIS OBISPO, CA 93401CONTACT: SCOTT STOKESscott@abovegradeengineering.com207 HIGUERA MIXED-USEARCHITECT TEN OVER STUDIO539 MARSH ST., SAN LUIS OBISPO, CA 93401805.541.1010CONTACT: JOEL SNYDER joels@tenoverstudio.comCIVIL ENGINEER ABOVE GRADE ENGINEERING, INC.1304 BROAD ST., SAN LUIS OBISPO, CA 93401 805.540.5115CONTACT: SCOTT STOKESscott@abovegradeengineering.comAttachment 2ARC2 - 13 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018ENERGY CONSERVATION207 Higuera Mixed Use consists of walk-up townhomes and apartments accessed by exterior egress balcony in order to capitalize on passive energy. This arrangement reduces the demand of heating and cooling loads by eliminating interior egress hallways, and maximizes the light and air quality to the units. All the units have the ability to have cross-breeze for natural cooling. BUILDING INFOBUILDING CONSTRUCTION: TYPE VB, SPRINKLERED. BUILDING A: NFPA 13 SYSTEM BUILDING B & C: NFPA 13D SYSTEM, WITH .1 DENSITY1 HR FIRE SEPARATION REQUIRED BTW. COMMERCIAL AND RESIDENTIAL USES. 1/2 HR FIRE SEPARATION REQUIRED BTW. RESIDENTIAL UNITS.BUILDING A: FIRST FLOOR BUILDING AREA*: 1202 SFCOMMERCIAL B1097 SFTRASH S 69 SFRISER/ELEC U 42 SFSECOND FLOOR BUILDING AREA*: 1528 SFRESIDENTIAL R-2 1528 SFBUILDING A TOTAL AREA: 2730 SFCOVERED DECK AT 2ND FLOOR 417 SFBUILDING B (BUILDING C IS SAME):FIRST FLOOR BUILDING AREA*: 1359 SFGARAGE U1359 SFSECOND FLOOR BUILDING AREA*: 1479 SFRESIDENTIAL R-2 1479 SFTHIRD FLOOR BUILDING AREA*: 1350 SFRESIDENTIAL R-2 1350 SFBUILDING B TOTAL AREA: 4170 SFUNCOVERED DECK AT 2ND FLOOR 396 SFTOTAL BUILDING AREA (A,B & C): 11,070 SFCOVERED DECK 417 SFUNCOVERED DECK 837 SFBREAKDOWN BY TYPE:3-STORY, 2-BD TOWNHOME: LIVING AREA:943 SFUNCOV’D DECK132 SFGARAGE:453 SF3-STORY 1-BD TOWNHOME: LIVING AREA:943 SFUNCOV’D ROOF DECK: 132 SFGARAGE:453 SF1-STORY 1-BD APARTMENT:LIVING AREA: UNIT 07/ 08 675 / 737 SFCOV’D DECK: UNIT 07/ 08 163 / 251 SFPARKING w/ AFFORDABLE INCENTIVE:(2) 1-BD APARTMENTS = 2 STALLS(6) SFR = 12 STALLS 1/300 SF RETAIL = 1000*/300 = 3 STALLSTOTAL PARKING REQ’D : 17 STALLSPARKING PROPOSED = 17 STALLS*ASSUMING SF AFTER RESTROOMS/ STORAGEBICYCLE: 1 SHORT TERM @ EXTERIOR, 1 LONG TERM LOCATED IN BUILDINGMOTORCYCLE: 1 PROVIDED INDEXPROJECT INFO1CONTEXTUAL SITE PLAN2PRELIMINARY GRADING & DRAINAGE PLAN C-1.1 (3) PRELIMINARY UTILITY PLANC-2.1 (4)TENTATIVE TRACT MAPC-3.1 (5)CONCEPTUAL LANDSCAPE PLAN 6PLANT SCHEDULE & IMAGES 7ARCH’L DEMO PLAN8SITE PLAN9SITE SECTIONS10SITE ELEVATIONS11FLOOR PLANS 12 - 14ROOF PLAN15ELEVATIONS16 - 19MATERIALS20 - 21MODEL IMAGES22 - 27VICINITY MAPSITEADDRESS:207 HIGUERA STREETAPN:003-721-039LOT SIZE: 10,019 SF / .23 ACRES CURRENT TOTAL LOT COVERAGE: 1,087 SF PROPOSED TOTAL LOT COVERAGE: 6,012 SF ALLOWED COVERAGE:75%ALLOWED F.A.R.1.5ZONING:C-S, MUAVERAGE SLOPE:0%DENSITY:24/ACREHEIGHT LIMIT:35’OCCUPANCY USE: B, (RETAIL/OFF.) & R-2 (RESIDENTIAL APT)SFR (6 RESIDENTIAL UNITS IN REAR)PROJECT DESCRIPTION207 Higuera Mixed-Use proposes a new 11,070 SF 3-buliding development with a 2,730 SF 2-story mixed-use building fronting Higuera St. The ground floor has 1097 SF of proposed commercial use divided into two suites flanking a central drive aisle access. Two new affordable residential apartments bridge over the drive aisle at the second floor. Directly behind the new mixed-use building, is surface parking, creating a seperation of 27’ minimum to the 3-story Townhomes behind. A parcel map subdivision is in concurrent review to subdivide the lot into 7 airspace lots that will separate each townhome into an individual SFR occupancies. The design provides for an average of 157 SF of private deck per unit. Project requests density bonus, parking reductions, and height increase at front setback through afforable incentives. PROJECT LOCATIONCALIFORNIA CODE REFERENCEPAGE 1DENSITYTOTAL DENSITY ALLOWED: 24/.23 = 5.52BASE DENSITY (BASED ON 6 DOORS): (4) 2 BD = 4 DU & (2) 1BD = 1.32 DUDENSITY BONUS: 2 OF 6 DOORS AS AFFORDABLE MODERATE33% AFFORDABLE MODERATE = 28% DENSITY BONUSTOTAL DENSITY= 5.52 + (5.52 X.28) = 7.06 ALLOWEDPROPOSED DENSITY: (5) 2BD = 5 DU & (3) 1BD = 1.98 DU6.98 DU PROPOSEDAttachment 2ARC2 - 14 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018CONTEXTUAL SITE PLANSCALE: NTSNPAGE 21. THE POND PLACE - EXISTING RETAIL BUILDING TO BE REMOVED.2. BAY AUTO & TIRE- REPAIR SHOP3. DUNN EDWARDS PAINTS - RETAIL STORE4. PAUL’S DRY CLEANERS- RETAIL STOREAttachment 2ARC2 - 15 Attachment 2ARC2 - 16 Attachment 2ARC2 - 17 Attachment 2ARC2 - 18 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018CONCEPTUAL LANDSCAPE PLANSCALE: 1/16” = 1’-0”PAGE 6NAttachment 2ARC2 - 19 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018PLANT SCHEDULE AND IMAGESMIXICAN SYCAMORECALIFORNIA FUCHSIAKINNIKINNICKSISKIYOU BLUE FESCUE DEER GRASSPAGE 7Attachment 2ARC2 - 20 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018DEMO PLANSCALE: 1/16” = 1’-0”1. (E) PAVERS TO BE REMOVED2. (E) STRUCTURE TO BE REMOVED3. (E) 6” DIA. CRAPE MYRTLE TO BE REMOVED4. (E) CURB AND WALL TO BE REMOVED5. (E) CONCRETE TO BE REMOVED6. (E) WELL TO BE REMOVED7. (E) PLANTERS TO BE REMOVED8. (E) DECOMPOSED GRANITE9. (E) PERIMETER FENCE TO BE REMOVED10. (E) ROCK FORMATION TO BE REMOVEDKEYNOTESPAGE 8ADJACENT BUILDINGADJACENT BUILDINGADJACENTBUILDING111975244339681011NAttachment 2ARC2 - 21 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018SITE PLANSCALE: 1/16” = 1’N36'-11"1'-6"27'-934"79'-6"6'-012"HIGUERA ST.U121'-0"24'-0"21'-0"1237135412864'-0"1'-6"31'-914"79'-6"5'-0"20'-0"4'-0"P.L. 151.77'P.L. 151.09'28'-1112"P.L.66.25'P.L. 65.85'PARKING1PARKING2PARKING3ADAPARKING4PARKING52-CAR GARAGE 2-CAR GARAGE 2-CAR GARAGE2-CAR GARAGE2-CAR GARAGE2-CAR GARAGE1BLDG A(N) MIXED-USE3152 SFBLDG B(N) TOWNHOMES4188 SFBLDG C(N) TOWNHOMES4188 SF2691091011ADJACENT BUILDINGADJACENT BUILDINGADJACENTBUILDING6MC9'-714"8'-714"9'-714"8'-0"9'-0"8'-714"18'-6"18'-6"61'-0"8. VEHICLE WHEELSTOP OVERHANG OVERHANG (2.5’)9. SIX FOOT TALL WOOD FENCE10. CURB WHEELSTOP11. LANDSCAPING. SEE LANDSCAPE SHEETS.12. PERMEABLE PAVERS. SEE CIVIL13. ELECTRICAL METERS1. (N) STREET TREE. SEE LANDSCAPING PLAN.2. (E) DRIVEWAY CURBCUT3. (N) CURB AT LANDSCAPING4. (N) CONCRETE DRIVE AISLE5. ELEC/ RISER ROOM w/ 4” BACKFLOW DEVICE AND FDC.6. BUILDING ABOVE7. TRASH ROOMS:1 TRASH/ 1 RECYCLE @ 32 GA. EA. PER APARTMENT1 TRASH/ 1 RECYCLE @ 96 GA. EA. PER COMM. SUITE1 TRASH/ 1 RECYCLE @ 96 GA. EA. PER TOWNHOME**IN GARAGESKEYNOTESPAGE 9Attachment 2ARC2 - 22 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018SITE SECTION - WESTSCALE: 3/32” = 1’-0”P.L.P.L.P.L.P.L.2ND F.F.9'-6"3RD F.F.18'-6"T.O.R.31'-3"1ST F.F.O'-0"2ND F.F.9'-6"3RD F.F.18'-6"T.O.R.31'-3"1ST F.F.O'-0"2ND F.F.16'-0"T.O.R.27'-7"1ST F.F.0'-0"MAX BLDGHEIGHT35'MAX BLDGHEIGHT35'MAX BLDGHEIGHT35'MAX BLDGHEIGHT35'CLEAR13'-6"PAGE 10SITE SECTION - SOUTHSCALE: 3/32” = 1’-0”Attachment 2ARC2 - 23 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018P.L.P.L.P.L.P.L.31'-3" TOP OF ROOF35'-0" BUILDING HEIGHT LIMIT35'-0" BUILDING HEIGHT LIMIT27'-7" TOP OF ROOF27'-7" TOP OF ROOFSITE ELEVATION WESTSCALE: 3/32” = 1’-0”PAGE 11SITE ELEVATION SOUTHSCALE: 3/32” = 1’-0”Attachment 2ARC2 - 24 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018FIRST FLOOR PLANSCALE: 3/32” - 1’PAGE 12N1. METAL AWNING ABOVE2. BUILDING ABOVEKEYNOTESAttachment 2ARC2 - 25 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018SECOND FLOOR PLANSCALE: 3/32” - 1’PAGE 13NAttachment 2ARC2 - 26 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/201814BLDG A: ROOF , BLDG B & C: THIRD FLOOR PLANSCALE: 3/32” - 1’PAGEN1. DECK BELOW2. BUILDING BELOW3. GUTTER AND DOWNSPOUTSKEYNOTESAttachment 2ARC2 - 27 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018BLDG. B & C: ROOF PLANSCALE: 3/32” - 1’PAGE 15N        6/23(                6/23( BLDG A%(/2:BLDG BBLDG C1. BALCONY BELOW2. BUILDING BELOW3. GUTTER AND DOWNSPOUTSKEYNOTESAttachment 2ARC2 - 28 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018P.L.16'-0" 2ND FLOOR11'-7"27'-7" TOP OF ROOF35'-0" BUILDING HEIGHT LIMITP.L.P.L.16'-0" 2ND FLOOR11'-7"27'-7" TOP OF ROOF35'-0" BUILDING HEIGHT LIMIT112234561089121113511121341513'-6" CLEARANCEMIXED USE ELEVATION - SOUTHSCALE: 1/8” = 1’-0”1. HARDIE PLANK - SMOOTH 2. CORRUGATED METAL SIDING3. HARDIE BOARD - SMOOTH 4. 2X WOOD FASCIA PAINTED - PAINTED BLACK5. BLACK VINYL WINDOW WITH TRANSPARENT GLASS 6. BLACK VINYL DOOR WITH TRANSPARENT GLASS7. NOT USED8. ALUMINUM CLAD STOREFRONT WINDOW WITH TRANSPARENT GLASS AND TRANSPARENT CLERESTORY ABOVE9. ALUMINUM STOREFRONT DOOR WITH TRANSPARENT GLASS PANEL 10. METAL AWNING11. CABLE RAILING - STAINLESS STEEL12. 4X PAINTED POSTS13. MOUNTED WALL SCONCE14. METAL FIRE RATED DOOR15. WOOD FENCE - 6FT TALL16. NOT USED17. WOOD SOFFIT18. STUCCO - SMOOTH19. WOOD AND CABLE RAIL BALCONY PAINTED - BLACK20. GARAGE DOOR WITH TRANSPARENT PANELS21. TPO ROOF22. METAL DOORKEYNOTESPAGE 16MIXED USE ELEVATION - WESTSCALE: 1/8” = 1’-0”Attachment 2ARC2 - 29 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/20183/3/3/ 1')/225  7232)522) %8,/',1*+(,*+7/,0,7  1')/225 7232)522) %8,/',1*+(,*+7/,0,767))MIXED USE ELEVATION - NORTHSCALE: 1/8” = 1’-0”PAGE 17MIXED USE ELEVATION - EASTSCALE: 1/8” = 1’-0”1. HARDIE PLANK - SMOOTH 2. CORRUGATED METAL SIDING3. HARDIE BOARD - SMOOTH4. 2X WOOD FASCIA PAINTED - PAINTED BLACK5. BLACK VINYL WINDOW WITH TRANSPARENT GLASS 6. BLACK VINYL DOOR WITH TRANSPARENT GLASS7. NOT USED8. ALUMINUM CLAD STOREFRONT WINDOW WITH TRANSPARENT GLASS AND TRANSPARENT CLERESTORY ABOVE9. ALUMINUM STOREFRONT DOOR WITH TRANSPARENT GLASS PANEL 10. METAL AWNING11. CABLE RAILING - STAINLESS STEEL12. 4X PAINTED POSTS13. MOUNTED WALL SCONCE14. METAL FIRE RATED DOOR15. WOOD FENCE - 6FT TALL16. NOT USED17. WOOD SOFFIT18. STUCCO - SMOOTH19. WOOD AND CABLE RAIL BALCONY PAINTED - BLACK20. GARAGE DOOR WITH TRANSPARENT PANELS21. TPO ROOF22. METAL DOORKEYNOTESAttachment 2ARC2 - 30 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/20183/ 67)/225 1')/225 5')/225  7232)522) %8,/',1*+(,*+7/,0,73/TOWNHOMES ELEVATIONS - WESTSCALE: 1/8” = 1’-0”PAGE 18TOWNHOMES ELEVATIONS - SOUTH(NORTH SIMILAR)SCALE: 1/8” = 1’-0”3/ 67)/225 1')/225 5')/225 3/1. HARDIE PLANK - SMOOTH 2. CORRUGATED METAL SIDING3. HARDIE BOARD - SMOOTH 4. 2X WOOD FASCIA PAINTED - PAINTED BLACK5. BLACK VINYL WINDOW WITH TRANSPARENT GLASS 6. BLACK VINYL DOOR WITH TRANSPARENT GLASS7. NOT USED8. ALUMINUM CLAD STOREFRONT WINDOW WITH TRANSPARENT GLASS AND TRANSPARENT CLERESTORY ABOVE9. ALUMINUM STOREFRONT DOOR WITH TRANSPARENT GLASS PANEL 10. METAL AWNING11. CABLE RAILING - STAINLESS STEEL12. 4X PAINTED POSTS13. MOUNTED WALL SCONCE14. METAL FIRE RATED DOOR15. WOOD FENCE - 6FT TALL16. NOT USED17. WOOD SOFFIT18. STUCCO - SMOOTH19. WOOD AND CABLE RAIL BALCONY PAINTED - BLACK20. GARAGE DOOR WITH TRANSPARENT PANELS21. TPO ROOF22. METAL DOORKEYNOTESAttachment 2ARC2 - 31 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018 67)/225 1')/225 5')/225  7232)522) %8,/',1*+(,*+7/,0,73/TOWNHOMES ELEVATION - SOUTH@ DRIVE AISLE(NORTH SIMILAR)TOWNHOMES ELEVATION - EASTSCALE: 1/8” = 1’-0”PAGE 19SCALE: 1/8” = 1’-0”3/ 67)/225 1')/225 5')/225  7232)522) %8,/',1*+(,*+7/,0,73/1. HARDIE PLANK - SMOOTH 2. CORRUGATED METAL SIDING3. HARDIE BOARD - SMOOTH 4. 2X WOOD FASCIA PAINTED BLACK5. BLACK VINYL WINDOW WITH TRANSPARENT GLASS 6. BLACK VINYL DOOR WITH TRANSPARENT GLASS7. NOT USED8. ALUMINUM CLAD STOREFRONT WINDOW WITH TRANSPARENT GLASS AND TRANSPARENT CLERESTORY ABOVE9. ALUMINUM STOREFRONT DOOR WITH TRANSPARENT GLASS PANEL 10. METAL AWNING11. CABLE RAILING - STAINLESS STEEL12. 4X PAINTED POSTS13. MOUNTED WALL SCONCE14. METAL FIRE RATED DOOR15. WOOD FENCE - 6FT TALL16. NOT USED17. WOOD SOFFIT18. STUCCO - SMOOTH19. WOOD AND CABLE RAIL BALCONY PAINTED - BLACK20. GARAGE DOOR WITH TRANSPARENT PANELS21. TPO ROOF22. METAL DOORKEYNOTESAttachment 2ARC2 - 32 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018MATERIALS - MIXED USE BUILDINGSIDING AND TRIM PANELSHARDIE PANEL SMOOTHSW 7069 IRON OREMETAL SIDING4” BOX RIB METAL PANEL SILVER METALLICLAP SIDINGHARDIE PANELSW 7739 HERBAL WASHSTOREFRONTKAWNEER, ANODIZED ALUM. BLACK NO.29WALL SCONCEBARNLIGHT G-32SOFFITSWOODTONE TRAD. PANELSTEXAS HONEY BROWNPAGE 20Attachment 2ARC2 - 33 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018MAIN BODY - STUCCOLA HABRA - SILVER GRAYWALL SCONCEBARNLIGHT - ATOMIC INDUSTRIAL SOFFITSWOODTONE TRAD. PANELSTEXAS HONEY BROWNMATERIALS - TOWNHOMESPAGE 21SIDING AND TRIM PANELSHARDIE PANEL SMOOTHSW 7069 IRON OREMETAL SIDING4” BOX RIB METAL PANEL SILVER METALLICLAP SIDINGHARDIE PANELSW 7739 HERBAL WASHAttachment 2ARC2 - 34 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018HIGUERA STREET ELEVATIONPAGE 22Attachment 2ARC2 - 35 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018HIGUERA STREET ELEVATIONPAGE 23Attachment 2ARC2 - 36 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018TOWNHOME - WEST ELEVATIONPAGE 24Attachment 2ARC2 - 37 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018MIXED USE BUILDING - EAST ELEVATIONPAGE 25Attachment 2ARC2 - 38 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018AXONOMETRIC VIEW LOOKING NORTH-WESTPAGE 26Attachment 2ARC2 - 39 805.541.1010539 Marsh StreetSan Luis Obispo, CAinfo@tenoverstudio.comtenoverstudio.comSET NOT FOR CONSTRUCTIONAll dimensions to be verified on site207 HIGUERA MIXED-USE207 HIGUERA STREET, SAN LUIS OBISPO, CADATE: 01/08/2018AXONOMETRIC VIEW LOOKING NORTH-EASTPAGE 27Attachment 2ARC2 - 40