Loading...
HomeMy WebLinkAbout09-17-2018 ARC Minutes - Final Minutes ARCHITECTURAL REVIEW COMMISSION Monday, September 17, 2018 Regular Meeting of the Architectural Review Commission CALL TO ORDER A Regular Meeting of the Architectural Review Commission was called to order on Monday, September 17, 2018 at 5:01 p.m. in the Council Hearing Room, located at 990 Palm Street, San Luis Obispo, California, by Chair Root. ROLL CALL Present: Commissioners Richard Beller, Brian Rolph, Micah Smith, Angela Soll, Christie Withers, and Chair Allen Root Absent: Vice-Chair Amy Nemcik Staff: Deputy Director Doug Davidson, Associate Planner Rachel Cohen, Associate Planner Kyle Bell, and Recording Secretary Summer Aburashed. Other staff members presented reports or responded to questions as indicated in the minutes. PUBLIC COMMENT ON ITEMS NOT ON THE AGENDA None --End of Public Comment-- PUBLIC HEARINGS 1. 1027 Nipomo Street. Review of a new 50-foot tall, five-story project that includes 3,392 square feet of commercial/retail space, 67 hotel rooms, and a 35-space subterranean valet parking lot within the Downtown Historic District. Case #: ARCH-3216-2016, C-D-H Zone; Creekside Lofts, L.P., applicant. Associate Planner Rachel Cohen presented the staff report with the use of a PowerPoint presentation and responded to Commissioner inquiries. Applicant representatives, Scott Martin, Rob Rossi, and Damien Mavis provided a presentation and responded to Commissioner inquiries. Public Comments: Minutes – Architectural Review Commission Meeting of September 17, 2018 Page 2 James Papp David Hannings Steve Delmartini Mark Johnson Ursula Bishop Pierre Rademaker Steve Snyder --End of Public Comment-- ACTION: MOTION BY COMMISSIONER ROLPH, SECOND BY COMMISSIONER SMITH, CARRIED 5-1-1 to continue with following direction: 1. Address the mass and scale of the side of the structure adjacent to the Creamery. 2. Provide additional step backs on the third and fourth floors, similar to how the building is set back above the brick portion along Nipomo Street. 3. Reconsider including the arch/gateway sign. Is this feature necessary? 4. Review the materials proposed for the project and their compatibility. 5. Provide additional documentation verifying how the valet parking will work. 6. Work with the CHC and the ARC to refine design. Revisions to the project will require CHC review before returning to the ARC. 7. Address the noise concerns regarding the balconies and windows that face the creek. Eliminate balconies and include inoperable windows. 8. Internalize and/or diminish the visibility of the elevator tower. 9. Provide loading and unloading areas for the hotel. 10. Provide a visual analysis of the project within the block. Show views from all the streets surrounding the project, especially from Nipomo Street and from Higuera Street over the lower story structures. 11. Review the paseo and provide more information on how the paseo connects to the Creamery entrance. 12. Reconsider the color of the dark colored cornice. RECESS: Minutes – Architectural Review Commission Meeting of September 17, 2018 Page 3 The Commission recessed at 7:23 p.m. and reconvened at 7:29 p.m. with all Commissioners present. 2. 950 Orcutt Road. Continued review of a one to three-story mixed-use development consisting of 78 apartment units and 6,800 square feet of commercial space inclusive of a 4,000 square foot amenity structure and three mechanical parking lift structures, with a Class 32 Categorical Exemption (Infill Development) from environmental review. Case #: ARCH- 1196-2017, M Zone; Andy Fuller, applicant. Associate Planner Kyle Bell presented the staff report with the use of a PowerPoint presentation and responded to Commissioner inquiries. Applicant Representatives, Tom Jess and Andrew Fuller, summarized the project and responded to Commission inquires. Public Comments: None --End of Public Comment-- ACTION: MOTION BY COMMISSIONER SMITH, SECOND BY COMMISSIONER WITHERS, CARRIED 6-0-1 to adopt Resolution No. ARC-1017-2018 entitled: A RESOLUTION OF THE SAN LUIS OBISPO ARCHITECTURAL REVIEW COMMISSION APPROVING THE DEVELOPMENT OF A ONE TO THREE-STORY MIXED-USE DEVELOPMENT CONSISTING OF 78 APARTMENT UNITS AND 6,800 SQUARE FEET OF COMMERCIAL SPACE WITH A 4,000 SQUARE FOOT AMENITY STRUCTURE AND THREE MECHANICAL PARKING LIFT STRUCTURES. THE PROJECT IS CATEGORICAL EXEMPT FROM ENVIRONMENTAL REVIEW. AS REPRESENTED IN THE STAFF REPORT AND ATTACHMENTS DATED SEPTEMBER 17, 2018 (950 ORCUTT ROAD, ARCH-1196-2018) With the following direction provided: Include additional conditions from the Engineering and Transportation Divisions with the exception of condition 56 as it does not apply to the project. The commission suggests modifying the condition 3 to direct the applicant to work with staff to enhance the design on the front elevation of the parking lift to give more articulation and variation COMMENT AND DISCUSSION Deputy Director Davidson provided a brief agenda forecast. ADJOURNMENT Minutes – Architectural Review Commission Meeting of September 17, 2018 Page 4 The meeting was adjourned at 7:58 p.m. The Regular meeting of the Architectural Review Commission for Monday, October 1, 2018 has been cancelled. The next Regular meeting of the Architectural Review Commission is scheduled for Monday, October 15, 2018 at 5:00 p.m., in the Council Hearing Room, 990 Palm Street, San Luis Obispo, California. APPROVED BY THE ARCHITECTURAL REVIEW COMMISSION: 10/15/2018