HomeMy WebLinkAbout11-29-2018 ATC AgendaPacketCity of San Luis Obispo, Agenda, Planning Commission
Agenda
ACTIVE TRANSPORTATION COMMITTEE
Thursday, November 29, 2018
6:00 p.m. SPECIAL MEETING Council Hearing Room
990 Palm Street
San Luis Obispo, CA
MISSION: The purpose of the Active Transportation Committee (ATC) is to provide oversight
and policy direction on matters related to bicycle and pedestrian transportation in San Luis Obispo
and its relationship to bicycling and walking outside the City.
CALL TO ORDER Chair Lea Brooks
ROLL CALL : Committee Members Jenna Espinosa, Timothy Jouet, Briana Martenies, Paul
Orton, Jonathan Roberts, Vice Chair Ken Kienow, and Chair Lea Brooks
PUBLIC COMMENT: At this time, people may address the Committee about items not on the
agenda. Persons wishing to speak should come forward and state their name and address.
Comments are limited to three minutes per person. Items raised at this time are generally referred
to staff and, if action by the Committee is necessary, may be scheduled for a future meeting.
CONSIDERATION OF MINUTES
1.Minutes of the Active Transportation Committee of November 15, 2018 will be considered
for approval at the next regular meeting of January 17, 2019
INFORMATION ITEM
2.ANHOLM BIKEWAY PLAN – PHASE 1 DESIGN UPDATE
(SCHWARTZ – 30 MINUTES)
City Staff has progressed with design efforts for the Phase 1 as prescribed in the Anholm
Bikeway Plan. Phase 1 improvements include a planned pedestrian/bicycle crossing at the
Active Transportation Committee Agenda November 29, 2018 Page 2
Foothill/Ferrini intersection, a multi-use path through the Latter-Day-Saints Church property
between Foothill and Ramona, and a two-way cycle track along Ramona between the multi-
use path and Broad Street. Staff will provide a status update on the Phase 1 design efforts,
including a review of the draft construction drawings for the Foothill/Ferrini crossing, and an
update on anticipated construction schedule.
Attachment 1: Draft Concept Drawing for Foothill/Ferrini Crossing
BUSINESS ITEMS
3.CITY BUDGET GOALS, FINAL ATC RECOMMENDATIONS
(FUKUSHIMA – 45 MINUTES)
At its September meeting, the ATC developed draft budget goal recommendations
(Attachment 2) for consideration by the City’s other advisory bodies. The Finance Dept has
now put together the consolidated list of goals across all the advisory bodies (Attachment 3)
for Committee review. The ATC should review the consolidated list of goals submitted by the
City’s advisory bodies and consider whether there are any common goals that the commit tee
would like to support. This is also an opportunity for the committee to make any refinements
or revisions to the ATC draft goals, if desired. It may be helpful for committee members to
review budget materials provided in the September agenda, which can be found at
http://opengov.slocity.org/weblink/1/doc/84995/Page1.aspx
Recommendation: Review the consolidated list of goals and formulate final recommended
ATC budget goals
COMMENT AND DISCUSSION
4.Committee Member Updates (5 minutes)
5.Staff Updates (10 minutes)
a. Active Transportation Plan Update
b. Shared Active Transportation Devices
c. Agenda Forecast
ADJOURNMENT
The next Regular Meeting of the Active Transportation Commi ttee is scheduled for
Thursday, January 17 , 2019 , at 6:00 p.m., in the Council Hearing Room, 990 Palm Street, San
Luis Obispo, California.
Active Transportation Committee Agenda November 29, 2018 Page 3
ATTACHMENTS
1. Draft Concept Drawing for Foothill/Ferrini Crossing
2. Draft FY 2019-21 ATC Recommended Goals
3. 2019-21 Financial Plan Proposed Major City Goals-Advisory Body Consolidated Goals
4. Minor Bikeway Improvements List
The City of San Luis Obispo wishes to make all of its public meet ings accessible to the
public. Upon request, this agenda will be made available in appropriate alternative formats to
persons with disabilities. Any person with a disability who requires a modification or
accommodation in order to participate in a meeting should direct such request to the City Clerk’s
Office at (805) 781-7100 at least 48 hours before the meeting, if possible. Telecommunications
Device for the Deaf (805) 781-7107.
Agenda related writings and documents are available online or for public inspection at the Public
Works Department, 919 Palm Street, SLO. Meeting audio recordings can be found at the following
web address:
http://opengov.slocity.org/WebLink/1/fol/60965/Row1.aspx
FOOTHILL
B
P FERRINIB
P
N
1" = 20'
PEDESTRIAN HYBRID BEACON (PHB) SYSTEM
WITH BEACONS MOUNTED ON MAST ARM
POLES OVER ROADWAY
DETAIL A - PHB SIGNAL OPERATIONS DETAIL B - SIGNAL HEADS
PED SIGNAL
(CROSSING)
PHB SIGNAL
(MAIN STREET)
BIKE SIGNAL
(CROSSING)
BP
FOOTHILLPLAZADRIVEWAYCLASS I PATH
THROUGH CHURCH FIELD
(2nd QUARTER 2019)
SHARROWS AND SPEED HUMPS PROPOSED ON
FERRINI TO CONVEY PRIORITY BIKE ROUTE
TO/FROM PACHECO ELEMENTARY
CROSSING SEQUENCE ACTUATED BY
PUSH BUTTON ON SIGNAL POLE (PEDS)
OR PUSH BUTTON PEDESTAL (BIKES)
NEW ADA CURB RAMP
NEW ADA CURB RAMP
DEDICATED BIKE
CROSSING
PUSH BUTTON PEDESTAL FOR BIKE ACTUATION
FOOTHILL & FERRINI CROSSING -- PEDESTRIAN HYBRID BEACON
RAISED CONCRETE CURB TO RESTRICT VEHICLE
ENCROACHMENT INTO BIKE LANE
50'-60' ADVANCE
STOP LINE
HI-VIS PEDESTRIAN
CROSSWALK MARKINGS
CONCEPT DRAWING
NOT FOR CONSTRUCTION
Attachment 1, Page 1 of 1
Page 1 of 3
DATE: October 2, 2018
TO: Brigitte Elke, Director of Finance
FROM: Adam Fukushima, Staff Liaison to the Active Transportation Committee
SUBJECT: DRAFT FY 2019-21 Active Transportation Committee Recommended Goals
On September 20, 2018 the Active Transportation Committee recommended its FY 2019-21
draft goals for Council consideration which are represented in the following table. The projects
are ranked in order of importance from most to least desired to fund.
Recommended Goal Why Goal is Important Candidate Funding
PROJECTS
Anholm Bikeway Plan-
1)Design, construct, and
maintain bikeway from
Lincoln to Ramona
2)Install art and lighting to
enhance the US 101
underpass
Railroad Safety Trail-
Design and construct:
1)Pepper St to the train
station
2)Jennifer St. bridge to Iris
(connecting to French
Hospital Trail)
Broad Street Crossing
Improvement-
Design and construct HAWK
beacon at Woodbridge Street
Bob Jones Trail-
1)Construct segment from
Calle Joaquin to
Oceanaire
2)Design and construct
bike path extension from
LOVR to the Octagon
Barn
3)Design grade separated
crossing of LOVR at
Highway 101
This project will provide a primary low
traffic north/south through route for
bicyclists serving the downtown core and
neighborhoods north of Foothill Blvd;
complements projects in the Bishop
Peak and Pacheco Elementary School
Safe Routes to School Plan
This goal provides a huge safety
enhancement for a large volume of
bicyclists and pedestrians to the
University, schools & parks; implements
General Plan goals to increase bicycling
& walking and supports Grand Jury
recommendations to close gaps.
This goal improves pedestrian
transportation and complements the
South Broad Street Area Plan
The City-to-Sea trail continues to be a
high priority for residents. Additionally,
SLO County is moving forward with its
section of the trail which will increase the
desire for the crossing.
Project Funding Sources:
State funds
Federal funds
General fund
City debt financing
Fundraising efforts
Measure G
Active Transportation Committee
Attachment 2, Page 1 of 3
Page 2 of 3
Misc. Bicycle Facility
Improvements-
Provide $100,000 in annual
funding for misc. projects
such as safe routes to
school, signing & striping
projects ideally incorporated
into other construction
projects.
Pacheco and Bishop Peak-
Safe Routes to School
Design and construct
enhanced bicycle/pedestrian
crossing of Foothill Blvd at
Patricia and La Entrada
Penny Lane Bridge-
Design a bicycle/pedestrian
bridge over the railroad tracks
at Penny Lane
Prado Road Class I-
Design and construct a Class
I bikeway from the current
terminus of Prado Road to
Broad Street.
Sinsheimer Park Pathway-
Construct a paved path
through Sinsheimer Park
from Helena Street to the
Railroad Safety Trail
Islay Bicycle Boulevard-
Design and construct the
City’s third bicycle boulevard.
Broad Street Class I-
Design and construct a Class
I bikeway from Damon
Garcia sports fields to
Rockview Place
Completing these projects as part of
other construction projects results in
substantial cost savings.
This project has been requested by
neighborhood families that have difficulty
crossing Foothill as they walk and
bicycle their kids to school.
This bridge will provide a connection
from downtown to the Johnson Avenue
and Ella Street neighborhoods via the
bicycle facilities recently constructed at
French Hospital.
Constructing this bikeway connection
ahead of development will provide an
important east/west bikeway connection
and alternative to Tank Farm Road
during the Chevron remediation efforts.
This project has been requested by
residents from throughout the community
and provides connectivity from the trail to
the park
Bicycle boulevards are facilities that
bicyclists of all abilities feel comfortable
using and therefore increase ridership.
In conjunction with the Prado Road
Class I bikeway, this segment provides
an alternative route to the busy Broad
Street corridor.
The intent of this goal is to improve east-
west connectivity of communities west of
the US 101 to the east side of the
freeway.
PROGRAMS
Traffic Safety Education:
Educating the public on cycling
Program Funding Sources:
State and Federal grants
Transportation Development
Attachment 2, Page 2 of 3
Page 3 of 3
Increase annual funding for
bicycle, motorist, and scooter
education
Ped/Bikeway Maintenance:
Maintain $60,000 annually
for bicycle and pedestrian
facilities
awareness and safety reduces
collisions. Goal supports Grand Jury
goal of promoting safe cycling.
Performing pavement maintenance and
weed control on pedestrian and bicycle
paths will increase the life of these
facilities and reduce the risk of
accidents.
Act funds
General fund
Measure G
STAFFING
Active Transportation
Manager:
Maintain position.
The Active Transportation Manager
implements the Bicycle Transportation
Plan policies and programs, prepares
grant applications, and helps manage
capital projects.
Staffing Funding Sources:
General fund
Measure G
Attachment 2, Page 3 of 3
2019-21 Financial Plan Proposed Major City Goals
Advisory Bodies Consolidated Goals
Tourism Business Improvement District – Page 4
Goals: (All equal weighted)
1. Support Partnerships that enhance tourism
2. Safety and homelessness
3. Vitality of downtown & other business districts
4. Parking + Connectivity
5. Infrastructure + Beautification
6. Homestay Compliance
Planning Commission – Page 5
Goals: (Priority Ranked)
1. Land Use: Implementation of the Downtown Concept Plan and Revisit Special Focus Areas
2. Housing: Increase Affordable and Workforce Housing Supply
3. Sustainability: Reduce GHG Emissions by Reducing VMT and Improving Residential Energy
Efficiency of Pre-1990 Housing Stock
4. Multi-Modal Circulation: Improve Walkability and Transit
Cultural Heritage Committee – Page 6
Goal:
1. Update the 36-year-old historic resource inventory and existing historic districts.
Architectural Review Commission – Page 7
Goal:
1. Update the Community Design Guidelines (CDG)
Promotional Coordinating Committee – Page 8
Goals: (All equal weighted)
1. Quality of Life + Public Art
2. Climate Action Plan: Housing+ Connectivity + Sustainability
3. Homelessness & Mental Health + Safety
Attachment 3, Page 1 of 19
2019-21 Financial Plan Proposed Major City Goals
Advisory Bodies Consolidated Goals
4.
5. Vitality of downtown & other business districts
6. Open Space
Administrative Review Board – Page 10
Goals:
1. Consistency in enforcement of existing municipal code by citing officers; consistent
interpretation of existing municipal code by hearing officers when reviewing citations that are
appealed; and raising fines for administrative citations.
2. Increase the cost to appeal to the Administrative Review Board and establish a fee to appeal to
a Hearing Officer.
3. Enforce the requirement of individual rideshare operators (such as driver-contractors for Uber
and Lyft) to have a business license issued by the City.
4. Expand education of homeowners regarding their obligation to have a business license if they
are renting a room, Accessory Dwelling Unit or home, as a step towards stricter enforcement.
Active Transportation Committee – Page 12
Goals: (Priority Ranked)
Projects
1. Anholm Bikeway Plan: Design, Construct, and Maintain Lincoln to Ramona bikeway and lighting
2. Railroad Safety Trail: Design, Construct, and Maintain
3. Broad Street Crossing Improvement: Design, Construct, and Maintain
4. Bob Jones Trail: Design, Construct, and Maintain
5. Misc Bicycle Facility Improvements: $100k in annual funding for misc. projects.
6. Pacheco and Bishop Peak Safe Routes to School: Design, Construct, and Maintain
7. Penny Lane Bridge: Design, Construct, and Maintain
8. Prado Road Class I: Design, Construct, and Maintain
9. Sinsheimer Park Pathway: Design, Construct, and Maintain
10. Isla Bicycle Boulevard: Design, Construct, and Maintain
11. Broad Street Class I: Design, Construct, and Maintain
Programs
1. Traffic Safety Education: Increase annual funding
2. Ped/Bikeway Maintenance: Maintain annual $60k for maintenance.
Staffing
1. Active Transportation Manager; maintain position
Attachment 3, Page 2 of 19
2019-21 Financial Plan Proposed Major City Goals
Advisory Bodies Consolidated Goals
Human Relations Commission – Page 15
Goals:
1. Housing
2. Homeless Prevention
3. Diversity, Equity, & Inclusive
Jack House Committee Advisory Body Goals – Page 17
Goals:
1. Commit funding for improvements to non-historic structures
2. Fund restoration of the Jack Carriage House
3. Provide for the historic preservation and public enjoyment of the Jack House and Garden
through strategic planning efforts
Mass Transportation Advisory Committee – Page 18
Goals:
1. Additional Staffing
2. Increase Services
3. Representation in Planning Review Process
4. Ensure Adequate Facilities
5. Adopt Advancements in Technology
Attachment 3, Page 3 of 19
2019-21 Financial Plan Proposed Major City Goals
Tourism Business Improvement District
Background
The Tourism Business Improvement District (TBID) board recommended the goals for consideration in
the 2019-21 work program to improve the visitor experience in San Luis Obispo. The TBID board did not
weigh its goals, keeping them all equally important.
Goals
1. Goal #1: Support Partnerships that enhance tourism
Fiscal sustainability in other methods aside from increase in TOT
Recognize tourism as an integral aspect of the City’s economic development efforts and support
the tourism promotion activities of the TBID and PCC.
Increase funding for the Promotional Coordinating Committee in its efforts to promote cultural,
recreational, and social events that bring and keep tourists in San Luis Obispo.
Support with city-wide special events (in the ways of not hindering city required permits,
applications, etc.) and providing tools necessary for events to be compliant
2. Goal #2: Safety and homelessness
Continue the City’s efforts to address homeless population.
Enhance safety relative to transient populations throughout the City so residents and tourists
can feel safe while enjoying activities in San Luis Obispo.
3. Goal #3: Vitality of downtown & other business districts
Free City wi-fi
encourage and support the growth of new business courting SLO and wanting to build in SLO
Creating some sort of policy or process for abandon buildings/storefronts specifically in
downtown
4. Goal #4: Parking + Connectivity
feasible parking around downtown
Accessibility of public transportation (trolley)
5. Goal #5: Infrastructure + Beautification
Cleanliness of the city in general and specifically in tourist central areas/ hotel locations
Infrastructure improvements
6. Goal 6#: Homestay Compliance
Continue the enforcement to gain compliance of properties with the City’s Homestay Ordinance
with the goal for 100% compliance with Homestay policy within the City.
Attachment 3, Page 4 of 19
2019-21 Financial Plan Proposed Major City Goals
Planning Commission
Background
The Planning Commission prioritized the following goals based on evaluation on the completion status for
the 2017-19 Major City Goals and General Plan goals; community need, and input received over the past
2 years; special and urgent conditions that need to be addressed; and the availability of City resources to
accomplish the identified goals and work programs within the financial plan timeframe.
Goals
1. Land Use: Implementation of the Downtown Concept Plan and Revisit Special Focus Areas
Implement the Mission Plaza improvements as identified in the Downtown Concept Plan. Revisit
the Special Focus Area development guidelines for the Foothill Boulevard/ Santa Rosa Area and
Upper Monterey to establish detailed design guidelines that enhance neighborhood integrity and
the diverse community character.
2. Housing: Increase Affordable and Workforce Housing Supply
Emphasize affordable housing programs, encourage flexible use and non-traditional housing
product types to facilitate development of workforce housing. Review existing regulations to
identify cost and time saving measures to promote the development of accessory dwelling units,
while maintaining the owner occupancy requirement to protect neighborhood compatibility and
wellness.
3. Sustainability: Reduce GHG Emissions by Reducing VMT and Improving Residential Energy
Efficiency of Pre-1990 Housing Stock
Update and implement the Climate Action Plan with emphasis on: 1) encouraging project design
that promotes accessible, convenient and safe pedestrian, bicycle and transit access that reduces
project generated vehicle miles traveled by 20-40% below average; 2) developing standards that
support infrastructure improvements for alternative transportation and electric vehicles; and 3)
identify and implement financial incentives for improving energy efficiency in pre- 1990 housing
stock.
4. Multi-Modal Circulation: Improve Walkability and Transit
Implement the Multi-Modal objectives identified in the LUCE and the Downtown Concept Plan by
encouraging in-fill development to include non-automobile alternatives. Conduct a walkable
community survey in major neighborhoods to inform the development of the Active
Transportation Plan, and to identify improvements that would encourage and support pedestrian
activities for people with varying degrees of mobility. Implement the Short-Range Transit Plan to
improve transit ridership by exploring operational improvements that could reduce run times to
less than 20 minutes along routes that serve densely populated areas.
Attachment 3, Page 5 of 19
2019-21 Financial Plan Proposed Major City Goals
Cultural Heritage Committee
Background
The California Office of Historic Preservation recommends updating historic resource
inventories every five years. San Luis Obispo has not done a global revision in thirty-five
years, making development decisions difficult and unpredictable. The CLG grant-funded City
of San Luis Obispo Citywide Historic Context Statement of 2014 logically leads to a historic
resource survey.
Goals
1. Update the 36 year-old historic resource inventory and existing historic districts.
Attachment 3, Page 6 of 19
2019-21 Financial Plan Proposed Major City Goals
Architectural Review Commission (ARC)
Background
The Community Design Guidelines (CDG), adopted in June 2010, are the guiding principles for the
ARC. The ARC’s purview, mission statement, and criteria for project approvals is all contained in
the CDG. The ARC has requested an update of the CDG over several Financial Plan cycles and on
October 15, 2018 decided to make it their sole recommended goal for the 2019-21 budget.
Goals
1. Goal – Update the Community Design Guidelines (CDG)
Due to the significant gap in the City’s projected budget, the ARC focused on one goal; updating
its major policy document, the Community Design Guidelines. It is timely and important to update
the CDG after the adoption of the comprehensive Zoning Regulations Update (September 2018).
The Zoning Regulations Update includes a new development review process, primarily changing
the focus and decision-making authority of the ARC. Under the new process, instead of final
decisions, the ARC makes advisory recommendations to the Planning Commission or Community
Development Director, and will conduct more focused, informal, and working session-type
meetings. The ARC will be totally focused on design guidelines and will not have to weigh in on
things outside their purview (State affordable housing law, environmental review, and parking
reductions), which the old process required them to consider as a final decision maker for many
types of projects. Updating the CDG will also be very important for consistency with the
upcoming updates to the Subdivision and Sign Regulations.
If approved as a component of the 2019-21 Financial Plan, the project plan, scope of work, and
budget for the CDG update will be prepared with the ARC. While a comprehensive look at the
CDG is warranted, the document contains many effective and relevant guidelines to maintain.
The ARC discussed working sessions and a subcommittee for the CDG update to do as much of
the “hands on” work as possible, with numerous opportunities for public review and input. Of
course, planning staff, particularly the ARC liaison would have a key role in this effort. While staff
and the ARC can carry some of the effort, it was recognized that some consultant services would
be needed to carry out the project. Based on recent similar efforts, a ballpark estimate would be
$50,000 in consultant services, in conjunction with staff/ARC to produce a focused update of the
CDG.
Attachment 3, Page 7 of 19
2019-21 Financial Plan Proposed Major City Goals
Promotional Coordinating Committee
Background
Consistent with its assigned role, the PCC’s proposed goals concentrate on improvements and
enhancements that would make the City of San Luis Obispo an even better place to reside and visit.
They PCC used community responses from their recent strategic planning exercise to inform and
develop the outlined goals. The PCC did not weigh the goals since the members felt that they were
equally important.
Goals
Goal #1: Quality of Life + Public Art
Enhance placemaking efforts by supporting Public Art and identify increased opportunities to
support additional public art throughout the city. Encourage non-traditional, eclectic, and
contemporary forms of public art to enhance arts tourism and serve as point of pride for
residents. Ensure that public art is included in all development / projects in the city, both
residential and business. Public art should be accessible to all members of the community.
Goal #2: Climate Action Plan: Housing+ Connectivity + Sustainability
Support implementation of the City of SLO Climate Action Plan. Support housing density, multi-
modal transit, increased connectivity, traffic mitigation efforts, and the Climate Action Plan with
construction of affordable, green, and net-zero housing.
Increase the efforts to make the city more pedestrian and bicycle friendly. Support enhanced
bike infrastructure and the completion of the Bob Jones Trail as energy efficient examples to
provide transportation for both residents and tourists in a small-scale city with excellent climate.
Encourage buffered, green-striped bike lanes with new construction. Identify and research
feasibility of bike share model connecting Downtown to Cal Poly, beaches, wine country, and
Monterey hotels.
Prioritize sustainability throughout the community for businesses, residents and events.
Goal #3: Homelessness & Mental Health + Safety
Support the city in the addressing of the homeless/ transient / mental health issues that we are
facing with our local population and residents.
Goal #4: Vitality of downtown & other business districts
Support the continuing efforts of community-based organizations to keep the downtown viable.
And also support other local business neighborhoods (which tend to be local business) i.e. MoJo,
Laurel Lane, Crossroads, the airport district, etc.
Attachment 3, Page 8 of 19
2019-21 Financial Plan Proposed Major City Goals
Goal #5: Open Space
Enhance awareness and availability of the natural spaces in and around town to residents and
visitors.
Continue to look for opportunities to expand the green belt around San Luis Obispo.
Attachment 3, Page 9 of 19
Administrative Review Board
Background
The Administrative Review Board serves as the final decision maker for the City on administrative appeal
hearings relating to administrative citations issued for certain contested San Luis Obispo Municipal Code
enforcement matters that require a more detailed administrative record.
Goals
1.Consistency in enforcement of existing municipal code by citing officers; consistent
interpretation of existing municipal code by hearing officers when reviewing citations that are
appealed; and raising fines for administrative citations.
The goal of more consistent enforcement and adherence to the municipal code by citing officers
and hearing officers would be to increase education of the public as to what the requirements of
the municipal code are and to reinforce the City’s commitment to consistent enforcement and
review when it comes to violations of the municipal code related to neighborhood wellness. With
the ongoing, excellent efforts of Police Department, Office of Neighborhood Outreach, the
suggestion is for citing officers and hearing officers to support that outreach through increased
attention to consistency in enforcement and administrative appeals review.
The ARB also suggests review of the level of administrative citation penalties.
2.Increase the cost to appeal to the Administrative Review Board and establish a fee to appeal to
a Hearing Officer.
Increasing the cost to appeal to the Administrative Review Board so the amount more closely
covers the administrative cost of processing the appeal, with the goal of removing more of the
financial burden on the City. In line with that increase, the ARB suggests requiring the fines for
administrative citations appealed for Hearing Officer review be paid up front and held until the
Hearing Officer issues a decision to prevent the filing of appeals solely for the purpose of delaying
payment of penalties and resulting “no show” appellants and unnecessary burdens on volunteer
Hearing Officer time. Review of an appeal by a Hearing Officer is currently free. If the appeal was
granted, the fine would be returned to the appellant. Indigent appellants may submit a financial
hardship waiver request through which an appellant could be heard by the Administrative Review
Board or a Hearing Officer without having to pay a fee.
3.Enforce the requirement of individual rideshare operators (such as driver-contractors for Uber
and Lyft) to have a business license issued by the City.
It was confirmed with our Finance Department that other cities, such as San Francisco, have a
process by which they receive a list of driver-contractors operating in their jurisdiction in order to
enforce the cities’ requirement that each driver-contractor have a business license. The list is
provided to the cities by the parent corporation and then utilized by the cities to enforce the code.
The goal of this effort would be to increase safety of users by having, at minimum, a list of driver-
Attachment 3, Page 10 of 19
contractors operating in the City and making the driver-contractors aware that they are on such
a list and subject to business license requirements.
4. Expand education of homeowners regarding their obligation to have a business license if they
are renting a room, Accessory Dwelling Unit or home, as a step towards stricter enforcement.
It is the belief of the Administrative Review Board that a majority of homeowners within the City
are unaware that they are required to have a business license in order to rent rooms in their
home, or to rent Accessory Dwelling Units (“ADUs”) or homes that they own. There have been
recent educational efforts around ADUs, but the global applicability of the business license may
not be well understood. Also, enhance education regarding the differences in requirements
between long-term and homestay (short-term) rentals. The goal of greater education would be
greater compliance, with the follow-up being increased citations for non-compliance.
Attachment 3, Page 11 of 19
DATE: October 2, 2018
TO: Brigitte Elke, Director of Finance
FROM: Adam Fukushima, Staff Liaison to the Active Transportation Committee
SUBJECT:DRAFT FY 2019-21 Active Transportation Committee Recommended Goals
On September 20, 2018 the Active Transportation Committee recommended its FY 2019-21
draft goals for Council consideration which are represented in the following table. The projects
are ranked in order of importance from most to least desired to fund.
Recommended Goal Why Goal is Important Candidate Funding
PROJECTS
Anholm Bikeway Plan-
1)Design, construct, and
maintain bikeway from
Lincoln to Ramona
2)Install art and lighting to
enhance the US 101
underpass
Railroad Safety Trail-
Design and construct:
1)Pepper St to the train
station
2)Jennifer St. bridge to Iris
(connecting to French
Hospital Trail)
Broad Street Crossing
Improvement-
Design and construct HAWK
beacon at Woodbridge Street
Bob Jones Trail-
1)Construct segment from
Calle Joaquin to
Oceanaire
2)Design and construct
bike path extension from
LOVR to the Octagon
Barn
3)Design grade separated
crossing of LOVR at
Highway 101
This project will provide a primary low
traffic north/south through route for
bicyclists serving the downtown core and
neighborhoods north of Foothill Blvd;
complements projects in the Bishop
Peak and Pacheco Elementary School
Safe Routes to School Plan
This goal provides a huge safety
enhancement for a large volume of
bicyclists and pedestrians to the
University, schools & parks; implements
General Plan goals to increase bicycling
& walking and supports Grand Jury
recommendations to close gaps.
This goal improves pedestrian
transportation and complements the
South Broad Street Area Plan
The City-to-Sea trail continues to be a
high priority for residents. Additionally,
SLO County is moving forward with its
section of the trail which will increase the
desire for the crossing.
Project Funding Sources:
State funds
Federal funds
General fund
City debt financing
Fundraising efforts
Measure G
Active Transportation Committee
Attachment 3, Page 12 of 19
Misc. Bicycle Facility
Improvements-
Provide $100,000 in annual
funding for misc. projects
such as safe routes to
school, signing & striping
projects ideally incorporated
into other construction
projects.
Pacheco and Bishop Peak-
Safe Routes to School
Design and construct
enhanced bicycle/pedestrian
crossing of Foothill Blvd at
Patricia and La Entrada
Penny Lane Bridge-
Design a bicycle/pedestrian
bridge over the railroad tracks
at Penny Lane
Prado Road Class I-
Design and construct a Class
I bikeway from the current
terminus of Prado Road to
Broad Street.
Sinsheimer Park Pathway-
Construct a paved path
through Sinsheimer Park
from Helena Street to the
Railroad Safety Trail
Islay Bicycle Boulevard-
Design and construct the
City’s third bicycle boulevard.
Broad Street Class I-
Design and construct a Class
I bikeway from Damon
Garcia sports fields to
Rockview Place
Completing these projects as part of
other construction projects results in
substantial cost savings.
This project has been requested by
neighborhood families that have difficulty
crossing Foothill as they walk and
bicycle their kids to school.
This bridge will provide a connection
from downtown to the Johnson Avenue
and Ella Street neighborhoods via the
bicycle facilities recently constructed at
French Hospital.
Constructing this bikeway connection
ahead of development will provide an
important east/west bikeway connection
and alternative to Tank Farm Road
during the Chevron remediation efforts.
This project has been requested by
residents from throughout the community
and provides connectivity from the trail to
the park
Bicycle boulevards are facilities that
bicyclists of all abilities feel comfortable
using and therefore increase ridership.
In conjunction with the Prado Road
Class I bikeway, this segment provides
an alternative route to the busy Broad
Street corridor.
The intent of this goal is to improve east-
west connectivity of communities west of
the US 101 to the east side of the
freeway.
PROGRAMS
Traffic Safety Education:
Educating the public on cycling
Program Funding Sources:
State and Federal grants
Transportation Development
Attachment 3, Page 13 of 19
Increase annual funding for
bicycle, motorist, and scooter
education
Ped/Bikeway Maintenance:
Maintain $60,000 annually
for bicycle and pedestrian
facilities
awareness and safety reduces
collisions. Goal supports Grand Jury
goal of promoting safe cycling.
Performing pavement maintenance and
weed control on pedestrian and bicycle
paths will increase the life of these
facilities and reduce the risk of
accidents.
Act funds
General fund
Measure G
STAFFING
Active Transportation
Manager:
Maintain position.
The Active Transportation Manager
implements the Bicycle Transportation
Plan policies and programs, prepares
grant applications, and helps manage
capital projects.
Staffing Funding Sources:
General fund
Measure G
Attachment 3, Page 14 of 19
Human Relations Commission
Background
The Human Relations Commission (HRC) requests the City Council consider the following goals for the
2019-2021 Financial Plan:
Goals
1. Housing
Continue to implement the Housing Element, facilitate affordable, supportive, and transitional housing
options; promote creative land use and density opportunities, and modify City fees and processes to
increase housing production.
Tasks and funding priorities should focus on:
a. Explore ways to increase the affordable, alternative, and transitional housing inventory, through
active support and involvement in the upcoming update of the City’s General Plan Housing
Element for 2020-2028;
b. Increase both rental and ownership opportunities within the City’s housing stock;
c. Promote smaller, efficiency units and adjust development fees accordingly;
d. Continue to prioritize Community Development Block Grant (CDBG0) funding for production and
rehabilitation of affordable housing; and
e. Promote and ensure fair housing practices and policies within the City.
2. Homeless Prevention
Continue to support a long-term, proactive, sustainable program that addresses homelessness and
focuses on transitioning children, families, and individuals out of homelessness into permanent housing.
Tasks and funding priorities should focus on:
a. Increase the HRC Grant-in-Aid Budget and General Fund support to allow greater financial
assistance to non-profits in the community who serve those less fortunate;
b. Continue efforts to prevent homelessness primarily with the most vulnerable populations;
c. Increase support and awareness for mental and physical health and wellness; and
d. Continue to work with the City’s Police and Community Together (PACT) team, the County’s
Homeless Services Oversight Council (HSOC), and other local municipalities in implementing the
San Luis Obispo Countywide 10-year Plan to End Chronic Homelessness.
Attachment 3, Page 15 of 19
3. Diversity, Equity, & Inclusivity
Identify and implement policies and procedures to encourage greater social and economic diversity in the
City.
Tasks and funding priorities should focus on:
a. Review and make changes to the HRC’s Bylaws and other Advisory Body Bylaws as necessary, to
encourage diversity and inclusivity;
b. Support, protect, and ensure the implementation of the City’s “welcoming city” designation;
c. Explore partnerships with stakeholder groups, including but not limited to, the Five Cities
Diversity Coalition, RACE Matters, SLO PACT, and various student groups to listen and learn
about opportunities to increase diversity and inclusion;
d. Increase commissioner community engagement and involvement to educate and inform City
residents about the role of the HRC;
e. Promote the city’s diversity and inclusion efforts through a collaboration with the City’s
Promotional Coordinating Committee and internal marketing team.
Attachment 3, Page 16 of 19
2019-21 Financial Plan Proposed Major City Goals
Jack House Committee Advisory Body Goals
Background
Goals
1. Commit funding for improvements to the non-historic structures, including storage, in the
Jack Garden including:
A. Carriage House Pergola Restoration or Demolition
B. Storage
2. Fund restoration of the Jack Carriage House, one of the three oldest documented wood
structures I the city, to Secretary of Interior Standards in order to qualify it for nomination
to the National Register of historic places and make it accessible and educational to the
public in a variety of uses.
3. Provide for the historic preservation and public enjoyment of the Jack House and
Garden through strategic planning efforts including:
A. A Historic structure Report to give the City guidance in the treatment of this National
Register Property in accordance with Secretary of Interior Standards.
B. A strategic Plan to develop an effective balance between public use and preservation
of the botanical, structural, and interior collections over time.
C. A long-range interpretive Plan to the education and understanding of visitors to the
house and garden.
Attachment 3, Page 17 of 19
DATE: November 14th, 2018
TO: Brigitte Elke, Director of Finance
FROM: Gamaliel Anguiano, Staff Liaison to the Mass Transportation Advisory Committee
SUBJECT: Mass Transportation Advisory Committee Recommended Goals for FY 2019-21
On November 14th, 2018 the Mass Transportation Advisory Committee adopted its recommended
FY 2019-21 goals for Council consideration. The following table presents the Committee’s goals, which
are aligned with current City goals and not listed in any specific order.
Recommended Goal Why Goal is Important Candidate Funding
Additional Staffing:
Create one additional full-time
staffing position for
Transportation Grant and
Reporting Programs.
Increase Services:
Support expanding transit
services for more frequency
along major transit corridors.
Representation in Planning
Review Process:
Strengthening transit
involvement in the planning
review process.
Ensure Adequate Facilities:
Including a dedicated Transit
Center and growth-ready
Maintenance Facility.
In the last TDA triennial audit, the
transit fund was recommended to
have at least one additional person
associated with grants to help ensure
sufficient separation of duties and to
help secure/manage otherwise
missed grant opportunities.
Public transit is a viable and life
sustaining means of transportation
for those who elect alternative
transportation and especially for
those who are transit dependent.
Service levels need to ensure
availability of services beyond current
levels to meet daily activities of those
who use transit, of course, where
feasible and supported by the public.
To ensure that developments are
designed transit-friendly and take
into consideration best practices and
the needs of those who elect to use
public transit as well as those who are
transit dependent.
As public transit continues to grow in
popularity and the City pushes for an
increased mode shift, there will need
to be adequate facilities to support
Project Funding Sources:
Transit Enterprise Fund
Project Funding Sources:
Transit Enterprise Fund
Project Funding Sources:
Transit Enterprise Fund as
part of Developer’s
process
Project Funding Sources:
Transit Enterprise Fund
Attachment 3, Page 18 of 19
Adopt Advancements in
Technology: Including
alternative fuel vehicles.
service and ridership growth. Current
facilities are quickly reaching max
capacity.
There have been recent
advancements in transit technology,
including zero emission (i.e. electric)
vehicles, which support the City’s
effort to reduce greenhouse gases
and climate change.
Project Funding Sources:
Transit Enterprise Fund
Attachment 3, Page 19 of 19
Project Status Notes Cost Priority
drainage grate upgrades at San Luis Drive (north of
Johnson), California at CHP office, 2 at Santa Barbara at
Broad, Broad SB near South Street, Madonna near S.
Higuera high
green bike lanes on LOVR on areas left over from the 2017
paving high
Improvements to path between Sinsheimer Park and RRST
request forwarded to
School District
School Dist not able to bring
improvements at this time medium
sharrow on Monterey st by the Fremont theatre medium
Actuation for Bikes on Broad and Upham crossing medium
Ped and bike crossing improvements on South St at King medium
flip stop signs on Morro and Pismo to favor bike blvd medium
Ped improvements on South St at King medium
Address car parking in bike lane on EB South St medium
pavement maintenance at Monday Club bridge over creek low
correct light angled on Jennifer St bridge
need clarification of
light location low
install sharrows and signage on Chorro between Palm and
Monterey
anticipated as part of
Broad Street Bike
Blvd construction low
King Street to Meadow Park ramp low
drainage issues in bike lane on Orcutt near Tank Farm low
flip yield sign on Jennifer Street bridge low
removal of bollards on pathway at Exposition and Bridge
streets low
Remove/move side railing on Jennifer Street Bridge low
replace concrete landing on Jennifer Street Bridge complete!$20k high
2018 summer paving plan improvements complete!high
Bollard removed on the Jennifer Street Bridge driveway
ramp Completed!low
bike box at Chorro / Foothill Completed!medium
bike lane improvements on LOVR bridge Completed!high
Remove parking on California Street at Higuera to
improve sight distance Completed!low
green bike lanes in front of Marigold Plaza on Los Osos
Valley Road Completed!high
Parking removed on California Street at Higuera to
improve sight distance for bike lane Completed!medium
improve delination between bike lane and travel lane on Completed!medium
green bike lanes on Santa Rosa at Olive completed!high
Improve delineation between bike lane and travel lane on
southbound S. Higuera to Madonna Rd completed!high
Remove bollards on the path behind Monday Club Completed! high
removal of three parking spaces on NB California Blvd at
Marsh Completed!high
Remove single bollard on Railroad Safety Trail at
George/Jennifer Street trailhead Completed!
The three bollards on the curb
ramp make this single bollard
on the trailhead redundant high
Yield markings and a push button beacon at the Broad
Street at Upham ped crossing Completed!high
Last Updated: 11/26/2018
Minor Bike Project Wish List: Annual Allocation $100k
Attachment 4, Page 1 of 1