HomeMy WebLinkAbout04-17-2018 Item 06 Request for Statements of Qualification for General Contracting and Subcontractors for WRRF ProjectMeeting Date: 4/17/2018
FROM: Carrie Mattingly, Director of Utilities
Prepared By: David Hix, Deputy Director, Wastewater
Jennifer Metz, Utilities Projects Manager
SUBJECT: REQUEST FOR STATEMENTS OF QUALIFICATION FOR GENERAL
CONTRACTING AND SUBCONTRACTORS FOR WRRF PROJECT
RECOMMENDATION
1.Adopt “A Resolution of The City Council of the City of San Luis Obispo, California
Adopting Bidder Prequalification Documents and Procedures and Establishing the Bidder
Prequalification Appeals Panel for the Water Resource Recovery Facility Project;” and
2.Authorize the City Manager, following City evaluation of the Statements of Prequalification,
to identify final lists of prequalified contractors and subcontractors to provide:
a) General Contracting Services
b) Subcontractors to provide Electrical Subcontracting Services, and
c) Subcontractors to provide Control System Integration Subcontracting Services.
DISCUSSION
Section 20101 of the California Public Contract Code authorizes cities to pre-qualify contractors
for bidding on the construction of public works projects. A Request for Statements of
Prequalification documents and procedures has been developed for this process.
The proposed prequalification process enables the City to assess a bidder’s experience, financial
situation, and past performance. This process ensures the bids the City receives are only from
serious, qualified bidders, making the bidding process more efficient.
The prequalification process, which provides a desirable level of certainty to both contractors
and the City, will:
1.Reduce the amount of work and time involved in evaluating bids from unqualified
contractors.
2.Encourage local firms to form joint ventures with other local or international
firms, thereby benefiting from their resources and experience.
3.Reduce significantly, if not eliminate, problems associated with low prices
submitted by bidders of doubtful capability.
4.Establishes minimum experience requirements for the contractors and their key
personnel. Only contractors with experienced staff and a proven track record of
successfully building projects of similar size and complexity as the WRRF Project
will be pre-qualified to submit bids.
5.Establishes minimum safety metrics for the contractor. Contractors with a history
of unsafe work practices will not be allowed to submit bids on the WRRF Project.
Packet Page 25
6
6. Increases bidder confidence and bidder participation as qualified contractors do
not have to compete against low bids from inexperienced and unqualified
contractors.
7. Generates interest in the City’s WRRF Project before the bid advertisement is
issued, allowing contractors to place the WRRF Project on their pursuit list and
increasing contractor participation in the bid process.
The request for statements of qualification documents and procedures provide a clear basi s upon
which prospective bidders can be evaluated, following an objective process based on fair and
transparent criteria. The qualification of a contractor, or subcontractor, is a separate process from
the City’s typical bid evaluation procedure, which concentrates on the price and merits of the bid
itself.
ENVIRONMENTAL REVIEW
The City Council adopted Resolution 10740 (2016 Series) certifying the environmental impact
report (EIR) for the WRRF Project (SCH #2015101044) on August 16, 2016. Recommendations
described here are for contractor and subcontractor prequalification for construction of the
WRRF Project analyzed under that EIR. These actions do not trigger the need for additional
environmental review.
FISCAL IMPACT
There is no fiscal impact associated with this action at this time. This request is to authorize staff
to pre-qualify contractors who will be eligible to submit a bid for the construction of the WRRF
Project. This cost will be known later this year after Council authorization to release construction
bid documents for the project and evaluation of the lowest responsible bidder.
Total construction cost for the WRRF Project is estimated to be $90-$110 million and will take
approximately three years to complete. The use of this prequalification process streamlines the
bidding process, saving staff and Council time and saving potential contractors the time and
money it takes to prepare construction bids.
ALTERNATIVE
Elect Not to Approve Resolution. The City Council may elect not to approve the resolution to
prequalify general contractors or subcontractors. Should Council choose this alternative, staff
would prepare bid documents for the WRRF Project for City Council approval. This approach is
not recommended as it would lengthen the bidding process and could lead to additional cost.
Attachments:
a - Resolution Adopting Bidder Prequalification Procedures
b - Council Reading File_Exhibit A_Request for SOQ_GeneralContractors
c - Council Reading File_Exhibit B_Request for SOQ_Electrical Subcontractors
d - Council Reading File_Exhibit C_Request for SOQ_Control System Integration
Packet Page 26
6
Resolution No. _____ (2018 Series) Page 1
R _______
RESOLUTION NO. _____ (2018 Series)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN LUIS
OBISPO, CALIFORNIA, ADOPTING BIDDER PREQUALIFICATION
PROCEDURES AND DOCUMENTS AND ESTABLISHING THE BIDDER
PRE-QUALIFICATION APPEALS PANEL FOR THE WATER
RESOURCE RECOVERY FACILITY PROJECT
WHEREAS, Section 20101 of the California Public Contract Code established procedures
for certain local agencies wishing to pre-qualify bidders on public works projects; and
WHEREAS, the Department of Industrial Relations (“DIR”) has developed standardized
questionnaires and model guidelines for rating bidders pursuant to Public Contract Code Section
20201 (hereafter “Model Guidelines”); and
WHEREAS, under Section 20101, the City Council may formally adopt bidder pre-
qualification procedures and documents modeled after the Model Guidelines and establish a
process by which disqualified bidders may appeal; and
WHEREAS, the City has modeled the “Request for Statements of Qualification of General
Contractors for Construction of the Water Resource Recovery Facility Project for the City of San
Luis Obispo,” attached hereto as Exhibit “A”, after the Model Guidelines; and
WHEREAS, the City has modeled the “Request for Statements of Qualification of
Electrical Subcontractors for Construction of the Water Resource Recovery Facility Project for the
City of San Luis Obispo” attached hereto as Exhibit “B”, after the Model Guidelines; and
WHEREAS, the City has modeled the “Request for Statements of Qualification of Control
System Integration Subcontractors for Construction of the Water Resource Recovery Facility
Project for the City of San Luis Obispo” attached hereto as Exhibit “C”, after the Model
Guidelines; and
WHEREAS, the City Council has determined that adopting bidder pre-qualification
procedures and establishing an appeal committee will streamline the formal bidding process for
the Water Resource Recovery Facility Project and further the City Council’s goals to operate
efficiently and in a businesslike manner.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of San Luis
Obispo as follows:
SECTION 1. The City Council hereby adopts the “Request for Statements of
Qualification of General Contractors for Construction of the Water Resource Recovery Facility
Project for the City of San Luis Obispo” attached hereto as Exhibit “A,” “Request for Statements
Packet Page 27
6
Resolution No. _____ (2018 Series) Page 2
R _______
of Qualification of Electrical Subcontractors for Construction of the Water Resource Recovery
Facility Project for the City of San Luis Obispo,” attached hereto as Exhibit “B”, “Request for
Statements of Qualification of Control System Integration Subcontractors for Construction of the
Water Resource Recovery Facility Project for the City of San Luis Obispo ,” attached hereto as
Exhibit “C,” and incorporated herein by reference (“Pre-Qualification Guidelines”). The City
Manager, or his or her designee, is hereby authorized to pre-qualify bidders on the public works
contract with the City of San Luis Obispo for the Water Resource Recovery Facility Project
pursuant to the attached Pre-Qualification Guidelines. The City Manager may use the scoring
system provided in the attached Pre-Qualification Guidelines consistent with the requirements of
the Public Contract Code.
SECTION 2. The City Council hereby establishes the Bidder Pre-Qualification Appeals
Panel ("Appeal Panel") consisting of the following, or their designee(s): the City Manager, the
City Engineer, and the Director of Utilities. Except as otherwise provided for herein, appeals shall
be conducted by the Appeal Panel in accordance with the rules set forth in the Uniform
Administrative Code. The sole issue before the Appeals Panel shall be the scoring of a prospective
bidder. The decision of the Appeals Panel shall the City's final administrative decision and any
judicial review thereof shall be instituted no later than the time period referred to in section 1094.6
of the Code of Civil Procedure.
SECTION 3. The City Council hereby determines that this Resolution is exempt from
review under the California Environmental Quality Act (CEQA) (California Public Resources
Code Section 21000 et seq.) because the Resolution, pursuant to State CEQA Guidelines section
15378, subdivision (b), constitutes a continuing administrative activity and the creation of a
governmental fiscal activity that does not involve any commitment to any specific project that may
result in a potentially significant physical impact on the environment.
SECTION 4. Effective Date. This Resolution shall take effect immediately upon its
adoption.
Upon motion of _______________________, seconded by _______________________,
and on the following roll call vote:
AYES:
NOES:
ABSENT:
The foregoing resolution was adopted this _____ day of _____________________ 2018.
____________________________________
Mayor Heidi Harmon
Packet Page 28
6
Resolution No. _____ (2018 Series) Page 3
R _______
ATTEST:
____________________________________
Teresa Purrington
City Clerk
APPROVED AS TO FORM:
_____________________________________
J. Christine Dietrick
City Attorney
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City
of San Luis Obispo, California, this ______ day of ______________, _________.
____________________________________
Teresa Purrington
City Clerk
Packet Page 29
6
Resolution No. _____ (2018 Series) Page 4
EXHIBIT “A”
Request for Statements of Qualification of General Contractors for Construction of the Water
Resource Recovery Facility Project for the City of San Luis Obispo
Packet Page 30
6
Resolution No. _____ (2018 Series) Page 5
EXHIBIT “B”
Request for Statements of Qualification of Electrical Subcontractors for Construction of the
Water Resource Recovery Facility Project for the City of San Luis Obispo
Packet Page 31
6
Resolution No. _____ (2018 Series) Page 6
EXHIBIT “C”
Request for Statements of Qualification of Control System Integration Subcontractors for
Construction of the Water Resource Recovery Facility Project for the City of San Luis Obispo
Packet Page 32
6