HomeMy WebLinkAboutItem #4 - ARCH-2213-2015 (San Luis Square - 570, 580, & 590 Marsh & 581 Higuera Streets)Meeting Date: March 5, 2018 Item Number: 4 2 ARCHITECTURAL REVIEW COMMISSION AGENDA REPORT SUBJECT: Continued architectural review based on specific direction from the ARC of a new mixed- use project that includes three, four-story structures with a request for a maximum height of 59.5 feet. The project includes 19,792 square feet of commercial space, 63 residential units, 36 hotel rooms, and a two-level underground parking garage with 136 parking spaces, as well as a request for a new driveway approach to the parking garage along on Nipomo Street. The project is categorically exempt from environmental review. PROJECT ADDRESS: 570, 578 & 590 Marsh & BY: Rachel Cohen, Associate Planner 581 Higuera Streets Phone Number: (805) 781-7574 e-mail: rcohen@slocity.org FILE NUMBER: ARCH-2213-2015 FROM: Doug Davidson, Deputy Director RECOMMENDATION: Adopt the Draft Resolution based on findings, and subject to conditions (Attachment 1). SITE DATA Applicant John Belsher, The Obispo Company Zoning Downtown Commercial (C-D) General Plan General Retail Site Area 0.98 Acres (42,610 square feet) (4 parcels) Environmental Status Consistent with CEQA Section 15168(C)4, Article 12 Section 15183(a) and Categorically Exempt from environmental review under 15332 (In-Fill Development Projects). SUMMARY The applicant has submitted revised plans per ARC direction for a new mixed-use project that includes three, four-story structures with 19,792 square feet of commercial space, 63 residential units, 36 hotel rooms, and a two-level underground parking garage with 136 parking spaces located at 570, 578 and 590 Marsh and 581 Higuera Street. The project proposes commercial space on the first floor and a mix of 40 studios and 23 one-bedroom residential units with 36 hotel units on the upper three floors. 1.0 COMMISSION’S PURVIEW The ARC’s role is to review the project in terms of its consistency with the Community Design ARC4 - 1 ARCH-2213-2015 570, 578 & 590 Marsh & 581 Higuera Street Page 2 Guidelines and applicable City policies and standards. 2.0 BACKGROUND December 1, 2014: The Architectural Review Commission (ARC) reviewed a conceptual architectural design of a new, four-story mixed-use project with approximately 13,000 square feet of retail space and 24 residential units located at 581 Higuera Street (see Figure 1 below, Parcel #4). The ARC provided direction to the applicant to consider removing the top floor of the structure and to return to the ARC with the proposal for the entire project (all three buildings) and not submit each building as an individual project. July 13, 2015: The Cultural Heritage Committee (CHC) and the ARC held a joint conceptual review of a mixed-use project that included three, four-story structures with approximately 21,322 square feet of retail space and 48 residential units (staff report available online at: http://opengov.slocity.org/weblink/1/doc/43537/Page1.aspx). Review by the CHC was not required for the site since it is not within a historic district and is not located on a historic site. The Community Development Director determined that the ARC would benefit from a common discussion with the CHC to gather insights at the conceptual stage of the project prior to the formal submittal and review of the application because of the adjacency of the project to the Master List Historic Jack House. The CHC and the ARC provided a list of directional items that were to be considered and included in the final project plan submittal. As a part of that direction, the ARC directed staff to return to the CHC to review the revised project. May 22, 2017: A revised project was reviewed by the CHC that included changes and additional information based on the direction provided during the conceptual review (staff report available online at: http://opengov.slocity.org/weblink/1,1,1/doc/64875/Page1.aspx). A Historic Resources Evaluation prepared by LSA Consultants evaluated the house located at 570 Marsh Street. LSA concluded that the building did not qualify as a historic resource because of a lack of significant association with a historical context. The CHC supported this determination and made the recommendation the that the house did not qualify as a cultural resource. The CHC discussed the shading study and evaluation of potential effects on cultural resources. The CHC provided input that since the proposed project’s scale and massing could impact the Jack House Gardens, a categorical exemption from environmental review should not be used and an Initial Study should be prepared pursuant to CEQA. The Director of Community Development is charged with determining whether and what level of environmental review is appropriate and directing the preparation of the appropriate environmental document or application of the appropriate categorical exemption. The Director considered the CHC’s discussion and recommendation and determined that the concerns regarding potential adverse impacts provided by the CHC did not support a conclusion that the project falls within an exception to a categorical exemption from environmental review. An in-depth discussion and analysis is provided as Attachment 10 in the staff report (http://opengov.slocity.org/weblink/1,1,1/doc/64875/Page1.aspx). The Community Development Director also directed that City staff verify the shade analysis by running their own analysis. ARC4 - 2 ARCH-2213-2015 570, 578 & 590 Marsh & 581 Higuera Street Page 3 November 13, 2017: The ARC continued their review of a new mixed-use project that included three, four-story structures with a request for a maximum height of 59.5 feet. The project included 19,792 square feet of commercial space, 62 residential units, 36 hotel rooms, and a two-level underground parking garage with 136 parking spaces, as well as a request for a new driveway approach to the parking garage along on Nipomo Street. The ARC provided specific direction to the applicant on modifications to bring back to the ARC for review (staff report from this meeting is available online at: http://opengov.slocity.org/weblink/1,1,1,1/doc/69235/Page1.aspx). Section 4 below provides the list of directional items, the applicant’s response and staff analysis. 3.0 PROJECT INFORMATION 3.1 Site Information/Setting The project site consists of four developed lots. Figure 1 shows the location of each parcel that makes up the project site and their location along Marsh, Nipomo and Higuera Streets. Table 1 provides site information and surrounding uses. 1 2 3 4 Jack House The Creamery Figure 1: Locations of the four parcels that make up the project site. ARC4 - 3 ARCH-2213-2015 570, 578 & 590 Marsh & 581 Higuera Street Page 4 Table 1: Site information and setting 3.2 Project Description Named “San Luis Square,” the proposed project site includes three, four-story structures with ground floor retail and upper floor residential and hotel uses, a public plaza and paths, a pedestrian connection between Marsh and Higuera Streets, and an on-site, two-level underground parking garage. The buildings are designed to include historic and classic architectural features with contemporary architecture. The new buildings will include the following elements (see Attachment 3, Revised Project Plans): 1. 19,792 s.f. Commercial/Retail spaces (first floor); 2. 63 Residential units (23 one-bedrooms and 40 studios); 3. 36 hotel rooms; 4. A two-level underground parking garage with 136 spaces; 5. Outdoor seating areas, arcades, and a plaza; 6. Materials and architectural features include: a. Glass, brick, stucco, and metal siding; b. Metal awnings; c. Metal balcony railings; and d. Stone and concrete bulkheads, lintels and cornices. Table 2: Project Statistics Item Proposed 1 Standard 2 Setback Front Yard 0 feet 0 feet Other Yard (max height 35 feet) 0 feet 0 feet Max. Height of Structure(s) 59.5 feet 60 feet3 Max. Building Coverage (footprint) 68% 75% Density Units (DU) 35.18 DU 35.27 DU Parking Spaces Vehicle 136 118 Bicycle 37 18 Notes: 1. Applicant’s project plans submitted Zoning C-D (Downtown Commercial) Site Size 0.98 acres (42,610 square feet) Present Use & Development Developed with the commercial structure that housed Foster’s Freeze (#3, above), a small commercial building (#2), a small residence used as an office (#1), and Mission Bank (#4). Topography Relatively flat Access Nipomo Surrounding Use/Zoning North: C-D (Sandy’s Liquor and the Creamery) South: C-D-MU (Marsh Street Commons Mixed Use) East: C-D (Historic Jack House) West: C-D (McCarthy’s) ARC4 - 4 ARCH-2213-2015 570, 578 & 590 Marsh & 581 Higuera Street Page 5 2. Zoning Regulations 3. The ARC may approve building height up to 60 feet (MC 17.42.020.C(2)). 4.0 PROJECT ANALYSIS During the November 13, 2017 ARC meeting, the ARC provided staff and the applicant with direction regarding the proposed project. Numbered below in italics are the specific ARC directional items. Staff has provided the applicant’s response and provided additional information as needed. In addition, staff has identified areas that may require further ARC discussion based on the applicant’s response. 1. The applicant should focus the project’s policy objectives on 1) workforce housing (the number of units should remain as close as possible to maximum density) and 2) the pedestrian connection between Higuera and Marsh Streets. The applicant has increased the number of residential units in the project from 62 to 63 residential units to have a maximum density of 35.18. The site has a maximum density of 35.27. This is a difference of 0.09 density units, which is not enough for any additional residential units on the site. The design of the project provides a pedestrian connection between Marsh and Higuera Streets which the applicant describes as the backbone of the project. As proposed, the project is consistent with the policy objectives outlined in the Zoning Regulations. Table 3 below provides the policy language and how the project meets these objectives. Table 3: San Luis Square Policy Objectives Property Development Standards (Zoning Regulations, Section 17.42.020.C(2)) Policy Objectives Features Outlined in the Policy Features Included in the Proposed Project Affordable and Workforce Housing The project includes residential density greater than or equal to 36 units per acre and the average floor area of units is 1,000 square feet or less. The project includes residential density that is based on 36 units per acre and the average floor area of units is 573 square feet. The project site is less than an acre and has a maximum density of 35.18. Pedestrian Amenities The project provides a major pedestrian connection between Higuera Street and the Creekwalk, Monterey Street and the Creekwalk, Higuera Street and Marsh Street, or at another acceptable mid-block location. San Luis Square provides a major pedestrian connection (paseo) between Marsh and Higuera Streets. The Paseo includes benches, bicycle parking, landscaping, decorative lighting, outdoor eating areas and interactive signage. The project is conditioned to return to the ARC with a sign program for the entire project (Condition #10). 2. 570 Marsh Street a. The majority of the ARC determined that this structure did not require any modifications. No modification to 570 Marsh Street is proposed. ARC4 - 5 ARCH-2213-2015 570, 578 & 590 Marsh & 581 Higuera Street Page 6 3. 590 Marsh Street a. The corner glass façade treatment does not match the interior program/activity taking place within the structure. Corner should match downtown character. Revise the design to include less glass and more structure. The applicant has revised the corner glass façade treatment to better match the residential uses housed within the structure and reinforce the traditional rhythm of downtown buildings. The windows have been reduced in size and the terracotta cladding extended around the entire corner of the building (see Attachment 3, Revised Project Plans, pgs. 7 & 8). The corner includes many downtown design elements including the use of bulkhead, horizontal lines, proportional spacing of the windows on the upper floors, and the inclusion of public space at the ground level (CDG Chapter 4). b. The top of the three-story projections of the building should be evaluated for the potential inclusion of some architectural feature or cornice. With the revised corner façade (discussed above), the applicant expressed that any further cornice treatment would detract from the contemporary architectural character of the building. As such, a cornice has not been included in the revised plans. ARC Discussion: The ARC should discuss if a cornice or architectural feature is still recommended for the revised façade design. Staff recommends that any modifications directed by the ARC be included as a condition of approval to be approved to the satisfaction of the Community Development Director during the Building Permit review. 4. 581 Higuera a. Revise the two-story windows in the structure so that they are more in scale with the structure and downtown architecture. The applicant would like to maintain the taller windows on this façade due to their function and orientation towards Cerro San Luis views. The project was designed to provide residential units that are daylight filled, urban lofts with nearly floor to ceiling windows similar to converted Figure 2: View of 590 Marsh from Marsh Street; (Left) Previous elevation with large glass windows; (Right) Revised design with smaller windows that reflect the residential use of the building. ARC4 - 6 ARCH-2213-2015 570, 578 & 590 Marsh & 581 Higuera Street Page 7 warehouse loft spaces. The applicant considered alternative designs yet have expressed that the architectural look and feel would be adversely affected by the re-design of this fenestration. ARC Discussion: The CDG discuss that upper floors use windows or architectural features that will enforce the typical rhythm of upper story windows found on traditional commercial buildings and provide architectural interest on all four sides of the building.1 The ARC should discuss if the windows are in scale with the structure and downtown architecture. Staff recommends that any modifications directed by the ARC be included as a condition of approval to be approved to the satisfaction of the Community Development Director during the Building Permit review. b. Address height and scale by setting back the entire fourth floor of the structure and consider other modifications to reduce the massing towards the Jack House property. The applicant has modified the south and east fourth floor elevations to step approximately 10 feet away from the third floor (see Figure 3 below and the revised elevations of Attachment 3, Revised Project Plans, pgs. 11 & 13). As a result, the project would have less massing at the upper floor facing the Jack House property, giving the perception from the ground level of a three-story building. ARC Discussion: The ARC should discuss if the proposed modifications are adequate to reduce the massing towards the Jack House Property. c. Vines covering the building are not necessary. Vines would be most appropriate on the first-floor portion of the structure and along the cornice where it appears someone can water the plants from the deck. The applicant has reduced the number of vining plants along the upper floors of the project and located them on first floor elevations or along cornices/decks where someone could water them (Attachment 7). 1 CDG 4.2.B(4) Design and Development Guidelines – Height, scale. Figure 3: View of 581 Higuera from Higuera Street; (Left) Previous west elevation; (Right) Revised elevation shows a fourth floor setback; Dashed redlines highlight the change. ARC4 - 7 ARCH-2213-2015 570, 578 & 590 Marsh & 581 Higuera Street Page 8 5. Consider opening up more space within the pedestrian connection, especially in the middle of the project. The applicant has not proposed a modification to the pedestrian connection. As designed, the applicant has expressed that the space within the pedestrian connection will be able accommodate circulation and the ground level activities of the paseo. The design, in part, is based on European towns, where the most active and interesting public spaces are the narrow streets and alleys with shops, restaurants and markets lining the way. As such, San Luis Square will provide a unique destination within the downtown core. ARC Discussion: There are no parameters for paseos discussed in the CDG. As such, the ARC should discuss if the pedestrian connection meets the policy direction in Section 17.42.020.C(2) of the Zoning Regulations which is outlined in Table 3 above. 6. Consider providing a developer’s statement about the project concerning your values and vision for community and housing downtown. The applicant has composed a Project Statement that may be accessed online through the Attachment 4 reading file link (see the attachment list at the end of the staff report). The Executive Summary for the project is included in the staff report as Attachment 5. 7. Consider providing an architect’s statement stating why they designed the building as they have. The title sheet of the plans provides a statement from the architects regarding the proposed project. This statement has been reprinted and included in this staff report as Attachment 6. 8. An overall roof plan with the plan set would be helpful. The applicant has provided an overall roof plan as part of the Project Plans (Attachment 3, pg. 15) 6.0 ENVIRONMENTAL REVIEW The project is categorically exempt from environmental review under Class 32, 15332 (In-Fill Development Projects) because the project is consistent with General Plan policies for the land use designation and is consistent with the applicable zoning designation and regulations. The project site occurs on property of no more than five acres substantially surrounded by urban uses that has no value as habitat for endangered, rare or threatened species as the site is located on an existing infill property and is served by required utilities and public services. As a separate and independent basis to conclude that the project does not require further environmental review under CEQA, the City concludes based on analysis provided in the supporting record that the project is consistent with CEQA Section 15168(C)4 and Article 12 Section 15183(a) because the City has provided a written analysis that evaluates the site and the activity to determine whether the environmental effects of the operation were covered in the Land Use and Circulation Element (LUCE) Final EIR and the project is consistent with the development density established by existing zoning and general plan policies in the LUCE Final EIR. ARC4 - 8 ARCH-2213-2015 570, 578 & 590 Marsh & 581 Higuera Street Page 9 Based on analysis reflected in the project review record and review of prior City actions, including, but not limited to, the approval of the Land Use and Circulation Update, the Historic Preservation Ordinance and Guidelines, prior zoning code updates, and the downtown height regulations, as set forth in Chapter 17.42 of the City’s Municipal Code, as well as review and approval of the Downtown Concept Plan, the City finds that the project is consistent with development previously analyzed and contemplated for the project site and is consistent with the type and level of development previously approved for this site. The project is consistent with all development standards applicable to the site, the project does not cause any substantial adverse changes to the significance of the historical resource located on the adjacent Jack House property, and the project does not present any other unusual circumstances that may have a significant environmental impact that could support an exception to the categorical exemption relied upon or otherwise require further environmental review. 7.0 ALTERNATIVES 1. Continue the project with direction to the applicant and staff on pertinent issues. 2. Deny the project based on findings of inconsistency with the Community Design Guidelines or applicable City policies and standards. 8.0 ATTACHMENTS 1. Draft Resolution 2. Vicinity Map 3. Project Plans 4. Project Statement Reading File 5. Project Statement Executive Summary 6. Architects Statement 7. Vine Exhibit ARC4 - 9 RESOLUTION NO. ARC- -18 A RESOLUTION OF THE SAN LUIS OBISPO ARCHITECTURAL REVIEW COMMISSION APPROVING A NEW MIXED-USE PROJECT WITH THREE, FOUR- STORY STRUCTURES THAT INCLUDE 19,792 SQUARE FEET OF COMMERCIAL SPACE, 63 RESIDENTIAL UNITS, 36 HOTEL ROOMS, AND A TWO-LEVEL UNDERGROUND PARKING GARAGE WITH 136 PARKING SPACES WITH A MAXIMUM HEIGHT OF 59.5 FEET AND A NEW DRIVEWAY APPROACH ALONG ON NIPOMO STREET, WITH A CATEGORICAL EXEMPTION FROM ENVIRONMENTAL REVIEW, AS REPRESENTED IN THE STAFF REPORT AND ATTACHMENTS DATED MARCH 5, 2018 570, 578 & 590 MARSH STREET & 581 HIGUERA STREET (ARCH-2213-2015) WHEREAS, the Architectural Review Commission of the City of San Luis Obispo conducted a public hearing in the Council Chambers of City Hall, 990 Palm Street, San Luis Obispo, California, on December 1, 2014, pursuant to a proceeding instituted under ARCH-0300- 2014, PB Companies, applicant; and WHEREAS, the Cultural Heritage Committee and the Architectural Review Commission of the City of San Luis Obispo conducted a joint public hearing in the Council Chambers of City Hall, 990 Palm Street, San Luis Obispo, California, on July 13, 2015, pursuant to a proceeding instituted under application #ARCH-0609-2014, PB Companies, applicant; and WHEREAS, the Cultural Heritage Committee of the City of San Luis Obispo conducted a public hearing in the Council Chambers of City Hall, 990 Palm Street, San Luis Obispo, California, on May 22, 2017, pursuant to a proceeding instituted under ARCH-2213-2015, The Obispo Company, applicant; and WHEREAS, the Architectural Review Commission of the City of San Luis Obispo conducted a public hearing in the Council Chambers of City Hall, 990 Palm Street, San Luis Obispo, California, on November 13, 2017, pursuant to a proceeding instituted under ARCH-2213- 2015, The Obispo Company, applicant; and WHEREAS, the Architectural Review Commission of the City of San Luis Obispo conducted a public hearing in the Council Chambers of City Hall, 990 Palm Street, San Luis Obispo, California, on March 5, 2018, pursuant to a proceeding instituted under ARCH-2213- 2015, The Obispo Company, applicant; and WHEREAS, the Architectural Review Commission of the City of San Luis Obispo has duly considered all evidence, including the testimony of the applicant, interested parties, and evaluation and recommendations by staff, presented at said hearing. WHEREAS, notices of said public hearing were made at the time and in the manner required by law; and NOW, THEREFORE, BE IT RESOLVED by the Architectural Review Commission of the City of San Luis Obispo as follows: ATTACHMENT 1 ARC4 - 10 Resolution No. ARC- -18 ARCH 2213-2015 (570, 578 & 590 Marsh & 581 Higuera Street) Page 2 SECTION 1. Findings. The Architectural Review Commission hereby grants final approval to the project (ARCH-2213-2015), based on the following findings: 1. That the project will not be detrimental to the health, safety, and welfare of persons living or working at the site or in the vicinity because the project respects site constraints and is compatible with the scale and character of the neighborhood. 2. The proposed project is consistent with Land Use Element Policy 4.20 (4.20.1 - 4.20.6) because the project provides continuous street level stores and restaurants, upper level residential dwellings, similar storefront widths to existing buildings in the Downtown, and includes design details such as transom windows, bulkheads, large display windows, awnings, landscaping and patios which can be appreciated by people on the sidewalks, includes public/private viewing decks as part of 581 Higuera Street, is designed to meet LEED silver energy standards, provides the maximum number of residential units allowed for the site, and includes a public/private plaza that connects Higuera to Marsh Street. 3. The proposed project is consistent with Housing Element Policies 5.3 and 6.2 because the project provides a mixed-use development that includes housing above ground-level retail stores and restaurants within the Downtown Core. 4. The proposed project is consistent with Zoning Regulations Chapter 17.42 Sections 17.42.020 and 17.42.020.C(2) because it meets all the property development standards and implements at least two policy objectives for buildings in the Downtown over 50 feet in height 5. The project is consistent with the City’s Community Design Guidelines because the proposed project incorporates similar materials and architectural features to the surrounding neighborhood and provides a complementary color scheme. 6. The proposed new driveway will not harm the pedestrian experience within the Downtown Core because the proposed driveway approach is located along a non-arterial street and will not significantly alter the character of the street or pedestrian circulation in the area in consideration of the characteristics of pedestrian flow to and from the project site and surrounding uses and the proposed driveway approach is a shared facility and provides efficient access to more than a single project in a way that eliminates the need for additional driveways (M.C. Section 17.42.020.G.Vehicle Access). 7. The character of the building located at 570 Higuera Street is not considered historically significant as described in Section 14.01.070.A of the City’s Historic Preservation Ordinance because the structure lacks significant historic and architectural features, is not associated with any significant historical person groups or events in the City's history and the existing structure no longer maintain authenticity and integrity due to alterations to the original function and historic fabric of the building because of renovations to the building, including additions to the front and rear façades, relocation of the main entrance, replacement windows and entrance door, conversion to a commercial use, and paving the side yard and backyard as parking spaces. ATTACHMENT 1 ARC4 - 11 Resolution No. ARC- -18 ARCH 2213-2015 (570, 578 & 590 Marsh & 581 Higuera Street) Page 3 SECTION 2. Environmental Review. 1. The project is categorically exempt from environmental review under Class 32, 15332 (In- Fill Development Projects) because the project is consistent with General Plan policies for the land use designation and is consistent with the applicable zoning designation and regulations. The project site occurs on property of no more than five acres substantially surrounded by urban uses that has no value as habitat for endangered, rare or threatened species as the site is located on an existing infill property and is served by required utilities and public services. 2. As a separate and independent basis to conclude that the project does not require further environmental review under CEQA, the City concludes based on analysis provided in the supporting record that the project is consistent with CEQA Section 15168(C)4 and Article 12 Section 15183(a) because the City has provided a written analysis that evaluates the site and the activity to determine whether the environmental effects of the operation were covered in the Land Use and Circulation Element (LUCE) Final EIR and the project is consistent with the development density established by existing zoning and general plan policies in the LUCE Final EIR. 3. Based on analysis reflected in the project review record and review of prior City actions, including, but not limited to, the approval of the Land Use and Circulation Update, the Historic Preservation Ordinance and Guidelines, prior zoning code updates, and the downtown height regulations, as set forth in Chapter 17.42 of the City’s Municipal Code, as well as review and approval of the Downtown Concept Plan, the City finds that the project is consistent with development previously analyzed and contemplated for the project site and is consistent with the type and level of development previously approved for this site. The project is consistent with all development standards applicable to the site, the project does not cause any substantial adverse changes to the significance of the historical resource located on the adjacent Jack House property, and the project does not present any other unusual circumstances that may have a significant environmental impact that could support an exception to the categorical exemption relied upon or otherwise require further environmental review. SECTION 3. Action. The Architectural Review Commission (ARC) hereby grants final approval to the project with incorporation of the following conditions: Planning Division – Community Development Department 1. The applicant shall defend, indemnify and hold harmless the City and/or its agents, officers and employees from any claim, action or proceeding against the City and/or its agents, officers or employees to attack, set aside, void or annul, the approval by the City of this project, and all actions relating thereto, including but not limited to environmental review (“Indemnified Claims”). The City shall promptly notify the applicant of any Indemnified Claim upon being presented with the Indemnified Claim and the City shall fully cooperate in the defense against an Indemnified Claim. ATTACHMENT 1 ARC4 - 12 Resolution No. ARC- -18 ARCH 2213-2015 (570, 578 & 590 Marsh & 581 Higuera Street) Page 4 2. Final project design and construction drawings submitted for a building permit shall be in substantial compliance with the project plans approved by the ARC. A separate, full-size sheet shall be included in working drawings submitted for a building permit that lists all conditions and code requirements of project approval listed as sheet number 2. Reference shall be made in the margin of listed items as to where in plans requirements are addressed. Any change to approved design, colors, materials, landscaping, or other conditions of approval must be approved by the Director or Architectural Review Commission, as deemed appropriate. 3. Plans submitted for a building permit shall call out the colors and materials of all proposed building surfaces and other improvements. Colors and materials shall be consistent with the color and material board submitted with Architectural Review application. 4. The locations of all exterior lighting, including lighting on the structure, bollard style landscaping or path lighting, shall be included in plans submitted for a building permit. All wall-mounted lighting fixtures shall be clearly called out on building elevations included as part of working drawings. All wall-mounted lighting shall complement building architecture. The lighting schedule for the building shall include a graphic representation of the proposed lighting fixtures and cut-sheets on the submitted building plans. The selected fixture(s) shall be shielded to ensure that light is directed downward consistent with the requirements of the City’s Night Sky Preservation standards contained in Chapter 17.23 of the Zoning Regulations. 5. Mechanical and electrical equipment shall be located internally to the building. With submittal of working drawings, the applicant shall include sectional views of the building, which clearly show the sizes of any proposed condensers and other mechanical equipment. If any condensers or other mechanical equipment is to be placed on the roof, plans submitted for a building permit shall confirm that parapets and other roof features will provide adequate screening. A line-of-sight diagram may be required to confirm that proposed screening will be adequate. This condition applies to both initial project construction and later building modifications and improvements. 6. A final landscaping plan, including irrigation details and plans, shall be submitted to the Community Development Department along with working drawings. The legend for the landscaping plan shall include the sizes and species of all groundcovers, shrubs, and trees with corresponding symbols for each plant material showing their specific locations on plans. 7. The location of any required backflow preventer and double-check assembly shall be shown on all site plans submitted for a building permit, including the landscaping plan. Construction plans shall also include a scaled diagram of the equipment proposed. Where possible, as determined by the Utilities Director, equipment shall be located inside the building within 20 feet of the front property line. Where this is not possible, as determined by the Utilities Director, the backflow preventer and double-check assembly shall be located in the street yard and screened using a combination of paint color, landscaping and, if deemed appropriate by the Community Development Director, a low wall. The size and configuration of such ATTACHMENT 1 ARC4 - 13 Resolution No. ARC- -18 ARCH 2213-2015 (570, 578 & 590 Marsh & 581 Higuera Street) Page 5 equipment shall be subject to review and approval by the Utilities and Community Development Directors. 8. Plans submitted for a building permit shall include all details, cut sheets, dimensions, and specifications to ensure all materials, windows, and architectural details are of high quality and suitable for a Downtown development project. 9. Plans submitted for a building permit shall include window details indicating the type of materials for the window frames and mullions, their dimensions, and colors. Plans shall include the materials and dimensions of all lintels, sills, surrounds recesses and other related window features. 10. The project shall submit a separate application for a sign program for the site. The sign program shall include information on the sizes, locations, colors, materials, types, and illumination of all signage. Project signs shall be designed to be compatible with the architecture of proposed buildings and complement the site’s setting. 11. The project shall install public art as part of the project in place of the in-lieu fee option. The public art application shall be submitted to the Community Development Director. Approval of public art shall be obtained prior to the issuance of a building permit. 12. The proposed project is permitted to unbundle parking for tenants of the project (commercial and residential), however, they shall not sell parking (required or otherwise) to off-site users unless a Use Permit is approved per Chapter 17.16.060.F (Off-site Parking) of the Municipal Code. Unbundled parking is when the cost of parking is levied separately from the rent of residential and commercial tenants. Building Division – Community Development Department 13. All existing underlying property lines shall be merged through the voluntary merger process or may be included within a lot line adjustment or subdivision process. The lines shall be adjusted or merged prior to any construction permits unless otherwise approved for deferral by the Community Development Director. 14. A roof plan shall be submitted as part of the construction documents submitted for building permit application as none were incorporated in the entitlement set. Engineering Division – Public Works/Community Development Department 15. Projects involving the construction of new structures requires that complete frontage improvements be installed or that existing improvements be upgraded per city standard MC 12.16.050. 16. The building plan submittal shall show all new frontage along Marsh, Nipomo, and Higuera to be in accordance with City Engineering Standards for the Mission Sidewalk District of downtown. ATTACHMENT 1 ARC4 - 14 Resolution No. ARC- -18 ARCH 2213-2015 (570, 578 & 590 Marsh & 581 Higuera Street) Page 6 17. The building plan submittal shall show and note any sections of damaged or displaced curb, gutter & sidewalk or driveway approach to be repaired or replaced to the satisfaction of the Public Works Department. 18. The building plan submittal shall include the dimensions and bearings for all property lines for reference. Any known property corner monuments shall be shown and noted on the plans for reference. Include the monument at the corner of Marsh and Nipomo. Monuments shall be preserved or re-established in accordance with current statutes. 19. The required public improvements may be included in the building permit plan submittal but will ultimately need to stand alone as a separate miscellaneous public improvement plan per City Engineering Standards with the standard signature cover sheet. Improvements located within the public right-of-way will require a separate encroachment permit and associated inspection fees. A separate plan review fee payable to the Public Works Department will be required for the Public Works Department review of the public improvements associated with the project. Said review fee shall be in accordance with the improvement plan review fee resolution in effect at the time of the plan submittal. Record drawings will be required at the completion of construction. 20. The building plan submittal or public improvement plans submittal shall include a complete design prepared by a licensed Civil Engineer. The plan shall include all existing and proposed improvements. The design shall show how drainage is being directed around the bulb out and able to maintain minimum flows in the street gutter without the need for a sidewalk underdrain. Drainage calculations may be required to confirm curb capacities and to evaluate any spread into the adjoining travel lanes. If gravity flows are not possible or are undesirable, the final design for either a sidewalk underdrain or additional catch basins shall be approved by the City Engineer. The bulb out shall be designed to the satisfaction of the Public Works Department. The transition from the widened sidewalk area back to the existing curb shall include a minimum inside radius and minimum outside radius per City Engineering Standards. A surface drainage strategy should be pursued for all areas of proposed sidewalk widening/bulb-outs. 21. The project shall install two pedestrian level streetlights along the Nipomo frontage per City Engineering Standards in accordance with the City approved layout plan. The streetlight conduit shall be extended to the northerly limits of the project or PGE secondary point of connection, whichever is closer to the proposed third future light along the Nipomo frontage of 599 Higuera. 22. The applicant should consider providing secondary conduit to the proposed and/or existing street trees for future tree lighting. If tree lighting is proposed, the system components shall be installed in accordance with current City and Downtown Association (DA) guidelines and standards and shall be approved to the satisfaction of the City and the DA. 23. The improvement plan submittal shall show the existing and proposed street parking, signage, striping, and parking meter abandonments/relocations per city engineering standards. The ATTACHMENT 1 ARC4 - 15 Resolution No. ARC- -18 ARCH 2213-2015 (570, 578 & 590 Marsh & 581 Higuera Street) Page 7 developer/contractor shall be responsible for all improvements including parking meter fees during construction. The demolition plan shall include a complete site inventory including all existing signage, parking meters, and furniture in the public right-of-way. 24. The contractor shall provide a construction staging plan and schedule for review and approval by the City prior to encroachment permit issuance. The developer/contractor shall provide construction notification, project description, phasing and timing, and contact information to the Downtown Association and affected businesses to the satisfaction of the City. 25. A “sidewalk dining” permit and/or a “tables and chairs” permit shall be required for any dining in the public right-of-way. The necessary permits shall be completed to the satisfaction of the Community Development Director. 26. The building plan submittal shall show an 8’ clear pedestrian path of travel void of all sidewalk obstructions along all street frontages in order to meet pedestrian level of service thresholds required for this area. 27. Any existing driveway approach that is not required for the new underground parking shall be abandoned. The existing driveway approach used for the new underground parking shall be upgraded per City and ADA Standards. The current City and ADA standard requires a 4’ sidewalk extension behind the ramp. 28. Development of the driveway and parking areas shall comply with the Parking and Driveway Standards for dimension, maneuverability, materials, signing, and striping. The building plan submittal shall show all parking spaces that are adjacent to a post, column, or wall sh all be one additional foot in width per City Engineering Standard 2220. 29. Provisions for trash, recycle, and green waste containment, screening, and collection shall be approved to the satisfaction of the City and San Luis Obispo Garbage Company. The respective refuse storage area and on-site conveyance shall consider convenience, aesthetics, safety, and functionality. Ownership boundaries and/or easements shall be considered in the final design. The building plan submittal shall show the proposed trash en closure to comply with Engineering Standard 1010.B for drainage and water quality standards. 30. The building plan submittal shall include a complete site utility plan. All existing and proposed utilities along with utility company meters shall be shown. Existing underground dry utilities and services shall be shown along with any proposed alterations or upgrades. All work in the public right-of-way shall be shown or noted. 31. The applicant shall provide a copy of the Preliminary PGE design sketch to the engineer of record and City of San Luis Obispo for review and approval prior to final design. The final PGE handout package shall be reviewed by the engineer of record for consistency with the design and shall be approved by the City of San Luis Obispo. 32. The building plan submittal shall include a final grading plan and drainage report for this project. The drainage report shall consider any historic offsite drainage tributary to this ATTACHMENT 1 ARC4 - 16 Resolution No. ARC- -18 ARCH 2213-2015 (570, 578 & 590 Marsh & 581 Higuera Street) Page 8 property that may need to be conveyed along with the improved on-site drainage. This development may alter and/or increase the storm water runoff from this site or adjoining sites. The improved or altered drainage shall be directed to the street and not across adjoining property lines unless the drainage is conveyed within recorded easements or existing waterways. 33. The project is located within a designated flood zone as shown on the Flood Insurance Rate Map (FIRM) for the City of San Luis Obispo. As such, any new or substantially remodeled structures shall comply with all Federal Emergency Management Agency (FEMA) requirements and the city’s Floodplain Management Regulations per Municipal Code Chapter 17.84. 34. This property is located in an AO (2’ depth) Flood Zone; the water surface or base flood elevation (BFE) of a 100-year storm is 2’ above adjacent grade. The structure and building service equipment must be raised or floodproofed to an elevation that is at least one foot above the BFE or 3’ above the highest adjacent grade. Additional freeboard to 2’ above the BFE may result in additional structure protection and savings on flood insurance and is strongly encouraged. 35. The building plan submittal shall show the below grade parking structure to be dry floodproofed per City and FEMA standards. The elevator designs and construction shall comply with the most current FEMA Technical Bulletin. 36. The building plan submittal shall show compliance with the Post Construction Stormwater Requirements as promulgated by the Regional Water Quality Control Board for redeveloped sites. Include a complete Post Construction Stormwater Control Plan Template as available on the City’s Website. 37. An operations and maintenance manual will be required for the post-construction stormwater improvements. The manual shall be provided at the time of building permit application and shall be accepted by the City prior to building permit issuance. A private stormwater conveyance agreement will be required and shall be recorded prior to final inspection approvals. If a direct connection to the public storm drain is proposed, an annual and recurring inspection fee will be required in accordance with the storm drain connection fee schedule in effect at the time of the permit approvals/connection. 38. The building plan submittal shall show all existing and proposed trees with a trunk diameter of 3” or greater. Offsite trees along the adjoining property lines with canopies and/or root systems that extend onto the property shall be shown or referenced. The plans shall note the disposition of all trees. Include the diameter and species of all trees. Tree canopies should generally be shown to scale for reference. The plan shall show all existing and proposed street trees. 39. The building plan submittal shall show all proposed new street trees to be 24” box minimum. Tree wells, grates and guards shall be in accordance with City Engineering Standards. Tree species and planting requirements shall be per City Engineering Standards. ATTACHMENT 1 ARC4 - 17 Resolution No. ARC- -18 ARCH 2213-2015 (570, 578 & 590 Marsh & 581 Higuera Street) Page 9 40. The City Arborist supports the proposed tree removals with compensatory tree plantings. Compensatory trees shall be provided at a 1 to 1 ratio. Compensatory trees (24” box) may be planted on-site, in the public sidewalk, or at specific empty tree wells within the Downtown area. Alternate planting locations outside of the Downtown shall be approved to the satisfaction of the City Engineer and City Arborist. 41. Tree protection measures for the existing neighboring Walnut, Redwoods, and Ficus street trees shall be implemented to the satisfaction of the City Arborist. Tree protection measures shall comply with City’s Engineering Standard Specifications. The existing neighboring Walnut tree canopy shall be pruned to match the amount of root pruning required for the project. The City Arborist shall review and approve the proposed tree protection measures prior to commencing with any demolition, grading, or construction. The City Arborist shall approve any safety pruning, the cutting of substantial roots, or grading within the dripline of trees on the property or on adjacent properties. A city-approved arborist shall complete safety pruning. Any required tree protection measures shall be shown or noted on the building plans. Transportation Division - Public Works Department 42. The building plan submittal shall show details of any gating facilities for the parking structure access control. All clearances for the gating mechanicals shall be accommodated with minimum ramp width maintained for vehicle access. 43. The building plan submittal shall show all parking spaces comply with City Engineering Standards 2230, 2240 and 2250. 44. Parking for employees and residents shall be marked as such. The sentence in the “Basis of Design for the Parking Structure Component”, submitted 2/6/17, “During the day when residents leave the facility to travel to work, that space is available to staff looking for parking” shall be deleted. 45. Building submittal shall show proposed signage for parking areas. Utilities Department 46. The project will be required to provide a plan for the disposal, storage, and collection of solid waste material for both the residential and commercial components of the project. The development of the plan shall be coordinated with San Luis Garbage Company. The plan must be submitted for approval by the City's Utilities Services Manager and the Community Development Director. 47. In order to be reused, any existing sewer laterals proposed to serve the project must pass a video inspection, including repair or replacement, as part of the project. The CCTV inspection shall be submitted during the Building Permit Review Process for review and approval by the Utilities Department prior to issuance of a Building Permit. Existing laterals that are not proposed to be reused shall be abandoned at the City main consistent with City standards. ATTACHMENT 1 ARC4 - 18 Resolution No. ARC- -18 ARCH 2213-2015 (570, 578 & 590 Marsh & 581 Higuera Street) Page 10 48. A new sewer lateral is proposed to serve the project. Any existing sewer lateral tied in along the Higuera, Nipomo, or Marsh Street project frontage must be abandoned at the main consistent with City standards as part of the project. Any sewer lateral that crosses one proposed parcel for the benefit of another shall provide evidence that a private utility easement appropriate for those facilities has been recorded prior to final Building Permit. 49. The property is served by a series of existing water meters. The project’s Building Permit submittal shall clearly show the disposition of all existing water meters. For the proposed project, commercial and residential uses shall be metered separately. All residential units are to be individually metered. Privately owned sub-meters may be provided for residential condominiums upon approval of the Utilities Director or her/his designee. The CCR’s for the property/homeowner association shall require that the sub-meters be read by the association (or a contracted service) and each condominium billed according to water use. Per Chapter 13.4.120 of the City’s Municipal Code, separate parcels will be supplied through individual water service connections and private service lines shall not cross parcel boundaries unless authorized by the Utilities Department. 50. During the declared drought emergency, the project’s estimated total wate r use (ETWU) to support new landscaping shall not exceed 50 percent of maximum applied water allowance (MAWA). Information shall be submitted during the Building Permit Review Process for review and approval by the Utilities Department prior to issuance of a Building Permit to support required water demand of the project’s proposed landscaping. On motion by Commissioner ___________, seconded by Commissioner _____________, and on the following roll call vote: AYES: NOES: REFRAIN: ABSENT: The foregoing resolution was passed and adopted this 5th day of March 2018. _____________________________ Doug Davidson, Secretary Architectural Review Commission ATTACHMENT 1 ARC4 - 19 C-D C-D C-D R-4 C-D-H C-D C-D C-D-MU C-D-H PF-H R-3-H C-R NI P O M O MARSHHIGUERAVICINITY MAP ARCH-2213-2015 570, 578 & 590 Marsh Street and 581 Higuera Street ¯ ATTACHMENT 2 ARC4 - 20 PAGE 1Project Statement San Luis Square is comprised of three newly constructed four story mixed-use buildings with one level of retail at grade,three levels of resi-dential above grade and two levels of parking below grade (subterranean parking).The project will include 63 small living units of high-density residential housing, 36 rooms of an extended stay hotel, ~22, 500 S.F. of commercial space (including a neighborhood market), two mid-block pedestrian crossings (paseos), a public plaza, diverse bicycle parking and 136 public parking spaces.San Luis Square has been designed to offer PRGHUQRSWLRQVIRUUHVLGHQWLDOÁRRUSODQVaverage 573.8 S.F. Ranging from 380 S.F. Micro-units to 1099 S.F. Rooftop lofts. This range of offerings will result in naturally diverse demographics within the resident population which will create a new and unique neighborhood that is representative of the diversity in the city and provides exemplary compatibility with the community design guidelines.&DWHJRUL]HGDVDQ´LQÀOOSURMHFWµLQWKHdowntown c ommercial zone, San Luis Square is located on several parcels in downtown San Luis Obispo and involves the redevelopment of a 0.9797 acre portion of the block bound by Higuera Street, Nipomo Street and Marsh Street.The relationship between the buildings and paseo will include a neighborhood marketplace with a public market hall, upscale restaurants with indoor/outdoor seating, drought resistant and native plant landscaping as well as civic art both in the form of graphic murals and a three dimensional sculpture to vitalize an active pedestrian streetscape.San Luis Square is an innovative collection of three architecturally distinct buildings clustered and joined together to form a unique space for both local residents and visitors of San Luis Obispo to enjoy. The design team wanted to provide the city and people of San Luis Obispo ZLWKDSURMHFWWKDWH[HPSOLÀHGWKHarchitectural diversity of the downtown core. As a result the three buildings were intentionally GHVLJQHGZLWKDUFKLWHFWXUDOGHWDLOVWKDWUHÁHFWvarious time periods throughout history - VSHFLÀFDOO\WKH(DUO\·V·V·V ´0LG&HQWXU\µ DQGSUHVHQWGD\7KH3URMHFWproudly highlights the Cities rich architectural history and provides a glimpse of what is to come.1 Title Page2 Overall Site Plan3-5 570 Marsh Street6-9 590 Marsh Street10-14 591 Higuera Street15-19 Landscape PlansPROPOSED MULTIFAMILY UNITS STUDIOS < 450SF: 40 UNITS x .50 DU = 20 DU1 BEDROOM: 23 UNITS x .66 DU = 15.18 DUTOTAL UNITS: 63 UNITS = 35.18Project Density = 35.1823 UNITS x .75per unit = 17.25 SPACES44 SPACES54 + 44 + 20 = 118 SPACES(+ 18 SPACES)63 UNITS /10 = 6.3 SPACESATTACHMENT 3ARC4 - 21 PAGE 2March 24, 2017San Luis Obispo, Ca.A5.1581 HIGUERAGROCERYRESTAURANTATTACHMENT 3ARC4 - 22 PAGE 3A17March 24, 2017ATTACHMENT 3ARC4 - 23 PAGE 4SCALE: 1/8”=1’-0”0 4 8163217’-6” F.F.29’-6” F.F.42’-0” F.F.54’-6” TOP OF ROOF 63’-6” TOP OF ROOF North Elevation As seen from Nipomo Street17’-6” F.F.29’-6” F.F.42’-0” F.F.54’-6” TOP OF ROOF 63’-6” TOPOF ROOFEast ElevationAs seen from Marsh StreetMarch 24, 2017570 MARSH STREETATTACHMENT 3ARC4 - 24 PAGE 517’-6” F.F.29’-6” F.F.42’-0” F.F.54’-6” TOP OF ROOF 63’-6” TOP OF ROOF South Elevation As seen from the Jack HouseSCALE: 1/8”=1’-0”048 16 32West Elevation As seen from Higuera Street17’-6” F.F.29’-6” F.F.42’-0” F.F.54’-6” TOP OF ROOF 63’-6” TOP OF ROOF March 24, 2017570 MARSH STREETATTACHMENT 3ARC4 - 25 PAGE 6A22March 24, 2017ATTACHMENT 3ARC4 - 26 PAGE 708'16'24'17'-6" F.F.19'-6" F.F.42'-0" F.F.54'-6" TOPOF ROOFNorth ElevationAs seen from Nipomo StreetNorth ElevationAs seen from Nipomo StreetMarch 24, 2017PREVIOUS ELEVATIONREVISED ELEVATION590 MARSH STREETATTACHMENT 3ARC4 - 27 PAGE 808'16'24'17'-6" F.F.19'-6" F.F.42'-0" F.F.54'-6" TOPOF ROOFEast ElevationAs seen from Marsh StreetEast ElevationAs seen from Marsh StreetMarch 24, 2017PREVIOUS ELEVATIONREVISED ELEVATION590 MARSH STREETATTACHMENT 3ARC4 - 28 PAGE 908'16'24'17'-6" F.F.19'-6" F.F.42'-0" F.F.54'-6" TOPOF ROOFSouth ElevationAs seen from The Jack House17'-6" F.F.19'-6" F.F.42'-0" F.F.54'-6" TOPOF ROOFWest Elevation As seen from Higuera StreetMarch 24, 2017590 MARSH STREETATTACHMENT 3ARC4 - 29 PAGE 10A10March 24, 2017ATTACHMENT 3ARC4 - 30 PAGE 11March 24, 201759’ - 6” TOPOF ROOF66’ - 0” TOPOF STAIRS47’ - 6” TOPOF ROOF64’ - 0” TOPOF ROOF57’ - 0” TOPOF ROOF44’ -0” F.F.32’ - 0” F.F.20’ - 0” F.F.14’ - 0” BOTOF CANOPYSouth ElevationAs seen from the Jack House081/8" = 1'-0"SCALE:42116South ElevationAs seen from the Jack House0842116PREVIOUS ELEVATIONREVISED ELEVATION581 HIGUERA streetATTACHMENT 3ARC4 - 31 PAGE 12March 24, 201764’ - 0” TOPOF ROOF57’ - 0” TOPOF ROOF44’ -0” F.F.32’ - 0” F.F.20’ - 0” F.F.14’ - 0” BOTOF CANOPY59’ - 6” TOPOF ROOF66’ - 0” TOPOF STAIRS47’ - 6” TOPOF ROOFNorth Elevation As seen from Nipomo Street081/8" = 1'-0"SCALE:42116581 HIGUERA streetATTACHMENT 3ARC4 - 32 PAGE 13581 HIGUERA street57’ - 0” TOPOF ROOF59’ - 6” TOPOF ROOF47’ - 6” TOPOF ROOF44’ -0” F.F.32’ - 0” F.F.20’ - 0” F.F.14’ - 0” BOTOF CANOPY64’ - 0” TOPOF ROOF66’ - 0” TOPSTAIRSEast ElevationAs seen from Marsh Street West ElevationAs seen from Higuera Street081/8" = 1'-0"SCALE:42116081/8" = 1'-0"SCALE:42116East ElevationAs seen from Marsh Street West ElevationAs seen from Higuera StreetMarch 24, 2017PREVIOUS ELEVATIONPREVIOUS ELEVATIONREVISED ELEVATIONREVISED ELEVATIONATTACHMENT 3ARC4 - 33 PAGE 141-BD740 SF#411 #4121-BD619 SF#406REVISED FOURTH FLOOR PLAN581 HIGUERA streetMarch 24, 2017PREVIOUS FOURTH FLOOR PLANNATTACHMENT 3ARC4 - 34 PAGE 15SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.10'-9"18'-6"64'-3"6'-11"19'-11"24'-6"6'-11"56'-5"21'-6"70'-9"11'-1"19'-10"84'-0"5'-1"14'-0"SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.SLOPE1/4:12 MIN.March 24, 2017San Luis Obispo, Ca.A5.1581 HIGUERAGROCERYRESTAURANTOverall Roof PlanDECKDECKDECKDECKDECKDECKDECKDECKDECKATTACHMENT 3ARC4 - 35 PAGE 16L1March 24, 2017Landscape PlanNORTHATTACHMENT 3ARC4 - 36 PAGE 17L2March 24, 2017Conceptual Planting PlaneptualPlantingPlanATTACHMENT 3ARC4 - 37 PAGE 18Tree PlanTREE INVENTORY570 Marsh Street / 590 Marsh Street / 581 HigueraSTATUS#1 - Ficus (22.25") To remain #2 - Ficus (36.75") To remain #3 - Redwood (20.50") To remain #4 - Redwood (22.75") To remain #5 - Redwood (22.50") To remain #6 - Redwood (24.75") To remain #7 - Redwood (24.50") To remain #8 - Redwood (20.75") To remain #9 - Redwood (20.50") To remain#10 - Paper Bark Melaleuca (10") To be removed#11 - Paper Bark Melaleuca (9") To be removed#12 - Paper Bark Melaleuca (13") To be removed#13 - Paper Bark Melaleuca (8.50") To be removed#14 - Paper Bark Melaleuca (10") To be removed#15 - Paper Bark Melaleuca (4.25") To be removed#16 - Osage (29") To be removed#17 - Pittosporum (6") To be removed#18 - Pittosporum (5") To be removed#19 - Pittosporum (4") To be removed#20 - Pittosporum (4") To be removed#21 - Pittosporum (5.50") To be removed#22 - Pittosporum (5") To be removed#23 - Ash (10.50 & 11.00") To be removed#24 - Ash (15.50") To be removed#25 - Jacaranda (11.75") To be removed#26 - Black Walnut (25") Toremain#27 - Paper Bark Melaleuca (11.00") To be removed#28 - Bradford Pear (5.50") To be removed#29 - Bradford Pear (5.50") To be removed#30 - Washington Palm (22.75") To be removed#31 - Mexican Sand Palm (21.75") To be removed#32 - Ficus (5.50") To be removed#33 - Brisbane Box Eucalyptus 11.25") To remain#34 - Brisbane Box Eucalyptus (11.25") To remain#35 - Mexican Sand Palm (18.00") To be removed#36 - Mexican Sand Palm (20.00") To be removed#37 - Paper Bark Melaleuca (12.00") To be removed#38 - Lagerstroemia (2.00") To be removedL3March 24, 2017ATTACHMENT 3ARC4 - 38 PAGE 19L4March 24, 2017Landscape Color and MaterialsATTACHMENT 3ARC4 - 39 PAGE 20L5March 24, 2017Landscape Color and MaterialsATTACHMENT 3ARC4 - 40 1 Project Statement Executive Summary Marsh Nipomo Mixed Use, LP March 2017 ATTACHMENT 5 ARC4 - 41 Project Description Proposed are three independently designed four-story mixed use buildings collectively allowing for 63 small living units averaging 573 S.F., 36 hotel rooms and 22,500 S.F. of ground level commercial. The Project features extensive pedestrian access, including a plaza and Public Space equaling 15,940 S.F., three connections to public streets and an offered connection to the Jack House Gardens. The public is also invited to use a rooftop lounge on the building at 581 Higuera which features a remarkable view of the surrounding hills. The Project includes 136 parking spaces in a subterranean garage intended for use by Project tenants as well as surrounding neighborhood. The Project steps back and respects neighboring properties and street views, including those from the Jack House, which will retain its large row of redwood trees as a natural screen. City Regulatory Setting This is an “infill” project entitled to deference under the City’s General Plan, which encourages downtown revitalization and expansion south of Nipomo Street. The Project’s pedestrian orientation is directly called for in the recently adopted City’s vision document The Downtown Concept Plan. The Project’s reduced footprint is enabled by its height and allow the Project to afford a public plaza and pedestrian orientation, features which are consistent with the City’s Zoning Regulations (which expressly allows for the Project height of up to 60 feet where significant pedestrian benefits are provided). The step backs on all buildings render upper floors virtually invisible from the pedestrian point of view on the street level. No exceptions or variances are sought. The inclusion of housing in San Luis Square exemplifies the Land ATTACHMENT 5 ARC4 - 42 Use Element policies which encourages mixed-use developments particularly in the Downtown Core. The City’s 2006-2007 lengthy review and re-writing of the Zoning Regulations specifically called for heights above 50 feet to achieve four stories and upper floor residential uses. The height regulations adopted by the City Council were recommended by the CHC, the ARC and the Planning Commission. Among those speaking in favor of these regulations allowing height above 50 feet were ex-mayor Ken Schwartz as well as the Save Our Downtown member (and former ARC member) Jamie Lopes (who voted for the change). The Project advances policies and regulations for housing, infill, tourism and downtown mixed use from the Housing Element, Land Use Element and Design Guidelines. The policy objectives of the Zoning Regulations are also met, including §17.42.020.2b (Pedestrian Connectivity), by providing a major pedestrian connection between Higuera Street and Marsh Street and incorporates a significant public plaza, where the public art requirement is met by providing the art on-site; §17.42.020.2c (Public Views), by requiring a public viewing deck to provide significant free public access to views of surrounding natural features and dedicated land within the downtown core for publicly-owned open space with street-level views of hillside resources; §17.42.020.2d (Resource and Hospitality), by having floor area dedicated to retail or hospitality uses to exceed 150% of the building footprint; and §17.42.020.2h (Implementation of City Goals), by directly implementing specific and identifiable City objectives as set forth in the General Plan, the Conceptual Plan for the City’s Center, the Downtown Strategic Plan or other key policy documents, all of which are promoted by this Project. ATTACHMENT 5 ARC4 - 43 Community Issues and History Community concerns are heard about the scale (and height) of new downtown projects and the impact on “character” of San Luis Obispo. Much analysis by the City and others shows that historically San Luis Obispo has always had numerous large and tall buildings. Many were replaced by less notable and unambitious buildings. Some however, such as the 90-foot tall Anderson Hotel have survived with distinction and without complaint. As former planning director John Mandeville predicted in 2006-2007 hearings, old and new taller buildings are and will continue to be spaced throughout downtown, a result of the difficulty of assembling larger parcels. It was emphasized in the 2006-2007 proceedings that there would be very few opportunities to consolidate land for purposes of pedestrian linkages between Marsh and Higuera, as well as upper floor workforce size housing units. This has proven to be true, which makes this Project a rare opportunity for such connections. San Luis Square is consistent with the General Plan and Zoning Regulations vision, objectives, goals and policies. It fits within the historic as well as present trends of larger-scale buildings necessary to provide economic workforce size units, tourist accommodations and commercial space with plazas and pedestrian orientation and linkages to parks and streets. It also fits to a tee the vision of the original Downtown Concept Plan advanced years ago by its committee of five inspired citizens, including Pierre Rademaker, Andrew Mirriam, Chuck Crotzer and former mayor Ken Schwartz. (The fifth author, Rod Levin, is deceased.) San Luis Square is the very project envisioned in these documents, which cumulatively express the desire of San Luis Obispo citizens to revitalize downtown and recreate the residential experience it once was. ATTACHMENT 5 ARC4 - 44 The Architects Statement San Luis Square is comprised of three newly constructed four story mixed-use buildings with one level of retail at grade, three levels of residential above grade and two levels of parking below grade (subterranean parking). The project will include 63 small living units of high-density residential housing, 36 rooms of an extended stay hotel, ~22, 500 S.F. of commercial space (including a neighborhood market), two mid-block pedestrian crossings (paseos), a public plaza, diverse bicycle parking and 136 public parking spaces. San Luis Square has been designed to offer modern options for residential floor plans average 573.8 S.F. Ranging from 380 S.F. Micro-units to 1099 S.F. Rooftop lofts. This range of offerings will result in naturally diverse demographics within the resident population which will create a new and unique neighborhood that is representative of the diversity in the city and provides exemplary compatibility with the community design guidelines. Categorized as an “infill project” in the downtown commercial zone, San Luis Square is located on several parcels in downtown San Luis Obispo and involves the redevelopment of a 0.9797 acre portion of the block bound by Higuera Street, Nipomo Street and Marsh Street. The relationship between the buildings and paseo will include a neighborhood marketplace with a public market hall, upscale restaurants with indoor/outdoor seating, drought resistant and native plant landscaping as well as civic art both in the form of graphic murals and a three-dimensional sculpture to vitalize an active pedestrian streetscape. San Luis Square is an innovative collection of three architecturally distinct buildings clustered and joined together to form a unique space for both local residents and visitors of San Luis Obispo to enjoy. The design team wanted to provide the city and people of San Luis Obispo with a project that exemplified the architectural diversity of the downtown core. As a result, the three buildings were intentionally designed with architectural details that reflect various time periods throughout history - specifically the Early 1900’s, 1950’s-1960’s (“Mid- Century”), and present day. The Project proudly highlights the City’s rich architectural history and provides a glimpse of what is to come. ATTACHMENT 6 ARC4 - 45 ATTACHMENT 7ARC4 - 46